CN117391636A CN202311483747.2A CN202311483747A CN117391636A CN 117391636 A CN117391636 A CN 117391636A CN 202311483747 A CN202311483747 A CN 202311483747A CN 117391636 A CN117391636 A CN 117391636A
Authority
CN
China
Prior art keywords
power grid
previewing
ticket
information
simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311483747.2A
Other languages
Chinese (zh)
Inventor
区伟健
吴奇珂
徐策
程培军
曾传凯
乐庆丰
姜浩宇
蒋宗祺
周达明
张卫华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN202311483747.2A priority Critical patent/CN117391636A/en
Publication of CN117391636A publication Critical patent/CN117391636A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Power Engineering (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application relates to a power grid operation processing system, a control method, a control device and a storage medium thereof. The power grid operation processing system comprises an operation ticket generating device and an operation previewing device, wherein the operation ticket generating device and the operation previewing device are both connected with power grid equipment; the operation ticket generating device is used for acquiring the operation information of the power grid equipment and generating an operation ticket carrying an expected operation flow matched with the operation information; the operation previewing device is used for extracting an expected operation flow carried in the operation ticket, acquiring the environment data of the power grid equipment, loading the expected operation flow into a simulation environment represented by the environment data for simulation previewing, and outputting a previewing result. The system can provide secondary guarantee for the safety of the operation ticket, and can avoid potential safety hazards of power grid operation and treatment.

Description

Power grid operation processing system, control method and device thereof and storage medium
Technical Field
The present disclosure relates to the field of information technologies, and in particular, to a power grid operation processing system, a control method, a control device, and a storage medium thereof.
Background
Along with the development of the information technology field, the intellectualization of the power grid operation processing is the first to take the best charge. In the process of grid operation processing, technicians need to fill in operation tickets, and power scheduling is carried out according to the operation flow of the operation tickets, so that power safety accidents caused by misoperation are avoided.
In the traditional technology, technicians manually draw an invoice according to operation experience, and the operation ticket detection process is also manually detected, so that great potential safety hazards exist in power grid operation treatment.
Disclosure of Invention
In view of the foregoing, it is desirable to provide a power grid operation processing system, a control method, a control device, and a storage medium thereof, which can avoid potential safety hazards in power grid operation processing.
The power grid operation processing system is characterized by comprising an operation ticket generating device and an operation previewing device, wherein the operation ticket generating device and the operation previewing device are connected with power grid equipment;
the operation ticket generating device is used for acquiring the operation information of the power grid equipment and generating an operation ticket carrying an expected operation flow matched with the operation information;
the operation previewing device is used for extracting an expected operation flow carried in the operation ticket, acquiring the environment data of the power grid equipment, loading the expected operation flow into a simulation environment represented by the environment data to conduct simulation previewing, and outputting a previewing result.
In one embodiment, the power grid operation processing system further comprises an operation ticket calling device, wherein the operation ticket calling device is connected with the power grid dispatching center;
The operation ticket calling device is used for indicating the power grid dispatching center to call the operation ticket under the condition that the previewing result of the operation ticket is normal.
In one embodiment, the operation ticket calling device comprises an instruction issuing module, a scene monitoring module and a feedback module, wherein the instruction issuing module is connected with the operation previewing device and the power grid dispatching center, and the scene monitoring module is connected with the feedback module and the power grid dispatching center;
the instruction issuing module is used for acquiring the previewing result of the operation ticket and issuing an operation ticket calling instruction for the operation ticket to the power grid dispatching center under the condition that the previewing result of the operation ticket is normal; the operation ticket calling instruction is used for indicating the power grid dispatching center to call the operation ticket; the scene monitoring module is used for acquiring real-time operation data of the power grid equipment in the implementation process of the expected operation flow carried by the operation ticket; the feedback module is used for feeding back flow adjustment information aiming at the operation ticket based on the real-time operation data.
In one embodiment, the power grid operation processing system further comprises an identity verification device, and the identity verification device is connected with the power grid dispatching center;
The identity verification device is used for acquiring identity verification information sent by the power grid dispatching center and feeding back an identity verification result of the power grid dispatching center to the operation ticket calling device; the operation ticket calling device specifically instructs the power grid dispatching center to call the operation ticket when the identity verification result is that verification is passed.
In one embodiment, the operation ticket generating device comprises an operation data acquiring module and an operation ticket generating module, wherein the operation data acquiring module is connected with the power grid equipment and the operation ticket generating module;
the operation data acquisition module is used for acquiring operation information of the power grid equipment; the operation information comprises state information, operation demand information and safety limit information of the power grid equipment; the operation ticket generation module is used for inputting the state information, the operation requirement information and the safety limit information into a deep learning model to obtain an expected operation flow matched with the operation information, and generating an operation ticket carrying the expected operation flow.
In one embodiment, the operation previewing device comprises an information extraction module, an information verification module and an operation previewing module; the information extraction module is connected with the operation ticket generation device and the information verification module, and the operation previewing module is connected with the power grid equipment;
The information extraction module is used for acquiring the operation ticket generated by the operation ticket generating device and extracting the operation information carried in the operation ticket; the operation information comprises operator information, operation equipment information and expected operation flow; the information verification module is used for carrying out information verification on the operation information to obtain a verification result; and the operation previewing module is used for acquiring the environment data of the power grid equipment under the condition that the verification result is that the verification is passed, loading the expected operation flow into a simulation environment corresponding to the environment data to perform simulation previewing, and outputting a previewing result.
In one embodiment, the operation previewing module comprises a simulation previewing unit and a previewing result analysis unit, wherein the simulation previewing unit and the previewing result analysis unit are both connected with the power grid equipment;
the simulation previewing unit is used for acquiring the environment data of the power grid equipment and loading the expected operation flow into a simulation environment corresponding to the environment data for simulation previewing when the verification result is that the verification is passed; the previewing result analysis unit is used for obtaining a simulation operation flow and a simulation operation result in the simulation previewing process and determining the previewing result of the operation ticket by combining the simulation operation flow and the simulation operation result.
In one embodiment, the previewing result analysis unit is specifically configured to: when the simulation operation flow is consistent with the expected operation flow and the simulation operation result is fault-free, determining that the previewing result of the operation ticket is normal; and determining that the previewing result of the operation ticket is abnormal under the condition that the simulation operation flow is inconsistent with the expected operation flow or the simulation operation result is that a fault exists.
A power grid operation processing method, comprising: acquiring operation information of power grid equipment, and determining an expected operation flow matched with the operation information; generating an operation ticket carrying the expected operation flow; acquiring environment data of the power grid equipment, and constructing a simulation environment represented by the environment data; and loading the expected operation flow into the simulation environment to perform simulation previewing, and outputting a previewing result.
In one embodiment, the power grid operation processing method further includes: under the condition that the previewing result of the operation ticket is normal, issuing an operation ticket calling instruction aiming at the operation ticket to a power grid dispatching center; the operation ticket calling instruction is used for indicating the power grid dispatching center to call the operation ticket; acquiring real-time operation data of the power grid equipment in the implementation process of the expected operation flow carried by the operation ticket; and feeding back flow adjustment information for the operation ticket based on the real-time operation data.
According to the power grid operation processing system, the control method, the control device and the storage medium, the operation ticket generating device and the operation previewing device are configured, the operation ticket generating device is used for acquiring the operation information of the power grid equipment and generating the operation ticket carrying the expected operation flow matched with the operation information, the accuracy of operation ticket generation is greatly improved, the operation previewing device is used for extracting the expected operation flow carried in the operation ticket, acquiring the environment data of the power grid equipment, loading the expected operation flow into the simulation environment represented by the environment data for simulation previewing, outputting the previewing result, providing secondary guarantee for the safety of the operation ticket, and avoiding the potential safety hazards of power grid operation processing.
Drawings
In order to more clearly illustrate the technical solutions of embodiments or conventional techniques of the present application, the drawings required for the descriptions of the embodiments or conventional techniques will be briefly described below, and it is apparent that the drawings in the following description are only some embodiments of the present application, and other drawings may be obtained according to these drawings without inventive effort for a person of ordinary skill in the art.
FIG. 1 is a schematic diagram of a grid operation processing system in one embodiment;
FIG. 2 is a schematic diagram of a power grid operation processing device in one embodiment;
FIG. 3 is a schematic diagram of a power grid operation processing device according to another embodiment;
FIG. 4 is a schematic diagram of a power grid operation processing device according to another embodiment;
FIG. 5 is a schematic diagram of a power grid operation processing module in one embodiment;
FIG. 6 is a flow chart of a method of grid operation processing in one embodiment;
fig. 7 is an internal structural diagram of a computer device in one embodiment.
Detailed Description
In order to facilitate an understanding of the present application, a more complete description of the present application will now be provided with reference to the relevant figures. Examples of the present application are given in the accompanying drawings. This application may, however, be embodied in many different forms and is not limited to the embodiments described herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. The terminology used herein in the description of the application is for the purpose of describing particular embodiments only and is not intended to be limiting of the application.
It will be understood that when an element is referred to as being "connected" to another element, it can be directly connected to the other element or be connected to the other element through intervening elements. Further, "connection" in the following embodiments should be understood as "electrical connection", "communication connection", and the like if there is transmission of electrical signals or data between objects to be connected.
As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms "comprises" and/or "comprising," and/or the like, specify the presence of stated features, integers, steps, operations, elements, components, or groups thereof, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, or groups thereof. Also, the term "and/or" as used in this specification includes any and all combinations of the associated listed items.
As described in the background art, the potential safety hazard problem exists in the operation and processing process of the power grid in the prior art, and the inventor researches and discovers that the problem occurs because the billing process in the operation and processing process of the power grid is manually billed by a technician according to the operation experience, and the operation ticket detection process is also manually detected.
Based on the above reasons, the invention provides a power grid operation processing scheme capable of avoiding potential safety hazards of power grid operation processing.
In one embodiment, as shown in fig. 1, there is provided a power grid operation processing system, including an operation ticket generating apparatus 100 and an operation previewing apparatus 200, where the operation ticket generating apparatus 100 and the operation previewing apparatus 200 are connected to a power grid device. The operation ticket generating device 100 is used for acquiring operation information of the power grid equipment and generating an operation ticket carrying an expected operation flow matched with the operation information; the operation previewing device 200 is configured to extract an expected operation flow carried in an operation ticket, obtain environmental data of the power grid device, load the expected operation flow into a simulation environment represented by the environmental data to perform simulation previewing, and output a previewing result.
The power grid equipment mainly comprises two major types of power generation equipment and power supply equipment, wherein the power generation equipment mainly comprises a power station boiler, a steam turbine, a gas turbine, a water turbine, a generator, a transformer and the like, and the power supply equipment mainly comprises power transmission lines, transformers, contactors and the like with various voltage levels. The operational information may include status information, operational demand information, and safety limit information for the grid device. The desired operation flow refers to an operation flow matching the operation information under an ideal operation environment. The environmental data of the grid device may include power parameters and device parameters of the grid device. The previewing results may include normal and abnormal. The operation ticket refers to written basis for power dispatching in a power grid system, comprises a dispatching instruction ticket and a power transformation operation ticket, and can be used for preventing false pulling, false closing, on-load pulling, closing an isolating switch, on-load closing, ground wire closing and the like in the power dispatching process. In a specific embodiment, the specific contents and forms of the operation ticket are shown in table 1.
Table 1 operation ticket sample
Specifically, the operation ticket generating apparatus 100 matches a corresponding expected operation flow according to the operation information after obtaining the operation information of the power grid device, and generates an operation ticket carrying the expected operation flow matched with the operation information. In a specific embodiment, the operation ticket generating apparatus 100 may acquire operation information of the power grid device, input the operation information into the deep learning model, obtain a desired operation procedure matched with the operation information, and generate an operation ticket carrying the desired operation procedure. In another specific embodiment, the operation ticket generating apparatus 100 may be connected to a monitoring apparatus that monitors the power grid device, obtain operation information of the power grid device from the monitoring apparatus, match a corresponding desired operation procedure according to the operation information, and generate an operation ticket carrying the desired operation procedure matched with the operation information.
After the operation ticket generating apparatus 100 obtains the operation information of the power grid device and generates the operation ticket carrying the expected operation flow matched with the operation information, the operation previewing apparatus 200 may extract the expected operation flow carried in the operation ticket, obtain the environmental data of the power grid device, construct the simulation environment of the power grid device based on the environmental data, load the expected operation flow into the simulation environment to perform simulation previewing, implement virtual copy of the operation ticket executing process, and output the previewing result.
In the present embodiment, the grid operation processing system includes an operation ticket generating apparatus 100 and an operation previewing apparatus 200. The operation ticket generating device 100 is used for acquiring the operation information of the power grid equipment, generating an operation ticket carrying an expected operation flow matched with the operation information, greatly improving the accuracy of operation ticket generation, the operation previewing device 200 is used for extracting the expected operation flow carried in the operation ticket, acquiring the environment data of the power grid equipment, loading the expected operation flow into a simulation environment represented by the environment data for simulation previewing, outputting a previewing result, providing secondary guarantee for the safety of the operation ticket, and avoiding potential safety hazards of power grid operation processing.
In one embodiment, as shown in fig. 1, the power grid operation processing system further includes an operation ticket calling device 300, where the operation ticket calling device 300 is connected to the power grid dispatching center and is used for instructing the power grid dispatching center to call the operation ticket when the previewing result of the operation ticket is normal.
The power grid dispatching center performs production command of power grid equipment, is responsible for safe operation of a power grid line of a power grid, and manages according to a specified power generation and utilization plan and a monitoring principle.
Specifically, in the case where the result of the previewing of the operation ticket is normal, the operation ticket calling device 300 may instruct the power grid dispatching center to call the operation ticket, that is, if the result of the previewing of the operation ticket is abnormal, the operation ticket calling device 300 may not instruct the power grid dispatching center to call the operation ticket.
In this embodiment, the power grid operation processing system further includes an operation ticket calling device 300, where the operation ticket calling device 300 is connected to the power grid dispatching center and is configured to instruct the power grid dispatching center to call the operation ticket under the condition that the previewing result of the operation ticket is normal, so that the security of the operation ticket calling process can be ensured, and the security level of the power grid operation processing system is further improved.
In one embodiment, as shown in FIG. 2, the ticket invoking apparatus 300 includes an instruction issuing module 310, a scene monitoring module 320, and a feedback module 330. The instruction issuing module 310 is connected with the operation previewing device 200 and the power grid dispatching center, and the scene monitoring module 320 is connected with the feedback module 330 and the power grid dispatching center. The instruction issuing module 310 is configured to obtain a previewing result of the operation ticket, and issue an operation ticket calling instruction for the operation ticket to the power grid dispatching center under a condition that the previewing result of the operation ticket is normal. The scene monitoring module 320 is configured to obtain real-time operation data of the power grid device during the implementation process of the expected operation flow carried by the operation ticket. And the feedback module 330 is configured to feedback flow adjustment information for the operation ticket based on the real-time operation data.
The operation ticket calling instruction is used for instructing the power grid dispatching center to call an operation ticket, for example, in the case that power dispatching is required, the instruction issuing module 310 may issue an operation ticket calling instruction to instruct the power grid dispatching center to call the operation ticket. The real-time operational data of the grid device may include real-time power parameters during operation of the grid device. The flow adjustment information is adjustment information indicating an operation flow of the operation ticket, and for example, the flow adjustment information may include voice prompt information or text information.
Specifically, the instruction issuing module 310 may obtain the previewing result of the operation ticket from the operation previewing device 200, and issue an operation ticket calling instruction for the operation ticket to the power grid dispatching center under the condition that the previewing result of the operation ticket is normal, that is, not issue the operation ticket calling instruction for the operation ticket to the power grid dispatching center under the condition that the previewing result of the operation ticket is abnormal. Further, the process of the instruction issuing module 310 obtaining the previewing result of the operation ticket from the operation previewing device 200 may be that the instruction issuing module 310 actively sends the receiving request, or that the instruction issuing module 310 passively receives the previewing result of the operation ticket.
In the implementation process of the expected operation flow carried by the operation ticket, the scene monitoring module 320 may acquire real-time operation data of the power grid device, so as to acquire the actual condition of the power grid in the process of carrying out the expected operation flow.
The feedback module 330 may feedback flow adjustment information for the operation ticket based on the real-time operation data acquired by the scene monitoring module 320. In a specific embodiment, the feedback module 330 may determine the grid operation condition based on the real-time operation data, and feedback the flow adjustment information for the operation ticket when the grid operation condition is wrong or the operation result deviates from the standard result. For example, camera monitoring may be installed on site, the data of the camera monitoring being connected to the grid dispatching center via network communication, and the feedback module 330 being able to alert and prompt the operator to correct by voice when the operator performs a wrong operation step or operates an incompatible device.
In this embodiment, the operation ticket calling device includes an instruction issuing module, a scene monitoring module and a feedback module, where the modules function respectively and are mutually linked, so that a previewing result of the operation ticket can be obtained, and an operation ticket calling instruction for the operation ticket is issued to the power grid dispatching center under the condition that the previewing result of the operation ticket is normal, real-time operation data of the power grid equipment is obtained in the implementation process of the expected operation flow carried by the operation ticket, and flow adjustment information for the operation ticket is fed back based on the real-time operation data, so that safety and accuracy of the operation ticket calling process are ensured, and potential safety hazards in the operation ticket calling process are avoided.
In one embodiment, as shown in fig. 1, the power grid operation processing system further includes an identity verification device 400, where the identity verification device 400 is connected to the power grid dispatching center. The identity verification device 400 is configured to obtain identity verification information sent by the power grid dispatching center, and feed back an identity verification result of the power grid dispatching center to the operation ticket calling device 300. The operation ticket calling device 300 instructs the power grid dispatching center to call the operation ticket specifically when the identity verification result is that verification is passed.
The identity verification information may include an identity code, an identity verification password, and the like. In the case that the identity verification information is an identity code, the identity verification device 400 may acquire the identity code transmitted by the power grid dispatching center due to the uniqueness of the identity code, and identify the identity of the sender according to the identity code; in the case that the identity verification information is an identity verification password, the identity verification device 400 may acquire the identity verification password sent by the power grid dispatching center, and determine the correctness of the identity verification password.
Specifically, the identity verification device 400 obtains identity verification information sent by the power grid dispatching center, and in the case that the identity verification information is an identity identification code, the identity verification device 400 can obtain the identity identification code sent by the power grid dispatching center due to the uniqueness of the identity identification code, identify the identity of a sender according to the identity identification code, and when the identity of the sender belongs to the identity capable of calling the operation ticket, the identity verification result is that verification is passed, and the operation ticket calling device 300 can instruct the power grid dispatching center to call the operation ticket; in the case that the identity verification information is an identity verification password, the identity verification device 400 may acquire the identity verification password sent by the power grid dispatching center, determine the correctness of the identity verification password, and if the identity verification password is correct, the identity verification result is that the verification is passed, and the operation ticket calling device 300 may instruct the power grid dispatching center to call the operation ticket.
In this embodiment, the identity verification device may obtain identity verification information sent by the power grid dispatching center, and feed back an identity verification result of the power grid dispatching center to the operation ticket calling device, where the operation ticket calling device instructs the power grid dispatching center to call the operation ticket specifically when the identity verification result is verification passing, thereby improving security of the power dispatching process.
In one embodiment, as shown in fig. 3, the operation ticket generating apparatus 100 includes an operation data acquisition module 110 and an operation ticket generating module 120, and the operation data acquisition module 110 connects the power grid device and the operation ticket generating module 120. The operation data acquisition module 110 is used for acquiring operation information of the power grid equipment; the operation information comprises state information, operation demand information and safety limit information of the power grid equipment; the operation ticket generation module 120 is configured to input the state information, the operation requirement information, and the security restriction information into the deep learning model, obtain a desired operation flow matched with the operation information, and generate an operation ticket carrying the desired operation flow.
The state information of the power grid equipment can comprise an operation state, a hot standby state, a cold standby state and an overhaul state of the power grid equipment; the operating demand information of the power grid device may include operating steps and device parameters of the power grid; the safety limit information of the grid device may comprise a parameter threshold of the grid device.
Specifically, the operation data obtaining module 110 may obtain operation information including status information, operation requirement information, and safety limitation information of the power grid device, and then the operation ticket generating module 120 inputs the status information, the operation requirement information, and the safety limitation information into the deep learning model to obtain a desired operation flow matched with the operation information, and generates an operation ticket carrying the desired operation flow.
In a specific embodiment, the operation data acquisition module 110 may collect and sort relevant data of the scheduled operation ticket, including operation steps, equipment information, safety requirements, and the like, and the data are input as a model, then the operation ticket generation module 120 performs preprocessing on the data, including word segmentation, stop word removal, word drying, and the like, converts text data into a vector representation that can be understood by a machine, uses an attention mechanism algorithm to construct a text generation model, the algorithm considers multiple factors such as equipment states, operation steps, safety regulations, and the like, the model adopts a model from a sequence to a sequence (Sequence to Sequence) based on a cyclic neural network (Recurrent Neural Network, RNN), an attention mechanism is introduced to enhance the expression capability of the model, the attention mechanism can help the model to automatically focus on a key part in input data, then the model is trained by using the preprocessed data, in the training process, the model can optimize model parameters according to a given input sequence and a target output sequence, so that the model can generate an operation ticket meeting requirements, and then a training set or test set can perform training process on a good training model, the model can include generating an accurate model, evaluating the operation ticket and the model meeting requirements according to the input requirements, and the training rule can further evaluate the input ticket can generate the operation ticket according to the training requirements, and the training parameters can meet the training requirements, and the training requirements.
In the embodiment, the process of generating the operation ticket is realized through a deep learning model, so that the error rate of generating the operation ticket is greatly reduced.
In one embodiment, as shown in fig. 4, the operation previewing apparatus 200 includes an information extraction module 210, an information verification module 220, and an operation previewing module 230; the information extraction module 210 is connected with the operation ticket generation device and the information verification module 220, and the operation previewing module 230 is connected with the power grid equipment; the information extraction module 210 is configured to obtain an operation ticket generated by the operation ticket generating device, and extract operation information carried in the operation ticket; the information verification module 220 is configured to perform information verification on the operation information to obtain a verification result; the operation pre-modeling module 230 is configured to obtain environmental data of the power grid device when the verification result is that the verification is passed, load the expected operation flow into a simulation environment corresponding to the environmental data to perform simulation pre-modeling, and output a pre-modeling result.
The operation information may include operator information, operation device information, and a desired operation flow, among others.
Specifically, the information verification refers to analysis of operation information, and verification of correctness of operators and operation steps and compliance of operation equipment. Specifically, the information extraction module 210 may acquire the operation ticket generated by the operation ticket generating apparatus, extract the operation information carried in the operation ticket, and send the operation information to the information verification module 220. The information verification module 220 may analyze the operation information, and verify correctness of the operator and the operation step and compliance of the operation device, and if the operator and the operation step are correct and the operation device is compliant, the verification result is that the operation information passes, otherwise, the operation information does not pass. The operation pre-modeling module 230 may obtain environmental data of the power grid device when the verification result is that the verification is passed, construct a corresponding simulation environment based on the environmental data, load an expected operation flow into the simulation environment to perform simulation pre-modeling, and output a pre-modeling result according to the simulation pre-modeling process. For example, the operation pre-modeling module 230 may construct a virtual environment similar to the local real grid environment through a virtual reality technology, load the expected operation flow corresponding to the generated operation ticket into the virtual environment, automatically perform related operations, determine whether an error occurs in a step operated in the virtual environment or whether a fault occurs after performing a certain operation through simulation pre-modeling, output a pre-modeling result, and generate a process report.
In the embodiment, the accuracy of the operation ticket and the safety of the operation process are effectively ensured through the information verification of the operation ticket and the double anti-misoperation verification of the simulation preview of the operation ticket corresponding to the expected operation flow.
In one embodiment, as shown in fig. 5, the operation pre-modeling module 230 includes a simulation pre-modeling unit 231 and a pre-modeling result analysis unit 232, and the simulation pre-modeling unit 232 and the pre-modeling result analysis unit 232 are connected to the power grid device. The simulation previewing unit 231 is configured to obtain environmental data of the power grid device when the verification result is that the verification is passed, and load the expected operation flow into a simulation environment corresponding to the environmental data to perform simulation previewing; the previewing result analysis unit 232 is configured to obtain a simulation operation flow and a simulation operation result in the simulation previewing process, and determine a previewing result of the operation ticket by combining the simulation operation flow and the simulation operation result.
Specifically, the simulation previewing unit 231 may acquire the environmental data of the power grid device when the verification result is that the verification is passed, construct a corresponding simulation environment based on the environmental data, load the expected operation flow into the simulation environment to perform simulation previewing, and output the previewing result according to the simulation previewing process. The previewing result analysis unit 232 may obtain a simulation operation flow and a simulation operation result in the simulation previewing process, and determine the previewing result of the operation ticket according to the consistency of the simulation operation flow and the correctness of the simulation operation result.
In the embodiment, the expected operation flow is loaded into the simulation environment corresponding to the environment data to perform simulation previewing, and the previewing result of the operation ticket is determined by combining the simulation operation flow and the simulation operation result in the simulation previewing process, so that the application scene of the operation ticket in the real environment is re-carved, and the safety of the operation process of the operation ticket is ensured.
In one embodiment, the previewing result analysis unit 232 is specifically configured to: when the simulation operation flow is consistent with the expected operation flow and the simulation operation result is fault-free, determining that the previewing result of the operation ticket is normal; and determining that the previewing result of the operation ticket is abnormal under the condition that the simulation operation flow is inconsistent with the expected operation flow or the simulation operation result is that a fault exists.
The simulation operation result is a corresponding simulation operation result after the simulation operation flow is completed.
Specifically, the replay result analysis unit 232 may compare the simulated operation flow with the expected operation flow, and determine that no error occurs in the simulated operation flow when the simulated operation flow is consistent with the expected operation flow and the simulated operation result is failure-free, so as to determine that the replay result of the operation ticket is normal; and determining that the previewing result of the operation ticket is abnormal under the condition that the simulation operation flow is inconsistent with the expected operation flow or the simulation operation result is that a fault exists.
In this embodiment, according to the result of comparing the simulated operation flow and the expected operation flow, the previewing result of the operation ticket is determined, so that the operation process security of the operation ticket can be improved.
In one embodiment, the simulation environment performs simulation previewing according to the operation steps on the operation ticket in table 1, each operation step records whether a fault or abnormal situation occurs, for example, a large-area power failure occurs when step 7 in the operation steps in table 1 is performed, or a circuit has a fault situation such as a short circuit, etc., the simulation environment determines that the previewing result is not passed, and meanwhile generates a report, and a technician can check the report to know which step has a problem, so as to analyze and change the operation steps. If no fault or abnormal condition occurs in the replay process, the simulation environment judges that the replay result is passed.
Based on the same inventive concept, the embodiment of the application also provides a power grid operation processing method for being realized based on the power grid operation processing system. The implementation of the solution to the problem provided by the method is similar to that described in the above system, so the specific limitation in one or more embodiments of the power grid operation processing method provided below may be referred to the limitation of the power grid operation processing system hereinabove, and will not be described herein.
In one embodiment, as shown in fig. 6, there is provided a power grid operation processing method, which includes:
step S602, operation information of power grid equipment is obtained, and an expected operation flow matched with the operation information is determined;
step S604, generating an operation ticket carrying a desired operation flow;
step S606, obtaining environment data of power grid equipment, and constructing a simulation environment represented by the environment data;
step S608, loading the expected operation flow into a simulation environment to perform simulation previewing, and outputting a previewing result.
According to the power grid operation processing method, the operation information of the power grid equipment is obtained, and the operation ticket carrying the expected operation flow matched with the operation information is generated, so that the accuracy of the generation of the operation ticket is greatly improved; the expected operation flow carried in the operation ticket is extracted, the environment data of the power grid equipment is obtained, the expected operation flow is loaded into a simulation environment represented by the environment data to conduct simulation previewing, a previewing result is output, secondary guarantee is provided for the safety of the operation ticket, and potential safety hazards of power grid operation processing are avoided.
In one embodiment, the grid operation processing method further includes: under the condition that the previewing result of the operation ticket is normal, issuing an operation ticket calling instruction aiming at the operation ticket to a power grid dispatching center; the operation ticket calling instruction is used for indicating the power grid dispatching center to call the operation ticket; acquiring real-time operation data of power grid equipment in the implementation process of an expected operation flow carried by an operation ticket; based on the real-time operation data, flow adjustment information for the operation ticket is fed back.
In this embodiment, in the implementation process of the expected operation flow carried by the operation ticket, the real-time operation data of the power grid device is obtained, and the flow adjustment information for the operation ticket is fed back based on the real-time operation data, so that the security and accuracy of the operation ticket calling process are ensured, and the potential safety hazard in the operation ticket calling process is avoided.
In one embodiment, the grid operation processing method further includes: acquiring identity verification information sent by a power grid dispatching center, and feeding back an identity verification result of the power grid dispatching center to an operation ticket calling device; the operation ticket calling device specifically instructs the power grid dispatching center to call the operation ticket when the identity verification result is that verification is passed.
In one embodiment, obtaining operation information of the power grid device and generating an operation ticket carrying a desired operation flow matched with the operation information includes: acquiring operation information of power grid equipment; the operation information comprises state information, operation demand information and safety limit information of the power grid equipment; and inputting the state information, the operation requirement information and the safety limit information into a deep learning model to obtain an expected operation flow matched with the operation information, and generating an operation ticket carrying the expected operation flow.
In one embodiment, extracting an expected operation flow carried in an operation ticket, acquiring environment data of power grid equipment, loading the expected operation flow into a simulation environment represented by the environment data to perform simulation previewing, and outputting a previewing result, wherein the method comprises the following steps: acquiring an operation ticket generated by an operation ticket generating device, and extracting operation information carried in the operation ticket; the operation information comprises operator information, operation equipment information and expected operation flow; performing information verification on the operation information to obtain a verification result; and under the condition that the verification result is that the verification is passed, acquiring the environment data of the power grid equipment, loading the expected operation flow into a simulation environment corresponding to the environment data to perform simulation previewing, and outputting a previewing result.
In one embodiment, when the verification result is that the verification is passed, acquiring environmental data of the power grid device, loading an expected operation flow into a simulation environment corresponding to the environmental data to perform simulation previewing, and outputting a previewing result, where the method includes: under the condition that the verification result is that the verification is passed, environment data of the power grid equipment are obtained, and an expected operation flow is loaded into a simulation environment corresponding to the environment data for simulation previewing; obtaining a simulation operation flow and a simulation operation result in the simulation previewing process, and determining the previewing result of the operation ticket by combining the simulation operation flow and the simulation operation result.
In one embodiment, obtaining a simulation operation flow and a simulation operation result in a simulation replay process, and determining a replay result of an operation ticket by combining the simulation operation flow and the simulation operation result includes: when the simulation operation flow is consistent with the expected operation flow and the simulation operation result is fault-free, determining that the previewing result of the operation ticket is normal; and determining that the previewing result of the operation ticket is abnormal under the condition that the simulation operation flow is inconsistent with the expected operation flow or the simulation operation result is that a fault exists.
It should be understood that, although the steps in the flowcharts related to the embodiments described above are sequentially shown as indicated by arrows, these steps are not necessarily sequentially performed in the order indicated by the arrows. The steps are not strictly limited to the order of execution unless explicitly recited herein, and the steps may be executed in other orders. Moreover, at least some of the steps in the flowcharts described in the above embodiments may include a plurality of steps or a plurality of stages, which are not necessarily performed at the same time, but may be performed at different times, and the order of the steps or stages is not necessarily performed sequentially, but may be performed alternately or alternately with at least some of the other steps or stages.
In one embodiment, a computer device is provided, which may be a terminal, and the internal structure of which may be as shown in fig. 7. The computer device includes a processor, a memory, an input/output interface, a communication interface, a display unit, and an input means. The processor, the memory and the input/output interface are connected through a system bus, and the communication interface, the display unit and the input device are connected to the system bus through the input/output interface. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and computer programs in the non-volatile storage media. The input/output interface of the computer device is used to exchange information between the processor and the external device. The communication interface of the computer device is used for carrying out wired or wireless communication with an external terminal, and the wireless mode can be realized through WIFI, a mobile cellular network, NFC (near field communication) or other technologies. The computer program is executed by a processor to implement a grid operation processing method. The display unit of the computer equipment is used for forming a visual picture, and can be a display screen, a projection device or a virtual reality imaging device, wherein the display screen can be a liquid crystal display screen or an electronic ink display screen, the input device of the computer equipment can be a touch layer covered on the display screen, can also be a key, a track ball or a touch pad arranged on a shell of the computer equipment, and can also be an external keyboard, a touch pad or a mouse and the like.
It will be appreciated by those skilled in the art that the structure shown in fig. 7 is merely a block diagram of some of the structures associated with the present application and is not limiting of the computer device to which the present application may be applied, and that a particular computer device may include more or fewer components than shown, or may combine certain components, or have a different arrangement of components.
In an embodiment, there is also provided a computer device comprising a memory and a processor, the memory having stored therein a computer program, the processor implementing the steps of the method embodiments described above when the computer program is executed.
In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored which, when executed by a processor, carries out the steps of the method embodiments described above.
In an embodiment, a computer program product is provided, comprising a computer program which, when executed by a processor, implements the steps of the method embodiments described above.
The technical features of the above-described embodiments may be arbitrarily combined, and all possible combinations of the technical features in the above-described embodiments are not described for brevity of description, however, as long as there is no contradiction between the combinations of the technical features, they should be considered as the scope of the description.
The above examples merely represent a few embodiments of the present application, which are described in more detail and are not to be construed as limiting the scope of the invention. It should be noted that it would be apparent to those skilled in the art that various modifications and improvements could be made without departing from the spirit of the present application, which would be within the scope of the present application. Accordingly, the scope of protection of the present application is to be determined by the claims appended hereto.

Claims (10)

1. The power grid operation processing system is characterized by comprising an operation ticket generating device and an operation previewing device, wherein the operation ticket generating device and the operation previewing device are connected with power grid equipment;
the operation ticket generating device is used for acquiring the operation information of the power grid equipment and generating an operation ticket carrying an expected operation flow matched with the operation information;
the operation previewing device is used for extracting an expected operation flow carried in the operation ticket, acquiring the environment data of the power grid equipment, loading the expected operation flow into a simulation environment represented by the environment data to conduct simulation previewing, and outputting a previewing result.
2. The grid operation processing system according to claim 1, further comprising an operation ticket calling device connected to a grid dispatching center;
The operation ticket calling device is used for indicating the power grid dispatching center to call the operation ticket under the condition that the previewing result of the operation ticket is normal.
3. The power grid operation processing system according to claim 2, wherein the operation ticket calling device comprises an instruction issuing module, a scene monitoring module and a feedback module, the instruction issuing module is connected with the operation previewing device and the power grid dispatching center, and the scene monitoring module is connected with the feedback module and the power grid dispatching center;
the instruction issuing module is used for acquiring the previewing result of the operation ticket and issuing an operation ticket calling instruction for the operation ticket to the power grid dispatching center under the condition that the previewing result of the operation ticket is normal; the operation ticket calling instruction is used for indicating the power grid dispatching center to call the operation ticket;
the scene monitoring module is used for acquiring real-time operation data of the power grid equipment in the implementation process of the expected operation flow carried by the operation ticket;
the feedback module is used for feeding back flow adjustment information aiming at the operation ticket based on the real-time operation data.
4. The grid operation processing system of claim 2, further comprising an identity verification device connected to the grid dispatching center;
the identity verification device is used for acquiring identity verification information sent by the power grid dispatching center and feeding back an identity verification result of the power grid dispatching center to the operation ticket calling device;
the operation ticket calling device specifically instructs the power grid dispatching center to call the operation ticket when the identity verification result is that verification is passed.
5. The grid operation processing system according to claim 1, wherein the operation ticket generating means includes an operation data acquiring module and an operation ticket generating module, the operation data acquiring module connecting the grid device and the operation ticket generating module;
the operation data acquisition module is used for acquiring operation information of the power grid equipment; the operation information comprises state information, operation demand information and safety limit information of the power grid equipment;
the operation ticket generation module is used for inputting the state information, the operation requirement information and the safety limit information into a deep learning model to obtain an expected operation flow matched with the operation information, and generating an operation ticket carrying the expected operation flow.
6. The grid operation processing system according to claim 1, wherein the operation previewing means comprises an information extraction module, an information verification module and an operation previewing module; the information extraction module is connected with the operation ticket generation device and the information verification module, and the operation previewing module is connected with the power grid equipment;
the information extraction module is used for acquiring the operation ticket generated by the operation ticket generating device and extracting the operation information carried in the operation ticket; the operation information comprises operator information, operation equipment information and expected operation flow;
the information verification module is used for carrying out information verification on the operation information to obtain a verification result;
and the operation previewing module is used for acquiring the environment data of the power grid equipment under the condition that the verification result is that the verification is passed, loading the expected operation flow into a simulation environment corresponding to the environment data to perform simulation previewing, and outputting a previewing result.
7. The power grid operation processing system according to claim 6, wherein the operation previewing module comprises a simulation previewing unit and a previewing result analyzing unit, and the simulation previewing unit and the previewing result analyzing unit are connected with the power grid equipment;
The simulation previewing unit is used for acquiring the environment data of the power grid equipment and loading the expected operation flow into a simulation environment corresponding to the environment data for simulation previewing when the verification result is that the verification is passed;
the previewing result analysis unit is used for obtaining a simulation operation flow and a simulation operation result in the simulation previewing process and determining the previewing result of the operation ticket by combining the simulation operation flow and the simulation operation result.
8. The grid operation processing system according to claim 7, wherein the previewing result analysis unit is specifically configured to:
when the simulation operation flow is consistent with the expected operation flow and the simulation operation result is fault-free, determining that the previewing result of the operation ticket is normal;
and determining that the previewing result of the operation ticket is abnormal under the condition that the simulation operation flow is inconsistent with the expected operation flow or the simulation operation result is that a fault exists.
9. A power grid operation processing method, characterized in that it is implemented based on the power grid operation processing system according to any one of claims 1 to 8, the power grid operation processing method comprising:
Acquiring operation information of power grid equipment, and determining an expected operation flow matched with the operation information;
generating an operation ticket carrying the expected operation flow;
acquiring environment data of the power grid equipment, and constructing a simulation environment represented by the environment data;
and loading the expected operation flow into the simulation environment to perform simulation previewing, and outputting a previewing result.
10. The power grid operation processing method according to claim 9, characterized in that the power grid operation processing method further comprises:
under the condition that the previewing result of the operation ticket is normal, issuing an operation ticket calling instruction aiming at the operation ticket to a power grid dispatching center; the operation ticket calling instruction is used for indicating the power grid dispatching center to call the operation ticket;
acquiring real-time operation data of the power grid equipment in the implementation process of the expected operation flow carried by the operation ticket;
and feeding back flow adjustment information for the operation ticket based on the real-time operation data.
CN202311483747.2A 2023-11-09 2023-11-09 Power grid operation processing system, control method and device thereof and storage medium Pending CN117391636A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311483747.2A CN117391636A (en) 2023-11-09 2023-11-09 Power grid operation processing system, control method and device thereof and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311483747.2A CN117391636A (en) 2023-11-09 2023-11-09 Power grid operation processing system, control method and device thereof and storage medium

Publications (1)

Publication Number Publication Date
CN117391636A true CN117391636A (en) 2024-01-12

Family

ID=89440771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311483747.2A Pending CN117391636A (en) 2023-11-09 2023-11-09 Power grid operation processing system, control method and device thereof and storage medium

Country Status (1)

Country Link
CN (1) CN117391636A (en)

Similar Documents

Publication Publication Date Title
CN103389705B (en) Operation supervise and control system and operation supervise and control method
CN109191082A (en) A kind of method for programming of dispatching platform, system and computer readable storage medium
CN106991483B (en) A kind of implementation for examining detection applied to special equipment
CN101789160B (en) Spacing false-entering prevention system for intelligent video transformer substation
CN107018523A (en) WIFI module method of testing and device
CN108776278B (en) Topological-associated configuration type relay protection test system and method
CN103390319A (en) Bank bill automatic processor and application method thereof
CN112990870A (en) Patrol file generation method and device based on nuclear power equipment and computer equipment
CN107608291A (en) A kind of intelligent substation application function linkage rule verification method and system
CN107907773A (en) A kind of assembly line detecting system for site protective relaying device
CN112102527A (en) Power grid equipment operation method and device, computer equipment and storage medium
CN109784502A (en) Site examining and repairing processing method and system based on faulty equipment
CN109655732A (en) Nuclear power plant reactor protects system plate test method, platform, device and terminal
CN111106671A (en) Five-prevention management control method and system for transformer substation coded lock
CN112367680A (en) External communication test method and device based on intelligent electric meter and computer equipment
CN114661535A (en) Operation and maintenance management method and device for Internet of things equipment, electronic equipment and storage medium
CN106532931A (en) Intelligent batch point-to-point method for power system dispatching master and slave stations
CN112054599A (en) System and method for safety management of wind power plant
CN117294531B (en) Ultrasonic metering instrument operation management method, device and equipment based on Internet of things
CN107170218A (en) A kind of remote assistance method debugged for fire protection alarm system and system
CN110361609A (en) Extra-high voltage equipment monitors system and method
CN109103985A (en) The method and apparatus for controlling the execution of operation order
CN106612215A (en) Integrated remote detection device and method based on Ethernet
CN102967839A (en) Detection method and device for online monitoring communication system of transformer substation
CN108492660A (en) Substation's peace arranges analogy method, device and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination