CN1238447A - Test furnace for ceramic products - Google Patents

Test furnace for ceramic products Download PDF

Info

Publication number
CN1238447A
CN1238447A CN 99109296 CN99109296A CN1238447A CN 1238447 A CN1238447 A CN 1238447A CN 99109296 CN99109296 CN 99109296 CN 99109296 A CN99109296 A CN 99109296A CN 1238447 A CN1238447 A CN 1238447A
Authority
CN
China
Prior art keywords
chamber
preheating
flue gas
cooling
ceramic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 99109296
Other languages
Chinese (zh)
Other versions
CN1114813C (en
Inventor
黄耀英
吕宽余
黄思远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Shiwang No 1 Ceramic Mill Co Ltd
Foshan Kangqiang Industrial Institute
Original Assignee
Foshan Shiwang No 1 Ceramic Mill Co Ltd
Foshan Kangqiang Industrial Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Shiwang No 1 Ceramic Mill Co Ltd, Foshan Kangqiang Industrial Institute filed Critical Foshan Shiwang No 1 Ceramic Mill Co Ltd
Priority to CN 99109296 priority Critical patent/CN1114813C/en
Publication of CN1238447A publication Critical patent/CN1238447A/en
Application granted granted Critical
Publication of CN1114813C publication Critical patent/CN1114813C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Furnace Details (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

A test furnace for ceramic products is composed of preheating-cooling chamber, burning chamber, fume mixer, hot air mixer, roller rods and their driver, test meters and instruments, and fuel combustion system, and features that it can perform all functions of tunnel kiln including preheating, dehumidifying, burning (oxidizing or reducing atmosphere), quick cooling, atomopheric treatment after quick cooling, and slow cooling. Its advantages are small size (less than 3 m in length), and low cost.

Description

Test furnace for ceramic products
The present invention relates to the ceramic kiln equipment technical field, particularly a kind of development that is mainly used in ceramic new product and existing ceramic product filled a prescription and the test furnace for ceramic products of technological innovation test.
Existing furnace equipment as the ceramic new product of test has three kinds: the one, and tunnel cave comprises roller kilns, pushed bat kiln etc., the 2nd, periodic kiln, the 3rd, resistance furnace.
Technical process can be divided into preheating zone, clinkering zone, salband (comprise quench zone, chilling after atmosphere processing section and slow cooling section) in the kiln of tunnel cave.The induced-draft fan that is loaded on kiln hood is evacuated to the preheating zone with the high-temperature flue gas that clinkering zone produces, and ceramic is progressively heated, and is drained by induced-draft fan through the flue gas of heat exchange.Clinkering zone is the place that fuel combustion produces high-temperature flue gas, also is that ceramic produces glassy phase, reaches densification and sinters the place of ceramic product into.Quench zone is that the chilling blower fan is directly sent into chilling wind and sprayed to ceramic product in the kiln, and ceramic product is reduced to rapidly about 700 ℃ from firing temperature.The slow cooling section is to take out behind the slow cooling section and drain by taking out the hot blast of air-heater after with chilling.The slow cooling section has cold wind that air blast sends into and the hot blast behind the chilling together ceramic product to be cooled off slowly, is cooled to 80-100 ℃ of left and right sides kiln discharge.In whole process of production, tunnel cave is actionless, and ceramic transmission mechanism in kiln transports down and is preheating to the Low fire ceramic product to the cooling kiln discharge from kiln hood, finishes the whole physical chemistry change procedure that burns till.Because in heating and the sintering process, it requires the interior section temperature difference of kiln can not be too big, and the rate of temperature fall of intensification, slow cooling section can not be too big, so the length of tunnel cave is all in 50-110 rice scope.Firing period was at 30 minutes to 20 hours.At present, during with tunnel cave trial-production new product, be to treat with 1 or several that test product is clipped in the product of positive large-scale production to carry out.Because it can only burn till under the calcining system of original product, thereby, can not test out best calcining system and new process for calcining, so.Its limitation is very big.
Periodic kiln such as shuttle kiln, top-hat kiln etc. are made up of firing chamber, firebreak, combustion chamber and flue etc.The ceramic of firing all is placed in the firing chamber, all is actionless in whole sintering process.Burned flame is by the firebreak from top to down ceramic of flowing through, the flue gas that flame forms from indoor flue row to outdoor flue, last emptying.This periodic kiln is in preheating with when burning till, because the kiln temperature skewness, so programming rate is very slow, because it does not have quenching apparatus, so cooling rate is also very slow.Thereby the firing period of periodic kiln is generally at 12-22 hour.And treat that test product also will have certain quantity loading of kiln to burn till, if having only one or several to treat that test product is clipped in and test in the goods in enormous quantities, then effect is poorer than tunnel cave.The limitation of periodic kiln is: (1) preheating and when burning till, and kiln temperature distributes and is not easy evenly, the little or firing chamber's volume of the ceramic product quantity of particularly firing hour, the indoor temperature difference is bigger.As a small amount of product of test usefulness, not only product quality is difficult to grasp, and the data represented property that test is come out is also poor.(2) quenching apparatus can not be installed.(3) programming rate is slow, and cooling rate is also slow, and firing period can not be tested rapid sintering technique at 12-22 hour.
Resistance furnace generally has two kinds of cell-type resistance furnace and push-down resistance furnaces.When ceramic being tested with resistance furnace, can only carry out the part preheating, oxidizing atmosphere is burnt till and test maximum sintering temperature, the slow cooling etc. that can not carry out chilling or control arranged is engineer testings all, its limitation shows: itself can not produce flue gas and reducing flame (1), when testing flue gas or reducing flame, increase equipment.(2) ventilating capability is poor in the warm.(3) can not carry out chilling.(4) atmosphere that is difficult to carry out behind the chilling is handled.(5) annealing process is difficult to grasp.
Above-mentioned three kinds of ceramic kiln testing equipments all exist certain defective, can not satisfy the needs of ceramic new product of test and new technology.
The object of the present invention is to provide a kind of test furnace for ceramic products, it can make tested ceramic in length is no more than 3 meters trial furnace, finish preheating, dehumidifier, burn till that atmosphere behind (under oxidizing atmosphere or reducing atmosphere) chilling, the chilling is handled, whole technical process of slow cooling, obtain ceramic new product and brand-new calcining system tested ceramic.
The object of the present invention is achieved like this: a kind of test furnace for ceramic products, and this trial furnace comprises: (1) can carry out that atmosphere behind preheating, dehumidifier, chilling, the chilling is handled to ceramic, the preheating chamber cooling chamber of slow cooling or preheating---the cooling chamber of its both organic assembling;
(2) can be under oxidizing atmosphere or reducing atmosphere burn till and can provide different temperatures, different atmosphere flue gas the chamber of burning till to the flue gas blender to ceramic;
(3) can be according to predetermined temperature profile, atmosphere curve, the flue gas that produces different temperature, different atmosphere in the different time is for preheating---the flue gas blender of cooling chamber use;
(4) can produce the hot air mixer of the hot blast of different temperatures in the different time according to predetermined temperature profile for preheating-cooling chamber use;
(5) can make that the roller rod comes back rotation, the ceramic product relative position on it is constant and use ceramic product to move forward and backward or make backing plate to move forward and backward, constant and the transmission mechanism that ceramic product is moved forward and backward of the ceramic product relative position on it.
(6) syndeton of the said equipment is: preheating-cooling chamber and burn till the chamber between the flashboard that can lifting opens and closes is housed; The flue gas blender is connected with the exhaust smoke hole that burns till the chamber by the smoke inlet pipe; The flue gas blender is connected by the flue gas-cooling air import of mixed flue gas outlet and adapter and preheating-cooling chamber; The exhaust opening of preheating-cooling chamber is connected by the inlet of heat resisting pipe with the induced-draft fan of hot air mixer; The flue gas of preheating-cooling chamber-cooling air import is joined by the hot blast checkout gear of heat resisting pipe and hot air mixer.
Described preheating-cooling chamber is built by laying bricks or stones by refractory material, and a wall adjacent with burning till the chamber is provided with flashboard, and indoor middle part or bottom are provided with roller rod or the outdoor transmission device that is provided with of backing plate; Top, chamber or sidewall are provided with instrument jack, top side, chamber or bottom and are provided with atmosphere import, flue gas-cooling air import and the corresponding exhaust opening that atmosphere is handled behind gas approach, chilling wind inlet, the chilling.
When firing temperature below 1450 ℃ the time, the middle part is provided with the roller rod in preheating-cooling chamber; When firing temperature during at 1450 ℃ to 1760 ℃, indoor bottom is provided with backing plate.
The described chamber of burning till is built by laying bricks or stones by refractory material, at the top or sidewall gas gun, fire hole, rupture pressure disc, exhaust smoke hole and instrument be housed draw together the hole; Indoor middle part or bottom are provided with roller rod or backing plate, the outdoor transmission device that is provided with.
When firing temperature below 1450 ℃ the time, burn till indoor middle part and be provided with the roller rod; When firing temperature during, burn till indoor bottom and be provided with backing plate at 1450 ℃ to 1760 ℃.
Described flue gas blender outer wall is made by the steel material, inner lining refractory, and two ends are provided with the end cover of refractory heat-insulating, and smoke inlet is equipped with at sidewall or top, cold air inlet, mixed flue gas outlet and instrument jack.
Described hot air mixer is made up of exhaust opening adapter, cold wind inlet valve, induced-draft fan, exhaust-valve, hot blast checkout gear, exhaust opening is taken over and the exhaust opening of preheating-cooling chamber joins, and the outlet of hot blast checkout gear is joined by the flue gas-cooling air import of pipeline and preheating-cooling chamber.
The preheating chamber of described independent setting and cooling chamber are built by laying bricks or stones by refractory material and are formed, preheating chamber and cooling chamber are positioned at and burn till the both sides, chamber, preheating chamber is provided with fire door on one side, another side is provided with flashboard, lifting by flashboard is connected with the chamber of burning till or is separated, and top or sidepiece are provided with gas approach, exhanst gas outlet and instrument socket; Cooling chamber is provided with fire door on one side, and another side is provided with flashboard, connects or separates by flashboard and lifting and the chamber of burning till, and top or sidepiece are equipped with cooling air import, gas approach, hot-blast outlet and instrument socket.
When firing temperature below 1450 ℃ the time, preheating chamber and burn till the middle part, chamber and be provided with the roller rod; When firing temperature during, burn till the bottom, chamber and be provided with backing plate at 1450~1760 ℃.
Roller rod or backing plate transmission mechanism are made of the electronic control circuit that gear, chain, reducing motor reach its forward and backward time control.
In preheating-cooling chamber, finish most of technical process of preheating, salband, burn till indoor, finish the firing process process of ceramic, and, can be at warm-up phase, provide hot flue gas in flue gas mixing-chamber and the processing of the atmosphere behind chilling, provide the flue gas that meets the requirements to handle and use for the atmosphere behind the chilling.The effect of flue gas blender is to accept the cold wind sent into from the flue gas that burns till the chamber and air blast, regulate the ratio of flue gas and cold wind by the requirement of firing temperature curve, cold wind and flue gas mix in the flue gas blender, and the flue gas that meets the requirements sent in preheating-cooling chamber through the mixed flue gas outlet, make the preheating flue gas and use.Equally, also can produce suitable atmosphere for chilling after atmosphere handle to use.The effect of hot blast mixing chamber is the requirement according to the sintering curve slow cooling section, and the hot blast that preheating-cooling chamber is sent out is made cooling air and used with sending back to after cold wind mixes in preheating-cooling chamber.
Fuel combustion system of the present invention is by petroleum gas storage tank, control valve, and composition, oil gas spray guns such as air blast, airduct, oil gas spray gun are installed in and burn till on the refractory brickwork of chamber.The present invention is also to use other gaseous fuel and liquid fuel.Detection comprises that with instrument and meter differential manometer, Pressure gauge, thermometer, flue gas contain oxygen and flue gas contains the carbon monoxide display instrument.
Can finish the preheating zone that accounts for the long tunnel cave length overall 70-80% of existing 50-110 rice, the technical process that salband just can be finished in preheating-cooling chamber, this is a main feature of the present invention; Burn till chamber, preheating-cooling chamber, flue gas blender, hot air mixer and roller rod and transmission device ingenious the connection and one-object-many-purposes together, just can finish whole technical process that ceramic burns till satisfactorily, this is another main feature of the present invention.
In sum, compared with prior art, the present invention has outstanding substantive distinguishing features and obvious improvement.
The invention has the advantages that:
1. compact conformation is reasonable, and appearance and size is little, floor space is little, reduced investment.
2. all functions that have tunnel cave and possessed promptly have preheating, burn till, the atmosphere behind the chilling, chilling is handled, the function of slow cooling, and, can be adjusted to different calcining systems, promptly different temperature curves, atmosphere curve and pressure curve.
3. obtain to be applicable to the calcining system of various ceramic new product that tunnel cave is used and new the best with minimum experimental manufacturing cost.For example just can test and obtain the whole process datas of this wall floor tile in tunnel cave is produced with 1-10 piece wall ground tile product at every turn.
Fig. 1 is a structural representation of the present invention, and the effective dotted line of figure apoplexy is represented.
The present invention is further elaborated by following embodiment.
Referring to shown in Figure 1, this test furnace for ceramic products is made up of following parts:
Exhaust smoke hole 1, fire door 2, burn till chamber 3, explosion-protection equipment 4, oil gas spray gun 5, instrument jack 6, flashboard 7, flue gas-cooling air import 8, hot blast checkout gear 9, exhaust-valve 10, induced-draft fan 11, cold wind inlet valve 12, roller rod 13, exhaust opening 14, preheating-cooling chamber 15, mixed flue gas outlet 16, flue gas blender 17, gas approach 18, cold wind import 19, air blast 20.
Below this test furnace for ceramic products each several part structure and effect are described below:
Preheating-cooling chamber 15 is used to finish most of technical process of preheating zone, salband.Its structure is the cuboid of a hollow, builds the right by laying bricks or stones by refractory brick all around fire door 2 is installed, and is tested the place of ceramic product turnover.The left side be equipped with the lifting of flashboard 7 by flashboard 7 can with burn till chamber 3 and connect or separate.There are three instrument jacks 6 at the place of keeping right, top, uses for the installation and measuring instrument.Top and bottom left or the place of keeping left, front and back are equipped with flue gas-cooling air import 8, and exhaust opening 14 is installed on the right side.Firing temperature is provided with roller rod 13 below 1450 ℃ the time in the chamber, ceramic can move on roller rod 13.Firing temperature is in the time of 1450 ℃ to 1760 ℃, and the bottom, chamber has backing plate, ceramic can be placed on the backing plate and backing plate moves together.Burn till the firing process that chamber 3 is used to finish ceramic.And, provide hot flue gas in flue gas blender and the processing of the atmosphere behind chilling at warm-up phase, provide the flue gas atmosphere that meets the requirements to handle and use for the atmosphere behind the chilling.The structure that burns till the chamber is a hollow cuboid, and wall is built by laying bricks or stones with refractory brick, and fire door 2 is equipped with on the left side, and flashboard 7 is equipped with on the right, can be by leading to or separate preheating-cooling chamber 15 by the lifting of hearing plate 7.This chamber front and rear wall is equipped with oil gas spray gun 5.Explosion-protection equipment 4 and instrument jack 6 are installed on the top, and there is exhaust smoke hole 1 at the place of keeping left, the end, joins by gas approach 18 and flue gas blender 17.Explosion-protection equipment 4 is made up of refractory material garden tube of making and the refractory slab that covers on the tube of garden.
The flue gas blender is used to accept the cold wind sent into from the flue gas that burns till chamber 3 and air blast 20, regulate the ratio of flue gas and cold wind by the requirement of firing temperature curve, cold wind and flue gas mix in flue gas blender 17, and the flue gas that meets the requirements is sent in preheating-cooling chamber 15 through mixed flue gas outlet 16.Making the preheating flue gas uses.Equally, can produce suitable atmosphere for chilling after atmosphere handle to use.The structure of flue gas blender 17 is hollow or Cylinder or the many shuttles body that dividing plate is housed, outer wall is made by steel, inner lining refractory, the outsourcing insulation material, two ends are with the end cap seal of inner lining refractory outsourcing insulation material, and the upper left side has the hole, by gas approach 18 with burn till chamber 3 and link to each other, the right side has mixed flue gas outlet 16, is connected with flue gas-cooling air import 8 on preheating-cooling chamber 15 by pipeline.Qualified flue gas is sprayed in preheating-cooling chamber 15.This chamber upper right side has 3 instrument jacks 6 and does the use of installation and measuring instrument.
The use of hot air mixer is the requirement according to the sintering curve slow cooling section, and the hot blast that preheating-cooling chamber 15 is sent out is made cooling air and used with sending back to after cold wind mixes in preheating-cooling chamber.It is by induced-draft fan 11, and exhaust opening 14 and tube connector, cold wind inlet valve 12, exhaust-valve 10 and hot blast checkout gear 9 are formed.Hot blast checkout gear 9 is hollow cylinders, and thermocouple jack is arranged above, as the usefulness that detects hot blast temperature.Hot blast checkout gear 9 left sides are connected with flue gas-cooling air import 8 in preheating-cooling chamber 15 by pipeline.The hot blast that meets the requirements through preheating inspection then install 9, flue gas-cooling air import 8 sprays in preheating-cooling chamber 15.
Roller rod and transmission device thereof adopt roller rod, travelling gear, driving chain and the reducing motor of existing common roller kilns, and install identical time control circuit of motor positive and inverse time additional, make ceramic product in preheating, burn till, the atmosphere behind the chilling, chilling is handled, slow cooling moves around around the time, but its relative position is constant.
Fuel combustion: form by petroleum gas storage tank, control valve, air blast 20 airducts, oil gas spray gun 5 etc.Oil gas spray gun 5 is installed on the refractory brickwork that burns till chamber 3.
Detect and use instrument and meter: comprise that differential manometer, Pressure gauge, thermometer, flue gas contain oxygen and flue gas contains the carbon monoxide display instrument.
The course of work of this ceramic product examination inspection stove is as follows:
1. warm-up phase: open the fire door 2 of preheating-cooling chamber 15, tested ceramic is sent in preheating-cooling chamber 15, close fire door 2.Start roller rod 13 transmission devices ceramic is moved around indoor, but relative position is constant.Put down flashboard 7, will burn till chamber 3 and separate with preheating-cooling chamber 15.Open exhaust-valve 10, start induced-draft fan 11, open the news plate of gas approach 18; Start air blast 20, burn till part oil gas spray gun 5 ignition in the chamber 3.Hot flue gas enters gas approach 18 from burning till chamber 3 exhaust smoke holes 1, enters flue gas blender 17.Cold wind also enters flue gas blender 17 from cold wind import 19 through gas approach 18.Regulate the number that catches fire of oil gas spray gun 5.Air consumption and enter cold blast rate can obtain preheating-cooling chamber 15 desired preheat temperatures to ceramic, and mixed flue gas enters ceramic in flue gas-cooling air import 8 heating preheating-cooling chambers 15 through mixed flue gas outlet 16 and tube connector thereof.Ceramic is finished the physical-chemical reaction of the preheating section of sintering curve below 700 ℃ in preheating-cooling chamber 15.Flue gas in preheating-cooling chamber 15 is discharged through exhaust opening 14, induced-draft fan 11, exhaust-valve 10.
Burn till the stage: open flashboard 7, close the flashboard of gas approach 18, the circuit for controlling motor in felt widening roll rod 13 transmission mechanisms makes ceramic send into from preheating-cooling chamber 15 and burns till chamber 3.Ceramic enters when burning till chamber 3 central authorities, and roller rod 13 recovers left-right rotation.Regulate oil gas spray gun 5 and make the temperature of burning till chamber 3 progressively be elevated to firing temperature, make firing atmosphere reach desired atmosphere, finish whole firing process process.
The chilling stage: after the stage of burning till finishes, close whole oil gas spray guns 5, start the circuit for controlling motor in roller rod 13 transmission devices, ceramic product is return preheating-cooling chamber 15 after burning till chamber 3.In the time of in the middle of ceramic product arrival preheating-cooling chamber 15, roller rod 13 comes back rotation about reverting to constantly.Move around before and after the ceramic product, but relative position is constant.Put down flashboard 7, cold wind enters preheating-cooling chamber 15 through flue gas-cooling air import 8, and ceramic product is carried out chilling.Hot blast behind the chilling is drained through exhaust opening 14, induced-draft fan 11, atmospheric valve 10.During this section, the ceramic product temperature drops to about 700 ℃ from firing temperature, finishes the physical change process of quench zone.
Atmosphere behind the chilling is handled, and closes chilling wind, opens the flashboard on the gas approach 18, burns till to start oil gas spray gun 5 in the chamber 3, and the ratio of regulating oil tolerance and combustion air makes the flue gas atmosphere of burning till chamber 3 reach requirement.This flue gas is with after the cold wind of import 19 mixes, and mixes device 17 from flue gas and sends into preheating-cooling ceramic product is carried out the atmosphere processing.
The slow cooling stage, close oil gas spray gun 5, close the flashboard of gas approach 18, open the valve of big hot blast checkout gear 9, turn down atmospheric valve 10, make hot blast at preheating-cooling chamber 15, induced-draft fan 11, circulation between hot blast checkout gear 9, the flue gas-cooling air import 8, the aperture of regulating cold wind inlet valve 12, at this moment, from hot blast checkout gear 9, can see the hot blast of the different temperatures that is obtained, thereby the ceramic product temperature is dropped to about 100 ℃ by 700 ℃, finish the physical change of slow cooling section.

Claims (10)

1, a kind of test furnace for ceramic products is characterized in that: this trial furnace comprises:
(1) can carry out preheating-cooling chamber that atmosphere behind preheating, dehumidifier, chilling, the chilling is handled, preheating chamber, cooling chamber or its both organic assembling of slow cooling become to ceramic;
(2) can be under oxidizing atmosphere or reducing atmosphere burn till and can provide different temperatures, different atmosphere flue gas the chamber of burning till to the flue gas blender to ceramic;
(3) can be according to predetermined temperature profile, atmosphere curve, the flue gas that produces different temperature, different atmosphere in the different time is for preheating---the flue gas blender of cooling chamber use;
(4) can produce the hot air mixer of the hot blast of different temperatures in the different time according to predetermined temperature profile for preheating-cooling chamber use;
(5) can make that the roller rod comes back rotation, the ceramic product phase position on it is constant and use ceramic product to move forward and backward or make backing plate to move forward and backward, constant and the transmission mechanism that ceramic product is moved forward and backward of the ceramic product relative position on it.
(6) syndeton of the said equipment is: preheating-cooling chamber and burn till the chamber between the flashboard that can lifting opens and closes is housed; The flue gas blender is connected with the exhaust smoke hole that burns till the chamber by the smoke inlet pipe; The flue gas blender is connected with the flue gas-cooling air import of preheating-cooling chamber by the mixed flue gas outlet; The exhaust opening of preheating-cooling chamber is connected by the inlet of heat resisting pipe with the induced-draft fan of hot air mixer; The flue gas of preheating-cooling chamber-cooling air import is joined by the hot blast checkout gear of heat resisting pipe and hot air mixer.
2, test furnace for ceramic products according to claim 1 is characterized in that: described preheating-cooling chamber is built by laying bricks or stones by refractory material, and a wall adjacent with burning till the chamber is provided with flashboard, and indoor middle part or bottom are provided with roller rod or the outdoor transmission device that is provided with of backing plate; Top, chamber or sidewall are provided with instrument jack, top side, chamber or bottom and are provided with atmosphere import, flue gas-cooling air import and the corresponding exhaust opening that atmosphere is handled behind gas approach, chilling wind inlet, the chilling.
3, test furnace for ceramic products according to claim 2 is characterized in that: when firing temperature below 1450 ℃ the time, the middle part is provided with the roller rod in preheating-cooling chamber; When firing temperature during at 1450 ℃ to 1760 ℃, indoor bottom is provided with backing plate.
4, test furnace for ceramic products according to claim 1 is characterized in that: the described chamber of burning till is built by laying bricks or stones by refractory material, at the top or sidewall gas gun, fire hole, rupture pressure disc, exhaust smoke hole and instrument jack are housed; Indoor middle part or bottom are provided with roller rod or backing plate, the outdoor transmission device that is provided with.
5, test furnace for ceramic products according to claim 4 is characterized in that: when firing temperature below 1450 ℃ the time, burn till indoor middle part and be provided with the roller rod; When firing temperature during, burn till indoor bottom and be provided with backing plate at 1450 ℃ to 1760 ℃.
6, test furnace for ceramic products according to claim 1 is characterized in that; Described flue gas blender outer wall is made by steel, inner lining refractory, and two ends are provided with the end cover of refractory heat-insulating, and smoke inlet, cold air inlet, mixed flue gas outlet and instrument jack are equipped with in sidewall or top.
7, test furnace for ceramic products according to claim 1, it is characterized in that: described hot air mixer is made up of exhaust opening adapter, cold wind inlet valve, induced-draft fan, exhaust-valve, hot blast checkout gear, exhaust opening is taken over and the exhaust opening of preheating-cooling chamber joins, and the outlet of hot blast checkout gear is joined by the flue gas-cooling air import of pipeline and preheating-cooling chamber.
8, test furnace for ceramic products according to claim 1 is characterized in that: roller rod or backing plate transmission mechanism are made of the electronic control circuit that gear, chain, reducing motor reach its forward and backward time control.
9, test furnace for ceramic products according to claim 1, it is characterized in that: the preheating chamber of described independent setting and cooling chamber are built by laying bricks or stones by refractory material and are formed, preheating chamber and cooling chamber are positioned at and burn till the both sides, chamber, preheating chamber is provided with fire door on one side, another side is provided with flashboard, lifting by flashboard is connected with the chamber of burning till or is separated, and top or sidepiece are provided with gas approach, exhanst gas outlet and instrument socket; Cooling chamber is provided with fire door on one side, and another side is provided with the news plate, connects or separates by flashboard and lifting and the chamber of burning till, and top or sidepiece are equipped with cooling air import, gas approach, hot-blast outlet and instrument socket.
10, according to claim 1 or 9 described test furnace for ceramic products, it is characterized in that: when firing temperature below 1450 ℃ the time, preheating chamber and burn till the middle part, chamber and be provided with the roller rod; When firing temperature during, burn till the bottom, chamber and be provided with backing plate at 1450~1760 ℃.
CN 99109296 1999-06-28 1999-06-28 Test furnace for ceramic products Expired - Fee Related CN1114813C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99109296 CN1114813C (en) 1999-06-28 1999-06-28 Test furnace for ceramic products

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99109296 CN1114813C (en) 1999-06-28 1999-06-28 Test furnace for ceramic products

Publications (2)

Publication Number Publication Date
CN1238447A true CN1238447A (en) 1999-12-15
CN1114813C CN1114813C (en) 2003-07-16

Family

ID=5273800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99109296 Expired - Fee Related CN1114813C (en) 1999-06-28 1999-06-28 Test furnace for ceramic products

Country Status (1)

Country Link
CN (1) CN1114813C (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101479552B (en) * 2006-05-02 2012-07-04 阿尔乔姆·茹里耶维奇·柴卡 Tunnel kiln for firing ceramic items
CN102976768A (en) * 2012-10-31 2013-03-20 佛山市紫蝴蝶陶瓷有限公司 Production process for ceramic product with smoky effect through firing by roller kiln
CN103256795A (en) * 2012-02-20 2013-08-21 柏昊仓 Double drying method and double drying chamber
CN103353224A (en) * 2013-08-05 2013-10-16 敬治民 Kiln body for baking archaized blue brick by virtue of natural gas
CN103968669A (en) * 2014-04-04 2014-08-06 珠海益鑫达科技有限公司 Open tunnel type constant temperature and humidity furnace
CN104045228A (en) * 2014-06-13 2014-09-17 信义汽车部件(芜湖)有限公司 Toughening furnace
CN104142056A (en) * 2013-05-08 2014-11-12 柏飞 Tunnel kiln equipped with air door in cross section
CN106197022A (en) * 2016-07-15 2016-12-07 河南大学 A kind of novel electrical integrated high-temperature service of bavin coal in order to firing ceramics
CN115507646A (en) * 2022-08-31 2022-12-23 山田新材料集团有限公司 High-temperature sintering furnace for smelting silicon carbide porous ceramic

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102252521B (en) * 2011-04-29 2013-03-27 林裕波 Efficient-combustion ceramic kiln system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101479552B (en) * 2006-05-02 2012-07-04 阿尔乔姆·茹里耶维奇·柴卡 Tunnel kiln for firing ceramic items
CN103256795A (en) * 2012-02-20 2013-08-21 柏昊仓 Double drying method and double drying chamber
CN102976768A (en) * 2012-10-31 2013-03-20 佛山市紫蝴蝶陶瓷有限公司 Production process for ceramic product with smoky effect through firing by roller kiln
CN102976768B (en) * 2012-10-31 2014-06-18 佛山市紫蝴蝶陶瓷有限公司 Production process for ceramic product with smoky effect through firing by roller kiln
CN104142056A (en) * 2013-05-08 2014-11-12 柏飞 Tunnel kiln equipped with air door in cross section
CN104142056B (en) * 2013-05-08 2018-09-25 柏飞 The tunnel oven on cross section is arranged in a kind of Kazakhstan air lock
CN103353224A (en) * 2013-08-05 2013-10-16 敬治民 Kiln body for baking archaized blue brick by virtue of natural gas
CN103968669A (en) * 2014-04-04 2014-08-06 珠海益鑫达科技有限公司 Open tunnel type constant temperature and humidity furnace
CN104045228A (en) * 2014-06-13 2014-09-17 信义汽车部件(芜湖)有限公司 Toughening furnace
CN106197022A (en) * 2016-07-15 2016-12-07 河南大学 A kind of novel electrical integrated high-temperature service of bavin coal in order to firing ceramics
CN115507646A (en) * 2022-08-31 2022-12-23 山田新材料集团有限公司 High-temperature sintering furnace for smelting silicon carbide porous ceramic

Also Published As

Publication number Publication date
CN1114813C (en) 2003-07-16

Similar Documents

Publication Publication Date Title
CN1114813C (en) Test furnace for ceramic products
CN202675857U (en) Wide-body energy-saving and environment-friendly tunnel kiln
CN2635677Y (en) Air and gas double-preheating hot-blast stove
Senegačnik et al. Annular shaft kiln for lime burning with kiln gas recirculation
CN2903868Y (en) Hot smoke device
KR100900204B1 (en) Apparatus and Method for Traditional Colorizing Clay Products
CN208505002U (en) Hot air circulation heat accumulation type radiant tube heating sealing roller way kiln
CN109238904A (en) A kind of structure fire resistance experimental provision
CN103743243B (en) Method for raising temperature of nickel flash furnace
CN2588214Y (en) Waste gas burning furnace
CN2199205Y (en) Indirect heating calciner for active lime
JPH0376788A (en) Drying and heating dry quenching equipment of coke oven
CN2102484U (en) Three ring type carbon products baking furnace
CN201811580U (en) Grate-rotary kiln-circularly cooling machine baking oven device
CN2705464Y (en) High temperature hot-air furnace
CN114018044B (en) Brand-new industrial heat treatment furnace and working method thereof
CN220419257U (en) Ultralow nitrogen combustion experiment platform
CN115418433B (en) High-temperature furnace drying method for opening new converter
CN2287282Y (en) Flaming gas burner
CN113566566B (en) Energy-saving quick-firing roller kiln
KR20040082260A (en) Method for making carbon coated brick and firing furnace thereof
OHIMAI APPLICATION OF FURNACES, KILNS AND OVENS IN ADVANCED CERAMICS
SU761814A1 (en) Reflective furnace
CN116222209A (en) Rotary hearth furnace drying method
CN1727499A (en) High temperature primary heater unit of blast furnace hot blast stove and technique

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee