CN117394311B - Power distribution network toughness assessment and emergency control method based on multi-source information fusion - Google Patents

Power distribution network toughness assessment and emergency control method based on multi-source information fusion Download PDF

Info

Publication number
CN117394311B
CN117394311B CN202311259965.8A CN202311259965A CN117394311B CN 117394311 B CN117394311 B CN 117394311B CN 202311259965 A CN202311259965 A CN 202311259965A CN 117394311 B CN117394311 B CN 117394311B
Authority
CN
China
Prior art keywords
distribution network
power distribution
toughness
ftu
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202311259965.8A
Other languages
Chinese (zh)
Other versions
CN117394311A (en
Inventor
张斌
齐屹
周宗川
郭骞
屈高强
唐梦媛
张诗豪
马俊先
胡志冰
徐鹏飞
李国杰
李燕
丁帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Economic and Technological Research Institute of State Grid Ningxia Electric Power Co Ltd
Original Assignee
Economic and Technological Research Institute of State Grid Ningxia Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Economic and Technological Research Institute of State Grid Ningxia Electric Power Co Ltd filed Critical Economic and Technological Research Institute of State Grid Ningxia Electric Power Co Ltd
Priority to CN202311259965.8A priority Critical patent/CN117394311B/en
Publication of CN117394311A publication Critical patent/CN117394311A/en
Application granted granted Critical
Publication of CN117394311B publication Critical patent/CN117394311B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Power Engineering (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Human Computer Interaction (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention provides a toughness assessment and emergency control method of a power distribution network based on multi-source information fusion, which belongs to the technical field of toughness assessment of power distribution networks, and comprises the steps of selecting one section of a power distribution network line as two ends of the power distribution network section to be tested, and arranging two FTUs; acquiring a current signal and a voltage signal acquired by an FTU; a wind speed sensor and a line impedance sensor are arranged between the power distribution network sections to be tested; performing multi-component mixed decomposition calculation on the sum voltage signals to obtain two groups of fundamental wave and harmonic wave signals; calculating a voltage stability coefficient matrix, an anti-interference factor and a power distribution network toughness evaluation coefficient; and judging the fault risk according to the toughness evaluation coefficient and the anti-interference factor of the power distribution network, and discharging the fault risk output to realize emergency control of the fault risk of the power distribution network. The method solves the technical problems that the physical quantity adopted by the existing power distribution network toughness assessment method is single, and the toughness state of the power distribution network cannot be assessed rapidly in a short time.

Description

Power distribution network toughness assessment and emergency control method based on multi-source information fusion
Technical Field
The invention belongs to the technical field of toughness assessment of a power distribution network, and particularly relates to a method for toughness assessment and emergency control of the power distribution network based on multi-source information fusion.
Background
With the rapid development of economy in China, stable and reliable electric energy supply is continuously pursued for power supply of a power distribution network, sensitive loads in the power distribution network are gradually increased, and great economic losses are caused by other faults such as voltage sag and short circuit caused by natural environment and the inside of a power system, so that the toughness evaluation of the power distribution network is beneficial to improving the running stability of the power distribution network and timely finding and overhauling of the power distribution network faults. However, the existing toughness evaluation method for the power distribution network adopts single physical quantity, and cannot evaluate the toughness state of the power distribution network rapidly in a short time, so that reliability and rapidity of toughness evaluation of the power distribution network are greatly limited.
Disclosure of Invention
In view of the above, the invention provides a method for evaluating toughness and controlling emergency of a power distribution network based on multi-source information fusion, which can solve the technical problems that the existing method for evaluating toughness of the power distribution network adopts single physical quantity and cannot evaluate the toughness state of the power distribution network rapidly in a short time.
The invention is realized in the following way:
The invention provides a power distribution network toughness assessment and emergency control method based on multi-source information fusion, which comprises the following steps:
S10, selecting a section of a power distribution network line as a power distribution network section to be tested, and arranging two FTUs at two ends of the power distribution network section to be tested, wherein the FTUs are feeder terminal units;
s20, acquiring two groups of current signals and voltage signals acquired by the two set FTUs;
s30, installing a wind speed sensor and a line impedance sensor between the power distribution network sections to be tested;
S40, acquiring a change curve of the wind speed obtained by the wind speed sensor along with time as a first curve and a change curve of the impedance value measured by the line impedance sensor along with time as a second curve, wherein the acquisition period of the first curve and the second curve is 24 hours;
S50, performing multi-component mixed decomposition calculation on the voltage signals acquired by the two FTUs to obtain two groups of fundamental wave and harmonic wave signals;
s60, calculating a voltage stability coefficient matrix and an anti-interference factor by using the obtained two groups of fundamental wave and harmonic wave signals;
S70, calculating a toughness evaluation coefficient of the power distribution network by using the voltage stability coefficient matrix, the first curve and the second curve;
and S80, judging the fault risk according to the calculated toughness evaluation coefficient and the anti-interference factor of the power distribution network, and outputting the fault risk to staff for discharging to realize emergency control of the fault risk of the power distribution network.
Based on the technical scheme, the toughness evaluation and emergency control method of the power distribution network based on multi-source information fusion can be improved as follows:
preferably, the wind speed sensor and the line impedance sensor are both arranged at the middle position of the power distribution network section to be tested.
The formula for performing multi-component mixed decomposition calculation on the voltage signals acquired by the two FTUs is as follows:
Wherein g (x) is a voltage signal of the power distribution network, the voltage signal comprises a current signal U1 measured by a first FTU and a current signal U2 measured by a second FTU, g 1(x)、g2(x)、…、gn (x) is a fundamental wave and a harmonic wave signal of the power distribution network, subscripts 1, 2, … and n in g 1(x)、g2(x)、…、gn (x) represent harmonic wave times, and x represents a dependent variable of the signal g (x), wherein the fundamental wave and the harmonic wave signals are obtained through an electric energy quality analyzer of the power distribution network;
the voltage signal U 1、U2 is subjected to multi-source mixed decomposition calculation respectively through the above method to obtain two groups of fundamental wave and harmonic wave signals U 11、U12、…、U1n and U 21、U22、…、U2n.
The calculation formula of the voltage stability coefficient matrix is as follows:
in the formula, U N represents the rated voltage of the power distribution network section to be tested, t 0 is the maximum load moment in the daily load curve of the power distribution network, and j=1, 2.
Further, the calculation formula of the toughness evaluation coefficient of the power distribution network is as follows:
Wherein G a represents the toughness evaluation coefficient t 0 of the power distribution network as the maximum load moment in the daily load curve, t 1 is the peak moment of the current signal I 1, t 2 is the peak moment of the current signal I 2, t F is the maximum wind speed moment, V (t) is the time-dependent change curve of the wind speed measured by the wind speed sensor, V max is the maximum wind speed, X 1、X2 is the voltage stability coefficient matrix obtained by monitoring the first and second FTUs, respectively, Z (t) is the time-dependent change curve of the impedance value measured by the line impedance device, and Z max is the maximum impedance value of the power distribution network monitored by the line impedance sensor in a 24-hour period.
The distribution network toughness represented by the value range of the distribution network evaluation coefficient is as follows: if Ga is less than or equal to 0.21, the toughness of the power distribution network is good; ga is more than 0.21 and less than or equal to 0.75, the toughness of the power distribution network is general, and the suspected fault risk or the anti-interference capability of the power distribution network is general; ga >0.75, the toughness of the distribution network is poor.
The anti-interference factor calculation formula is as follows:
Wherein eta is an anti-interference factor.
The fault risk judging method comprises the following steps: if eta is less than or equal to Ga, indicating that the toughness of the power distribution network is general and the fault risk exists, sending out a warning through the FTU, and informing a worker of removing the fault risk; if eta > Ga, the toughness of the power distribution network is poor, the action of the isolating switch is controlled through the FTU, the line of the power distribution network section to be tested is cut off, and a warning is sent out to inform staff of eliminating the fault risk.
Compared with the prior art, the power distribution network toughness assessment and emergency control method based on multi-source information fusion has the beneficial effects that: by setting two FTUs, the voltage and the current of the power distribution network section to be tested are collected in real time, the change curve of the wind speed along with the time and the change curve of the resistance along with the time are collected by utilizing the wind speed sensor and the line impedance sensor in a trial test mode, a voltage stability coefficient matrix and an anti-interference factor are calculated according to the collected data, and the calculation result is utilized for carrying out the toughness assessment and the risk analysis of the power distribution network, so that the technical problems that the physical quantity adopted by the conventional toughness assessment method of the power distribution network is single, and the toughness state of the power distribution network cannot be rapidly assessed in a short time are effectively solved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are needed in the description of the embodiments of the present invention will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present invention, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a flowchart of a power distribution network toughness evaluation and emergency control method based on multi-source information fusion.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in fig. 1, the present invention provides a flow chart of a toughness evaluation and emergency control method for a power distribution network based on multi-source information fusion, and the method includes the following steps:
S10, selecting one section of a power distribution network line as a power distribution network section to be tested, and arranging two FTUs at two ends of the power distribution network section to be tested, wherein the FTUs are feeder terminal units;
s20, acquiring two groups of current signals and voltage signals acquired by the two set FTUs;
s30, installing a wind speed sensor and a line impedance sensor between the power distribution network sections to be tested;
S40, acquiring a change curve of the wind speed obtained by the wind speed sensor along with time as a first curve and a change curve of the impedance value measured by the line impedance sensor along with time as a second curve, wherein the acquisition period of the first curve and the second curve is 24 hours;
S50, performing multi-component mixed decomposition calculation on the voltage signals acquired by the two FTUs to obtain two groups of fundamental wave and harmonic wave signals;
s60, calculating a voltage stability coefficient matrix and an anti-interference factor by using the obtained two groups of fundamental wave and harmonic wave signals;
S70, calculating a toughness evaluation coefficient of the power distribution network by using the voltage stability coefficient matrix, the first curve and the second curve;
and S80, judging the fault risk according to the calculated toughness evaluation coefficient and the anti-interference factor of the power distribution network, and outputting the fault risk to staff for discharging to realize emergency control of the fault risk of the power distribution network.
FTU (FEEDER TERMINAL Unit), namely feeder terminal Unit, is an important device in distribution automation system, it is usually installed at the feeder terminal of the distribution network, have centralized control feeder switch, monitor feeder parameter, realize the function of distribution network automation, etc.;
the main functions of the FTU include:
1. Remotely monitoring parameters such as feeder current, voltage, power and the like, and communicating with a main station in real time;
2. the on-off operation of the feeder switch is controlled, so that the remote control of the feeder is realized;
3. automatic reclosing, self-recovery and other automatic functions of the feeder line are realized;
4. Judging faults on the feeder line, and supporting feeder line protection;
5. communication with other intelligent terminals is supported, and a distribution network automation system is constructed;
6. providing feeder load monitoring, electric energy metering and other functions;
7. supporting remote parameter setting of field devices;
8. Integrating with GIS, DMS and other systems, supporting advanced functions such as network analysis and state monitoring;
The FTU generally comprises a power supply, a CPU, a communication interface, a switch controller, an electric quantity acquisition terminal, lighting lightning protection and other components, and can realize centralized monitoring, automatic control and protection of a feeder line by adopting microcomputer control. The method is key equipment for realizing unattended operation of the power distribution network;
Preferably, the wind speed sensor and the line impedance sensor are both arranged at the middle position of the power distribution network section to be tested.
Multisource mixed decomposition calculation (Multi-source hybrid decomposition computation) mainly refers to a method for analyzing and calculating multisource mixed waveforms generated by various distributed power supplies after the distributed power supplies of different types are connected into a power distribution network;
the multi-source mixed decomposition calculation mainly comprises the following aspects:
1. The mixed waveform acqisition is used for collecting complex mixed waveforms formed by multiple sources in the power distribution network;
2. waveform preprocessing, namely removing abnormal signals such as noise, interference and the like in the acquired waveform;
3. extracting basic characteristic parameters of the mixed waveform, such as frequency, amplitude, phase and the like;
4. Source component decomposition-the mixed waveform is separated into a plurality of source component waveforms using a signal decomposition algorithm. The common algorithms have finite impulse response decomposition, singular value decomposition and the like;
5. calculating source parameters, namely calculating parameters of each power supply component to obtain parameters such as active power, reactive power, harmonic waves and the like;
7. And (3) analyzing and optimizing results, namely analyzing calculation results, and carrying out parameter optimization and model correction.
Multisource hybrid decomposition computing is one of the key technologies for implementing multisource monitoring and management of power distribution networks.
In the specific embodiment of the invention, the formula for performing multi-component mixed decomposition calculation on the voltage signals acquired by the two FTUs is as follows:
Wherein g (x) is a voltage signal of the power distribution network, the current signal U 1 measured by the first FTU and the current signal U 2,g1(x)、g2(x)、…、gn (x) measured by the second FTU are fundamental wave and harmonic wave signals of the power distribution network, subscripts 1, 2, … and n in g 1(x)、g2(x)、…、gn (x) represent harmonic wave times, and x represents a dependent variable of the signal g (x), wherein the fundamental wave and the harmonic wave signals are obtained through an electric energy quality analyzer of the power distribution network;
the voltage signal U 1、U2 is subjected to multi-source mixed decomposition calculation respectively through the above method to obtain two groups of fundamental wave and harmonic wave signals U 11、U12、…、U1n and U 21、U22、…、U2n.
The general voltage stability coefficient matrix (Voltage Stability Coefficient Matrix) is an important matrix for researching the voltage stability problem of the power system;
The method comprises the steps of establishing a linear relation model between node voltage and node injection power through a circuit voltage and current state equation, and reflecting sensitivity information between the voltage and the power;
The voltage stability coefficient matrix is mainly characterized in that:
1. Describing the sensitivity of node voltage to node injection active and reactive power changes;
2. the larger the element value in the matrix, the more sensitive the voltage of the node to the corresponding variable;
3. the voltage stability condition of the system can be judged according to the voltage stability coefficient matrix;
4. the method can be used for guiding the implementation of voltage stabilization control and determining key nodes;
5. the method can be used for voltage stability analysis, voltage breakdown point judgment and voltage breakdown prevention control;
6. The method can also be converted into a rapid voltage stability index for online analysis;
in a specific embodiment of the present invention, a simpler compression stability coefficient matrix may be used, and its calculation formula is as follows:
Wherein U N represents rated voltage of a power distribution network section to be tested, t 0 is maximum moment of load in a daily load curve of the power distribution network, and j=1, 2, wherein the daily load curve of the power distribution network is obtained from a power distribution network operation system.
The calculation formula of the toughness evaluation coefficient of the power distribution network is as follows:
Wherein G a represents the toughness evaluation coefficient t 0 of the power distribution network as the maximum load moment in the daily load curve, t 1 is the peak moment of the current signal I 1, t 2 is the peak moment of the current signal I 2, t F is the maximum wind speed moment, V (t) is the time-dependent change curve of the wind speed measured by the wind speed sensor, V max is the maximum wind speed, X 1、X2 is the voltage stability coefficient matrix obtained by monitoring the first and second FTUs, respectively, Z (t) is the time-dependent change curve of the impedance value measured by the line impedance device, and Z max is the maximum impedance value of the power distribution network monitored by the line impedance sensor in a 24-hour period.
The toughness of the distribution network represented by the value range of the distribution network evaluation coefficient is as follows: if Ga is less than or equal to 0.21, the toughness of the power distribution network is good; ga is more than 0.21 and less than or equal to 0.75, the toughness of the power distribution network is general, and the suspected fault risk or the anti-interference capability of the power distribution network is general; ga >0.75, the toughness of the distribution network is poor. The Ga value range is obtained by the following steps: and constructing a simulation model under normal operation and fault states of the power distribution network, obtaining a large amount of data by combining field actual measurement, and obtaining the value range of the toughness coefficient of the power distribution network through data analysis and fitting.
The anti-interference factor calculation formula is as follows:
Wherein eta is an anti-interference factor.
The fault risk judging method comprises the following steps: if eta is less than or equal to Ga, indicating that the toughness of the power distribution network is general and the fault risk exists, sending out a warning through the FTU, and informing a worker of removing the fault risk; if eta > Ga, the toughness of the power distribution network is poor, the action of the isolating switch is controlled through the FTU, the line of the power distribution network section to be tested is cut off, and a warning is sent out to inform staff of eliminating the fault risk.
The foregoing is merely illustrative of the present invention, and the present invention is not limited thereto, and any person skilled in the art will readily recognize that variations or substitutions are within the scope of the present invention. Therefore, the protection scope of the invention is subject to the protection scope of the claims.

Claims (9)

1. A power distribution network toughness assessment and emergency control method based on multi-source information fusion is characterized by comprising the following steps:
S10, selecting one section of a power distribution network line as a power distribution network section to be tested, and arranging two FTUs at two ends of the power distribution network section to be tested, namely arranging one FTU at the head and the tail of each FTU, wherein the FTUs are feeder terminal units;
s20, acquiring two groups of current signals and voltage signals acquired by the two set FTUs; comprising a first FTU-acquired set of current signals and voltage signals Another set of current signals and voltage signals acquired by the second FTU/>
S30, installing a wind speed sensor and a line impedance sensor between the power distribution network sections to be tested;
S40, acquiring a change curve of the wind speed obtained by the wind speed sensor along with time as a first curve, and acquiring a change curve of the impedance value measured by the line impedance sensor along with time as a second curve;
S50, performing multi-component mixed decomposition calculation on the voltage signals acquired by the two FTUs to obtain two groups of fundamental wave and harmonic wave signals;
s60, calculating a voltage stability coefficient matrix and an anti-interference factor by using the obtained two groups of fundamental wave and harmonic wave signals;
s70, calculating a toughness evaluation coefficient of the power distribution network by using the voltage stability coefficient matrix, the first curve and the second curve;
and S80, judging the fault risk according to the calculated toughness evaluation coefficient and the anti-interference factor of the power distribution network, and outputting the fault risk to staff for discharging to realize emergency control of the fault risk of the power distribution network.
2. The method for evaluating toughness and controlling emergency of a power distribution network based on multi-source information fusion according to claim 1, wherein the wind speed sensor and the line impedance sensor are both installed at the middle position of the power distribution network section to be tested.
3. The method for evaluating toughness and controlling emergency of a power distribution network based on multi-source information fusion according to claim 1, wherein the acquisition period of the first curve and the second curve is 24 hours.
4. The toughness assessment and emergency control method for a power distribution network based on multi-source information fusion according to claim 1, wherein the formula for performing multi-component mixed decomposition calculation on voltage signals acquired by two FTUs is as follows:
In the method, in the process of the invention, For the voltage signal of the distribution network, comprising a voltage signal U1 measured by a first FTU and a voltage signal U2 measured by a second FTU,/>Is the fundamental wave and harmonic wave signals of the power distribution network,The subscripts 1,2, …, n in (a) denote harmonic orders,/>Representation of signal/>The fundamental wave and harmonic wave signals are obtained through an electric energy quality analyzer of the power distribution network;
by measuring voltage signal of first FTU The voltage signal U2 measured by the second FTU is respectively subjected to multi-source mixed decomposition calculation to obtain two groups of fundamental wave and harmonic wave signals
5. The method for evaluating toughness and controlling emergency of a power distribution network based on multi-source information fusion according to claim 4, wherein the calculation formula of the voltage stability coefficient matrix is as follows:
In the method, in the process of the invention, Representing rated voltage of power distribution network section to be tested,/>J=1, 2, which is the moment of maximum load in the daily load curve of the distribution network.
6. The method for evaluating toughness and controlling emergency of a power distribution network based on multi-source information fusion according to claim 5, wherein the calculation formula of the toughness evaluation coefficient of the power distribution network is as follows:
In the method, in the process of the invention, Representing the toughness evaluation coefficient/>, of a power distribution networkIs the maximum moment of load in daily load curve,/>For the current signal/>Peak time record,/>For the current signal/>Peak time of/>For maximum wind speed moment,/>For the change curve of wind speed measured by wind speed sensor with time,/>For maximum wind speed,/>The voltage stability coefficient matrix obtained by monitoring the first FTU and the second FTU is shown as Z (t) which is the change curve of the impedance value measured by the line impedance device along with time,/>The impedance sensor is used for monitoring the maximum value of the impedance of the power transmission line of the power distribution network in a period of 24 hours.
7. The method for evaluating the toughness of the power distribution network and controlling the toughness of the power distribution network based on the multi-source information fusion according to claim 6, wherein the power distribution network toughness represented by the value range of the power distribution network evaluation coefficient is as follows: if Ga is less than or equal to 0.21, the toughness of the power distribution network is good; ga is more than 0.21 and less than or equal to 0.75, the toughness of the power distribution network is general, and the suspected fault risk or the anti-interference capability of the power distribution network is general; ga >0.75, the toughness of the distribution network is poor.
8. The method for evaluating toughness and controlling emergency of a power distribution network based on multi-source information fusion according to claim 6, wherein the anti-interference factor calculation formula is as follows:
In the method, in the process of the invention, Is an anti-interference factor.
9. The method for evaluating toughness and controlling emergency of a power distribution network based on multi-source information fusion according to claim 8, wherein the method for judging risk of failure is as follows: if eta is less than or equal to Ga, indicating that the toughness of the power distribution network is general and the fault risk exists, sending out a warning through the FTU, and informing a worker of removing the fault risk; if eta > Ga, the toughness of the power distribution network is poor, the action of the isolating switch is controlled through the FTU, the line of the power distribution network section to be tested is cut off, and a warning is sent out to inform staff of eliminating the fault risk.
CN202311259965.8A 2023-09-26 2023-09-26 Power distribution network toughness assessment and emergency control method based on multi-source information fusion Active CN117394311B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311259965.8A CN117394311B (en) 2023-09-26 2023-09-26 Power distribution network toughness assessment and emergency control method based on multi-source information fusion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311259965.8A CN117394311B (en) 2023-09-26 2023-09-26 Power distribution network toughness assessment and emergency control method based on multi-source information fusion

Publications (2)

Publication Number Publication Date
CN117394311A CN117394311A (en) 2024-01-12
CN117394311B true CN117394311B (en) 2024-05-24

Family

ID=89440099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311259965.8A Active CN117394311B (en) 2023-09-26 2023-09-26 Power distribution network toughness assessment and emergency control method based on multi-source information fusion

Country Status (1)

Country Link
CN (1) CN117394311B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113962461A (en) * 2021-10-22 2022-01-21 国网辽宁省电力有限公司抚顺供电公司 Power distribution network toughness improvement strategy based on environmental data prediction
CN115310378A (en) * 2022-07-19 2022-11-08 武汉大学 Power grid toughness evaluation and differentiation planning method under extreme typhoon disaster
CN115879833A (en) * 2023-03-02 2023-03-31 国网山东省电力公司威海供电公司 Double-layer power distribution network toughness evaluation method and system considering disaster response and recovery
CN116565842A (en) * 2023-05-06 2023-08-08 东南大学 Power distribution network toughness assessment method, system and equipment based on multi-source collaborative strategy

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113962461A (en) * 2021-10-22 2022-01-21 国网辽宁省电力有限公司抚顺供电公司 Power distribution network toughness improvement strategy based on environmental data prediction
CN115310378A (en) * 2022-07-19 2022-11-08 武汉大学 Power grid toughness evaluation and differentiation planning method under extreme typhoon disaster
CN115879833A (en) * 2023-03-02 2023-03-31 国网山东省电力公司威海供电公司 Double-layer power distribution network toughness evaluation method and system considering disaster response and recovery
CN116565842A (en) * 2023-05-06 2023-08-08 东南大学 Power distribution network toughness assessment method, system and equipment based on multi-source collaborative strategy

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"提升城市配角电网韧性的研究";孙小涵;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20200115;C042-2151 *

Also Published As

Publication number Publication date
CN117394311A (en) 2024-01-12

Similar Documents

Publication Publication Date Title
JP2021148778A (en) Failure position identification method based on transient state for ungrounded power distribution system
CN110311709B (en) Fault judgment method for electricity consumption information acquisition system
CN112698087B (en) Broadband measurement-based power system broadband oscillation online monitoring method and system
CN111525697A (en) Medium and low voltage power distribution network electricity larceny prevention method and system based on current monitoring and line topology analysis
CN100554976C (en) Area voltage stability monitoring method based on synchronous phasor measurement
CN105719094A (en) State evaluation method of power transmission equipment
CN114383652A (en) Method, system and device for identifying potential fault online risk of power distribution network
CN114720819A (en) Fault section binary positioning method based on self-checking learning
CN114154722A (en) Power distribution station management method, system and device based on digital twin technology
CN112381467A (en) Artificial intelligence line loss analysis system based on big data of distribution station district total collection
CN115860321A (en) Power distribution network power supply reliability assessment method and system, electronic equipment and medium
CN105371742A (en) Bushing tap pulse signal injection method-based transformer winding deformation detection device and method
CN117152925B (en) Big data-based power communication data processing system
CN117129791B (en) Distribution network side power quality monitoring device
CN117394311B (en) Power distribution network toughness assessment and emergency control method based on multi-source information fusion
CN203164360U (en) Transformer device insulation online monitoring system
CN112147409B (en) Online impedance detection method and device for low-voltage distribution line
CN205176158U (en) Electric capacity type current transformer on -line measuring device
CN101620250B (en) Self-adaptive monitoring method for measuring quality
CN113933747A (en) System and method for detecting grounding current of secondary circuit of voltage transformer
CN109507468B (en) Header box branch current detection method and system based on correlation characteristics
CN116150195A (en) System and method for online monitoring safety low-carbon electricity consumption of users in multiple types of parks
CN115224684A (en) Intelligent power distribution network risk state identification method and system based on immune hazard theory
Zhiwang et al. Study on power equipment condition based maintenance (CBM) technology in smart grid
CN112462195A (en) Small current fault positioning method based on fault characteristic value

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant