CN117439041A - Power supply control method and system, electronic equipment and storage medium - Google Patents

Power supply control method and system, electronic equipment and storage medium Download PDF

Info

Publication number
CN117439041A
CN117439041A CN202311199023.5A CN202311199023A CN117439041A CN 117439041 A CN117439041 A CN 117439041A CN 202311199023 A CN202311199023 A CN 202311199023A CN 117439041 A CN117439041 A CN 117439041A
Authority
CN
China
Prior art keywords
power supply
combination
energy storage
load rate
storage system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311199023.5A
Other languages
Chinese (zh)
Inventor
刘伟民
米新锋
刘刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Wanguo Changan Technology Co ltd
Original Assignee
Beijing Wanguo Changan Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Wanguo Changan Technology Co ltd filed Critical Beijing Wanguo Changan Technology Co ltd
Priority to CN202311199023.5A priority Critical patent/CN117439041A/en
Publication of CN117439041A publication Critical patent/CN117439041A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/14Balancing the load in a network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/10Parallel operation of dc sources
    • H02J1/106Parallel operation of dc sources for load balancing, symmetrisation, or sharing
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/10Parallel operation of dc sources
    • H02J1/109Scheduling or re-scheduling the operation of the DC sources in a particular order, e.g. connecting or disconnecting the sources in sequential, alternating or in subsets, to meet a given demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0013Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0063Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with circuits adapted for supplying loads from the battery
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/061Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for DC powered loads

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The application provides a power supply control method and system, electronic equipment and storage medium, wherein the method comprises the following steps: collecting the power supply load rate of the uninterrupted power supply in each power supply combination in real time; judging whether the power supply load rate exceeds a preset first load rate threshold value or not; if the power supply load rate exceeds the first load rate threshold, determining the power supply combination with the power supply load rate exceeding the first load rate threshold as a target power supply combination; and controlling the energy storage system to supply power for the load equipment of the target power supply combination through the DC/DC converter of the target power supply combination. According to the scheme, the problem that the server is down due to the superelectricity is solved, and the service safety and stability of the data center are ensured. In addition, the energy storage system is connected to the power distribution framework of the data center in a distributed deployment and centralized access mode, and the flexible deployment of the energy storage system is realized through the decoupling of the battery and the DC/DC converter, so that the problem of failure of the energy storage system caused by single battery faults is avoided, and the availability of the energy storage system is improved.

Description

Power supply control method and system, electronic equipment and storage medium
Technical Field
The present disclosure relates to the field of energy storage technologies, and in particular, to a power supply control method and system, an electronic device, and a computer readable storage medium.
Background
The increasing power density of data center servers creates significant challenges for the power and cooling capabilities of data centers when emergency or service peaks are encountered, where the peak power consumption of some racks may exceed the design power consumption. When the total power consumption of all internet devices (such as servers) on a cabinet or a machine array exceeds the upper limit of the power consumption of the cabinet or the machine array, local high temperature of the cabinet servers can be caused, the servers are powered down due to tripping of an upper-level switch, and the server is down due to power failure, so that the service safety and stability operation of a data center can be adversely affected.
Disclosure of Invention
An object of the embodiments of the present application is to provide a power supply control method and system, an electronic device, and a computer readable storage medium, which are used for solving the problem of server downtime caused by superelectricity, and ensuring the safe and stable operation of a service of a data center.
In one aspect, the present application provides a power supply control method, applied to an energy storage system of a data center system, where the data center system includes a plurality of power supply combinations, a DC bus system, and an energy storage system, each power supply combination includes a load device, an uninterruptible power supply, and a DC/DC converter that are sequentially connected, the energy storage system includes a plurality of battery systems that are distributed and deployed, and a plurality of battery systems are converged by the DC bus system and then connected to a plurality of power supply combinations, and the method includes:
collecting the power supply load rate of the uninterrupted power supply in each power supply combination in real time;
judging whether the power supply load rate exceeds a preset first load rate threshold value or not;
if the power supply load rate exceeds the first load rate threshold, determining the power supply combination with the power supply load rate exceeding the first load rate threshold as a target power supply combination;
and controlling the energy storage system to supply power for the load equipment of the target power supply combination through the DC/DC converter of the target power supply combination.
In an embodiment, after the controlling the energy storage system to power the load devices of the target power combination, the method further comprises:
issuing a power failure risk prompt to the load equipment of the target power supply combination; the super-electricity risk prompt is used for indicating the migration processing of the load equipment of the target power supply combination.
In an embodiment, the method further comprises:
judging whether the power supply load rate of the uninterruptible power supply in the target power supply combination is larger than a preset second load rate threshold value or not in the migration process of the load equipment of the target power supply combination; wherein the second load factor threshold is less than the first load factor threshold;
if yes, the energy storage system is controlled to supply power for load equipment of the target power supply combination through the DC/DC converter of the target power supply combination;
and if not, stopping power supply to the load equipment of the target power supply combination through the DC/DC converter of the target power supply combination.
In an embodiment, the method further comprises:
and under the condition that the uninterrupted power supply in any power supply combination is powered off, the energy storage system is controlled to supply power for the load equipment of the power supply combination through the DC/DC converter of the power supply combination.
In an embodiment, the method further comprises:
under the condition that the energy storage system stops supplying power, if the electric quantity of the energy storage system is lower than an electric quantity target, the uninterrupted power supply is controlled through at least one DC/DC converter for supplying power, and the energy storage system is charged until the electric quantity target is reached.
In an embodiment, the controlling the uninterruptible power supply by the at least one DC/DC converter to charge the energy storage system until the power target is reached includes:
generating a charging strategy according to the electricity price time-sharing condition; wherein the charging strategy characterizes that the charging priority of the valley period is higher than that of the peak period;
and controlling the uninterruptible power supply through at least one DC/DC converter of the power supply combination, and charging the energy storage system according to the charging strategy until the electric quantity target is reached.
In an embodiment, the dc bus system includes a plurality of first switch cabinets and a plurality of second switch cabinets, and the plurality of battery systems are connected to the plurality of first switch cabinets in a one-to-one correspondence; and the plurality of second switch cabinets are connected to the plurality of DC/DC converters for power supply combination in a one-to-one correspondence manner.
In another aspect, the present application provides a data center system comprising:
the energy storage system comprises an energy management system and a plurality of battery systems which are distributed and deployed, and the battery systems are respectively connected with the energy management system;
a direct current bus system connected with a plurality of battery systems;
the power supply system comprises a plurality of power supply combinations, a plurality of battery systems and a power supply system, wherein each power supply combination comprises load equipment, an uninterruptible power supply and a DC/DC converter which are sequentially connected, and the plurality of battery systems are converged through the DC bus system and then connected with the plurality of DC/DC converters of the power supply combinations;
the energy management system is connected with a plurality of uninterruptible power supplies and DC/DC converters which are combined by power supply;
the energy management system is used for: collecting the power supply load rate of the uninterrupted power supply in each power supply combination in real time; judging whether the power supply load rate exceeds a preset first load rate threshold value or not; if the power supply load rate exceeds the first load rate threshold, determining the power supply combination with the power supply load rate exceeding the first load rate threshold as a target power supply combination; and controlling the energy storage system to supply power for the load equipment of the target power supply combination through the DC/DC converter of the target power supply combination.
Further, the present application provides an electronic device, including:
a processor;
a memory for storing processor-executable instructions;
wherein the processor is configured to perform the above-described power supply control method.
Furthermore, the present application provides a computer-readable storage medium storing a computer program executable by a processor to perform the above-described power supply control method.
According to the scheme, under the condition that the power supply load rate is too high in any power supply combination, the load of the uninterrupted power supply in the power supply combination can be reduced by means of the energy storage system, the problem that a server is down due to super-conduction is solved, and the safe and stable operation of a service of a data center is ensured. In addition, the energy storage system is connected to the power distribution framework of the data center in a distributed deployment and centralized access mode, and the flexible deployment of the energy storage system is realized through the decoupling of the battery and the DC/DC converter, so that the problem of failure of the energy storage system caused by single battery faults is avoided, and the availability of the energy storage system is improved. Because the plurality of battery systems in the energy storage system are connected into the direct current bus system in parallel, the total power supply amount of the energy storage system is very high, and under the condition that the power supply load rate in any power supply combination is too high, the load of the uninterrupted power supply can be fully reduced by means of the energy storage system, and the time requirement for the subsequent equipment migration is reduced.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present application, the following description will briefly explain the drawings that are required to be used in the embodiments of the present application.
FIG. 1 is a schematic diagram of a data center system according to an embodiment of the present disclosure;
FIG. 2 is a schematic diagram of a local architecture of a data center system according to an embodiment of the present application;
fig. 3 is a schematic structural diagram of an electronic device according to an embodiment of the present application;
fig. 4 is a schematic flow chart of a power supply control method according to an embodiment of the present disclosure;
fig. 5 is an overall flow chart of a power supply control method according to an embodiment of the present disclosure;
fig. 6 is a block diagram of a control device of a data center energy storage system according to an embodiment of the present application.
Detailed Description
The technical solutions in the embodiments of the present application will be described below with reference to the drawings in the embodiments of the present application.
Like reference numerals and letters denote like items in the following figures, and thus once an item is defined in one figure, no further definition or explanation thereof is necessary in the following figures. Meanwhile, in the description of the present application, the terms "first", "second", and the like are used only to distinguish the description, and are not to be construed as indicating or implying relative importance.
Referring to fig. 1, a schematic architecture diagram of a data center system according to an embodiment of the present application is provided, and as shown in fig. 1, the data center system includes an energy storage system, a dc bus system, and a plurality of power supply combinations.
The energy storage system comprises an energy management system (Energy Management System, EMS) and a plurality of battery systems (battery in fig. 1) in distributed arrangement, wherein the plurality of battery systems are respectively connected with the energy management system. In practical application, the number of the battery systems can be flexibly configured according to the requirements of the data center.
A direct current Bus system (DC Bus in fig. 1) connects a plurality of battery systems. The plurality of battery systems are connected into the direct current bus system in parallel.
Each power supply combination includes a Load device (Load in fig. 1), an uninterruptible power supply, and a DC/DC converter, which are connected in sequence. Here, the ups may be ac ups UPS (Uninterruptible Power Supply) or hvdc ups HVDC (High Voltage Direct Current) for reliable power supply of the load devices.
The DC/DC converter is used for discharging and charging the energy storage system and is comprehensively configured according to the number and the capacity of the uninterruptible power supplies. The DC/DC converter is connected with the energy storage system interface and is coupled with the uninterruptible power supply; when the energy storage system is connected to the uninterruptible power supply system by adopting a direct current scheme, the energy storage system can be connected to a UPS direct current bus or an HVDC direct current output bus, and a corresponding DC/DC converter is selected according to the type of the uninterruptible power supply system to realize compatibility.
The load equipment of the data center comprises refrigeration equipment and IT (Internet Technology) equipment, and the IT equipment is mainly used.
As shown in fig. 1, a load device with the number 1, an uninterruptible power supply with the number 1 and the load device with the number 1 form a power supply combination; the load equipment with the number 2, the uninterruptible power supply with the number 2 and the load equipment with the number 2 form a power supply combination; the load equipment with the number m, the uninterruptible power supply with the number m and the load equipment with the number m form a power supply combination; and so on.
And after the battery systems are converged through the direct current bus system, the battery systems are connected with a plurality of DC/DC converters for power supply combination.
The energy management system is connected with a plurality of uninterruptible power supplies and DC/DC converters for supplying power.
The energy management system is used for: collecting the power supply load rate of the uninterrupted power supply in each power supply combination in real time; judging whether the power supply load rate exceeds a preset first load rate threshold value or not; if the power supply load rate exceeds the first load rate threshold, determining the power supply combination with the power supply load rate exceeding the first load rate threshold as a target power supply combination; and controlling the energy storage system to supply power for the load equipment of the target power supply combination through the DC/DC converter of the target power supply combination. The details are described in the following.
Referring to fig. 2, a schematic diagram of a local architecture of a data center system provided in an embodiment of the present application is shown in fig. 2, where a battery system in an energy storage system may be deployed in a container set, and internal batteries are flexibly deployed as required by modularized battery cabinets, and the battery system includes a battery cabinet, an air conditioning cabinet, a monitoring cabinet, a metering cabinet, a convergence cabinet and a fire-fighting cabinet. The battery is connected into the conflux cabinet through the cable through the measurement cabinet, and the measurement cabinet is used for the accurate measurement of charge-discharge electric quantity and power, sets up busbar and circuit breaker in the conflux cabinet. The air conditioner cabinet radiates or heats for the battery to ensure that the battery operates at a proper temperature. And the monitoring cabinet is internally provided with battery monitoring, air conditioner monitoring, breaker monitoring and fire control monitoring, and the centralized monitoring is carried out on the equipment in the battery container. And a fire-fighting system is arranged in the fire-fighting cabinet and is used for preventing and treating the fire of the system.
The direct current bus system comprises a plurality of first switch cabinets and a plurality of second switch cabinets, and the direct current bus, the input circuit breaker, the output circuit breaker and the electric meter are contained in the direct current bus. The plurality of battery systems are connected to the plurality of first switch cabinets in a one-to-one correspondence. The plurality of second switch cabinets are connected to the plurality of power supply combined DC/DC converters in a one-to-one correspondence.
The DC/DC converter comprises an input/output switch, a high-frequency bidirectional DC converter and an input/output cable; the input is connected to the DC bus system, and the output is connected with the DC bus of the uninterrupted power supply.
As shown in fig. 3, the present embodiment provides an electronic apparatus 1 including: at least one processor 11 and a memory 12, one processor 11 being exemplified in fig. 3. The processor 11 and the memory 12 are connected by a bus 10, and the memory 12 stores instructions executable by the processor 11, which instructions are executed by the processor 11, so that the electronic device 1 may perform all or part of the flow of the method in the embodiments described below. In an embodiment, the electronic device 1 may be a host, a server cluster, etc. on which the energy management system is mounted, for executing the power supply control method.
The Memory 12 may be implemented by any type of volatile or non-volatile Memory device or combination thereof, such as static random access Memory (Static Random Access Memory, SRAM), electrically erasable Programmable Read-Only Memory (Electrically Erasable Programmable Read-Only Memory, EEPROM), erasable Programmable Read-Only Memory (Erasable Programmable Read Only Memory, EPROM), programmable Read-Only Memory (PROM), read-Only Memory (ROM), magnetic Memory, flash Memory, magnetic disk, or optical disk.
The present application also provides a computer-readable storage medium storing a computer program executable by the processor 11 to perform the control method of power supply provided by the present application.
Referring to fig. 4, a flowchart of a power supply control method according to an embodiment of the present application is shown in fig. 4, and the method may include the following steps 410 to 440.
Step 410: and collecting the power supply load rate of the uninterrupted power supply in each power supply combination in real time.
The energy storage system is applied to the data center system and is mainly executed by an energy management system of the energy storage system. The data center system comprises a plurality of power supply combinations, a direct current bus system and an energy storage system, wherein each power supply combination comprises load equipment, an uninterruptible power supply and a DC/DC converter which are sequentially connected, the energy storage system comprises a plurality of battery systems which are distributed, and the battery systems are connected to the power supply combinations after being converged through the direct current bus system. The architecture of the data center system is described in detail in connection with the foregoing.
Here, the power supply load ratio is a ratio between an actual output power and a rated power of the uninterruptible power supply.
In the running process of the data center system, the power consumption of each power supply combination can change along with time due to business volume variation, air temperature variation and the like. At this time, the power load rate of the uninterruptible power supply in the power supply combination may change. The energy management system can collect the power supply load rates of the uninterrupted power supplies in all power supply combinations in real time so as to monitor the power supply load rates of all the power supply combinations.
Step 420: and judging whether the power supply load rate exceeds a preset first load rate threshold value.
The first load rate threshold is a load rate threshold which needs to consider the risk of over-electricity (load power consumption exceeds the upper power consumption limit), and can be configured according to the requirement. Illustratively, the first load factor threshold may be 90%.
For each power supply combination, after obtaining a power supply load rate of the uninterruptible power supply of the power supply combination, it may be determined whether the power supply load rate exceeds a first load rate threshold. In one case, if not exceeded, the power load rate of the uninterruptible power supply of the power supply combination may continue to be monitored. In another case, if so, step 430 may be performed.
Step 430: and if so, determining the power supply combination with the power supply load rate exceeding the first load rate threshold as a target power supply combination.
Step 440: and controlling the energy storage system to supply power for the load equipment of the target power supply combination through the DC/DC converter of the target power supply combination.
In the event that the power supply load rate of the uninterruptible power supply within any one of the power supply combinations exceeds a first load rate threshold, the power supply combination may be determined to be the target power supply combination. At this time, the energy management system may notify the DC/DC converter of the target power supply combination, and control the energy storage system to supply power to the load device of the target power supply combination. The energy management system may issue a command to cause the DC/DC converter to switch to an anti-peak mode, output at constant power, the output voltage may be adaptive to a DC bus voltage of the uninterruptible power supply, and the output power may be determined based on the first load factor threshold.
At the moment, the energy storage system and the uninterruptible power supply in the target power supply combination jointly supply power for the load equipment in the target power supply combination, so that the overpower risk of the uninterruptible power supply in the target power supply combination is reduced.
Through the measures, under the condition that the power supply load rate in any power supply combination is too high, the energy storage system can be used for reducing the load of the uninterrupted power supply in the power supply combination, the problem that a server is down due to super-conduction is solved, and the safe and stable operation of the business of the data center is ensured. In addition, the energy storage system is connected to the power distribution framework of the data center in a distributed deployment and centralized access mode, and the flexible deployment of the energy storage system is realized through the decoupling of the battery and the DC/DC converter, so that the problem of failure of the energy storage system caused by single battery faults is avoided, and the availability of the energy storage system is improved. Because the plurality of battery systems in the energy storage system are connected into the direct current bus system in parallel, the total power supply amount of the energy storage system is very high, and under the condition that the power supply load rate in any power supply combination is too high, the load of the uninterrupted power supply can be fully reduced by means of the energy storage system, and the time requirement for the subsequent equipment migration is reduced.
In an embodiment, after controlling the energy storage system to supply power to the load device of the target power supply combination, the energy management system may issue an overpower risk prompt to the load device of the target power supply combination. The energy management system can send out a power failure risk prompt to the IT equipment of the target power supply combination. The power supply system comprises a target power supply combination, a power supply system and a power supply system, wherein the power supply system is used for supplying power to the power supply system, and the power supply system is used for supplying power to the power supply system. The migration process may be to transfer a portion of the servers of the target power supply combination to the racks of other power supply combinations that are not powered up. Thereby reducing the power consumption of the target power supply combination to reduce the power supply load rate of the target power supply combination. Specifically, IT equipment in the target power supply combination can be transferred to a cabinet of the power supply combination with lower power supply load rate, so that the situation that the power supply load rate of other power supply combinations is too high after the equipment is transferred is avoided.
By the measures, for the target power supply combination with high power supply load rate, the power failure risk prompt can be issued to instruct the load equipment in the target power supply combination to carry out migration processing, so that the power supply load rates of all the power supply combinations of the data center are more balanced. Because the energy storage system comprises a plurality of battery systems which are distributed and arranged, and the energy storage system has enough electric quantity, the IT equipment of the target power supply combination has enough time to carry out migration treatment, and the over-electricity risk caused by the power failure of the energy storage system in the migration process is avoided.
In an embodiment, after the energy management system issues the power failure risk prompt to the load device of the target power supply combination, in a migration process of the load device of the target power supply combination, a power supply load rate of the uninterruptible power supply in the target power supply combination can be obtained in real time, and whether the power supply load rate is greater than a preset second load rate threshold value is judged. The second load rate threshold is smaller than the first load rate threshold, and the second load rate threshold is used for distinguishing power supply combinations separated from the over-electricity risk. Illustratively, the second load factor threshold may be 70%.
Under the condition, if the power supply load rate is larger than the preset second load rate threshold value, it is indicated that the power supply load rate of the uninterruptible power supply of the target power supply combination is still higher, and there is an overpower risk, at this time, the energy management system can control the energy storage system to continue to supply power for the load equipment of the target power supply combination through the DC/DC converter of the target power supply combination.
In this case, since the IT devices within the target power supply combination are still migrated to other power supply combinations, the power supply load rate may be continuously obtained and compared to the second load rate threshold.
In another case, if not (i.e. the power load rate is less than or equal to the preset second load rate threshold), it is indicated that the power load rate of the uninterruptible power supply of the target power supply combination is reduced, and the risk of overpotential is eliminated, at this time, the energy management system may control the DC/DC converter to exit the anti-peak mode, and stop the energy storage system from supplying power to the load device of the target power supply combination through the DC/DC converter of the target power supply combination.
Referring to fig. 5, an overall flow chart of a power supply control method according to an embodiment of the present application is shown in fig. 5, where an energy management system may detect a power load rate of each power supply combination and determine whether the power load rate of each power supply combination is greater than a first load rate threshold (90%). In one case, if not, the DC/DC converter in the power supply combination can be controlled to exit the anti-peak mode, and the power supply load rate of the power supply combination can be continuously detected. In another case, if yes, the DC/DC converter in the power supply combination can be controlled to switch to the anti-peak mode, and the energy storage system is controlled by the DC/DC converter to supply power to the load equipment in the power supply combination. In addition, IT devices within the power supply combination may be controlled to migrate to other power supply combinations.
And in the migration process, continuously detecting the power supply load rate of the power supply combination, and judging whether the power supply load rate is larger than a second load rate threshold (70%). And under the condition that the power supply load rate is larger than the second load rate threshold value, continuously controlling the DC/DC converter to operate in the anti-peak mode, and continuously migrating the load equipment. In the case where the power supply load ratio is not greater than the second load ratio, the DC/DC converter of the power supply combination may be controlled to exit the anti-peak mode.
In an embodiment, the energy management system may control the energy storage system to supply power to the load device of the power supply combination through the DC/DC converter of the power supply combination in the case that the uninterruptible power supply is powered off in any power supply combination.
Under the condition, emergency power supply for the load equipment in the power supply combination is realized, and downtime of the load equipment caused by sudden power failure is avoided.
In an embodiment, in the event that the energy storage system ceases to supply power, the energy management system may check whether the power of the energy storage system is below a power target. Here, the electric quantity target may be configured as needed. For example, the charge target may be up to 100% of the charge of the battery system in the energy storage system, or up to 90% of the charge.
In one aspect, if the power of the energy storage system reaches the power target, no processing may be performed. On the other hand, if the electric quantity of the energy storage system is lower than the electric quantity target, the uninterruptible power supply can be controlled by the DC/DC converter for indicating a power supply combination to charge the energy storage system until the electric quantity target is reached.
Through the measures, under the condition that the electric quantity of the energy storage system is lower than an electric quantity target, the battery in the energy storage system can be charged in time, so that the energy storage system is used for avoiding the over-electricity risk in the follow-up process.
In an embodiment, when the uninterruptible power supply is controlled to charge the energy storage system, the energy management system may generate a charging policy according to the electricity price time-sharing condition. Wherein the charging strategy characterizes a charging priority over a peak electrical time period for the valley electrical time period. Exemplary, electricity price time-sharing conditions are: daily 8:00 to 22:00 peak to 8:00 next day, then the charging strategy may characterize charging preferentially at 22:00 to 8:00 next day.
The energy management system can control the uninterruptible power supply through at least one DC/DC converter for power supply combination, and charge the energy storage system according to a charging strategy until the electric quantity target is reached.
In an embodiment, after the energy management system generates a charging policy according to the electricity price time-sharing situation and charges the energy storage system with the charging policy, the energy storage system can be controlled to switch to a peak load shifting mode in a peak electricity time period, and the energy storage system is controlled to supply power to the load equipment of at least one power supply combination, so that the output electric quantity of the uninterruptible power supply in the power supply combination is reduced.
Fig. 6 is a power supply control device according to an embodiment of the present invention, and as shown in fig. 6, the device may include:
the collection module 610 is configured to collect, in real time, a power load rate of the uninterruptible power supply in each of the power supply combinations;
a judging module 620, configured to judge whether the power load rate exceeds a preset first load rate threshold;
a determining module 630, configured to determine, if the power load rate exceeds the first load rate threshold, that the power supply combination is a target power supply combination;
and the control module 640 is used for controlling the energy storage system to supply power for the load equipment of the target power supply combination through the DC/DC converter of the target power supply combination.
The implementation process of the functions and roles of each module in the above device is specifically shown in the implementation process of the corresponding steps in the above power supply control method, and will not be described herein.
In the several embodiments provided in the present application, the disclosed apparatus and method may be implemented in other manners. The apparatus embodiments described above are merely illustrative, for example, flow diagrams and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of apparatus, methods and computer program products according to various embodiments of the present application. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s). In some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems which perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
In addition, the functional modules in the embodiments of the present application may be integrated together to form a single part, or each module may exist alone, or two or more modules may be integrated to form a single part.
The functions, if implemented in the form of software functional modules and sold or used as a stand-alone product, may be stored on a computer readable storage medium. Based on such understanding, the technical solution of the present application may be embodied essentially or in a part contributing to the prior art or in a part of the technical solution, in the form of a software product stored in a storage medium, including several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods of the embodiments of the present application. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a random access Memory (RAM, random Access Memory), a magnetic disk, or an optical disk, or other various media capable of storing program codes.

Claims (10)

1. The utility model provides a power supply control method, is applied to the energy storage system of data center system, characterized in that, data center system includes a plurality of power supply combination, direct current bus system and energy storage system, and each power supply combination includes load equipment, uninterrupted power source and DC/DC converter that connect gradually, energy storage system includes a plurality of battery system of distributed deployment, a plurality of battery system is assembled through direct current bus system and is later inserted to a plurality of power supply combination, the method includes:
collecting the power supply load rate of the uninterrupted power supply in each power supply combination in real time;
judging whether the power supply load rate exceeds a preset first load rate threshold value or not;
if the power supply load rate exceeds the first load rate threshold, determining the power supply combination with the power supply load rate exceeding the first load rate threshold as a target power supply combination;
and controlling the energy storage system to supply power for the load equipment of the target power supply combination through the DC/DC converter of the target power supply combination.
2. The method of claim 1, wherein after the controlling the energy storage system to power the load devices of the target power combination, the method further comprises:
issuing a power failure risk prompt to the load equipment of the target power supply combination; the super-electricity risk prompt is used for indicating the migration processing of the load equipment of the target power supply combination.
3. The method according to claim 2, wherein the method further comprises:
judging whether the power supply load rate of the uninterruptible power supply in the target power supply combination is larger than a preset second load rate threshold value or not in the migration process of the load equipment of the target power supply combination; wherein the second load factor threshold is less than the first load factor threshold;
if yes, the energy storage system is controlled to supply power for load equipment of the target power supply combination through the DC/DC converter of the target power supply combination;
and if not, stopping power supply to the load equipment of the target power supply combination through the DC/DC converter of the target power supply combination.
4. The method according to claim 1, wherein the method further comprises:
and under the condition that the uninterrupted power supply in any power supply combination is powered off, the energy storage system is controlled to supply power for the load equipment of the power supply combination through the DC/DC converter of the power supply combination.
5. The method according to claim 1, wherein the method further comprises:
under the condition that the energy storage system stops supplying power, if the electric quantity of the energy storage system is lower than an electric quantity target, the uninterrupted power supply is controlled through at least one DC/DC converter for supplying power, and the energy storage system is charged until the electric quantity target is reached.
6. The method of claim 5, wherein the controlling the uninterruptible power supply via the at least one power-combined DC/DC converter to charge the energy storage system until a charge target is reached, comprises:
generating a charging strategy according to the electricity price time-sharing condition; wherein the charging strategy characterizes that the charging priority of the valley period is higher than that of the peak period;
and controlling the uninterruptible power supply through at least one DC/DC converter of the power supply combination, and charging the energy storage system according to the charging strategy until the electric quantity target is reached.
7. The method of claim 1, wherein the dc bus system comprises a plurality of first switch cabinets and a plurality of second switch cabinets, the plurality of battery systems being connected to the plurality of first switch cabinets in a one-to-one correspondence; and the plurality of second switch cabinets are connected to the plurality of DC/DC converters for power supply combination in a one-to-one correspondence manner.
8. A data center system, comprising:
the energy storage system comprises an energy management system and a plurality of battery systems which are distributed and deployed, and the battery systems are respectively connected with the energy management system;
a direct current bus system connected with a plurality of battery systems;
the power supply system comprises a plurality of power supply combinations, a plurality of battery systems and a power supply system, wherein each power supply combination comprises load equipment, an uninterruptible power supply and a DC/DC converter which are sequentially connected, and the plurality of battery systems are converged through the DC bus system and then connected with the plurality of DC/DC converters of the power supply combinations;
the energy management system is connected with a plurality of uninterruptible power supplies and DC/DC converters which are combined by power supply;
the energy management system is used for: collecting the power supply load rate of the uninterrupted power supply in each power supply combination in real time; judging whether the power supply load rate exceeds a preset first load rate threshold value or not; if the power supply load rate exceeds the first load rate threshold, determining the power supply combination with the power supply load rate exceeding the first load rate threshold as a target power supply combination; and controlling the energy storage system to supply power for the load equipment of the target power supply combination through the DC/DC converter of the target power supply combination.
9. An electronic device, the electronic device comprising:
a processor;
a memory for storing processor-executable instructions;
wherein the processor is configured to perform the power supply control method of any one of claims 1-7.
10. A computer-readable storage medium, characterized in that the storage medium stores a computer program executable by a processor to perform the power supply control method of any one of claims 1 to 7.
CN202311199023.5A 2023-09-15 2023-09-15 Power supply control method and system, electronic equipment and storage medium Pending CN117439041A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311199023.5A CN117439041A (en) 2023-09-15 2023-09-15 Power supply control method and system, electronic equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311199023.5A CN117439041A (en) 2023-09-15 2023-09-15 Power supply control method and system, electronic equipment and storage medium

Publications (1)

Publication Number Publication Date
CN117439041A true CN117439041A (en) 2024-01-23

Family

ID=89554345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311199023.5A Pending CN117439041A (en) 2023-09-15 2023-09-15 Power supply control method and system, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN117439041A (en)

Similar Documents

Publication Publication Date Title
CN106941276B (en) The distributed DC data center based on module
US10110006B2 (en) Management of battery capacity
US11146099B2 (en) Two-tier battery solution for data center backup
KR101206362B1 (en) Battery Energy Storage System
CN108702023B (en) Rack power system and method
US10476297B2 (en) Device and method for wiring a battery management system
KR20130066283A (en) Apparatus for simulating battery system
CN111446718B (en) Power supply method, system, power supply device and storage medium
CN109193723B (en) Combined base station backup energy storage power supply and control method
KR20130020626A (en) High voltage direct current power feeding apparatus considering battery states and load power, and its method
US10978886B2 (en) Self-inspection topology design for battery energy storage
CN117439041A (en) Power supply control method and system, electronic equipment and storage medium
CN111009929A (en) Storage battery pack string direct current confluence and pack string balance control device of energy storage system
KR20230049243A (en) Energy storage system connected to photovolatic system and controlling method thereof
KR102060270B1 (en) Hybrid type control power supplying apparatus and control power supplying method using the same
CN221177340U (en) Data center system
CN218829639U (en) Direct current power supply system
US20230187957A1 (en) System and method for active power flow control and equalization for electrochemical accumulators connected to the electrical grid
US11614783B2 (en) Method and system for providing power from a utility power source or a photovoltaic (PV) system to information technology
US11990757B2 (en) Current detection based renewable energy system for a data center
Rahmat et al. Reliability estimation of uninterruptible power supply using reliability block diagram method
BR102021025348A2 (en) SYSTEM AND METHOD FOR ACTIVE POWER FLOW CONTROL AND EQUALIZATION FOR ELECTROCHEMICAL STORERS CONNECTED TO THE ELECTRIC GRID
BR102022004768A2 (en) DEVICE AND PROCESS FOR CHARGING LOAD ELEMENTS IN BATTERY BANKS
CN118630859A (en) Battery cluster parallel inhibition circulation system, method and device and storage medium
CN116544541A (en) Energy storage system and inter-cluster SOC calibration method for battery system of energy storage system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination