CN117606296A - Worker's fort for training exercise - Google Patents

Worker's fort for training exercise Download PDF

Info

Publication number
CN117606296A
CN117606296A CN202311759482.4A CN202311759482A CN117606296A CN 117606296 A CN117606296 A CN 117606296A CN 202311759482 A CN202311759482 A CN 202311759482A CN 117606296 A CN117606296 A CN 117606296A
Authority
CN
China
Prior art keywords
fort
plate
wall
plates
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311759482.4A
Other languages
Chinese (zh)
Inventor
凌钢
吴昊
赵园林
王高明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Aerospace Yuanwang Science & Technology Co ltd
Original Assignee
Hunan Aerospace Yuanwang Science & Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Aerospace Yuanwang Science & Technology Co ltd filed Critical Hunan Aerospace Yuanwang Science & Technology Co ltd
Priority to CN202311759482.4A priority Critical patent/CN117606296A/en
Publication of CN117606296A publication Critical patent/CN117606296A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F41WEAPONS
    • F41HARMOUR; ARMOURED TURRETS; ARMOURED OR ARMED VEHICLES; MEANS OF ATTACK OR DEFENCE, e.g. CAMOUFLAGE, IN GENERAL
    • F41H5/00Armour; Armour plates
    • F41H5/24Armour; Armour plates for stationary use, e.g. fortifications ; Shelters; Guard Booths

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Rehabilitation Tools (AREA)

Abstract

The invention provides a worker fort for training exercise. The first square fort is assembled with a plurality of layers from bottom to top in a concave-convex inserting mode, the assembling number of each layer is at least one, the assembling number of the layer positioned at the lowest is larger than the assembling number of the layer positioned at the upper layer, and the second square fort is arranged in a certain layer and assembled with the first square fort; and two opposite surfaces of the second square fort are provided with through shooting holes. On one hand, the invention can be installed into forts with different shapes according to the terrain environment, and on the other hand, the invention clings to the ground, and has high construction and disassembly efficiency and convenient transportation.

Description

Worker's fort for training exercise
Technical Field
The invention relates to the technical field of army training equipment, in particular to a worker fort for training exercises.
Background
In military training and exercise, it is one of the important training projects to protect my important military facilities from attack by enemy infantry. In the training project, fort works need to be set up for protection.
Currently, as a main shooting work of an infantry, a fort of Shang Mogui Fan Chengxing is used as a practical device for training exercise, generally two modes are adopted, namely: the virtual object can be simply constructed by stones, rattans and sandy soil so as to achieve the effect of simulating the ground fort. The reality degree and battlefield environmental atmosphere on the training exercise site are created more falsely, the actual combat simulation level is lower, and the training effect is reduced. Secondly, adopt inflatable ground to carry out simulation training, the shortcoming of this ground is: the time of inflation and deflation is longer, the process is complex and tedious, and the rapid deployment and retraction are inconvenient.
Disclosure of Invention
The invention aims to provide a work fort for training and practice, which is convenient to install, disassemble and transport.
The technical scheme of the invention is as follows: the utility model provides a training exercise is with worker's fort, includes a plurality of first square forts and a plurality of second square fort, first square fort and second square fort all have six faces, in every two faces of relative setting, one of them face is equipped with the shrinkage pool, another face be equipped with the bump of shrinkage pool adaptation, first square fort has assembled the multilayer from bottom to top with unsmooth cartridge mode, and every layer is assembled quantity and is at least one, and is located the lower one layer assemble quantity and be greater than the one deck above and assemble quantity, the second square fort set up in a certain layer and with first square fort is assembled; and two opposite surfaces of the second square fort are provided with through shooting holes.
Preferably, the first square fort and the second square fort all have four first boards that the area equals and two second boards that the area equals, one be equipped with four bumps on the second board and form a set of, another be equipped with four shrinkage pool on the second board and form a set of, two be equipped with two sets of bumps on the first board, another two be equipped with two sets of shrinkage pools on the first board, the shooting hole sets up on the first board.
Preferably, the area of the first plate is larger than the area of the second plate.
Preferably, the four first plates are connected through a hinge, the two first plates at the end are butted into a cylinder body in a fitting mode of the insert block and the slot, and the two second plates are butted with the two ends of the cylinder body in a fitting mode of the insert block and the slot.
Preferably, sand is filled in the cylinder of the first square fort.
Preferably, the industrial fort for training exercise further comprises a first round fort, the first square fort is formed by assembling multiple layers of first wall bodies and second wall bodies, the first round fort is of an arc-shaped structure, multiple layers of first round forts are stacked, the first round fort is connected between the first wall bodies and the second wall bodies, and the multiple layers of first round forts form arc-shaped walls.
Preferably, the first circular castellation comprises a third plate, a first arc plate, a second arc plate and a fourth plate, wherein two third plates are arranged at intervals, the upper surface and the lower surface of the third plate are arc surfaces, the two arc surfaces are respectively connected with the first arc plate and the second arc plate, and the fourth plate is respectively arranged at two ends of the third plate and connected with the third plate, the first arc plate and the second arc plate.
Preferably, in the two third plates and the two fourth plates, concave holes are formed in one of the third plates and the fourth plates, and convex points matched with the concave holes are formed in the other of the third plates and the fourth plates; when the first wall body is connected with the arc-shaped wall, the convex points on the fourth plate are inserted into the concave holes on the first square fort; when the multi-layer arc walls are connected, concave holes on one third plate are inserted with convex points on the other third plate; when the arc wall is connected with the second wall, the concave holes on the fourth plate are inserted with the convex points on the first square fort.
Preferably, the first square fort is assembled in multiple layers and is further provided with a third wall body and a fourth wall body, one end, far away from the first round fort, of the second wall body is vertically connected with the third wall body, and one end, far away from the second wall body, of the third wall body is vertically connected with the fourth wall body.
Preferably, the second wall body and the fourth wall body are respectively arranged on two opposite sides of the third wall body.
Compared with the related art, the invention has the beneficial effects that:
1. the single assembled fort is designed on the fort for training exercise, on one hand, the fort can be installed into forts with different shapes according to the terrain environment, on the other hand, the fort is tightly attached to the ground, the construction and disassembly efficiencies are high, and the transportation is convenient;
2. the work fort for training exercise creates a vivid work training atmosphere for preparing an infantry through stacking, arranging and other modes, and has the capability of improving the combined training of troops;
3. the sandy soil is filled in the inner cavity of each fort, so that the fort has the capabilities of resisting high and low temperature, preventing wind and sand and vibration, can be repeatedly used for a plurality of times, reduces the training expense and the labor cost, and has the effects of reducing cost and enhancing efficiency;
4. the fort for training exercise is stacked and laid conveniently, has fewer parts, is convenient for storage, and has low transportation requirement and strong environmental adaptability.
Drawings
FIG. 1 is a schematic diagram of a first embodiment of a fort for training a training exercise according to the present invention;
FIG. 2 is a schematic diagram of a first exemplary castellation;
FIG. 3 is a schematic diagram of a second castellation;
FIG. 4 is a schematic diagram of a second embodiment of a fort for training a training exercise according to the present invention;
FIG. 5 is a schematic view of the structure of the first round fort;
FIG. 6 is a schematic diagram of a third embodiment of a fort for training a exercise according to the present invention;
fig. 7 is a schematic structural view of the second round fort.
In the accompanying drawings: 1. a first square fort; 2. a second square fort; 21. a shooting hole; 3. concave holes; 4. a bump; 5. a first round fort; 51. a third plate; 52. a first arc plate; 53. a second arc plate; 54. a fourth plate; 6. a second round fort; 7. a first plate; 8. a second plate; 9. a first wall; 10. a second wall; 11. a third wall; 12. a fourth wall; 13. a hinge; 14. inserting blocks; 15. a slot.
Detailed Description
The invention will be described in detail below with reference to the drawings in connection with embodiments. It should be noted that, without conflict, the embodiments of the present invention and features of the embodiments may be combined with each other. For convenience of description, the words "upper", "lower", "left" and "right" are used hereinafter to denote only the directions corresponding to the upper, lower, left, and right directions of the drawings, and do not limit the structure.
Example 1
As shown in fig. 1, the industrial fort for training exercise provided in this embodiment includes a plurality of first fort 1 and a plurality of second fort 2. As shown in fig. 2 and 3, the first square fort 1 and the second square fort 2 each have six faces, and in each two faces arranged oppositely, one face is provided with a concave hole 3, and the other face is provided with a convex point 4 adapted to the concave hole 3.
The six faces are formed by a first plate 7 and a second plate 8, respectively. The first square fort 1 and the second square fort 2 are provided with four first plates 7 with equal areas and two second plates 8 with equal areas, and the area of the first plates 7 is larger than that of the second plates 8. One of the second plates 8 is provided with four protruding points 4 and forms a group, and the other second plate 8 is provided with four concave holes 3 and forms a group. Two groups of convex points 4 are arranged on the two first plates 7, and two groups of concave holes 3 are arranged on the other two first plates 7. Two first plates 7 arranged oppositely in the second square fort 2 are provided with through shooting holes 21.
The first square fort 1 and the second square fort 2 are made of modified PP materials and are of jointed board structures. Specifically, four first plates 7 are connected by a hinge 13, a plurality of inserting blocks 14 are arranged on the side lengths of two first plates 7 at the end, and a slot 15 is formed between every two inserting blocks 14. The insert blocks 14 on the two first plates 7 are staggered with the insert grooves 15, so that the insert blocks 14 on one first plate 7 can be inserted into the insert grooves 15 on the other first plate 7 to be clamped and connected to form a cylinder. The cylinder is filled with sand, so that the weight is increased, and the wind resistance is improved. The two second plates 8 are abutted with the two ends of the cylinder body in a fitting manner of the inserting blocks and the inserting grooves so as to cover the cylinder body. The first square fort 1 and the second square fort 2 can be assembled and disassembled, and a platy structure is formed after the first square fort and the second square fort are disassembled and unfolded, so that the first square fort and the second square fort are convenient to transport and store; the assembly mode is rapid, and the rapid construction and the use of the work module can be realized.
As shown in fig. 1, the first square fort 1 is assembled with multiple layers from bottom to top in a manner that the protruding points 4 on one first plate 7 are inserted into the protruding points 3 on the other first plate 7, the assembled number of each layer is at least one, and the assembled number of the layer positioned at the lowest layer is greater than the assembled number of the layer positioned at the upper layer. The second square fort 2 is arranged in a certain layer and assembled with the first square fort 1.
The fort for training exercise is constructed on the outer edges of the continuous and the row supporting points or in gaps among the group fort by adopting a detachable structure so as to form a dense annular fire net, which is one of the main shooting fort for infantry.
The outer surfaces of the first square fort 1 and the second square fort 2 are provided with coatings, so that vivid battlefield environment atmosphere can be created, and the capability of actual combat training is improved.
Example two
As shown in fig. 4, the industrial fort for training exercise provided in this embodiment includes a plurality of first square forts 1, a plurality of second square forts 2, and a plurality of first round forts 5. The structures and the splicing methods of the first square fort 1 and the second square fort 2 are the same as those of the first embodiment. The first square fort 1 is formed by multi-layer assembly of a first wall 9, a second wall 10, a third wall 11 and a fourth wall 12.
As shown in fig. 5, the first round fort 5 has an arc structure, which includes a third plate 51, a first arc plate 52, a second arc plate 53 and a fourth plate 54. The third plates 51 are arranged at intervals, the upper surface and the lower surface of the third plates 51 are arc-shaped surfaces, and the chord length of the arc-shaped surface at the upper end is smaller than that of the arc-shaped surface at the lower end, so that the third plates 51 are similar to isosceles trapezoids. The area of the first arc plate 52 is smaller than the area of the second arc plate 53. The area of the fourth plate 54 is equal to the area of the second plate 8. The two arc surfaces are respectively connected with a first arc plate 52 and a second arc plate 53, and the fourth plate 54 is respectively arranged at two ends of the third plate 51 and is connected with the third plate 51, the first arc plate 52 and the second arc plate 53.
Four concave holes 3 are formed in one of the third plate 51 and the fourth plate 54, and four convex points 4 matched with the four concave holes 3 are formed in the other of the third plate 51 and the fourth plate 54.
The first round fort 5 is stacked with a plurality of layers, and is connected between the first wall 9 and the second wall 10, and the plurality of layers of the first round fort 5 form an arc wall. When the first wall 9 is connected with the arc wall, the convex points 4 on the fourth plate 54 are inserted into the concave holes 3 on the first square fort 1. When the multi-layer arc wall is connected, the concave holes 3 on the third plate 51 at the lower layer are inserted with the convex points 4 on the third plate 51 at the upper layer. When the arc wall is connected with the second wall body 10, the concave holes 3 on the fourth plate 54 are inserted with the convex points 4 on the first square fort 1. One end of the second wall body 10 far away from the first round fort 5 is vertically inserted with the third wall body 11, and one end of the third wall body 11 far away from the second wall body 10 is vertically inserted with the fourth wall body 12. The second wall 10 and the fourth wall 12 are separately disposed on opposite sides of the third wall 11.
The third plate 51, the first arc plate 52, the second arc plate 53 and the fourth plate 54 of the first round fort 5 may also adopt a jointed structure like the first square fort 1, and a cylinder is also formed and filled with sand. The plate-shaped structure is also formed after the expansion.
Example III
As shown in fig. 6, the work fort for training exercise provided in the present embodiment includes a plurality of first round forts 5 and a plurality of second round forts 6. The structure of the first round fort 5 in this embodiment is the same as the structure of the first round fort 5 in the second embodiment. As shown in fig. 7, the second round fort 6 has the same shape as the first round fort 5 and is also a jigsaw structure, except that the first arc plate 52 and the second arc plate 53 are provided with through shooting holes 21.
As shown in fig. 6, a plurality of the first circular forts 5 are round, and are overlapped from bottom to top to form a cylindrical fort. The second round fort 6 is spliced with the first round fort 5 in a certain layer.
The foregoing description is only illustrative of the present invention and is not intended to limit the scope of the invention, and all equivalent structures or equivalent processes or direct or indirect application in other related technical fields are included in the scope of the present invention.

Claims (10)

1. The utility model provides a training exercise is with worker's fort, its characterized in that includes a plurality of first fort (1) and a plurality of second fort (2), first fort (1) and second fort (2) all have six faces, in every two faces of relative setting, one of them face is equipped with shrinkage pool (3), another face be equipped with bump (4) of shrinkage pool (3) adaptation, first fort (1) is assembled from bottom to top with unsmooth cartridge's mode has the multilayer, and every layer is assembled quantity at least one, and the quantity of assembling of the one deck that is located the lowest is greater than the quantity of assembling of the one deck above, second fort (2) set up in a certain layer and assemble with first fort (1); two surfaces of the second square fort (2) which are oppositely arranged are provided with through shooting holes (21).
2. The fort for training exercise according to claim 1, characterized in that the first fort (1) and the second fort (2) each have four first plates (7) with equal areas and two second plates (8) with equal areas, one of the second plates (8) is provided with four protruding points (4) and forms a group, the other second plate (8) is provided with four protruding points (3) and forms a group, two first plates (7) are provided with two protruding points (4), the other two first plates (7) are provided with two groups of protruding points (3), and the shooting hole (21) is arranged on the first plates (7).
3. A fort for training exercises according to claim 2, characterized in that the area of the first plate (7) is larger than the area of the second plate (8).
4. The fort for training exercise according to claim 2, characterized in that the four first plates (7) are connected by hinges (13), the two first plates (7) at the ends are butted into a cylinder in a fitting manner of a plug and a slot, and the two second plates (8) are butted with the two ends of the cylinder in a fitting manner of a plug and a slot.
5. The fort for training exercises according to claim 4, characterized in that the cylinder of the first square fort (1) is filled with sand.
6. The fort for training exercises according to claim 1, further comprising a first round fort (5), wherein the first square fort (1) is formed by assembling a first wall body (9) and a second wall body (10) in multiple layers, the first round fort (5) is of an arc-shaped structure, multiple layers of the first round fort (5) are stacked and connected between the first wall body (9) and the second wall body (10), and the multiple layers of the first round fort (5) form an arc-shaped wall.
7. The fort for training exercise according to claim 6, wherein the first round fort (5) comprises a third plate (51), a first arc plate (52), a second arc plate (53) and a fourth plate (54), two third plates (51) are arranged at intervals, the upper surface and the lower surface of each third plate (51) are arc surfaces, the two arc surfaces are respectively connected with the first arc plate (52) and the second arc plate (53), and the fourth plate (54) is arranged at two ends of each third plate (51) in a separated mode and is connected with the third plate (51), the first arc plate (52) and the second arc plate (53).
8. The fort for training exercise according to claim 7, characterized in that one of the two third plates (51) and the two fourth plates (54) is provided with a concave hole (3) and the other of the third plates (51) and the fourth plates (54) is provided with a convex point (4) which is matched with the concave hole (3); when the first wall body (9) is connected with the arc-shaped wall, the convex points (4) on the fourth plate (54) are inserted with the concave holes (3) on the first square fort (1); when the multi-layer arc-shaped wall is connected, the concave holes (3) on one third plate (51) are inserted with the convex points (4) on the other third plate (51); when the arc wall is connected with the second wall body (10), the concave holes (3) on the fourth plate (54) are inserted with the convex points (4) on the first square fort (1).
9. The fort for training exercise according to claim 6, wherein the first square fort (1) is further formed with a third wall (11) and a fourth wall (12) in a multi-layer assembly manner, one end of the second wall (10) far away from the first round fort (5) is vertically connected with the third wall (11), and one end of the third wall (11) far away from the second wall (10) is vertically connected with the fourth wall (12).
10. The fort for training exercise according to claim 9, characterized in that said second wall (10) and fourth wall (12) are provided separately on opposite sides of the third wall (11).
CN202311759482.4A 2023-12-20 2023-12-20 Worker's fort for training exercise Pending CN117606296A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311759482.4A CN117606296A (en) 2023-12-20 2023-12-20 Worker's fort for training exercise

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311759482.4A CN117606296A (en) 2023-12-20 2023-12-20 Worker's fort for training exercise

Publications (1)

Publication Number Publication Date
CN117606296A true CN117606296A (en) 2024-02-27

Family

ID=89957978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311759482.4A Pending CN117606296A (en) 2023-12-20 2023-12-20 Worker's fort for training exercise

Country Status (1)

Country Link
CN (1) CN117606296A (en)

Similar Documents

Publication Publication Date Title
US8186109B2 (en) Re-configurable armored tactical personnel and collective training facility
US7941976B2 (en) Construction block
US7806038B2 (en) Modular polymeric projectile absorbing armor
US20060107985A1 (en) Modular shoot house facility
US7246471B2 (en) Modular assault course
US8961258B2 (en) Interlocking building block, paving unit, tile or toy element and the construction method thereof
US20100326001A1 (en) Construction block
US20100186345A1 (en) Ballistic construction panel
US20140130438A1 (en) Transportable modular system for covered isolation of assets
WO2008048325A2 (en) Re-configurable armored tactical personnel and collective training facility
US9340967B2 (en) Kit including self-supporting panels for assembling a modular structure
CN117606296A (en) Worker's fort for training exercise
US20190153741A1 (en) Ballistic and fire protection enclosures
EP3256810A1 (en) Barrier
CN207600302U (en) Portable individual protecting equipment
GB2564090A (en) Construction block and method of use
US20090215556A1 (en) Inflatable game system
US20060042180A1 (en) Construction unit suitable for making regular and irregular polyhedral structures
RU2725192C2 (en) Prefabricated canopy
RU210472U1 (en) The densest structure modulus
CN117516279A (en) Simulation steel hedgehog for training and practice
CN214541149U (en) Environmental simulation device that combat training used
CN117722892A (en) Simulation wave-absorbing block for training exercise
CN108562192A (en) A kind of Portable individual protecting equipment and method
CN213062610U (en) Fast-assembling wall brick

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination