CN1254587C - Half screw pile and its pile forming method thereof - Google Patents

Half screw pile and its pile forming method thereof Download PDF

Info

Publication number
CN1254587C
CN1254587C CN 03128265 CN03128265A CN1254587C CN 1254587 C CN1254587 C CN 1254587C CN 03128265 CN03128265 CN 03128265 CN 03128265 A CN03128265 A CN 03128265A CN 1254587 C CN1254587 C CN 1254587C
Authority
CN
China
Prior art keywords
pile
screw
semi
stake
drilling rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 03128265
Other languages
Chinese (zh)
Other versions
CN1482308A (en
Inventor
彭桂皎
虞锋
赵思学
彭文广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Zhuodian High Technology Development Co ltd
Original Assignee
彭桂皎
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=34153304&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN1254587(C) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 彭桂皎 filed Critical 彭桂皎
Priority to CN 03128265 priority Critical patent/CN1254587C/en
Publication of CN1482308A publication Critical patent/CN1482308A/en
Application granted granted Critical
Publication of CN1254587C publication Critical patent/CN1254587C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The present invention relates to a half screw pile and a pile forming method thereof. The half screw pile is composed of an upper part and a lower part, wherein the upper part is a linear structure, and the lower part is a screw type structure. The half screw pile can be divided into two types, namely a filed casting type and a prefabrication type, and the pile forming method of both types is simple. During pile forming construction, the present invention has the advantages of no noise pollution, no vibration hazard and convenient construction; the present invention has a wide prospect. Besides, the present invention has the advantages that the present invention not only meets the characteristic of stress concentration of the upper part of the pile but also increases bearing capacity; compared with other concrete piles, the dosage of concrete is low, and thus, the cost can be saved by more than 30%.

Description

Semi-screw pile and one-tenth pile work method thereof
Technical field
The present invention relates to building field, be specifically related to semi-screw pile and become pile work method.
Background technology
No matter be prefabricated both at home and abroad or the Cast-in-place concrete end holds friction pile, a stake end group originally is placed on to have better holds the power soil layer, and under the ultimate bearing capacity state, the primary load of stake is still born by pile side friction.Although the concrete compressive strength deposit is very big, be difficult to performance, often with the bearing capacity limit index of soil body friction destruction as stake.On behalf of domestic outer end, this type stake hold almost whole stress characteristics of friction pile.The birth of the prefabricated full thread stake of Japan's steel fibre changed this stress characteristic, but it is owing to high cost can not get extensive use and popularization.By stake environment is categorized as soil compaction stake (containing the stake of part soil compaction), non-soil compaction stake, the soil compaction stake is in work progress, pile peripheral earth is subjected to the squeezing action of pile body, excess pore water pressure increases in the soil body, the protuberance phenomenon takes place in the soil body, cause the infringement of surrounding enviroment to receive publicity day by day, in big and medium-sized cities, the strict controlled use of this method.Non-soil compaction stake refers to do, the stake of wet trade worker method, and it fetches earth very serious with mud contamination, at present, does not almost have better technical measures to solve.
Summary of the invention
Purpose of the present invention provides a kind of semi-screw pile and becomes pile work method in order to overcome the problem and shortage of above-mentioned existence, and this is to be based upon the CFG stake promptly to do the novel stake of inventing on the basis of the working system stake and the steel fibre full thread stake of Japan.This pile capacity obviously improves, and construction costs obviously reduces.
A kind of semi-screw pile is made up of two parts, and top is linear structure, and the bottom is the screw-type structure, linear pattern partly account for total stake long 1/3, screw-type partly account for total stake long 2/3.
Semi-screw pile of the present invention is divided into precasting and cast-in-place type.The precasting semi-screw pile can be prefabricated into hollow and solid two types, can adopt the above concrete of C25 prefabricated, disjunction welding or bonding, utilize dither to make the local liquefaction of the soil body, make stake pile sinking progressively in liquefaction of soil mass, form semi-screw pile, this method easy construction, vibration effect radius≤5 meter, the pollution of construction noiselessness, friction public hazards, easy construction, prospect is very extensive.This method is cheap more than Japanese steel fibre helical burr ram.Japan's steel fibre pre-threaded stake is adopted to exert pressure by force and rotated the pile worker method of burying, and is therefore high to the concrete strength requirement, no large-scale promotion prospect.
Cast-in-place type pile-formation process also is simple, can adopt the construction of typing half tommy bar bar drill machine disposal molding.The pile amount can reach 750 linear meter(lin.m.)s (ф 500mm stake footpath) every day.The basic step of cast-in-place its disposal molding of type semi-screw pile is poly-as described below:
1, is rotated into the hole under the semi-screw pile drilling rod rig of employing special use and is shaped to projected depth;
2, utilize pump machine extruding concrete to go out concrete, and be rotated counterclockwise and carry drilling rod, keep in the drilling rod pressure differential with the soil body, must not interrupt concrete, be rotated counterclockwise and promote the pumping concrete, form bottom screw-type stake from the drilling rod base pressure;
3, drilling rod rises near behind the absolute altitude at the bottom of the weak soil, is changed into not rotating directly by rotation and carries, and the stake pressure injection finishes until top, forms the linear pattern stake.
Also can in stake, place reinforcing cage.
Wherein: a, in the hole that has half screw, when rotatablely moving up and down, drilling rod to keep the screw pore-forming synchronous, and spiral shell tooth between cog soil must not be disturbed, and the spiral shell tooth will have certain thickness and width, and this technology is applicable to>120KPa soil layer or other soil layer therebetween.B, in linear hole is arranged, drilling rod is rotated down the drilling and forming hole of exerting pressure, the straight deduction stake of upwards stopping the rotation.This technology is applicable to≤120KPa soil layer or other soil layer therebetween.
This worker's method advantage: 1, by the disposable compact making hole pile of machinery, the outward transport of nothing left soil, noiselessness; 2, speed of application obviously is better than other stake, and a machine is constructed about 750 linear meter(lin.m.)s every day; 3, be squeezed into screw-type+linear pattern by the pump pressure type drilling rod, the moulding stake does not have broken pile, no necking down, and bearing capacity obviously improves.
Semi-screw pile accommodation:
1, extensively applies to weak soil layer and hardpan and replace soil layer, as friction pile+end bearing pile use of structure.
2, stake footpath ф 300mm to ф 800mm.
3, stake long≤60 meter
The semi-screw pile advantage:
1, semi-screw pile is as screw-type, and its stress characteristic is to develop into the soil body by the stressed linear pattern stake of friction to shear the force type stake, and it holds the power of cutting and obviously improves.
2, semi-screw pile top is linear pattern, avoids screw-type in the not obvious and relatively poor phenomenon of rigidity of weak soil bearing capacity.Satisfied the feature that stake top stress is comparatively concentrated.
3, the moulding process of semi-screw pile can be cast-in-place and prefabricated, and prefabricated semi-screw pile can adopt the C30 concrete, and construct with dither.
4, the concrete consumption is lower than other concrete stakes, can economize more than 30%.
5, the general concrete stake of single pile bearing force rate doubles above.
Description of drawings
Fig. 1 is the structure elevation of cast-in-place type semi-screw pile.
Fig. 2 is the structure elevation of precasting semi-screw pile.
Fig. 3 is the 1-1 sectional drawing of precasting semi-screw pile.
The specific embodiment
Embodiment 1
Cast-in-place type semi-screw pile is made up of two parts, and top is linear structure, and the bottom is the screw-type structure, linear structure account for total stake long 1/3, the screw-type structure account for total stake long 2/3, adopt the construction of typing half tommy bar bar drill machine disposal molding.1., adopt and to be rotated into the hole under the special-purpose semi-screw pile drilling rod rig up time and to be shaped to projected depth concrete steps are as follows:;
2., utilize pump machine extruding concrete to go out concrete from the drilling rod base pressure, and be rotated counterclockwise and carry drilling rod, keep in the drilling rod pressure differential with the soil body, must not interrupt concrete, be rotated counterclockwise and promote the pumping concrete, form bottom screw-type stake;
3., drilling rod rises near behind the absolute altitude at the bottom of the weak soil, changed into not rotating directly by rotation and carries, the stake pressure injection finishes until top, forms top linear pattern stake.
Also can in stake, place reinforcing cage.And in the hole that has half screw, will keep the screw pore-forming synchronous when drilling rod rotatablely moves up and down, spiral shell tooth between cog soil must not be disturbed, and the spiral shell tooth will have certain thickness and width.
Embodiment 2
The precasting semi-screw pile is made up of two parts, top is linear structure, the bottom is the screw-type structure, linear structure account for total stake long 1/3, the screw-type structure account for total stake long 2/3, sectional forming welding or bonding is adopted in this stake, utilizes dither to make that the soil body is local to liquefy, make stake pile sinking progressively in liquefaction of soil mass, form semi-screw pile.

Claims (6)

1, a kind of semi-screw pile is made up of two parts, and top is linear structure, the bottom is the screw-type structure, it is characterized in that linear structure partly account for total stake long 1/3rd, the screw-type structure division account for total stake long 2/3rds, its spiral shell tooth has certain thickness and width.
2, semi-screw pile according to claim 1 is characterized in that semi-screw pile can be divided into cast-in-place type and precasting.
3,, it is characterized in that semi-screw pile can make solid pile or hollow pile according to claims 1 or 2 described semi-screw piles.
4, a kind of one-tenth pile work method of cast-in-place type semi-screw pile is characterized in that carrying out according to the following steps:
Adopt the special-purpose semi-screw pile drilling rod rig pore-forming that turns clockwise to be shaped to projected depth;
Utilize pump machine extruding concrete, go out concrete, and be rotated counterclockwise and carry drilling rod, keep in the drilling rod pressure differential with soil body periphery medium, must not interrupt concrete, be rotated counterclockwise the lifting concrete, form bottom screw-type structure division from the drilling rod base pressure;
Drilling rod rises near behind the absolute altitude at the bottom of the weak soil, perhaps near two places of stake Senior Three branchs, is changed into not rotating by rotation and directly carries drilling rod, finishes formation linear structure part until top stake cast.
5, the one-tenth pile work method of cast-in-place type semi-screw pile according to claim 4 is characterized in that will keeping when drilling rod rotatablely moves up and down the screw pore-forming synchronous, and spiral shell tooth between cog soil must not be disturbed.
6, a kind of one-tenth pile work method of precasting semi-screw pile is characterized in that stake adopts sectional forming welding or bonding, utilizes dither to make the local liquefaction of the soil body, makes stake pile sinking progressively in liquefaction of soil mass, forms semi-screw pile.
CN 03128265 2003-07-03 2003-07-03 Half screw pile and its pile forming method thereof Expired - Lifetime CN1254587C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03128265 CN1254587C (en) 2003-07-03 2003-07-03 Half screw pile and its pile forming method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03128265 CN1254587C (en) 2003-07-03 2003-07-03 Half screw pile and its pile forming method thereof

Publications (2)

Publication Number Publication Date
CN1482308A CN1482308A (en) 2004-03-17
CN1254587C true CN1254587C (en) 2006-05-03

Family

ID=34153304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03128265 Expired - Lifetime CN1254587C (en) 2003-07-03 2003-07-03 Half screw pile and its pile forming method thereof

Country Status (1)

Country Link
CN (1) CN1254587C (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864768A (en) * 2010-06-25 2010-10-20 彭桂皎 Pile-forming drilling tool for screw pile and pile-forming construction method thereof
CN102162248B (en) * 2011-04-26 2012-08-29 武汉高铁桩工科技有限公司 Method for forming variable-cross-section compaction thread pile and compaction drilling tool
CN102312434A (en) * 2011-04-26 2012-01-11 王庆伟 Compound screw pile and method for forming pile
CN103266601B (en) * 2013-06-09 2015-05-06 中铁科工集团有限公司 Deep-layer dense multi-branch pile and application thereof
CN104975598A (en) * 2014-04-03 2015-10-14 上海振中机械制造有限公司 Screw grout pile
CN104563102B (en) * 2014-10-13 2016-08-24 叶长青 A kind of screw pile and manufacture method thereof and the construction method of screw pile
CN104264666B (en) * 2014-10-20 2017-02-15 刘淼 Variable diameter all-thread pile and pile forming method thereof
CN108179741A (en) * 2018-03-26 2018-06-19 卓典机器人(海南)有限公司 A kind of screw rod pile and combined drilling tool and its engineering method

Also Published As

Publication number Publication date
CN1482308A (en) 2004-03-17

Similar Documents

Publication Publication Date Title
CN102493437B (en) Grouting-type micro steel pipe pile and grouting reinforcement method
CN1254587C (en) Half screw pile and its pile forming method thereof
CN1219945C (en) High-pressure rotary spraying and core inserting process to form pedestal pile
CN1131912C (en) Variable supporting-plate club-footed embedded pile and its forming method
CN1182301C (en) Technology for boring and prefabricating cast piles for foundation of building
CN1793524A (en) Method for construction of large head expanding combined pile
CN2298285Y (en) Deformed sectional bored concrete pile
CN1277024C (en) Construction machinery for long spiral press pouring concrete lock pin combination piles
CN1152990C (en) Cast-in-situ pedestal pile with variable bearing and its construction method
CN113585246A (en) Reinforced building pile foundation
CN1635229A (en) Half screw pile and processing method and apparatus therefor
CN102312431A (en) Spiral tooth combined pile and pile forming method
CN2813871Y (en) Semi-screw drilling rod structure
CN106939596A (en) A kind of cast-in-place slub type slurry drilled pile
CN2575155Y (en) Static pressure enlarging apparatus in operation of pipeline sinking grout enlarge piles
CN2608557Y (en) High pressure rotary spraying core inserting bottom expanding pile
CN1306121C (en) Method for pile foundation construction of geologic structure with flow plastic half-flow plastic and its application apparatus
CN2511782Y (en) Screw pile driver drilling rod
CN200955146Y (en) Multi-stage sink-pipe bored concrete pile
CN100503989C (en) Pre-press reinforcing construction method for digging hole pile bottom rock-soil layer and grouting bottom plate device
CN217500224U (en) Grouting device for improving bearing capacity of pile foundation
CN2672164Y (en) Centrifugal steel pipe concrete pipe pile
CN216948324U (en) Reinforced structure of transition platform between silt texture side slopes
CN2532118Y (en) Pile mould for Y-shape concrete pouring pile
CN1141457C (en) Base-extending deposited pile and its formation process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Liu Jianping

Assignor: Peng Guijiao

Contract fulfillment period: 2009.3.14 to 2023.7.3

Contract record no.: 2009210000156

Denomination of invention: Half screw pile and its pile forming method thereof

Granted publication date: 20060503

License type: Exclusive license

Record date: 20090422

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.3.14 TO 2023.7.3; CHANGE OF CONTRACT

Name of requester: LIU JIANPING

Effective date: 20090422

EE01 Entry into force of recordation of patent licensing contract

Assignee: Sichuan Ke Hui Construction Co.,Ltd.

Assignor: Peng Guijiao

Contract fulfillment period: 2009.11.14 to 2023.6.3

Contract record no.: 2009510000181

Denomination of invention: Half screw pile and its pile forming method thereof

Granted publication date: 20060503

License type: Exclusive license

Record date: 20091215

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.11.14 TO 2023.6.3; CHANGE OF CONTRACT

Name of requester: SICHUAN KEHUI CONSTRUCTION CO., LTD.

Effective date: 20091215

EC01 Cancellation of recordation of patent licensing contract

Assignee: Sichuan Ke Hui Construction Co.,Ltd.

Assignor: Peng Guijiao

Contract record no.: 2009510000181

Date of cancellation: 20100720

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180612

Address after: 570208 unit 1, unit 4, 4 Cove garden, 59 Peace Avenue, Meilan District, Haikou, Hainan.

Patentee after: HAINAN ZHUODIAN HIGH TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: 430060 electromechanical Department of Wuhan University of Technology, Hubei (Yu Jiatou campus)

Patentee before: Peng Guijiao

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Peng Guijiao

Document name: Notification of Passing Examination on Formalities

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20060503