CN1190313C - Apparatus for mfg. steel-plastic composite pipe - Google Patents

Apparatus for mfg. steel-plastic composite pipe Download PDF

Info

Publication number
CN1190313C
CN1190313C CNB021215839A CN02121583A CN1190313C CN 1190313 C CN1190313 C CN 1190313C CN B021215839 A CNB021215839 A CN B021215839A CN 02121583 A CN02121583 A CN 02121583A CN 1190313 C CN1190313 C CN 1190313C
Authority
CN
China
Prior art keywords
tubulature
car
temperature
main frame
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNB021215839A
Other languages
Chinese (zh)
Other versions
CN1435312A (en
Inventor
章明伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Shengfeng Steel Plastic Pipe Manufacturer
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB021215839A priority Critical patent/CN1190313C/en
Publication of CN1435312A publication Critical patent/CN1435312A/en
Application granted granted Critical
Publication of CN1190313C publication Critical patent/CN1190313C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

The present invention relates to a device for manufacturing a steel-plastic composite pipe, which comprises a pipe collecting type pipe loading vehicle, a cylindrical body for heating and pressurizing, a cooling water device, a control circuit, mechanical parts and tracks. The device has the advantages of high yield, good quality and energy saving, and the yield and the quality of products are guaranteed by a series of physical change procedures and controls.

Description

Steel-plastic composite pipe manufacturing equipment
One, technical field: the invention belongs to Machine Manufacturing Technology, its invention is to make steel-plastic composite pipe, is to belong to the mechanical invention that solves construction material water supply and sewerage pipeline technical field.
It is China's ability recent years Development and Production that steel is moulded pipe, it is a kind of novel products, the current domestic professional manufacturing works that also do not make steel-plastics composite pipe equipment, through development more than 2 years, the advanced manufacturing equipment of our factory self design one cover, go into operation through on probation, effect is fine, has filled up China and has used steam to make the blank of steel-plastics composite pipe cause.
Two, background technology: it is a metal (steel pipe) and the material of nonmetal (plastics) two kinds of coefficient of dilatation great disparities is combined with each other, and becomes a kind of technology of novel environment friendly material.The existing metal tube of steel-plastics composite pipe is hard, good rigidly has the corrosion resistant characteristic of plastic tube again, and it is to overcome steel pipe and plastic tube shortcoming, and gets its advantage, this Tube, and its fluid of flowing through is not subjected to secondary pollution.Wherein, high strength hot melt technology, steam is heated, and Compressed Gas is shaped, and the raw material steel pipe, moulds specification requirement such as pipe selection.
Three, summary of the invention:
A kind of manufacturing equipment of producing steel-plastic composite pipe:
It constitutes six parts: a " steam " and moves tubulature car c conveyor track d temperature and pressure cylinder main frame e control circuit f water spray cooling device for heat energy b header pipe type, it is characterized in that:
A uses " steam " heat to enter temperature and pressure cylinder main frame and heater, and steam pressure is in the 1MPa temperature below 200 ℃, and is delivered to steel pipe and glue is moulded layer, by compressed-air actuated expansionary force typing, pressure is in 0.8MPa, and glue is moulded layer and is close to steel pipe inwall, cooling forming then;
The b header pipe type moves steel pipe that the tubulature car adopts lift that interior cover the is moulded pipe location of getting on the bus, and two ends reach sealing effectiveness with the universal top of taper with mechanical, manual, electric locking method, enters main frame by conveyor track through pressure testing is qualified;
The c conveyor track is to move the condition that the conveying operation is provided that tubulature car, temperature and pressure cylinder main frame and water spray cooling device are adopted for connecting header pipe type, and its method is electronic and machine driving;
D temperature and pressure cylinder main frame is the operating room of heat-insulation pressure keeping;
F adopts the water spray cooling device, make the tubulature car temperature and pressure cylinder host work indoor by conveyor track to chill station, water spray cooling forming.A succession of physical change process and control have guaranteed product yield and quality.
Four. description of drawings:
Accompanying drawing 1 is a Steel-plastic composite pipe manufacturing equipment.
1, header pipe type moves tubulature cooling car 2, cooling water nest of tubes 3, tank 4, cooling frame 5, mobile chassis 6, roller 7, roller 8, manually articulate track 9, associating apparatus 10, road rail steel 11, combined unit 12, roller 13, cylindrical shell inside rail 14, venthole 15, both sides steam distribution case 16, temperature and pressure cylinder main frame 17, handwheel dish 18, manually articulate track 19, roller 20 rollers 21, mobile chassis 22, tubulature frame 23, mother tube 24, header pipe type moves tubulature heating car 25, the handwheel dish.
Accompanying drawing 2 is steel-plastics composite pipe production line diagram.
Five, the specific embodiment:
Have below special-purpose several tubulature cars, every tubulature car and promote movable carriage about can be arbitrarily.Pipe spacing anchor clamps are arranged in the tubulature car, mother tube has mechanical elevator to deliver in the tubulature car, steel pipe is located voluntarily, tubulature Che Ertou comes directly towards push pipe with taper, and the taper top can arbitrarily angledly be rotated, but also length is flexible, tighten extruding by spring spiro rod, one end tube sheet of tubulature car is with the screw rod telescopic moving, and the other end is fixed the air inlet of dress compressed air, and each car can be adorned several~tens steel pipe, having adorned the back screw rod tightens, the logical compressed air of examination carries out leak test, behind the examination driving fit lattice, tubulature car (but also move left and right) is aimed at cylindrical shell, exert oneself gently, the automobile-used machinery of tubulature or the kind of drive is (manual, electronic) advance in the cylindrical shell, all track connects.Two door cover structures of the pressure cylinder of heating body main frame, adopt the claw hook door-sliding, track is arranged below the door frame, our factory has craft to move door, and the electronic door that moves is also arranged, and speed is fast, light and handy flexibly, use steam heat to enter temperature and pressure cylinder main frame and heater, the following steam pressure of 1MPa in the cylindrical shell, the temperature height can be regulated arbitrarily in 200 ℃ of scopes.Enter to from the tubulature of tubulature car that cylindrical shell is heated until last cooling finishes, keep air pressure 0.8MPa in the pipe in the omnidistance technical process, compressed air displacement gas threshold switch (gas is inserted outward by cylindrical shell) is housed in the cylindrical shell, the end of heating in the cylindrical shell, pull out the tubulature car, directly to the chill station cooling of spraying water.Simultaneously another tubulature car enters cylindrical shell, and a chassis successively, sheds production tube with a chassis after the cooling, and empty wagons pushes back former tubulature platform, tubulature again, track travel all back and forth, also have on the chill station dress cooling car adjustable shelf can about move arbitrarily.Full car advances, and empty wagons returns, streamline production, and circulation was carried out, every 10 minutes~15 minutes.Only a car pipe can be produced several to tens steel and mould pipe, and the fast quality of speed is well energy-conservation again.

Claims (1)

  1. A kind of manufacturing equipment of producing steel-plastic composite pipe:
    It constitutes six parts: a " steam " and moves tubulature car c conveyor track d temperature and pressure cylinder main frame e control circuit f water spray cooling device for heat energy b header pipe type, it is characterized in that:
    A uses " steam " heat to enter temperature and pressure cylinder main frame and heater, and steam pressure is in the 1MPa temperature below 200 ℃, and is delivered to steel pipe and glue is moulded layer, by compressed-air actuated expansionary force typing, pressure is in 0.8MPa, and glue is moulded layer and is close to steel pipe inwall, cooling forming then;
    The b header pipe type moves steel pipe that the tubulature car adopts lift that interior cover the is moulded pipe location of getting on the bus, and two ends reach sealing effectiveness with the universal top of taper with mechanical, manual, electric locking method, enters main frame by conveyor track through pressure testing is qualified;
    The c conveyor track is to move the condition that the conveying operation is provided that tubulature car, temperature and pressure cylinder main frame and water spray cooling device are adopted for connecting header pipe type, and its method is electronic and machine driving;
    D temperature and pressure cylinder main frame is the operating room of heat-insulation pressure keeping;
    F adopts the water spray cooling device, make the tubulature car temperature and pressure cylinder host work indoor by conveyor track to chill station, water spray cooling forming.
CNB021215839A 2002-06-27 2002-06-27 Apparatus for mfg. steel-plastic composite pipe Expired - Lifetime CN1190313C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB021215839A CN1190313C (en) 2002-06-27 2002-06-27 Apparatus for mfg. steel-plastic composite pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB021215839A CN1190313C (en) 2002-06-27 2002-06-27 Apparatus for mfg. steel-plastic composite pipe

Publications (2)

Publication Number Publication Date
CN1435312A CN1435312A (en) 2003-08-13
CN1190313C true CN1190313C (en) 2005-02-23

Family

ID=27628584

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB021215839A Expired - Lifetime CN1190313C (en) 2002-06-27 2002-06-27 Apparatus for mfg. steel-plastic composite pipe

Country Status (1)

Country Link
CN (1) CN1190313C (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101303096A (en) 2007-08-09 2008-11-12 章明伟 Equipment for manufacturing steel plastic composite pipe as well as method for manufacturing steel plastic composite pipe
CN102789836B (en) * 2011-05-20 2014-04-23 泰科电子(上海)有限公司 Insulated conduit bus and manufacturing method thereof
CN113681789A (en) * 2021-08-31 2021-11-23 宁波市盛丰钢塑管制造厂 Steel-plastic composite pipe manufacturing equipment

Also Published As

Publication number Publication date
CN1435312A (en) 2003-08-13

Similar Documents

Publication Publication Date Title
CN107097442A (en) A kind of polyurethane coating polyethylene winding insulating tube manufacturing equipment and manufacturing process
CN103660277B (en) A kind of internal lining pipe deformation device
CN101862725A (en) Steel-plastic composite pipe spraying device
CN109318445B (en) High-elasticity wear-resistant dual-density in-mold foamed rubber tire and manufacturing process thereof
CN1190313C (en) Apparatus for mfg. steel-plastic composite pipe
CN204866320U (en) Plastic -coated outside of tubes surface spraying plastics processing equipment
CN108177285A (en) A kind of intelligent slush moulding device being heated evenly for being used to manufacture fascia
CN103921378B (en) A kind of hot sheet rubber heat sink and cool-down method
CN103807520B (en) A kind of production line of making lining plastic spipot and socket cast iron pipe
CN101143485A (en) Technology for manufacturing automobile door and window sealing strip
CN108544704A (en) Molding device for bridge-cutting-free heat-insulation aluminum profiles and forming method
CN106111458B (en) A kind of full-automatic inside and outside operating method for applying coating line of steel conduit
CN106694593A (en) Molding production line for aluminum alloy profile and molding technology of aluminum alloy profile
CN115338960B (en) Ceramic rock plate reinforcing and toughening method, back net laying method and hot melting equipment
CN203854198U (en) Lining tube deformation device
CN203711264U (en) Steel pipe protection layer coating production line for short-distance heating
CN204842073U (en) Novel plastic -coated outside of tubes surface spraying plastics processing equipment
CN210388169U (en) Quick rolling steel ball mounting device based on metal cold and hot deformation
CN105135877B (en) Circulation conveying equipment and the smokeless and odorless energy-conserving and environment-protective de-waxing tunnel cave using the equipment
CN204209963U (en) A kind of novel carat pipe hot briquetting automatic production line
CN211467556U (en) Forming system of carbon fiber prepreg product
CN204526059U (en) A kind of special-shaped wall Guan Cheng, socket mould and bell and spigot manufacturing equipment thereof
CN204866353U (en) Improvement plastic -coated outside of tubes surface spraying plastics processing equipment
CN109570254B (en) Heat transfer aluminum pipe blank hot extrusion rough forming device
CN208250452U (en) A kind of polycrystalline copper single crystallization device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Ningbo Jiangdong Shengfeng Steel-Plastic Tube Factory

Assignor: Zhang Mingwei

Contract fulfillment period: 2009.5.25 to 2022.6.26

Contract record no.: 2009330001337

Denomination of invention: Equipment for manufacturing steel plastic composite pipe as well as method for manufacturing steel plastic composite pipe

Granted publication date: 20050223

License type: Exclusive license

Record date: 20090605

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.5.25 TO 2022.6.26; CHANGE OF CONTRACT

Name of requester: NINGBO JIANGDONG SHENGFENG STEEL + PLASTIC PIPE MA

Effective date: 20090605

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 315040 Zhejiang province Ningbo Jiangdong fuming Road No. 828 Hang Fu Building 14 floor

Patentee after: Zhang Mingwei

Address before: 315040, -5, 177 Jiangdong South Road, Zhejiang, Ningbo

Patentee before: Zhang Mingwei

TR01 Transfer of patent right

Effective date of registration: 20190808

Address after: 315803 No. 15, 102 Lane, Jinji Road, Qijiashan, Beilun District, Ningbo City, Zhejiang Province

Patentee after: NINGBO SHENGFENG STEEL PLASTIC PIPE MANUFACTURER

Address before: 315040 Zhejiang province Ningbo Jiangdong fuming Road No. 828 Hang Fu Building 14 floor

Patentee before: Zhang Mingwei

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20050223

CX01 Expiry of patent term