CN1186504C - Ground foundation delay consolidation treatment method - Google Patents

Ground foundation delay consolidation treatment method Download PDF

Info

Publication number
CN1186504C
CN1186504C CNB031303218A CN03130321A CN1186504C CN 1186504 C CN1186504 C CN 1186504C CN B031303218 A CNB031303218 A CN B031303218A CN 03130321 A CN03130321 A CN 03130321A CN 1186504 C CN1186504 C CN 1186504C
Authority
CN
China
Prior art keywords
foundation
proof curtain
seepage proof
vertical seepage
consolidation process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB031303218A
Other languages
Chinese (zh)
Other versions
CN1478961A (en
Inventor
刘远锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB031303218A priority Critical patent/CN1186504C/en
Publication of CN1478961A publication Critical patent/CN1478961A/en
Application granted granted Critical
Publication of CN1186504C publication Critical patent/CN1186504C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention discloses a delay consolidation treatment method for a foundation. The circumference of a building foundation is provided with a circle of vertical seepage resistance curtain, or tilted feet at both sides of a road foundation are provided with two vertical seepage resistance curtains along the line direction, and the bottom surface of a building or the road foundation is paved with one horizontal seepage resistance layer hermetically connected with the vertical seepage resistance curtains. The delay consolidation treatment method for a foundation of the present invention greatly reduces cost under the precondition that a post-construction settlement method is similar to a deep agitation method. The engineering is only about 15% of the engineering of the deep agitation method, and a pad layer is not required. In addition, prepressing or placing time of a drainage consolidation method is not required, and the road foundation is filled according to the normal speed rate, or other upper loads are applied. Thus, the present invention is favorable to the reduction of the construction period. In addition, the method can not damage the structure performance of foundation soil, and thereby, the natural strength of the foundation soil can be performed to the maximum extent.

Description

Ground delays the consolidation process method
Technical field
The present invention relates to the method for processing foundation in a kind of civil construction field, particularly relate to a kind of ground and delay the consolidation process method.
Background technology
Along with rapid development of social economy, civil engineering has proposed new requirement for the performance of ground, promptly from lay particular emphasis in the past to the intensity of foundation soil and bearing capacity of foundation soil claim and change into also need to ground externally the sedimentation that produces down of load action carry out strict control.Especially in the last few years, the construction speed of the high-speed railway of China, speedway and special line for passenger trains is constantly accelerated, because the settlement request of such engineering after to the roadbed worker is very strict, and common circuit cross-regional very wide and engineering quantity is huge, thereby the settlement Control problem of soft foundation is just seemed particularly outstanding.Even can satisfy the requirement of engineering fully through the bearing capacity that regular meeting runs into natural ground, but the sedimentation and deformation that ground produces under the effect of upper load do not reach and requires such problem, thereby just must handle to control its sedimentation this ground.Existing method for processing foundation mainly is divided into bed course, change and composite foundation factures such as pellet stake facture such as shallow-layer facture, consolidation, broken stone pile, sand pile and agitation pile, powder spray piling such as fill out.Wherein bed course, change and the shallow-layer facture such as fill out and can't handle deep soft foundation; Though consolidation can be handled deep soft foundation, and it is with low cost, but there is problems such as needing precompressed or placement processing, sometimes even need very long squeeze time, and construction period ground can produce sedimentation largely, can prolong the duration so undoubtedly and increase engineering quantity and cost; There are problems such as construction quality is wayward, cost height in pellet such as broken stone pile, sand pile stake facture, and its engineering property cost is higher than not; Though and composite foundation factures such as agitation pile, powder spray piling can obtain good engineering property, also exist the higher and engineering property cost of cost than not high shortcoming, thereby its range of application is subjected to certain restriction.
Summary of the invention
In order to address the above problem, the object of the present invention is to provide and a kind ofly can satisfy strict settlement after construction requirement, economically feasible, but and the ground of reduction of erection time delay the consolidation process method.
In order to achieve the above object, it is that road along the line, the toe position direction that a circle or roadbed both sides are set around structure foundation is provided with the vertical seepage proof curtain of twice that ground provided by the invention delays the consolidation process method, and lay the horizontal impervious layer that one deck and vertical seepage proof curtain are tightly connected in the bottom surface of building or roadbed, the degree of depth of vertical seepage proof curtain is determined by the size requirements of settlement after construction and the actual geological conditions of ground.
On horizontal impervious layer or below or top and bottom lay one or more layers horizontal reinforcement layer simultaneously.
Along the vertical seepage proof curtain of the length direction of building or roadbed both sides length direction or the perpendicular horizontal separation seepage proof curtain of line direction with building are set at a certain distance together.
Described vertical seepage proof curtain and laterally separate seepage proof curtain and lay geomembrane, fluting asphalt reperfusion, waterproof concrete or swell soil, overlap and beat agitation pile and chemical grouting method is made on the spot with fluting.
Described horizontal impervious layer is any or its combination in geomembrane, pitch and the non-infiltration soil.
Ground provided by the invention delays the consolidation process method can because its engineering quantity approximately has only 15% of deep mixing method, but also not need mattress layer guaranteeing to reduce cost significantly under the close even more excellent prerequisite of settlement after construction and deep mixing method; In addition, it does not need the precompressed or the standing time of consolidation, and is need only be according to normal speed filling roadbed or apply other upper load, thereby very favourable for the reduction of erection time; In addition, this method can not destroyed the structural of foundation soil, thereby can bring into play the natural intensity of foundation soil to greatest extent.
Description of drawings
Below in conjunction with the drawings and specific embodiments ground of the present invention being delayed the consolidation process method is elaborated.
Fig. 1 is the foundation structure schematic diagram that utilizes after ground of the present invention delays the processing of consolidation process method.
The specific embodiment
The traditional foundation treatment technology that reduces the ground settlement after construction mainly is divided into acceleration ground discharging consolidation process and ground is carried out such two classes of reinforcement.As everyone knows, the ground externally inner down meeting of effect of load produces excess pore water pressure, foundation soil will be to draining, fixed all around under this pressure effect, at this moment, excess pore water pressure can dribble and effective stress increases gradually, ground is gradually by densification, the intensity of foundation soil increases gradually, and bearing capacity increases gradually, the face of land can produce sedimentation gradually simultaneously, the modulus of deformation of foundation soil increases gradually, and until reaching stable state, this progressive formation just can stop when promptly excess pore water pressure was dissipated as zero.Last class foundation treatment technology is exactly the drainage channel by the shortening ground, thereby quickens above-mentioned progressive formation, and then makes ground reach stable status in advance.Then a class foundation treatment technology then be by compacted, displacement or add bulk strength that means such as curing compound directly improve ground and modulus of deformation with the sedimentation of the stable of enhancing ground and minimizing ground.Because being one, soil is in the three-phase hybrid system that the material of solid-state, liquid state and gaseous state is formed respectively by these three kinds in soil particle, pore water and hole gas.For the soft foundation that is in saturation state usually, the solid, liquid two-phase system that it just is made up of soil particle and pore water.Ground based system under the native state or after the conventional process is an open system, and pore water can be discharged under the excess pore water pressure effect that subsidiary stress causes gradually, and all external force are born by soil skeleton the most at last.In the pressure limit that ground bore, soil particle and pore water itself are incompressible.Therefore, if cut off the passage that pore water is discharged, be exactly incompressible by the solid, liquid two-phase system that soil particle and pore water are formed so, that is to say that ground externally under the effect of load sedimentation will not take place! On the other hand, if not the passing away that cuts off pore water fully, but increase the resistance that pore water is discharged by prolonging its drainage path, the consolidation settlement meeting becomes slower than normal condition so.Drainage path is long more, and resistance will be big more, and the consolidation settlement of ground will be slow more.Because the draining process of osmosis of ground needs an initial hydraulic gradient, therefore need only the drainage path long enough, the drainage channel that need not cut off ground fully also can be realized the termination fully of ground consolidation process.That is to say, if the foundation treatment technology that adopts can make ground in the engineering useful life with the settlement after construction of interior generation less than the designing requirement value, so this foundation treatment technology just can satisfy the requirement of engineering design.As can be seen, the way of this foundation treatment technology is just in time opposite with consolidation.Ground of the present invention delays the consolidation process method and just is being based on this principle and proposes.
As shown in Figure 1, it is that road along the line, the toe position direction that a circle or roadbed both sides are set around structure foundation is provided with the vertical seepage proof curtain 1 of twice that ground provided by the invention delays the consolidation process method, and lays the horizontal impervious layer 2 that one deck and vertical seepage proof curtain 1 are tightly connected in the bottom surface of building or roadbed.Such form of structure can prevent that excess pore water in the ground to the sideways diffusion of foundation surface and soil layer, can only walk around vertical seepage proof curtain 1 and discharging, and can make its permeation pathway lengthening like this, increases osmotic resistance, thereby can slow down consolidation process.The thickness of vertical seepage proof curtain 1 and the prolonged permeation effect that transmission coefficient should be enough to resist the maximum excess pore water pressure that produces in the ground thereof.Vertical seepage proof curtain 1 usefulness fluting is laid geomembrane, fluting asphalt reperfusion, waterproof concrete or swell soil, is overlapped and beat agitation pile and chemical grouting method is made on the spot.The antiseepage ability of the horizontal impervious layer 2 of building or roadbed bottom surface also will reach above-mentioned requirements.Horizontal impervious layer 2 is any or its combinations in geomembrane, pitch and the non-infiltration soil.The degree of depth of vertical seepage proof curtain 1 is by the size requirements of settlement after construction and the actual geological conditions of ground, and is determined as character such as compressibilty and infiltration concretenesses.Because the soil pressure of vertical seepage proof curtain 1 about both sides is inconsistent, vertical seepage proof curtain 1 also should satisfy the distortion indehiscent requirement in back under about two lateral earth pressure difference effects.In order to reduce of the requirement of the unbalanced soil pressure in vertical seepage proof curtain 1 both sides to vertical seepage proof curtain 1, on the horizontal impervious layer 2 of roadbed bottom surface or below or top and bottom lay the horizontal reinforcement layer 3 of one deck simultaneously, as geo-grid, with the lateral deformation of constraint ground, and improve the stress condition of vertical seepage proof curtain 1.Along the vertical seepage proof curtain 1 of the length direction of building or roadbed both sides length direction or the perpendicular horizontal separation seepage proof curtain of line direction with building are set at a certain distance together.This is because the situation on stratum is not unalterable, the different different vertical seepage proof curtain degree of depth of stratum inevitable requirement.Especially in subgrade construction, in order not influence each other between the adjacent highway section that guarantees to have the vertical seepage proof curtain 1 of different depth, in vertical seepage proof curtain 1 change in depth part the horizontal separation seepage proof curtain of horizontal path direction must be set, its degree of depth should be consistent with darker vertical seepage proof curtain among two highway sections.In addition, the defective that may occur on the construction quality and bring adverse effect for adjacent highway section even the vertical seepage proof curtain degree of depth does not change, also will be provided with at a certain distance and laterally separate seepage proof curtain together.

Claims (5)

1, a kind of ground delays the consolidation process method, it is characterized in that: it is that road along the line, the toe position direction that a circle or roadbed both sides are set around structure foundation is provided with the vertical seepage proof curtain of twice (1) that described ground delays the consolidation process method, and lay the horizontal impervious layer (2) that one deck and vertical seepage proof curtain (1) are tightly connected in the bottom surface of building or roadbed, the degree of depth of vertical seepage proof curtain (1) is determined by the size requirements of settlement after construction and the actual geological conditions of ground.
2,1 described ground delays the consolidation process method as requested, it is characterized in that: on horizontal impervious layer (2) below or top and bottom lay one or more layers horizontal reinforcement layer (3) simultaneously.
3,1 described ground delays the consolidation process method as requested, it is characterized in that: along the vertical seepage proof curtain (1) of the length direction of building or roadbed both sides length direction or the perpendicular horizontal separation seepage proof curtain of line direction with building are set at a certain distance together.
4,1 described ground delays the consolidation process method as requested, it is characterized in that: described vertical seepage proof curtain (1) and laterally separate seepage proof curtain and lay geomembrane, fluting asphalt reperfusion, waterproof concrete or swell soil, overlap and beat agitation pile and chemical grouting method is made on the spot with fluting.
5,1 described ground delays the consolidation process method as requested, it is characterized in that: described horizontal impervious layer (2) is any or its combination in geomembrane, pitch and the non-infiltration soil.
CNB031303218A 2003-06-30 2003-06-30 Ground foundation delay consolidation treatment method Expired - Fee Related CN1186504C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB031303218A CN1186504C (en) 2003-06-30 2003-06-30 Ground foundation delay consolidation treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB031303218A CN1186504C (en) 2003-06-30 2003-06-30 Ground foundation delay consolidation treatment method

Publications (2)

Publication Number Publication Date
CN1478961A CN1478961A (en) 2004-03-03
CN1186504C true CN1186504C (en) 2005-01-26

Family

ID=34153698

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB031303218A Expired - Fee Related CN1186504C (en) 2003-06-30 2003-06-30 Ground foundation delay consolidation treatment method

Country Status (1)

Country Link
CN (1) CN1186504C (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101289848B (en) * 2007-04-16 2010-09-29 中国土木工程集团有限公司 Foundation pore pressure conditioning and processing method
CN103161175B (en) * 2011-12-08 2015-09-09 贵阳铝镁设计研究院有限公司 Impermeable type lime-soil compaction pile composite manual foundation
CN202809596U (en) * 2012-03-25 2013-03-20 浙江宏宇工程勘察设计有限公司 Concentration delaying foundation based on controlling of foundation settlement
CN107313468A (en) * 2017-08-14 2017-11-03 兰州有色冶金设计研究院有限公司 A kind of seepage proof curtain for releasing collapsible loess foundation settlement by soaking is with level every infiltration level structure and method
CN107313439A (en) * 2017-08-14 2017-11-03 兰州有色冶金设计研究院有限公司 A kind of seepage proof curtain structure and method for releasing collapsible loess foundation settlement by soaking
CN112176804B (en) * 2020-10-12 2022-03-01 东南大学 Anti-settlement water retention roadbed structure in water-rich soft soil area and design method
CN112921726B (en) * 2021-01-28 2022-04-19 长安大学 Roadbed structure capable of preventing roadbed soil from being dry cracked or wet sunk and construction method thereof

Also Published As

Publication number Publication date
CN1478961A (en) 2004-03-03

Similar Documents

Publication Publication Date Title
CN106522037B (en) Side broad way based structures based on existing railway roadbed and its construction method
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN101634143A (en) Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay
CN112048955B (en) Construction method for backfilling gravel roadbed
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN207672558U (en) A kind of railroad embankment Pile slab-wall structure
CN102359096A (en) Method for strengthening deep soft soil foundation by sealing
CN108867200A (en) A kind of Resistant heave high-speed railway rock chasm structuref and design method
CN106835880A (en) Highway lateral support type peg board formula is without earth roadbed
CN107747261A (en) A kind of new Soft Clay seasonal frozen soil region highway subgrade structure and construction method
CN104234034B (en) After a kind of first draining, plugging plate holds the construction method of formula embankment
CN108193648A (en) Plasticity panel homogeneous dam
CN110185022A (en) A kind of constructing structure and method of plastic draining board and CFG treatment of soft foundation changeover portions
CN1186504C (en) Ground foundation delay consolidation treatment method
CN207295358U (en) A kind of platform back of the body for preventing bumping at bridge-head and road surface drainage structure
CN206815127U (en) The soft interim sidewalk laying structure in base
CN104846712A (en) Hard road construction method by naturally recharging underground water
CN206346075U (en) Side broad way based structures based on existing railway roadbed
CN209307882U (en) It is a kind of for improving the cushion cap device on pile foundation reinforcement basis
CN107447731B (en) A kind of mixed dam and its construction method
CN206666956U (en) A kind of highway subgrade soft soil slope composite reinforcing structure
CN209276926U (en) A kind of highway subgrade with protective device
CN203795260U (en) New roadbed and old roadbed combined road structure
CN103866788B (en) A kind of method of pillar abutment scarp slope barricadeization transformation
JPH02504050A (en) Method for forming road and roadbed structures

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA CIVIL ENGINEERING CONSTRUCTION GROUP CORPORA

Free format text: FORMER OWNER: LIU YUANFENG

Effective date: 20100804

Owner name: LIU YUANFENG

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 300142 604-606, UNIT 12, BUILDING 10, FUJIANGBEILI, JINGJIANG ROAD, HEBEI DISTRICT, TIANJIN CITY TO: 100038 NO.4, BEIFENGWO, HAIDIAN DISTRICT, BEIJING CITY

TR01 Transfer of patent right

Effective date of registration: 20100804

Address after: 100038 Haidian District, North Beijing, No. 4

Co-patentee after: Liu Yuanfeng

Patentee after: China Civil Engineering Construction Corporation

Address before: 300142 Tianjin City, Hebei District Jingjiang Road 10 North Fujiang building 12 604-606

Patentee before: Liu Yuanfeng

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170321

Address after: 100038 Haidian District, North Beijing, No. 4

Patentee after: China Civil Engineering Construction Corporation

Address before: 100038 Haidian District, North Beijing, No. 4

Patentee before: China Civil Engineering Construction Corporation

Patentee before: Liu Yuanfeng

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050126

Termination date: 20210630

CF01 Termination of patent right due to non-payment of annual fee