CN1229160A - Automatic sluice gate with buoyancy programmed control - Google Patents

Automatic sluice gate with buoyancy programmed control Download PDF

Info

Publication number
CN1229160A
CN1229160A CN98104565A CN98104565A CN1229160A CN 1229160 A CN1229160 A CN 1229160A CN 98104565 A CN98104565 A CN 98104565A CN 98104565 A CN98104565 A CN 98104565A CN 1229160 A CN1229160 A CN 1229160A
Authority
CN
China
Prior art keywords
gate
water
board
steel
buoyancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN98104565A
Other languages
Chinese (zh)
Inventor
卢树春
王留荣
卢冰
吴力行
卢江
Original Assignee
卢树春
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 卢树春 filed Critical 卢树春
Priority to CN98104565A priority Critical patent/CN1229160A/en
Publication of CN1229160A publication Critical patent/CN1229160A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Barrages (AREA)

Abstract

A floatage controlled automatic gate for water conservancy and hydroelectric generation, which are described carefully in 10 patents, features better operating and working performance and high economic index, and can be widely used as water gate, blood-diversion gate, tide-stop gate, ship lock, etc. or used for stream diversion or catching water.

Description

Automatic sluice gate with buoyancy programmed control
The invention belongs to the water conservancy and hydropower technical field.It belongs to roof weir gate in the classification of hydraulic gate.
It is investigated card, original roof weir gate is to be invented in 1818 by American White (Jasiah White), when beginning to build, has made up a story in order to confuse the masses, advocation is to build the large-scale trap of catching black bear, and must be called bear well gate (Bear-trap gate).Bear well gate is successively built in ten engineerings in the development of the U.S., lasts 88 years, and maximum port size reaches 48.6 * 5m.U.S. engineer Parker (Parker) is in " control of water " (The Contral of water) of works in 1916 book, describe bear well gate in detail in engineering practice, generally occur from floating, self-locking and phenomenon such as asynchronous, and cause destruction, and point out: " failure of this gate has two big reasons: (1) design is bad; the flashboard ratio is improper, easily self-locking when landing; (2), take place serious asynchronous in when landing because lateral stiffness is not enough." after this book publishes, engineering circle of the U.S. just nobody adopt this gate again.
Afterwards, this technology was imported Europe into, became roof weir gate about nineteen thirty by the Hu Bai of Swede (Huber) design improvement.We can say to have the gate of sector-like shape and the drum gate of bleeding edge in modern age, also is on the engineering practice basis of summing up various roof weir gates, and innovation improves and forms.
First bear-trap dam of China is built in September nineteen sixty-eight, and promptly Henan Province faces Huanglong's canal bear-trap dam (8 * 2m) that clever county water conservancy bureau builds.Subsequently this county water conservancy bureau again in July, 1970 build up the Da Guo bear-trap dam (26.5 * 4.5m), put on display in Guangzhou trade fair in autumn in 1971 as the technological innovation achievement, and then in all parts of the country in short several years, successively build up about 23 bear-trap dam engineerings.Hydraulic and electric engineering publishing house has published " bear-trap dam " book in January, 1973 for this reason, and bear-trap dam is used widely throughout the country, and about 50 of bear-trap dam engineering has been built in the whole nation so far.But engineering practice proves, the bear-trap dam built of initial stage all exists serious self-locking, phenomenon such as floating certainly, out of control and asynchronous, and exposes that maintenance is difficult, the life-span is short, water shutoff is poor, operates serious problems such as the bad and flashboard structure destruction of runnability.Afterwards, through the verification document, the bear-trap dam of just finding China was in construction profile, and operation characteristic is upward very similar to the bear well gate of the U.S. with existing problems, and the someone advocates for this reason, and the bear-trap dam of China will have same end with the bear well gate of the U.S..
The inventor has accepted Luoyang City's Gold Water River reservoir spillway bear-trap dam (design objective of 26 * 6m) in 1972, grind the serious problems that expose in the examination at bear-trap dam engineering practice and model, in conjunction with the gains in depth of comprehension of being engaged in the design of hydraulic gate and metal construction, manufacturing, installation for a long time, carry out ten innovations audaciously and improve---set up the hinged inching gear of steel work intermediate chain bar and enhancing integral rigidity; Improve flashboard structure design conditions and gallery valve system; Improve water shutoff connection, construction hoisting and maintenance support etc.This bear-trap dam was completed in August, 1974, just stood once the intense impact check of unexpected " flood breaks down " immediately, and bear-trap dam rises the lock dash apace, lifting nimbly and freely, without any floating certainly, self-locking, out of control and asynchrony phenomenon.After particularly " 75.8 " extraodinary flood disaster appears in Henan Province, the operation performance of high water level is carried out in the managerial decision of Henan Province water conservancy department at this lock, allow the various places, city, the county water conservancy chief that participate in a conference all visit, so that widely popularize on each reservoir spillway.Carried out the high water level operation demonstration on October 17th, 1975, its good runnability of operation is reliably inspired leader's favor at different levels of visit as a result.Thereafter a collection of reservoir spillway has been built bear-trap dam in succession.Grinding of Luoyang Gold Water River reservoir spillway bear-trap dam tries and the design improvement success, indicates the birth of second generation bear-trap dam.So far move more than 20 year, stable and reliable for performance, not overhaul as yet.
It is worth mentioning August 3 nineteen eighty-two, Huixian, Henan Province Shimen Dam flood spillway bear-trap dam (accident destruction of 47 * 6.25-7m), unexpectedly done once most valuable " destructive testing " for design, construction and the operational administrative of second generation bear-trap dam, for the development of bear-trap dam provides the most convictive scientific basis.Because the survey report of the scene of the accident, photo and party's dictated material proves: every principle, principle and the calculation assumption of the design of second generation bear-trap dam are safe and reliable; Every by the various steel work component of design drawing requirement manufacturing and the reinforced concrete member of normal construction, all stand the current special doubly load " destructive testing " and not destruction of surpassing; This bear-trap dam has 18 flashboard unit, be coupled to " semi-rigid " overall structure with powerful " hinged inching gear " and the water shutoff of epoxy resin mortar seam, the result has only destroyed 10 flashboard unit, still there have 8 flashboard unit to keep to be intact, and dropping to design attitude automatically, the super doubly transmission of load does not influence when not destroyed by adjacent flashboard unit; The flashboard unit of destroyed, the position and the shape of its destruction have nothing in common with each other; Every construction, the position of welding, be equipped with hidden danger of quality and steel work weldment have all destroyed; Every construction, welding quality are good does not all have damage.Therefore, construction quality is poor, exists many serious quality accident hidden danger, is the basic reason of this having an accident property of bear-trap dam destruction; Error on the operational administrative then is the external cause that destroys, because as long as the operation operating instructions of observing the instruction of county flood control headquarter and clearly stipulating for many years---forbid the high water level operation to move between flood season or storm period, guarantee reservoir safety, current malicious event can be avoided taking place fully, because this lock rules was in accordance with regulations operated safe operation 6 years, and planned comprehensive maintenance and inspection.But from current unexpected accident destruction, also obtain many useful enlightenments: comprehensively innovation improves design, construction, the installation and operation management condition of bear-trap dam, for the innovation and creation automatic sluice gate with buoyancy programmed control provides new approaches and theoretical, practical basis.
In October, 1988, with the name of Yellow River Water Conservancy Committee of Ministry of Water Resources exploration planning and design institute, published " bear-trap dam technological service explanation ", and pointed out: " my institute has more rich practical experience aspect bear-trap dam engineering design and research.Luoyang City's Gold Water River reservoir spillway bear-trap dam of design in 1972 (26 * 6m) and Huixian Shimen Dam flood spillway bear-trap dam of design in 1975 (47 * 6.25-7m), check through construction and long-time running, prove success.What occur on the past bear-trap dam performance is asynchronous, and problem such as self-locking, floating, out of control certainly, poor durability, maintenance difficulty all is resolved basically.Therefore, it is acknowledged as the sign that second generation bear-trap dam is born.My institute has received relevant personnel's interview in more than 30 provinces in all parts of the country, city, county for this reason, and successively provides the drawing of Analysis of Nested Design more than 100 for relevant department, calculated description with exchange data.In order to reduce cost significantly, simultaneously also in order further to promote the development of bear-trap dam, be China's water resources and hydropower construction cause service better, my institute will bear bear-trap dam technical advice and second and third bear-trap dam design objective in generation.Technological service and standard of charge are as follows: (1) bear-trap dam engineering design (span is greater than more than the 50m), will collect design fee than saving 1/2~1/5 of investment cost by the rubber dam of identical discharge type design; (2) based on the novel small power station engineering of bear-trap dam, will collect design fee than 1/3~1/10 of the small power station's engineering economy investment cost that designs routinely; (3) to the newly-designed bear-trap dam engineering consulting of other unit, if can not propose three above improvement ideas and reduce construction investment, same free answer from.General advisory fee is only collected than 1/3~1/10 of investment cost that former design scheme is saved.Cooperate this Service Description, write " bear-trap dam new technology summary and prospect " by the inventor and printed and distributed national units concerned.This paper more comprehensively sums up the evolution and the experience and lessons of China's bear-trap dam, has tentatively proposed the scenario and the improvement idea of third generation bear-trap dam, and the bear-trap dam engineering is combined with the medium and small-scale water and electricity engineering, proposes some new concepts and new approaches.Subsequently, once the demonstration in conjunction with some object of construction production compared, third generation bear-trap dam is carried out more deep, the more exploratory development of system, and write " development of bear-trap dam technology with apply ", publication is outstanding technical journal " water conservancy and hydropower technology " first phase in 1994 in the whole nation, formal for the first time third generation bear-trap dam design scheme and the accompanying drawing of proposing in the literary composition.In a word, the inventor once reached the exploratory development in 20 years to third generation floating gate, it will more perfect than second generation bear-trap dam, more advanced, more economical and safety and reliability, but regrettably still do not have the engineering practice check, the particular content details is also never published, the maximum mistake of third generation bear-trap dam achievement in research, be traditional concept and the Mechanical Builds of yielding to bear-trap dam, the new results of achieving no breakthrough property just change original design, execution conditions, become better and approaching perfection day by day.But, the development of things always has the process of quantitative change to qualitative change, and follows " what negate negates " rule, and it provides abundant foundation and scheme contrast for creation, the invention of automatic sluice gate with buoyancy programmed control, and it is the teacher of funeral affairs that preceding thing is arranged greatly, and what Failure is the mother of success sighs with deep feeling!
The purpose of this invention, widely collect contemporary science and technology progress achievement and bear-trap dam engineering experience exactly, for Hydraulic and Hydro-Power Engineering is built a kind of novel gate with automatic compatible microcomputer remote control of waterpower of contemporary advanced level of creativity and innovation, substitute and be extensive use of the various conventional gate (containing the ship lock gate type) that falls behind with technical-economic index at present, and, keep in repair the replacement door type easy, that application life is the longest, the construction period is the shortest, comprehensive cost is minimum for the Hydraulic and Hydro-Power Engineering construction of 21st century provides a kind of operation safe and reliable to operation.In addition, this invention and a whole set of new technology, new equipment, new technology combines, create a kind of novel movable gate dam hydroelectric project, substitute concrete gate dam hydroelectric project conventional and that still adopt in a large number present countries in the world, and be middle low water head, the construction diversion of hydroelectric project and disposable cut-off cofferdam water retaining generate electricity in advance and start new way, thereby make China in, the small-sized hydropower projects construction will make a breakthrough: go into operation then, build up flood discharge sand washing gate dam engineering (automatic sluice gate with buoyancy programmed control) then, build up the simplification ship lock then, Construction Closure then, utilize the first batch of unit generation in high cofferdam that dams then, supported electrical rolling with electricity in 1 year and raise funds to build up, beginning energy charge income was paid the principal and interest on the loan in the 3rd year.It will make China the waterpower automatic gate and in, the low water head construction of hydropower plant is in world lead level.
The task of this invention, systematically resolve the ten big technical barriers that expose in the bear-trap dam engineering practice exactly comprehensively, make lifting performance, automation mechanized operation runnability, water shutoff performance, maintainability, endurance quality, the uprising stormy waves impact endurance test shock performance of bear-trap dam, anti-silt alluvial performance, and design art moulding, tourist sight, combined energy dissipater, install miniature self-contained hydroelectric generation unit, comprehensive management management, construction technology, construction period, construction costs etc., create to some extent, advance to some extent.And combine with a whole set of new technology, new equipment, new material, new technology, new policy, new concept, make the comprehensive rolling development improvement of China's rivers, " five certainly " engineering mode of go on fund raising voluntarily rapidly, charging, repay voluntarily, build voluntarily, manage voluntarily voluntarily.
This invention has four big name features: first, what it derived from China's first, second and third floating gate in generation grinds examination achievement and engineering experience widely in a large number, its root and basis are bear-trap dams, its lifting operating principle, five-bar mechanism transmission principle and structural load design condition etc. are fully identical with bear-trap dam.Therefore, it can only " float " by surname, promptly presses operating principle, design, the operating experience of bear-trap dam, needn't do any model testing again, just can directly design the automatic sluice gate with buoyancy programmed control that can guarantee safe and reliable operation.Second, its extensive use hydraulics, the principle of structural mechanics and mechanism's mechanics, problem to the bear-trap dam existence, carry out the innovation of system improvement again comprehensively, we can say, remove standardized screw, outside the nut, 99% component are all different with bear-trap dam, it all is record-breaking innovating the improved degree of depth and range, quantitative change produces qualitative change, therefore, can be renamed as " range control automatic gate ", first word of name is " power ", representing that promptly it all is to be undertaken by mechanics principle that all innovations improve, is not arbitrarily to act by subjective wishes, as multi-functional hinge water shutoff combined unit, gentle floating middle carrier bar, universal maintenance bracing or strutting arrangement, permanent sealing water device etc.The 3rd, it is provided with very complicated perfect again multi-functional gallery valve operation management system, makes it carry out the automatic and microcomputer straighforward operation operation of waterpower according to designing program and various design water levels.It is different from traditional waterpower automatic gate, and all the water recast that increases with design containers is an equilibrant force lift gate automatically; New design is then by filling very plastic bottle, the pulling pullswitch of low capacity the communicating pipe of electric wiring of designing program and various water levels, with the special electromagnetic valve of accumulator jar power supply opening, just can operate Pneumatic butterfly valve lift gate automatically, promptly " PROGRAMMED AUTO " is different from traditional " the heavy balance of water is automatic ".The 4th, it has the prerequisite performance of hydraulic gate and feature one fast opening and closing gate, tight sealing water device reliably, favorable durability energy, good construction, installation, maintenance condition, can install Emergency Gate carries out large repairs etc., thereby its category division genus " gate ", and belong to movable dam or movable weir unlike the type of rubber dam, bear-trap dam.In a word, be that science is rigorous again by this four big feature called after " automatic sluice gate with buoyancy programmed control ".
Necessary technical characterictic of the technical scheme of this invention and additional technical feature have following ten:
1. initiate multi-functional permanent hinge water shutoff combined unit, this is a technical and professional very strong patent of invention technology, also is the important symbol that automatic sluice gate with buoyancy programmed control has contemporary advanced level.Bear-trap dam is propped up the combination of hinge form of structure and seal water structure device, once spending more than 20 year time carries out exploratory development, also once conceived many form of structure schemes, but because the constraint of traditional concept and technology, fail to make a breakthrough, in working out manual of the present invention and drawing course in recent years, just progressively improve and be comparatively ideal achievement: the technology that 1. breaks traditions gate props up hinge and transmits point load, the hinge steel pipe that changes communication type into rotates the contact surface supporting, transmit evenly distributed load, eliminate stress to concentrate and destroy a difficult problem; 2. utilize the hinge steel pipe to rotate the tangent line bearing surface, increase the protection of brush chromium layer,, solved the hinge constructional device problem that combines with the seal water structure device as permanent water shutoff; 3. utilize " minute surface sealing " new technology, Molykote, the stainless copper coin of nickel chromium triangle, stainless steel parts and electrodeposited chromium layers antirust etc., at parting place, flashboard unit, sealed-for-life hinge transmission tensile device has been designed in the end that is the hinge steel pipe, and the permanent water shutoff problem of solution seam and plane of rotation, its maximum characteristics are transmission hinge and face mirror obturator, after the program general assembly by design, can not change taking-up, guarantee permanent safe operation, be total to the life-span with reinforced concrete structure, greatly simplified the construction and installation and the maintenance of a hinge water shutoff combined unit; 4. only depending on the hinge at hinge two ends and seat board embedded part to bear the main gate-board hydraulic pressure component (pulling force) that makes progress is safety inadequately, overlap cambered surfaces and end the common tension of axillare weldment so each flashboard unit sets up three, and double notched sill energy dissipating; 5. energy dissipation by aeration and the energy dissipating of water jets bump in order to increase a hinge steel work deflecting flow dam, and with the energy dissipating of main gate-board Lower Half beam and slab structure, the energy dissipating of absorption basin notched sill, form less expensive reasonably novel " combined energy dissipater ", welding triangular prismatic type cast iron detal and taper discharge jet on the hinge welding I beam, and bury underground and carry compressed-air actuated aeration pipe; 6. handling with a water shutoff of hinge plane of rotation intersection, end in the water shutoff of gate pier side is a technical barrier, and present various gates all do not have successful experience, and serious leakage jetting phenomenon all takes place.Use the welded steel structure garden dish of fine finishining and brush chromium layer protection for this reason instead, utilize " minute surface sealing " principle to eliminate Lou jetting phenomenon, and reach permanent water shutoff and long-term maintenance free requirement; 7. install three cover tumblers in the end of gate pier one side hinge: the one, press water is carried sealing device; The 2nd, the compressed air delivery sealing device; The 3rd, gatage discharge indicator.More than the assembling of every structure and process conditions see explanatory note one joint of Fig. 1, Fig. 2.
2. adopt novel main gate-board structure.A large amount of engineering practices of bear-trap dam prove, main gate-board form of structure and shape, lifting performance and security reliability influence to bear-trap dam are very big, brightness tool Shimen Dam flood spillway bear-trap dam particularly, storm wave impact and strong vibrations test have been stood, powerful stormy waves impacts and makes bed rearrangement door body structure and lock wall construction generation sharp pounding and sound, the huge sound is on tenterhooks administrative staff with rocking, though considered the coefficient of impact 1.5 that stormy waves impacts on the structure design, but rupture failure (main gate-board rising 50mm) still takes place in the steel work intermediate chain bar of welding, main gate-board props up hinge stress and concentrates the bulb shape crack that produces to develop to some extent, the epoxy resin sand of seam water shutoff, slurry local failure, the existing bear-trap dam main gate-board design condition incompatibility storm wave impact endurance test shock of proof thus; Secondly, be the prefabricated and unsuitable complexity of hoisting restriction main gate-board shape of construction of main gate-board, size is unsuitable excessive, and it is big to do big improvement difficulty.The main gate-board of automatic sluice gate with buoyancy programmed control improves and moulding at these two technical barriers exactly.At first, the installation technology of main gate-board is improved to clay model moulding pouring construction in place on the spot and the disposable steel work weldment of burying underground, greatly simplify and accelerate construction and installation, and main gate-board cell width, structure length and geomery etc. are not subjected to the hoisting machine tool condition restriction.Next changes the main gate-board top into broken line type, and the high about 800mm of broken line is to satisfy auxiliary gate-board and gentle minimum maintenance requirements of installation space of floating middle carrier bar on the flexible combination type.Its top curve is then by vacuum weir overflow curve condition setting, to reach maximum discharge coefficient.These two conditions combine, certainly leading to main gate-board puts at the most high-grade water level, the about 400mm in underwater will be slipped in its top, when storm wave impacts like this, its retaining hit rigid body plane that face is not the main gate-board cantilever end and with reinforced concrete structure on auxiliary gate-board form the horn shape rigid body, but sharp mouth shape curved body, the first half of storm impact climbs along curved surface and crosses the top and descend like this, do not produce the reaction force of storm impact, the Lower Half of storm impact is then made tangential motion along auxiliary gate-board on the flexible combination type, and defeat a force with a tenderness, the reaction force of generation is obviously very little.But also produce a very big side effect, promptly huge repeatedly storm wave fluctuation, certainly will drive main gate-board fluctuates, the last auxiliary gate-board of bullet flexibility wants the bigger elasticity of specific rigidity structure generation to shake distortion altogether, therefore, one time storm wave just may be the hydraulic type rubber water shutoff wear-out failure of gate pier both sides, for this reason, adopted three remedial measures: the one, in the main gate-board top-side uprising stormy waves impact elasticity locking stopping means is set, limit significantly free floating of main gate-board, and unite anti-resistance with the water shutoff of hydraulic type rubber; The 2nd, descending auxiliary gate-board to prop up on the hinge free bearing girder steel weldment, cambered surface is set ends the axillare elastic limit device, and restriction is descended freely swinging of secondary lock flashboard and is produced covibration; The 3rd, effective measures are in time to utilize the about 500mm of microcomputer remote handling system landing automatic sluice gate with buoyancy programmed control, local unlatching earial drainage, and storm wave just is difficult to impact gate.In a word, uprising stormy waves impacts and shaking device is to alleviate its influence as far as possible, is major action of automatic sluice gate with buoyancy programmed control design model.Once more, the main gate-board Lower Half is made into the beam and slab type energy-dissipating structure, both saved reinforcing bar and concrete amount, be beneficial to again and form novel " combined energy dissipater ", but then should make the continuous hollow plated construction in high water head earial drainage condition, and utilize " combined energy dissipater " of choosing the aerial energy dissipating of stream bank.Also have, the support pattern of main gate-board improves to some extent, and main gate-board is droped to the ground the position top-supported at following auxiliary gate-board hinge weldment, and steel to steel line contact supporting is eliminated the problem of stress concentration of point load, and set up old tire rubber tile elastic cushion block, eliminates impact load.In addition, supporting beam forward the moving of trying one's best in middle part reduced the top-supported span, adapts to the big characteristics of overflow depth of water flowing pressure.Its specification specified is seen the relevant explanatory note of Fig. 1, Fig. 3, Fig. 4.
3. the auxiliary gate-board structure replaces the reinforced concrete structure flashboard on the employing flexible combination type.It derives from the engineering practice of rubber dam and gentle abdomen bear-trap dam and grinds the examination achievement, but not that simple the transplanting applied mechanically, but maximize favourable factors and minimize unfavourable ones, and in conjunction with the runnability of automatic sluice gate with buoyancy programmed control, support maintenance condition and installation technology characteristics, innovated and formed a complete set of, float fixedly connecting device of middle carrier bar, chain form hydraulic type rubber sealing water device, special arc steel work as gentle, thereby produce qualitative leap, have very big novelty, creativeness and practicality.Its technical characterictic is: 1. flexible flashboard is that the wire rope bonding by the thick nylon cloth rubber tile of 7~12mm and diameter 6.2~12.5mm is combined into, rubber tile is regardless of the flashboard unit, the bonding view picture that is unified into, its width equate that with the gate overall width other widens 600mm and uses as side seal water is folding; But the configuration of wire rope is then divided by the flashboard unit, each flashboard unit is provided with 4, mainly satisfy the service requirement that uprising stormy waves impacts, and prevent the aging permanent deformation that produces of nylon rubber plate, make the dash height of gate constantly increase variation through the long-time running meeting.The full-length of wire rope must strictly be controlled, and every wire rope needs to be woven into ring-type by the experienced operator, the arc steel work that is fixed on two ends with 4 special pulleys is connecting device fixedly, when impacting in order to adapt to the uprising stormy waves of wire rope, produce powerful concentrated pulling force, set up the shearing resistance burnished bolt and strengthen connection, and with 120 * 5mm nylon cloth rubber tile that the wire rope bonding is fixing.2. its two ends connect with special arc steel work connecting device, and this device also has flashboard and turns to tension, bending resistance, side seal water arc transition, the fixing hinged and multiple function of main gate-board top elastomeric bearing of fine motion of strengthening of wire rope.In addition, the length that must be pointed out its every joint only is 2.2m, so that stagger with the seam of flashboard unit, part plays strengthens the hinged globality connection effect of fine motion.3. the side seal water of auxiliary gate-board connection processing is a technical barrier on the flexible combination type, should satisfy flashboard plastic deformation condition, side seal water with main gate-board and following auxiliary gate-board has continuity and bending again, rotate, stretching good linking, through multi-scheme research relatively, adopt chain form hydraulic type rubber side seal water device at last, it is to utilize the two pass bolt, two sleeve backing plates, double-layer rubber plate and long bar steel plate connect fixedly hydraulic type rubber water shutoff, and enhancing lateral stiffness, prevent excessive Free Transform and leak, utilize the anticaustic power of hydraulic type rubber water shutoff and frictional resistance supporting-point again as flexible flashboard, thereby improve the stability of sealing water device, the Free Transform that unlikely generation is excessive and leaking in a large number.4. as the ingredient of auxiliary gate-board on the flexible combination type, be exactly gentle floating middle carrier bar, both interdependences, mutual restriction, moulding mutually, inseparable.Its structure assembling and process conditions are seen the explanatory note of Fig. 4.
4. adopt gentle floating middle carrier bar to come instead of steel structure intermediate chain bar.The most high-grade water level at automatic sluice gate with buoyancy programmed control is put, and it is the ingredient of auxiliary gate-board on the flexible combination type, only in the gate lifting process neutralization position of droping to the ground, just demonstrating the shape and the function of gentle floating centre carrier bar.It has similar function with the steel work intermediate chain bar of the second generation five connecting rod bear-trap dams: be convenient to be connected upper and lower auxiliary gate-board and water shutoff; Constitute five side rod motion of mechanism mechanism, transmit the buoyancy and the water pressure of each member respectively; Through a large amount of model investigations and electronic computer computing check, it greatly improves lifting, the runnability of bear-trap dam; It can cancel reservoir water-filling start gate, rises gate automatically and used the dynamic head design instead; Strengthen bear-trap dam globality rigidity, help eliminating the serious asynchrony phenomenon of bear-trap dam.But steel work intermediate chain bar handles for construction, manufacturing, installation, the seam water shutoff of bear-trap dam, and uprising stormy waves impact and vibrations, operational management and maintenance etc. bring numerous unfavorable conditions, and the rupture failure of having an accident property.This invention is maximized favourable factors and minimized unfavourable ones, and resolve these technical barriers with flying colors, it is characterized in that: 1. the height of gentle floating middle carrier bar is about 800~1000mm, to grow one times than the steel work intermediate chain bar of bear-trap dam, help eliminating " reignition head ", and when satisfying universal maintenance bracing or strutting arrangement and using, auxiliary gate-board under the unlikely drive is also created the better space condition for maintenance; 2. the effect of plastic pipe is to strengthen lateral stiffness and buoyancy moulding, and the two ends of every joint plastic pipe will seal with the hard plastic board hot weld, and stick on securely on the nylon rubber plate with bonding agent and rubber tile; 3. in gentle floating middle carrier bar scope, ageing-resistant foamed plastic buoyancy aid, the about 400 * 100mm of its cross dimensions is cemented on the nylon rubber plate with bonding agent and rubber tile, to reach buoyancy moulding effect; 4. special arc steel work weldment is a straight forming and transmit to divide key parts to water pressure, and its cambered surface length is slightly than the arc steel work at top fixedly about the long 100mm of connecting device.The structure assembling and the process conditions of gentle floating middle carrier bar are seen the relevant explanatory note of Fig. 4.
5. adopt novel auxiliary gate-board down, substitute the board-like structure of steel concrete of four-point supporting.The four-point supporting structure not only produces huge point load at a hinged bearing place, need a large amount of radiation reinforcing bar of configuration, and, adjust requirement in order to satisfy cracking resistance because flashboard thickness is limited, need a lot of two-way concrete slab of configuration, reinforcing bar density is very big, difficulty of construction is also big, once causes serious quality accident and rupture failure, if the flashboard cell width adds is twice, then problem can give prominence to and be difficult to handle more, must improve a form of structure and a hinge form.The present invention improves and clay model molding construction process modification staff in place on the spot from a hinge, be improved to the board-like reinforced concrete structure of optimization type simply supported beam, it is characterized in that: 1. high accuracy standard unit mould prefabrication and lifting technology, be improved to clay model moulding continuity construction technology in place on the spot, this is the innovation and the breakthrough of most critical, thereby greatly simplify construction and installation, reduction of erection time and reduction cost; The evenly distributed load transmission of 2. permanent hinge water shutoff combined unit and gentle floating middle carrier bar, for selecting for use of optimization type simply supported beam plated construction created essential precondition, the height of beam slab can be selected by optimum reinforcement ratio like this, expectation can be saved amount of reinforcement more than 50%, checks also very favourable to cracking resistance; 3. the vertical and horizontal section shape of beam and slab structure is seen Fig. 4, shown in Figure 5, the span of its position supporting-point of droping to the ground, and this is one of flexural strength essential condition, will dwindle more than 1/3 than traditional design; 4. the supporting of main gate-board top-supported and universal maintenance support all is located at down on the auxiliary gate-board hinge weldment, and be convenient to stress diffusion and simplified structure and arrange, also be a key character.
6. adopt novel sealing water device to substitute conventional sealing water device.One of maximum characteristics of bear-trap dam are that the seal water structure device is of a great variety, and it is big to make installation difficulty, and application life is short, and maintenance changes inconvenience, and the total cost of seal water structure device accounts for about 1/3 of door body structure total cost.This invention breaks through the process conditions of traditional concept and technology, seal water structure more than 90% is improved to permanent seal water structure device, can move continuously for a long time, need not keep in repair and change, has the feature that is total to the life-span with reinforced concrete structure, thereby greatly simplify construction and installation, reduce maintenance management personnel and expense, have very high practicality and economic benefit, it is characterized in that: 1. a hinge seal water structure device of main gate-board and following auxiliary gate-board, be improved to the double permanent seal water structure device of steel to steel line contact supporting, and " the minute surface sealing " of the stainless copper washer of supporting employing nickel chromium triangle, the permanent sliding agent of molybdenum bisuphide, new technologies such as stainless steel parts and brush chromium layer make the durability of whole hinge water shutoff combined unit reach hundreds of years; 2. the seam water shutoff between the main gate-board unit is improved to steel mesh reinforcement and cooperates the shutoff of steel fibre coloured cement mortar arch, the colored bulb decoration reaches and the requirement in life-span altogether of steel concrete flashboard, in case local damage also is easy to repair.It derives from the practical experience of bear-trap dam epoxy resin mortar shutoff, impacts and the vibrations check through strong storm wave, has only a small amount of damage, and is most intact.3. the side seal water of auxiliary gate-board on main gate-board and the flexible combination type, be improved to hydraulic type rubber seal water structure device, during gate lifting operation, the closing presure water source makes the water shutoff rubber separate with the lock wall, reduces the wearing and tearing and the frictional resistance of water shutoff rubber; When the closing gate dash, open pressure water source, make water shutoff rubber jam-packed, and reach good water sealing effect, this is the technical new breakthrough of large-scale activity gate water shutoff, particularly a main gate-board side seal water and the permanent sealing water device of a steel disc structure use that matches of hinge plane of rotation intersection, end will make the buoyancy programmed control lock eliminate Lou jetting phenomenon fully, and this is that present various gate all is difficult to accomplish.4. descend the sealing water device of auxiliary gate-board unit seam crossing more to simplify, central space is the formwork for placing that the type of making is mixed in the prefabricated thick bamboo tube skeleton pitch wood chip heating of steel form, and the top seam is then used the shutoff of branded oil felt.5. descend the side seal water of auxiliary gate-board, because loading and unloading change condition restriction, should not adopt the water shutoff of hydraulic type rubber, use the seal water structure device of ageing-resistant plastic pipe and rubber cushion blocks elastic compression instead, wherein imbed the STAINLESS STEEL NUTS in the concrete, need to be cemented on the angle steel weldment with powerful bonding agent earlier, and in the end of nut with the bonding shutoff of stamping forming tin plate cap.The assembling of novel seal water structure and process conditions are seen the explanatory note of Fig. 6.
7. initiative main gate-board i beam rotary type construction platform mould is the fan-shaped water shutoff work plane service of the high-quality high accuracy of gate pier both sides.The engineering practice of bear-trap dam proves: no matter workman's technical level how, well construction howsoever, because the accumulated error of the deviation of the rotational plane of main gate-board side seal water steel knot embedded part and the construction deviation of the fan-shaped water shutoff work plane of gate pier, often cause the fan-shaped water shutoff work plane generation of side seal water steel work embedded part and gate pier part to bump card and cause the scratch that is difficult to see, and make water shutoff rubber squeeze and destroy, the dash height of bear-trap dam is big more, and problem is outstanding more, serious more.It is consistent with the installation deviation of rotating construction platform mould that this invention is exactly the planeness deviation that the large tracts of land work high above the ground of the fan-shaped water shutoff work plane of gate pier is produced, this is easy to accomplish, because the planeness of gate pier shape water shutoff work plane is to wipe mensuration off by rotating construction platform mould, later stage, with second stage concrete main gate-board i beam rotary type construction platform mould is connected with main gate-board, can guarantees its high-quality high-precision requirement.Must be pointed out, in order to adapt to the execution conditions of turntable mould, the wall body structure and the technological process of the fan-shaped water shutoff work plane of gate pier must be improved: in the standard size scope of fan-shaped working face, reserve the dark steel mesh reinforcement second stage concrete hole groove of about 50mm, and bury the joint bar of sufficient amount underground; Before the construction basal plane hacking flushing, after weld fixedly steel mesh reinforcement immediately, and with thicker fine concrete (need mix the early strength admixture of some) placement in layers to the steel mesh reinforcement inner face; And then layering metal binding wire net from bottom to top, and the floating cement mortar of standard baseline of pressing the turntable mould is in time checked its planeness with turntable mould standard plank basal plane after the initial set, and local failure in time repairs; Every layer of initial setting time and begin to fill period of upper strata cement mortar is according to temperature condition at that time, by the technician on duty decision of signing; Whole fan-shaped working face, must be that three-shift system is worked continuously, the centre does not allow to hold up work for lack of material, after all construction is finished, check planeness by the quality inspection inspector with the turntable mould immediately, to in time polish processing if the partial deviations value surpasses permissible value, can't handle, then need destroy construction again if deviate is very big; Be up to the standards, hang up straw mat watering maintenance seven days immediately; The smoothness of this fan-shaped water shutoff work plane is brushed ageing-resistant, the anti-new coating that tans by the sun and is guaranteed.The feature that this cover rotates construction platform mould is: standing tree mould 1. in place is on the spot built the wide steel concrete I-shaped beam of 800mm, its appearance profile and main gate-board are just the same, and have buried water shutoff angle steel weldment and the uprising stormy waves steel structure support weldment towards the elastic locking stopping means underground by designing requirement; 2. install with the screw of side seal water angle steel and fix a straight wooden lath datum, as the main foundation of rotating construction platform modulo n check and the fan-shaped water shutoff work plane of control; Welding simultaneously is temporary rod, scaffold fixedly, safety net and pedal; 3. reserve a hole for hoist and frame bolt built-in fitting at gate pier top outrigger base, install the manual and electric dual-purpose hoist engine of an about 1000kg of pulling force,, operate and rotate construction platform mould by being installed in 4 multiplying power assembly pulleys on the steel structure support weldment.Also must point out emphatically, in order to prevent just in case, on the gate floor of steel concrete I-shaped back portion bearing position, place a collection of old tire, prevent the impact damage of degenerating, and be used round log and support auxiliaryly, guarantee construction safety.
8. initiate universal maintenance bracing or strutting arrangement, this is that automatic sluice gate with buoyancy programmed control is applied and " maintenance packet " promises to undertake indispensable technical characterictic.The engineering practice of bear-trap dam shows that bear-trap dam is independently to be assembled into the flashboard unit by dozens of, and weight reaches hundreds of tons and even goes up kiloton, once uses traditional crane lifting maintenance, and difficulty is very big, and expense is very high, and is chronic.Afterwards, once be improved to extensive manually-operated rotary type bracing or strutting arrangement, but poor effect, once having an accident property destruction.Therefore, will be the huge heavy again flashboard unit of dozens of, need not any lifting facility, only depend on floating and lifting of gate self, while is support fixation equably, and drop to exactly on the special self-aligning spherical support plate, this high precision universal maintenance bracing or strutting arrangement must have a whole set of strict process flow process to guarantee.So-called universal is exactly tens of seats and even up to a hundred automatic sluice gate with buoyancy programmed control, a shared cover maintenance bracing or strutting arrangement, and periodic maintenance is changed wearing terrain manage streamlined socialized service system does not need management unit to work hard and starts.Its technical characterictic is: 1. universal steel pipe supporting member, by the high-quality seamless steel pipe and the accurately machined self-aligning spherical support plate of full-length, welding mounting, micrometer adjusting screw junction plate, WELD NUTS etc., on special high accuracy platform mould, assemble and be welded into, must strict control and eliminate welding deformation, this is standardized high precision universal member, it is common to all automatic sluice gate with buoyancy programmed control in certain serial scope, except that first gate, other needn't reproduce, and use from special warehouse to get final product; 2. accurately machined spill self-aligning spherical support seat board is wanted strict being welded on down on the hinge of auxiliary gate-board by the design centre distance between centers of tracks, and is cooperated welding with the elasticity limiting plate, the sphere of brush chromium layer protection after the assay was approved; 3. on the platform mould of standard, the fixed earlier firmly fixing following auxiliary gate-board that welds that assembled props up hinge water shutoff combined unit, the shown standard obliquity of plank sectional model by 1: 1, the universal steel pipe of fit on supports, adjust positioning and fixing main gate-board top girder steel weldment then, through after the assay was approved, fix connecting the steel plate welding, use 3 the temporary fixed support seat board of bolt weldments simultaneously.Here the technological process of most critical is: because the steel work weldment is transported, move, bump, influences such as the temperature difference, add the distortion that concreting is vibrated and produced, and the cumulative departure of alignment error etc., cause each universal steel pipe fulcrum ball face central point that identical air coordinates position can not be arranged, what have may substantially exceed deviation allowable value, therefore, each buoyancy programmed control gate is before construction finishes to check and accept, once design the operation operation test of dash position, universal steel pipe is installed after qualified immediately to be supported, and with each fulcrum ball surface bearing central point adjustment point-blank with micrometer adjusting screw, open a sluice gate the upper pond level that lands then, at this moment automatic sluice gate with buoyancy programmed control will land and corresponding landing with upper pond level, when dropping to apart from the design maintenance, main gate-board top curve section supports height mark (red setting-out) when still 50mm being arranged, stop to land and wearing the deviate that sphere central point and spill self-aligning spherical support central point are respectively supported in the diving dress submarine inspection, place on record one by one by the diver; If it is excessive that deviate all exceeds standard, then barrier gate rises gate, raises at the water surface and integrates lattice; If have only the minority deviate big; it is qualified then to be adjusted under water by the diver; slowly landing supports subsequently, but main gate-board has only the fraction weight supporting stressed also at water float; at this moment the diver can knock with weight; make the bearing surface normotopia that fits like a glove, so that upper pond level is when dropping to lowest water level, the electric welder goes down each is supported the seat board weldment and connects steel plate and weld; and 3 temporary fixed bolts are changed weldering be shearing resistance anchor weldering screw, brush the protection of novel antirust material at last.Last barrier gate rises gate, and measures the deviate that respectively supports sphere central point and standard straight-line, and number record is on record one by one, during for periodic inspection support later on, the foundation of adjusting is installed.But operation operation and storm wave impact endurance test shock through decades may produce the structure permanent deformation deviation of accumulation, and therefore, when each thereafter maintenance was supported, all needing did not have too great deviations by diver's submarine inspection, and the side allows the emptying water level to overhaul support.Here it is guarantees that this overlaps whole technological processes of the safe and reliable use of universal maintenance bracing or strutting arrangement.If run counter to this technological process, must cause supporting individually overburden and destroy and the local failure of main flow plate.
9. create a kind of novel two pass cable wire nylon rubber plate Emergency Gate, this is an additional technical feature.When the design automatic sluice gate with buoyancy programmed control, manage also can regularly overhaul support and change the damage component without the Emergency Gate dash as far as possible, for example match with the electromechanical equipment overhaul phase, scheduled overhaul in 20~30 years once empties to upper pond level below the gate floor and to get final product.But the river course that some is low-lying, the gate dam engineering of shipping, lake, seashore, it is a lot of that lowest water level will exceed gate floor, and Emergency Gate must be set could periodic inspection be supported.Still do not have a good method type of becoming reconciled in the world today and solve the access door problem of large span shutter.According to the engineering experience of external cable wire veneer rubber dam, in conjunction with the condition of applying and the design model characteristics of automatic sluice gate with buoyancy programmed control, concept design should the invention.This is an additional technical feature, does not have its automatic sluice gate with buoyancy programmed control also can exist, and just limits its extent of spreading amd application.It is characterized in that: 1. two bearer cables are fixed by manpower stretch-draw on the reinforcement anchoring part with special stretching screw, and the connection of cable wire and nylon rubber plate is fixed with special bent plate weldment and double nut; 2. for the ease of installing, transportation and keeping, the nylon rubber door-plate can be assembled into by 1~7, and its assembly mode sees that Fig. 8 assembles sketch, and the junction compresses water shutoff with standard bolt and packing ring and gets final product; 3. special doorframe built-in fitting is set, and nylon rubber plate and the bolted on connection and the dismounting of built-in fitting are under water finished by the workman who wears diving dress; 4. utilize buoyancy programmed control gate main gate-board top curve surface shape and special arc steel work weldment, special wooden voussoir is installed, directly bear a part of water pressure, the force-bearing situation and the load that can improve nylon rubber plate and cable wire preferably distribute, and improve its security reliability; 5. this invention can be used for span 12~152m, and the sluicing aperture of dash height 2~8m is as Emergency Gate; But if can form the seriation standard fitting, unified preparation, keeping and socialization overhaul service then can be common to all automatic sluice gate with buoyancy programmed control.
10. multi-functional gallery, pipeline, valve, electromechanical equipment Operational Management System are set, are the modernization operation operation of gate, comprehensive management management and tourist sight are created essential condition.Bear-trap dam and all waterpower automatic gates all have own unique collector drain and valve operation management system of filling, but too simply extensive, function is imperfection very, and it is many because of difficult and inconvenient to cause for the operation operational management.This Innovation System will be the most advanced and the most perfect Operational Management System of function in the world today: its existing hydraulic automatic (unattended) operation operational system and microcomputer straighforward operation management system; Miniature self-contained hydroelectric generation unit (self-powered's power supply) is arranged again, diving pump station, pipeline booster station, high pressure water pot and pressure water pipe net, for water shutoff rubber press water, living water, agricultural sprinkling irrigation are supplied water, the tourist sight injection water, regular channel sand-flushing desilting jetting etc. provides cheap water source; Also have mini air compressor group, high pressure tank and gas transmission pipeline network, prevent that for Pneumatic butterfly valve, pressure-air spray freezing and compressed air aeration provides safe and reliable source of the gas; Also have traffic, observation, draining, irrigation gallery system, fill collector drain valve operation management system and gate floor hollowcore slab system.The layout of this cover valve, gallery Operational Management System, section grade separation layout and thin portion assembly relation are seen Fig. 9, Figure 10, shown in Figure 11 and relevant explanatory note.Its technical characterictic is: 1. novel hydraulic automatic operating system and device are set, realize the water discharging valve that fills of hydraulic automatic operation operation, use inflatable type Pneumatic butterfly valve (LCL-10 type without exception instead with contemporary advanced level, Jiangsu Province's Yixing City first Machinery Plant of Light Industry's innovation product, latus rectum  50mm~ 500mm), so only needs the very storage battery of low capacity, open ventilating pipe with electromagnetic valve, just can operate many cover inflatable type Pneumatic butterfly valves, thereby realize waterpower automatic lifting gate.Simple designing program is: when normal operation, all water discharging valves are all closed, and inlet valve is opened, and automatic sluice gate with buoyancy programmed control is the automatic lifting dash with the variation of upper pond level, does not need personal management; When coming the water yield to surpass water supply volumes such as generating irrigation water supply, water level surpasses door top overflow, and the autobalance turnover water yield does not need personal management yet; When flood comes amount bigger, water level reaches design flood discharge water level, at this moment current flow into plastic bottle by ad hoc communicating pipe automatically, water-filled weight can be drawn back pullswitch automatically, thereby special electromagnetic valve is opened, just can close the Pneumatic butterfly valve of water-filling automatically, and open a Pneumatic butterfly valve of hinge jet water course bump energy dissipating gutter and the Pneumatic butterfly valve in gate pier draining duct simultaneously, automatic sluice gate with buoyancy programmed control just can be carried out landing flood discharge automatically; After the flood peak or in normal earial drainage process, when upper pond level is reduced to minimum emerging sharp limiting water level, device with float in ad hoc communicating pipe can draw back pullswitch automatically, thereby by predetermined designing program, one after the other the special electromagnetic valve of appendix is opened, closed the Pneumatic butterfly valve in relevant draining duct earlier, after open the Pneumatic butterfly valve of inlet channel, automatic sluice gate with buoyancy programmed control can rise dash fast, and with the variation of water level free floating, do not need personnel to manage; If just in case extra torrential rain and flood attack occur, reservoir level soars to extreme high water, at this moment, though the opened operation of the first cover hydraulic automatic device, but because sinking speed slowly or chance failure occurs, gate is not standard-sized sheet flood discharge as yet, in order to ensure the engineering flood control safety, designed the 3rd cover hydraulic automatic operating means (the waterpower automatic gate in past does not generally all have this cover safeties), current flow into plastic bottle by ad hoc communicating pipe, water-filled weight can be drawn back pullswitch automatically, the power supply opening that is provided by the miniature self-contained hydroelectric generation unit of installing in the gate pier is by the disk jet gate slot cantilever fixed wheel gate of electronic cylinder operation, this gate is arranged on the large-scale inertia drainage pipe that waits and chooses the Liu Kan exit, can guarantee that the buoyancy programmed control automatic brake steadily drops to the end apace and carries out safe flood discharge, adopting the large-scale inertia drainage pipe that waits in the waterpower automatic gate is initiative.2. microcomputer straighforward operation management system and corollary apparatus are set, not only whole operational administratives of automatic sluice gate with buoyancy programmed control can be by the microcomputer straighforward operation, other facilities such as hydroelectric generation unit, relevant pumping plant, row's silt sand surfing pipe special valve, the feed ditch diversion, the energy dissipating of injection water bump, energy dissipation by aeration, the pressure pipeline sprinkling irrigation, tourist sight lamp decoration etc., also by the microcomputer straighforward operation, also have hydraulic automatic system and device also can promptly when reservoir level does not reach the automatic design water level of waterpower as yet, can shift to an earlier date straighforward operation and open a sluice gate earial drainage by microcomputer remote control dual operation, emptying goes out bigger storage capacity, so that increase the flood detention benefit.But the electric part of this cover microcomputer straighforward operation management system is installed, generally do not carry out (except the Important Project) synchronously with engineering construction, its expense is disregarded the investment of people's engineering, but after engineering is built up the operation several years, extend installation by the fund that rolling development is raised, and carry out specialized designs and examination is installed according to the practical operating conditions of every engineering by the Electrical Engineer.Also to point out, the significant feature of this cover microcomputer straighforward operation, be that automatic sluice gate with buoyancy programmed control can be realized soon fruitfully, lifting and local the unlatching are moved flexibly at a slow speed, and control by the disk jet gate slot cantilever fixed wheel gate of inertia drainage pipe outlet such as large-scale, this gate is operated by the electric cylinder, and this is the new technology of an initiative.3. miniature self-contained hydroelectric generation unit is installed in the headspace of gate pier, carry out low water head, small-power generating, for gate automation mechanized operation operation and gate dam engineering management unit carry out the comprehensive management service, cheapness power supply reliably again is provided, this is initiative on world's gate construction history.Tentatively select " the miniature self-contained hydraulic generator unit of full-tubular " of the development of water machine teaching and research room of Gansu Polytechnical Univ for use, its head 1~7m, unit capacity 1~100kW; When head is higher, " the full-automatic self-contained minitype wheel generator group of MAA-1 type " that then can adopt Hubei Province automation equipment factory of Lu Shui multi-purpose project office to produce, its head 6~20m, unit capacity 5~40kW.In addition, consider from the development strategy of small watershed and step engineering rolling development, on the gate pier limit of a bank, reserve small hydropower station unit position, see and raise fund with comprehensive management rolling development and mortgage loan shown in Figure 11 mark 8~12, by the water amount of power generating that small watershed is planned and little multi-reservoir can provide, small power station's engineering that design-build is supporting provides new model for water conservancy industry and water project management move towards commercial running.Electricity is arranged, water is arranged, have to roll and raise fund and the technician, a kind of newborn enterprise-power supply of socialist market economy, waters supply, for feed, for food, cooling storehouse, in conjunction with modernization breed, the comprehensive industrial corporation of planting, it is flourishing to be bound to.This is maximum economic benefit and the social benefit that is caused out by emerging electricity.4. living water and industrial or agricultural water supply Operational Management System, utilize submersible pump, pipeline force (forcing) pump, normal pressure water pot and the pipeline system of automatic sluice gate with buoyancy programmed control operation operation, carry out small-scale, life tap water among a small circle and the service of farmland sprinkling irrigation water earlier, after progressively promote the expansion service zone, after treating that supporting small hydropower station builds up, then develop into specialized living water, indusqtrial water supply and agricultural sprinkling irrigation, drip irrigation socialized service system, the advantage of performance basic industry of water conservancy.5. the development modernization is cultured and the plantation system of operation and management, utilize cheap power supply reliably, the pressure sprinkling irrigation, the mist irrigation source, waters, reservoir area and absorption basin waters, doing medium scale net cage and absorption basin earlier breeds fish, investment then, make a lot of money then, work as tap with this and drive other biological chain aquaculture and brooder, fruit-bearing forest plant husbandry, it is managed the layout scope and is clearly stipulated by the planning and designing file, in principle with the technology investment joint venture of relevant universities and colleges, and near resident is carried out technical training manage with demonstration, also be that the water conservancy industry worker moves towards the enterprise management only way.6. tourist sight and tourist service facility, this is the new problem that contemporary Hydraulic and Hydro-Power Engineering construction must think better of.Automatic sluice gate with buoyancy programmed control is in conjunction with the gate pier management house, pumping plant, road bridge, the fruit-bearing forest green area, the building artistic design of culture zone, constituted a landscape engineering that ornamental value is arranged very much, particularly main gate-board overflow, the energy dissipating of injection water bump, the high-pressure water spray facility, cooperate modern rainbow color lamp to shine mutually again, constitute the very magnificent dynamic solid tourist sight of a width of cloth, and the fund of utilizing rolling development to raise is built some amusement on water places again, the park of fishing, the perpetual bloom park, dining room waterborne, the village etc. of spending holidays will form the water conservancy and hydropower benefit, the new model of modernization breeding and planting benefit and three combinations of social tourism benefit.7. traffic, inspection, observation gallery system, each gate pier increases two stair wells and corresponding access gallery and scope, and administrative staff can operate, check and observe that this is that design in the past is unprecedented easily to relevant position.8. impinging jet energy dissipating and channel sand-flushing desilting pipeline valve system, this is seldom to consider in the general gate design.In order to guarantee that the impinging jet energy dissipating has enough pressure water sources, the hemisphere valve that the special pressure waterpipe is set and operates by diving sealing electric cylinder.When automatic sluice gate with buoyancy programmed control rise dash, but copper nozzle on the spiral cover repacks the spraying view into, and injecting time and length can be controlled by the microcomputer straighforward operation.End on the gate floor is provided with the channel sand-flushing desilting pipeline, in the exit of bank gate pier, the control of disk jet gate slot cantilever fixed wheel gate is set, by electronic cylinder operation.In order to improve the channel sand-flushing desilting effect, can cooperate the jet pumping station regularly to open a sluice gate the flood discharge channel sand-flushing desilting, make it have anti-silt alluvial performance.9. the problem that is provided with of traffic highway bridge is not built road bridge in principle simultaneously, because its cost is approaching or surpass automatic sluice gate with buoyancy programmed control, and one of great advantage of this gate is exactly a large span waterpower automatic lifting, saves many gate piers and frame bridge engineering quantity.But consider the needs of socio-economic development, reserve the condition of bridge construction on the gate pier, this bridge can only be large-scale arch bridge, novel prestressed reinforced concrete box shaped bridge or cable stayed bridge, and promptly middle should not have gate pier.If more bridge pier must be set, can change into the power of disappearing and let out end and build the simply-built highway bridge.
Of the present invention excellent with conspicuous characteristics, have eight: it is safe and reliable 1. to operate runnability, under any pernicious disaster scenarios it, (arrange ice, serious silt alluvial, the bed load of flood tide as violent earthquake, extraodinary flood, ice flood, power circuit interruption etc.), can both carry out normal running operation and hydraulic automatic fast lifting, and can be stabilized in different opening control discharge; 2. application life is very long, wear-resisting anti-freezing property was very high, generally can use continuously 100~500 years, wherein changed auxiliary gate-board on side seal water rubber and the flexible combination type every 20~30 years, and to a small amount of steel work embedded part surface brush coating protection, maintenance capacity and maintenance cost are all less; 3. the design span of gate can reach 100~150m, and the dash height can reach 10-20m, can be built into the waterpower automatic gate of maximum port size in the world; 4. the duration the shortest, about 3~6 months of the duration of a large-scale automatic sluice gate with buoyancy programmed control engineering (containing the water conservancy project structure), the construction and installation of gate can be carried out with hydro-structure continuous productive process and in place on the spot the intersection, other gates can't be accomplished; 5. cost is minimum, countries in the world are consistent at present generally acknowledges, rubber dam is most economical a kind of gate dam, generally than conventional gate dam saving investment 30~70%, save steel 30~75%, cement 30~50%, timber about 60%, but contrast according to one's analysis, the automatic sluice gate with buoyancy programmed control (containing the water conservancy project structure) of same flood discharge scale (non-port size) will also reduce investment outlay 10~30% than rubber dam; 6. the discharge coefficient and the novel combined energy dissipater benefit that have the vacuum weir promptly reduce by 30% lock hole width and absorption basin length than the broad crested weir form that conventional gate adopted; 7. have higher comprehensive management and rolling development benefit, owing in gate pier, installed the miniature self-contained water generator group of easy full-tubular, living water and industrial or agricultural water supply pumping station system, and in the overall plan design, tourist sight, industrial and commercial market, traffic road and bridge and modernization breed, planting base have been set up, utilize water, electricity, fund, science and technology, talent advantage, be comprehensive management and rolling development creation ten minutes advantage, estimate to pay off in 2~4 years financing of projects principal and interest, can roll in 5~8 years and to build up water conservancy type integrated farm-industry-commerce enterprise; 8. have practicality and very high promotional value widely, the barrage sluice that not only can be used for various river courses, area, river mouth tide-block sluice, the large-scale ship lock of modernization, also be specially adapted to detention basin flood-diversion sluice, reservoir spillway sluice, the irrigation water-drawing gate of fully-loaded stream, check gate, and the multi-functional barrage of novel hydroelectric project, water conservancy diversion, flood discharge, towards the silt lock.In addition, not only can on middle-size and small-size Hydraulic and Hydro-Power Engineering, be applicable, also can on large-scale, huge Hydraulic and Hydro-Power Engineering, be applicable.
Below in conjunction with accompanying drawing and specific embodiments, the present invention is further detailed explanation.
Fig. 1 is multi-functional hinge of the present invention water shutoff combined unit figure.
Fig. 2 is the detail of Fig. 1.
Fig. 3 is main gate-board top structure of the present invention and uprising stormy waves impact elasticity locking stopping means figure.
Fig. 4 is auxiliary gate-board on the flexible combination type of the present invention, gentle floating middle carrier bar and the novel device graph of a relation of auxiliary gate-board down.
Fig. 5 is the cross-sectional drawing of auxiliary gate-board on the novel main gate-board of the present invention, novel auxiliary gate-board down and the flexible combination type.
Fig. 6 is novel sealing water device figure of the present invention.
Fig. 7 is the universal maintenance bracing or strutting arrangement of the present invention figure.
Fig. 8 is two pass cable wire nylon rubber plate Emergency Gate figure of the present invention.
Fig. 9 is a various valve assembling relationship figure of the present invention.
Figure 10 is that gate pier gallery valve system section of the present invention concerns arrangement diagram.
Figure 11 is the layout plan of gallery valve system of the present invention.
Figure 12 is the engineering structures profile of embodiment of the present invention.
Fig. 1 is described to be the structure assembling and the process conditions of multi-functional hinge water shutoff combined unit, hinge steel work weldment 8 is by the high-quality seamless steel pipe, its external diameter 80~160mm, wall thickness 4~6mm, the long 5m of every joint, with the steel plate welding I beam, web, end joint water shutoff steel plate, stiffener, taper discharge jet 9,31 assemblings of triangular prismatic type ironcasting are welded into, its crucial process conditions are: the assembling welding must be on special standard unit mould, elder generation's clamping point solid welding is fixed, through being up to the standards, two welders weld simultaneously by design sequence and direction, strict control welding deformation, seamless steel pipe particularly, its any direction does not allow flexural deformation, if any distortion roof pressure takes place then need heat and corrects.Free bearing shaped steel weldment 6, mainly by channel-section steel, angle steel, bury bolt angle steel and blowpipe 3, arc underground and end 7 assemblings of axillare weldment and be welded into, process conditions are identical with above-mentioned hinge weldment.Ageing-resistant water shutoff rubber tube 4 is dual fail-safe settings, and the heat of can holing after wearing out is irritated polyvinyl chloride (PVC) cement and remedied.Hinge sealed-for-life device, be to adopt " minute surface sealing " new technology to design, by Molykote 15, the stainless copper washer 13 of nickel chromium triangle, stainless steel screw 18, fine finishining chromium plating bearing 16, soldering aluminium sheet seal cover 17, chromium plating hinge 11, stainless steel check screw 12, malthoid packing ring 14, chromium plating hinge seat ring 19 are assembled into, wherein the welding of chromium plating hinge seat ring and hinge seat board embedded part 5 is not the weld seam at hinge seat ring edge, but have on the camber line of a segment distance, to guarantee to connect the coating that does not destroy the hinge seat ring; Also having a technological requirement is being adhesively fixed of the stainless copper sheet 20 of nickel chromium triangle, in order to guarantee that this running clearance water shutoff life-span reaches hundreds of years, so adopt the side soldering to fix the stainless copper sheet of nickel chromium triangle, and require factory the end water shutoff steel plate of hinge weldment to be milled out this segmental arc with milling machine.The burial place of special concrete pipe 1 and special ferrocement pipe 2 and inclination angle must be accurately.Cast copper spraying spiral cover 10 is to increase the spraying view in non-flood season just to install, and flood season, the energy dissipating of water spray bump took down.Compressed air energy dissipation by aeration air nozzle device, be that anti-sealing freely enters gas pipeline, cast copper sleeve pipe 29 is to be convenient to be threaded, the special elastic caoutchouc seat 27 of tailormadepiston hemispherical valve 28 usefulness is adhesively fixed on cast copper spiral cover 26, when connecting compressed air reservoir, elastic caoutchouc seat meeting compressive strain, promptly jet automatically; Close the appendix valve and then can seal anti-water intrusion automatically.
This figure also shows the joining relation of main gate-board and multi-functional hinge water shutoff combined unit, and end joint place of wherein special ferrocement pipe 21 will be provided with the pitch felt pan and brush water-repellent paint, and being strictly on guard against has the jetting of leakage phenomenon.In the gate pier lateral ends Pneumatic butterfly valve 22 of diameter 400mm is set, uses as the lock chamber water discharging valve.Connecting steel pipe 23 will fix with the cement mortar joint filling and with 9 spot welding of taper discharge jet.The main gate-board reinforcing bar is connected taper thread bar splice 24 new technologies that adopt the Beijing Architectural Engineering Inst development with the hinge dowel, save a large amount of welding job amounts, but accelerating construction progress not only also can reduce welding deformation, improves construction quality.Special concrete drain tile 25 is to be provided with by inertia water deliverys such as ship lock are theoretical, and promptly the quantity near the collector drain outlet is few, away from quantity increase, be not disposed at equal distance.
Fig. 2 is the end detail drawing of Fig. 1, chromium plating hinge flange 1 is wherein fixed by the STAINLESS STEEL NUTS 2 of welding, with the zinc-plated permanent water shutoff attic base weldment 3 of fine finishining are lightpressure fits, after treating that acceptance(check) is adjusted in the general assembly of whole hinge water shutoff combined unit, fix with second stage concrete 5.The zinc-plated attic base of gatage indicator 6 is fixed with zinc-plated sleeve pipe 4 usefulness interference fits, and slip copper sheathing 7 is to assemble movingly with water pipe head 8, guarantees that zinc-plated sleeve pipe 4 can be with the gate hinge through, and leaks with the plane of rotation of water pipe head 8 is unlikely.Equally, chromium plating axle sleeve 9 is to assemble movingly with slip copper sheathing 10, when guaranteeing to connect copper pipe 14 with the gate hinge through, and unlikely gas leakage.Gatage electric wiring dial 13 needs through Electrical Engineer's specialized designs, so that microcomputer remote control display screen can be seen the aperture and the corresponding discharge of gate.The pointer 12 usefulness bolts 11 that dry cell is housed connect with zinc-plated attic base 6.Special cast copper water gas diverter 17 is with gas transmission copper pipe 18 and water delivery copper pipe 20 and is threaded, and smears the clay water shutoff.Cast copper elbow 16 will be provided with special copper back-up ring with the end that is threaded of gas transmission copper pipe 14 and water delivery copper pipe 18 and prevent to leak gas or leak.Chromium plating threaded closure caps 15 will be smeared the clay water shutoff with being connected also of special cast copper water gas diverter 17.The copper nut of pepe standard screws part 19 and imbeds in the concrete.Rubber mat plate 21 is adhesively fixed with the scarf of hydraulic type rubber water shutoff 22, for the ease of with being connected of hinge steel pipe water shutoff, set up special corrosion resistant plate weldment 25 and round rubber bar water shutoff 26, connect with stainless steel WELD NUTS fitting 24, the nut end seals with soldering aluminium sheet lid 23.The rubber tile 27 that F-SP is set at the extreme position of main gate-board dash compresses sealing, and with the steel plate 28 of similar shape, connects fixing by standard bolt 29.
Must be pointed out, after all the processing and manufacturing of multi-functional hinge water shutoff combined unit is finished, carry out general assembly in factory and check and accept, after the passed examination, first, Party B representative will be signed on acceptance report, and is writing assemble sequence number on each unit member, center line butt joint sign on seam crossing is printed.Use the derusting by sandblasting method that welded steel structure appearance surfaces (imbed concrete surface except) is cleaned out at last, brush anticorrosive paint of new generation (the NSJ sapecial coating that Fangshan District, Beijing traffic special anticorrosive coating factory produces, this application of paints nuclear technology radiation modification forms, greatly be better than conventional coating), and develop CGJ-8 type high pressure airless spray equipment jointly with Architectural Engineering Inst., Beijing City and Jiangsu Province Taizhou City electric switch factory, improve 22 times of work efficiency than air compressor machine spraying equipment.In addition, proposing brush chromium plating in the literary composition, is not traditional direct current brush-plating technique, but adopts the pulse brush electroplating device and the technology of Liaoning Normal University's experimental center development, and its quality of coating and thickness of coating just can reach permanent water shutoff requirement.
Fig. 3 is described be main gate-board when high limit position, the detail of top structure assembly relation and uprising stormy waves impact elasticity locking stopping means.This device subduction generally be cannot see its profile below the top gear water level, and beyond fan-shaped water shutoff work plane, guarantees that the built-in fitting and the side seal water device of gate pier is noiseless.The special embedded part of side seal water angle steel of main gate-board top curve section is an independently combination construction: the support weldment 1 that comprises uprising stormy waves impact elasticity locking stopping means; A bit of (about 1000mm is long) of top girder steel weldment 2; Side seal water device curve transition angle steel embedded part 3; The local steel plate embedded part 4 that enlarges; Jet coating steel pipe 5, these members all need the erection welding in factory.It is the stress diffusion problem that solves the stormy waves impact load that gate pier is reserved hole groove second stage concrete steelframe embedded part 6.The internal mold 7 of making type with waste wood bar nail is to alleviate end weight with thick bamboo tube internal mold 8, is beneficial to and has reduced dynamic head.Prefabricated ferrocement arc 9 is to use when internal mold, and strengthens top structure, be with the fixing both side ends of cement mortar.Strengthen totally 3 of floors 10, i.e. each one of two ends shutoff, middle ad hoc one.Building of second phase steel concrete 12 will be with special steel form moulding, and strict its construction quality of control, and the seam 17 at two ends will be cut a hole a hair processing, and taper thread bar splice 13 will be used in the steel mesh reinforcement end.Reinforced concrete circular shutoff plate 15.Periphery will be cut a hole hair and handle, and with high strength cement mortar 14 joint fillings sealing, prevents that the long-term accumulated infiltration from influencing each other.Make the cavity 16 of movable internal mold moulding with the inflation poly-bag, must remove ponding and foreign material in the work progress, could use shutoff plate 15 to seal.The unit seam crossing of top girder steel weldment 2 is provided with and strengthens fine motion chromium plating hinge 18, and axis hole is also wanted the protection of brush chromium layer, replaces the splice bar fine motion of bear-trap dam hinged.
Burying underground of the position-arresting disk weldment 24 of uprising stormy waves impact elasticity locking stopping means, can not go to carry out by traditional idea and design coordinate size, must wait until automatic sluice gate with buoyancy programmed control final acceptance of construction trial run, descending operation repeatedly repeatedly, and check universal maintenance bracing or strutting arrangement qualified, the dead seat board that supports of weldering at last, gate is risen in retaining, removing whole universal steel pipes supports, dash is to peak level, at this moment with position-arresting disk embedded part 24 and limit shaft assembling and positioning, fix with little bolt 23,, weld with steelframe embedded part 6 again through being up to the standards, can eliminate the accumulative total distortion deviation after whole construction and installation cumulative departures and each flashboard structure bear the design maximum load so effectively, but consider that the permanent deformation after the long-time running can increase, when therefore finely tuning fixed limit dish embedded part, also should reserve the 5mm gap, when storm wave impacted, this gap will be made up automatically.Limit shaft weldment 25 is chromium plating protections, and itself and the welding of support weldment 1 are to coil periphery to carry out in the garden, and it is less to influence the chromium coating quality.Back-up ring 26 is to connect rotation construction platform mould just to use.In order to strengthen the elastic locking effect, stainless steel elasticity jig is set, locate with stainless steel shearing resistance tip nail 19, fix with stainless steel countersunk head screw 20 again.Stainless steel opening limiting plate 22 and position-arresting disk embedded part 24, welding is fixing in factory.The adjustment of snap lock price fixing embedded part 32 fixedly is that the center line by the snap lock dead axle of support weldment 1 is a foundation, the central point that is snap lock price fixing embedded part is along the about 90mm of gate rotary motion trace deviation in driction elastic locking shaft centre line (deflection upstream side), guarantee that when spacing snap lock dead axle sphere centre point is near the summit of lock slider 28.Wherein, spherical surface body is processed in the end of welding lock shaft 27, and Quenching Treatment is carried out on the surface, and whole weldment carries out the chromium plating protection.Special lock slider 28 need carry out fine finishining and hard surfacing is handled, and the chromium plating protection.Elastic caoutchouc backing plate 30 can be cut by old tire and make, and behind the ageing failure, regularly changes new.Stainless steel screw 29 and fixing STAINLESS STEEL NUTS 31 connections of welding.
Fig. 4 is new, and what describe is auxiliary gate-board on the flexible combination type, gentle floating in the middle of carrier bar and the novel assembling relationship figure of auxiliary gate-board down.Wherein, Plastic buoy 1 is an auxiliary gate-board and the gentle boundary sign that floats middle carrier bar on the flexible combination type, but in fact auxiliary gate-board extends to and novel auxiliary gate-board junction down on the flexible combination type, both interdependences, mutual restriction, moulding mutually, this floating drum length is not limited by the flashboard cell width, and select by the physical length of buying, two ends need seal with the plastic plate hot weld, and, percolating water phenomenon can not be arranged through immersion check, be bonded on the flexible combination type on the auxiliary gate-board with the nylon rubber lath in the erecting bed, building site.Ageing-resistant foamed plastic buoyancy aid 2, its cross dimensions is about 400 * 100mm, and the bonding one-tenth non-individual body of length is identical with the gate width, in order to prevent the immersion and the piece that wears out, adopts the engineering plastics thin film encapsulation to be bonded on the flexible combination type on the auxiliary gate-board.Special arc steel work weldment 4, be that gentle floating middle carrier bar straight forming and transmission divide the key parts to water pressure, the special arc steel work fitting at its appearance and size and structure and last auxiliary gate-board top is difference slightly, and promptly curved plate adds and is about 100mm, but saves elastomeric bearing steel plate 16.Except that arc steel work weldment, main accessory has: connecting bolt 6; Shearing resistance burnished bolt 7; Special welding wire rope pulley 17.
The structure of auxiliary gate-board is on the flexible combination type: select the thick nylon rubber plate 13 of 7~12mm for use, its width is regardless of the flashboard unit, and the connective view picture of bonding one-tenth; The wire rope 14 of 4 diameter 6.2~12.5mm of each flashboard unit configuration, limit the elastic deformation and the aging permanent deformation that is produced of nylon rubber plate, be fixed on the arc steel work weldment with special welded pulley 17, and paste fixing with 120 * 5mm nylon rubber plate 15, in addition, consider the elastic deformation and the permanent deformation of long-time running, the installation length of wire rope and nylon rubber is than the little 30~50mm of design size, chain form hydraulic type rubber sealing water device is the ingredient of auxiliary gate-board most critical on the flexible combination type, because the flexible nylon rubber tile is in the gate lifting process, meeting produces bigger water-head (grind its numerical value of examination mensuration through a large amount of models and reach the above head of 4.2m), the Free Transform significantly that must cause the nylon rubber plate, and produce huge water stream channel, and the good lifting performance of destruction automatic sluice gate with buoyancy programmed control forms so-called waterpower locking phenomenon.If the side seal water of auxiliary gate-board on the flexible combination type is made into rigid structures, then destroying main gate-board, gentle floating middle carrier bar and the novel down process that auxiliary gate-board is good is connected, the life-span of joint can greatly shorten, and has chain form hydraulic type rubber sealing water device only and could solve this difficult problem with flying colors.Its assembling and process conditions are seen the explanatory note of Fig. 6.
The novel main feature of auxiliary gate-board down, be exactly traditional board-like structure of four-point supporting steel concrete, be improved to the board-like reinforced concrete structure 8 of optimization type simply supported beam, and construction technology by high accuracy standard unit mould prefabrication and lifting, be improved to clay model moulding continuity construction in place on the spot, greatly saved amount of reinforcement, construction period and construction costs.Wherein angle steel weldment 5 is the embedded parts that connect secondary gate on the flexible combination type, and the concrete bearing beam is the novel auxiliary gate-board down standard unit mould of construction in place on the spot, is again direct bearing surface, has saved steel cushion block embedded part.Rib ellbeam 20 between same gate floor concrete inclined-plane and flashboard unit also plays standard unit mould and even supporting role, the supporting effective span of novel like this auxiliary gate-board down in the position of droping to the ground reduces more than 1/3 than conventional structure, advantageous particularly is calculated in this check to high water level operation operation, can save a large amount of reinforcing bars again.Elastic caoutchouc cushion block 10 is to slow down the impact load of main gate-board at dead band, and available damaged tire cuts bonding being assembled into of system, and fixing with U bolt 11.The main gate-board position of droping to the ground is bearing on the vertical steel plate of hinge weldment 12 of novel down auxiliary gate-board, and with the garden steel 18 that is communicated with as the supporting mass permanent water shutoff of holding concurrently, guarantee that unlikely generation resembles from appearing in one's mind, also be beneficial to the concentration problem that eliminates stress, in addition, on the offset plate of hinge weldment 12, weld the spill sphere seat board and the elasticity limiting plate of universal maintenance bracing or strutting arrangement, also be a key character.If install the requirement of two pass cable wire nylon rubber plate Emergency Gate, then need install doorframe embedded part 19, adjust relevant water shutoff part in order in work progress, to install, need set up seal orifice 3, construction and installation are used the reinforced concrete prefabricated board shutoff after checking and accepting and finishing, and periphery is filled sealing with cement mortar.
Fig. 5 is described to be novel main gate-board, the cross-sectional drawing of auxiliary gate-board on novel auxiliary gate-board down and the flexible combination type, wherein novel main gate-board cross section shows three kinds of textural associations: the one, and main gate-board top hollowcore slab structure section 3, the prefabricated water shutoff inner formword 2 of pitch wood chip thick bamboo tube and the made from permanent ornamental moulded water shutoff 1 of flashboard unit seam crossing, the detail of sealing water device is seen Fig. 6, cavity is made by the inflated rubber bag movable mold, and the minimal thickness of hollowcore slab is 100mm, and reinforcement placement is by the evenly distributed load Continuous beam design; The 2nd, the board-like energy-dissipating structure 4 of main gate-board lower beam, this is the improved important symbol of wound, but when the energy dissipating requirement can be relaxed for rock in the basis, or design head is bigger, in order to improve the stressed state of flashboard structure, also can change the hollowcore slab structure identical into, the reinforcing bar setting of beam and slab type structure with top, press tee girder and continuous beam bi-directional design, being provided with of floor mainly is to increase effect of energy dissipation; The 3rd, the main gate-board i beam rotates the section assembly relation of construction platform mould, the longitudinal section profile and the main gate-board of steel concrete I-shaped beam 6 are identical, and bear and bury side seal water angle steel embedded part underground, the construction later stage is connecting the joint bar welding and filling with second stage concrete, promptly constitute the main gate-board ingredient, this i beam design width is 1000mm, and actual fabrication is wide to be 800mm, i beam lower wing plate edge is 400mm far from the gate pier side, is to guarantee minimum installing space.It is that interim welding is fixing that construction safety blocks bar 7, and the back burning of having constructed slices off can be for reusing.Antiskid pedal 8 also is that interim colligation is fixed, and will remove after having constructed to clean up.Most critical be to utilize the screw of side seal angle steel embedded part to install the refining standard basal plane wooden model 10 of fixed flat, be used for the fan-shaped water shutoff work plane 11 of strict control ferrocement.
The novel reinforced concrete beam and plate 16 of auxiliary gate-board down is to prop up tee girder design cloth muscle by tube, and the drop to the ground cloth muscle of freely-supported condition of checking computations peak level, flashboard unit seam adopts pitch wood chip thick bamboo tube precast plate water shutoff internal mold 15 to simplify and handles, the flashboard cell width of both sides increases the 1m continuous placing, side seal water angle steel embedded part 17 is inequality with main gate-board side seal water angle steel embedded part, sees Fig. 6 for details.
The cross section of auxiliary gate-board is connective on the flexible combination type, be regardless of the flashboard unit, but to install 4 wire rope in each flashboard unit and strengthen and reduce stretcher strain, wherein wire rope 14 usefulness nylon rubber plates 13 are bonded in nylon rubber plate 12 surfaces of connection, and side seal water only need bend with the water shutoff of chain form hydraulic type rubber and be coupled to whole getting final product.
Fig. 6 is described to be the novel sealing water device figure that is adopted, wherein main gate-board side seal water setting drawing shows that side seal water angle steel embedded part 2 is installed in main gate-board and rotates on the edge of construction platform mould 1, if engineering has compressed air to blow the antifreeze requirement of ice, then need weld and carry compressed-air actuated coating steel pipe 3, the coating steel pipe 4 of discharge pressure water needs that copper pipe 5 is installed and spot welding is fixed, and special hydraulic type rubber water shutoff 10 needs with cover plate 6, pad Fig. 7, sleeve 8 and bolt 9 connect fixing.The cross-sectional design of the fan-shaped water shutoff work plane of gate pier that matches with this sealing water device is: when building the gate pier concrete; with the default dark fan-shaped hole of the standard groove 15 of 60mm of template; and bury enough joint bars 17; before fan-shaped water shutoff work plane begins construction; to cheat rooved face cutter hair and flushing earlier; the back welding is the steel grid 16 of minority fixedly; be convenient to steel mesh reinforcement 14 spot welding are fixed; then fill hole groove 15, and mix the early strength admixture of capacity, be convenient to manually placement in layers from bottom to top with the high grade fine concrete; when concrete begins initial set; and then layering metal binding wire net 13 uses high-grade cement mortar 12 floating thereafter, and controls planeness with rotating construction platform mould datum wooden model lath; whole fan-shaped water shutoff work plane need be worked continuously and be finished; in case of rainy, need canopy-protected, acceptance(check) on inspection; hung the straw mat water seasoning seven days; spraying ageing-resistant novel imitation porcelain coating layer 11 in back is decorated and is wanted smooth smooth abrasion-proof, reduces the wearing and tearing of water shutoff rubber.
Auxiliary gate-board chain form hydraulic type rubber sealing water device on the flexible combination type, after 18 bendings of nylon rubber plate, with two bolt clip plates 19, pad Figure 20, sleeve 21, clamping plate 22 and bolt 23 connect moulding, as the first road sealing water device.With pressing plate packing ring, sleeve, clamping plate and bolt hydraulic type rubber 10 is coupled to the second road sealing water device equally.Adopting double bolt and lengthening pressing plate is to increase lateral stiffness, prevents from the water-head that produces to force flexible rubber tile to be out of shape significantly in the gate lifting process, forms the lifting performance that water stream channel influences automatic sluice gate with buoyancy programmed control; And the function of hydraulic type rubber water shutoff is more outstanding, because water under high pressure makes rubber produce very big frictional resistance in the gate pier side, restriction flexible rubber plate can not Free Transform and is produced water stream channel, and this is to use on the flexible combination type under the auxiliary gate-board condition the great technical task that must properly settle instead.
The novel side seal water device of auxiliary gate-board down; because installation and maintenance condition are limit; should not adopt the water shutoff of hydraulic type rubber; and use the sealing water device that the supporting of engineering plastics pipe 34 and caoutchouc elasticity is combined into instead; side seal water angle steel embedded part 25 is embedded on the novel auxiliary gate-board side bar 24 down; in order to create the condition that changes soldering stainless steel nut 27; a special space is set; the STAINLESS STEEL NUTS end seals with the stamping forming aluminium sheet cap 26 of soldering; interior dress butter corrosion protection connects screw 29; it has been balance effect of water pressure that cover plate 28 is provided with boring 30; rubber tube 32 is bonded on the rubber tile 31; play the elastomeric bearing effect, the rubber tile 33 of stickup shaping then is cemented on the cover plate 28 with powerful bonding agent.The prefabricated hexagon pitch wood chip internal mold water shutoff 37 of prefabricated pitch sawdust board 35 and steel mould is adopted in the novel water shutoff of auxiliary gate-board unit seam crossing down, and wherein thick bamboo tube 36 is to strengthen to be convenient to carrying, and top seam is provided with one deck pitch felt 38.Building the surface and will smear and paste layer of plastic film 39 as moulding clay model 40 of building in place on the spot with mud.
The seam water shutoff moulding of novel main gate-board unit has novelty and durability most, the main gate-board 41 of construction in place will be made the seam inner formword with the prefabricated octagon pitch wood chip internal mold water shutoff 52 of steel mould on the spot, wherein thick bamboo tube 50 will be followed closely into framed bent with garden wood 51, be convenient to moulding and carrying, the about 2m of every joint length, seam crossing is bonding with water-repellent paint.With the prefabricated infundibulate pitch of special punching block wood chip internal mold water shutoff 51; the about 1.5m of every joint length; all seams all need be bonding with water-repellent paint; wherein the anchor post steelframe 50; what steel plate contacted with concrete edge will grind the garden; being convenient to its end every reinforcing bar post of 500mm welding fixes with anchor bar 47 welding; then; count from main gate-board hinge weldment i iron edge,, and require along the backguy of gate width every the molded steel sheet spherical surface body 46 of 500mm boring spot welding fixed punch; control its central point point-blank; then with all-purpose adhesive colored bulb is cemented, spot welding simultaneously is steel mesh reinforcement 48 fixedly, fills hot asphalt wood chip 49 subsequently; its surface is arch; fill steel fiber feinforced cement coarse sand slurry 44 after the cooling, the only about 10mm of bed thickness smears skim silica flour coloured cement mortar enhanced protection again and beautifies after the initial set.Be worth pointing out that seal at the seam top builds moulding, need smear used oil before the concreting that after having filled, scrape triangle with the block cutter, recycle silicon powder cement mortar 42 is filled up during initial set, and corner angle are worn into the garden arc with the identical template of the special shape of high-quality timber.
Fig. 7 is described to be universal maintenance bracing or strutting arrangement assembly relation, wherein universal steel pipe supports by high-quality seamless steel pipe 3, fine finishining self-aligning spherical support seat 2 welding mounting 4 junction plates, 5 micrometer adjusting screws 6 and WELD NUTS 7 assemblings and is welded into, but must on special standard unit mould, carry out, strict control and elimination welding deformation, and guarantee that design size is no more than the allowable variation value.The technology of most critical is to support the process conditions of seat board weldment 9, factory can only select the inclination angle and the normal place of the main gate-board top girder steel weldment 10 of welding standard platform mould according to 1: 1 section plank model, support and support seat board weldment 9 mounts on the plate of the position, hole of standard unit mould at the universal steel pipe that will weld with special stay bolt on the plate of the position, hole of standard unit mould then, standard inclination angle and accurate position that promptly fixing automatically universal steel pipe supports, it is fixing then will to connect stiffener 15 with 3 temporary fixed bolts 14, and be welded on the girder steel of main gate-board top, unload the special bolt on the plate of position, hole after cooling, promptly calculate factory's erection welding and finish.The universal maintenance bracing or strutting arrangement of two covers that also must point out each flashboard unit need be welded on the standard unit mould in assembling simultaneously.And it is dead to support seat board weldment weldering, and 3 temporary fixed bolts are changed weldering shearing resistance weldering holdfast, is in building site trial run acceptance(check), and adjust through diver's in-water survey qualified, emptying water level then, maintenance is supported loading condition and is welded extremely at the scene.At last, closed closing valve and risen this gate, it is standby to unload whole universal steel pipes supports, and all operations are just finished.Wherein micrometer adjusting screw 6 is to install each universal steel pipe before the maintenance to support on the water surface, adjusts each self-aligning spherical support seat central point and uses in a straight line.The welding of spill sphere seat board 1 and following auxiliary gate-board hinge, also should on the standard unit mould, support adjustment qualified back weldering extremely with universal steel pipe, and elasticity limiting plate 20 assembling burn-on, then the erection welding arc ends axle position-limited rack 16 and stainless steel panelling 17, back turning joint weldment is to extreme position (shown in imaginary line among the figure), stainless steel shearing resistance limiting plate 19 and caoutchouc elasticity cushion block 18 are adhesively fixed, assurance arc shearing resistance face is close to stainless steel panelling 17 fine finishining arcs, and the dead stainless steel shearing resistance limiting plate 19 of weldering is up to the standards.Arc strip steel plate voussoir fixed mount 13, set bolt 12 and garden steel shearing resistance post 11 among the figure just have when having only the two pass of setting cable wire nylon rubber plate bolt to repair gate.
Fig. 8 is described to be the structure assembling of two pass cable wire nylon rubber plate Emergency Gate, wherein cable wire 4.5, be connected and fixed with special thread 9, nut 10, packing ring 11, mounting embedded part 12, sleeve pipe 13 and doorframe embedded part 14, middle part, upper strata nylon rubber plate 2 double widths are suspended on the cable wire 4, and the back hangs over above the steel pipe 5 as offset plate 1 connection with bolt 8, packing ring 7, special arc bent plate weldment 6 and lower floor's middle part nylon.In addition for the ease of the carrying of nylon rubber plate, keeping and with the bolted on connection of doorframe embedded part, tell the nylon rubber plate 3 of view picture by two of gate piers, be assembled into view picture nylon rubber plate access door with bolt washer, assemble shown in the sketch as Fig. 8.After bearing the design water pressure, will produce bigger elastic deformation, two arc shapes as shown.In order to reduce the load of two pass cable wire nylon rubber plate Emergency Gate significantly, improve its security reliability, utilize arc strip steel plate voussoir fixed mount 20, install wooden voussoir water pressure is directly delivered on the main gate-board cambered surface, the water pressure load of this Emergency Gate will be born by three big members like this: the two pass cable wire; Doorframe embedded part bolt connects; Main gate-board top cambered surface and wooden voussoir.Thereby than cable wire veneer rubber dam safety and reliability.Ground sill angle steel embedded part 15 and both sides gate slot embedded part 18 are with having the steel plate 16 of screw and bolt 17 to connect.
The various valve assembly relations that the described the present invention of being of Fig. 9 adopts, wherein main fill, water discharging valve, adopt Jiangsu Province's Yixing City second Machinery Plant of Light Industry's innovation product (CL-10 type) inflatable type Pneumatic butterfly valve 28, connect with special taper weldment 30 and stainless steel screw 29, this taper weldment is embedded in the end of prefabricated reinforced concrete pipe 31.The large-scale water discharging valve of microcomputer remote control then adopts jet gate slot garden shape steel work cantilever fixed wheel gate, and this gate is assembled into by garden shape steel plate welding door body 17, connection bearing pin 16, cantilevered axle 20, brass sliding bearing 21, cast iron fixed wheel 22 etc.For permanent water shutoff and elimination jet phenomenon, cancel traditional rubber water shutoff, use the water shutoff of polished surface brush chromium layer contact instead, and weld half garden shape water shutoff seat 27 in the Lower Half of conical pipe embedded part 18, the first half at the door body welds half garden shape water shutoff lid 26 simultaneously, so that seal when closing gate.It is operating experience according to bear-trap dam that exit half garden shape is chosen stream bank 19, utilizes flip shot current closed orifices, can prevent that the disorderly fluidised form of high water level of absorption basin from pouring in down a chimney into lock chamber, resembles and produce from appearing in one's mind, influences flood discharge safety.The support size of the electronic cylinder 1 of HDG series that bonding machine mounting 15 should provide according to producer designs, and fixes with stainless steel bolt 9.
The regulating gate of impinging jet energy dissipating water-supply-pipe import and the import of bank gate pier generating pipe; have special operating maintenance condition-easy good again underwater operation performance and endurance quality; specially design a kind of novel semispherical shape steel work gate for this reason; its operation is done operation and is adopted Jiangsu Province's Wuxi County to introduce the electronic cylinder 1 of HDG series that advanced foreign technology is produced; under water with the protection of steel work seal closure; and with special garden dish frame 4 and trashrack tubing string welding fabrication, fix with stainless steel stone bolt 9.Hemispherical Steel structure door body 7 usefulness chromium plating bearing pins 6 are connected with electronic cylinder power transmission shaft, use hot asphalt wood chip 8 filling moldings then, the guide-localization of door body is controlled by 3 stainless steel guide rails, guide rail is welded on above the steel work embedded part 10, and, fix copper shoe 12 with stainless steel screw 14 at 3 guiding of the correspondence position of door body welding seat boards 13.Steel work embedded part 10 is protected with brush chromium layer with hemispherical Steel structure door contact level.A whole set of gate and electronic cylinder can be set up hoist cable to suspension ring 2 under water by the diver, and unload hold-doun nut, and the back hangs out the water surface with crane and keeps in repair, also can be when automatic sluice gate with buoyancy programmed control regularly change component, and the emptying water level keeps in repair.
Water under high pressure taper water injection valve lamp decoration device mainly is to be provided with in order to increase tourist sight, chooses views such as stream bank waterfall and the energy dissipating of jet water course bump with the crack overflow of automatic sluice gate with buoyancy programmed control and shines mutually.Color cap 32 is fixed on standard lamp socket 33, by selecting for use the design of lamp socket condition to be connected with threaded sleeve 38, this threaded sleeve and 39 welding of cross steel pipe stand are fixing, electric wire is connected by steel pipe stand and lamp socket, accurately machined cast iron conical valve 36 can rotate along threaded sleeve with hand, fix with nut 34 and packing ring 35, spray the gap and the water yield in order to adjust.Cast iron conical valve seat 37 is connected with cast copper conical pipe 41 with bolt 40, and 42 of coating steel pipes are embedded in concrete precast block 43, and this prefabricated section and gate pier are built the water conveyance steel tube connection of burying underground and cemented.The cast copper conical pipe also can directly freeze with water conveyance steel tube and dock.
This figure has shown that also waterpower operates operation pullswitch control system assembly relation automatically, wherein special concrete pipe container 55, two ends precast concrete block and cement paste shutoff moulding, manually filling concrete fixes, copper bend pipe 50 is imbedded in it and is filled into cone with the cement mortar heap and fixes, equally, copper sleeve 54 also is connected with this container with cement paste, cast copper porous screw thread spiral cover 53 is that anti-dirt enters, the cover mouth 51 of copper pipe processing is convenient to rubber tube 52 usefulness copper wire colligations and is fixed, at bottle neck 56, rack 58 is to prevent that the free heavy curtain of plastics is moving, and is located on it automatically behind plastic bottle full water Drawing switch the sebific duct stitch in the backguy of plastic bottle 57 usefulness pullswitches 44.Improving plastic bottle after the reservoir level landing turns water in order to using next time again.Two cover waterpower Automatic pull switch control system devices are just the same up and down, just control water level is different, the waterpower program of control automatically is: when flood level rises to the design water level 60 of opening the door, the water of communicating pipe can be full of plastic bottle very soon, its weight is enough to spur pullswitch, open special electromagnet tracheae valve by the electric wiring of accumulator jar power supply immediately, the Pneumatic butterfly valve of charging pipe promptly can be closed automatically, and the Pneumatic butterfly valve of gutter can be opened automatically, at this moment slowly landing flood discharge of automatic sluice gate with buoyancy programmed control, if flood comes amount very big, flood level continues to soar, when reaching 59 precontract half an hour of extreme high water, the second cover waterpower Automatic pull switch works, and what at this moment electric wiring was connected is the large-scale water discharging valve of electronic cylinder operation, guarantees in 10 minutes automatic sluice gate with buoyancy programmed control to be crouched on earth entirely, at this moment flood discharge flow equals to design maximum flood discharge, guarantees that flood level can not continue to rise.After flood, reservoir level is landing fast, when water level is reduced to the emerging sharp water level 61 of design safety (or generating lowest water level), at this moment the 3rd cover waterpower Automatic pull switch device works, the electric wiring controller cuts out all water discharging valves, open into water Pneumatic butterfly valve simultaneously, make automatic sluice gate with buoyancy programmed control can rise dash at several minutes, and it is unsteady voluntarily with Reservoir Water Level, not needing the personnel operation management, realize the hydraulic automatic unattended on large-scale floodgate, is initiative in the world, and required power supply is to be provided by miniature self-contained hydroelectric generation unit in the gate pier, do not need any power source and the expensive power transmission and transformation system of a cover.The assembly relation of the 3rd cover waterpower Automatic pull switch device is: segmental installation mechanical compaction concrete pipe 49, with the floating device 47 of nylon wire 46 suspention plastic bottles, interior dress iron sand 48, its weight is with pulling pullswitch 44, the size of the floating device of plastic bottle then is advisable can float on the surface behind the dress iron sand, special pulley yoke 45 is the line stitch of the line of pullswitch with the suspention plastic bottle, and its length guarantees when the emerging sharp water level 61 of design, lucky stretchy pullswitch.
Figure 10 is described to be that gate pier gallery valve system relation is arranged, wherein, waits inertia collector drain 1, is that the experience according to inertia drainage systems such as external large-scale ship lock is provided with.The upstream side of gate pier outfall 6 is provided with semicircular and chooses the stream bank, is the operating experience according to bear-trap dam, forms negative pressuren zone closed orifices effectively after choosing the stream bank, prevents that downstream high water level tail water from pouring in down a chimney into lock chamber.The draining aperture of this gallery jet gate slot garden shape steel work cantilever, fixed wheel gate 45 is controlled, the 44 operation operations of microcomputer remote control electric cylinder.It is the capital equipment of automatic sluice gate with buoyancy programmed control different opening operation operation.The observation maintenance of this collector drain is taken rope ladder by the gate pier outfall and is entered, and does not establish access path in addition.The concrete prefabricated pipe 2 of impinging jet energy dissipating special-purpose steel silk screen is connected with ferrocement prefabricated pipe 38 with fabricated pipe bend at gate pier.Jet sparge pipe 3 is every meter wide one of an equidistant placement.Tubulose reinforced concrete precast member 40 is embedded with the annulus steel work embedded part 39 of novel semispherical shape steel work gate, and is connected with the concrete prefabricated pipe 38 of steel wire by the bend pipe of cast in situs, thereby constitutes the pipeline valve system of independent special-purpose impinging jet energy dissipating.The moulding prefabricated concrete pipe 30 of hollow gate floor is to use as internal mold, and the waterproof coating butt joint is brushed in every joint joint, in case run slurry when vibrating.Steel concrete appendix 4 also is to use as internal mold, and joint is handled the same.Gate pier props up hinge side seal water and reserves second stage concrete aperture 5, treat all a hinge water shutoff combined unit install adjust acceptance(check)s after, build second stage concrete and fix.The full-tubular self-contained hydroelectric generation unit 7 of type that declines, about 15~the 30kW of its capacity, installing 2 units in principle earlier uses for the operation operation, the fund of utilizing rolling development to raise is later on progressively extended installation, for safe operation be convenient to maintenance, the unit front complement is provided with reduced form Hand-operated butterfly valve 8 and is the emergency repair door.Drainage pipe delivery port 9 is by inflatable type Pneumatic butterfly valve 43 controls of waterpower automatic system.High pressure water delivery coating steel pipe 10 is in parallel with taper water injection valve lamp decoration device 13, by microcomputer remote control valve control water supply time.Living water water tank 11 provides the water source by lock floor transition sandy gravel stratum purified water source pumping plant pipe-line system 18, and top cover 19 is a reinforced concrete prefabricated board, is transported to each urbanite water consumption district by pipeline force (forcing) pump 12 and living water pipe-line system.Compressed air spherical tank 15 keeps constant voltage by the periodic operation of small-sized air compressor 14, is mainly various Pneumatic butterfly valves source of the gas is provided, and also provides source of the gas for energy dissipation by aeration during high water level flood discharge operation.Normal pressure power water spherical tank 17 is supplied with the water source by the living water pipeline, and by the water-filling requirement of the valve 16 control hydraulic type rubber water shutoffs of microcomputer remote control, top cover 20 be special steel work structure hermatic door, and double construction and installation and maintainer pass in and out the duct.The electronic fluviograph 22 of remote measurement, DS-3 type electrical long distance water level recorder that available Chongqing hydrological instrument factory produces or more advanced remote water level gauge, can in time observe lock chamber SEA LEVEL VARIATION situation, and when the lock chamber water level reaches peak and minimum, be provided with autoalarm, the lock chamber water level is to be connected by maintenance People's Bank of China duct 25.Hydraulic automatic water inlet 21 and relevant operation running gear are arranged in the stair well 23, are convenient to install and maintenance.The doorframe embedded part 24 of two pass cable wire nylon rubber Emergency Gate also is related with stair well.The chance that the special-purpose hermatic door 26 of installation and maintenance uses seldom adopts the reinforced concrete prefabricated board structure, and periphery seals with polyvinyl chloride (PVC) cement, and heating is pried open during use, heats shutoff after using up again.The chamber filling conduit water inlet is installed special trashrack 27, enters to prevent wood, branch, dirt.Multi-functional gallery 28 has purposes such as traffic, maintenance, observation, draining, grouting, tourism, and is installed on observation pipeline 29, can directly observe lock chamber water-level fluctuation luffing and silt alluvial situation.Sand washing row silt pipe special 31 only is used for fully-loaded stream, and mold forming in being done by special ferrocement prefabricated pipe at middle gate pier grade separation place, needs to be provided with and turns over the water culvert pipe, and the concrete pipe 41 cast-in-place by pre-making cement pipe 42 and formwork erection connects and composes.Impinging jet energy dissipating pipe special water inlet is provided with special concrete reinforced pipe 40 and gate embedded part 39.The automatic drainage pipe outlet of waterpower is operated control by inflatable type Pneumatic butterfly valve 43.
Figure 11 is described to be the layout of gallery valve system, the structural configuration that demonstrates the bank gate pier of automatic sluice gate with buoyancy programmed control of porous and middle gate pier is different, and the novel full-tubular formula of schematic arrangement unit reserved location and mill construction overview, concrete unit quantity is selected by engineering design, unit generation can not be set up if the research of process demonstration is thought, this reserved location can be cancelled.For unessential automatic sluice gate with buoyancy programmed control engineering, the gallery valve system of a side shore pier can fully phase out, and concentrates on an enterprising line operate operational management of shore pier, can save more engineering quantity and investment like this.The water inlet 1 of impinging jet energy dissipating pipe special wherein, two water inlets of gate pier only keep water inlet of bank gate pier in the middle of also can cancelling.Most of automatic sluice gate with buoyancy programmed control need not be provided with two pass cable wire nylon rubber plate Emergency Gate, and shown for this reason ground sill angle steel embedded part 4 can be cancelled.The processing of gate pier and gate floor construction joint 3 is a new technology (the new experiences of Jiangsu Province's water conservancy construction), past is to handle by the absolute construction construction joint, still need and to establish waterstop, the independent separately bearing load of structure, be independent of each other, now be improved to the construction joint of building of simplification, structure is transmitted load mutually, gate pier base plate and chamber, storehouse back-plane design wedgewise body, Safety Design is moved in the antiskid of lock floor, all bear by the gate pier of two sides, and the huge vertical load of gate pier and management house, except that bearing by pile foundation, both sides respectively increase by one meter wide outrigger base, promptly increase by 50% foundation area, and arrange that at seam crossing pile group limits sink deformation, earthquake-resistant like this globality and degree of safety can be higher.Very big as the lock chamber width, the centre need be provided with a reduced form and build construction joint, and the section of this seam is thickeied into the beam shape, and arranges that castinplace pile comes the restraint of liberty distortion, and this project seam will play the hinged effect of fine motion.The spacing of impinging jet energy dissipating sparge pipe 5 is about 1m.In order to strengthen the gate floor rigidity of structure and to be convenient to by canonical form control clay model molding construction in place on the spot, each parting place, gate pier unit is provided with supporting beam shaft of rib system: the beam rib 6 of pressing the moulding of auxiliary gate-board shape, continuous supporting beam 7, access path stiff girder 8, large-scale supporting i beam 9, main gate-board supporting beam rib 10.Bank gate pier power generation pipeline water inlet 11 is controlled by novel semispherical shape steel work gate, and installs the miniature self-contained hydroelectric generation unit 13 of full-tubular of maximum model, and its capacity is about 150~300kW.Living water tubulose open caisson 12 is set in the gate pier of bank, can installs many submersible pumps and supply water by water requirement.The outlet 14 in special-purpose sand washing desilting tube road is controlled by jet gate slot circular steel structure cantilever fixed wheel gate.Future units inclined-plane shaft intake 16, by novel unsteady trashrack Emergency Gate 16, novel full-tubular formula unit 17, novel draft-tube maintenance flap valve 18 waits a whole set of new equipment, will the mill construction in power station very be simplified, and cost and duration reduce significantly.
One of optimum implementation of the present invention, be to select an object of construction production meticulously, it once routinely technical condition worked out feasibility study report, the hydrology, geological exploration data possess complete, but poor because of foundation condition, technology conservative, long in time limit, big, of poor benefits, the fund of investment is difficult to raise, wait one's opportunity and suspend.Its main economic and technical indices is: with irrigation, water supply, generating, breed, tourism, road bridge etc. is the comprehensive development target, irrigates water diversion 20m 3/ s, capacity of installed generator 1500kW, total 2 years durations, 1,500 ten thousand yuan of gross investments; Ground is deep sand loam with dissection, the wide about 230m of compound river channel, mean annual discharge 37m 3/ s, design flood discharge 4600m 3/ s, irrigation canal productive head 6m, because water supply requirement, water-drawing channel can not stop throughout the year, promptly requires regulating dam that Emergency Gate will be set and towards the silt facility.
Decide through consultation through getting in touch with owner department, agreement is consulted approval by the inventor with relevant design, unit in charge of construction, and formal sign contract agreement, be responsible for the over contract of this project project jointly, and carry out design, construction, management, operation, maintenance, benefit one package service.In addition, owing to be first over contract engineering, in order to allow the owner eliminate the risk misgivings, on contract agreement, expressly write out: if the design of over contract and construction, do not reach the quality specifications requirement that national quality testing department is checked and accepted, can be by " Contract Law is asked for the great number damages, and detains than large-engineering expense hospitality operation 5 years, reach the rolling development fund raising benefit of estimating, just propped up and give a good account of oneself.Can put it briefly, if can use automatic sluice gate with buoyancy programmed control and a whole set of new technology, new technology instead, draw breakthrough design scheme surely---investment duration demultiplication, overall economic efficiency multiplication.After reporting the audit approval of relevant higher level department, formally put into operation.
Breakthrough design scheme main points are: select 2 holes, 80 * 6m automatic sluice gate with buoyancy programmed control for use, as barrage, flood discharge, row's silt, water conservancy diversion gate dam, and be provided with towards silt, sediment outflow duct and two pass cable wire nylon rubber plate Emergency Gate; On the embankment of tableland, beach, arrange novel full-tubular formula hydroelectric generation unit or the through-flow shaft extension formula hydroelectric generation unit of 4 600kW, factory building, water inlet, trashrack, emergency repair gate, sand washing duct and Draft tube gate all adopt novel simplified structure, and utilize the wide interim lock of the water conservancy diversion hole of auxiliary power house clipping room design 15m, bear the construction diversion in dry season jointly with power station, 4 hole water inlet; Utilize the power plant tail water canal as irrigation water supply channel irrigating gate, weir, labyrinth diffluence pass is set, the generating tail water that surpasses design discharge of canal, automatically shunt in former river course, the tentative reinforced concrete box shaped structure of road bridge for the slip steel form balance construction of adopting new technology, select more economical rational bridge type by design of bid at last, this bridge is that the fund of utilizing rolling development to raise after 3 years is built, and its investment is not taken into account within construction investment; The design of tourist sight figurative art, engage building fine arts engineer to carry out specialized designs, the view project has: the fishpond flower bed spray scape of two sides lock gate pier management house, factory building management building, power station, two sides access bridge water spray color lamp and railing, two sides symmetry, the sight spot, industrial or agricultural pressure pipeline supply-water pump station administration room of two sides symmetry, bank protection work, the water surface travel sight spot, engineering management district garden type greening view etc.; Modern breed, plantation place and attached food, feed, packing, building materials, freezer, commerce and trade enterprise, carry out well-planned layout by landform and development plan, the liberalization of forbidding not have planning is disorderly built, the engineering payment for goods is invested about 6,000,000 yuan, pay off 6,600,000 yuan of loan and interests in two years, total investment of engineering is about 2,000 ten thousand yuan in 5 years, and wherein 1,460 ten thousand yuan is to support the electrical rolling exploitation with electricity to raise; Total 4 years durations, the generating only 4 months but first unit gone into operation, major project is built up and second unit gone into operation generates electricity half a year approximately, and management house, shore protection, breed etc. are the second stage of the project, the 3rd unit and road bridge, plantation etc. are the third stage of the project, and the 4th unit and tourist sight etc. are fourth phase engineering.
The scheduling of construction organization design is: according to the dry season in China's meteorological condition and river, selected formally the beginning at the beginning of 9 months built, under the situation of water conservancy diversion not, mechanization excavation lock hole, tableland, beach and feed ditch monolith basis, power station, and the construction drainage ditch and the open caisson that draws water are set by design condition, and then adopt advanced facility continuous productive process rapid construction vibro replacement stone column and castinplace pile, and shake and handle towards closely knit sluice foundation.Adopt a medium-sized concrete pump, a 0.5m3 lorry mounted mixer matching track formula tower crane concreting, concentrate strength on three-shift system earlier and build power station monolith underplate concrete and adjacent bank gate pier concrete, estimate to build in 20 days 4 interim water-bed layer structure and pod apertures structures crossed of unit water conservancy diversion, then divide two work plane parallel construction gate floor structures and absorption basin structures.In addition, in the time of with the sluice foundation soil excavation, utilize small-sized merogenesis moving belt conveyer and spoir, in the water on opposite bank, river course, fill the wide platform of about 40m, exceed the about 0.5m of the water surface,, be convenient to the rapid construction in lock hole and the longitudinal cofferdam of double construction diversion so that construct gate pier open caisson foundation and absorption basin quaywall open caisson foundation in the above, estimate to build up at the beginning of 11 months first lock hole base arrangement, absorption basin and middle gate pier, movable major-minor flashboard structure wouldn't be constructed, in order to the bigger slow big vast overcurrent of flood.Then, select the low water discharge cofferdam construction that dams, allow current pass through from the diversion gap (backfill is excavated) on monolith water conservancy diversion aperture, power station and gate pier open caisson bank.Strive for that (by the end of December) tentatively builds up two hole automatic sluice gate with buoyancy programmed control and hydro-structures in 4 months, and in first unit operation generating at unit's beginning of the month next year, the 2nd unit generation carries out first phase final acceptance of construction and engineering capital settlement subsequently at the beginning of 3 months.Then the second stage of the project goes into operation, promptly build power station integrated management building and gate pier top management house and relevant bank protection work, and the fish culture in net pen and the absorption basin that began for first year according to plan breed fish, the 3rd unit generating of going into operation in the end of the year, and carry out the second stage of the project final acceptance of construction and capital settlement.Mainly be to build up road bridge and access bridge sight spot, and establish modernized planting base in the 3rd year.At first be to install the 4th unit operation generating, and tentatively build up relevant tourist sight engineering in the 4th year.Tentatively build up modernized plant and plantation on the 5th year, and built up relevant biological chain, storehouse enterprise of chain factory of enterprise.
Overall economic efficiency assessment overview: irrigation water supply water diversion annual mean 10m 3/ s, promptly annual total about 300,000,000 m of water diversion 3Every cubic metre of water is collected construction investment depreciation management fee red cent (all the other water rates are collected by relevant department), about 3,000,000 yuan of annual income, total installation of generating capacity (containing 4 self-contained miniature units of through-flow in the gate pier) 2840kW, about 1,000 ten thousand kWh of average annual energy output, the annual mean online electricity charge are taken in about 4,000,000 yuan, about 1,000,000 yuan of the annual profit income of electric power pumping plant pipeliner agricultural living water; About 1,000,000 yuan of annual profit incomes such as modernization breed, plantation, tourism, affiliated enterprise, behind the commencement of works 1 year, water pipe take about 1,500,000 yuan of income, and the electricity charge are taken in about 2,000,000 yuan, 3,300,000 yuan of the first batch of payment for goods principals and interests of repayment engineering; Water pipe took about 2,500,000 yuan of income in the 3rd year, and the electricity charge are taken in about 3,500,000 yuan, repaid 3,300,000 yuan of second batch of loan and interests of engineering, and left fund is used for the road bridge construction, and going forward side by side does business already provides a loan 2,000,000 yuan, is used for affiliated enterprise's construction; Water pipe took 3,000,000 yuan of incomes in the 4th year, and the electricity charge are taken in 4,000,000 yuan, and enterprise's profit is taken about 200,000 yuan of income, repays 2,300,000 yuan of commercial loans principals and interests, and left fund is used for rolling development; Four charge moneys were totally 900 ten thousand yuan in the 5th year, began comprehensive rolling development, established new supporting step engineering, thereby, have higher economic benefit and social benefit.
Now in conjunction with the accompanying drawing 12 of the present embodiment, make following brief description: wherein the composite foundation new technology is adopted in the design of sluice foundation, promptly adopts displacement soil layer, vibro replacement stone column, perfusion to dredge the stake composite foundation, substitutes traditional densely covered perfusion pile group basis.The displacement soil layer is that good condition is created in the mechanization rapid construction of vibro replacement stone column and castinplace pile, and the closely knit sluice foundation of vibro replacement stone column will be eliminated earthquake liquefaction and excessive sink deformation effectively.The how fast light efficient engineering driller of QGJ-1000 of Xiangcheng City Huabao Drilling-Machine Factory, Henan Prov. and the development of Chinese agricultural machinery academy is adopted in the boring of filling pile construction and vibro replacement stone column, can finish 5 of the dark castinplace piles of 50m in one day, than about 20 times of routine techniques raising work efficiency.
Description of reference numerals is as follows: pipe shape open caisson 1 among the figure, it is the ingredient of job site well-point de-watering system, it is again the pumping plant water source of permanent living water, vibro replacement stone column 2, castinplace pile 3, sluice foundation gutter 4, gravel transition zone 5, mix gravelly soil compacted lift 6, double as construction transportation road surface and place, clear up smoothly at last, and spread skim cement-soil 7 compacting, as gate floor concreting clay model; The shutoff of drain hole 8 is set up the geotextile filtering layer except that filtering layer is set; Upstream impervious blanket 10 is used the cement-soil mask instead, the gravelly soil antiseepage, and cement-soil and gate floor seam crossing are irritated polyvinyl chloride (PVC) cement 9 with heat and are handled.The water spray fishpond 18 of industrial or agricultural supply-water pump station administration room 12, water spray view 13, ground flower bed 11, gate pier management house 14 and road bridge two sides, water spray pipe network 17, slope mark time 19 etc., make specialized designs in addition by building fine arts engineer; Road bridge 16 is selected by design of bid optimization, but needs to increase press water conveyance conduit 15; The seam 28 of absorption basin 29 and gate floor is irritated the polyvinyl chloride (PVC) cement water shutoff with heat and is handled, and the construction drainage ditch 27 of seaming position is buried permeable pipe of cement 26 underground, and is communicated with the construction drainage open caisson; The absorption basin base plate is provided with drain hole 30, and lays loaded filter 31; Adopt the secondary absorption basin to shorten apron length, and make absorption basin obtain bigger the energy dissipating depth of water and crawl area, its structure is by the reinforced concrete rectangular beam 20 and 24 of cast in situs, precast rc slab beam 22, withe 23 is formed netted bridge construction, fill up with cemented rock 21 in the lattice beam, some reinforcing bar crotches 25 are buried at the lattice beam top underground, are convenient to fixedly breed fish net.
The design of apron structure and jackstone anti-scour trench is different from routine techniques: in the downstream side of reinforced concrete rectangular beam 20, the reinforcing bar crotch is set, the about 1.0m of its center distance, and with prefabricated armored concrete slab 32, beam 33 flexibly jointed chains, placed rockfill in the space; On the top layer of jackstone anti-scour trench 36, prefabricated reinforced concrete girder slab reinforcement block is set equally protects, and set up one deck engineering film 37, all the other top layer laid dry boulders 34 protection, underlay rubble 35 and loaded filter 35 in the bottom.

Claims (11)

1. automatic sluice gate with buoyancy programmed control, it has the essential characteristic that general hydraulic gate must be held: can retain the highest design water level safely; Can let out the design maximum flow by safe wash with watercolours; The gate lifting is flexible, operates safe and reliable to operationly, and can be stabilized under the local unlocking condition, controls discharge reliably; The flimsy component of gate have good maintenance to change condition; Gate has higher durability and application life; Can install Emergency Gate in case of necessity carries out large repairs; Gate has the good uprising stormy waves impact and the ability of earthquake disaster, anti-silt alluvial performance, Practical Performance widely; In case of necessity can gate being provided with the effect measure eliminates freezing and ice pressure; Gate is convenient to construction, makes and is installed, and better economic is arranged; In addition, it also has the mechanism driving principle of five connecting rod bear-trap dams, the load of flashboard structure distributes and good operation runnability.It is different from a complete technical scheme of existing various gates, it is characterized in that: 1. initiate multi-functional permanent hinge water shutoff combined unit and substitute a traditional hinge sealing water device; 2. adopt novel main gate-board structure to substitute conventional linear pattern hollowcore slab structure; 3. adopt on the flexible combination type auxiliary gate-board structure to come instead of steel reinforced concrete flashboard structure; 4. adopt gentle floating middle carrier bar to come instead of steel structure intermediate chain bar; 5. adopt the following auxiliary gate-board of the board-like reinforced concrete structure of optimization type simply supported beam to substitute the board-like structure of steel concrete of four-point supporting; 6. adopt novel sealing water device to substitute conventional sealing water device; 7. initiate main gate-board i beam construction turntable mould and solve the fan-shaped water shutoff work plane of two sides gate pier good quality and high precision technological requirement; 8. initiate that universal maintenance bracing or strutting arrangement solves the maintenance overhaul of automatic sluice gate with buoyancy programmed control and the overhaul of fragile part changes; 9. the two cable wire nylon rubber plate Emergency Gates of initiative solve the maintenance difficult problem under water of the automatic gate of buoyancy programmed control; 10. adopt a whole set of advanced valve pipe system and device to solve the hydraulic automatic and the microcomputer straighforward operation management problem of automatic sluice gate with buoyancy programmed control.
2. automatic sluice gate with buoyancy programmed control according to claim 1, the feature of wherein multi-functional permanent hinge water shutoff combined unit is: 1. hinge steel work weldment [8], made up by seamless steel pipe and steel welding I beam, stiffener, end joint water shutoff plate and the taper sparge pipe [9] of high-quality and to be welded into; 2. free bearing shaped steel weldment [6], by standard channel-section steel and equal leg angle, burying underground fixedly, angle steel and compressed air delivery steel pipe [3] combination are welded into; When 3. gate rotated, the evenly distributed load of main gate-board was transmitted in the contacted tangent line cambered surface supporting of the seamless steel pipe of hinge and free bearing shaped steel, and this tangent line bearing surface promptly forms permanent water shutoff, in order to improve durability, at the work plane of rotating support; Adopt the protection of brush chromium layer new technology.In addition, set up ageing-resistant rubber tube [4] for the leakproofness that improves water shutoff; 4. at the seam crossing of each flashboard unit, shared hinge assembling sealed-for-life device is set, adopt " minute surface sealing " new technology to design, dress up by Molykote, stainless copper washer [19], stainless steel and chrome-plated part seal group, carry out general assembly and construction by designing program after, all hinges need not keep in repair and change, and have the feature that is total to the life-span with the steel concrete main gate-board; 5. transmit the make progress point load of component of main gate-board water pressure in order to reduce hinge, each flashboard unit is set up 3 cambered surfaces and is ended axillare [7], bears upwards component jointly; 6. in the end water shutoff and a main gate-board side seal water intersection of hinge both sides, special steel work water shutoff transmission device is set, promptly installs three cover transmission devices: the one, the compressed air delivery device; The 2nd, side seal water special pressure water conveying device; The 3rd, gatage discharge indicator.Its structure assembling and process conditions are seen the explanatory note of Fig. 2.
3. automatic sluice gate with buoyancy programmed control according to claim 1, the feature of wherein novel main gate-board structure is: 1. the main gate-board top is improved to broken line shape and vacuum weir curve, and when design top gear water level, the about 0.4m in underwater is slipped at the main gate-board top; 2. the first half of main gate-board is the hollowcore slab structure, and the hollow mould of inflation poly-bag is pulled out by the reservation breach of curved section, makes internal mold with the prefabricated arc of special ferro-cement, cooperates special steel form to build the second stage of steel concrete shutoff; 3. the main gate-board Lower Half is the beam slab energy-dissipating structure, chooses stream bank energy dissipation by aeration with a hinge, the energy dissipating of water jets bump, and the energy dissipating of notched sill absorption basin constitutes " combined energy dissipater "; 4. the relevant steel work embedded part of main gate-board and main gate-board clay model moulding in place on the spot primary concreting construction need not any hoisting machine tool and template.
4. according to the described automatic sluice gate with buoyancy programmed control of claim 1, wherein the feature of auxiliary gate-board structure is on the flexible combination type: 1. the flashboard material is combined into by the wire rope bonding of the thick nylon rubber plate of 7~12mm and diameter 6.2~12.5mm, rubber tile is regardless of the flashboard unit and the offset plate of a view picture of bonding one-tenth, but the configuration of wire rope is then divided by the flashboard unit, the wide flashboard unit of each 5m is provided with 4, be fixed on the arc steel work weldment [4] with special welded pulley [16], and be adhesively fixed with 120 * 5mm nylon rubber plate [18]; 2. its two ends are with arc steel work weldment [4] and galvanized bolt M30[6] connection, and set up shearing resistance stainless steel bolt M16[7] in wire rope pulley bearing, but point out, the full-length of its every joint is 2.2m, so that stagger, strengthen " fine motion is hinged " effect of main gate-board top girder steel weldment [10] seam with the seam of flashboard unit; 3. a part and arc steel work weldment of auxiliary gate-board directly formed gentle major part of floating middle carrier bar on the flexible combination type.
5. according to the described automatic sluice gate with buoyancy programmed control of claim 1, wherein the feature of gentle floating intermediate chain plated construction is: 1. in order to strengthen lateral stiffness and to limit its effective height, the ageing-resistant plastic pipe that employing is adhesively fixed, the about 140mm of caliber, its length is not limited by the flashboard cell width, and select by the physical length of buying, the two ends of every joint plastic pipe will be with hard plastic board hot weld sealing, to guarantee the buoyancy moulding; 2. for better buoyancy moulding, adopts ageing-resistant novel foamed plastic buoyancy aid [2], the about 400 * 100mm of its cross dimensions be bonded in securely on the flexible combination type on the auxiliary gate-board with powerful bonding agent and rubber tile, and the brushing waterproof coating is protected; 3. arc steel work weldment [4] is straight forming and the key member that transmits middle carrier bar direction water pressure, and its cambered surface length is about 100mm than the arc steel work weldment at top.
6. automatic sluice gate with buoyancy programmed control according to claim 1, the following auxiliary gate-board of freely-supported optimization type beam and slab type reinforced concrete structure wherein, it is characterized in that: 1. its vertical and horizontal section shape is seen Fig. 4 [9], Fig. 5 [16], and actual simply supported span has only about half of effective span, than security insurance; 2. the design amount of reinforcement of freely-supported optimization type beam and slab type reinforced concrete structure is saved about half than traditional board-like structure of four-point supporting steel concrete; 3. construction technology is improved to " clay model " in place on the spot moulding and builds steel concrete, saves heavy prefabrication and lifting operation; 4. each flashboard unit is provided with the garden steel of 2 old tire elastic cushion blocks [10] and a connection, and main gate-board directly supports on it; 5. its hinge seal water structure device is similar to multi-functional permanent hinge water shutoff combined unit of main gate-board, but this hinge is to bear pulling force, so each flashboard unit will be divided into two cover support hinge devices, increase the lubricated sealed-for-life device of a cover hinge assembling promptly, increase by two cover cambered surfaces in addition again and end the axle stopping means, common tension.
7. automatic sluice gate with buoyancy programmed control according to claim 1, the feature of wherein novel seal water structure device is: 1. the water shutoff of main gate-board unit seam is improved to fixedly steel mesh reinforcement [47] of key reinforcing bar [46] welding, cooperate steel fibre coloured cement mortar [44] arch shutoff, wherein the spacing of colored bulb [45] is 500mm, play the decoration effect, silica flour cement mortar [43] is then for strengthening moulding; 2. descend the water shutoff of auxiliary gate-board unit seam to simplify, central space is prefabricated thick bamboo tube skeleton [31] pitch wood chip [32] forming panel of punching block, and the top seam gets final product with high-quality malthoid [33] shutoff; 3. the side seal water of main gate-board is improved to hydraulic type rubber seal water structure device, wherein special hydraulic type water shutoff rubber [10] connects with angle steel weldment [2] with zinc-plated standard bolt [9] and sleeve [8], packing ring [7], cover plate [6], zinc-plated penstocks [4] are connected with the water-filling duct of water shutoff rubber with copper pipe [5]; 4. the side seal water of auxiliary gate-board structure is improved to chain form hydraulic type rubber seal water structure device on the flexible combination type, and wherein special hydraulic type water shutoff rubber [10] connects with double-layer nylon rubber tile [17] with the zinc-plated standard bolt of two pass [9], clamping plate [18], pressing plate [19]; 5. descend auxiliary gate-board side seal water to be improved to ageing-resistant plastic pipe rubber cushion blocks elastic compression seal water structure device, STAINLESS STEEL NUTS [23] wherein, cement with powerful bonding agent and angle steel weldment [21], the end of nut is with the bonding shutoff of stamping forming tin plate cap [22], in addition, the big rubber tube [27] of bonding continuous rubber tile [26] and elastic deformation amount on the angle steel weldment, sticker rubber plate [29] on cover plate [24] is jointly with ageing-resistant water shutoff plastic pipe [28] bidirectional elastic restriction.
8. automatic sluice gate with buoyancy programmed control according to claim 1, wherein the feature of main gate-board i beam construction turntable mould is: a standing tree mould 1. in place is on the spot built the wide concrete filled steel tube i beam [6] of 800mm, its appearance profile size and main gate-board are just the same, and have buried the steel structure support weldment [1] of the elastic locking stopping means of side seal water angle steel weldment [9] and the impact of uprising stormy waves underground by designing requirement; 2. install a wooden lath of straight datum [10], as measuring the construct foundation of smooth precision of check fan-shaped working face; 3. bar scaffold [7] and pedal [8] are blocked in the fixing construction of welding special use, and the safety block is installed, and guarantee work high above the ground safety; 4. on the cantilevered axle of welding lock shaft [25], install the assembly pulley of 4 multiplying powers, and lock, by an electric winch operation turntable mould at gate pier top with nut and packing ring [26].
9. automatic sluice gate with buoyancy programmed control according to claim 1, the feature of wherein universal maintenance bracing or strutting arrangement is: 1. universal steel pipe supporting member, by the seamless steel pipe [3] of full-length and accurately machined self-aligning spherical support plate [2], accurately machined welding mounting [4], be connected stiffener [5], micrometer adjusting screw [6], standard cap [7] assembling and be welded into, must strictly control and eliminate welding deformation, should on high-precision special mould, assemble welding, unclamp relevant jig after the cooling again; 2. accurately machined spill self-aligning spherical support seat board [1] is welded on down on the web of auxiliary gate-board hinge, and with elasticity limiting plate [21] erection welding, want the error precision of strict its centreline spacing of check after spot welding is fixing, just allow welding after obtaining inspection certificate, protect at spill sphere power up brush chromium layer at last; 3. on the platform mould of standard, temporary fixed in place with 3 bolts the joint cover [15] of main gate-board top girder steel weldment [10] and support seat board weldment [9], and after checking its centreline spacing error qualified, joint cover [15] is welded; 4. the process conditions of most critical are when could unload 3 temporary fixed bolts, and it is dead with joint cover [15] weldering to support seat board weldment [9] with the weldering holdfast, accurate normal use the in side.Allowing to weld holdfast regular time and condition is: must be after automatic sluice gate with buoyancy programmed control final acceptance of construction and trial run performance tests are qualified, specially carry out once universal maintenance bracing or strutting arrangement operation demonstration check by row, when the cumulative errors of revising bracing or strutting arrangement repeatedly, support the location at last under water, qualified through diver's in-water survey, the emptying water level, under the actual support condition, carry out the weldering holdfast of 3 bolts and the welding of circumferential weld at the scene, indicate numbering with red lacquer at last, so that sit in the right seat when using.
10. automatic sluice gate with buoyancy programmed control according to claim 1, wherein the feature of hydraulic automatic and microcomputer remote control system is: 1. adopt the inflatable type Pneumatic butterfly valve with contemporary advanced level, as the by-pass valve control that fills drainage pipe; 2. utilize the automation equipment of special communicating pipe of water level and balance weight principle design,, open the electromagnetic valve of pullswitch and conveying compressed air hose automatically, just can operate the switch of Pneumatic butterfly valve automatically by the power supply that the low capacity accumulator jar provides; 3. at ordinary times, the Pneumatic butterfly valve of drainage pipe is a closed condition, and the inflatable butterfly valve of water-filled pipe is an open mode, and free floating does not need personnel to manage to automatic sluice gate with buoyancy programmed control with the lifting of upstream reservoir level; 4. when flood occurs, automatic overflow flood discharge before this, if upper pond level continues to go up when surpassing the design limitations water level, the special communicating pipe [50] of water can be full of water with plastic bottle [57] automatically, design water by plastic bottle heavily makes the flexible rubber hose [52] of connection stretch elongated, automatically draw back pullswitch [44], the electromagnetic valve of the power supply opening appendix by accumulator jar, can close the Pneumatic butterfly valve of water-filled pipe automatically, open the Pneumatic butterfly valve of gate pier drainage pipe and main gate-board bottom hinge impinging jet energy dissipating drainage pipe in succession, at this moment automatic sluice gate with buoyancy programmed control will drop to the fully open position flood discharge lentamente automatically; 5. after flood peak, the upstream reservoir level begins to land significantly, when water level is reduced to minimum emerging sharp water level, balance weight plastic bottle [47] in special communicating pipe [49] can draw back pullswitch [44] by guide pulley rack [45], the electromagnetic valve of the power supply opening appendix of storage battery, the Pneumatic butterfly valve of water-filled pipe is opened automatically, the Pneumatic butterfly valve of drainage pipe is closed in succession automatically, the automatic sluice gate with buoyancy programmed control dash that can emerge fast, and, meet the appearance of end flood with water level rising and rising automatically, repeat flood season repeatedly like this, all be hydraulic automatic operation operation, administrative staff only need relative assembly and pullswitch are recovered normotopia; 6. when attacked by extraodinary flood, the reservoir level speed that rises in upstream is very fast, when though water level rises to the design limitations water level, automatically, open a sluice gate flood discharge, but belong to slowly designing program of landing, or do not drop to fully open position as yet because of the chance failure automatic sluice gate with buoyancy programmed control, and the upstream reservoir level rises to extreme high water suddenly, in order to ensure reservoir area dyke and resident's safety, designed the 3rd cover hydraulic automatic device especially, by above-mentioned identical principle and program, waterpower is opened pullswitch automatically, connects the standby electric power of the miniature self-contained hydroelectric generation unit of gate pier, just can be opened fast by the garden dish jet gate slot cantilever fixed wheel gate of electric cylinder [1] operation, by the large-scale quick draining that waits the inertia drainage pipe, just can guarantee that the buoyancy programmed control automatic brake falls the flood discharge of fully open position safety fast; 7. this overlaps large-scale inertia drainage pipe and the valving of waiting, it is again the key facility of microcomputer straighforward operation automatic sluice gate with buoyancy programmed control, the earial drainage operation is opened in the part of its any aperture, can come the electronic cylinder of operations platoon's penstock by the microcomputer remote control, and, just can make automatic sluice gate with buoyancy programmed control be stabilized in any aperture and carry out controlled earial drainage by the aperture that the variation that gatage discharge curve on the display screen and lock chamber level sensor show comes control garden dish jet gate slot cantilever fixed wheel gate; 8. all hydraulic automatic operating system and device are all installed microcomputer straighforward operation circuit, realize the double insurance operational administrative, and other all also realize microcomputer straighforward operation management about facility.
11. automatic sluice gate with buoyancy programmed control according to claim 1, wherein the feature of two pass cable wire nylon rubber Emergency Gate is: 1. two bearer cables are fixed by manpower stretch-draw on the reinforcement anchoring part with special stretching screw [9]; 2. the connection of cable wire and nylon rubber plate is fixed with special bent plate weldment [6] and double nut; 3. special doorframe embedded part is set, finishes nylon rubber plate and the bolted on connection or the dismounting of embedded part under water by the personnel that wear diving dress; 4. utilize automatic sluice gate with buoyancy programmed control main gate-board top curve surface shape and special arc steel work weldment [20], special wooden voussoir [19] is installed, directly bear a part of water pressure, can improve the force-bearing situation of nylon rubber and cable wire preferably, and greatly improve its security reliability; 5. the nylon rubber plate can be assembled into by 1~7, and the junction compresses with standard bolt and packing ring and gets final product.
CN98104565A 1998-03-18 1998-03-18 Automatic sluice gate with buoyancy programmed control Pending CN1229160A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN98104565A CN1229160A (en) 1998-03-18 1998-03-18 Automatic sluice gate with buoyancy programmed control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN98104565A CN1229160A (en) 1998-03-18 1998-03-18 Automatic sluice gate with buoyancy programmed control

Publications (1)

Publication Number Publication Date
CN1229160A true CN1229160A (en) 1999-09-22

Family

ID=5218292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN98104565A Pending CN1229160A (en) 1998-03-18 1998-03-18 Automatic sluice gate with buoyancy programmed control

Country Status (1)

Country Link
CN (1) CN1229160A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134844A (en) * 2010-01-21 2011-07-27 孟顺利 Automatic dredging and desilting system for rubber dam
CN103321189A (en) * 2013-07-03 2013-09-25 水利部交通运输部国家能源局南京水利科学研究院 Gate top overflowing ventilating and damping device and method
CN105178265A (en) * 2015-10-10 2015-12-23 中国电建集团贵阳勘测设计研究院有限公司 Precast stairwell for roller compacted concrete dam
CN105648975A (en) * 2015-12-30 2016-06-08 浙江大学 Saline water shunting device with wireless transceiving function
CN107938616A (en) * 2017-12-28 2018-04-20 中国电建集团贵阳勘测设计研究院有限公司 Device for preventing sediment deposition on bottom sill of tail gate slot
CN113931123A (en) * 2021-10-20 2022-01-14 北京华能新锐控制技术有限公司 Hydroelectric power generation river course reposition of redundant personnel floodgate
CN115679792A (en) * 2021-07-27 2023-02-03 江苏省太湖水利规划设计研究院有限公司 T-shaped beam for check brake, working bridge and working bridge manufacturing method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134844A (en) * 2010-01-21 2011-07-27 孟顺利 Automatic dredging and desilting system for rubber dam
CN102134844B (en) * 2010-01-21 2014-10-29 孟顺利 Automatic dredging and desilting system for rubber dam
CN103321189A (en) * 2013-07-03 2013-09-25 水利部交通运输部国家能源局南京水利科学研究院 Gate top overflowing ventilating and damping device and method
CN103321189B (en) * 2013-07-03 2015-08-05 水利部交通运输部国家能源局南京水利科学研究院 A kind of gate top overflow air ventilation shock-proof apparatus and method
CN105178265A (en) * 2015-10-10 2015-12-23 中国电建集团贵阳勘测设计研究院有限公司 Precast stairwell for roller compacted concrete dam
CN105648975A (en) * 2015-12-30 2016-06-08 浙江大学 Saline water shunting device with wireless transceiving function
CN107938616A (en) * 2017-12-28 2018-04-20 中国电建集团贵阳勘测设计研究院有限公司 Device for preventing sediment deposition on bottom sill of tail gate slot
CN115679792A (en) * 2021-07-27 2023-02-03 江苏省太湖水利规划设计研究院有限公司 T-shaped beam for check brake, working bridge and working bridge manufacturing method
CN113931123A (en) * 2021-10-20 2022-01-14 北京华能新锐控制技术有限公司 Hydroelectric power generation river course reposition of redundant personnel floodgate

Similar Documents

Publication Publication Date Title
CN207567889U (en) Residential quarters Rainwater collection system
CN103290805A (en) Method for regulating river water by utilizing sea power
Quanke et al. Hong Kong Zhuhai Macao Bridge-Tunnel project immersed tunnel and artificial islands–From an Owners’ perspective
CN101429758B (en) Construction method for wet land artificial ecological island
CN1229160A (en) Automatic sluice gate with buoyancy programmed control
CN210684945U (en) Rainwater collecting pool
CN102134933B (en) Stereoscopic level building
Pougatsch et al. Swiss dams: Overview of historical development
CN205475122U (en) A whole steel gate dam of transportation by driving formula for coastal area
Weight Ocean cooling water system for 800 MW power station
Sheppard et al. The Usk scheme for the water supply of Swansea
CN219011114U (en) Anti-seepage structure at bottom of pumped storage power station reservoir
CN111535260B (en) A reinforcement structure system of a dam body and construction method thereof
Nishikawa et al. Nanoimprint Biosensors: The Fusion of Nanofabrication, Nanophotonics and Nanobiology
Brown History of the Barrage at the head of the Delta of Egypt
CN1067466A (en) Hollow man-made island construction method and monomer structure
Xu Study on corrosion status and control strategies in infrastructure field in China
Hill THE THIRLMERE WORKS FOR THE WATER-SUPPLY OF MANCHESTER.(INCLUDING APPENDIX AND PLATES).
Eckart The water supply system of San Francisco
Paton THE GLEN SHIRA HYDRO-ELECTRIC PROJECT.
Kolios et al. An Award-Winning Multi-Purpose Bridge in the Red Sea: Construction Challenges and Engineering Solutions
Furkert et al. REMEDIAL MEASURES ON THE ARAPUNI HYDRO-ELECTRIC SCHEME OF POWER DEVELOPMENT ON THE WAIKATO RIVER, NEW ZEALAND.(INCLUDES APPENDICES AND PLATE AT BACK OF VOLUME).
Storey The Bureau of reclamation: history essays from the centennial symposium
Jing et al. Application of Pneumatically Actuated Dams in Urban River Regulation
CN109898596A (en) The step groundwater reservoir that monsoon rainwater automatic control system is related to

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication