CN117780067A - Assembled building construction lift platform - Google Patents

Assembled building construction lift platform Download PDF

Info

Publication number
CN117780067A
CN117780067A CN202410010854.1A CN202410010854A CN117780067A CN 117780067 A CN117780067 A CN 117780067A CN 202410010854 A CN202410010854 A CN 202410010854A CN 117780067 A CN117780067 A CN 117780067A
Authority
CN
China
Prior art keywords
frame
platform
lifting
telescopic
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202410010854.1A
Other languages
Chinese (zh)
Inventor
高杰
张伟
张耀林
赵雅
严小霞
郑峰
周啸
丁晨轩
姚鹏鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cscec Science & Engineering Group Wuhan Co ltd
Original Assignee
Cscec Science & Engineering Group Wuhan Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cscec Science & Engineering Group Wuhan Co ltd filed Critical Cscec Science & Engineering Group Wuhan Co ltd
Priority to CN202410010854.1A priority Critical patent/CN117780067A/en
Publication of CN117780067A publication Critical patent/CN117780067A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an assembled building construction lifting platform, which comprises a lifting frame, a fixed base frame and a platform frame, wherein the lifting frame is fixedly arranged on the fixed base frame; the platform frame comprises a drawing frame, a bottom plate and a protective fence; the pull frame comprises a fixing rod and a telescopic rod which are connected in a telescopic way, and the bottom plate is fixedly connected with the telescopic rod. Through setting up the pull frame, when meetting the wall far away from the platform frame during the construction, through making the telescopic link carry out axial telescopic movement along the dead lever, the telescopic link of adjustment pull frame drives the bottom plate and is close to the construction wall and remove, makes the pull frame be close to the wall and removes to suitable distance, ensures the platform from the wall clearance, conveniently builds, need not constructor and visit most health and construct, can guarantee the personal safety of constructor when the construction. Meanwhile, due to the arrangement of the drawing frame, the construction lifting platform does not need to be integrally reinstalled and position-adjusted when being far away from a construction wall surface, so that turnover of operation of constructors is reduced, and site construction efficiency is improved.

Description

Assembled building construction lift platform
Technical Field
The invention relates to the technical field of building construction equipment, in particular to an assembled building construction lifting platform.
Background
At present, the domestic assembled steel structure building is mainly constructed by adopting a traditional cantilever frame and an cantilever net, and an electric hanging basket is adopted for outer wall waterproofing, heat preservation, curtain wall decoration construction and the like, so that the technology level is low in backward, mechanization and intelligence degree, and the construction safety is difficult to guarantee. The existing building construction lifting platform with higher mechanization degree only supports lifting adjustment to adapt to the heights of different construction floors, but the distance between the construction platform and the wall of a building cannot be adjusted, under the condition that the appearance of an outer wall is nonlinear, the construction platform needs to be reinstalled to enable the construction platform to adapt to the distance between the construction platform and the wall of the outer wall, and the construction platform is complex in structure and large in size, so that the position and installation are readjusted to be extremely time-consuming.
Disclosure of Invention
Therefore, the technical problem to be solved by the invention is that the building lifting platform in the prior art has the defects of complex structure and incapability of adjusting the distance between the building lifting platform and the wall of a building after installation, so as to provide the assembled building construction lifting platform.
In order to solve the technical problems, the technical scheme of the invention is as follows:
an assembled building construction lifting platform comprises a lifting frame, a fixed base frame arranged on the lifting frame and a platform frame arranged on the fixed base frame; the platform frame comprises a drawing frame connected with the lifting frame, a bottom plate arranged on the drawing frame and protective fences arranged around the bottom plate; the drawing frame comprises a fixed rod and a telescopic rod in telescopic connection with the fixed rod, and the bottom plate is fixedly connected with the telescopic rod.
Further, the pull frame comprises at least two fixing rods and at least two telescopic rods, a supporting plate is fixedly connected between the two telescopic rods, and the bottom plate is fixed on the supporting plate.
Further, a sliding sleeve is connected between the two fixing rods, and the bottom plate is connected with the sliding sleeve.
Further, a limiting piece is arranged at one end, far away from the telescopic rod, of the fixing rod, and the sliding sleeve is located between the limiting piece and the bearing plate.
Further, the telescopic rod is a telescopic sleeve rod sleeved on the periphery of the fixed rod.
Further, the guard rail comprises at least four vertical rods fixed on four corners of the bottom plate, and a tripod and a reinforcing frame connected between two adjacent vertical rods.
Further, the tripod is positioned at two opposite sides of the bottom plate, and the reinforcing frame is positioned at two opposite ends of the bottom plate.
Further, the tripod and the reinforcing frame are composed of angle steel and square tubes.
Further, the lifting frame comprises a vertical frame, a guide rail arranged on the vertical frame and a lifting driving piece connected to the guide rail, wherein the lifting driving piece is suitable for driving the fixed base frame to move along the guide rail.
Further, the limiting piece is a nut sleeved on the fixing rod through threads.
The technical scheme of the invention has the following advantages:
1. according to the assembled building construction lifting platform provided by the invention, the fixed base frame drives the platform frame on the fixed base frame to lift along the lifting frame, the drawing frame is arranged, when a wall surface far away from the platform frame is encountered during construction, the telescopic rod is axially telescopic along the fixed rod, the telescopic rod of the drawing frame is adjusted to drive the bottom plate to move close to the construction wall surface, so that the drawing frame is moved to a proper distance close to the wall surface, construction is conveniently carried out by constructors on the platform frame, most of bodies do not need to be detected by the constructors to carry out construction, and the protective rail arranged on the platform frame is moved towards the construction wall surface along with the bottom plate on the drawing frame, so that the personal safety of the constructors during construction can be ensured, and the wall clearance of the platform is also ensured. Meanwhile, due to the arrangement of the drawing frame, the construction lifting platform does not need to be integrally reinstalled and position-adjusted when being far away from a construction wall surface, so that turnover of operation of constructors is reduced, and site construction efficiency is improved.
2. The invention provides an assembled building construction lifting platform, which comprises at least two fixing rods and at least two telescopic rods, wherein a supporting plate is fixedly connected between the two telescopic rods, and a bottom plate is fixed on the supporting plate. So set up, can improve the stability of bottom plate when removing along with it through two telescopic links, through setting up fixed bearing board on two telescopic links, can guarantee the uniformity when two telescopic links carry out telescopic movement to this stability when improving the bottom plate and removing along with the telescopic link.
3. The invention provides an assembled building construction lifting platform, wherein a sliding sleeve is connected between two fixed rods, and a bottom plate is connected with the sliding sleeve. So set up, when making bottom plate and telescopic link fixed connection, still be connected indirectly with the dead lever, can improve the connection stability between bottom plate and the pull frame, guarantee joint strength, can guarantee the stationarity when the bottom plate moves along with the telescopic link simultaneously.
4. According to the assembled building construction lifting platform provided by the invention, the limiting piece is arranged at one end of the fixed rod, which is far away from the telescopic rod, and the sliding sleeve is positioned between the limiting piece and the bearing plate. So set up, can make the telescopic link carry out the axial displacement along the dead lever and carry out spacingly through the locating part to sliding sleeve, drive sliding sleeve and break away from the dead lever when avoiding the telescopic link to remove.
5. According to the assembled building construction lifting platform provided by the invention, the tripod and the reinforcing frame are both composed of the angle steel and the square pipe, so that the tripod and the reinforcing frame are wide in material sources, are convenient to install and set by taking local materials, are convenient to guide construction on site, and can save material cost.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings that are needed in the description of the embodiments or the prior art will be briefly described, and it is obvious that the drawings in the description below are some embodiments of the present invention, and other drawings can be obtained according to the drawings without inventive effort for a person skilled in the art.
FIG. 1 is a three-dimensional structure diagram of an assembled building construction lifting platform provided by an embodiment of the invention;
FIG. 2 is a schematic view of a drawing frame according to the present invention;
FIG. 3 is a perspective view of a base plate according to the present invention;
FIG. 4 is a perspective view of a tripod according to the present invention;
fig. 5 is a perspective view of a reinforcing frame according to the present invention.
Reference numerals illustrate: 1. a lifting frame; 2. fixing the base frame; 3. a bottom plate; 4. a vertical rod; 5. a fixed rod; 6. a telescopic rod; 7. a bearing plate; 8. a sliding sleeve; 9. a limiting piece; 10. a tripod; 11. and a reinforcing frame.
Detailed Description
The following description of the embodiments of the present invention will be made apparent and fully in view of the accompanying drawings, in which some, but not all embodiments of the invention are shown. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
In the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present invention will be understood in specific cases by those of ordinary skill in the art.
In addition, the technical features of the different embodiments of the present invention described below may be combined with each other as long as they do not collide with each other.
1-5, an assembled building construction lifting platform comprises a lifting frame 1, a fixed base frame 2 arranged on the lifting frame 1 and a platform frame arranged on the fixed base frame 2; the platform frame comprises a drawing frame connected with the lifting frame 1, a bottom plate 3 arranged on the drawing frame and protective fences arranged around the bottom plate 3; the drawing frame comprises a fixed rod 5 and a telescopic rod 6 which is in telescopic connection with the fixed rod 5, and the bottom plate 3 is fixedly connected with the telescopic rod 6.
This kind of assembled building construction lift platform, fixed bed frame 2 drives the platform frame on it and carries out lift removal along crane 1, through setting up the pull frame, when meetting the wall far away from the platform frame during the construction, through making telescopic link 6 carry out axial telescopic movement along dead lever 5, the telescopic link 6 of adjustment pull frame drives bottom plate 3 and is close to the construction wall and remove, make the pull frame be close to the wall and remove to suitable distance, so that the constructor on the platform frame is under construction to need not the constructor and visit most health and carry out the construction, the rail guard of installation on the platform frame is close to the construction wall along with bottom plate 3 on the pull frame, personal safety when can guarantee the constructor under construction also has ensured the platform from the wall clearance. Meanwhile, due to the arrangement of the drawing frame, the construction lifting platform does not need to be integrally reinstalled and position-adjusted when being far away from a construction wall surface, so that turnover of operation of constructors is reduced, and site construction efficiency is improved.
In this embodiment, the lifting frame 1 comprises a vertical frame, a guide rail mounted on the vertical frame, and a lifting driving member connected to the guide rail, the lifting driving member being adapted to drive the fixed base frame 2 to move along the guide rail.
In this embodiment, the pull frame includes two dead levers 5 and two telescopic links 6, and fixedly connected with carrier plate 7 between two telescopic links 6, bottom plate 3 is fixed in on the carrier plate 7. So set up, can improve the stability of bottom plate 3 when it removes along with it through two telescopic links 6, through setting up fixed spanners 7 on two telescopic links 6, can guarantee the uniformity when two telescopic links 6 carry out telescopic movement to this improves the stability of bottom plate 3 when removing along with telescopic link 6. Specifically, the telescopic rod 6 is a telescopic sleeve rod sleeved on the periphery of the fixed rod 5.
Specifically, a sliding sleeve 8 is connected between the two fixing rods 5, and the bottom plate 3 is connected with the sliding sleeve 8. So set up, when making bottom plate 3 and telescopic link 6 fixed connection, still be connected with dead lever 5 indirection, can improve the connection stability between bottom plate 3 and the pull frame, guarantee joint strength, can guarantee the stationarity when bottom plate 3 moves along with telescopic link 6 simultaneously.
In this embodiment, a limiting member 9 is disposed at an end of the fixing rod 5 away from the telescopic rod 6, and the sliding sleeve 8 is located between the limiting member 9 and the supporting plate 7. So set up, can make telescopic link 6 carry out the spacing to sliding sleeve 8 through locating part 9 when axial displacement carries out along dead lever 5, drive sliding sleeve 8 and break away from dead lever 5 when avoiding telescopic link 6 to remove. Specifically, the limiting part 9 is a nut which is sleeved on the fixing rod 5 through threads.
In this embodiment, the guard rail comprises four uprights 4 fixed to four corners of the base plate 3, a tripod 10 and a reinforcing frame 11 connected between two adjacent uprights 4. Specifically, the upright rod 4 is detachably mounted on the corner of the bottom plate 3 through bolts. Specifically, the tripod 10 is located at opposite sides of the base plate 3, and the reinforcing frame 11 is located at opposite ends of the base plate 3. Specifically, the tripod 10 and the reinforcing frame 11 are composed of angle steel and square pipes, so that the tripod 10 and the reinforcing frame 11 are wide in material sources, convenient to install and set by taking local materials, convenient to guide construction on site and capable of saving material cost.
To sum up, this kind of assembled building construction lift platform, fixed bed frame 2 drives the platform frame on it and carries out lift removal along crane 1, through setting up the pull frame, when meeting the wall far away from the platform frame during the construction, through making telescopic link 6 carry out axial telescopic movement along dead lever 5, the telescopic link 6 of adjustment pull frame drives bottom plate 3 and is close to the construction wall and remove, make the pull frame be close to the wall and remove to suitable distance, so that constructor on the platform frame is under construction, need not constructor and visit most health and carry out the construction, the rail guard of installation on the platform frame is close to the construction wall along with bottom plate 3 on the pull frame, can guarantee the personal safety of constructor when the construction, also ensured the wall clearance that leaves of platform. Meanwhile, due to the arrangement of the drawing frame, the construction lifting platform does not need to be integrally reinstalled and position-adjusted when being far away from a construction wall surface, so that turnover of operation of constructors is reduced, and site construction efficiency is improved.
It is apparent that the above examples are given by way of illustration only and are not limiting of the embodiments. Other variations or modifications of the above teachings will be apparent to those of ordinary skill in the art. It is not necessary here nor is it exhaustive of all embodiments. While still being apparent from variations or modifications that may be made by those skilled in the art are within the scope of the invention.

Claims (10)

1. The lifting platform for the assembled building construction is characterized by comprising a lifting frame (1), a fixed base frame (2) arranged on the lifting frame (1) and a platform frame arranged on the fixed base frame (2); the platform frame comprises a drawing frame connected with the lifting frame (1), a bottom plate (3) arranged on the drawing frame and protective fences arranged around the bottom plate (3); the drawing frame comprises a fixed rod (5) and a telescopic rod (6) which is in telescopic connection with the fixed rod (5), and the bottom plate (3) is fixedly connected with the telescopic rod (6).
2. The lifting platform for the fabricated building construction according to claim 1, wherein the drawing frame comprises at least two fixing rods (5) and at least two telescopic rods (6), a supporting plate (7) is fixedly connected between the two telescopic rods (6), and the bottom plate (3) is fixed on the supporting plate (7).
3. The lifting platform for the fabricated building construction according to claim 2, wherein a sliding sleeve (8) is connected between the two fixed rods (5), and the bottom plate (3) is connected with the sliding sleeve (8).
4. A prefabricated building construction lifting platform according to claim 3, characterized in that a limiting piece (9) is arranged on one end of the fixed rod (5) far away from the telescopic rod (6), and the sliding sleeve (8) is positioned between the limiting piece (9) and the bearing plate (7).
5. The lifting platform for the fabricated building construction according to claim 1, wherein the telescopic rod (6) is a telescopic sleeve rod sleeved on the periphery of the fixed rod (5).
6. The lifting platform for fabricated building construction according to claim 1, wherein the guard rail comprises at least four uprights (4) fixed to four corners of the base plate (3), a tripod (10) and a reinforcing frame (11) connected between two adjacent uprights (4).
7. The lifting platform for fabricated building construction according to claim 6, wherein the tripod (10) is located at opposite sides of the base plate (3), and the reinforcing frame (11) is located at opposite ends of the base plate (3).
8. The lifting platform for the fabricated building construction according to claim 6, wherein the tripod (10) and the reinforcing frame (11) are composed of angle steel and square tubes.
9. The modular building construction lifting platform according to claim 1, wherein the lifting frame (1) comprises a vertical frame, a guide rail mounted on the vertical frame and a lifting drive connected to the guide rail, the lifting drive being adapted to drive the stationary base frame (2) to move along the guide rail.
10. The lifting platform for the fabricated building construction according to claim 4, wherein the limiting piece (9) is a nut sleeved on the fixing rod (5) in a threaded manner.
CN202410010854.1A 2024-01-03 2024-01-03 Assembled building construction lift platform Pending CN117780067A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410010854.1A CN117780067A (en) 2024-01-03 2024-01-03 Assembled building construction lift platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410010854.1A CN117780067A (en) 2024-01-03 2024-01-03 Assembled building construction lift platform

Publications (1)

Publication Number Publication Date
CN117780067A true CN117780067A (en) 2024-03-29

Family

ID=90401762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410010854.1A Pending CN117780067A (en) 2024-01-03 2024-01-03 Assembled building construction lift platform

Country Status (1)

Country Link
CN (1) CN117780067A (en)

Similar Documents

Publication Publication Date Title
CN111058618B (en) Combined type telescopic sleeve jacking device and method thereof
CN111576436B (en) Lattice column positioning guide mechanism and lattice column positioning method
CN117780067A (en) Assembled building construction lift platform
JP2019515166A (en) Perimeter safety screen assembly
CN207960496U (en) Be easily installed drilling tool from hoisting type horizontal boring machine
CN215593870U (en) Can assemble adjustable repair platform device
CN213679511U (en) Crane convenient to move
CN210366899U (en) Lifting platform
CN218493046U (en) Elevator shaft lifting operation platform
CN220725708U (en) Simple movable hanging cage
CN114575575B (en) Construction method of multi-dimensional mobile automatic peripheral protection structure construction platform
CN213326414U (en) Hoisting apparatus with adjustable height
CN219672175U (en) Movable installation operation frame for light wallboard
CN103711299A (en) Liftable scaffold for building outer wall
CN217173048U (en) Lifting device for unit type building materials
CN218324142U (en) Slide rail reinforcing bar processing canopy
CN218708717U (en) Multifunctional combined hoisting tool for tunnel
CN217732600U (en) Operation panel of can encorbelmenting
CN217627231U (en) Novel visual crane
CN217230020U (en) Frock is changed to immersible pump
CN213356708U (en) Frame type disassembling and assembling jack
CN216190897U (en) Building carrying frame with protection function
CN221093462U (en) Equipment installation promotes removes frock
CN216072803U (en) Fan lifting equipment for pumped storage power station
CN213774398U (en) Elevator shaft operating platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination