CN117188666A - Flexible connection structure of prefabricated part and building main body and construction method thereof - Google Patents

Flexible connection structure of prefabricated part and building main body and construction method thereof Download PDF

Info

Publication number
CN117188666A
CN117188666A CN202311197803.6A CN202311197803A CN117188666A CN 117188666 A CN117188666 A CN 117188666A CN 202311197803 A CN202311197803 A CN 202311197803A CN 117188666 A CN117188666 A CN 117188666A
Authority
CN
China
Prior art keywords
prefabricated
buffer
fixedly connected
plate
building main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311197803.6A
Other languages
Chinese (zh)
Inventor
邓强
贾飞飞
刘建凯
胡茂林
王亮
张海军
李寅寅
夏宇轩
孙艺恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Second Navigation Engineering Co ltd
Original Assignee
Cccc Second Navigation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc Second Navigation Engineering Co ltd filed Critical Cccc Second Navigation Engineering Co ltd
Priority to CN202311197803.6A priority Critical patent/CN117188666A/en
Publication of CN117188666A publication Critical patent/CN117188666A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a flexible connection structure of a prefabricated part and a building main body and a construction method thereof, the flexible connection structure comprises a prefabricated curtain wall, one side of the prefabricated curtain wall is fixedly connected with a mounting plate, a mounting mechanism is arranged between the prefabricated curtain wall and the mounting plate, a buffer plate is arranged on one side of the mounting plate far away from the prefabricated curtain wall, an adjusting mechanism is arranged between the mounting plate and the buffer plate, the building main body is arranged on one side of the buffer plate far away from the prefabricated curtain wall, two guide posts are fixedly connected onto the building main body, and both guide posts penetrate through the buffer plate and are in sliding connection with the buffer plate, and a buffer mechanism is arranged between the buffer plate and the building main body. The invention can mount or dismount the prefabricated curtain wall through the mounting mechanism, and replace the prefabricated curtain wall; can cushion the protection to prefabricated curtain through buffer gear, become flexible impact to the rigidity impact that will receive, extension prefabricated curtain installation stability and its life.

Description

Flexible connection structure of prefabricated part and building main body and construction method thereof
Technical Field
The invention relates to the technical field of connecting structures, in particular to a flexible connecting structure of a prefabricated part and a building main body and a construction method thereof.
Background
The assembled part has the characteristics of standardized design, industrial production, assembled construction, energy conservation, consumption reduction, environmental protection, shortened construction period, improved quality and the like, and can promote the integration of informatization and industrialization depth, so that the assembled building is developed and applied vigorously.
The existing prefabricated part and the building main body are generally rigidly installed and fixed through the matching of the bracket and the bolt, the rigidity of the joint of the prefabricated part and the building main body is high after the prefabricated curtain wall and the building main body are connected, and the problem that the installed bracket is easy to break at the moment due to poor deformation effect of the connecting bracket when the prefabricated curtain wall is impacted by the outside exists is solved.
Disclosure of Invention
The invention aims to solve the defects in the prior art, and provides a flexible connecting structure of a prefabricated part and a building main body and a construction method thereof, wherein the prefabricated curtain wall can be installed or detached through an installation mechanism, and the prefabricated curtain wall can be replaced; can cushion the protection to prefabricated curtain through buffer gear, become flexible impact to the rigidity impact that will receive, extension prefabricated curtain installation stability and its life.
In order to achieve the above purpose, the present invention adopts the following technical scheme:
the utility model provides a prefabricated component and building main part flexonics structure, includes prefabricated curtain, one side fixedly connected with mounting panel of prefabricated curtain, be equipped with installation mechanism between prefabricated curtain and the mounting panel, installation mechanism includes two inserted bars with prefabricated curtain's lateral wall fixed connection, be equipped with two slots on the mounting panel, two the inserted bars insert respectively and set up in the slot, run through on the mounting panel be equipped with rather than rotating the T type handspike of being connected, the rear end fixedly connected with wind-up roll of T type handspike, the outer wall cover of wind-up roll is equipped with two connecting wires, two the connecting wire all runs through the mounting panel setting, two the equal fixedly connected with T type piece of connecting wire, two the T type piece all runs through the mounting panel and rather than sliding connection, every T type piece all fixedly connected with two connecting springs, every connecting spring's both ends respectively with mounting panel and T type piece fixed connection, two all set up the constant head tank on the inserted respectively in the constant head tank, one side that keeps away from the prefabricated curtain is equipped with the buffer board, be equipped with the regulating mechanism between two side of the baffle-plate and the two guide post, two guide posts are equipped with between the two side of the buffer post and the two guide post, the buffer post is equipped with between the two guide post and the two side of the same is connected with the main part, and the buffer post is connected with the two guide post, and is connected with the buffer post respectively to the two guide post and the main part is connected with the buffer post, two sliding rods are fixedly connected to the buffer plate, the two sliding rods penetrate through the sliding blocks respectively and are in sliding connection with the sliding blocks, the outer walls of the sliding rods are sleeved with second buffer springs, the second buffer springs are respectively fixedly connected with the buffer plate and the sliding blocks at two ends, the sliding blocks are in sliding connection with the buffer plate, the fixing rods are fixedly connected with the sliding blocks, the fixing rods penetrate through the buffer plate and are in sliding connection with the buffer plate, two cavities are formed in the buffer plate, the fixing rods are fixedly connected with sealing blocks, the sealing blocks are respectively in sealing sliding connection with the inner walls of the cavities, a plurality of damping holes are formed in the sealing blocks in a penetrating mode, and buffer solutions are filled in the cavities.
Preferably, the adjustment mechanism includes the connecting rod with the lateral wall fixed connection of buffer board, connecting rod fixedly connected with universal ball, the rotary groove has been seted up on the mounting panel, the universal ball is located the rotary inslot and sets up, mounting panel and buffer board all rotate and are connected with the cavity post, two all run through on the cavity post be equipped with rather than threaded connection's threaded rod, two the equal fixedly connected with anticreep piece of threaded rod, two the common fixedly connected with swiveling wheel of threaded rod.
Preferably, two winding grooves are formed in the winding roller, two connecting wires are respectively wound in the two winding grooves, and one ends of the two connecting wires are respectively fixedly connected with the inner walls of the winding grooves.
Preferably, an inclined plane is formed on the T-shaped block.
Preferably, the thread directions of the two threaded rods are opposite.
Preferably, the outer wall of the rotating wheel is provided with anti-skid patterns.
Preferably, the guide post is arranged in a T shape.
Preferably, a plurality of the damping holes are distributed at equal intervals.
Preferably, a sealing ring is arranged between the outer wall of the fixing rod and the buffer plate, the sealing ring is fixedly connected with the buffer plate, and the sealing ring is in sealing sliding connection with the fixing rod.
The invention also provides a construction method for the flexibility of the prefabricated part and the building main body, which comprises the following steps:
s1, processing in a factory in advance to finish manufacturing the prefabricated curtain wall, then finishing the processing of parts on the mounting plate and the buffer plate, inserting two inserted bars on the prefabricated curtain wall into the slots, inserting the T-shaped blocks into the corresponding positioning slots, and finishing the mounting and fixing between the prefabricated curtain wall and the mounting plate;
s2, a worker installs and fixes the installation plate and the buffer plate, the worker holds the rotating wheel to rotate to drive the two threaded rods and the anti-drop block to rotate, so that the hollow columns at two sides relatively move back to back, and the angle adjustment of the prefabricated curtain wall is completed;
and S3, the buffer plate and the building main body are installed and fixed by a worker, two guide posts on the buffer plate are installed with the side wall of the building main body, and two deflection rods connected on the buffer plate are respectively installed with the side wall of the building main body.
Compared with the prior art, the invention has the beneficial effects that:
1. the staff T type handspike rotates and drives the wind-up roll to rotate, makes two connecting wires rolling in the wind-up groove through the wind-up roll is rotatory, and two T type pieces relative movement this moment, and this in-process connecting spring compresses, and can take off prefabricated curtain wall, changes prefabricated curtain wall until two T type pieces break away from the constant head tank.
2. The staff T type handspike rotates and drives the wind-up roll and rotate, makes two connecting wires rolling at the wind-up groove, and two T type pieces relative movement this moment until two T type pieces break away from the constant head tank can take off prefabricated curtain, changes prefabricated curtain.
3. When the prefabricated curtain wall is impacted by the outside world, the outside world impacts drive the prefabricated curtain wall, the mounting plate and the buffer plate to move left and right, the buffer plate slides on the guide post in the process of moving the buffer plate, the first buffer spring in the process is compressed or stretched, and the impact of the prefabricated curtain wall can be flexibly buffered through the deformation of the first buffer spring.
4. The deflection rod deflects in the process of moving the buffer plate left and right, the sliding block is driven to slide on the sliding rod through the deflection of the deflection rod, the second buffer spring compresses or stretches in the process, and the impact of the prefabricated curtain wall can be flexibly buffered through the deformation of the second buffer spring.
5. The fixing rod and the sealing block are driven to slide through the sliding block to slide on the sliding rod, the sealing block slides in the cavity to enable buffer solution in the cavity to continuously flow through the damping holes, the buffer solution can flow through the damping holes to generate damping force, so that the impact force is consumed, the vibration energy is converted into the internal energy of the buffer solution, and the effect of buffering and protecting the prefabricated curtain wall is achieved.
In summary, the prefabricated curtain wall can be installed or disassembled through the installation mechanism, and the prefabricated curtain wall can be replaced; can cushion the protection to prefabricated curtain through buffer gear, become flexible impact to the rigidity impact that will receive, extension prefabricated curtain installation stability and its life.
Drawings
FIG. 1 is a cross-sectional view of a flexible connection structure between a prefabricated part and a building body according to the present invention;
FIG. 2 is a front view of a flexible connection structure of a prefabricated part and a building main body according to the present invention;
FIG. 3 is a schematic view of a wind-up roll in a flexible connection structure of a prefabricated part and a building main body according to the present invention;
FIG. 4 is an enlarged view of the structure of FIG. 1 at A;
FIG. 5 is an enlarged view of the structure at B in FIG. 1;
fig. 6 is an enlarged view of the structure at C in fig. 1.
In the figure: 1 prefabricated curtain wall, 2 mounting panels, 3 inserted bars, 4 slots, 5T type hand bars, 6 wind-up rolls, 7 connecting lines, 8T type blocks, 9 connecting springs, 10 positioning grooves, 11 connecting rods, 12 universal balls, 13 rotating grooves, 14 hollow columns, 15 anti-drop blocks, 16 threaded rods, 17 rotating wheels, 18 buffer plates, 19 guide columns, 20 first buffer springs, 21 deflection bars, 22 sliding blocks, 23 sliding bars, 24 fixed bars, 25 cavities, 26 sealing blocks, 27 damping holes, 28 buffer solutions, 29 sealing rings, 30 building main bodies and 31 second buffer springs.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments.
Referring to fig. 1-6, a prefabricated component and building main part flexonics structure, including prefabricated curtain 1, prefabricated curtain 1 is prefabricated component, the preparation of processing in advance in the factory building, one side fixedly connected with mounting panel 2 of prefabricated curtain 1, be equipped with installation mechanism between prefabricated curtain 1 and the mounting panel 2, installation mechanism includes two inserted bars 3 with the lateral wall fixed connection of prefabricated curtain 1, be equipped with two slot 4 on the mounting panel 2, two inserted bars 3 insert in slot 4 respectively and set up, run through on the mounting panel 2 be equipped with rather than rotate T type hand bar 5, T type hand bar 5's rear end fixedly connected with wind-up roll 6, wind up two connecting wire 7 in two wind-up grooves respectively, the one end of two connecting wire 7 respectively with the inner wall fixed connection of wind-up groove, two connecting wire 7 all run through the mounting panel 2 setting, set up the inclined plane on two connecting wire 7 equal fixedly connected with T type piece 8,T type piece 8, be convenient for inserted bar 3 insert in slot 4, two T type piece 8 all run through 2 and install the mounting panel and two fixed connection piece 10 with two end-to-up spring positioning device of two T type 8, can be set up with two fixed connection of two positioning device 10 on two mounting panel 10 and two fixed connection type 10 respectively, each have two positioning device 10 and two positioning device.
One side of the mounting plate 2, which is far away from the prefabricated curtain wall 1, is provided with a buffer plate 18, an adjusting mechanism is arranged between the mounting plate 2 and the buffer plate 18, the adjusting mechanism comprises a connecting rod 11 fixedly connected with the side wall of the buffer plate 18, a universal ball 12 is fixedly connected with the connecting rod 11, a rotary groove 13 is formed in the mounting plate 2, the universal ball 12 is arranged in the rotary groove 13, the mounting plate 2 is enabled to rotate by taking the universal ball 12 as a rotation center, the mounting plate 2 and the buffer plate 18 are all rotationally connected with a hollow column 14, threaded rods 16 in threaded connection with the two hollow columns 14 are all penetrated and arranged on the two hollow columns 14, the thread directions of the two threaded rods 16 are opposite, the hollow columns 14 on two sides are enabled to move relatively or back to back, the two threaded rods 16 are fixedly connected with anti-falling blocks 15, the threaded rods 16 are prevented from being separated from the hollow columns 14, the two threaded rods 16 are fixedly connected with rotary wheels 17 together, and the outer walls of the rotary wheels 17 are provided with anti-skidding patterns, and the friction force with hands.
The one side that prefabricated curtain 1 was kept away from to the buffer board 18 is equipped with building main part 30, be fixedly connected with two guide posts 19 on the building main part 30, guide posts 19 are T type setting, two guide posts 19 all run through buffer board 18 and rather than sliding connection, the outer wall of every guide post 19 all overlaps and is equipped with first buffer spring 20, the both ends of every first buffer spring 20 respectively with buffer board 18 and building main part 30 fixed connection, be equipped with buffer gear between buffer board 18 and the building main part 30, buffer gear includes two deflection poles 21 with building main part 30's lateral wall swivelling joint, two deflection poles 21 all rotate and be connected with slider 22, fixedly connected with two slide bars 23 on the buffer board 18, two slide bars 23 run through slider 22 respectively and rather than sliding connection, the outer wall of every slide bar 23 all overlaps and is equipped with second buffer spring 31, the both ends of every second buffer spring 31 respectively with buffer board 18 and slider 22 fixed connection, two slider 22 all fixed connection dead lever 24 with buffer board 18, two dead lever 24 and two dead lever 24 all run through buffer board 18 and are equipped with two sealing washer blocks 29, two sealing washer 26 and two sealing washer 25 are connected with two sealing washer 25, seal bore 29 are all fixed connection, seal bore 29 are equipped with between two sealing washer 25 and the cavity 25 are connected with two sealing washer 24, sealing washer 25 and two sealing washer 25 and 25 are connected with the cavity 25.
The invention also provides a construction method for the flexibility of the prefabricated part and the building main body, which comprises the following steps:
s1, processing in a factory in advance to finish manufacturing the prefabricated curtain wall 1, then finishing the processing of parts on the mounting plate 2 and the buffer plate 18, inserting two inserting rods 3 on the prefabricated curtain wall 1 into the inserting grooves 4, inserting the T-shaped blocks 8 into the corresponding positioning grooves 10, and finishing the mounting and fixing between the prefabricated curtain wall and the mounting plate 2;
s2, a worker installs and fixes the installation plate 2 and the buffer plate 18, the worker holds the rotating wheel 17 to rotate to drive the two threaded rods 16 and the anti-drop blocks 15 to rotate, so that the hollow columns 14 on two sides relatively move back to back, and the angle adjustment of the prefabricated curtain wall 1 is completed;
and S3, the staff installs and fixes the buffer plate 18 and the building main body 30, two guide posts 19 on the buffer plate 18 are installed on the side wall of the building main body 30, and two deflection rods 21 connected on the buffer plate 18 are respectively installed on the side wall of the building main body 30.
In the invention, when the prefabricated curtain wall 1 and the mounting plate 2 are required to be mounted, two inserting rods 3 on the prefabricated curtain wall 1 are respectively inserted into the slots 4, the inserting rods 3 are contacted with inclined planes on the T-shaped blocks 8 in the process of insertion, the T-shaped blocks 8 are driven to slide in the mounting plate 2 through the insertion of the inserting rods 3, the connecting springs 9 are compressed in the process until the T-shaped blocks 8 are matched with the positioning grooves 10, the T-shaped blocks 8 are inserted into the positioning grooves 10 under the action of the connecting springs 9, the limit of the inserting rods 3 is completed, and the mounting and fixing between the prefabricated curtain wall 1 and the mounting plate 2 are ensured; when the prefabricated curtain wall 1 needs to be disassembled, the T-shaped hand lever 5 of the worker rotates to drive the winding roller 6 to rotate, the two connecting wires 7 are wound in the winding groove through the rotation of the winding roller 6, the two T-shaped blocks 8 relatively move at the moment, the connecting springs 9 are compressed in the process until the two T-shaped blocks 8 are separated from the positioning groove 10, the prefabricated curtain wall 1 can be taken down, and the prefabricated curtain wall 1 is replaced.
The staff holds swiveling wheel 17 and rotates and drives two threaded rods 16, anticreep piece 15 and rotate, rotates through two threaded rods 16 and makes the hollow post 14 of both sides relative or move in opposite directions to make prefabricated curtain 1 and mounting panel 2 rotate (universal ball 12 rotates in rotatory inslot 13) as the center of rotation with the right-hand member of connecting rod 11, and then adjusts the angle of prefabricated curtain 1, satisfies prefabricated curtain 1's angular adjustment.
When the prefabricated curtain wall 1 is impacted by the outside, the outside impact drives the prefabricated curtain wall 1, the mounting plate 2 and the buffer plate 18 to move left and right, the buffer plate 18 slides on the guide post 19 in the process of moving the buffer plate 18, the first buffer spring 20 is compressed or stretched in the process, and the impact of the prefabricated curtain wall 1 can be flexibly buffered through the deformation of the first buffer spring 20; the deflection rod 21 deflects in the process of moving the buffer plate 18 left and right, the sliding block 22 is driven to slide on the sliding rod 23 by the deflection of the deflection rod 21, the second buffer spring 31 compresses or stretches in the process, and the impact of the prefabricated curtain wall 1 can be flexibly buffered by the deformation of the second buffer spring 31; the sliding block 22 slides on the sliding rod 23 to drive the fixed rod 24 and the sealing block 26 to slide, the sealing block 26 slides in the cavity 25 to enable the buffer solution 28 in the cavity 25 to continuously flow through the damping holes 27, the buffer solution 28 can flow through the damping holes 27 to generate damping force, so that the received impact force is consumed, the vibration energy is converted into the internal energy of the buffer solution 28, and the function of buffering and protecting the prefabricated curtain wall 1 is further achieved.
The present invention is not limited to the above-mentioned embodiments, and any person skilled in the art, based on the technical solution of the present invention and the inventive concept thereof, can be replaced or changed within the scope of the present invention.

Claims (10)

1. The utility model provides a prefabricated component and building main part flexible connection structure, includes prefabricated curtain (1), its characterized in that, one side fixedly connected with mounting panel (2) of prefabricated curtain (1), be equipped with installation mechanism between prefabricated curtain (1) and mounting panel (2), one side that prefabricated curtain (1) was kept away from to mounting panel (2) is equipped with buffer board (18), be equipped with adjustment mechanism between mounting panel (2) and buffer board (18), one side that prefabricated curtain (1) was kept away from to buffer board (18) is equipped with building main part (30), fixedly connected with two guide posts (19) on building main part (30), two guide posts (19) all run through buffer board (18) and rather than sliding connection, every the outer wall of guide post (19) all overlaps and is equipped with first buffer spring (20), the both ends of every first buffer spring (20) are respectively with buffer board (18) and building main part (30) fixed connection, be equipped with buffer mechanism between buffer board (18) and the building main part (30);
the mounting mechanism comprises two inserted bars (3) fixedly connected with the side wall of the prefabricated curtain wall (1), two slots (4) are formed in the mounting plate (2), the two inserted bars (3) are respectively inserted into the slots (4) and are arranged, a T-shaped hand bar (5) rotationally connected with the mounting plate (2) is arranged on the mounting plate in a penetrating mode, a winding roller (6) is fixedly connected to the rear end of the T-shaped hand bar (5), two connecting wires (7) are sleeved on the outer wall of the winding roller (6), the two connecting wires (7) are arranged through the mounting plate (2), the two connecting wires (7) are fixedly connected with T-shaped blocks (8), the two T-shaped blocks (8) are all arranged through the mounting plate (2) and are in sliding connection with the T-shaped blocks (8), two connecting springs (9) are fixedly connected to the two ends of each connecting spring (9) and are respectively connected with the mounting plate (2) and the T-shaped blocks (8), and two positioning grooves (10) are formed in the two inserted blocks (10);
the damping mechanism comprises two deflection rods (21) which are rotationally connected with the side wall of a building main body (30), wherein the two deflection rods (21) are rotationally connected with a sliding block (22), two sliding rods (23) are fixedly connected with the buffering plate (18), the two sliding rods (23) penetrate through the sliding block (22) respectively and are in sliding connection with the sliding block, the outer wall of each sliding rod (23) is sleeved with a second damping spring (31), the two ends of each second damping spring (31) are fixedly connected with the buffering plate (18) and the sliding block (22) respectively, the two sliding blocks (22) are fixedly connected with the buffering plate (18) in a sliding manner, the two sliding blocks (22) are fixedly connected with a fixing rod (24), the two fixing rods (24) penetrate through the buffering plate (18) and are in sliding connection with the buffering plate, two cavities (25) are formed in the buffering plate (18), the two fixing rods (24) are fixedly connected with sealing blocks (26) respectively, the two sealing blocks (26) are respectively connected with the inner walls of the cavities (25) in a sliding manner, and each sealing block (27) is filled with damping liquid in each sealing block (27).
2. The flexible connection structure of prefabricated components and a building main body according to claim 1, wherein the adjusting mechanism comprises a connecting rod (11) fixedly connected with the side wall of a buffer plate (18), the connecting rod (11) is fixedly connected with a universal ball (12), a rotating groove (13) is formed in the mounting plate (2), the universal ball (12) is arranged in the rotating groove (13), the mounting plate (2) and the buffer plate (18) are both rotationally connected with a hollow column (14), threaded rods (16) connected with the threaded rods are all penetrated through the hollow column (14), the threaded rods (16) are both fixedly connected with anti-falling blocks (15), and the threaded rods (16) are both fixedly connected with a rotating wheel (17).
3. The flexible connection structure of prefabricated components and a building main body according to claim 1, wherein two winding grooves are formed in the winding roller (6), two connecting wires (7) are respectively wound in the two winding grooves, and one ends of the two connecting wires (7) are respectively fixedly connected with the inner walls of the winding grooves.
4. The flexible connection structure of prefabricated parts and building main body according to claim 1, wherein the T-shaped block (8) is provided with an inclined plane.
5. A flexible connection structure of prefabricated elements to a building body and a construction method thereof according to claim 2, characterized in that the thread directions of the two threaded rods (16) are arranged opposite.
6. A flexible connection between prefabricated elements and building bodies according to claim 2, characterized in that the outer wall of the swivel wheel (17) is provided with anti-slip threads.
7. A flexible connection between prefabricated elements and building bodies according to claim 1, characterized in that the guide posts (19) are provided in a T-shape.
8. A flexible connection between a prefabricated element and a building body according to claim 1, wherein a plurality of said damping holes (27) are equally spaced.
9. The flexible connection structure of prefabricated parts and building main bodies according to claim 1, wherein a sealing ring (29) is arranged between the outer wall of the fixing rod (24) and the buffer plate (18), the sealing ring (29) is fixedly connected with the buffer plate (18), and the sealing ring (29) is in sealing sliding connection with the fixing rod (24).
10. The flexible construction method of the prefabricated part and the building main body is characterized by comprising the following steps of:
s1, manufacturing a prefabricated curtain wall (1) by processing in a factory in advance, then finishing the processing of parts on a mounting plate (2) and a buffer plate (18), inserting two inserting rods (3) on the prefabricated curtain wall (1) into slots (4), inserting T-shaped blocks (8) into corresponding positioning grooves (10), and finishing the mounting and fixing between the prefabricated curtain wall and the mounting plate (2);
s2, a worker installs and fixes the installation plate (2) and the buffer plate (18), holds the rotating wheel (17) to rotate to drive the two threaded rods (16) and the anti-drop blocks (15) to rotate, so that the hollow columns (14) on two sides relatively move back to back, and the angle adjustment of the prefabricated curtain wall (1) is completed;
s3, a worker installs and fixes the buffer plate (18) and the building main body (30), two guide posts (19) on the buffer plate (18) are installed on the side wall of the building main body (30), and two deflection rods (21) connected on the buffer plate (18) are installed on the side wall of the building main body (30) respectively.
CN202311197803.6A 2023-09-18 2023-09-18 Flexible connection structure of prefabricated part and building main body and construction method thereof Pending CN117188666A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311197803.6A CN117188666A (en) 2023-09-18 2023-09-18 Flexible connection structure of prefabricated part and building main body and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311197803.6A CN117188666A (en) 2023-09-18 2023-09-18 Flexible connection structure of prefabricated part and building main body and construction method thereof

Publications (1)

Publication Number Publication Date
CN117188666A true CN117188666A (en) 2023-12-08

Family

ID=88986685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311197803.6A Pending CN117188666A (en) 2023-09-18 2023-09-18 Flexible connection structure of prefabricated part and building main body and construction method thereof

Country Status (1)

Country Link
CN (1) CN117188666A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117605195A (en) * 2023-11-22 2024-02-27 杭州嘉图建筑节能科技有限公司 Building outer elevation decorative plate structure and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117605195A (en) * 2023-11-22 2024-02-27 杭州嘉图建筑节能科技有限公司 Building outer elevation decorative plate structure and construction method
CN117605195B (en) * 2023-11-22 2024-04-19 杭州嘉图建筑节能科技有限公司 Building outer elevation decorative plate structure and construction method

Similar Documents

Publication Publication Date Title
CN117188666A (en) Flexible connection structure of prefabricated part and building main body and construction method thereof
CN207823644U (en) A kind of apparatus for bending of cab framework
CN116498050B (en) Externally hung frame fast-assembling structure taking wall hole as support and fast-assembling method
CN212450060U (en) A quick coiling mechanism for textile machinery rolling is effectual
CN112302693A (en) Subway tunnel antidetonation support column
CN113638495B (en) Assembly type steel structure building main body connecting structure and mounting method thereof
CN205222236U (en) Paper exhibition flat -bed machine constructs
CN211344583U (en) Highway electromechanical device monitor convenient to adjust
CN204037918U (en) For the adjustable rotation mechanism for wind of multiple diameter specification rocket rocket body
CN212027231U (en) A telescopic pillar for building field
CN212311539U (en) Safety door of numerical control machine tool
CN110777986A (en) Assembly type combined frame of decorative component and mounting method thereof
CN216081439U (en) Fast stable laser level meter
CN215368392U (en) Special fixing device of stand decorative cover in high-speed railway station room
CN113802738B (en) Assembled gradient double-layer aluminum plate curtain wall and construction process thereof
CN217024626U (en) A rolling tension adjusting device for carpet manufacture
CN117553651B (en) Geological fracture measuring device
CN220395382U (en) Movable fence for road construction
CN213626046U (en) Adjustable steel structure factory building bearing base frame
CN220236602U (en) Convenient installation type curtain rod
CN220618227U (en) Wall surface attached steel structure for tower crane
CN220392747U (en) Spreading frame for producing sun-proof cover for vehicle
CN217998590U (en) Ceiling connecting piece
CN218758168U (en) Glass curtain wall connecting structure
CN218933542U (en) Wall curtain wall construction stock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination