CN1283545C CNB2005100464172A CN200510046417A CN1283545C CN 1283545 C CN1283545 C CN 1283545C CN B2005100464172 A CNB2005100464172 A CN B2005100464172A CN 200510046417 A CN200510046417 A CN 200510046417A CN 1283545 C CN1283545 C CN 1283545C
Authority
CN
China
Prior art keywords
bracket
cantilever beam
drilling
platform
ratchet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2005100464172A
Other languages
Chinese (zh)
Other versions
CN1687533A (en
Inventor
纪卓尚
林焰
陈明
张明霞
于雁云
郑玄亮
王运龙
刘阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CNB2005100464172A priority Critical patent/CN1283545C/en
Publication of CN1687533A publication Critical patent/CN1687533A/en
Application granted granted Critical
Publication of CN1283545C publication Critical patent/CN1283545C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention relates to a movable bracket of a cantilever beam of a petroleum drilling platform, which belongs to the field of devices of petroleum drilling platforms. The movable bracket of a cantilever beam of a petroleum drilling platform adopts a quadrate framework structure which is composed of four bracket bases, two bracket longitudinal beams and two bracket cross beams, the lower part of each bracket base which is arranged in one of four corners of the quadrate framework is provided with a slide way, the movable bracket can transversely move on the slide ways below the bracket, the upper part of each bracket base is provided with a slide way which a cantilever beam and the slide ways on the bracket can longitudinally move on, and a drill tower is fixed at the tail end of the cantilever beam. A driving device which can transversely and longitudinally move is especially arranged in the movable bracket, and the movable bracket can conveniently and accurately position the drill tower in the position needs drilling. The present invention has the advantages of simple structure and reliable work, the bearing situation of the cantilever beam is particularly improved, the drilling capacity of the drilling platform is enhanced, the drilling depth is increased, and the efficiency and the economy of well drilling are further improved.

Description

Movable bracket of cantilever beam on platform of drilling for oil
Technical field
The present invention relates to a kind of movable bracket of cantilever beam on platform of drilling for oil, it belongs to the oil drilling platform apparatus field.
Background technology
Jack-up drilling unit is the basic drilling well facility that carries out the marine oil field drilling operation, is made up of platform main body, liftable spud leg and the cantilever beam that can do to move forward and backward on platform deck.The cantilever beam tail end is equipped with boring tower, and when cantilever beam moves when stretching out outside the drilling platform stern backward, its boring tower is in outside the aft end, and rig is in control position, can carry out drilling operation.When cantilever beam moves forward, when making boring tower partly be recovered to the hull tail end, rig is in the platform deck top, and platform is in non-drilling operation state.Therefore, boring tower need have the vertical and horizontal locomotive function, to realize the adjustment of drilling well position.The method that adopts usually that moves of jack-up drilling unit boring tower position is now: longitudinally establish intermeshing slideway with the cantilever beam lower surface on platform deck, with the cylinder pushes cantilever beam, whole cantilever beam can be moved forward and backward, thereby realize vertically moving of boring tower; Plane and boring tower bottom surface with the cylinder pushes boring tower, are realized the side travel of boring tower along laterally establishing intermeshing slideway on the cantilever beam tail end.The shortcoming of this move mode is: travel mechanism divides two-layer up and down, complex structure; When boring tower when side travel makes boring tower position deviation cantilever beam longitudinal centerline because cantilever beam bears eccentric load, its load-carrying capacity descends, and the boring tower top hook load of sign drilling capacity is reduced, drilling depth reduces.
Summary of the invention
For the boring tower that overcomes existing oil drilling platform move existence between topic, the invention provides a kind of movable bracket of cantilever beam on platform of drilling for oil, this movable bracket of cantilever beam should simple in structure, reliable operation; Under any circumstance, cantilever beam can not bear eccentric load, thereby improves the flat-bed drilling capacity.
The technical solution adopted for the present invention to solve the technical problems is: a kind of movable bracket of cantilever beam on platform of drilling for oil, and it mainly comprises drilling platform, boring tower and a cantilever beam, cantilever beam one end that boring tower is housed can reach the outside of drilling platform.It also comprises a movable support bracket, and movable support bracket is by four bracket bases, two pallet stringers and two quadras that the carriage crossbeam is formed, and bracket base is positioned at four jiaos of quadra.Bottom at bracket base is provided with horizontal concrete chute, and horizontal concrete chute matches with two carriage glide paths that are fixed in the drilling platform afterbody, respectively is provided with a horizontal mobile device in the carriage crossbeam; Be provided with vertical chute on the top of bracket base, vertically chute matches with two carriage bilge logss that are positioned at the cantilever beam bottom, respectively is provided with a longitudinal moving device in pallet stringer.In the horizontal concrete chute of bracket base bottom, be provided with liner and lower liner; In vertical chute on bracket base top, be provided with liner and lower liner.Longitudinal moving device is fixed on the pallet stringer through first otic placode and the first ratchet bearing, is provided with ratchet holes on the base plate of carriage bilge logs, and ratchet holes matches with first ratchet.Horizontal mobile device is fixed on the carriage crossbeam through second otic placode and the second ratchet bearing, is provided with ratchet holes on the panel of carriage glide path, and ratchet holes matches with second ratchet.
The guiding theory of technique scheme is: because movable support bracket is a quadra, bracket base is positioned at four jiaos of quadra, is provided with horizontal concrete chute in the bottom of bracket base, and top is provided with vertical chute.Therefore, the cantilever beam that afterbody is equipped with boring tower can move forward and backward by vertical chute, and the movable support bracket of carrying boring tower and cantilever beam can be made sway by horizontal concrete chute.As seen have only between movable support bracket and platform and the cantilever beam to have relative displacement, and the position between boring tower and the cantilever beam is changeless that the force-bearing situation that this has just improved cantilever beam has improved the load-carrying capacity of cantilever beam.
The invention has the beneficial effects as follows: this movable bracket of cantilever beam on platform of drilling for oil, owing to adopt by four bracket bases, two pallet stringers and two movable support brackets that the carriage crossbeam is formed, the bottom that is positioned at four jiaos bracket base is provided with the chute that makes movable support bracket make cross motion, top is provided with the chute that cantilever beam is travelled longitudinally, and boring tower is the tail end that is fixed on cantilever beam.This movable support bracket can make the position that boring tower correctly is positioned at needs work easily, and simple in structure, reliable operation, especially improved the load situation of cantilever beam, improved the drilling capacity of drilling platform, increased drilling depth, drilling efficiency and economy are further enhanced.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples.
Fig. 1 is a kind of front view of movable bracket of cantilever beam on platform of drilling for oil.
Fig. 2 is that the H shown in Fig. 1 is to view.
Fig. 3 is the A-A cutaway view shown in Fig. 1.
Fig. 4 is the B-B cutaway view shown in Fig. 3.
Fig. 5 is the C-C cutaway view shown in Fig. 3.
Fig. 6 is the F enlarged drawing shown in Fig. 1.
Fig. 7 is with the F-F shown in Fig. 8 (the first oil cylinder line of centers) cutaway view.
Fig. 8 is the D-D cutaway view shown in Fig. 6.
Fig. 9 is the G enlarged drawing shown in Fig. 2.
Figure 10 is with the G-G shown in Figure 11 (the second oil cylinder line of centers) cutaway view.
Figure 11 is the E-E cutaway view shown in Fig. 9.
Among the figure: 1, bracket base, 2, pallet stringer, 3, the carriage crossbeam, 4, the carriage glide path, 4a, last liner, 4b, lower liner, 4c, ratchet holes, 5, cantilever beam, 5a, the carriage bilge logs, 5b, last liner, 5c, lower liner, 5d, ratchet holes, 6, first oil cylinder, 6a, second oil cylinder, 7, first push rod, 7b, second push rod, 7a, the first fork-shaped plate, 7c, the second fork-shaped plate, 8, first otic placode, 8a, second otic placode, 9, first bearing pin, 9a, second bearing pin, 10, the first ratchet bearing, 10a, the second ratchet bearing, 11, first ratchet, 11a, second ratchet, 12, first bearing pin, 12a, second bearing pin, 13, first weight, 13a, second weight, 14, the first hammer carriage, 14a, the second hammer carriage, 15, first backing plate, 15a, second backing plate, 16, bearing, 17, boring tower, 18, drilling platform, 19, longitudinal moving device, 20, horizontal mobile device.
The specific embodiment
In the embodiment shown in Fig. 1,2,3: the afterbody of drilling platform 18 is fixed with two carriage glide paths 4, the movable support bracket of being made up of four bracket bases 1, two pallet stringers 2 and two carriage crossbeams 3 is the quadra structure, and bracket base 1 is positioned at four jiaos of quadra.Be provided with the horizontal concrete chute that matches with carriage glide path 4 in the bottom of bracket base 1, in carriage crossbeam 3, respectively be provided with a horizontal mobile device 20, can drive movable support bracket by means of hydraulic action horizontal mobile device 20 and on carriage glide path 4, move laterally.Be provided with two vertical chutes that carriage bilge logs 5a matches with cantilever beam 5 bottoms on the top of bracket base 1, in pallet stringer 2, respectively be provided with a longitudinal moving device 19, by means of hydraulic action longitudinal moving device 19 can drive cantilever beam 5 and carriage bilge logs 5a together longitudinally chute move.Boring tower 17 is the tail ends that are fixed on cantilever beam 5.When cantilever beam 5 reaches, boring tower 17 is positioned at the top of drilling platform 18, and the front end of cantilever beam 5 is by bearing 16 supportings; When moving behind the cantilever beam 5, boring tower 17 just stretches to outside the drilling platform 18, is in the drilling operation position.So side travel movable support bracket and vertically move cantilever beam 5 and come boring tower 17 is carried out correct drilling well location easily.
The fit structure of chute and slideway has been shown among Fig. 4,5.In Fig. 4, carriage glide path 4 matches with the bottom chute of bracket base 1, and carriage glide path 4 is to be welded on the drilling platform 18, has only bracket base 1 to move on carriage glide path 4, therefore in gliding groove, be provided with liner 4a and lower liner 4b on the anti-attrition bronze, and scribble lubricating grease.In Fig. 5, carriage bilge logs 5a matches with the top chute of bracket base 1, carriage bilge logs 5a is and cantilever beam 5 weld togethers, have only carriage bilge logs 5a in upper hopper chute, to move, therefore in upper hopper chute, also be provided with liner 5b and lower liner 5c on the anti-attrition bronze, and scribble lubricating grease.
Fig. 6,7,8 shows longitudinal moving device 19.Longitudinal moving device 19 is mainly by first oil cylinder 6, first push rod 7, the first fork-shaped plate 7a, first ratchet 11 and first weight 13 are formed, the first fork-shaped plate 7a that is positioned at first push rod, 7 heads through first bearing pin 12 first backing plate 15, first ratchet 11, the first ratchet bearing 10 and first weight 13 link together, wherein first ratchet 11 and first bearing pin 12 are for captiveing joint, and 13 pairs first bearing pins 12 of first weight can relatively rotate the flexible connection about about 180 degree, first oil cylinder 6 is in the hinge connection through first bearing pin 9 and first otic placode 8, and the hydraulic oil in first oil cylinder 6 is through first push rod 7, the first fork-shaped plate 7a drives 11 work of first ratchet.Because first ratchet 11 is a bipitch structure, as long as change the position of first weight 13, two first ratchets 11 is taken turns to operate, thereby finish two-way the moving of advancing or retreating.This longitudinal moving device is fixed in the pallet stringer 2 through the first ratchet bearing 10 and first otic placode 8, establishes ratchet holes 5d at regular intervals on the base plate of carriage bilge logs 5a.When the diagram rightward pawl is arranged in ratchet holes 5d, but hydraulic oil driven bracket bilge logs 5a is moved to the left; First weight 13 is turned over 180 degree, and when diagram left side ratchet is arranged in ratchet holes 5d, but hydraulic oil driven bracket bilge logs 5a moves right.
Fig. 9,10,11 shows horizontal mobile device 20.Horizontal mobile device 20 is mainly by the second oil cylinder 6a, the second push rod 7b, the second fork-shaped plate 7c, the second ratchet 11a and the second weight 13a form, the second fork-shaped plate 7c that is positioned at the second push rod 7b head through the second bearing pin 12a the second backing plate 15a, the second ratchet 11a, the second ratchet bearing 10a and the second weight 13a link together, wherein the second ratchet 11a and the second bearing pin 12a are for captiveing joint, and the second weight 13a to the second bearing pin 12a can relatively rotate about 180 the degree about flexible connection, the second oil cylinder 6a is in the hinge connection through the second bearing pin 9a and the second otic placode 8a, and the hydraulic oil among the second oil cylinder 6a is through the second push rod 7b, the second fork-shaped plate 7c drives second ratchet 11a work.Because the second ratchet 11a is a bipitch structure, as long as change the position of the second weight 13a, two second ratchet 11a is taken turns to operate, thereby finish two-way the moving of advancing or retreating.This horizontal mobile device is fixed in the carriage crossbeam 3 through the second ratchet bearing 10a and the second otic placode 8a, establishes ratchet holes 4c at regular intervals on the panel of carriage glide path 4.When the diagram rightward pawl is arranged in ratchet holes 4c, but hydraulic oil driven bracket crossbeam 3 is moved to the left; The second weight 13a is turned over 180 degree, and when diagram left side ratchet is arranged in ratchet holes 4c, but hydraulic oil driven bracket crossbeam 3 moves right.

Claims (4)

1, a kind of movable bracket of cantilever beam on platform of drilling for oil, it mainly comprises a drilling platform (18), boring tower (17) and cantilever beam (5), cantilever beam (5) one ends that boring tower (17) is housed can reach the outside of drilling platform (18), it is characterized in that: it also comprises a movable support bracket, movable support bracket is by four bracket bases (1), the quadra that two pallet stringers (2) and two carriage crossbeams (3) are formed, bracket base (1) is positioned at four jiaos of quadra, bottom at bracket base (1) is provided with horizontal concrete chute, horizontal concrete chute matches with two the carriage glide paths (4) that are fixed in drilling platform (18) afterbody, in carriage crossbeam (3), respectively be provided with a horizontal mobile device (20), top at bracket base (1) is provided with vertical chute, vertically chute matches with two the carriage bilge logss (5a) that are positioned at cantilever beam (5) bottom, respectively is provided with a longitudinal moving device (19) in pallet stringer (2).
2, according to the described movable bracket of cantilever beam on platform of drilling for oil of claim 1, it is characterized in that: in the horizontal concrete chute of bracket base (1) bottom, be provided with liner (4a) and lower liner (4b), in vertical chute on bracket base (1) top, be provided with liner (5b) and lower liner (5c).
3, according to the described movable bracket of cantilever beam on platform of drilling for oil of claim 1, it is characterized in that: longitudinal moving device (19) is fixed on the pallet stringer (2) through first otic placode (8) and the first ratchet bearing (10), be provided with ratchet holes (5d) on the base plate of carriage bilge logs (5a), ratchet holes (5d) matches with first ratchet (11).
4, according to the described movable bracket of cantilever beam on platform of drilling for oil of claim 1, it is characterized in that: horizontal mobile device (20) is fixed on the carriage crossbeam (3) through second otic placode (8a) and the second ratchet bearing (10a), be provided with ratchet holes (4c) on the panel of carriage glide path (4), ratchet holes (4c) matches with second ratchet (11a).
CNB2005100464172A 2005-05-10 2005-05-10 Movable bracket of cantilever beam on platform of drilling for oil Expired - Fee Related CN1283545C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100464172A CN1283545C (en) 2005-05-10 2005-05-10 Movable bracket of cantilever beam on platform of drilling for oil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100464172A CN1283545C (en) 2005-05-10 2005-05-10 Movable bracket of cantilever beam on platform of drilling for oil

Publications (2)

Publication Number Publication Date
CN1687533A CN1687533A (en) 2005-10-26
CN1283545C true CN1283545C (en) 2006-11-08

Family

ID=35305575

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100464172A Expired - Fee Related CN1283545C (en) 2005-05-10 2005-05-10 Movable bracket of cantilever beam on platform of drilling for oil

Country Status (1)

Country Link
CN (1) CN1283545C (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102477733B (en) * 2010-11-26 2014-12-31 大连船舶重工集团有限公司 Installation method for integrally dragging cantilever beam onto platform
CN102162232A (en) * 2011-02-22 2011-08-24 武汉理工大学 Multipurpose plug rod-climbing type continuous elevating gear
CN103029813A (en) * 2011-09-30 2013-04-10 中国石油化工股份有限公司 Ocean platform operation beam shift device
CN102828706A (en) * 2012-08-01 2012-12-19 中国石油天然气集团公司 Slidable main unit base of continuous drilling fluid circulating system
CN102862911A (en) * 2012-10-09 2013-01-09 中国海洋石油总公司 Clamping type device hoisting supporting frame
CN108071101B (en) * 2016-11-17 2020-11-24 烟台中集来福士海洋工程有限公司 Conduit frame lifting device and method for lifting conduit frame by using same

Also Published As

Publication number Publication date
CN1687533A (en) 2005-10-26

Similar Documents

Publication Publication Date Title
CN1283545C (en) Movable bracket of cantilever beam on platform of drilling for oil
CN2793294Y (en) Drill tower moving apparatus of petroleum drilling platform
CN1091481C (en) Jack-up platform locking apparatus
CN1139517C (en) Floating offshore construction and floating element
CN104141456B (en) Coal mine gallery high working face gas pumping caterpillar drilling machine
CN105203301A (en) Crown block active and passive combined heave compensation testing device
CN204283252U (en) A kind of semi-active type drilling platform crown-block heave compensator
CN102155162A (en) Floating chassis foldable boom type hydraulic drill carriage
CN86100433A (en) The articulated barge that ocean structure haul and following water are used
CN101857075B (en) Lifting system of slipway
CN205329691U (en) A floating device that is used for aquatic steel -pipe pile income rock to install
CN201013239Y (en) Drill mobile guide rail
CN113279790B (en) Working face support retracting robot and working method thereof
CN102325691B (en) Skid beam assembly for loading and transporting large structures
CN2140958Y (en) Folding hydraulic anchoring bolt drill
CN2711385Y (en) Frame type well repairing machine seat for offshore oil-prodn. able to move in all-directions
CN201010483Y (en) Inverse mast type lifting mechanism
CN105156016B (en) Embarkation equipment
CN203593151U (en) Hydraulic cylinder-double slide block aquatic locking device
NL8720240A (en) APPARATUS FOR PERFORMING WORK UNDER WATER.
CN201474620U (en) Derrick docking mechanism
CN201083028Y (en) Hydraulic vertical lifting longitudinal transition parking device structure
CN210977307U (en) Novel petroleum drilling machine for sea heavy oil region artificial island well factory
CN205036346U (en) Embedded driller roon structure of oil -well rig driller concubine
CN206158602U (en) Two -way removal marine rig base of gate -type

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20061108