CN1299906A - Long distance delivery of fresh water from river mouth - Google Patents

Long distance delivery of fresh water from river mouth Download PDF

Info

Publication number
CN1299906A
CN1299906A CN 00131317 CN00131317A CN1299906A CN 1299906 A CN1299906 A CN 1299906A CN 00131317 CN00131317 CN 00131317 CN 00131317 A CN00131317 A CN 00131317A CN 1299906 A CN1299906 A CN 1299906A
Authority
CN
China
Prior art keywords
fresh water
water
outlet
river
rivers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 00131317
Other languages
Chinese (zh)
Other versions
CN1185390C (en
Inventor
孙克锟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB001313177A priority Critical patent/CN1185390C/en
Priority claimed from CNB011094478A external-priority patent/CN1236128C/en
Publication of CN1299906A publication Critical patent/CN1299906A/en
Application granted granted Critical
Publication of CN1185390C publication Critical patent/CN1185390C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The present invention relates to once more utilization of fresh water resource of estuary of river and long-distance transmission by means of ocean to raise the economic performance of fresh water. Said invention is specially suitable for long-distance transmission of lots of fresh water of global great river, for example it can supply fresh water for desert area, and can improve the ecological environment of said area, and features small investment, convenient construction and low cost.

Description

The remote conveying of fresh water from river mouth
The freshwater resources that the present invention relates to the rivers estuary utilize once more, the method that the fresh water of rivers estuary is carried at a distance by the ocean.
As everyone knows, the earth surface ocean accounts for 71%, land accounts for 29%, but human freshwater resources and rareness thereof of depending on for existence, accounts for that 70% freshwater resources concentrate on the South Pole and area, Greenland is difficult to utilize.Along with the increase of global population, expanding economy, freshwater resources are deficient day by day, the minimizing of whole world tree and grass coverage, the desertification degree further enlarges, and urban water supply day is becoming tight, the ecological environment in the whole world is worsened day by day, had influence on the sustainable development of global economy.From another angle analysis, the last region-by-region freshwater resources of the earth are still very abundant, as basin, South America Amazon, the basin, the Congo in Africa, the Yangtze river basin in Asia etc.Because these regional freshwater resources are abundant, a large amount of fresh water also do not make full use of, and but flow into the ocean endlessly.
When people stepped into 21 century, people recognized to have only freshwater resources are increased income and throttling, improve the utilization rate of freshwater resources, could improve the ecological environment in the whole world, could keep the global economy sustainable development.
At present the method for countries in the world regulating pondage normally: from the upper, middle and lower reaches of the abundant regional rivers of freshwater resources, extract certain fresh water amount by pumping plant, be transported to the area that lacks fresh water from land after pressurizeing.This method has following deficiency: 1, regulating pondage generally can not be too big, because when extracting rivers middle and upper reaches fresh water, will have influence on the output of downstream river.2, lay a considerable amount of sloots or pipeline on land, can be subjected to the restriction of geographical environment, as the restriction of mountains and rivers, rivers cities and towns, industrial facility.3, the sloot of being built, pipeline, unavoidably occupy the land resources in a large amount of farmlands, so construction cost is higher.
In view of the deficiency of said method, task of the present invention proposes a kind of method that the fresh water of rivers estuary is utilized once more, and by the ocean fresh water of rivers estuary is carried out long distance and carry, and has improved the economy that freshwater resources use.
A large amount of fresh water that the present invention is specially adapted to global great rivers mouth carry out the long distance conveying, and it is few to have investment cost, and it is convenient to build, the characteristics that cost is low.
Advantage of the present invention is: the pipeline that is laid in the ocean does not take the land resources that the mankind depend on for existence; Secondly, the pipeline of being laid in the ocean can be considered the deadweight of fresh water in the pipeline, even lay huge bore pipeline because external and internal pressure is equal substantially, the wall thickness of pipeline can design very thinly, so the cost of pipeline material is significantly less than the cost of land tubing; Once more, the fresh water pipeline that is laid in the ocean generally is laid on the continental shelf, and the depth of water is more shallow, and construction cost is lower.Four, the long distance of fresh water conveying in the pipeline in the ocean need not energy consumption.
Typical example as: river mouth, the Congo by Africa and the river mouth, the Amazon of South America draw gets a certain proportion of fresh water, if get the 10-20% that above-mentioned river on average flows into the ocean fresh water amount for many years by drawing, can obtain about 1600 billion cubic meters of year estuary and 3500 billion cubic meter fresh water respectively, lay conduit pipe from the continental shelf in seabed, the Atlantic Ocean, west coast of Africa respectively, cross the conduit pipe in seabed, the Atlantic Ocean with laying from the river mouth, the Amazon of South America, fresh water is carried in area, African the Sahara and Arabic area to 7,700,000 square kilometres of areas, build two parallel artificial main stems from West to East in the area, Sahara Desert, and build river course or the pipe network that connects two artificial main stems: draw the seabed conduit pipe of getting fresh water from river mouth, the Amazon and land from Morocco's south seashore, the artificial main stem of building is by way of Algeria, Libya, Egyptian, through Sinai, enter the Palestine in Arabic area again, Israel, Jordan, finally deliver into the Saudi Arabia area in the Arabia Peninsula; Draw the seabed conduit pipe of getting fresh water from river mouth, the Congo and land from Mauritanian seashore, the artificial main stem of construction is by way of Mali, the Niger, Chad, turn to north within the border in the Sudan, and domestic and another artificial main stem converges in Egypt.Because area, the Sahara physical features is comparatively smooth, generally carries fresh water from stream mode, as long as increase a small amount of force feed pumping plant.The present invention can thoroughly change the ecological environment in area, Sahara Desert and Arabic area, and above-mentioned area is transformed into forest, grassland and farmland, also helps the exploitation of underground mine resource.Be benefited area in ten thousand square kilometres of scopes of 400-500, thereby can obtain huge economic benefit and social benefit.
And for example drawing and get the about 1200-1800 billion cubic meter of Chinese the Changjiang river year estuary fresh water, is that main irrigating gate draws and gets fresh water from the Changjiang river estuary of Chongming Island north side, by being laid on seabed, Huanghai Sea continental shelf conduit pipe, supplies water to Beijing, Tianjin after entering marine site, the Bohai Sea.The Huanghai Sea continental shelf depth of water is more shallow, and pipeline generally is laid in the sea water advanced scope of 60-80 rice.Its main fresh water amount seashore between Qinhuangdao and Jinzhou City lands, cross by the cascade pumping station force feed and to exert Shandong youngster's Tiger Mountain, after entering Nei Mongol Plateau, fresh water is carried in main master stream westwards, north side, the Yinshan Mountains by way of the Yellow River river bend enters the north, Gansu Province, Bosten until Xinjiang, and replenish the water source to exhausted day by day Tarimhe River; And can carry the branch of fresh water to pass tower lattice desert, khoum to Xinjiang, along the Ruoqiang in southern side, Tarim Basin and the end, the people live in plenty and a line such as field, Yecheng is carried fresh water.The Takla Makan Desert that takes up an area of 330,000 square kilometres is transformed into forest, grassland and farmland; By the Altun mountain pass again through the cascade pumping station force feed, the desert area of carrying fresh water to enter the Caidamu Basin from the northwestward, Qinghai Province, another road fresh water northwards along the Turpan Basin west side through Urumchi, until the Junggar Basin, to support the exploitation of mineral reserve such as these regional oil, natural gas.Carry the fresh water amount in year 600-800 billion cubic meter scope to Xinjiang.Effectively like this improved the situation that these areas, the Chinese north seriously lack fresh water.Because these areas belong to Nei Mongol Plateau, physical features is comparatively smooth, and the underground mine resource is very abundant, the existing mineral reserve such as oil, natural gas of developing.These regional physical features are generally in the altitude range of height above sea level 1000-2000 rice, the river rareness, therefore by the excavation river course, carry fresh water from stream mode, as long as increase a small amount of force feed pumping plant, under the less fund condition of input ratio, can obtain its great economic benefit and social benefit, strong support transfering natural gas from the west to the east and development of the West Regions, increase the cultivated area of China greatly.If draw the fresh water of getting coastal area of southeastern China such as the Zhujiang River, the Min River, the Oujiang River rivers estuary again, can transform the Desert of Gobi that comprises People's Republic of Mongolia like this.The benefited area that fresh water is carried is in ten thousand square kilometres of scopes of 150-250.
Suggestion is built two and is striden the Bohai Haixia and stride the highway and the railway major paths of Liaodong Wan in the Bohai Sea: stride Bohai Haixia highway and railway bridge building in the Lvshun city in Liaoning Province, through the island, mausoleum of Shandong Province archipelago to Penglai City; Stride the highway of Liaodong Wan and a large amount of silts that the railway major path utilizes deposition in the bay, build between the Changxing Island in Qinhuangdao, Hebei province and Liaodong Peninsula, and below two gulf over strait passages, having can be by the navigation ability of 20-30 ton boats and ships.Shorten transportation range greatly, improved transport capacity along Bohai Sea Area, strong promotion the ring economic zone, the Bohai Sea development.
Liaodong Wan is set up in suggestion becomes open fresh water storage areas, promptly stores fresh water at dry year.
The present invention show for typical example: the fresh water by the rivers estuary utilizes once more, these regional ecological environments have been changed effectively, above-mentioned area is transformed into forest, grassland and farmland, guaranteed Africa and Asia sustainable economic development, had profound significance to the improvement of world's ecological environment with to development of world economy.
Feature of the present invention is below the sea level, fresh water district of rivers estuary, the fresh water inlet tube that quantity does not wait is set, and link to each other with the house steward who is laid on marine bottom, the house steward of marine bottom is stretched over the area that lacks fresh water always, and pump works is set on this ground, be transported to the water-deficient area after drawing the fresh water pressurization of getting in the house steward, or below the sea level, fresh water district of rivers estuary, after the fresh water inlet duct that is provided with converges, after the water pump pressurization, the house steward through being laid on marine bottom is transported to the water-deficient area again.Again according to the difference of purposes, fresh water is handled or is directly used, and inlet tube when drawing fresh water to the filtration of mechanical admixture, all do not belonged to scope of the present invention.
Essence of the present invention is that huge being similar to " U " type communicating pipe is set in the ocean, one of communicating pipe is arranged on horizontal plane below, fresh water from river mouth district, the other end lacks fresh water area or in the neighbourhood for the water outlet pipe is arranged on, when water pump extracts the fresh water of outlet, according to the principle of communicating pipe, the fresh water in river mouth will replenish in the automatic flow ipe.
The invention is characterized in the inlet duct that is arranged on the fresh water from river mouth district, can be in charge of by some and form, draw fresh water simultaneously after, two kinds of way of supplying water 1 are arranged, earlier after the water pump pressurization, the house steward through being laid on marine bottom is transported to the water-deficient area again.2, the house steward of fresh water at the bottom of being laid on the ocean that suck of effluent mouth, pump works extracts fresh water from house steward's outlet conduit, is transported to the user after the pressurization, or both combine and carry.
The invention is characterized in that the height of laying the pump works behind the marine bottom house steward outlet conduit has dual mode: 1, the pump intake height is arranged on b.s.l..2, the pump intake height is arranged on more than the sea level.Fig. 1 as can be known, because pump works is arranged on b.s.l., must build dam, the height of pump works and the distance on sea level are big more, the height of dam is high more, then the investment of pump works is big more, but the flow velocity of fresh water has increased in the house steward of seabed, and caliber has reduced, Fig. 2 as can be known, carry out force feed after directly extracting fresh water by pump works, flow velocity increases, and it is less therefore to lay marine bottom house steward caliber.Fig. 3 is as can be known because pump works is arranged on more than the sea level, and the pump works investment reduces, but seabed house steward's caliber is bigger, and outlet can expand to bigger fresh water district.
The invention will be further described below in conjunction with accompanying drawing:
Fig. 1, the fresh water from river mouth schematic diagram that after the seabed house steward carries, pressurizes.
Fig. 2, fresh water from river mouth pressurize after seabed house steward's conveying principle figure.
Fig. 3, fresh water from river mouth pressurized delivered schematic diagram that after the seabed house steward carries, draws water.
Fig. 1 is the fresh water from river mouth schematic diagram that pressurizes after the seabed house steward carries.。
It is characterized in that: the marine bottom below the sea level, fresh water district of rivers estuary is provided with fresh water delivery main 2, its the fresh water inlet tube mouth of pipe 1 is arranged on the below on seawater plane (or fresh water plane) of fresh water district B of the estuary of rivers A, and link to each other with delivery main 2, with the height on sea level be L, delivery main 2 outlet 3 is arranged on and lacks light district or near the land place that lacks the fresh water district.The pump works 5 set on this ground can be below the sea level, and water pump 5 inlets are H apart from sea level altitude, and behind outlet 3 interior extraction fresh water, through pipeline 4, water pump 5 pressurizations are after outlet conduit 6 delivery user.
Fig. 2 is that the fresh water from river mouth pressurization is after seabed house steward's conveying principle figure.
It is characterized in that: after extracting fresh water by the fresh water district B fresh water inlet tube 1 of rivers river mouth A, after water pump 5 pressurizations, the delivery main 2 who enters submarine laying, by outlet 3 and be provided with: delivery main 4 on land is transported to the user.
Fig. 3 to be fresh water from river mouth draw water after the seabed house steward carries pressurized delivered schematic diagram.
It is characterized in that: pump works 5 is arranged on the land 7 that lacks fresh water more than the sea level, according to this figure as can be known: the delivery main 2 who is laid on the seabed, its the fresh water inlet tube mouth of pipe 1 is arranged on the below on seawater plane (or fresh water plane) of fresh water district B of the estuary of rivers A, pump works 5 is drawn fresh water in delivery main 2 outlet 3, after water pump 5 pressurizations by pipeline 6 delivery user.

Claims (3)

1. be laid on the fresh water manifold system in the ocean.It is characterized in that:
It by the inlet tube system 1 that is arranged on rivers estuary A fresh water district B, (inlet tube system 1 can be made up of being in charge of of not waiting quantity; Respectively be in charge of to converge and then link to each other with house steward, respectively being in charge of the height that the mouth of pipe must be lower than the sea level converges), the house steward 2, the water outlet pipe 3 that are laid in the ocean are formed, and the pump works 5 that is arranged on b.s.l., by the fresh water that intake pipe 4 extracts in the outlet 3, pressurization is after outlet 6 delivery user.
2. fresh water manifold system according to claim 1.It is characterized in that:
After extracting fresh water by the fresh water district B fresh water inlet tube system 1 of rivers river mouth A, after water pump 5 pressurizations, the delivery main 2 who enters submarine laying is transported to the user by outlet 3 and the delivery main 4 that is arranged on the land.
3. fresh water manifold system according to claim 1.It is characterized in that:
Pump works 5 is arranged on the land 7 that lacks fresh water more than the sea level, be laid on the delivery main 2 in seabed, its the fresh water inlet tube mouth of pipe 1 is arranged on the below on seawater plane (or fresh water plane) of fresh water district B of the estuary of rivers A, pump works 5 is drawn fresh water in delivery main 2 outlet 3, after water pump 5 pressurizations by pipeline 6 delivery user.
CNB001313177A 2000-07-13 2000-10-24 Long distance delivery of fresh water from river mouth Expired - Fee Related CN1185390C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB001313177A CN1185390C (en) 2000-07-13 2000-10-24 Long distance delivery of fresh water from river mouth

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN00119447.X 2000-07-13
CNB001313177A CN1185390C (en) 2000-07-13 2000-10-24 Long distance delivery of fresh water from river mouth
CNB011094478A CN1236128C (en) 2000-09-20 2001-03-12 Discharge controller for washing machine

Publications (2)

Publication Number Publication Date
CN1299906A true CN1299906A (en) 2001-06-20
CN1185390C CN1185390C (en) 2005-01-19

Family

ID=34523578

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB001313177A Expired - Fee Related CN1185390C (en) 2000-07-13 2000-10-24 Long distance delivery of fresh water from river mouth

Country Status (1)

Country Link
CN (1) CN1185390C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102388792A (en) * 2011-07-19 2012-03-28 胡孟春 Wind-energy and solar-energy desert water delivery sand-culture technical equipment
CN104790466A (en) * 2014-12-25 2015-07-22 浙江诺顿园林建设有限公司 Multi-branch long-distance pressure water delivery system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101387120B (en) * 2007-09-14 2010-09-29 中台资源科技股份有限公司 Water intake system of sea water

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102388792A (en) * 2011-07-19 2012-03-28 胡孟春 Wind-energy and solar-energy desert water delivery sand-culture technical equipment
CN104790466A (en) * 2014-12-25 2015-07-22 浙江诺顿园林建设有限公司 Multi-branch long-distance pressure water delivery system

Also Published As

Publication number Publication date
CN1185390C (en) 2005-01-19

Similar Documents

Publication Publication Date Title
CN103866750B (en) Barren hill is conserved water and soil spiral zanjon
Webb et al. Karst evolution of the Nullarbor plain, Australia
US20140193201A1 (en) River bottom siphon for hydro-electric generation and irrigation
CN1185390C (en) Long distance delivery of fresh water from river mouth
Schneeberger The Kerayan-Kalabit Highland of Central Northeast Borneo
Angelakis et al. Aqueducts during the Minoan era
CN107466665B (en) Sand land water and soil conservation system and method
CN102870651A (en) Underground water storage infiltrating irrigation system
Garbell The Jordan Valley plan
CN107724447A (en) The small-sized channel cleanout in south and dirt water farmland utilization system and its application method
Jain et al. Ganga basin
CN107687156A (en) A kind of rapidly solidified device of blast-filled ground
Alaibakhsh et al. Water resource management with a combination of underground dam/qanat and site selection of suitable sites using GIS
CN102561250A (en) Water delivery and storage method and siphon system
CN201517205U (en) System for utilizing natural runoffs of mountain
Ozis et al. Water works of ancient civilizations
Du et al. History of water supply in pre-modern China
CN205242501U (en) Deep water intaking facility of nearly bank down --hole is adopted in circulating water water intaking
Gungor International water transfer project: Nortern Cyprus Turkish Republic water supply project (TRNC)
Elvin et al. Man Against the Sea: Natural and Anthropogenic Factors in the Changing Morphology of Harngzhou Bay, circa 1000-1800
CN101235630A (en) Desert ecological city
CN111705740A (en) Water-binding sand-attacking tunnel-culvert pipeline formed by splicing reinforced concrete five parts and used for double-dragon underground river
Greenshields Water has a key role
Bolonkin Extraction of freshwater and energy from atmosphere
Nikolaou et al. Evolution of Cretan, Greece Aqueducts

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050119

Termination date: 20121024