CN1257776C - Integral stretching technology of double (three)-tank stainless steel water tanks - Google Patents

Integral stretching technology of double (three)-tank stainless steel water tanks Download PDF

Info

Publication number
CN1257776C
CN1257776C CN 03151027 CN03151027A CN1257776C CN 1257776 C CN1257776 C CN 1257776C CN 03151027 CN03151027 CN 03151027 CN 03151027 A CN03151027 A CN 03151027A CN 1257776 C CN1257776 C CN 1257776C
Authority
CN
China
Prior art keywords
stainless steel
stretching
tank
time
multicavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 03151027
Other languages
Chinese (zh)
Other versions
CN1524639A (en
Inventor
熊汉梯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Franta Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=34286860&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN1257776(C) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CN 03151027 priority Critical patent/CN1257776C/en
Publication of CN1524639A publication Critical patent/CN1524639A/en
Application granted granted Critical
Publication of CN1257776C publication Critical patent/CN1257776C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forging (AREA)
  • Punching Or Piercing (AREA)

Abstract

The present invention relates to integral stretching technology of a double-tank (three-tank) stainless steel water tank. The technology comprises the process steps of baiting, shearing angles, primary stretching, shearing edges, cleaning, annealing, secondary stretching, cutting edges, punching holes, cleaning, processing surfaces, etc. Tank bodies of the stainless steel water tank produced by the process steps of the present invention are in an integral structure without welding. Consequently, the present invention overcomes the defects of multiple process steps, large material consumption, etc., caused by welding. The present invention reduces the production cost for enterprises, and simultaneously avoids the problems of water leakage and fastness influence caused by miss welding and dewelding in the process of welding. Consequently, the present invention improves the integral quality and the service life of the water tank. The appearance and the shape of the integral stainless steel water tank better meet the requirements of modern people. The present invention has better cost superiority in market competition, and creates better economic benefit for enterprises.

Description

Multicavity whole drawing craft of the stainless steel cistern
Technical field
The present invention relates to kitchen utensils, especially wash the integral drawing technique of the stainless steel trough of usefulness.
Background technology
Along with the raising of living standards of the people, a kind of to have good looking appearance, fluent form, in light weight, easy scouring, non-damageable stainless steel trough be the direction that replaces ceramic tank, and entered huge numbers of families, more and more liked by people.Stainless steel trough has structures such as single groove, double flute, three-flute at present, when making double flute, three-flute tank, owing to be subjected to restrictions such as process conditions, appointed condition, all be to come out with the stretching one by one of single groove, be welded into double flute or three groove pattern on demand by welding procedure then, welding procedure at first makes the manufacturing procedure of tank increase, and material consumption also increases, thereby the production cost of tank is improved greatly; Secondly, welding quality is difficult to guarantee that the leakage weldering in the welding process, sealing-off, crack are difficult to avoid, and certainly will influence the total quality and the service life of tank.Now find 2002 the 10th interim reports that have a piece about integrally stretching of pertinent literature " mould industry ", the described stretching die design of this article adopts blank shape and the local method that adds the stretching muscle revised, amended blank shape and stretching muscle position have been determined, and considered the problem of selecting for use of the selection of structural design, mold materials of mould and lubrication problem, forcing press, general purpose be prevent wrinkling and break at the drawing process material surface.But the tank degree of depth that this scheme stretched only is 150mm, and all are purpose for the tank that reaches the 150mm degree of depth all, and the processing technology of using in the reported in literature can't reach darker size.Empirical evidence, the degree of depth be the tank of 150mm only, is to lack Practical significance, because people dislike in washing process The water splash in all directions phenomenon.
Summary of the invention
Technical problem to be solved by this invention is to avoid the defective of prior art and provides a kind of manufacturing cost that reduces to improve the Contiuum type Multicavity whole drawing craft of the stainless steel cistern that tank total quality and service life, groove depth can reach 180~250mm.
Technical problem of the present invention realizes by following technical proposal:
A kind of Multicavity whole drawing craft of the stainless steel cistern is characterized in that:
(1) blanking: the stainless steel coiled strip is sent into plate shearing machine cut into the required development size of tank;
(2) shear angle: the slab after the blanking is sent into plate shearing machine carry out four jiaos of excess stocks shearings by designing requirement;
(3) stretch for the first time: the slab behind the shear angle is sent into hydraulic press, at first arrange stretching muscle position on the stretching die in the first time according to raw material development size and the cell body size that will draw, carry out then stretching the first time, the cell body degree of depth after the stretching requires to reach the 80-90% of total depth;
(4) cut the limit: the cell body after will stretching for the first time cuts off the both sides excess stock that is provided with the stretching muscle on cutter by designing requirement;
(5) cleaning treatment;
(6) annealing in process: above-mentioned tank carries out annealing in process in bright annealing furnace, and annealing temperature is 1150-1170 ℃, and annealing heat time heating time is 25-35min;
(7) stretch for the second time: the stainless steel trough after will annealing carries out the drawing and forming second time in the second time on stretching die and the hydraulic press, and requiring cell body and frame to pull out simultaneously and reach the requirement of design total depth is 180-250mm;
(8) cut edge: the tank after will stretching is for the second time cut edge by the wide dimensional requirement of tank four cinctures on edger and hydraulic press;
(9) punching: on water falling hole perforating die and hydraulic press, carry out end water falling hole punching out in the groove;
(10) punching: on spillway hole perforating die and hydraulic press, carry out the punching out of sidewall spillway hole;
(11) clean: the flume surface greasy dirt is cleaned;
(12) surface treatment.
Described surface treatment comprises that polishing deburring, blasting treatment, electrolysis descale are handled, spray treatment.
Described blasting treatment comprises that double-colored spray cell body and inferior light spray entirely.
Described spray treatment comprises spraying noise reduction of cell body outer surface and reverse osmosis aqueous vapor colloid.
After the flume surface greasy dirt is cleaned, also be provided with the mark operation in the described stainless steel trough integral drawing technique, promptly in mark mould and the enterprising sample printing of marking on a map of doing business of hydraulic press.
After the mark operation, also be provided with welding reinforcement operation in the described stainless steel trough integral drawing technique, promptly on welding machine to spot welding fixed strip around the tank frame back side.
After surface treatment, also be provided with the punching operation in the described stainless steel trough integral drawing technique, promptly on the hydraulic pressure puncher, carry out the installing hole punching out.
Described installing hole is packed leading installing hole and soap lye installing hole.
The present invention provides better technology to guarantee for making Contiuum type multiple-grooved stainless steel trough, make and do not have welding between the stainless steel trough cell body of making by this technology, thereby defectives such as the operation that causes because of welding is many, fee of material have been overcome, for enterprise has reduced production cost; Leakage weldering, the sealing-off of also having avoided simultaneously welding process to occur easily be caused leaks and influences quality problems such as fastness, thereby the total quality and the service life of tank have been improved, make this stainless steel trough in market competition, have the better price advantage, for enterprise creates better economic benefit; The present invention has adopted bright annealing and succeeding stretch technology in processing technology, make the stretching depth of tank can reach 180~250mm, has better Practical significance.
Description of drawings
Fig. 1 is technology for blanking figure of the present invention.
Fig. 2 is a shear angle artwork of the present invention.
Fig. 3 is the present invention drawing process figure first time.
Fig. 4 is the vertical view of Fig. 3.
Fig. 5 cuts the limit artwork for the present invention.
Fig. 6 is the present invention drawing process figure second time.
Fig. 7 is the A-A cutaway view of Fig. 6.
Fig. 8 is trimming technology figure of the present invention.
Fig. 9 is that the present invention is towards the water falling hole artwork.
Figure 10 is a washover of the present invention water hole artwork.
Figure 11 is the B-B cutaway view of Figure 10.
Figure 12 is a mark artwork of the present invention.
Figure 13 welds the reinforcement artwork for the present invention.
Figure 14 is that the present invention is towards the installing hole artwork.
Figure 15 is a primary-secondary type disjunctor tank stereogram of the present invention.
The specific embodiment
Below with reference to above-mentioned accompanying drawing and with primary and secondary double flute model is 28211 to be that embodiment is described in further detail integral drawing technique of the present invention again, and its technical process is as follows:
(1) blanking: with the stainless steel trade mark is that SUS304, specification are that the coiled strip of 1 * 1219 * C is sent into plate shearing machine and cut into the required development size of tank (Fig. 1), is material-saving, adopts in pairs and shears;
(2) shear angle: the slab after the blanking is sent into plate shearing machine, carry out four jiaos of excess stocks and shear (Fig. 2), to prevent down the wrinkling in the road drawing process;
(3) stretch for the first time: the slab behind the shear angle is sent into the 630T hydraulic press, for the material that stops indivedual positions flows, prevent the drawing crack phenomenon, must be in advance on the first time stretching die reasonable Arrangement stretching muscle 3, so that stop this place's material to flow, avoid material by drawing crack, carry out double flute then and stretch for the first time (Fig. 3-4), at this moment vat 1 depth H 1=180mm, sulculus 2 depth H 2=150mm.
(4) cut the limit: the cell body after will stretching for the first time cuts off the both sides excess stock (Fig. 5) that is provided with stretching muscle 3 on cutter by designing requirement;
(5) cleaning treatment: artificial cleaning workpiece surface and oil contaminant, in case annealing back product surface forms the spot that can't remove;
(6) annealing in process: when stretching for the second time, reach the projected depth requirement smoothly in order to make tank, workpiece must be handled through bright annealing, so that material softening is prepared for stretching for the second time, annealing is carried out in bright annealing furnace, the control annealing temperature is 1160 ℃, and annealing heat time heating time is 30min;
(7) stretch for the second time: the stainless steel trough after will annealing carries out the drawing and forming second time in the second time on stretching die and 600/350 hydraulic press, this moment, frame 4 and big or small cell body 1,2 were pulled out fully, vat 1 dark H3=200mm, sulculus 2 dark 170mm (not shown), when vat and sulculus cell body are measure-alike, groove depth is also identical, when stretching for the second time, frame 4 materials do not enter cell body substantially, the cell body degree of depth and fillet place need material to compensate by the attenuation of cell body internal material fully, belong to ironing processing, the 30-40% (Fig. 6-7) that its maximum attenuation amount is an origianl wall thickness;
(8) cut edge: for the second time the tank of drawing and forming on edger and 315 hydraulic presses by the wide dimensional requirement of tank four cinctures cut edge (Fig. 8);
(9) punching: on water falling hole perforating die and 100B hydraulic press, go out end water falling hole 5 (Fig. 9) in the groove;
(10) punching: on spillway hole perforating die and 315 hydraulic presses, go out sidewall spillway hole 6 (Figure 10-11);
(11) clean: the flume surface greasy dirt is manually cleaned;
(12) mark: print (Figure 12) at mark mould and enterprising mark 7 patterns of doing business of 63 hydraulic presses;
(13) welding reinforcement: spot welding reinforcement 8 around the frame at the tank back side, this operation is carried out (Figure 13) on 200 percussion welders, the setting of reinforcement 8 is determined on a case-by-case basis, be fixed on cabinet top for tank, must weld reinforcement, be convenient to fix, as be fixed on the cabinet below, can remove reinforcement from cabinet.
(14) surface treatment: this operation at first goes to institute jagged by artificial polishing; Then blasting treatment is placed on and carries out double-colored spray cell body on the automatic sand-blasting machine and inferior light sprays entirely; Bright afterwards electrolysis descale carries out spray treatment at last, gives cell body outer surface spraying noise reduction, anti-reverse osmosis water gas colloid, and polishing, sandblast, electrolysis descale, spraying are carried out in order;
(15) punching: on the hydraulic pressure puncher, tank frame 4 places are carried out leading installing hole 9 and soap lye installing hole 10 is processed (Figure 14);
So far, processing technology is all over, and finished product primary-secondary type disjunctor tank as shown in figure 15.
(16) last test package warehouse-in.

Claims (8)

1, a kind of Multicavity whole drawing craft of the stainless steel cistern is characterized in that:
(1) blanking: the stainless steel coiled strip is sent into plate shearing machine cut into the required development size of tank;
(2) shear angle: the slab after the blanking is sent into plate shearing machine carry out four jiaos of excess stocks shearings by designing requirement;
(3) stretch for the first time: the slab behind the shear angle is sent into hydraulic press, at first arrange stretching muscle position on the stretching die in the first time according to raw material development size and the cell body size that will draw, carry out then stretching the first time, the cell body degree of depth after the stretching requires to reach the 80-90% of total depth;
(4) cut the limit: the cell body after will stretching for the first time cuts off the both sides excess stock that is provided with the stretching muscle on cutter by designing requirement;
(5) cleaning treatment;
(6) annealing in process: above-mentioned tank carries out annealing in process in bright annealing furnace, and annealing temperature is 1150-1170 ℃, and annealing heat time heating time is 25-35min;
(7) stretch for the second time: the stainless steel trough after will annealing carries out the drawing and forming second time in the second time on stretching die and the hydraulic press, and requiring cell body and frame to pull out simultaneously and reach the requirement of design total depth is 180-250mm;
(8) cut edge: the tank after will stretching is for the second time cut edge by the wide dimensional requirement of tank four cinctures on edger and hydraulic press;
(9) punching: on water falling hole perforating die and hydraulic press, carry out end water falling hole punching out in the groove;
(10) punching: on spillway hole perforating die and hydraulic press, carry out the punching out of sidewall spillway hole;
(11) clean: the flume surface greasy dirt is cleaned;
(12) surface treatment.
2, a kind of Multicavity whole drawing craft of the stainless steel cistern according to claim 1 is characterized in that described surface treatment comprises that polishing deburring, blasting treatment, electrolysis descale are handled, spray treatment.
3, a kind of Multicavity whole drawing craft of the stainless steel cistern according to claim 2 is characterized in that described blasting treatment comprises that double-colored spray cell body and inferior light spray entirely.
4, a kind of Multicavity whole drawing craft of the stainless steel cistern according to claim 2 is characterized in that described spray treatment comprises spraying noise reduction of cell body outer surface and reverse osmosis aqueous vapor colloid.
5, a kind of Multicavity whole drawing craft of the stainless steel cistern according to claim 1 and 2, it is characterized in that in the described stainless steel trough integral drawing technique after the flume surface greasy dirt is cleaned, also be provided with the mark operation, promptly in mark mould and the enterprising sample printing of marking on a map of doing business of hydraulic press.
6, a kind of Multicavity whole drawing craft of the stainless steel cistern according to claim 5, it is characterized in that after the mark operation, also being provided with in the described stainless steel trough integral drawing technique welding reinforcement operation, promptly on welding machine to spot welding fixed strip around the tank frame back side.
7, a kind of Multicavity whole drawing craft of the stainless steel cistern according to claim 1 and 2 is characterized in that also being provided with in the described stainless steel trough integral drawing technique punching operation after surface treatment, promptly carry out the installing hole punching out on the hydraulic pressure puncher.
8, a kind of Multicavity whole drawing craft of the stainless steel cistern according to claim 7 is characterized in that described installing hole packs leading installing hole and soap lye installing hole.
CN 03151027 2003-09-18 2003-09-18 Integral stretching technology of double (three)-tank stainless steel water tanks Expired - Lifetime CN1257776C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03151027 CN1257776C (en) 2003-09-18 2003-09-18 Integral stretching technology of double (three)-tank stainless steel water tanks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03151027 CN1257776C (en) 2003-09-18 2003-09-18 Integral stretching technology of double (three)-tank stainless steel water tanks

Publications (2)

Publication Number Publication Date
CN1524639A CN1524639A (en) 2004-09-01
CN1257776C true CN1257776C (en) 2006-05-31

Family

ID=34286860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03151027 Expired - Lifetime CN1257776C (en) 2003-09-18 2003-09-18 Integral stretching technology of double (three)-tank stainless steel water tanks

Country Status (1)

Country Link
CN (1) CN1257776C (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100448561C (en) * 2005-11-24 2009-01-07 比亚迪股份有限公司 Drawing method and drawing mould
CN100415404C (en) * 2006-08-17 2008-09-03 徐剑光 Forming processing technics for stainless steel flume
CN101676066B (en) * 2008-09-18 2011-05-18 大唐移动通信设备有限公司 Realization process of curved surface mesh metal plate deep notch sculpt
CN201791826U (en) * 2009-11-13 2011-04-13 熊汉梯 Die for integrally drawing a plurality of stainless steel sinks
CN101791650B (en) * 2010-04-12 2011-11-30 温州市科能金属制品有限公司 Ultra-deep stretching method for stainless steel product
CN102172703B (en) * 2011-02-23 2013-01-09 上海电气电站设备有限公司 Hot compacting method of composite steel plate spherical crown
CN102198581B (en) * 2011-05-19 2013-06-05 青岛鸿森重工有限公司 Manufacturing process for air temperature adjusting bottom plate mechanism
CN102380550B (en) * 2011-10-17 2013-09-18 宁波欧琳厨具有限公司 Anneal-free processing technique of stainless steel water tank
CN102784832B (en) * 2012-08-28 2015-09-09 中国南方航空工业(集团)有限公司 The forming method of a kind of combustion chamber casing
CN102941272A (en) * 2012-10-24 2013-02-27 郑州飞机装备有限责任公司 Method for molding 1Cr18Ni9Ti complicated stainless steel sheet-metal part
CN104985408A (en) * 2015-08-15 2015-10-21 西安华瑞机械设备有限责任公司 Refrigeration compressor shell processing technology
CN105562545B (en) * 2015-12-22 2018-07-13 宁波市天马厨具有限公司 Dish-washing machine stainless steel babinet manufacture craft
CN107008795B (en) * 2017-04-01 2018-08-31 泰州华新航空备品制造有限公司 A kind of siding sliding track stretching technique in main cabin dining car
CN109201837A (en) * 2018-08-15 2019-01-15 东莞市瑞成精密模具有限公司 A kind of battery steel shell drawing process
CN108817212A (en) * 2018-08-16 2018-11-16 中山市金中电热科技有限公司 Electric pressure cooking saucepan stainless steel inner container stretches automatic production line
CN112872157B (en) * 2020-12-29 2023-06-16 宁波欧琳科技股份有限公司 Forming process for water tank annealing-free surface treatment-free

Also Published As

Publication number Publication date
CN1524639A (en) 2004-09-01

Similar Documents

Publication Publication Date Title
CN1257776C (en) Integral stretching technology of double (three)-tank stainless steel water tanks
CN101067567A (en) Metal plate water meter casing forming technology
CN203542213U (en) Bearing ring discharging mechanism
CN109909375A (en) A kind of metal tile shaping mould group and its moulding process
CN201309204Y (en) Excessive material removing device of aeroconcrete longitudinal cutting apparatus
CN105710209B (en) Rocker body bending and forming side blow class progressive die
CN202021129U (en) Oil-immersed device for winding pipes
CN210676683U (en) Metal necking machine
CN1817556A (en) Flange production
CN105414892A (en) Method for welding and manufacturing H-shaped steel with cellular holes in web through ship position model
CN1710145A (en) Method for direct forming tool die by multiple etchig and apparatus thereof
CN205085282U (en) Tensile mould of punching press
CN209318293U (en) A kind of lifting of piece-holder and spray equipment
CN210474778U (en) Crankshaft oil hole cleaning tool for cleaning machine
CN209465518U (en) A kind of anti-chip puncturing blade applied on drawing die
CN202969489U (en) Welding type double-position washing basin
CN1465453A (en) Method for forming steel liquid storage cylinder
CN220145604U (en) Manual glass production line
CN220074964U (en) Panel slotted hole equipment for producing you Ke Li
CN211218265U (en) Decorative board puncher
CN217571649U (en) Gravure printing mold production line
CN110640048A (en) Machining process of oiling plug-in with baffle
CN200963878Y (en) Stone groove cutter
CN107866642A (en) A kind of manufacture method of stainless steel faucet
CN212577681U (en) Hollow glass aluminum strip cutting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: NINGBO FRANTA PIPE INDUSTRY Co.,Ltd.

Assignor: Xiong Hanti

Contract fulfillment period: 2006.6.1 to 2014.5.31

Contract record no.: 2008990001529

Denomination of invention: Integral stretching technology of double (three)-tank stainless steel water tanks

Granted publication date: 20060531

License type: Exclusive license

Record date: 20081223

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2006.6.1 TO 2014.5.31; CHANGE OF CONTRACT

Name of requester: NINGBO FULANTE TUBE CO., LTD.

Effective date: 20081223

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170615

Address after: 315300, No. 177 pad Road, Changhe Town, Cixi City, Zhejiang, Ningbo

Patentee after: ZHEJIANG FRANTA Co.,Ltd.

Address before: 315326 Zhejiang province Cixi City South Road Ningbo franta kitchenware Co. Ltd.

Patentee before: Xiong Hanti

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20060531