CN1274565C - Logistic dynamic material control process - Google Patents

Logistic dynamic material control process Download PDF

Info

Publication number
CN1274565C
CN1274565C CN 02158367 CN02158367A CN1274565C CN 1274565 C CN1274565 C CN 1274565C CN 02158367 CN02158367 CN 02158367 CN 02158367 A CN02158367 A CN 02158367A CN 1274565 C CN1274565 C CN 1274565C
Authority
CN
China
Prior art keywords
picking
storage
control technology
list
material control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 02158367
Other languages
Chinese (zh)
Other versions
CN1511771A (en
Inventor
简志宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitac International Corp
Original Assignee
Mitac International Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitac International Corp filed Critical Mitac International Corp
Priority to CN 02158367 priority Critical patent/CN1274565C/en
Publication of CN1511771A publication Critical patent/CN1511771A/en
Application granted granted Critical
Publication of CN1274565C publication Critical patent/CN1274565C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The present invention relates to a logistic dynamic material sorting control process which is applied to a warehousing system. Under known limits, an original material sorting list can be effectively divided, combined and dispatched to a new material sorting list; the new material sorting list is allotted at any time according to new orders so as to equalize the work load of each material sorting person and optimize work dispatch.

Description

Logistics dynamic material control technology
Technical field
The present invention is a kind of material picking control method of storage, particularly a kind ofly can distribute the material picking operation in real time, and reaches the best logistics dynamic material control technology of assigning of personnel.
Background technology
Quickening along with the logistics management automated process, most dealers use automated storage and retrieval system (Automated Storage/Retrieval System mostly, AS/RS) as the instrument of Care for Cargo, the basic operation of AS/RS is very simple, its stored cargo kind is few, and mostly belong to the storage and turnover goods of large form, turnover goods is base unit mostly with the pallet, therefore on putting up working, do not need to plan again that any material picking pattern gives assistance, can say that almost the function performance of its AS/RS mainly is on the function that stores.But, in case the automated storage and retrieval system that it is a whole set of has been installed in a small amount of, various, demand rapidly in the logistics centre, with regard to the problem of easy generation storage and material picking.
At present relevant automatic stored research is many, comprises storage design-calculated principle and the classification of storage framework etc., but relevant with the automatic stored material picking operation that cooperates what for few people's discussion.But, the production time of material picking accounts for more than 1/3 of whole logistics centre production time, the operating system of general storage, on the job assignment of material picking, the picking list of often taking to fix carries out the material picking operation, management for storage is to belong to dynamic storage space management mode, or the workload of material picking is to rise and fall very greatly, often causes the assignment of work can't reach optimization.When an order (order) is set, or according to work capacity at that time set finish the personnel of assignment after, operation Once you begin, just can't allocate in response to following new order again, the result often only can select both one of order, abandon another order, and form the situation that properly to use resource.
Therefore,, must there be a method to solve this kind problem really, carries out the material picking operation of whole storage effectively, just can avoid material-choosing personnel's job assignment inequality, thereby cause the retardation of integrity service quality in the face of this situation.
Summary of the invention
The objective of the invention is to propose a kind of logistics dynamic material control technology in order to address the above problem, this technology is effectively disassembled original picking list, remerge, assign new picking list, at any time allocate in response to new order again, make each material-choosing personnel's workload close, and make job assignment reach optimization.
Purpose of the present invention can realize by following measure:
A kind of logistics dynamic material control technology based on computing machine, and is applied to a material picking operation of storing in a warehouse, and this technology comprises the following step:
Produce a new picking list;
Send material picking data according to this new picking list;
Show these material picking data in a terminating machine, finish material picking for a material-choosing personnel;
Upgrade a storage data; And
Add up this storage data, and confirm this storage load and safety stock.
This terminating machine in the above-mentioned technology is a rf terminal machine.
This storage in the above-mentioned technology is an automated storage and retrieval system.
This storage data in the above-mentioned technology is by this terminating machine and this online renewal of storage information system.
The step of described generation one new picking list comprises the following step:
Import a present available number;
Material picking quantity is treated in input one;
Set a minimum work unit, an electron path and a minimum material picking zone;
Disassemble an original picking list; And
Merge and assign this new picking list.
The original picking list of in the above-mentioned technology this is an original order.
The present invention has following advantage compared to existing technology:
1, material picking method and traditional material picking method of the present invention's proposition are compared, and the material picking method elasticity that the present invention proposes is bigger, and cooperates automatic stored information system, more can be in response to provisional production capacity adjustment, can be fit to order goods differs greatly, and quantity on order changes frequent, the logistics centre that operation is complicated.
2, the present invention can make personnel's Occupation coefficient can reach optimization; Average material-choosing personnel's workload; More helpful to promoting the material picking benefit.
Description of drawings
Fig. 1 is the diagram of circuit of traditional material picking operation;
Fig. 2 is the diagram of circuit of logistics dynamic material control technology of the present invention; And
Fig. 3 is that the picking list of logistics dynamic material control technology of the present invention produces diagram of circuit.
The specific embodiment
The present invention sees also Fig. 1 with the concrete feasibility of preferred embodiment explanation method proposed by the invention, and this figure is the diagram of circuit of material picking operation in the past, and in order to the flow process that illustrates that traditional material picking is assigned, it is described as follows:
At first, system can configure minimum work unit earlier, define all electron paths and minimum material picking zone, begin to receive order (step 100) then, the storage personnel can converge order with putting in order earlier and handle (step 110), reexamine stock's whether enough (step 120), if the shortage of stock is then arranged to transfer goods or order (step 130), otherwise is just assigned picking list (step 140) according to minimum work unit, after the material-choosing personnel takes picking list, again to the material picking (step 150) of storing in a warehouse, after material picking work is finished, then to going out goods area tally (step 160), after finishing the tally step, then can carry out shipment (step 170).
See also Fig. 2, this figure is the diagram of circuit of logistics dynamic material control technology of the present invention, input picking list proposed by the invention is described to the flow process of finishing material picking, and it is described as follows:
At first, use a distribution mechanism, produce new picking list (step 200), send material picking data (step 210) by system again, show material picking data (step 220) in terminating machine, the storage personnel are again according to radio frequency (Radio Frequency, RF) electronic data that shows on the terminating machine, according to the Article Number material picking, treat that material picking is finished after, the storage personnel can be directly import this terminating machine, terminating machine again by wireless network automatically and system online, upgrade storage data (step 230), operating personal is confirmed AS/RS load and safety stock (step 240) again, if not greater than safety stock (step 250), then order goods (step 260), if greater than safety stock, and finish material picking (step 270), get final product shipment after then tally is finished.
In order to describe the distribution mechanism that the present invention proposes in detail, see also Fig. 3, this figure is the picking list generation diagram of circuit that logistics dynamic material proposed by the invention is controlled technology, the execution in step that produces new picking list in order to explanation is as follows:
The present invention adopts order to cut apart the mode of getting of choosing, and an order is cut into some sub-orders, transfers to different material-choosing personnels again, carrying out the material picking operation simultaneously, and accelerates material picking work.Before cutting apart again, must import present available number (step 300) earlier, and material picking quantity (step 310) is treated in input, set minimum work unit again, electron path and minimum material picking zone (step 320), this material picking odd number, system determines according to the result of order analysis, that is decide according to the batch strategy that logistics centre is accepted an order, after the initial condition setting was finished, promptly disassembled original picking list (step 330) was again according to above-mentioned condition, merge and assign new picking list (step 340), many orders are assembled a collection of, quantity is not added the General Logistics Department according to commodity and choose again and get, or do not do classification according to customer order and handle.
Though the present invention discloses as above with aforesaid preferred embodiment; right its is not in order to limiting the present invention, anyly has the knack of this skill person, without departing from the spirit and scope of the present invention; when can doing a little change and retouching, thus protection scope of the present invention with claims the person of being defined be as the criterion.

Claims (5)

1, a kind of logistics dynamic material control technology based on computing machine, and is applied to a material picking operation of storing in a warehouse, and this technology comprises the following step:
Treat material picking quantity by importing a present available number and, set a minimum work unit, an electron path and a minimum material picking zone, disassemble an original picking list;
Merge and assign a new picking list;
Send material picking data according to this new picking list;
Show these material picking data in a terminating machine, finish material picking for a material-choosing personnel;
Upgrade a storage data; And
Add up this storage data, and confirm this storage load and safety stock.
2, logistics dynamic material control technology as claimed in claim 1 is characterized in that this terminating machine is a rf terminal machine.
3, logistics dynamic material control technology as claimed in claim 1 is characterized in that this storage is an automated storage and retrieval system.
4, logistics dynamic material control technology as claimed in claim 1 is characterized in that this storage data is by this terminating machine and this online renewal of storage information system.
5, logistics dynamic material control technology as claimed in claim 1 is characterized in that this original picking list is an original order.
CN 02158367 2002-12-30 2002-12-30 Logistic dynamic material control process Expired - Lifetime CN1274565C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02158367 CN1274565C (en) 2002-12-30 2002-12-30 Logistic dynamic material control process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02158367 CN1274565C (en) 2002-12-30 2002-12-30 Logistic dynamic material control process

Publications (2)

Publication Number Publication Date
CN1511771A CN1511771A (en) 2004-07-14
CN1274565C true CN1274565C (en) 2006-09-13

Family

ID=34236986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02158367 Expired - Lifetime CN1274565C (en) 2002-12-30 2002-12-30 Logistic dynamic material control process

Country Status (1)

Country Link
CN (1) CN1274565C (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108256872B (en) * 2016-12-28 2021-05-25 中国科学院沈阳自动化研究所 Collaborative tracing method for batch assembly information of automobile parts

Also Published As

Publication number Publication date
CN1511771A (en) 2004-07-14

Similar Documents

Publication Publication Date Title
Dunne Plant age and technology use in US manufacturing industries
Molavi et al. Truck scheduling in a cross docking systems with fixed due dates and shipment sorting
Saidi-Mehrabad et al. Production planning and worker training in dynamic manufacturing systems
EP1654647B1 (en) A method of assigning objects to processing units
CN116051004B (en) Intelligent management method, system and medium based on big data
Huang et al. Simulation study of CONWIP for a cold rolling plant
Jemelka et al. ABC analyses with recursive method for warehouse
Seyedi et al. Developing a mathematical model for a multi-door cross-dock scheduling problem with human factors: A modified imperialist competitive algorithm
Boysen et al. Robotized sorting systems: Large-scale scheduling under real-time conditions with limited lookahead
CN1274565C (en) Logistic dynamic material control process
CN114707874A (en) Scheduling method, equipment and storage medium applied to aluminum alloy production
CN112559577B (en) Method and system for recommending plate processing technology
Sridharan Simulation modeling and analysis of tool sharing and part scheduling decisions in single-stage multimachine flexible manufacturing systems
CN113537657B (en) Commodity inventory quantity determining method, device, storage medium and computer equipment
CN117522057A (en) Scheduling method
Longo Operational strategies and internal logistic costs analysis in a real warehouse based on modeling & simulation
Ferreira et al. Continuous Improvement to Create Value: Warehouse Management in a Telecommunications Company
CN1758274A (en) Universal service processing method and its computer system
Shin et al. Hierarchical remarshaling operations in block stacking storage systems considering duration of stay
Barber et al. The effects of computer-aided production-control systems on defined company types
Carneiro et al. Optimization of the grapes reception process
CN113807628A (en) Warehouse management method and device, electronic equipment and readable storage medium
Pradenas et al. A solution for the aggregate production planning problem in a multi-plant, multi-period and multi-product environment
CN1508732A (en) Production capacity simulating system and method
Van Nieuwenhuyse et al. Order batching in multi-server pick-and-sort warehouses

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20060913