CN117166326A - Concrete road tool type side form installation construction method - Google Patents

Concrete road tool type side form installation construction method Download PDF

Info

Publication number
CN117166326A
CN117166326A CN202311225611.1A CN202311225611A CN117166326A CN 117166326 A CN117166326 A CN 117166326A CN 202311225611 A CN202311225611 A CN 202311225611A CN 117166326 A CN117166326 A CN 117166326A
Authority
CN
China
Prior art keywords
steel pipe
channel steel
steel
construction method
type side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311225611.1A
Other languages
Chinese (zh)
Inventor
胡旭阳
曹拥军
张也
李雪飞
李林军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Construction Engineering Group Co Ltd
Original Assignee
Shaanxi Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Construction Engineering Group Co Ltd filed Critical Shaanxi Construction Engineering Group Co Ltd
Priority to CN202311225611.1A priority Critical patent/CN117166326A/en
Publication of CN117166326A publication Critical patent/CN117166326A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50—Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502—Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/05—Devices for installing or removing forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a concrete road tool type side form installation construction method, which relates to the technical field of concrete roads and comprises a first channel steel, wherein a second channel steel is arranged at one end of the first channel steel, the first channel steel and the second channel steel are both attached to the side wall of a roadbed, screw rods are fixedly connected to the inner walls of the first channel steel and the second channel steel, square timber is connected to the inner parts of the first channel steel and the second channel steel in a clamping manner, one square timber is clamped at a joint of the first channel steel and the second channel steel, a steel pipe pile is arranged at one side of the first channel steel, which is opposite to the roadbed, of the screw rod, a mountain-shaped clamp is arranged at one end, which is far away from the inner wall of the second channel steel, of the screw rod, and a first steel pipe and a second steel pipe are arranged between the mountain-shaped clamp and the square timber. The concrete road tool type side form installation construction method has the advantages that quality defects are obviously reduced, secondary cutting of concrete roadsides is not needed before the road is installed along stones, labor, machinery and cost are reduced, and the construction period is saved.

Description

一种混凝土道路工具式侧模安装施工方法A kind of concrete road tool type side formwork installation and construction method

技术领域Technical field

本发明涉及混凝土道路技术领域,特别涉及一种混凝土道路工具式侧模安装施工方法。The invention relates to the technical field of concrete roads, and in particular to a concrete road tool-type side formwork installation and construction method.

背景技术Background technique

建筑产业化领跑行业发展的趋势日益激增,随之一些简单、快捷、实用的工具式施工措施的创新势头,在建筑行业内热潮不断;一系列可周转利用的混凝土道路模板遍及建筑市场,而周转次数较多、刚度较大的钢制混凝土道路模板被广泛应用。因此,一种能使道路混凝土浇筑质量明显提高,且快速安装的支撑体系成了行业内迫切需要解决的问题。The trend of construction industrialization leading the development of the industry is increasing day by day. Along with the innovation momentum of some simple, fast and practical tool-based construction measures, the craze continues in the construction industry; a series of recyclable concrete road formworks are all over the construction market, and the turnover Steel concrete road formwork with more times and greater stiffness is widely used. Therefore, a support system that can significantly improve the quality of road concrete pouring and be installed quickly has become an urgent problem that needs to be solved in the industry.

传统的钢制道路模板加固方式,多为废旧钢筋头的二次利用,打入后与土体间隙大,且其存在纵向顺直度和侧模垂直度控制不易、拼缝漏浆、涨模等诸多不利因素,给后续的工序施工带来不可估量的质量隐患。The traditional reinforcement method of steel road formwork is mostly the secondary use of scrap steel bar heads. After driving, the gap between it and the soil is large, and it is difficult to control the longitudinal straightness and verticality of the side formwork, leakage of grout at the joints, and expansion of the formwork. and many other unfavorable factors, which bring immeasurable quality hazards to subsequent construction processes.

因此,发明一种混凝土道路工具式侧模安装施工方法来解决上述问题很有必要。Therefore, it is necessary to invent a concrete road tool-type side form installation and construction method to solve the above problems.

发明内容Contents of the invention

本发明的目的在于提供一种混凝土道路工具式侧模安装施工方法,以解决上述背景技术中提出的问题。The object of the present invention is to provide a concrete road tool-type side form installation and construction method to solve the problems raised in the above background technology.

为实现上述目的,本发明提供如下技术方案:一种混凝土道路工具式侧模安装施工方法,包括第一槽钢,所述第一槽钢的一端设置有第二槽钢,所述第一槽钢与第二槽钢均贴合在路基的侧壁上,所述第一槽钢与第二槽钢的内壁上均固定连接有螺杆,所述第一槽钢与第二槽钢的内部均卡合连接有方木,其中一个方木卡合在第一槽钢与第二槽钢的拼缝处,所述第一槽钢背向路基的一侧设置有钢管桩,所述螺杆远离第二槽钢内壁的一端滑动设置有山型卡,所述山型卡与方木之间设置有第一钢管和第二钢管,所述第一钢管位于螺杆的上方,所述第二钢管位于螺杆的下方,所述第一钢管与钢管桩之间设置有第一连接组件,所述第二钢管与钢管桩之间设置有第二连接组件;In order to achieve the above object, the present invention provides the following technical solution: a concrete road tool-type side formwork installation and construction method, including a first channel steel, one end of the first channel steel is provided with a second channel steel, the first channel The steel and the second channel steel are both attached to the side walls of the roadbed. Screws are fixedly connected to the inner walls of the first channel steel and the second channel steel. The interiors of the first channel steel and the second channel steel are both Square timbers are snap-connected, and one of the square timbers is snapped at the joint between the first channel steel and the second channel steel. A steel pipe pile is provided on the side of the first channel steel facing away from the roadbed, and the screw rod is away from the roadbed. One end of the inner wall of the second channel steel is slidably provided with a mountain-shaped card. A first steel pipe and a second steel pipe are provided between the mountain-shaped card and the square wood. The first steel pipe is located above the screw, and the second steel pipe is located above the screw. Below the screw, a first connection component is provided between the first steel pipe and the steel pipe pile, and a second connection component is provided between the second steel pipe and the steel pipe pile;

混凝土道路工具式侧模安装施工方法,包括以下步骤:第一步、第一槽钢与第二槽钢端部切口打磨垂直、平整,涂刷油性脱模剂;第二步、路基抄平、放线验收,高低不平、路基不足处模板安装前修补完善,然后将第一槽钢与第二槽钢均贴合在路基的侧壁上,并通过山型卡对第一钢管和第二钢管进行固定;第三步、使用第一连接组件对第一钢管与钢管桩进行连接,使用第二连接组件对第二钢管与钢管桩进行连接。The installation and construction method of tool-type side formwork for concrete roads includes the following steps: the first step is to polish the end cuts of the first channel steel and the second channel steel vertically and flatly, and apply an oily release agent; the second step is to level the roadbed. After laying out the line for acceptance, the uneven and insufficient subgrade formwork shall be repaired and completed before installation. Then the first channel steel and the second channel steel shall be attached to the side wall of the subgrade, and the first steel pipe and the second steel pipe shall be connected through the mountain-shaped clamp. Fix; the third step is to use the first connecting component to connect the first steel pipe and the steel pipe pile, and use the second connecting component to connect the second steel pipe and the steel pipe pile.

优选的,所述第一连接组件包括第二卡扣和第三钢管,所述第二卡扣设置为两个,所述第三钢管的一端通过第二卡扣与第一钢管固定连接,所述第三钢管的另一端通过第二卡扣与钢管桩固定连接。Preferably, the first connection component includes a second buckle and a third steel pipe, there are two second buckles, and one end of the third steel pipe is fixedly connected to the first steel pipe through the second buckle, so The other end of the third steel pipe is fixedly connected to the steel pipe pile through a second buckle.

优选的,所述第二连接组件包括第一卡扣和第四钢管,所述第一卡扣设置为两个,所述第四钢管的一端通过第一卡扣与第二钢管连接,所述第四钢管的另一端通过第一卡扣与钢管桩固定连接。Preferably, the second connection component includes a first buckle and a fourth steel pipe. There are two first buckles. One end of the fourth steel pipe is connected to the second steel pipe through the first buckle. The other end of the fourth steel pipe is fixedly connected to the steel pipe pile through the first buckle.

优选的,所述螺杆上螺纹连接有螺母,所述螺母位于山型卡背向方木的一侧,所述螺母与螺杆配合,且通过山型卡对第一钢管和第二钢管进行固定。Preferably, a nut is threadedly connected to the screw rod, and the nut is located on the side of the mountain-shaped card facing away from the square wood. The nut cooperates with the screw rod, and the first steel pipe and the second steel pipe are fixed by the mountain-shaped card.

优选的,所述钢管桩的底部固定连接有第一尖锥,所述第一尖锥钉入土壤内。Preferably, a first pointed cone is fixedly connected to the bottom of the steel pipe pile, and the first pointed cone is driven into the soil.

优选的,所述钢管桩的下半段滑动设置有滑套,所述滑套的外部设置有支撑组件。Preferably, a sliding sleeve is slidably provided on the lower half of the steel pipe pile, and a support assembly is provided on the outside of the sliding sleeve.

优选的,所述支撑组件设置为三组,三组支撑组件围绕在滑套的外部均匀分布。Preferably, the support components are arranged in three groups, and the three groups of support components are evenly distributed around the outside of the sliding sleeve.

优选的,所述支撑组件包括第一支块、转条、第二支块、方板、第一螺栓和第二螺栓,所述第一支块固定连接在滑套的外壁上,所述转条的一端通过第二螺栓转动连接在第一支块上,所述转条的另一端通过第一螺栓转动连接在第二支块上,所述方板固定连接在第二支块远离转条的一端上。Preferably, the support assembly includes a first support block, a rotating bar, a second support block, a square plate, a first bolt and a second bolt, the first support block is fixedly connected to the outer wall of the sliding sleeve, and the rotating bar One end of the bar is rotatably connected to the first support block through a second bolt, the other end of the rotating bar is rotatably connected to the second support block through a first bolt, and the square plate is fixedly connected to the second support block away from the rotating bar. on one end.

优选的,所述方板背向第二支块的一面固定连接有第二尖锥,所述第二尖锥呈矩阵状分布有多个。Preferably, a second pointed cone is fixedly connected to a side of the square plate facing away from the second support block, and a plurality of the second pointed cones are distributed in a matrix.

优选的,所述滑套的壁体内部螺纹连接有螺纹杆,所述螺纹杆远离滑套的一端固定连接有转板。Preferably, a threaded rod is threadedly connected to the inside of the wall of the sliding sleeve, and an end of the threaded rod away from the sliding sleeve is fixedly connected to a rotating plate.

本发明的技术效果和优点:Technical effects and advantages of the present invention:

1、质量缺陷明显减少,安装道沿石前不用对混凝土路边二次切缝,即降低了人工、机械、成本,又节约了工期,且不用购买材料且材料周转率高,所有材料均为施工工地租赁,加工制作非常容易;1. Quality defects are significantly reduced. There is no need to cut seams on the concrete roadside twice before installing the curb stone, which reduces labor, machinery, and costs, and saves the construction period. There is no need to purchase materials and the material turnover rate is high. All materials are Construction site rental, processing and production is very easy;

2、加固体系应用的螺杆、山型卡、槽钢、扣件、钢管等材料均为钢制,周转次数高,即便正常使用损坏后,也可维修恢复原状。较之木质模板和传统的钢筋头内外固定加固的方式节约了钢筋头的损耗;2. The screws, mountain clamps, channel steels, fasteners, steel pipes and other materials used in the reinforcement system are all made of steel and have a high turnover rate. Even after damage due to normal use, they can be repaired and restored to their original condition. Compared with wooden formwork and the traditional method of internal and external fixation of steel bar heads, the loss of steel bar heads is saved;

3、解决了道路模板拼缝漏浆、侧模垂直度和纵向顺直度难以保证、堪固不到位涨模等质量问题。使道路混凝土的施工质量达到了一次成优的目的,最大限度降低了二次修补费用,对建筑行业混凝土道路施工质量控制起到了积极作用,有推广应用的价值。3. Solve the quality problems such as leakage of slurry in the road formwork joints, difficulty in ensuring the verticality and longitudinal straightness of the side formwork, and inability to secure the formwork in place. The construction quality of road concrete has achieved the goal of first-time excellence, minimized the cost of secondary repairs, played a positive role in the quality control of concrete road construction in the construction industry, and has the value of promotion and application.

附图说明Description of drawings

图1为本发明结构混凝土道路工具式侧模安装施工方法结构示意图。Figure 1 is a schematic structural diagram of the installation and construction method of tool-type side formwork for structural concrete roads according to the present invention.

图2为本发明图1中A处放大结构示意图。Figure 2 is an enlarged structural schematic diagram of position A in Figure 1 of the present invention.

图3为本发明第一槽钢和第二槽钢结构示意图。Figure 3 is a schematic structural diagram of the first channel steel and the second channel steel of the present invention.

图4为本发明滑套、第一支块和转条结构示意图。Figure 4 is a schematic structural diagram of the sliding sleeve, first block and rotating bar of the present invention.

图中:1、第一槽钢;2、螺杆;3、螺母;4、方木;5、第一钢管;6、第二钢管;7、山型卡;8、第二槽钢;9、第一卡扣;10、第二卡扣;11、第三钢管;12、第四钢管;13、钢管桩;14、第一尖锥;15、滑套;16、第一支块;17、转条;18、方板;19、第二支块;20、第一螺栓;21、第二螺栓;22、转板;23、第二尖锥;24、螺纹杆。In the picture: 1. The first channel steel; 2. Screw; 3. Nut; 4. Square wood; 5. The first steel pipe; 6. The second steel pipe; 7. Mountain-shaped clamp; 8. The second channel steel; 9. The first buckle; 10. The second buckle; 11. The third steel pipe; 12. The fourth steel pipe; 13. Steel pipe pile; 14. The first pointed cone; 15. Sliding sleeve; 16. The first block; 17 , rotating bar; 18. square plate; 19. second support block; 20. first bolt; 21. second bolt; 22. rotating plate; 23. second pointed cone; 24. threaded rod.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚;完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly described below with reference to the accompanying drawings in the embodiments of the present invention; a complete description will be given. Obviously, the described embodiments are only some of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present invention.

本发明提供了如图1-图4所示的一种混凝土道路工具式侧模安装施工方法,包括第一槽钢1,第一槽钢1的一端设置有第二槽钢8,第一槽钢1与第二槽钢8均贴合在路基的侧壁上,第一槽钢1与第二槽钢8均作为钢制模板。使用前,对第一槽钢1与第二槽钢8棱边及表面进行除锈,打磨平整,第一槽钢1与第二槽钢8端部切口打磨垂直、平整,涂刷油性脱模剂。同时,路基抄平、放线验收,高低不平、路基不足处模板安装前修补完善。第一槽钢1与第二槽钢8的内壁上均固定连接有螺杆2。第一槽钢1与第二槽钢8的内部均卡合连接有方木4,其中一个方木4卡合在第一槽钢1与第二槽钢8的拼缝处,以此保证拼缝不漏浆,支撑加固时有足够的操作空间。第一槽钢1背向路基的一侧设置有钢管桩13,钢管桩13的底部固定连接有第一尖锥14,第一尖锥14钉入土壤内。The invention provides a concrete road tool-type side formwork installation and construction method as shown in Figures 1 to 4, which includes a first channel steel 1. One end of the first channel steel 1 is provided with a second channel steel 8. Both the steel 1 and the second channel steel 8 are attached to the side walls of the roadbed, and both the first channel steel 1 and the second channel steel 8 serve as steel formwork. Before use, remove rust from the edges and surfaces of the first channel steel 1 and the second channel steel 8 and polish them flat. Grind the end cuts of the first channel steel 1 and the second channel steel 8 vertically and flatly, and apply oily release mold. agent. At the same time, the roadbed was leveled and laid out for acceptance, and the uneven and insufficient roadbed areas were repaired and completed before the formwork was installed. The screw rod 2 is fixedly connected to the inner walls of the first channel steel 1 and the second channel steel 8. The first channel steel 1 and the second channel steel 8 are both connected with square logs 4 inside. One of the square logs 4 is engaged at the joint between the first channel steel 1 and the second channel steel 8 to ensure that the joints are joined together. The seams do not leak grout, and there is enough space for operation when supporting and reinforcing. A steel pipe pile 13 is provided on the side of the first channel steel 1 facing away from the roadbed. A first pointed cone 14 is fixedly connected to the bottom of the steel pipe pile 13, and the first pointed cone 14 is driven into the soil.

混凝土道路工具式侧模安装施工方法,包括以下步骤:S1、第一槽钢1与第二槽钢8端部切口打磨垂直、平整,涂刷油性脱模剂;S2、路基抄平、放线验收,高低不平、路基不足处模板安装前修补完善,然后将第一槽钢1与第二槽钢8均贴合在路基的侧壁上,并通过山型卡7对第一钢管5和第二钢管6进行固定;S3、使用第一连接组件对第一钢管5与钢管桩13进行连接,使用第二连接组件对第二钢管6与钢管桩13进行连接。The installation and construction method of tool-type side formwork for concrete roads includes the following steps: S1. Grind the end cuts of the first channel steel 1 and the second channel steel 8 vertically and flatly, and apply an oily release agent; S2. Level the roadbed and lay out the lines. After inspection and acceptance, the uneven and deficient areas of the roadbed are repaired and completed before the formwork is installed. Then, the first channel steel 1 and the second channel steel 8 are attached to the side walls of the roadbed, and the first steel pipe 5 and the second steel pipe 5 are connected through the mountain-shaped clamp 7. The two steel pipes 6 are fixed; S3, use the first connecting component to connect the first steel pipe 5 and the steel pipe pile 13, and use the second connecting component to connect the second steel pipe 6 and the steel pipe pile 13.

混凝土道路工具式侧模安装施工工法具有较强的实用性和取材便利的特点,该模板加固体系,采用扣件式钢管支撑结合螺杆2拉结加固的方法,利用简单的几何原理支撑加固模板,最大化减少了支撑点数,每12延米的模板仅需要3个支撑点位;与传统的模板安装方法相比,对于路基要求较高和模板不可调节性造成的漏浆、变形、不顺直等质量问题,保证了道路混凝土施工一次成优,最大限度的降低了后续工序的质量隐患。而且杜绝了由于模板质量问题,引发的二次切割、打磨、修补等额外措施,支撑点位大量减少,工程成本最大优化。The installation and construction method of tool-type side formwork for concrete roads has the characteristics of strong practicability and convenient material selection. The formwork reinforcement system uses a fastener-type steel pipe support combined with a screw 2 tie reinforcement method, and uses simple geometric principles to support and strengthen the formwork. The number of support points is reduced to the maximum, with only 3 support points required for every 12 linear meters of formwork; compared with the traditional formwork installation method, the requirements for the roadbed are higher and the formwork is not adjustable, causing leakage, deformation, and non-alignment. and other quality issues, ensuring that the road concrete construction is excellent the first time and minimizing the quality hazards in subsequent processes. In addition, additional measures such as secondary cutting, grinding, and repair caused by template quality problems are eliminated, the number of support points is greatly reduced, and the project cost is maximized.

该加固体系的螺杆2与第一槽钢1以及第二槽钢8焊接形成整体,通过螺杆2将多个第一槽钢1和第二槽钢8用第一钢管5和第二钢管6背楞拼接的方式,很好的保证了第一槽钢1和第二槽钢8的拼缝和整体性;之后路基外用钢管桩13钉入土壤受力,用作第一槽钢1和第二槽钢8加固时的支撑点,优点突出,不但提高了第一槽钢1和第二槽钢8支撑强度,降低第一槽钢1和第二槽钢8变形,而且此种方式适用环境广泛,灰土路基、砂石路基等均可应用;支撑牢固、操作简单、四面调节灵活,充分体现了该加固体系的适用广泛性、操作简便性、调节灵活性的优点。The screw 2 of the reinforcement system is welded to the first channel steel 1 and the second channel steel 8 to form a whole. Through the screw 2, a plurality of first channel steel 1 and second channel steel 8 are backed by the first steel pipe 5 and the second steel pipe 6. The corrugated splicing method ensures the joints and integrity of the first channel steel 1 and the second channel steel 8; then steel pipe piles 13 are driven into the soil outside the roadbed to bear force, and are used as the first channel steel 1 and the second channel steel 8. The support point when the second channel steel 8 is reinforced has outstanding advantages. It not only improves the support strength of the first channel steel 1 and the second channel steel 8, but also reduces the deformation of the first channel steel 1 and the second channel steel 8. This method is also suitable for the environment. It can be widely used in lime soil roadbed, sand and gravel roadbed, etc.; the support is firm, the operation is simple, and the four-sided adjustment is flexible, which fully reflects the advantages of the reinforcement system's wide application, easy operation, and flexibility of adjustment.

螺杆2远离第二槽钢8内壁的一端滑动设置有山型卡7,山型卡7与方木4之间设置有第一钢管5和第二钢管6,第一钢管5和第二钢管6之间的夹角角度为45°-60°。第一钢管5位于螺杆2的上方,第二钢管6位于螺杆2的下方。螺杆2上螺纹连接有螺母3,螺母3位于山型卡7背向方木4的一侧,螺母3与螺杆2配合,且通过山型卡7对第一钢管5和第二钢管6进行固定。用山型卡7、螺母3与螺杆2配合,将相接的第一槽钢1与第二槽钢8拼装成整体。One end of the screw 2 away from the inner wall of the second channel steel 8 is slidably provided with a mountain-shaped clamp 7. A first steel pipe 5 and a second steel pipe 6 are arranged between the mountain-shaped clamp 7 and the square wood 4. The first steel pipe 5 and the second steel pipe 6 The angle between them is 45°-60°. The first steel pipe 5 is located above the screw 2 , and the second steel pipe 6 is located below the screw 2 . There is a nut 3 threaded on the screw rod 2. The nut 3 is located on the side of the mountain-shaped clamp 7 facing away from the square wood 4. The nut 3 cooperates with the screw rod 2, and the first steel pipe 5 and the second steel pipe 6 are fixed through the mountain-shaped clamp 7. . Use the mountain-shaped clamp 7, the nut 3 and the screw 2 to assemble the connected first channel steel 1 and the second channel steel 8 into a whole.

第一钢管5与钢管桩13之间设置有第一连接组件。第一连接组件包括第二卡扣10和第三钢管11,第二卡扣10设置为两个。第三钢管11的一端通过第二卡扣10与第一钢管5固定连接,第三钢管11的另一端通过第二卡扣10与钢管桩13固定连接。A first connecting component is provided between the first steel pipe 5 and the steel pipe pile 13 . The first connection component includes a second buckle 10 and a third steel pipe 11, and there are two second buckles 10. One end of the third steel pipe 11 is fixedly connected to the first steel pipe 5 through the second buckle 10 , and the other end of the third steel pipe 11 is fixedly connected to the steel pipe pile 13 through the second buckle 10 .

第二钢管6与钢管桩13之间设置有第二连接组件。第二连接组件包括第一卡扣9和第四钢管12,第一卡扣9设置为两个。第四钢管12的一端通过第一卡扣9与第二钢管6连接,第四钢管12的另一端通过第一卡扣9与钢管桩13固定连接。A second connecting component is provided between the second steel pipe 6 and the steel pipe pile 13 . The second connection component includes a first buckle 9 and a fourth steel pipe 12, and there are two first buckles 9. One end of the fourth steel pipe 12 is connected to the second steel pipe 6 through the first buckle 9 , and the other end of the fourth steel pipe 12 is fixedly connected to the steel pipe pile 13 through the first buckle 9 .

第一钢管5与第二钢管6不仅仅起到了支撑加固的作用,分别通过第二卡扣10和第一卡扣9紧锢合适力度,微调模板纵向顺直,侧模垂直度、顶面高程等操作简便。模板安装过程中使用水准仪对模板顶面的高程进行控制,模板顶面低于标高采用下口垫木楔的方法。The first steel pipe 5 and the second steel pipe 6 not only play the role of support and reinforcement, but also tighten the appropriate strength through the second buckle 10 and the first buckle 9 respectively to fine-tune the longitudinal straightness of the formwork, the verticality of the side formwork, and the elevation of the top surface. etc. Easy to operate. During the installation process of the formwork, a level is used to control the elevation of the top surface of the formwork. If the top surface of the formwork is lower than the elevation, the lower opening wedge method is used.

为提高钢管桩13的稳定性,钢管桩13的下半段滑动设置有滑套15,滑套15的外部设置有支撑组件。支撑组件设置为三组,三组支撑组件围绕在滑套15的外部均匀分布。从多个方向对钢管桩13进行支撑,防止钢管桩13出现晃动。In order to improve the stability of the steel pipe pile 13, a sliding sleeve 15 is provided on the lower half of the steel pipe pile 13, and a support assembly is provided on the outside of the sliding sleeve 15. The support components are arranged in three groups, and the three groups of support components are evenly distributed around the outside of the sliding sleeve 15 . The steel pipe pile 13 is supported from multiple directions to prevent the steel pipe pile 13 from shaking.

具体设置时,支撑组件包括第一支块16、转条17、第二支块19、方板18、第一螺栓20和第二螺栓21。第一支块16固定连接在滑套15的外壁上,转条17的一端通过第二螺栓21转动连接在第一支块16上。调整转条17的倾斜角度。然后紧固第二螺栓21,使转条17的倾斜角度得到固定。转条17的另一端通过第一螺栓20转动连接在第二支块19上。调整第二支块19的倾斜角度,使方板18贴合在地面上,然后紧固第一螺栓20,防止方板18出现晃动。方板18固定连接在第二支块19远离转条17的一端上,增加与地面的接触面积,提高支撑的稳定性。When specifically set up, the support assembly includes a first support block 16, a rotating bar 17, a second support block 19, a square plate 18, a first bolt 20 and a second bolt 21. The first support block 16 is fixedly connected to the outer wall of the sliding sleeve 15 , and one end of the rotating bar 17 is rotationally connected to the first support block 16 through a second bolt 21 . Adjust the tilt angle of the rotating bar 17. Then tighten the second bolt 21 to fix the inclination angle of the rotating bar 17 . The other end of the rotating bar 17 is rotatably connected to the second support block 19 through the first bolt 20 . Adjust the inclination angle of the second support block 19 to make the square plate 18 fit on the ground, and then tighten the first bolt 20 to prevent the square plate 18 from shaking. The square plate 18 is fixedly connected to the end of the second support block 19 away from the rotating bar 17 to increase the contact area with the ground and improve the stability of the support.

方板18背向第二支块19的一面固定连接有第二尖锥23,第二尖锥23呈矩阵状分布有多个。第二尖锥23插入土壤内部,防止方板18出现滑动。The side of the square plate 18 facing away from the second support block 19 is fixedly connected with second cones 23 , and there are multiple second cones 23 distributed in a matrix. The second pointed cone 23 is inserted into the soil to prevent the square plate 18 from sliding.

滑套15的壁体内部螺纹连接有螺纹杆24,螺纹杆24远离滑套15的一端固定连接有转板22。滑套15在钢管桩13上滑动,进而带动支撑组件上下移动,提高支撑组件的适用性。A threaded rod 24 is threadedly connected to the inner wall of the sliding sleeve 15 , and a rotating plate 22 is fixedly connected to an end of the threaded rod 24 away from the sliding sleeve 15 . The sliding sleeve 15 slides on the steel pipe pile 13, thereby driving the support assembly to move up and down, thereby improving the applicability of the support assembly.

Claims (10)

1.一种混凝土道路工具式侧模安装施工方法,包括第一槽钢(1),其特征在于:所述第一槽钢(1)的一端设置有第二槽钢(8),所述第一槽钢(1)与第二槽钢(8)均贴合在路基的侧壁上,所述第一槽钢(1)与第二槽钢(8)的内壁上均固定连接有螺杆(2),所述第一槽钢(1)与第二槽钢(8)的内部均卡合连接有方木(4),其中一个方木(4)卡合在第一槽钢(1)与第二槽钢(8)的拼缝处,所述第一槽钢(1)背向路基的一侧设置有钢管桩(13),所述螺杆(2)远离第二槽钢(8)内壁的一端滑动设置有山型卡(7),所述山型卡(7)与方木(4)之间设置有第一钢管(5)和第二钢管(6),所述第一钢管(5)位于螺杆(2)的上方,所述第二钢管(6)位于螺杆(2)的下方,所述第一钢管(5)与钢管桩(13)之间设置有第一连接组件,所述第二钢管(6)与钢管桩(13)之间设置有第二连接组件;1. A concrete road tool-type side formwork installation and construction method, including a first channel steel (1), characterized in that: one end of the first channel steel (1) is provided with a second channel steel (8), and the The first channel steel (1) and the second channel steel (8) are both attached to the side walls of the roadbed, and screws are fixedly connected to the inner walls of the first channel steel (1) and the second channel steel (8). (2), the first channel steel (1) and the second channel steel (8) are both connected with square timbers (4) inside, and one of the square timbers (4) is snapped into the first channel steel (1) ) and the second channel steel (8), a steel pipe pile (13) is provided on the side of the first channel steel (1) facing away from the roadbed, and the screw (2) is away from the second channel steel ( 8) One end of the inner wall is slidably provided with a mountain-shaped card (7), and a first steel pipe (5) and a second steel pipe (6) are provided between the mountain-shaped card (7) and the square wood (4). A steel pipe (5) is located above the screw (2), the second steel pipe (6) is located below the screw (2), and a first steel pipe (5) is provided between the first steel pipe (5) and the steel pipe pile (13). A connecting component, a second connecting component is provided between the second steel pipe (6) and the steel pipe pile (13); 所述混凝土道路工具式侧模安装施工方法,包括以下步骤:The installation and construction method of tool-type side formwork for concrete roads includes the following steps: S1、第一槽钢(1)与第二槽钢(8)端部切口打磨垂直、平整,涂刷油性脱模剂;S1. Grind the end cuts of the first channel steel (1) and the second channel steel (8) vertically and flatly, and apply oily release agent; S2、路基抄平、放线验收,高低不平、路基不足处模板安装前修补完善,然后将第一槽钢(1)与第二槽钢(8)均贴合在路基的侧壁上,并通过山型卡(7)对第一钢管(5)和第二钢管(6)进行固定;S2. The subgrade is flattened and laid out for acceptance. The uneven and deficient parts of the subgrade are repaired and completed before the formwork is installed. Then the first channel steel (1) and the second channel steel (8) are attached to the side walls of the subgrade, and Fix the first steel pipe (5) and the second steel pipe (6) through the mountain-shaped clamp (7); S3、使用第一连接组件对第一钢管(5)与钢管桩(13)进行连接,使用第二连接组件对第二钢管(6)与钢管桩(13)进行连接。S3. Use the first connection component to connect the first steel pipe (5) and the steel pipe pile (13), and use the second connection component to connect the second steel pipe (6) and the steel pipe pile (13). 2.根据权利要求1所述的一种混凝土道路工具式侧模安装施工方法,其特征在于:所述第一连接组件包括第二卡扣(10)和第三钢管(11),所述第二卡扣(10)设置为两个,所述第三钢管(11)的一端通过第二卡扣(10)与第一钢管(5)固定连接,所述第三钢管(11)的另一端通过第二卡扣(10)与钢管桩(13)固定连接。2. A concrete road tool-type side formwork installation and construction method according to claim 1, characterized in that: the first connection component includes a second buckle (10) and a third steel pipe (11), and the There are two buckles (10). One end of the third steel pipe (11) is fixedly connected to the first steel pipe (5) through the second buckle (10). The other end of the third steel pipe (11) It is fixedly connected to the steel pipe pile (13) through the second buckle (10). 3.根据权利要求1所述的一种混凝土道路工具式侧模安装施工方法,其特征在于:所述第二连接组件包括第一卡扣(9)和第四钢管(12),所述第一卡扣(9)设置为两个,所述第四钢管(12)的一端通过第一卡扣(9)与第二钢管(6)连接,所述第四钢管(12)的另一端通过第一卡扣(9)与钢管桩(13)固定连接。3. A concrete road tool-type side formwork installation and construction method according to claim 1, characterized in that: the second connection component includes a first buckle (9) and a fourth steel pipe (12). There are two buckles (9). One end of the fourth steel pipe (12) is connected to the second steel pipe (6) through the first buckle (9), and the other end of the fourth steel pipe (12) is connected through The first buckle (9) is fixedly connected to the steel pipe pile (13). 4.根据权利要求1所述的一种混凝土道路工具式侧模安装施工方法,其特征在于:所述螺杆(2)上螺纹连接有螺母(3),所述螺母(3)位于山型卡(7)背向方木(4)的一侧,所述螺母(3)与螺杆(2)配合,且通过山型卡(7)对第一钢管(5)和第二钢管(6)进行固定。4. A concrete road tool-type side formwork installation and construction method according to claim 1, characterized in that: a nut (3) is threadedly connected to the screw rod (2), and the nut (3) is located in the mountain-shaped clamp. (7) On the side facing away from the square wood (4), the nut (3) cooperates with the screw (2), and the first steel pipe (5) and the second steel pipe (6) are connected through the mountain-shaped clamp (7). fixed. 5.根据权利要求1所述的一种混凝土道路工具式侧模安装施工方法,其特征在于:所述钢管桩(13)的底部固定连接有第一尖锥(14),所述第一尖锥(14)钉入土壤内。5. A concrete road tool-type side formwork installation and construction method according to claim 1, characterized in that: the bottom of the steel pipe pile (13) is fixedly connected with a first pointed cone (14), and the first pointed cone (14) is fixedly connected to the bottom of the steel pipe pile (13). The pointed cone (14) is driven into the soil. 6.根据权利要求1所述的一种混凝土道路工具式侧模安装施工方法,其特征在于:所述钢管桩(13)的下半段滑动设置有滑套(15),所述滑套(15)的外部设置有支撑组件。6. A concrete road tool-type side formwork installation and construction method according to claim 1, characterized in that: the lower half of the steel pipe pile (13) is provided with a sliding sleeve (15), and the sliding sleeve The outside of (15) is provided with a support component. 7.根据权利要求6所述的一种混凝土道路工具式侧模安装施工方法,其特征在于:所述支撑组件设置为三组,三组支撑组件围绕在滑套(15)的外部均匀分布。7. A concrete road tool-type side formwork installation and construction method according to claim 6, characterized in that the support components are arranged in three groups, and the three groups of support components are evenly distributed around the outside of the sliding sleeve (15). 8.根据权利要求7所述的一种混凝土道路工具式侧模安装施工方法,其特征在于:所述支撑组件包括第一支块(16)、转条(17)、第二支块(19)、方板(18)、第一螺栓(20)和第二螺栓(21),所述第一支块(16)固定连接在滑套(15)的外壁上,所述转条(17)的一端通过第二螺栓(21)转动连接在第一支块(16)上,所述转条(17)的另一端通过第一螺栓(20)转动连接在第二支块(19)上,所述方板(18)固定连接在第二支块(19)远离转条(17)的一端上。8. A concrete road tool-type side formwork installation and construction method according to claim 7, characterized in that: the support assembly includes a first support block (16), a rotating bar (17), a second support block (19) ), square plate (18), first bolt (20) and second bolt (21), the first support block (16) is fixedly connected to the outer wall of the sliding sleeve (15), the rotating bar (17) One end of the rotating bar (17) is rotatably connected to the first support block (16) through a second bolt (21), and the other end of the rotating bar (17) is rotatably connected to the second support block (19) through a first bolt (20). The square plate (18) is fixedly connected to the end of the second support block (19) away from the rotating bar (17). 9.根据权利要求8所述的一种混凝土道路工具式侧模安装施工方法,其特征在于:所述方板(18)背向第二支块(19)的一面固定连接有第二尖锥(23),所述第二尖锥(23)呈矩阵状分布有多个。9. A concrete road tool-type side formwork installation and construction method according to claim 8, characterized in that: the side of the square plate (18) facing away from the second support block (19) is fixedly connected with a second pointed cone. (23), there are multiple second pointed cones (23) distributed in a matrix. 10.根据权利要求6所述的一种混凝土道路工具式侧模安装施工方法,其特征在于:所述滑套(15)的壁体内部螺纹连接有螺纹杆(24),所述螺纹杆(24)远离滑套(15)的一端固定连接有转板(22)。10. A concrete road tool-type side formwork installation and construction method according to claim 6, characterized in that: a threaded rod (24) is threadedly connected to the interior of the wall of the sliding sleeve (15), and the threaded rod (24) 24) The rotating plate (22) is fixedly connected to the end far away from the sliding sleeve (15).
CN202311225611.1A 2023-09-21 2023-09-21 Concrete road tool type side form installation construction method Pending CN117166326A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311225611.1A CN117166326A (en) 2023-09-21 2023-09-21 Concrete road tool type side form installation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311225611.1A CN117166326A (en) 2023-09-21 2023-09-21 Concrete road tool type side form installation construction method

Publications (1)

Publication Number Publication Date
CN117166326A true CN117166326A (en) 2023-12-05

Family

ID=88941152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311225611.1A Pending CN117166326A (en) 2023-09-21 2023-09-21 Concrete road tool type side form installation construction method

Country Status (1)

Country Link
CN (1) CN117166326A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204728691U (en) * 2015-05-18 2015-10-28 山东天齐置业集团股份有限公司 A kind of concrete shear force wall formwork erecting structure
KR20170002009A (en) * 2015-06-29 2017-01-06 서울메트로 Roadbed construction equipment improved operation of the railway track
CN110747718A (en) * 2019-10-25 2020-02-04 陕西中大力鼎科技有限公司 Large-thickness paving curb steel formwork supporting device and using method
CN210827021U (en) * 2019-09-30 2020-06-23 马星宇 Steady construction of water is with visual portable drill rod
CN212128775U (en) * 2020-01-10 2020-12-11 武汉市市政建设集团有限公司 Combined type flower basket bolt rapid formwork structure
CN112681332A (en) * 2020-12-03 2021-04-20 中建六局土木工程有限公司 Construction method for supporting system by using steel sheet piles in complex environment
CN215366689U (en) * 2021-01-18 2021-12-31 广东翔顺建设集团有限公司 Smooth formula concrete road side form is to detaining socket joint support system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204728691U (en) * 2015-05-18 2015-10-28 山东天齐置业集团股份有限公司 A kind of concrete shear force wall formwork erecting structure
KR20170002009A (en) * 2015-06-29 2017-01-06 서울메트로 Roadbed construction equipment improved operation of the railway track
CN210827021U (en) * 2019-09-30 2020-06-23 马星宇 Steady construction of water is with visual portable drill rod
CN110747718A (en) * 2019-10-25 2020-02-04 陕西中大力鼎科技有限公司 Large-thickness paving curb steel formwork supporting device and using method
CN212128775U (en) * 2020-01-10 2020-12-11 武汉市市政建设集团有限公司 Combined type flower basket bolt rapid formwork structure
CN112681332A (en) * 2020-12-03 2021-04-20 中建六局土木工程有限公司 Construction method for supporting system by using steel sheet piles in complex environment
CN215366689U (en) * 2021-01-18 2021-12-31 广东翔顺建设集团有限公司 Smooth formula concrete road side form is to detaining socket joint support system

Similar Documents

Publication Publication Date Title
CN110541329B (en) Construction method of ballastless track of heavy haul railway tunnel group
CN112049143B (en) Large-sized concrete bearing platform construction method for large-sized low-temperature storage tank
CN101956458B (en) Construction method of overlong and superhigh single-side fair-faced concrete wall
CN101851884A (en) Construction method for paving CRTS I-type plate-type ballastless track plate in severe cold area
CN108824220A (en) A kind of cast-in-place support and construction method of the rigid structure of cantilever T-type
CN108755394B (en) A method of reinforcing bridge special-shaped piers with prestressed tendons
CN110468729B (en) Construction method of frame bridge
CN116005510B (en) Construction method of chessboard type mixed pavement of automobile test field
CN110607805A (en) A kind of cable tunnel construction method
CN116446305A (en) Reinforced concrete box girder flange plate widening and reinforcing method
KR20060082832A (en) Height adjustable precast concrete panel and road repair method using the same
CN100464020C (en) End Treatment Method of Continuously Reinforced Concrete Pavement
CN117758549A (en) A kind of construction technology for ballastless track of urban railway
CN103422443B (en) The multidirectional coupling precasting process of frame culvert segment long line method and frame culvert segment template system
US20220412106A1 (en) Method of constructing a concrete curb or similar structure using a wood form construction arrangement
CN110820455A (en) Construction process for lapping and expanding roadbed of asphalt concrete highway
CN113846695B (en) Reverse construction method basement construction method
US6695525B2 (en) Metal curb installation system and method
CN113958087A (en) Large-area steel fiber super-flat terrace construction method suitable for industrial factory building
CN119145426A (en) Foundation pit support without fertilizer groove and comprehensive construction method for basement outer wall
CN111411585A (en) A low-shrinkage formwork-free bridge deck joint structure and construction method
Chattaraj et al. Short panelled concrete pavement in built-up area
CN111395212A (en) Method and structure for rapidly reinforcing and repairing culvert by adopting corrugated steel structure
CN115506268A (en) Cantilever bent cap construction method
CN108979133B (en) Dense rib floor mold and use method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination