CN1287058C - Light steel paired joist connection structure and its connection method - Google Patents

Light steel paired joist connection structure and its connection method Download PDF

Info

Publication number
CN1287058C
CN1287058C CN 01123914 CN01123914A CN1287058C CN 1287058 C CN1287058 C CN 1287058C CN 01123914 CN01123914 CN 01123914 CN 01123914 A CN01123914 A CN 01123914A CN 1287058 C CN1287058 C CN 1287058C
Authority
CN
China
Prior art keywords
tenon
auxiliary keel
light steel
keel body
paired joist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 01123914
Other languages
Chinese (zh)
Other versions
CN1400370A (en
Inventor
张福长
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=4665360&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN1287058(C) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CN 01123914 priority Critical patent/CN1287058C/en
Publication of CN1400370A publication Critical patent/CN1400370A/en
Application granted granted Critical
Publication of CN1287058C publication Critical patent/CN1287058C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The present invention discloses a light steel paired joist connection structure and a connection method thereof, which belongs to a light steel joist for a building. The present invention is characterized in that a connecting piece is not connected between two paired joist bodies which are provided with grooves; a tenon is arranged at one end of one paired joist body, and clamping hooks which outward bulge are arranged on both lateral walls of the tenon; clamping grooves are respectively arranged on both lateral walls of one end of the other paired joist body, and the clamping grooves are matched with the clamping hooks on the tenon. A novel light steel paired joist connection structure is formed as long as the tenon of one paired joist body is inserted into a groove of another paired joist body until the clamping hooks on both of the two lateral walls of the tenon of the paired joist body are fit with the clamping grooves of both sides of the end of another paired joist body. The novel connection structure is used for the lengthening connection of light steel paired joists. The present invention has the advantages of high integral strength, convenient construction, good stability and low cost.

Description

Syndeton of light steel paired joist and attaching method thereof
Technical field
The present invention relates to syndeton of a kind of lightgage steel joist for building, especially light steel paired joist and attaching method thereof.
Background technology
The inventor once invented " automatic connecting light steel keel ", China Patent No.: 97231611.6, only solve main joist and do not wanted the problem of spreading annex, but because rider keel is different with the structure of main joist, if cancellation spreading annex is inconvenient, therefore the connection new construction of rider keel is failed to solve always, for with the light steel paired joist spreading, the syndeton of traditional light steel paired joist, remain between two rider keels, for example the connection between A auxiliary keel body and the B auxiliary keel body is by a special connector, these connector two ends insert in respectively in the groove of A auxiliary keel body and B auxiliary keel body end, reach the purpose of connection of two rider keels or spreading rider keel, but this connection has following deficiency: because the fit clearance between rider keel and the connector is big, the abutment is often very loose, the accuracy and the safety of spreading clinch are low, construction inconvenience is produced and managerial trouble link owing to this connector needs special production to increase again, and cost is also higher.
Summary of the invention
The problem to be solved in the present invention is the connector that will cancel between two rider keels, provides a kind of and can make direct-connected new syndeton and new method of attachment thereof between two light steel paired joists, makes bulk strength height, easy construction.
For addressing the above problem, solution of the present invention is: a kind of syndeton of light steel paired joist, comprise A auxiliary keel body with groove shape and with the identical B auxiliary keel body of its section structure, it is characterized in that: an end of described A auxiliary keel body is provided with the same head, is respectively equipped with outwards outstanding grab on this tenon two side; Be respectively equipped with draw-in groove outwards outstanding and that be complementary with grab on the above-mentioned tenon two side on the two side of described B auxiliary keel body one end.
Grab on the described tenon two side is extreme direction inclination outside tenon; The cross dimensions of described tenon is greater than the cross dimensions of above-mentioned A auxiliary keel body, and this tenon two side is recessed, and its top is plane.
Connection Step is as follows: get A auxiliary keel body and B auxiliary keel body, connect therebetween and do not need any connector, but the tenon of A auxiliary keel body one end is directly inserted in the groove of B auxiliary keel body one end, and continue deeply, till the draw-in groove on grab on this tenon two side and the two side, B rider keel one end matches, promptly finish fixedly connected between two rider keels.
After adopting technique scheme, the present invention has following beneficial effect against existing technologies:
Because the connector in the middle of the syndeton of this light steel paired joist has been cancelled, syndeton is simplified, links such as the production of connector and handling of goods and materials have been saved, easy construction, the efficient height, cost is low, as long as the tenon of an auxiliary keel body is directly inserted in the groove of another auxiliary keel body, grab on the A rider keel tenon two side and the draw-in groove on the B rider keel two side are matched, it is formed a fixed connection, the bulk strength that connects improves, tie point can not become flexible, safe and reliable, accuracy and good stability, no external force acts on B auxiliary keel body groove two side, then two auxiliary keel bodies cannot separate, thereby this connection structure connecting is simple, the method facility, quality is good.
Description of drawings
Fig. 1 is the syndeton of light steel paired joist of the present invention, the perspective view that A auxiliary keel body and B auxiliary keel body are connected as one.
Fig. 2 be the syndeton of light steel paired joist of the present invention be decomposed into or connect before the A auxiliary keel body and the perspective view of B auxiliary keel body.
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present invention is described in further detail.
As depicted in figs. 1 and 2, the syndeton of light steel paired joist of the present invention comprises A auxiliary keel body 1 and the B auxiliary keel body 2 with groove shape, both section structures are identical, it is characterized in that: be provided with a tenon 3 (left part of A rider keel 1 in referring to Fig. 2) in an end of above-mentioned A auxiliary keel body 1, be respectively equipped with outwards outstanding grab 4 on the two side of this tenon 3, and tilt to the outer extreme direction of tenon 3, present embodiment is to be made by punching press, the cross dimensions of this tenon 3 is less than the cross dimensions of its auxiliary keel body 1, the two side of this tenon 3 is recessed, and its top is plane; Be respectively equipped with draw-in groove 5 on the two side of above-mentioned B auxiliary keel body 2 one ends, the grab 4 on this draw-in groove 5 and above-mentioned tenon 3 two sides is complementary.
The syndeton of above-mentioned light steel paired joist, its method of attachment step is: get two auxiliary keel bodies, for example A auxiliary keel body 1 and B auxiliary keel body 2, connection therebetween is without any need for connector, but directly insert the tenon 3 of A auxiliary keel body 1 one ends (present embodiment is a left end) in the groove 6 of B auxiliary keel body 2 one ends (present embodiment is a right-hand member), and continue deeply, till the draw-in groove 5 on grab on these tenon 3 two sides 4 and the two side, B auxiliary keel body 2 right part matches, promptly finish fixedly connected between two rider keels, become a kind of new Joining Structure of light steel paired joist.

Claims (2)

1. the syndeton of a light steel paired joist, comprise A auxiliary keel body with groove shape and with the identical B auxiliary keel body of its section structure, it is characterized in that: an end of described A rider keel is provided with a tenon, is respectively equipped with outwards outstanding grab on this tenon two side; Be respectively equipped with on the two side of described B auxiliary keel body one end with above-mentioned tenon two side on the draw-in groove that is complementary of grab; The grab of described tenon two side is to the tenon outer end to tilt respectively; The cross dimensions of described tenon is less than the cross dimensions of above-mentioned A auxiliary keel body, and this tenon two side is recessed, and its top is plane.
2. the method for attachment of the syndeton of a light steel paired joist as claimed in claim 1, it is characterized in that Connection Step is as follows: get A auxiliary keel body and B auxiliary keel body, the tenon of A auxiliary keel body one end is directly inserted in the groove of B auxiliary keel body one end, till the draw-in groove on grab on this tenon two side and the two side, B auxiliary keel body one end matches, promptly finish fixedly connected between two rider keels.
CN 01123914 2001-08-02 2001-08-02 Light steel paired joist connection structure and its connection method Expired - Fee Related CN1287058C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01123914 CN1287058C (en) 2001-08-02 2001-08-02 Light steel paired joist connection structure and its connection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01123914 CN1287058C (en) 2001-08-02 2001-08-02 Light steel paired joist connection structure and its connection method

Publications (2)

Publication Number Publication Date
CN1400370A CN1400370A (en) 2003-03-05
CN1287058C true CN1287058C (en) 2006-11-29

Family

ID=4665360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01123914 Expired - Fee Related CN1287058C (en) 2001-08-02 2001-08-02 Light steel paired joist connection structure and its connection method

Country Status (1)

Country Link
CN (1) CN1287058C (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2011355484A1 (en) * 2011-01-13 2013-08-29 Cimc Containers Holding Company Ltd. Light steel keel connecting structure
CN108316527A (en) * 2017-04-28 2018-07-24 湖南省金为新材料科技有限公司 Curtain skeleton bigeminy connection structure
CN106948531B (en) * 2017-04-28 2018-05-18 湖南省金为新材料科技有限公司 Curtain skeleton internal connecting type bigeminy connection structure
JP7319150B2 (en) * 2019-09-12 2023-08-01 ニチハ株式会社 Architectural brackets, building wall structures, and board construction methods

Also Published As

Publication number Publication date
CN1400370A (en) 2003-03-05

Similar Documents

Publication Publication Date Title
CA2332442A1 (en) Frp roofing member manufacturing method, and its connecting structure and connecting method
CN1287058C (en) Light steel paired joist connection structure and its connection method
CN1018173B (en) Escalator main frame and angle member method of making joint portion thereof
KR20180042552A (en) Profile connector
CN2486646Y (en) Connection structure of light steel false keel
KR101598761B1 (en) Wood Columns Corporate Body
CN210944614U (en) Novel tower arm connecting device
CN102725460B (en) Truss structure
CN2801933Y (en) High strength assemblied I-beam
JPH10252142A (en) Joint construction for steel frame member
CN211622004U (en) Assembled square tube steel structure
CN212836264U (en) Assembled stair binding structure
CN215053888U (en) High-strength C-shaped steel
CN207559912U (en) A kind of dead-weight photovoltaic system of Fast Installation
CN215623433U (en) Assembled square paper tube tray structure
CN212405495U (en) Precast concrete
CN212405496U (en) Connecting device for concrete prefabricated parts
CN1093586C (en) Automatic connecting light steel keel and its connecting method
CN215865785U (en) Split type butt joint connection structure
CN204826225U (en) Singly, two thin wall in -flanges C shaped steel cross connection heads and connection structure
CN2327751Y (en) Supporting truss of electric ascending/descending scaffold
CN210860620U (en) Convenient part is consolidated to H shaped steel
CN2931228Y (en) Composite-type connection joint
CN211597060U (en) Main and secondary beams for steel building structure and connecting structure thereof
CN219931407U (en) First column, second column and combined column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20061129

Termination date: 20150802

EXPY Termination of patent right or utility model