CN117150570B - Asset information process safety monitoring method and system based on data resource elements - Google Patents

Asset information process safety monitoring method and system based on data resource elements Download PDF

Info

Publication number
CN117150570B
CN117150570B CN202311442138.2A CN202311442138A CN117150570B CN 117150570 B CN117150570 B CN 117150570B CN 202311442138 A CN202311442138 A CN 202311442138A CN 117150570 B CN117150570 B CN 117150570B
Authority
CN
China
Prior art keywords
asset
digital asset
region
information
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202311442138.2A
Other languages
Chinese (zh)
Other versions
CN117150570A (en
Inventor
王海明
丁伟斌
蓝飞
吴要毛
金翔
杨玲
张德奇
徐建斌
纪德良
楼杏丹
林萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Huayun Information Technology Co Ltd
Original Assignee
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Huayun Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Zhejiang Electric Power Co Ltd, Zhejiang Huayun Information Technology Co Ltd filed Critical State Grid Zhejiang Electric Power Co Ltd
Priority to CN202311442138.2A priority Critical patent/CN117150570B/en
Publication of CN117150570A publication Critical patent/CN117150570A/en
Application granted granted Critical
Publication of CN117150570B publication Critical patent/CN117150570B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/62Protecting access to data via a platform, e.g. using keys or access control rules
    • G06F21/6218Protecting access to data via a platform, e.g. using keys or access control rules to a system of files or objects, e.g. local or distributed file system or database
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/22Indexing; Data structures therefor; Storage structures
    • G06F16/2282Tablespace storage structures; Management thereof
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/242Query formulation
    • G06F16/2428Query predicate definition using graphical user interfaces, including menus and forms

Abstract

The invention provides a method and a system for safely monitoring an asset information process based on data resource elements, which are used for generating an asset management table corresponding to each digital asset region, and setting the asset management table in association with a second management end so that the asset management table carries out asset information configuration on the asset management table based on regional asset data of the second management end; generating a corresponding information access interaction interface based on the identity authority corresponding to the monitoring end; determining asset types of asset information based on the information access interaction interface, and respectively splitting asset management tables of a plurality of digital asset areas based on the asset types to obtain corresponding splitting tables; and combining the plurality of split tables according to the different attributes of the different split tables to obtain a combined table, positioning different areas in the combined table based on the split tables, displaying the different areas in a differentiated mode, and sending the different areas to a monitoring end.

Description

Asset information process safety monitoring method and system based on data resource elements
Technical Field
The invention relates to a digital asset technology, in particular to an asset information process safety monitoring method and system based on data resource elements.
Background
In recent years, asset digitization has grown faster and faster, and enterprise asset digitization has also become popular. However, because of the sensitivity and confidentiality requirements of the digital assets of an enterprise, it is not easy to manage the digital assets in the enterprise.
In the prior art, when enterprises manage digital assets, the digital assets are often managed in a personnel record mode, the assets cannot be customized and managed in combination with the safety requirements of asset data in the process, and the safety requirements of the asset data cannot be met while the management efficiency is low.
Therefore, how to perform customized management on the asset data, and meet the safety requirement of the asset data while improving the management efficiency becomes an urgent problem to be solved.
Disclosure of Invention
The embodiment of the invention provides an asset information process safety monitoring method and system based on data resource elements, which can carry out customized management on asset data, and meet the safety requirement of the asset data while improving the management efficiency.
In a first aspect of the embodiment of the present invention, there is provided a method for monitoring asset information process security based on data resource elements, including:
after receiving the data resource element division data of the first management end, the digital asset platform generates digital asset areas with relative position relations, plans and adjusts the digital asset areas to obtain area images, and configures a corresponding second management end for each digital asset area based on the digital asset authority data of the first management end;
Generating an asset management table corresponding to each digital asset region, and associating and setting the asset management table with the second management end so that the asset management table carries out asset information configuration on the asset management table based on the region asset data of the second management end;
after judging that a monitoring end accesses a digital asset platform, generating a corresponding information access interaction interface based on the identity authority corresponding to the monitoring end, wherein the information access interaction interface comprises an area image of a digital asset area corresponding to the identity authority;
determining asset types of asset information based on the information access interaction interface, and respectively splitting asset management tables of a plurality of digital asset areas based on the asset types to obtain corresponding splitting tables;
and combining the plurality of split tables according to the different attributes of the different split tables to obtain a combined table, positioning different areas in the combined table based on the split tables, displaying the different areas in a differentiated mode, and sending the different areas to a monitoring end.
Optionally, in one possible implementation manner of the first aspect, after receiving the data resource element division data of the first management end, the digital asset platform generates a digital asset area with a relative positional relationship and plans and adjusts the digital asset area to obtain an area image, configures a corresponding second management end for each digital asset area based on the digital asset authority data of the first management end, and includes:
After receiving the data resource element division data of the first management end, the digital asset platform generates a corresponding digital asset area in a preset interactive image according to the area quantity information and the area position information in the data resource element division data;
extracting role rights in the digital asset rights data of the first management end, and determining the role rights of each digital asset region based on the corresponding relation between the role rights of the digital asset rights data and the digital asset regions;
and acquiring a second management end corresponding to each role authority, and configuring the corresponding second management end and the digital asset area correspondingly.
Optionally, in one possible implementation manner of the first aspect, the generating a corresponding digital asset area in the preset interactive image according to the area number information and the area location information in the data resource element division data includes:
generating an initial digital asset region in a preset interactive image according to region quantity information in data resource element division data, wherein the initial digital asset region has an initial first position in the preset interactive image;
acquiring region position information corresponding to all digital asset regions, determining corresponding region position center coordinates, and establishing a corresponding coordinate system in a preset interactive image based on the region position center coordinates;
Determining corresponding second positions in the coordinate system according to the region positions of all the digital asset regions and generating region images corresponding to the digital asset regions;
and if the region images corresponding to any two digital asset regions are judged to be overlapped, carrying out position adjustment on the overlapped digital asset regions to obtain a corresponding third position.
Optionally, in one possible implementation manner of the first aspect, the acquiring area location information corresponding to all digital asset areas and determining corresponding area location center coordinates, and establishing a corresponding coordinate system in a preset interactive image based on the area location center coordinates includes:
acquiring a longitude extremum group and a latitude extremum group in regional position information corresponding to all digital asset regions, wherein the longitude extremum group comprises a longitude maximum value and a longitude minimum value, and the latitude extremum group comprises a latitude maximum value and a latitude minimum value;
determining a longitude median value and a longitude extremum interval corresponding to the longitude extremum group, and determining a latitude median value and a latitude extremum interval corresponding to the latitude extremum group;
and counting the longitude median value and the latitude median value to obtain a regional position center coordinate, calculating to obtain a unit longitude coordinate interval of the coordinate system based on the longitude extreme value interval and the longitude constant value, and calculating to obtain a unit latitude coordinate interval of the coordinate system based on the latitude extreme value interval and the latitude constant value.
Optionally, in a possible implementation manner of the first aspect, the determining the corresponding second position in the coordinate system according to the region positions of all the digital asset regions and generating the region image corresponding to the digital asset region includes:
determining a longitude diameter value and a latitude diameter value corresponding to an area image according to a preset radius scale interval, wherein the radius scale interval is the scale number in a coordinate system;
and generating an area image of the corresponding digital asset area by taking the second position as a circle center and the radius scale interval as a radius, wherein the area image has a corresponding longitude diameter value and latitude diameter value.
Optionally, in one possible implementation manner of the first aspect, if it is determined that the area images corresponding to any two digital asset areas overlap, then performing position adjustment on the overlapped digital asset areas to obtain a corresponding third position, where the step includes:
if the longitude diameter value and/or the latitude diameter value of any two area images are judged to have the overlapped numerical value, the overlapped longitude value and/or the overlapped latitude value are determined;
determining longitude and/or latitude movement values of two area images based on the overlapping longitude and/or latitude values;
And determining opposite longitudinal directions and/or latitudes of the digital asset region, and moving the two region images according to the longitudinal directions and/or the latitudes based on the longitudinal movement values and/or the latitudes movement values to obtain a third position of the moved region image.
Optionally, in one possible implementation manner of the first aspect, the method further includes:
if any one of the area images with the third position is overlapped with other area images with the second position, displaying the moved area image with the third position according to a first preset form;
displaying the area images of the other second positions which are judged to be overlapped according to a second preset form;
and if the position adjustment information of the first management end on the area image is received, adjusting the area image at the second position and/or the third position based on the position adjustment information.
Optionally, in one possible implementation manner of the first aspect, the generating an asset management table corresponding to each digital asset area, and associating the asset management table with the second management end, so that the asset management table configures asset information of the asset management table based on the area asset data of the second management end, includes:
Generating an asset management table corresponding to each digital asset region, wherein the asset management table at least comprises an asset type column, an asset quantity column and an asset state column;
and configuring the unit cell corresponding to the asset category column, the asset quantity column and the asset state column in the asset management table based on the regional asset data input by the second management end to obtain asset information corresponding to the asset management table.
Optionally, in one possible implementation manner of the first aspect, after the monitoring end is judged to access the digital asset platform, a corresponding information access interaction interface is generated based on the identity authority corresponding to the monitoring end, where the information access interaction interface includes an area image of an area of the digital asset corresponding to the identity authority, and the method includes:
determining a corresponding preset interactive image based on the identity authority corresponding to the monitoring end;
determining an area image of a digital asset area of a preset interactive image corresponding to the monitoring end, generating a first background color on the area image of the determined digital asset area of the preset interactive image, and generating a second background color on the area image of an undetermined digital asset area in the preset interactive image;
And counting the information of all asset category columns in the asset management table of the determined digital asset area to obtain a category screening table, and obtaining a corresponding information access interactive interface based on the preset interactive image and the category screening table.
Optionally, in one possible implementation manner of the first aspect, the determining, based on the information access interaction interface, an asset type of the asset information, and splitting asset management tables of a plurality of digital asset areas based on the asset type to obtain corresponding splitting tables respectively includes:
based on the information access interaction interface, determining an asset management table corresponding to the digital asset region with the first background color selected by the monitoring end as an asset management table to be processed, and determining the asset type selected in the type screening table;
copying the asset management table to be processed to obtain a copy management table, deleting the unselected asset types in the copy management table from the copy management table to realize the type splitting, and obtaining a corresponding splitting table.
Optionally, in one possible implementation manner of the first aspect, the combining the multiple splitting tables according to the attribute differences of the different splitting tables to obtain a combined table, positioning and displaying different areas in the combined table differently based on the splitting tables, and sending the different areas to the monitoring end, where the positioning and displaying are performed on the different areas includes:
Counting the sum of the asset numbers corresponding to all asset types in each splitting table to obtain a first asset number, and taking the first asset number as an attribute of the splitting table;
sorting all the splitting tables in a descending order based on the first asset quantity to obtain a splitting table sequence, and respectively adding corresponding differential display states according to the sequence of the splitting tables in the splitting table sequence;
taking the splitting table of the 1 st splitting table in the splitting table sequence as a table to be combined, and sequentially adding asset information in other splitting tables into the table to be combined according to the splitting table sequence to obtain a combination table;
and determining a splitting table corresponding to each cell in the combination table and a corresponding differential display state, and displaying and processing the corresponding cell according to the differential display state.
In a second aspect of the embodiment of the present invention, there is provided an asset information process security monitoring system based on data resource elements, including:
the generation module is used for enabling the digital asset platform to generate a digital asset region with a relative position relationship after receiving the data resource element division data of the first management end, planning and adjusting the digital asset region to obtain a region image, and configuring a corresponding second management end for each digital asset region based on the digital asset authority data of the first management end;
The association module is used for generating an asset management table corresponding to each digital asset region, and associating and setting the asset management table with the second management end so that the asset management table carries out asset information configuration on the asset management table based on the region asset data of the second management end;
the judging module is used for generating a corresponding information access interactive interface based on the identity authority corresponding to the monitoring end after the monitoring end is judged to access the digital asset platform, wherein the information access interactive interface comprises an area image of the digital asset area corresponding to the identity authority;
the splitting module is used for determining asset types of asset information based on the information access interaction interface, and respectively splitting asset management tables of a plurality of digital asset areas based on the asset types to obtain corresponding splitting tables;
and the combination module is used for combining the plurality of split tables according to the different attributes of the different split tables to obtain a combination table, positioning different areas in the combination table based on the split tables, displaying the different areas in the combination table in a differentiated mode, and sending the different areas to the monitoring end.
In a third aspect of an embodiment of the present invention, there is provided an electronic device including: a memory, a processor and a computer program stored in the memory, the processor running the computer program to perform the first aspect of the invention and the methods that the first aspect may relate to.
In a fourth aspect of embodiments of the present invention, there is provided a storage medium having stored therein a computer program for implementing the method of the first aspect and the various possible aspects of the first aspect when executed by a processor.
The invention provides an asset information process safety monitoring method and system based on data resource elements, which can divide the area of asset data by combining data resource element division data, and then determine a corresponding management end by combining the authority of digital assets, so that the corresponding management end only has the processing authority of the corresponding digital asset, and the safety of the asset data can be improved. Meanwhile, the method can obtain the asset management table of the digital asset region, and can combine the asset types of the asset information by combining the information access interaction interface to determine the asset types of the asset information, position different regions in the combination table, display the different regions in a differentiated mode and send the different regions to the monitoring end. By the method, the customized management of the asset data can be realized, and the safety requirement of the asset data is met while the management efficiency is improved.
Drawings
FIG. 1 is a schematic flow chart of a method for monitoring the security of an asset information process based on data resource elements according to an embodiment of the present invention;
Fig. 2 is a schematic structural diagram of an asset information process safety monitoring system based on data resource elements according to an embodiment of the present invention.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are only some embodiments of the present invention, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
The terms "first," "second," "third," "fourth" and the like in the description and in the claims and in the above drawings, if any, are used for distinguishing between similar objects and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used may be interchanged where appropriate such that the embodiments of the invention described herein may be implemented in sequences other than those illustrated or otherwise described herein.
It should be understood that, in various embodiments of the present invention, the sequence number of each process does not mean that the execution sequence of each process should be determined by its functions and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.
It should be understood that in the present invention, "comprising" and "having" and any variations thereof are intended to cover non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements that are expressly listed or inherent to such process, method, article, or apparatus.
It should be understood that in the present invention, "plurality" means two or more. "and/or" is merely an association relationship describing an association object, meaning that there may be three relationships, e.g., a and/or B, may represent: a exists alone, A and B exist together, and B exists alone. The character "/" generally indicates that the context-dependent object is an "or" relationship. "comprising A, B and C", "comprising A, B, C" means that all three of A, B, C comprise, "comprising A, B or C" means that one of the three comprises A, B, C, and "comprising A, B and/or C" means that any 1 or any 2 or 3 of the three comprises A, B, C.
It should be understood that in the present invention, "B corresponding to a", "a corresponding to B", or "B corresponding to a" means that B is associated with a, from which B can be determined. Determining B from a does not mean determining B from a alone, but may also determine B from a and/or other information. The matching of A and B is that the similarity of A and B is larger than or equal to a preset threshold value.
As used herein, "if" may be interpreted as "at … …" or "at … …" or "in response to a determination" or "in response to detection" depending on the context.
The technical scheme of the invention is described in detail below by specific examples. The following embodiments may be combined with each other, and some embodiments may not be repeated for the same or similar concepts or processes.
Referring to fig. 1, a flow chart of an asset information process safety monitoring method based on data resource elements according to an embodiment of the present invention includes S1-S5:
s1, after receiving data resource element division data of a first management end, the digital asset platform generates digital asset areas with relative position relations, plans and adjusts the digital asset areas to obtain area images, and configures a corresponding second management end for each digital asset area based on digital asset authority data of the first management end.
When the scheme is used for managing the digital assets, in order to meet the management requirement of a management end, the data resource element division data is required to be input into the digital asset platform. After receiving the data of the data resource element division of the first management end, the digital asset platform generates a digital asset area with a relative position relationship, and a specific generating mode is described below. And meanwhile, planning and adjusting the digital asset region to obtain a region image. It is worth mentioning that the asset information may be a power device.
After obtaining a plurality of digital asset regions, the scheme can configure a corresponding second management terminal for each digital asset region by combining the digital asset authority data of the first management terminal, so that the corresponding management terminal manages the corresponding digital asset by using the corresponding authority.
In some embodiments, after receiving the data of the data resource element division of the first management end, the digital asset platform generates a digital asset area with a relative position relationship and plans and adjusts the digital asset area to obtain an area image, configures a corresponding second management end for each digital asset area based on the digital asset authority data of the first management end, and includes S11-S13:
s11, after receiving the data resource element division data of the first management end, the digital asset platform generates a corresponding digital asset region in a preset interactive image according to the region quantity information and the region position information in the data resource element division data.
After receiving the data resource element division data of the first management end, the digital asset platform analyzes the data resource element division data to obtain region quantity information and region position information, wherein the region quantity information is for example 3, the region position information is geographic information corresponding to longitude and latitude, for example, longitude and latitude information corresponding to region A, longitude and latitude interval information corresponding to region B and the like, and the region position information can be the center position of a preset region corresponding to each region by a worker. The area quantity information and the area position information are preconfigured by the management end. It should be noted that, for example, for a group enterprise, there are a plurality of enterprises, for example, enterprise a, enterprise b, and enterprise c, which are distributed in different areas, and different enterprise asset data are different, for example, enterprise a has asset data such as a transformer and a transformer, and enterprise b has asset data such as a voltage sensor and a current sensor, and the scheme can divide the asset data in combination with the above geographical locations to further manage.
The method and the device can combine the region quantity information and the region position information in the data resource element division data to generate corresponding digital asset regions in the preset interactive image. The digital asset region may be a small region corresponding to each company, for example, a preset small circle, which has a smaller shape, or may be a point, which is used to represent each region, for example, a small circle corresponding to region a, a small circle corresponding to region B, and so on.
In some embodiments, the generating the corresponding digital asset region in the preset interactive image according to the region number information and the region position information in the data resource element division data includes S111-S114:
s111, generating an initial digital asset region in the preset interactive image according to region quantity information in the data resource element division data, wherein the initial digital asset region has an initial first position in the preset interactive image.
First, the present solution may divide the region number information in the data with the data resource elements, and generate initial digital asset regions in the preset interactive image, for example, the region number information is 10, and then there are 10 initial digital asset regions. Wherein the initial digital asset region has an initial first location in the preset interactive image. The first location is an initial location of an initial digital asset region, e.g., the initial digital asset region is located at a position above a preset interactive image. The position of each preset interactive image is adjusted later.
S112, obtaining the region position information corresponding to all the digital asset regions, determining the corresponding region position center coordinates, and establishing a corresponding coordinate system in a preset interactive image based on the region position center coordinates.
The method can obtain the region position information corresponding to all the digital asset regions, and the corresponding region position center coordinates need to be determined, and a mode of calculating the region position center coordinates is provided. The scheme can be combined with the central coordinates of the region positions to establish a corresponding coordinate system in the preset interactive image. The origin of the coordinate system may be at the center of the preset interactive image.
The method comprises the steps of obtaining the regional position information corresponding to all the digital asset regions, determining the corresponding regional position center coordinates, and establishing a corresponding coordinate system in a preset interactive image based on the regional position center coordinates, wherein the method comprises the following steps:
and acquiring a longitude extremum group and a latitude extremum group in the regional position information corresponding to all the digital asset regions, wherein the longitude extremum group comprises a longitude maximum value and a longitude minimum value, and the latitude extremum group comprises a latitude maximum value and a latitude minimum value.
The method and the device can obtain a longitude extremum group and a latitude extremum group in the regional position information corresponding to all the digital asset regions, wherein the longitude extremum group and the latitude extremum group are longitude and latitude intervals corresponding to all the digital asset regions, the longitude extremum group comprises a longitude maximum value and a longitude minimum value, and the latitude extremum group comprises a latitude maximum value and a latitude minimum value.
The scheme calculates and determines a longitude median and a longitude extremum interval corresponding to the longitude extremum group, and calculates a latitude median and a latitude extremum interval corresponding to the latitude extremum group. The median value may be obtained by using a median value between the maximum value and the minimum value, and may be obtained by dividing the sum of the maximum value and the minimum value by 2. The longitude extremum interval is an interval obtained by a longitude maximum value and a longitude minimum value, and the latitude extremum group is an interval obtained by a latitude maximum value and a latitude minimum value.
The regional position center coordinates can be obtained by counting longitude median values and latitude median values. And then combining the longitude extremum interval and the longitude constant value to calculate a unit longitude coordinate interval of the coordinate system, and combining the latitude extremum interval and the latitude constant value to calculate a unit latitude coordinate interval of the coordinate system.
The longitude value is preset by the management end, for example, 10, the longitude value interval can be a span value of a maximum value and a minimum value, for example, 100, and then the longitude value interval is calculated to obtain the unit longitude coordinate interval of the coordinate system as 10. Similarly, the calculation mode of the unit longitude coordinate interval of the coordinate system is the same, and is not repeated. It should be noted that the coordinate interval is an interval corresponding to each scale in the coordinate system.
And S113, determining corresponding second positions in the coordinate system according to the region positions of all the digital asset regions and generating region images corresponding to the digital asset regions.
The method can determine corresponding second positions in the coordinate system by combining the region positions of all the digital asset regions, and simultaneously generate region images corresponding to the digital asset regions. It is worth mentioning that the region image is a large circle corresponding to the digital asset region.
Determining a corresponding second position in the coordinate system according to the region positions of all the digital asset regions and generating a region image corresponding to the digital asset region, wherein the method comprises the following steps:
and determining a longitude diameter value and a latitude diameter value corresponding to the area image according to a preset radius scale interval, wherein the radius scale interval is the scale number in a coordinate system.
It can be understood that the longitude diameter value and the latitude diameter value corresponding to the area image are determined by the radius scale interval, where the radius scale interval is the number of scales in the coordinate system, for example, 0.5 scale number.
And generating an area image of the corresponding digital asset area by taking the second position as a circle center and the radius scale interval as a radius, wherein the area image has a corresponding longitude diameter value and latitude diameter value.
And then, generating a corresponding area image by taking the second position as the center of a circle and the radius scale interval as the radius, wherein the area image is circular, and the area image has a corresponding longitude diameter value and latitude diameter value.
And S114, if the region images corresponding to any two digital asset regions are judged to be overlapped, the overlapped digital asset regions are subjected to position adjustment, and a corresponding third position is obtained.
If the region images corresponding to any two digital asset regions are judged to be overlapped, an adjustment operation is needed. The method can adjust the positions of the overlapped digital asset areas to obtain corresponding third positions.
If it is determined that the area images corresponding to any two digital asset areas overlap, performing position adjustment on the overlapped digital asset areas to obtain a corresponding third position, where the method includes:
and if the longitude diameter value and/or the latitude diameter value of any two area images are judged to have the overlapped numerical value, determining the overlapped longitude value and/or the overlapped latitude value.
If it is determined that the longitude diameter value and/or the latitude diameter value of any two area images have overlapping values, it is indicated that the two area images overlap, and at this time, the overlapping longitude value and/or the overlapping latitude value need to be determined.
Longitude and/or latitude movement values of the two area images are determined based on the overlapping longitude and/or latitude values.
Wherein the determination of the longitude and/or latitude movement values is determined using overlapping longitude values and/or spans of overlapping latitude values, for example, using two longitude extrema overlapping longitude values, for example, a longitude maxima minus a longitude minima; taking the latitude movement value as an example, two latitude extreme values of overlapping latitude values are adopted to determine, for example, a latitude maximum value minus a latitude minimum value.
The present approach may determine longitude and/or latitude movement values for two area images in combination with overlapping longitude and/or latitude values.
And determining opposite longitudinal directions and/or latitudes of the digital asset region, and moving the two region images according to the longitudinal directions and/or the latitudes based on the longitudinal movement values and/or the latitudes movement values to obtain a third position of the moved region image.
When moving, the scheme needs to determine opposite longitudinal directions and/or latitudes of the digital asset region, and the two region images are moved according to the longitudinal directions and/or latitudes and combined with the longitudinal movement value and/or the latitudes movement value to obtain a third position of the moved region image.
Where the determination of the opposite longitudinal and/or latitudinal directions of the digital asset regions may be made in opposite directions of the two digital asset regions in the longitudinal direction and in opposite directions in the latitudinal direction.
S12, extracting role rights in the digital asset rights data of the first management end, and determining the role rights of each digital asset region based on the corresponding relation between the role rights of the digital asset rights data and the digital asset regions.
It can be understood that the digital asset rights corresponding to different management ends are different, and the role rights in the digital asset rights data of the first management end can be extracted according to the scheme. And determining the role rights of each digital asset region by combining the corresponding relationship between the role rights of the digital asset rights data and the digital asset regions.
S13, acquiring a second management end corresponding to each role authority, and configuring the corresponding second management end corresponding to the digital asset region.
The scheme can obtain a second management end corresponding to each role authority, and then the corresponding second management end is configured corresponding to the digital asset area.
On the basis of the above embodiment, the method further comprises:
and if any one of the area images with the third position is judged to be overlapped with other area images with the second position, displaying the moved area image with the third position according to a first preset form.
In some cases, there may be other overlapping of the region images after the movement, at which point further processing is required. If any one of the area images with the third position is judged to be overlapped with other area images with the second position, the moving area image with the third position is displayed according to a first preset form. For example in red. Meanwhile, the area images of other second positions which are judged to be overlapped are displayed according to a second preset form, for example, yellow.
And if the position adjustment information of the first management end on the area image is received, adjusting the area image at the second position and/or the third position based on the position adjustment information.
At this time, the first management end may actively adjust, and if the position adjustment information of the first management end on the area image is received, the present solution may combine the position adjustment information to perform adjustment processing on the area image at the second position and/or the third position. The above-mentioned position adjustment information may be that the first management end performs a trigger movement on the area image.
S2, generating an asset management table corresponding to each digital asset region, and setting the asset management table in association with the second management end so that the asset management table carries out asset information configuration on the asset management table based on the region asset data of the second management end.
The scheme generates an asset management table corresponding to each digital asset region to manage digital assets.
The asset management table is associated with the second management end, so that the asset management table configures asset information for the asset management table based on the regional asset data of the second management end. It will be appreciated that the asset management table corresponds to a digital asset area and the second management side corresponds to a digital asset area, and thus the corresponding asset management table may be associated with the second management side.
In some embodiments, the generating an asset management table corresponding to each digital asset area and associating the asset management table with the second management end to enable the asset management table to configure asset information of the asset management table based on the area asset data of the second management end includes S21-S22:
s21, generating an asset management table corresponding to each digital asset region, wherein the asset management table at least comprises an asset type column, an asset quantity column and an asset state column.
The method can generate an asset management table corresponding to each digital asset region, wherein the asset management table at least comprises an asset type column, an asset quantity column and an asset state column. The asset category field may fill in asset categories, such as category a, category B, etc., the asset quantity field may fill in corresponding quantity information, and the asset status field may fill in status of the asset, such as status of whether used, damaged, etc.
S22, configuring the unit cell corresponding to the asset type column, the asset quantity column and the asset state column in the asset management table based on the regional asset data input by the second management end, and obtaining the asset information corresponding to the asset management table.
The method can be combined with the regional asset data input by the second management end to configure the asset type column, the asset quantity column and the corresponding cell of the asset state column in the asset management table, so as to obtain the asset information corresponding to the asset management table.
S3, after the monitoring end is judged to access the digital asset platform, a corresponding information access interactive interface is generated based on the identity authority corresponding to the monitoring end, and the information access interactive interface comprises an area image of the digital asset area corresponding to the identity authority.
After the monitoring end accesses the digital asset platform, the scheme can obtain the access authority of the monitoring end, and then a corresponding information access interactive interface is generated by combining the identity authority corresponding to the monitoring end, wherein the information access interactive interface comprises an area image of a digital asset area corresponding to the identity authority. It will be appreciated that different identity rights correspond to different digital asset regions, and thus, the information access interface will present an area image of the digital asset region corresponding to the identity rights.
In some embodiments, after determining that a monitoring end accesses a digital asset platform, generating a corresponding information access interaction interface based on an identity authority corresponding to the monitoring end, where the information access interaction interface includes an area image of a digital asset area corresponding to the identity authority, and the method includes S31-S33:
s31, determining a corresponding preset interaction image based on the identity authority corresponding to the monitoring end.
The scheme can firstly combine the identity authority corresponding to the monitoring end to determine the corresponding preset interactive image.
S32, determining an area image of a digital asset area of the preset interactive image corresponding to the monitoring end, generating a first background color on the determined area image of the digital asset area in the preset interactive image, and generating a second background color on the area image of the digital asset area which is not determined in the preset interactive image.
The method comprises the steps of obtaining a digital asset region of a preset interactive image corresponding to a monitoring end, generating a first background color, such as green, for a region image of a determined digital asset region in the preset interactive image, and generating a second background color, such as blue, for a region image of an undetermined digital asset region in the preset interactive image. Can be displayed to the monitoring end.
S33, counting the information of all asset type columns in the asset management table of the determined digital asset area to obtain a type screening table, and obtaining a corresponding information access interaction interface based on the preset interaction image and the type screening table.
The present solution will count the information of all asset category columns in the asset management table of the determined digital asset region to obtain a category screening table, and it will be understood that the category screening table has information of all asset categories.
The scheme can obtain a corresponding information access interactive interface by using a preset interactive image and a type screening table.
And S4, determining asset types of asset information based on the information access interactive interface, and respectively splitting asset management tables of a plurality of digital asset areas based on the asset types to obtain corresponding splitting tables.
The scheme can combine the information access interaction interface to determine the asset type of the asset information, and meanwhile, combine the asset type to split the asset management tables of the plurality of digital asset areas respectively to obtain corresponding split tables.
In some embodiments, the determining the asset type of the asset information based on the information access interaction interface, and splitting the asset management tables of the plurality of digital asset areas based on the asset type to obtain corresponding splitting tables respectively includes S41-S42:
S41, accessing the interactive interface based on the information, determining an asset management table corresponding to the digital asset region with the first background color selected by the monitoring end as an asset management table to be processed, and determining the asset type selected in the type screening table.
The scheme can be combined with the information access interactive interface to determine the asset management table corresponding to the digital asset region with the first background color selected by the monitoring end as the asset management table to be processed, and can also determine the asset type selected in the type screening table. Such as class a.
S42, copying the asset management table to be processed to obtain a copy management table, deleting the unselected asset types in the copy management table from the copy management table to realize the type splitting, and obtaining a corresponding splitting table.
The scheme can copy the asset management table to be processed to obtain a copy management table, and then delete the unselected asset types in the copy management table from the copy management table to realize the type splitting to obtain a corresponding splitting table. It will be appreciated that this scheme leaves only the data corresponding to the selected asset class to be split into separate tables.
S5, combining the plurality of splitting tables according to the different attributes of the different splitting tables to obtain a combined table, positioning different areas in the combined table based on the splitting tables, displaying the different areas in a differentiated mode, and sending the different areas to a monitoring end.
The method comprises the steps that a plurality of splitting tables are combined to obtain a combined table according to the difference of the attributes of the splitting tables, different areas in the combined table are positioned according to the splitting tables, and the different areas are displayed in a differentiated mode and then sent to a monitoring end. By the mode, the monitoring terminal can be assisted to quickly check.
In some embodiments, the combining the multiple splitting tables according to the different attributes of the different splitting tables to obtain a combined table, positioning and displaying different areas in the combined table differently based on the splitting tables, and sending the different areas to the monitoring end, where the steps include S51-S54:
s51, counting the sum of the numbers of the assets corresponding to all asset types in each splitting table to obtain a first asset number, and taking the first asset number as an attribute of the splitting table.
It can be understood that the method can count the sum of the numbers of the assets corresponding to all the asset types in each splitting table to obtain the first number of assets, and then take the first number of assets as the attribute of the splitting table.
S52, sorting all the splitting tables in a descending order based on the first asset quantity to obtain a splitting table sequence, and respectively adding corresponding differential display states according to the sequence of the splitting tables in the splitting table sequence.
According to the scheme, all the splitting tables are ordered in a descending order by utilizing the first asset quantity to obtain a splitting table sequence, and then corresponding differential display states are respectively added according to the sequence of the splitting tables in the splitting table sequence. The differential display states may be displayed in different colors.
S53, taking the splitting table of the 1 st splitting table in the splitting table sequence as a table to be combined, and sequentially adding asset information in other splitting tables to the table to be combined according to the splitting table sequence to obtain a combination table.
According to the scheme, the splitting table of the 1 st splitting table sequence is taken as a table to be combined, and meanwhile, asset information in other splitting tables is sequentially added into the table to be combined according to the splitting table sequence to obtain a combination table. In this way, the asset information in the other split tables can be combined in a smaller combined amount.
S54, determining a splitting table and a corresponding differential display state corresponding to each cell in the combination table, and displaying and processing the corresponding cell according to the differential display state.
The method and the device can obtain a splitting table corresponding to each cell in the combination table and a corresponding differential display state, and simultaneously display the corresponding cell according to the differential display state.
Referring to fig. 2, a schematic structural diagram of an asset information process safety monitoring system based on data resource elements according to an embodiment of the present invention includes:
the generation module is used for enabling the digital asset platform to generate a digital asset region with a relative position relationship after receiving the data resource element division data of the first management end, planning and adjusting the digital asset region to obtain a region image, and configuring a corresponding second management end for each digital asset region based on the digital asset authority data of the first management end;
the association module is used for generating an asset management table corresponding to each digital asset region, and associating and setting the asset management table with the second management end so that the asset management table carries out asset information configuration on the asset management table based on the region asset data of the second management end;
the judging module is used for generating a corresponding information access interactive interface based on the identity authority corresponding to the monitoring end after the monitoring end is judged to access the digital asset platform, wherein the information access interactive interface comprises an area image of the digital asset area corresponding to the identity authority;
The splitting module is used for determining asset types of asset information based on the information access interaction interface, and respectively splitting asset management tables of a plurality of digital asset areas based on the asset types to obtain corresponding splitting tables;
and the combination module is used for combining the plurality of split tables according to the different attributes of the different split tables to obtain a combination table, positioning different areas in the combination table based on the split tables, displaying the different areas in the combination table in a differentiated mode, and sending the different areas to the monitoring end.
The embodiment of the invention provides electronic equipment, which comprises: a processor, a memory and a computer program; wherein the method comprises the steps of
And a memory for storing the computer program, which may also be a flash memory (flash). Such as application programs, functional modules, etc. implementing the methods described above.
And the processor is used for executing the computer program stored in the memory to realize each step executed by the equipment in the method. Reference may be made in particular to the description of the embodiments of the method described above.
In the alternative, the memory may be separate or integrated with the processor.
When the memory is a device separate from the processor, the apparatus may further include:
And the bus is used for connecting the memory and the processor.
The present invention also provides a storage medium having stored therein a computer program for implementing the methods provided by the various embodiments described above when executed by a processor.
The storage medium may be a computer storage medium or a communication medium. Communication media includes any medium that facilitates transfer of a computer program from one place to another. Computer storage media can be any available media that can be accessed by a general purpose or special purpose computer. For example, a storage medium is coupled to the processor such the processor can read information from, and write information to, the storage medium. In the alternative, the storage medium may be integral to the processor. The processor and the storage medium may reside in an application specific integrated circuit (Application Specific Integrated Circuits, ASIC for short). In addition, the ASIC may reside in a user device. The processor and the storage medium may reside as discrete components in a communication device. The storage medium may be read-only memory (ROM), random-access memory (RAM), CD-ROMs, magnetic tape, floppy disk, optical data storage device, etc.
The present invention also provides a program product comprising execution instructions stored in a storage medium. The at least one processor of the device may read the execution instructions from the storage medium, the execution instructions being executed by the at least one processor to cause the device to implement the methods provided by the various embodiments described above.
In the above embodiments of the terminal or the server, it should be understood that the processor may be a central processing unit (english: central Processing Unit, abbreviated as CPU), or may be other general purpose processors, digital signal processors (english: digital Signal Processor, abbreviated as DSP), application specific integrated circuits (english: application Specific Integrated Circuit, abbreviated as ASIC), or the like. A general purpose processor may be a microprocessor or the processor may be any conventional processor or the like. The steps of a method disclosed in connection with the present invention may be embodied directly in a hardware processor for execution, or in a combination of hardware and software modules in a processor for execution.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solution of the present invention, and not for limiting the same; although the invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical scheme described in the foregoing embodiments can be modified or some or all of the technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit of the invention.

Claims (12)

1. The asset information process safety monitoring method based on the data resource elements is characterized by comprising the following steps:
after receiving the data resource element division data of the first management end, the digital asset platform generates digital asset areas with relative position relations, plans and adjusts the digital asset areas to obtain area images, and configures a corresponding second management end for each digital asset area based on the digital asset authority data of the first management end;
generating an asset management table corresponding to each digital asset region, and associating and setting the asset management table with the second management end so that the asset management table carries out asset information configuration on the asset management table based on the region asset data of the second management end;
after judging that a monitoring end accesses a digital asset platform, generating a corresponding information access interaction interface based on the identity authority corresponding to the monitoring end, wherein the information access interaction interface comprises an area image of a digital asset area corresponding to the identity authority;
determining asset types of asset information based on the information access interaction interface, and respectively splitting asset management tables of a plurality of digital asset areas based on the asset types to obtain corresponding splitting tables;
Combining the plurality of split tables according to the different attributes of the different split tables to obtain a combined table, positioning different areas in the combined table based on the split tables, displaying the different areas in a differentiated mode, and sending the different areas to a monitoring end;
after receiving the data resource element division data of the first management end, the digital asset platform generates digital asset areas with relative position relations, plans and adjusts the digital asset areas to obtain area images, configures a corresponding second management end for each digital asset area based on the digital asset authority data of the first management end, and comprises the following steps:
after receiving the data resource element division data of the first management end, the digital asset platform generates a corresponding digital asset area in a preset interactive image according to the area quantity information and the area position information in the data resource element division data;
extracting role rights in the digital asset rights data of the first management end, and determining the role rights of each digital asset region based on the corresponding relation between the role rights of the digital asset rights data and the digital asset regions;
acquiring a second management end corresponding to each role authority, and configuring the corresponding second management end and the digital asset area correspondingly;
The generating the corresponding digital asset region in the preset interactive image according to the region quantity information and the region position information in the data resource element division data comprises the following steps:
generating an initial digital asset region in a preset interactive image according to region quantity information in data resource element division data, wherein the initial digital asset region has an initial first position in the preset interactive image;
acquiring region position information corresponding to all digital asset regions, determining corresponding region position center coordinates, and establishing a corresponding coordinate system in a preset interactive image based on the region position center coordinates;
determining corresponding second positions in the coordinate system according to the region positions of all the digital asset regions and generating region images corresponding to the digital asset regions;
and if the region images corresponding to any two digital asset regions are judged to be overlapped, carrying out position adjustment on the overlapped digital asset regions to obtain a corresponding third position.
2. The asset information process safety monitoring method based on data resource elements of claim 1,
the obtaining the region position information corresponding to all the digital asset regions and determining the corresponding region position center coordinates, and establishing a corresponding coordinate system in a preset interactive image based on the region position center coordinates comprises the following steps:
Acquiring a longitude extremum group and a latitude extremum group in regional position information corresponding to all digital asset regions, wherein the longitude extremum group comprises a longitude maximum value and a longitude minimum value, and the latitude extremum group comprises a latitude maximum value and a latitude minimum value;
determining a longitude median value and a longitude extremum interval corresponding to the longitude extremum group, and determining a latitude median value and a latitude extremum interval corresponding to the latitude extremum group;
and counting the longitude median value and the latitude median value to obtain a regional position center coordinate, calculating to obtain a unit longitude coordinate interval of the coordinate system based on the longitude extreme value interval and the longitude constant value, and calculating to obtain a unit latitude coordinate interval of the coordinate system based on the latitude extreme value interval and the latitude constant value.
3. The asset information process safety monitoring method based on data resource elements of claim 1,
the determining the corresponding second position in the coordinate system according to the region positions of all the digital asset regions and generating the region image corresponding to the digital asset region comprises the following steps:
determining a longitude diameter value and a latitude diameter value corresponding to an area image according to a preset radius scale interval, wherein the radius scale interval is the scale number in a coordinate system;
And generating an area image of the corresponding digital asset area by taking the second position as a circle center and the radius scale interval as a radius, wherein the area image has a corresponding longitude diameter value and latitude diameter value.
4. The asset information process safety monitoring method based on data resource elements of claim 3,
if it is determined that the area images corresponding to any two digital asset areas overlap, performing position adjustment on the overlapped digital asset areas to obtain a corresponding third position, including:
if the longitude diameter value and/or the latitude diameter value of any two area images are judged to have the overlapped numerical value, the overlapped longitude value and/or the overlapped latitude value are determined;
determining longitude and/or latitude movement values of two area images based on the overlapping longitude and/or latitude values;
and determining opposite longitudinal directions and/or latitudes of the digital asset region, and moving the two region images according to the longitudinal directions and/or the latitudes based on the longitudinal movement values and/or the latitudes movement values to obtain a third position of the moved region image.
5. The asset information process safety monitoring method based on data resource elements of claim 4, further comprising:
If any one of the area images with the third position is overlapped with other area images with the second position, displaying the moved area image with the third position according to a first preset form;
displaying the area images of the other second positions which are judged to be overlapped according to a second preset form;
and if the position adjustment information of the first management end on the area image is received, adjusting the area image at the second position and/or the third position based on the position adjustment information.
6. The asset information process safety monitoring method based on data resource elements of claim 5,
the generating an asset management table corresponding to each digital asset area, and associating the asset management table with the second management end, so that the asset management table configures asset information for the asset management table based on the area asset data of the second management end, including:
generating an asset management table corresponding to each digital asset region, wherein the asset management table at least comprises an asset type column, an asset quantity column and an asset state column;
and configuring the unit cell corresponding to the asset category column, the asset quantity column and the asset state column in the asset management table based on the regional asset data input by the second management end to obtain asset information corresponding to the asset management table.
7. The asset information process safety monitoring method based on data resource elements of claim 6,
after the monitoring end is judged to access the digital asset platform, a corresponding information access interaction interface is generated based on the identity authority corresponding to the monitoring end, wherein the information access interaction interface comprises an area image of the digital asset area corresponding to the identity authority, and the information access interaction interface comprises the following steps:
determining a corresponding preset interactive image based on the identity authority corresponding to the monitoring end;
determining an area image of a digital asset area of a preset interactive image corresponding to the monitoring end, generating a first background color on the area image of the determined digital asset area of the preset interactive image, and generating a second background color on the area image of an undetermined digital asset area in the preset interactive image;
and counting the information of all asset category columns in the asset management table of the determined digital asset area to obtain a category screening table, and obtaining a corresponding information access interactive interface based on the preset interactive image and the category screening table.
8. The asset information process safety monitoring method based on data resource elements of claim 7,
The determining asset types of asset information based on the information access interactive interface, and splitting asset management tables of a plurality of digital asset areas based on the asset types to obtain corresponding splitting tables, wherein the splitting tables comprise:
based on the information access interaction interface, determining an asset management table corresponding to the digital asset region with the first background color selected by the monitoring end as an asset management table to be processed, and determining the asset type selected in the type screening table;
copying the asset management table to be processed to obtain a copy management table, deleting the unselected asset types in the copy management table from the copy management table to realize the type splitting, and obtaining a corresponding splitting table.
9. The asset information process safety monitoring method based on data resource elements of claim 8,
the method for combining the plurality of splitting tables according to the different attributes of the different splitting tables to obtain a combined table, positioning and displaying different areas in the combined table in a differentiated mode based on the splitting tables, and sending the different areas to a monitoring end comprises the following steps:
counting the sum of the asset numbers corresponding to all asset types in each splitting table to obtain a first asset number, and taking the first asset number as an attribute of the splitting table;
Sorting all the splitting tables in a descending order based on the first asset quantity to obtain a splitting table sequence, and respectively adding corresponding differential display states according to the sequence of the splitting tables in the splitting table sequence;
taking the splitting table of the 1 st splitting table in the splitting table sequence as a table to be combined, and sequentially adding asset information in other splitting tables into the table to be combined according to the splitting table sequence to obtain a combination table;
and determining a splitting table corresponding to each cell in the combination table and a corresponding differential display state, and displaying and processing the corresponding cell according to the differential display state.
10. An asset information process safety monitoring system based on data resource elements, comprising:
the generation module is used for enabling the digital asset platform to generate a digital asset region with a relative position relationship after receiving the data resource element division data of the first management end, planning and adjusting the digital asset region to obtain a region image, and configuring a corresponding second management end for each digital asset region based on the digital asset authority data of the first management end;
the association module is used for generating an asset management table corresponding to each digital asset region, and associating and setting the asset management table with the second management end so that the asset management table carries out asset information configuration on the asset management table based on the region asset data of the second management end;
The judging module is used for generating a corresponding information access interactive interface based on the identity authority corresponding to the monitoring end after the monitoring end is judged to access the digital asset platform, wherein the information access interactive interface comprises an area image of the digital asset area corresponding to the identity authority;
the splitting module is used for determining asset types of asset information based on the information access interaction interface, and respectively splitting asset management tables of a plurality of digital asset areas based on the asset types to obtain corresponding splitting tables;
the combination module is used for combining the plurality of split tables according to the different attributes of the different split tables to obtain a combination table, positioning different areas in the combination table based on the split tables, displaying the different areas in the combination table in a differentiated mode, and sending the different areas to the monitoring end;
after receiving the data resource element division data of the first management end, the digital asset platform generates digital asset areas with relative position relations, plans and adjusts the digital asset areas to obtain area images, configures a corresponding second management end for each digital asset area based on the digital asset authority data of the first management end, and comprises the following steps:
after receiving the data resource element division data of the first management end, the digital asset platform generates a corresponding digital asset area in a preset interactive image according to the area quantity information and the area position information in the data resource element division data;
Extracting role rights in the digital asset rights data of the first management end, and determining the role rights of each digital asset region based on the corresponding relation between the role rights of the digital asset rights data and the digital asset regions;
acquiring a second management end corresponding to each role authority, and configuring the corresponding second management end and the digital asset area correspondingly;
the generating the corresponding digital asset region in the preset interactive image according to the region quantity information and the region position information in the data resource element division data comprises the following steps:
generating an initial digital asset region in a preset interactive image according to region quantity information in data resource element division data, wherein the initial digital asset region has an initial first position in the preset interactive image;
acquiring region position information corresponding to all digital asset regions, determining corresponding region position center coordinates, and establishing a corresponding coordinate system in a preset interactive image based on the region position center coordinates;
determining corresponding second positions in the coordinate system according to the region positions of all the digital asset regions and generating region images corresponding to the digital asset regions;
And if the region images corresponding to any two digital asset regions are judged to be overlapped, carrying out position adjustment on the overlapped digital asset regions to obtain a corresponding third position.
11. An electronic device, comprising: a memory, a processor and a computer program stored in the memory, the processor running the computer program to perform the method of any one of claims 1 to 9.
12. A storage medium having stored therein a computer program for implementing the method of any of claims 1 to 9 when executed by a processor.
CN202311442138.2A 2023-11-01 2023-11-01 Asset information process safety monitoring method and system based on data resource elements Active CN117150570B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311442138.2A CN117150570B (en) 2023-11-01 2023-11-01 Asset information process safety monitoring method and system based on data resource elements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311442138.2A CN117150570B (en) 2023-11-01 2023-11-01 Asset information process safety monitoring method and system based on data resource elements

Publications (2)

Publication Number Publication Date
CN117150570A CN117150570A (en) 2023-12-01
CN117150570B true CN117150570B (en) 2024-01-26

Family

ID=88897289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311442138.2A Active CN117150570B (en) 2023-11-01 2023-11-01 Asset information process safety monitoring method and system based on data resource elements

Country Status (1)

Country Link
CN (1) CN117150570B (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006202239A (en) * 2005-01-17 2006-08-03 Yasuhiro Saga Asset management system
JP2007316996A (en) * 2006-05-26 2007-12-06 Nec Corp Asset management system, asset management server, asset management method and program
CN112529548A (en) * 2021-02-09 2021-03-19 深圳市华师兄弟教育科技有限公司 Online education platform cloud resource management system
CN113065855A (en) * 2021-06-03 2021-07-02 江苏数字产权交易有限公司 Block chain based method and system for splitting digital assets
CN113269379A (en) * 2020-02-14 2021-08-17 腾讯科技(深圳)有限公司 Method and device for determining house asset level, storage medium and computer equipment
CN113379330A (en) * 2021-07-15 2021-09-10 济南科金信息技术有限公司 Modular BIM park management system and method
CN113868601A (en) * 2020-06-11 2021-12-31 中国标准化研究院 Data asset segmentation checking method and equipment
CN114118709A (en) * 2021-11-02 2022-03-01 浪潮软件股份有限公司 Database-based information asset management method, system, device and readable medium
CN115049321A (en) * 2022-08-15 2022-09-13 国网浙江省电力有限公司信息通信分公司 Material allocation data processing method and system based on geographic information
CN116049254A (en) * 2022-12-24 2023-05-02 世纪恒通科技股份有限公司 Data asset statistics method based on database
CN116521782A (en) * 2023-05-04 2023-08-01 中移信息技术有限公司 Data asset map acquisition method, device, equipment, medium and product
CN116541578A (en) * 2023-05-16 2023-08-04 三峡科技有限责任公司 Asset digital multidimensional management method and system
CN116737277A (en) * 2023-07-17 2023-09-12 国网浙江省电力有限公司 Electric attribute automatic processing method and equipment suitable for intelligent ammeter
CN116957887A (en) * 2023-09-20 2023-10-27 南京快萤科技有限公司 Intelligent meter reading method and meter reading system

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006202239A (en) * 2005-01-17 2006-08-03 Yasuhiro Saga Asset management system
JP2007316996A (en) * 2006-05-26 2007-12-06 Nec Corp Asset management system, asset management server, asset management method and program
CN113269379A (en) * 2020-02-14 2021-08-17 腾讯科技(深圳)有限公司 Method and device for determining house asset level, storage medium and computer equipment
CN113868601A (en) * 2020-06-11 2021-12-31 中国标准化研究院 Data asset segmentation checking method and equipment
CN112529548A (en) * 2021-02-09 2021-03-19 深圳市华师兄弟教育科技有限公司 Online education platform cloud resource management system
CN113065855A (en) * 2021-06-03 2021-07-02 江苏数字产权交易有限公司 Block chain based method and system for splitting digital assets
CN113379330A (en) * 2021-07-15 2021-09-10 济南科金信息技术有限公司 Modular BIM park management system and method
CN114118709A (en) * 2021-11-02 2022-03-01 浪潮软件股份有限公司 Database-based information asset management method, system, device and readable medium
CN115049321A (en) * 2022-08-15 2022-09-13 国网浙江省电力有限公司信息通信分公司 Material allocation data processing method and system based on geographic information
CN116049254A (en) * 2022-12-24 2023-05-02 世纪恒通科技股份有限公司 Data asset statistics method based on database
CN116521782A (en) * 2023-05-04 2023-08-01 中移信息技术有限公司 Data asset map acquisition method, device, equipment, medium and product
CN116541578A (en) * 2023-05-16 2023-08-04 三峡科技有限责任公司 Asset digital multidimensional management method and system
CN116737277A (en) * 2023-07-17 2023-09-12 国网浙江省电力有限公司 Electric attribute automatic processing method and equipment suitable for intelligent ammeter
CN116957887A (en) * 2023-09-20 2023-10-27 南京快萤科技有限公司 Intelligent meter reading method and meter reading system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
公路资产数据库的设计与可视化研究;曲冠晨;朱霞;;测绘与空间地理信息(第11期);全文 *
基于ThingJS平台的资产管理系统设计;赵长远;;电脑知识与技术(第35期);全文 *

Also Published As

Publication number Publication date
CN117150570A (en) 2023-12-01

Similar Documents

Publication Publication Date Title
US11740102B2 (en) Method, apparatus, device and storage medium for determining point of interest area
US11182544B2 (en) User interface for contextual document recognition
EP3525420B1 (en) Method and apparatus for guiding service flow
CN109858441A (en) A kind of monitoring abnormal state method and apparatus for construction site
CN116957887B (en) Intelligent meter reading method and meter reading system
CN106790744A (en) IP dispatching methods and system
CN110866205B (en) Method and apparatus for storing information
CN112015971A (en) Recommendation method and device for cloud product, electronic equipment and computer readable medium
CN115509765A (en) Super-fusion cloud computing method and system, computer equipment and storage medium
CN111966600B (en) Webpage testing method, webpage testing device, computer equipment and computer readable storage medium
CN117150570B (en) Asset information process safety monitoring method and system based on data resource elements
US20230388745A1 (en) Creating A Communication Channel Between User Devices And Local Stores
US11397775B2 (en) User interface for evaluating the quality of geospatial data
CN111061733B (en) Data processing method, device, electronic equipment and computer readable storage medium
CN110515929B (en) Book display method, computing device and storage medium
EP3407568A1 (en) Service processing method and device
CN110967036B (en) Test method and device for navigation product
CN115827899A (en) Data integration method, device and equipment based on knowledge graph and storage medium
CN115563942A (en) Contract generation method and device, electronic equipment and computer readable medium
CN115495489A (en) Cross-border logistics order track query method and device, terminal equipment and storage medium
CN109831737B (en) Bluetooth positioning method, device, equipment and system based on confidence degree
CN110955547B (en) Management method, system, equipment and readable storage medium for interface abnormal information
CN110457332B (en) Information processing method and related equipment
CN111612023A (en) Classification model construction method and device
CN109788431B (en) Bluetooth positioning method, device, equipment and system based on adjacent node group

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant