CN117758995A - Scaffold board, outer scaffold and scaffold assembly method - Google Patents
Scaffold board, outer scaffold and scaffold assembly method Download PDFInfo
- Publication number
- CN117758995A CN117758995A CN202311834624.9A CN202311834624A CN117758995A CN 117758995 A CN117758995 A CN 117758995A CN 202311834624 A CN202311834624 A CN 202311834624A CN 117758995 A CN117758995 A CN 117758995A
- Authority
- CN
- China
- Prior art keywords
- scaffold
- board
- plate
- plate body
- board body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000010276 construction Methods 0.000 claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
The scaffold comprises the scaffold plate, the scaffold and the scaffold plate assembling method, wherein the scaffold plate comprises a first plate body and a second plate body, the first plate body and the second plate body are connected through a connecting piece, an opening adapting to an arc surface is formed between the first plate body and the second plate body, and the scaffold comprises the scaffold plate and is used for construction of the scaffold. According to the scaffold board, the scaffold and the scaffold board assembling method, the opening adapting to the arc-shaped surface is formed between the first board body and the second board body, so that interference between the first board body, the second board body and the arc-shaped surface is avoided, the scaffold is vertical to the horizontal plane as much as possible, and the safety of the construction process is improved.
Description
Technical Field
The invention relates to the technical field of scaffolds, in particular to an outer scaffold plate.
Background
In building engineering construction, the outer scaffold is set up and is an indispensable item, and along with the continuous renewal and breakthrough of building appearance, arc curtain has been used very extensively, and current outer scaffold board can't satisfy arc position and lay the requirement, the outer scaffold foot can produce the interference between the arc position, under the condition of interference, the arc position can make outer scaffold foot no longer perpendicular to the horizontal plane, but has certain inclination angle with ground, under this kind of condition, can have great potential safety hazard in the field construction process.
Disclosure of Invention
In view of the above, an object of the present invention is to provide an external scaffold board, which can make the scaffold vertical to the horizontal plane as much as possible, thereby improving the safety of the construction process.
The invention provides an external scaffold board which comprises a first board body and a second board body, wherein the first board body and the second board body are connected through a connecting piece, and an opening adapting to an arc surface is formed between the first board body and the second board body.
In an embodiment, the first plate body and the second plate body each comprise a plate body main body, an inclined edge arranged at one end of the plate body and a hanging piece, an opening adapting to the arc surface is formed between the inclined edges of the first plate body and the second plate body, and the hanging piece is connected with the plate body main body.
In one embodiment, the plate body is provided with a plurality of through holes.
In an embodiment, the connecting piece comprises a nut and a bolt, wherein the nut is correspondingly assembled on the first plate body and the second plate body, and the bolt is in threaded connection with the nuts on the first plate body and the second plate body.
In an embodiment, the upper end surfaces of the first plate body and the second plate body are on the same plane.
The invention also provides a scaffold, which comprises the scaffold plate and a frame main body, wherein the first plate body and the second plate body are connected with the frame main body.
The invention also provides a scaffold board assembly method for the construction of the scaffold, which comprises the following steps:
determining the distance between the first plate body and the second plate body according to the condition of the arc-shaped surface;
the first plate body and the second plate body are fixedly connected;
and connecting the first plate body and the second plate body which are connected and fixed to the frame main body.
According to the outer scaffold plate, the scaffold and the scaffold assembly method, the opening adapting to the arc-shaped surface is formed between the first plate body and the second plate body, so that interference between the first plate body and the arc-shaped surface and the second plate body is avoided, the scaffold is vertical to the horizontal plane as much as possible, and therefore the safety of a construction process is improved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are needed in the embodiments will be briefly described below, it being understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and other related drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic structural view of an external scaffold board provided by the present invention.
Detailed Description
Specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. It will be apparent that the described embodiments are only some, but not all, embodiments of the invention. All other embodiments, which can be made by those skilled in the art without making any inventive effort, are intended to be within the scope of the present invention.
In the description of the present invention, unless explicitly stated and limited otherwise, the terms "disposed," "mounted," "connected," and the like are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium. The specific meaning of the terms described above will be understood to those of ordinary skill in the art in a specific context.
The terms "upper," "lower," "left," "right," "front," "rear," "top," "bottom," "inner," "outer," and the like are used as references to orientations or positional relationships based on the orientation or positional relationships shown in the drawings, or the orientation or positional relationships in which the inventive product is conventionally disposed in use, merely for convenience of description and simplicity of description, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be configured and operated in a particular orientation, and therefore are not to be construed as limiting the invention.
The terms "first," "second," "third," and the like, are merely used for distinguishing between similar elements and not necessarily for indicating or implying a relative importance or order.
The terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a list of elements does not include only those elements but may include other elements not expressly listed.
Example 1
Referring to fig. 1, the scaffold board provided by the invention comprises a first board body 1 and a second board body 2, wherein the first board body 1 and the second board body 2 are connected through a connecting piece, and an opening 6 adapting to an arc surface is formed between the first board body 1 and the second board body 2.
It can be known that the materials of the first plate body 1 and the second plate body 2 can be light steel plates, the area of the opening 6 corresponds to the arc-shaped surface of the curtain wall, the opening 6 well avoids interference between the scaffold plate formed by the first plate body 1 and the second plate body 1 and the arc-shaped surface of the curtain wall, the scaffold plate can be assembled on the frame main body, and the frame main body can be hung on the curtain wall.
Referring to fig. 1, in some embodiments, the first plate 1 and the second plate 2 each include a plate body, an inclined edge disposed at one end of the plate body, and a hanging member 7, an opening 6 adapted to an arc surface is formed between the inclined edges of the first plate 1 and the second plate 2, and the hanging member 7 is connected with the plate body.
It can be understood that the hanging piece 7 may be a hook, and is used for hanging on a frame body, so as to hang the first plate body 1 and the second plate body 2 on the frame body, an included angle between an inclined edge and a horizontal plane may be 45 °, and the size of the opening 6 formed between the first plate body 1 and the second plate body 2 may be achieved by adjusting the distance between the first plate body 1 and the second plate body 2, so as to adapt to arc surfaces with different sizes.
Referring to fig. 1, in some embodiments, a plurality of through holes 5 are formed in the plate body.
It can be appreciated that the through holes 5 can be uniformly distributed on the plate body, and the through holes 5 can well lighten the whole weight of the plate body.
Referring to fig. 1, in some embodiments, the connecting member includes a nut 4 and a bolt 3, where the nut 4 is correspondingly assembled on the first plate 1 and the second plate 2, and the bolt 3 is screwed with the nuts 4 on the first plate 1 and the second plate 2.
It can be known that the nut 4 can be welded on the lower end surfaces of the first plate body 1 and the second plate body 2, or can be embedded into the first plate body 1 and the second plate body 2, and then the first plate body 1 or the second plate body 2 is rotated by rotating the bolts, so that the adjustment of the distance between the first plate body 1 and the second plate body 2 is realized, and the adjustment mode is simple and quick.
Referring to fig. 1, in some embodiments, the upper end surfaces of the first plate 1 and the second plate 2 are on the same plane.
It can be known that the upper end surfaces of the first plate body 1 and the second plate body 2 can be the end surfaces of the first plate body 1 and the second plate body 2 for foot pedal, and the upper end surfaces are flush, so that the stability during foot pedal can be improved.
Example two
Referring to fig. 1, the scaffold provided by the invention comprises the scaffold board and also comprises a frame body, wherein the first board body 1 and the second board body 2 are connected with the frame body.
It can be understood that the frame main part can include two parallel and the frame that aligns the setting, and the setting couple that the frame upper end can correspond, couple can be hung on the up end of curtain, connects through the horizontal pole between two frames, and the couple of scaffold board can be hung on the horizontal pole to realize the quick connect between scaffold board and the frame main part and fix.
Example III
The scaffold board assembling method is used for the construction of the scaffold and comprises the following steps:
the distance between the first plate body 1 and the second plate body 2 is determined according to the condition of the arc surface.
It will be appreciated that the arcuate surface may refer to the arc and the size of the arcuate surface of the curtain wall, which determines the distance between the first plate 1 and the second plate 2, and the opening 6 formed between the first plate 1 and the second plate 2 may avoid interference between the first plate 1 and the second plate 2 and the arcuate surface.
The first plate body 1 and the second plate body 2 are fixedly connected.
It is to be appreciated that the manner of attachment may be as described above.
The first plate 1 and the second plate 2 after the connection and fixation are connected to the frame body.
It will be appreciated that the manner of connection of the first plate 1 and the second plate 2 and the adjustment of the distance between the first plate and the second plate may be as described above.
As can be seen from the above description, according to the scaffold board, the external scaffold and the scaffold assembly method provided by the invention, the opening 6 adapted to the arc surface is formed between the first board body 1 and the second board body 2, so that interference between the first board body 1 and the arc surface and the second board body 2 is avoided, and the scaffold is vertical to the horizontal plane as much as possible, thereby improving the safety of the construction process.
The foregoing is merely illustrative of the present invention, and the present invention is not limited thereto, and any changes or substitutions easily contemplated by those skilled in the art within the scope of the present invention should be included in the present invention. Accordingly, the scope of the invention should be assessed as that of the appended claims.
Claims (7)
1. The scaffold board is characterized by comprising a first board body and a second board body, wherein the first board body and the second board body are connected through a connecting piece, and an opening adapting to an arc surface is formed between the first board body and the second board body.
2. The scaffold board according to claim 1, wherein the first board body and the second board body each comprise a board body, an inclined edge arranged at one end of the board body, and a hanging piece, an opening adapted to the arc surface is formed between the inclined edges of the first board body and the second board body, and the hanging piece is connected with the board body.
3. The scaffold board of claim 2, wherein the board body is provided with a plurality of through holes.
4. The scaffold board according to claim 1, wherein the connecting member comprises a nut and a bolt, the nut is correspondingly assembled on the first board body and the second board body, and the bolt is in threaded connection with the nuts on the first board body and the second board body.
5. The scaffold board of claim 1, wherein the upper end surfaces of the first board body and the second board body are on the same plane.
6. A scaffold comprising the scaffold board of any one of claims 1 to 5, further comprising a frame body, the first and second boards being connected to the frame body.
7. A scaffold board assembly method for construction of the scaffold of claim 6, comprising the steps of:
determining the distance between the first plate body and the second plate body according to the condition of the arc-shaped surface;
the first plate body and the second plate body are fixedly connected;
and connecting the first plate body and the second plate body which are connected and fixed to the frame main body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311834624.9A CN117758995A (en) | 2023-12-28 | 2023-12-28 | Scaffold board, outer scaffold and scaffold assembly method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311834624.9A CN117758995A (en) | 2023-12-28 | 2023-12-28 | Scaffold board, outer scaffold and scaffold assembly method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN117758995A true CN117758995A (en) | 2024-03-26 |
Family
ID=90318036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202311834624.9A Pending CN117758995A (en) | 2023-12-28 | 2023-12-28 | Scaffold board, outer scaffold and scaffold assembly method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN117758995A (en) |
-
2023
- 2023-12-28 CN CN202311834624.9A patent/CN117758995A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113323365B (en) | Elevator shaft protection platform and construction method | |
CN207905358U (en) | A kind of beam building template | |
CN117758995A (en) | Scaffold board, outer scaffold and scaffold assembly method | |
CN103628692B (en) | A kind of floor beam mounting bracket and use it to install the method for floor beam | |
CN209397515U (en) | Deck form support device and cantilever bridge floor auxiliary device | |
CN213087179U (en) | Composite fixing device for heavy ceiling lamp | |
CN210032564U (en) | Telescopic pedal | |
US20210095484A1 (en) | Elevated walkway system and method | |
JP2019112904A (en) | Building construction method | |
CN210685332U (en) | Spraying device convenient to install on climbing frame | |
CN211736313U (en) | Suspension device for inclined wall surface | |
CN105781056A (en) | Abnormal-shaped wall surface shape adjustable triangular supporting point hanging device | |
KR20160003751U (en) | Lifeline mounting pole | |
CN210086967U (en) | I-shaped section tent frame | |
JP4044411B2 (en) | ALC floor / wall structure | |
CN207878743U (en) | Resist the cell curtain wall mounting system of big wind pressure | |
CN216905200U (en) | Combined hanging device for loudspeaker box | |
CN215212193U (en) | Scaffold for construction operation of building engineering | |
CN211447459U (en) | Steel construction furred ceiling conversion layer | |
CN212428010U (en) | Scaffold and scaffold unit | |
CN211169401U (en) | Elevator car guide rail bracket | |
CN214169884U (en) | Scaffold with reduced shaking | |
CN216476264U (en) | Fixing assembly for side-mounted electric hanging basket front support on flower stand beam | |
CN221074056U (en) | Climbing ladder | |
CN220247537U (en) | Hanging bracket for installing ceiling plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |