CN1195078C - Integrated metal mixer depositing process - Google Patents

Integrated metal mixer depositing process Download PDF

Info

Publication number
CN1195078C
CN1195078C CNB001371061A CN00137106A CN1195078C CN 1195078 C CN1195078 C CN 1195078C CN B001371061 A CNB001371061 A CN B001371061A CN 00137106 A CN00137106 A CN 00137106A CN 1195078 C CN1195078 C CN 1195078C
Authority
CN
China
Prior art keywords
mould
furnace
mixer
iron notch
rim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB001371061A
Other languages
Chinese (zh)
Other versions
CN1361292A (en
Inventor
陈瑞金
张顺庆
张丰乐
张光普
周安宏
徐德亭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gengsheng Refractory Co., Ltd., Henan Prov.
Original Assignee
GENGSHENG INDUSTRY (GROUP) CORP Ltd HENAN PROV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GENGSHENG INDUSTRY (GROUP) CORP Ltd HENAN PROV filed Critical GENGSHENG INDUSTRY (GROUP) CORP Ltd HENAN PROV
Priority to CNB001371061A priority Critical patent/CN1195078C/en
Publication of CN1361292A publication Critical patent/CN1361292A/en
Application granted granted Critical
Publication of CN1195078C publication Critical patent/CN1195078C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention discloses an integrated casting process for a metal mixer, which is characterized in that the present invention comprises the following steps: light casting materials are laid at the bottoms of a mixer and an iron notch, and then light heat-insulating bricks are built; the bottom die of the bottom of the mixer is supported, and then the working layer at the bottom of the mixer is cast; a die plate is laid, and the bottom of the iron notch is cast with the casting materials; the bottom, etc., are disassembled after the casting materials are naturally cured; finally, after the inner part of the mixer is cleaned, a mixer baking pipe is installed, and then the mixer starts to be baked according to a mixer baking curve. Due to the adoption of the integrated casting method in the present invention, the metal mixer has the advantages of short working procedure time, good integrated performance of a lining, good heat insulation, fuel saving, strong repairing performance, safe and reliable operation, extension of service life and cost reduction.

Description

Integrated metal mixer depositing process
Technical field
The present invention relates to a kind of hot metal mixer casting stove method, relate to a kind of integrated metal mixer depositing process specifically.
Background technology
At present, the construction of hot metal mixer liner commonly used all is with brick, program be earlier shop furnace bottom thermofin, build permanent layer, furnace bottom working lining, built, block front-back wall working lining (dilatation joint filler), build bottom of trench and wall working lining, casting house and chew installation, the built of shell, change arch gusset, headwall and the casting house vault is built by laying bricks or stones, built, encircle mould, vault and build by laying bricks or stones, tear open and encircle mould, filleting, tear bow member, cleaning, mounting arch boiler tube, baker open.The characteristics of this casting stove method are that furnace bottom part does not need built, and shortcoming is: 1, ore deposit day lasting, job schedule is (a general stove is brick than pouring into a mould the time of Duoing with about 15 days) very slowly.2, the construction process unsafe factor is many, and the fragment of brick casualty accident often takes place.3, fragment of brick everywhere thickness can not design and build by laying bricks or stones according to stove fact damaged situation.4, there are a large amount of wedge type bricks, arch angle brick to need cutting, polishing, hot-tempered sound greatly.5, stay the brickwork joint of a treaty 2mm between masonry brick and the brick inevitably, this is the weakest link of masonry, and the damage of masonry is all from brickwork joint.6, heat insulation effect is poor, and casing temperature is low, can not protect box hat to have well and waste a large amount of coal gas.7, furnace campaign is short.
Summary of the invention
Purpose of the present invention just is to provide a kind of can simplify blast furnace mixer casting technology, improves the casting furnaceman and does security, reduces labor strength, speeds casting stove progress, improves the furnace lining quality, increases the service life the integrated metal mixer depositing process of energy efficient.
Purpose of the present invention can realize by following measure:
The present invention includes following steps:
Lightening casting material at the bottom of a, shop furnace bottom, the iron notch is built insulating brick;
Lightening casting material adds 6%~7% water, is paved into even one deck by design thickness and position, with instrument compactings such as chi bars, wipes out wholely, builds one deck light-weight insulating brick on the lightweight bed of material of having completed, bonds with chamotte;
B, a bed die, working lining at the bottom of the pouring furnace
Furnace bottom mould skeleton tiltedly draws with reinforcing bar and is welded on the furnace wall with pre-ready-made rim, rim two ends, between rim with give the standard form shop of making just after, just can pour into a mould bed die;
C, an iron notch bed die water at the bottom of the iron notch
Furnace bottom pours, and just carries out the steady job of iron notch end template at once, and template adopts and falls apart, and welded reinforcement presses down and fixes template on the steel plate of iron notch both sides, just can pour into a mould then;
D, tear open the bottom mould
Treat furnace bottom natural curing after 16~36 hours, just can the demoulding; Earlier the lacing wire at rim two ends is cut off, with the rim of slinging of driving a vehicle, with crowbar piece of standard form is levered up again, earlier reinforcing bar is sliced off at the bottom of the iron notch, template can lever up one by one;
E, stove front-back wall and headwall weldering nut are built light cinder brick, fill out light material
At stove front-back wall and headwall weldering nut, on the screw mandrel of having measured length on the nut of corresponding position, press design attitude, thickness is built light-weight insulating brick, fills out light material, requires brickwork joint to be not more than 2MM, light material is wanted the densification reality;
F, fixedly front-back wall and headwall, cast furnace wall, form removal
Mould adopts the template of loosing herein, add two-layer baffle plate and pass through screw mandrel, fixed by nut on furnace wall, by adding mat and transferring screw to adjust the template exact position, reach the thick poison of design, must twine two-layer malthoid on the screw mandrel, be beneficial to extract, template surface will nail on one deck malthoid, and mould fixes and can pour into a mould, and natural curing is after 16~36 hours, get final product the demoulding, screw mandrel also will be extracted during the demoulding;
Fiberboard is pasted in g, the perforate of furnace roof two ends, the weldering anchoring piece
Respectively cut a hole at the furnace roof two ends, the diameter in hole is 400MM~500MM, so that the cast furnace roof is expected at present; When pasting fiber, the fine brush of water glass adhesive one time of furnace roof box hat, above then fiberboard being spread out in, compacting can steadily be stained with, and has pasted fiberboard earlier, the corresponding anchoring piece of burn-oning on design attitude;
H, Zhi Dingmo, the cast furnace roof is torn backform open
The top die skeleton also adopts the rim that makes in advance, and the wheel spider is located with reinforcing bar on crossbeam, the lock piece frame is on the front and back furnace wall that has poured into, and the standard that nails on above the rim falls apart, shop, surface one deck malthoid, spread malthoid and just can pour into a mould, after the maintenance, got final product the demoulding then;
Installing of I, iron notch mould, cast, form removal
Because the iron notch shape is not planned, must on-the-spotly survey and draw, the scene installs as mould, cast maintenance, the demoulding.
After J, screw mandrel are extracted, each root stays next hole, also stay two-layer malthoid inside, after crossbeam was extracted, each root beam also stayed two hitch, must handle, with air drill to living the hole perforating of former screw mandrel, malthoid smash claw after, use closely knitly with the material ramming of this identical trade mark in position, hitch also is like this; After the stove internal cleaning is clean, the baker pipe is installed, is begun baker according to drying out curve.
Described in the present invention in the step g diameter in each cut-out hole of furnace roof two ends be 400~500MM, certainly, diameter also can be bigger as required or littler.The concentration of water glass adhesive can adopt conventional concentration to get final product as required in addition.
The present invention makes the casting furnaceman preface time of hot metal mixer short owing to adopt whole casting stove method, and the furnace lining overall performance is good, stove good heat insulating, fuel economy; And after the stove local damage, also can this operation carry out sectional repair, but toolability is strong, the stove operation is safer reliable, increases factory work-ing life, has reduced cost.
Embodiment
The present invention does with detailed description below in conjunction with embodiment:
Embodiment 1: the present invention includes following steps:
Lightening casting material at the bottom of a, shop furnace bottom, the iron notch is built insulating brick;
Lightening casting material adds 6% water (can pinch agglomerating getting final product), is paved into even one deck by design thickness and position, with instrument compactings such as chi bars, wipes out whole.On the lightweight bed of material of having completed, build one deck light-weight insulating brick, with the chamotte bonding, brickwork joint otherwise greater than 2MM.
B, a bed die, working lining at the bottom of the pouring furnace
Furnace bottom mould skeleton tiltedly draws with reinforcing bar and is welded on the furnace wall with pre-ready-made rim, rim two ends, between rim with give the standard form shop of making just after, just can pour into a mould bed die.
C, an iron notch bed die water at the bottom of the iron notch
Furnace bottom pours, and just carries out the steady job of iron notch end template at once, and template adopts and falls apart, and welded reinforcement presses down and fixes template on the steel plate of iron notch both sides, just can pour into a mould then.
D, tear open the bottom mould
Treat that furnace bottom natural curing, just can the demoulding after 24 hours (summer is short, and winter is long).Earlier the lacing wire at rim two ends is cut off, with the rim of slinging of driving a vehicle, with crowbar piece of standard form is levered up again, earlier reinforcing bar is sliced off at the bottom of the iron notch, template can lever up one by one.
E, stove front-back wall and headwall weldering nut are built light cinder brick, fill out light material
At stove front-back wall and headwall weldering nut, on the screw mandrel of having measured length on the nut of corresponding position, press design attitude, thickness is built light-weight insulating brick, fills out light material, requires brickwork joint to be not more than 2MM, light material is wanted the densification reality.
F, fixedly front-back wall and headwall, cast furnace wall, form removal
Mould adopts the template of loosing herein, add two-layer baffle plate and pass through screw mandrel, fixed by nut on furnace wall, by adding mat and transferring screw to adjust the template exact position, reach the thick poison of design, must twine two-layer malthoid on the screw mandrel, be beneficial to extract, template surface will nail on one deck malthoid, and mould fixes and can pour into a mould, and natural curing is after 16~36 hours, get final product the demoulding, screw mandrel also will be extracted during the demoulding.
Fiberboard is pasted in G, the perforate of furnace roof two ends, the weldering anchoring piece
Respectively cut a diameter 400MM (big stove can be opened bigger, and the bogey hole is corresponding smaller) at the furnace roof two ends, so that the cast furnace roof is expected at present; When pasting fiber, earlier the furnace roof box hat with the fine brush of water glass adhesive (concentration is through adjusting meticulously) a time, above then fiberboard being spread out in, compacting can steadily be stained with, and has pasted fiberboard, the anchoring piece of the correspondence of burn-oning on design attitude.
H, Zhi Dingmo, the cast furnace roof is torn backform open
The top die skeleton also adopts the rim that makes in advance, and the wheel spider is located with reinforcing bar on crossbeam, the lock piece frame is on the front and back furnace wall that has poured into, and the standard that nails on above the rim falls apart, shop, surface one deck malthoid, spread malthoid and just can pour into a mould, after the maintenance, got final product the demoulding then.
Installing of I, iron notch mould, cast, form removal
Because the iron notch shape is not planned, must on-the-spotly survey and draw, the scene installs as mould, cast maintenance, the demoulding.
After J, screw mandrel are extracted, each root stays next hole, also stay two-layer malthoid inside, after crossbeam was extracted, each root beam also stayed two hitch, must handle, with air drill to living the hole perforating of former screw mandrel, malthoid smash claw after, use closely knitly with the material ramming of this identical trade mark in position, hitch also is like this.After the stove internal cleaning is clean, the baker pipe is installed, is begun baker according to drying out curve.
Embodiment 2: the present invention includes following steps
Lightening casting material at the bottom of a, shop furnace bottom, the iron notch is built thermal insulation layer;
Lightening casting material adds 7% water (can pinch agglomerating getting final product), is paved into even one deck by design thickness and position, with instrument compactings such as chi bars, wipes out whole.On the lightweight bed of material of having completed, build one deck light-weight insulating brick, with the chamotte bonding, brickwork joint otherwise greater than 2MM.
B, a bed die, working lining at the bottom of the pouring furnace
Furnace bottom mould skeleton tiltedly draws with reinforcing bar and is welded on the furnace wall with pre-ready-made rim, rim two ends, between rim with give the standard form shop of making just after, just can pour into a mould bed die.
C, an iron notch bed die water at the bottom of the iron notch
Furnace bottom pours, and just carries out the steady job of iron notch end template at once, and template adopts and falls apart, and welded reinforcement presses down and fixes template on the steel plate of iron notch both sides, just can pour into a mould then.
D, tear open the bottom mould
Treat that furnace bottom natural curing, just can the demoulding after 30 hours (summer is short, and winter is long).Earlier the lacing wire at rim two ends is cut off, with the rim of slinging of driving a vehicle, with crowbar piece of standard form is levered up again, earlier reinforcing bar is sliced off at the bottom of the iron notch, template can lever up one by one.
E, stove front-back wall and headwall weldering nut are built light cinder brick, fill out light material
Stove front-back wall and headwall weldering nut, on the screw mandrel of having measured length on the nut of corresponding position, press design attitude, thickness is built light-weight insulating brick, fills out light material, requires brickwork joint to be not more than 2MM, light material is wanted the densification reality.
F, fixedly front-back wall and headwall, cast furnace wall, form removal
Mould adopts the template of loosing herein, add two-layer baffle plate and pass through screw mandrel, fixed by nut on furnace wall, by adding mat and transferring screw to adjust the template exact position, reach the thick poison of design, must twine two-layer malthoid on the screw mandrel, be beneficial to extract, template surface will nail on one deck malthoid, and mould fixes and can pour into a mould, and natural curing is after 16~36 hours, get final product the demoulding, screw mandrel also will be extracted during the demoulding.
Fiberboard is pasted in G, the perforate of furnace roof two ends, the weldering anchoring piece
Respectively cut a diameter 500MM (big stove can be opened bigger, and the bogey hole is corresponding smaller) at the furnace roof two ends, so that the cast furnace roof is expected at present; When pasting fiber, earlier the furnace roof box hat with the fine brush of water glass adhesive (concentration is through adjusting meticulously) a time, above then fiberboard being spread out in, compacting can steadily be stained with, and has pasted fiberboard, the anchoring piece of the correspondence of burn-oning on design attitude.
H, Zhi Dingmo, the cast furnace roof is torn backform open
The top die skeleton also adopts the rim that makes in advance, and the wheel spider is located with reinforcing bar on crossbeam, the lock piece frame is on the front and back furnace wall that has poured into, and the standard that nails on above the rim falls apart, shop, surface one deck malthoid, spread malthoid and just can pour into a mould, after the maintenance, got final product the demoulding then.
Installing of I, iron notch mould, cast, form removal
Because the iron notch shape is not planned, must on-the-spotly survey and draw, the scene installs as mould, cast maintenance, the demoulding.
After J, screw mandrel are extracted, each coring stays next hole, also stay two-layer malthoid inside, after crossbeam was extracted, each root beam also stayed two hitch, must handle, with air drill to living the hole perforating of former screw mandrel, malthoid smash claw after, use closely knitly with the material ramming of this identical trade mark in position, hitch also is like this.After the stove internal cleaning is clean, the baker pipe is installed, is begun baker according to drying out curve.

Claims (1)

1, a kind of integrated metal mixer depositing process, it is characterized in that: it may further comprise the steps:
Lightening casting material at the bottom of a, shop furnace bottom, the iron notch is built insulating brick; Lightening casting material adds 6%~7% water, is paved into even one deck by design thickness and position, with instrument compactings such as chi bars, wipes out wholely, builds one deck light-weight insulating brick on the lightweight bed of material of having completed, bonds with chamotte; Described brickwork joint otherwise greater than 2MM;
B, bed die, working lining furnace bottom mould skeleton is with pre-ready-made rim at the bottom of the pouring furnace, the rim two ends are tiltedly drawn with reinforcing bar and are welded on the furnace wall, between rim with give the standard form shop made from regard to after, just can pour into a mould bed die;
C, iron notch bed die, water iron notch at the bottom of furnace bottom pour, just carry out the steady job of iron notch end template at once, template adopts and falls apart, welded reinforcement presses down and fixes template on the steel plate of iron notch both sides, just can pour into a mould then;
D, tear the bottom mould open and treat furnace bottom natural curing after 16~36 hours, just can the demoulding; Earlier the lacing wire at rim two ends is cut off, with the rim of slinging of driving a vehicle, with crowbar piece of standard form is levered up again, earlier reinforcing bar is sliced off at the bottom of the iron notch, template can lever up one by one;
E, stove front-back wall and headwall weldering nut are built light cinder brick, fill out light material at stove front-back wall and headwall weldering nut, on the screw mandrel of having measured length on the nut of corresponding position, press design attitude, thickness and build light-weight insulating brick, fill out light material, require brickwork joint to be not more than 2MM, light material wants densification real;
F, fixedly front-back wall and headwall, the cast furnace wall, the template of loosing is adopted in form removal mould herein, add two-layer baffle plate and pass through screw mandrel, fixed by nut on furnace wall, by adding mat and transferring screw to adjust the template exact position, reach the thick poison of design, must twine two-layer malthoid on the screw mandrel, be beneficial to extract, template surface will nail on one deck malthoid, and mould fixes and can pour into a mould, and natural curing is after 16~36 hours, get final product the demoulding, screw mandrel also will be extracted during the demoulding;
Fiberboard is pasted in g, the perforate of furnace roof two ends, and the weldering anchoring piece respectively cuts a hole at the furnace roof two ends, and the diameter in hole is 400MM~500MM, so that the cast furnace roof is expected at present; When pasting fiber, the fine brush of water glass adhesive one time of furnace roof box hat, above then fiberboard being spread out in, compacting can steadily be stained with, and has pasted fiberboard earlier, the corresponding anchoring piece of burn-oning on design attitude;
H, Zhi Dingmo, the cast furnace roof, tear backform top die skeleton open and also adopt the rim that makes in advance, the wheel spider is located with reinforcing bar on crossbeam, the lock piece frame is on the front and back furnace wall that has poured into, the standard that nails on above the rim falls apart, and shop, surface one deck malthoid has been spread malthoid and just can have been poured into a mould, after the maintenance, get final product the demoulding then;
Installing of I, iron notch mould, cast, form removal is not because the iron notch shape plans that must on-the-spotly survey and draw, the scene installs as mould, cast maintenance, the demoulding.
After J, screw mandrel are extracted, each root stays next hole, also stay two-layer malthoid inside, after crossbeam was extracted, each root beam also stayed two hitch, must handle, with air drill to living the hole perforating of former screw mandrel, malthoid smash claw after, use closely knitly with the material ramming of this identical trade mark in position, hitch also is like this; After the stove internal cleaning is clean, the baker pipe is installed, is begun baker according to drying out curve.
CNB001371061A 2000-12-29 2000-12-29 Integrated metal mixer depositing process Expired - Fee Related CN1195078C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB001371061A CN1195078C (en) 2000-12-29 2000-12-29 Integrated metal mixer depositing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB001371061A CN1195078C (en) 2000-12-29 2000-12-29 Integrated metal mixer depositing process

Publications (2)

Publication Number Publication Date
CN1361292A CN1361292A (en) 2002-07-31
CN1195078C true CN1195078C (en) 2005-03-30

Family

ID=4597663

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB001371061A Expired - Fee Related CN1195078C (en) 2000-12-29 2000-12-29 Integrated metal mixer depositing process

Country Status (1)

Country Link
CN (1) CN1195078C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101581540B (en) * 2009-06-19 2011-01-12 中国第一冶金建设有限责任公司 Flange beam formwork method when pouring material for heating furnace wall

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100447255C (en) * 2005-12-27 2008-12-31 王振武 Blast furnace mixer inside lining building structure for steelmaking
CN100393891C (en) * 2006-08-07 2008-06-11 濮阳濮耐高温材料(集团)股份有限公司 fIntegrated building blast furnace mixer and building technology thereof
CN101514870B (en) * 2008-02-22 2012-02-22 中冶天工建设有限公司 Construction method for manufacturing working layer of annular heating furnace by utilizing timber shuttering and profile steel
CN101649368B (en) * 2009-09-10 2011-04-06 武汉钢铁(集团)公司 Method for integrally pouring mixer furnace
CN101942576B (en) * 2010-09-02 2012-04-18 中信锦州铁合金股份有限公司 Manufacturing method of brasque used for smelting metal chromium

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101581540B (en) * 2009-06-19 2011-01-12 中国第一冶金建设有限责任公司 Flange beam formwork method when pouring material for heating furnace wall

Also Published As

Publication number Publication date
CN1361292A (en) 2002-07-31

Similar Documents

Publication Publication Date Title
CN1263930C (en) Thin-wall form member for hollowing out concrete
CN1162595C (en) Hollow floor slab with hidden and dense ribs
CN1216217C (en) Thin-wall form for filling concrete
CN103276651B (en) No-cutting-seam cement concrete pavement structure and construction method thereof
CN1195078C (en) Integrated metal mixer depositing process
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN1086435C (en) A set of parts for use in building and a method of using same
CN106639005B (en) A kind of loam wall forming method and device based on phase transformation solidified earth
CN100393891C (en) fIntegrated building blast furnace mixer and building technology thereof
CN1804236A (en) Sandwiched brick and manufacturing method thereof
CN1273698C (en) Hollow reinforced concrete board
CN2534270Y (en) Blind rib hollow floor
CN1348045A (en) Hollow tube member and its making process
CN1236158C (en) In-situ deposited reinforced concrete floor board
CN2526145Y (en) Hollow pipe structural member
CN2594347Y (en) Thin-wall formwork component for hollow bricks
CN1236171C (en) A hollow component for concrete
CN1891923A (en) Concrete hollow thin-wall shuttering member
CN1896423A (en) Cavity construction member
CN1515653A (en) High-effective shift converter inner liner and its preparation method
CN1696438A (en) Hollow slab made from concrete reinforced by steel bar cast in-site
CN1782269A (en) Steel concrete hollow plate
CN1904248A (en) Mould shell construction unit for on site pouring reinforced concrete storey cover
CN1824899A (en) Thin wall pipe for filling concrete
CN1789609A (en) Thin wall tube for concrete filling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HENAN PROVINCE GENGSHENG REFRACTORY CO., LTD.

Free format text: FORMER OWNER: GENGSHENG INDUSTRY (GROUP) CORP., LTD., HENAN PROV.

Effective date: 20060623

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20060623

Address after: Dayugou town Gongyi city Henan province 451271 Gengsheng Road No. 88

Patentee after: Gengsheng Refractory Co., Ltd., Henan Prov.

Address before: Dayugou town Gongyi city Henan province 451271 Gengsheng Road No. 88

Patentee before: Gengsheng Industry (Group) Corp., Ltd., Henan Prov.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050330

Termination date: 20121229