CN117113104A - Intelligent management system and method applying data analysis technology - Google Patents

Intelligent management system and method applying data analysis technology Download PDF

Info

Publication number
CN117113104A
CN117113104A CN202311179856.5A CN202311179856A CN117113104A CN 117113104 A CN117113104 A CN 117113104A CN 202311179856 A CN202311179856 A CN 202311179856A CN 117113104 A CN117113104 A CN 117113104A
Authority
CN
China
Prior art keywords
fault
equipment
precision
value
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311179856.5A
Other languages
Chinese (zh)
Inventor
许东也
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Maosen Software Co ltd
Original Assignee
Harbin Maosen Software Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Maosen Software Co ltd filed Critical Harbin Maosen Software Co ltd
Priority to CN202311179856.5A priority Critical patent/CN117113104A/en
Publication of CN117113104A publication Critical patent/CN117113104A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F18/00Pattern recognition
    • G06F18/20Analysing
    • G06F18/22Matching criteria, e.g. proximity measures
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F18/00Pattern recognition
    • G06F18/20Analysing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F18/00Pattern recognition
    • G06F18/20Analysing
    • G06F18/21Design or setup of recognition systems or techniques; Extraction of features in feature space; Blind source separation
    • G06F18/217Validation; Performance evaluation; Active pattern learning techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Evolutionary Biology (AREA)
  • Economics (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • General Engineering & Computer Science (AREA)
  • Bioinformatics & Computational Biology (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Artificial Intelligence (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Strategic Management (AREA)
  • Evolutionary Computation (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • General Factory Administration (AREA)

Abstract

The invention relates to the field of intelligent management, in particular to an intelligent management system and method applying a data analysis technology, wherein the system comprises a data preprocessing module, a part precision analysis module, a fault risk judging module and a fault management module.

Description

Intelligent management system and method applying data analysis technology
Technical Field
The invention relates to the field of intelligent management, in particular to an intelligent management system and method applying a data analysis technology.
Background
Along with the continuous improvement of the automation, informatization and intellectualization levels of the equipment, the precision requirement on the machined parts is also continuously improved, because the machining equipment has certain error in precision due to the common influence of internal factors and external factors in the process of producing the parts, if the machining equipment is not calibrated in time, the machining quality of the workpiece is reduced, even the service life of the machining equipment is seriously damaged,
at present, analysis is carried out according to the equipment operation process, and then the corresponding equipment fault reasons are obtained, equipment parts are replaced according to the fault reasons, the fault points cannot be solved from the root, and because the operation duration of each machining equipment is inconsistent, a certain error exists in the precision of the parts produced by the machining equipment, and in order to more accurately reduce the fault influence degree generated during the combined operation between two associated parts, how to monitor the interaction influence between the two associated parts is still significant.
Disclosure of Invention
The invention aims to provide an intelligent management method applying a data analysis technology, so as to solve the problems in the background technology, and the invention provides the following technical scheme:
an intelligent management method applying data analysis technology, the method comprising the steps of:
s1, acquiring a device fault analysis report in a monitoring area through historical data, and preprocessing fault information by combining the device fault analysis report;
s2, analyzing the relation between the abrasion time of the part production equipment and the precision of the part, obtaining a corresponding part precision evaluation value by combining the analysis result, and further calculating the influence degree value of interference influence between adjacent parts on equipment faults according to the evaluation value;
s3, monitoring the performance index change condition of the current equipment in real time, and judging whether the current equipment has a fault risk or not by combining the performance index change condition;
and S4, further receiving an early warning signal according to the judgment result in the S3, combining and analyzing the current equipment performance index data detection value with the analysis result in the S2, and taking corresponding measures under the condition that the current index data detection value is abnormal.
Further, the method of S1 includes the following steps:
step 1001, recording the equipment fault analysis report in the monitoring area acquired in the step S1 as a set A,
A={A 1 ,A 2 ,A 3 ,...,A n },
wherein A is n The method comprises the steps of representing a fault set corresponding to an nth device, wherein n represents the total number of device fault analysis reports in a historical monitoring area;
step 1002, extracting a fault characteristic value corresponding to each fault in a fault set corresponding to an nth device, wherein the fault corresponds to a unique fault characteristic value, and the fault characteristic value is a database preset value;
step 1003, repeating step 1002 to obtain corresponding fault characteristic values of the corresponding devices, and combining the fault characteristic values of the corresponding devices to obtain a fault part set of the corresponding devices, which is denoted as a set B,
B={G 1 (B),G 2 (B),G 3 (B),...,G n (B)},
wherein G is n (B) A part set indicating that the nth device has a fault.
According to the invention, the fault analysis report of the equipment in the monitoring area in the historical database is obtained, the fault characteristic value is extracted according to the fault analysis report, the fault characteristic value is further analyzed to obtain the part corresponding to the equipment fault, and the data reference is provided for the relationship between the precision of the subsequently analyzed part and the abrasion condition of the machining equipment.
Further, the method of S2 includes the following steps:
step 2001, obtaining a part set with faults of the nth equipment in step 1003, marking machining equipment corresponding to the faulty parts in the part set as a set C, wherein one faulty part corresponds to one part production equipment,
C=(C 1 ,C 2 ,C 3 ,...,C m ),
C m representing machining equipment corresponding to an mth faulty part of the nth equipment;
step 2002, the relation between the wear time of the machining equipment corresponding to the mth fault part of the nth equipment and the precision of the machined part is recorded as M m (t),
M m (t)=φ 1 *N(t)+φ 2 *Q(t),
Wherein phi is 1 And phi 2 Presetting a proportionality coefficient for a database, wherein N (t) represents the change relation of the abrasion loss of the blade of the mechanical processing equipment along with time, Q (t) represents the change relation of heat energy along with time when the mechanical processing equipment operates,
wherein t is E [0, beta ],
when t is E [0, t 1 ) When the operation of the machining equipment is earlier, N (t) =a 1 t 2 ,a 1 <0,
When t is E [ t ] 1 ,t 2 ) When the machining equipment represents the middle operation period of the machining equipment, N (t) =t/a 2 ,a 2 >0,
When t is E [ t ] 2 ,β]The time indicates the later operation period of the mechanical processing equipment, and N (t) = (a) 3 t) 2 ,a 3 >0,
Wherein a is 1 ,a 2 ,a 3 Presetting a constant for a database, t 1 ,t 2 Beta is a preset constant for the database,
q (t) =μ×n×Δd (t), N representing the normal contact force between the blade and the machined part, μ representing the coefficient of friction, Δd (t) representing the average distance value between the initial position of the blade of the machining device and the machined part, the coefficient of friction being a database preset constant;
step 2003, repeating the step 2002 to analyze that the operation time of the nth equipment is t h The relation between the wear time of the machining equipment corresponding to each faulty part and the precision of the machined part is recorded as a set D (t h ),
D(t h )={M 1 (t h ),M 2 (t h ),M 3 (t h ),...,M m (t h )},
Setting the operation time of the nth equipment to be t h When the machining equipment corresponding to each fault part is used, the precision values of the parts produced by the machining equipment at different operation stages are compared with the reference intervals of the corresponding standard parts, the reference values of the standard parts are database preset constants,
if the precision of the corresponding processed part exceeds the reference interval of the standard part, marking abnormality, eliminating the corresponding part,
if the precision of the corresponding processed part does not exceed the reference interval of the standard part, marking is normal;
step 2004, extracting the normal processed parts, carrying out combination analysis on adjacent parts in pairs according to the production flow, judging whether interference influence exists in the combination use between the adjacent parts,
combining standard part reference intervals of the corresponding processed parts in any group of combinations to obtain standard reference values of the corresponding processed part precision, and recording the standard reference values as (delta) 1 /2,δ 2 /2),δ 1 And/2 represents the reference value delta of the standard part corresponding to the machined part of the first machining equipment in any combination 2 And/2 represents the standard part reference value corresponding to the machined part of the second machining equipment in any combination,
acquiring precision values of machined parts corresponding to different operation stages of corresponding machining equipment in the current combination, and recording the precision values as
{(W b1 ,W b2 ,W b3 ),(W c1 ,W c2 ,W c3 ) W, where W b1 Representing the precision value, W, of the machined part corresponding to the earlier operation stage of the previous machining equipment in the combination c2 Representing the precision value, W, of the machined part corresponding to the earlier operation stage of the latter machining equipment in the combination b2 Representing the precision value, W, of the machined part corresponding to the middle operation period of the previous machining equipment in the combination c2 Representing the precision value, W, of the machined part corresponding to the middle operation period of the latter machining equipment in the combination b3 Representing the precision value, W, of the machined part corresponding to the last operation period of the previous machining equipment in the combination c3 Representing the last mechanical addition in the combinationThe precision values of the processing parts corresponding to the later operation stage of the working equipment are subjected to pairwise combination analysis,
inquiring the using time of the corresponding equipment under the corresponding combination condition through historical data, calculating fault influence degree values generated when the machined parts corresponding to different operation stages of the mechanical machining equipment are used in combination, and recording as G b—c
G b—c =-h 1 *T+h 2
The fault influence degree value formula reflects the relation between time and influence degree, namely, the longer the equipment is put into use, the higher the corresponding fault risk (direct relation) is, the precision of the corresponding processed parts of the equipment in different operation stages is different (indirect relation),
wherein h is 1 Represents a first coefficient, h 2 Representing a second coefficient, T representing the duration of use of the device.
According to the invention, through analyzing the relation between the abrasion conditions corresponding to the machining equipment in different operation stages and the precision of the machined parts, the machining equipment corresponding to the associated parts are combined in pairs, the use time of the corresponding equipment when the machining equipment is used for combining the parts produced in different stages is analyzed, and further the fault influence value of the machining equipment on the equipment when the parts produced in different stages are used in combination is further judged according to the equipment use time, so that data reference is provided for monitoring each performance index during subsequent real-time monitoring when the current equipment is used, and judging whether the current equipment has fault risk.
Further, the method of S3 includes the following steps:
step 3001, setting the current equipment performance index data detection period as η;
step 3002, using an origin o as a reference point, using a line from west to east in a direction crossing the origin o as an x-axis, and using a line from south to north in a direction crossing the origin o as a y-axis, to construct a first plane rectangular coordinate system;
step 3003, normalizing the data in each period detection report, labeling the normalized data in a first plane rectangular coordinate system to obtain corresponding coordinate points, and calculating the difference between adjacent coordinate points, wherein the normalization process is implemented by performing difference operation on the period detection report data and corresponding standard reference values, multiplying the period detection report data and corresponding scale coefficients, and summing,
if the difference value between the adjacent points exceeds the preset value, sending out an early warning signal to judge that the current equipment has fault risk,
if the difference value between the adjacent points does not exceed the preset value, continuing monitoring.
According to the invention, the first plane rectangular coordinate system is constructed, the performance index data of the current equipment are mapped into the first plane rectangular coordinate system after being normalized, the difference value between two adjacent data is further calculated, whether the current equipment has fault analysis or not is judged by combining the difference value, an early warning signal is sent out, and data reference is provided for tracing the fault part of the current equipment by combining the early warning signal subsequently.
Further, in S4, according to the determination result in S3, an early warning signal is further received and a corresponding measure is taken in combination with the performance index data detection value of the current device, if the early warning signal exists, a factory-returning maintenance request is sent to the current device, a fault position corresponding to the abnormality of the performance index data detection value of the current device is obtained, a processed part related to the fault position is extracted, whether the precision of the extracted processed part is not up to standard is determined, if the precision of a single processed part is not up to standard, an early warning signal is sent, the current device is determined, if the precision of the processed part related to the fault position is up to standard, interference influence among the processed parts related to the up to standard is further analyzed, the fault influence degree value generated when the corresponding processed parts are combined in the matching history data is compared with a preset value, when the fault influence degree value is determined to exceed the preset value, the fault risk exists in the current device, and when the fault influence degree value is determined not to exceed the preset value, the fault risk does not exist in the current device.
An intelligent management system applying data analysis techniques, the system comprising the following modules:
and a data preprocessing module: the data preprocessing module is used for analyzing equipment fault reports in the monitoring area in the historical data and further preprocessing the fault data by combining the equipment fault analysis results;
part precision analysis module: the part precision analysis module is used for analyzing the relation between the abrasion degree of the mechanical processing equipment and the precision of the processed part, further evaluating the precision of the corresponding part by combining the analysis result, and analyzing the interference influence effect between two adjacent parts according to the evaluation result;
and a fault risk judging module: the fault risk judging module is used for monitoring the performance index change condition of the current equipment in real time and further judging whether the current equipment has fault risk according to the monitoring result;
and a fault management module: the fault management module is used for combining the early warning signals, further sending a factory return maintenance request to the equipment fault, and tracing the equipment fault reason according to the detection condition of the corresponding equipment performance index data.
Further, the data preprocessing module includes a data acquisition unit and a data processing unit:
the data acquisition unit is used for extracting equipment fault analysis reports in the monitoring area by combining the historical database;
the data processing unit is used for further analyzing the fault equipment by combining the data of the data acquisition unit and extracting the fault reason.
Further, the part precision analysis module comprises a precision analysis unit, a precision comparison unit and a fault influence analysis unit:
the precision analysis unit is used for further analyzing whether the precision value of the machined part has abnormal conditions or not according to the abrasion conditions of the machining equipment in different operation stages;
the precision comparison unit is used for combining the analysis result of the precision analysis module, removing abnormal values and further analyzing whether mutual interference influences exist when the related parts are used in combination;
the fault influence analysis unit is used for monitoring the corresponding service lives of the parts produced by the mechanical processing equipment in different operation stages in real time when the parts are combined and used, and further analyzing the influence degree value of the parts produced by the mechanical processing equipment in different operation stages on equipment faults when the parts are combined and used according to the service lives.
Further, the fault risk judging module comprises a device monitoring unit and an early warning unit:
the device monitoring unit is used for monitoring performance index data of the current device in real time;
the early warning unit is used for analyzing whether abnormal conditions exist in the difference value between the adjacent performance index data in the equipment monitoring module and sending an early warning signal in combination with the analysis result.
Further, the fault management module includes an early warning signal receiving unit and an equipment fault management unit:
the early warning signal receiving unit is used for monitoring the analysis result of the early warning unit in real time and receiving an early warning signal;
the equipment fault management unit is used for further sending a factory return maintenance request to the corresponding equipment according to the early warning signal, carrying out preliminary evaluation on the current equipment according to the service time of the current equipment and combining the fault influence analysis unit to obtain a corresponding fault condition, further tracing the corresponding fault part according to the fault condition, and taking corresponding measures on the fault part.
According to the invention, the faults of equipment in historical data are analyzed, specific parts are further traced, the relation between the abrasion condition of mechanical processing equipment corresponding to the parts and the precision of the processed parts is analyzed, the processed parts are subjected to preliminary screening, the influence of the interference generated when the processing equipment corresponding to the related parts is in different operation stages is analyzed when the processing equipment corresponding to the related parts is in different operation stages after abnormal values are removed, the influence degree value of the influence of the interference on equipment faults is obtained in combination with the use time of the equipment, further whether the current equipment has fault risks is judged according to the current equipment index data monitoring process, the fault reasons are further analyzed in combination with the fault risks, the parts corresponding to the faults are rapidly traced, and the equipment overhaul efficiency is improved.
Drawings
FIG. 1 is a flow chart of an intelligent management method using data analysis technology according to the present invention;
FIG. 2 is a schematic block diagram of an intelligent management system employing data analysis techniques according to the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Example 1: referring to fig. 1, in this embodiment:
an intelligent management method applying a data analysis technology is realized, and the method comprises the following steps:
s1, acquiring a device fault analysis report in a monitoring area through historical data, and preprocessing fault information by combining the device fault analysis report;
the method of S1 comprises the following steps:
step 1001, recording the equipment fault analysis report in the monitoring area acquired in the step S1 as a set A,
A={A 1 ,A 2 ,A 3 ,...,A n },
wherein A is n The method comprises the steps of representing a fault set corresponding to an nth device, wherein n represents the total number of device fault analysis reports in a historical monitoring area;
step 1002, extracting a fault characteristic value corresponding to each fault in a fault set corresponding to an nth device, wherein the fault corresponds to a unique fault characteristic value, and the fault characteristic value is a database preset value;
step 1003, repeating step 1002 to obtain corresponding fault characteristic values of the corresponding devices, and combining the fault characteristic values of the corresponding devices to obtain a fault part set of the corresponding devices, which is denoted as a set B,
B={G 1 (B),G 2 (B),G 3 (B),...,G n (B)},
wherein G is n (B) A part set indicating that the nth device has a fault.
S2, analyzing the relation between the abrasion time of the part production equipment and the precision of the part, obtaining a corresponding part precision evaluation value by combining the analysis result, and further calculating the influence degree value of interference influence between adjacent parts on equipment faults according to the evaluation value;
the method of S2 comprises the following steps:
step 2001, obtaining a part set with faults of the nth equipment in step 1003, marking machining equipment corresponding to the faulty parts in the part set as a set C,
C=(C 1 ,C 2 ,C 3 ,...,C m ),
C m representing machining equipment corresponding to an mth faulty part of the nth equipment;
step 2002, the relation between the wear time of the machining equipment corresponding to the mth fault part of the nth equipment and the precision of the machined part is recorded as M m (t),
M m (t)=φ 1 *N(t)+φ 2 *Q(t),
Wherein phi is 1 And phi 2 Presetting a proportionality coefficient for a database, wherein N (t) represents the change relation of the abrasion loss of the blade of the mechanical processing equipment along with time, Q (t) represents the change relation of heat energy along with time when the mechanical processing equipment operates,
wherein t is E [0, beta ],
when t is E [0, t 1 ) When the operation of the machining equipment is earlier, N (t) =a 1 t 2 ,a 1 <0,
When t is E [ t ] 1 ,t 2 ) When the machining equipment represents the middle operation period of the machining equipment, N (t) =t/a 2 ,a 2 >0,
When t is E [ t ] 2 ,β]The time indicates the later operation period of the mechanical processing equipment, and N (t) = (a) 3 t) 2 ,a 3 >0,
Wherein a is 1 ,a 2 ,a 3 Presetting a constant for a database, t 1 ,t 2 Beta is a preset constant for the database,
q (t) =μ×n×Δd (t), N representing the normal contact force between the blade and the machined part, μ representing the coefficient of friction, Δd (t) representing the average distance value between the initial position of the blade of the machining device and the machined part, the coefficient of friction being a database preset constant;
step 2003, repeating the step 2002 to analyze that the operation time of the nth equipment is t h The relation between the wear time of the machining equipment corresponding to each faulty part and the precision of the machined part is recorded as a set D (t h ),
D(t h )={M 1 (t h ),M 2 (t h ),M 3 (t h ),...,M m (t h )},
Setting the operation time of the nth equipment to be t h When the machining equipment corresponding to each fault part is used, the precision values of the parts produced by the machining equipment at different operation stages are compared with the reference intervals of the corresponding standard parts, the reference values of the standard parts are database preset constants,
if the precision of the corresponding processed part exceeds the reference interval of the standard part, marking abnormality, eliminating the corresponding part,
if the precision of the corresponding processed part does not exceed the reference interval of the standard part, marking is normal;
step 2004, extracting the normal processed parts, carrying out combination analysis on adjacent parts in pairs according to the production flow, judging whether interference influence exists in the combination use between the adjacent parts,
combining standard part reference intervals of the corresponding processed parts in any group of combinations to obtain standard reference values of the corresponding processed part precision, and recording the standard reference values as (delta) 1 /2,δ 2 /2),δ 1 And/2 represents the standard part corresponding to the machined part of the first machining equipment in any combinationReference value delta 2 And/2 represents the standard part reference value corresponding to the machined part of the second machining equipment in any combination,
acquiring precision values of machined parts corresponding to different operation stages of corresponding machining equipment in the current combination, and recording the precision values as
{(W b1 ,W b2 ,W b3 ),(W c1 ,W c2 ,W c3 ) W, where W b1 Representing the precision value, W, of the machined part corresponding to the earlier operation stage of the previous machining equipment in the combination c2 Representing the precision value, W, of the machined part corresponding to the earlier operation stage of the latter machining equipment in the combination b2 Representing the precision value, W, of the machined part corresponding to the middle operation period of the previous machining equipment in the combination c2 Representing the precision value, W, of the machined part corresponding to the middle operation period of the latter machining equipment in the combination b3 Representing the precision value, W, of the machined part corresponding to the last operation period of the previous machining equipment in the combination c3 Representing the precision value of the machined part corresponding to the later operation period of the latter machining equipment in the combination, carrying out pairwise combination analysis on the precision values of the machining equipment corresponding to different stages,
inquiring the using time of the corresponding equipment under the corresponding combination condition through historical data, calculating fault influence degree values generated when the machined parts corresponding to different operation stages of the mechanical machining equipment are used in combination, and recording as G b—c
G b—c =-h 1 *T+h 2
Wherein h is 1 Represents a first coefficient, h 2 Representing a second coefficient, T representing the duration of use of the device.
S3, monitoring the performance index change condition of the current equipment in real time, and judging whether the current equipment has a fault risk or not by combining the performance index change condition;
the method of S3 comprises the following steps:
step 3001, setting the current equipment performance index data detection period as η;
step 3002, using an origin o as a reference point, using a line from west to east in a direction crossing the origin o as an x-axis, and using a line from south to north in a direction crossing the origin o as a y-axis, to construct a first plane rectangular coordinate system;
step 3003, normalizing the data in each period detection report, labeling the normalized data in a first plane rectangular coordinate system to obtain corresponding coordinate points, and calculating the difference between adjacent coordinate points, wherein the normalization process is implemented by performing difference operation on the period detection report data and corresponding standard reference values, multiplying the period detection report data and corresponding scale coefficients, and summing,
if the difference value between the adjacent points exceeds the preset value, sending out an early warning signal to judge that the current equipment has fault risk,
if the difference value between the adjacent points does not exceed the preset value, continuing monitoring.
S4, further receiving an early warning signal according to the judgment result in the S3, combining and analyzing the current equipment performance index data detection value with the analysis result in the S2, and taking corresponding measures under the condition that the current index data detection value is abnormal;
and S4, further receiving an early warning signal and taking corresponding measures by combining the performance index data detection value of the current equipment, if the early warning signal exists, sending a factory-returning maintenance request to the current equipment, acquiring a fault position corresponding to the abnormality of the performance index data detection value of the current equipment, extracting a processed part related to the fault position, judging whether the precision of the extracted processed part is not up to standard, if the precision of a single processed part is not up to standard, sending an early warning signal, judging that the current equipment is at fault risk, if the precision of the processed part related to the fault position is up to standard, further analyzing interference influence among the processed parts related to the standard, comparing the fault influence degree value with a preset value through matching the fault influence degree value generated when the corresponding processed part is combined in the history data, judging that the current equipment is at fault risk when the fault influence degree value is judged to be higher than the preset value, and judging that the current equipment is not at fault risk when the fault influence degree value is judged not to be higher than the preset value.
In this embodiment:
an intelligent management system (as shown in fig. 2) applying data analysis techniques is disclosed for implementing the specific scheme content of the method.
Example 2: setting the precision standard reference interval of the current processed part as [ alpha, beta ]]The current machining equipment operation time is at [ t ] 1 ,t 2 ) In the interval, the precision value of the part processed by the current machining equipment is M m (T),
M m (T)=φ 1 *t/a 22 *μ*N*△d(T),
The precision value of the part processed by the current mechanical processing equipment is M m And (T) comparing the precision standard reference interval of the current processed part, marking abnormal if the precision of the corresponding processed part exceeds the standard part reference interval, removing the corresponding part, and marking normal if the precision of the corresponding processed part does not exceed the standard part reference interval.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present invention, and the present invention is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present invention has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. An intelligent management method applying a data analysis technology, which is characterized by comprising the following steps:
s1, acquiring a device fault analysis report in a monitoring area through historical data, and preprocessing fault information by combining the device fault analysis report;
s2, analyzing the relation between the abrasion time of the part production equipment and the precision of the part, obtaining a corresponding part precision evaluation value by combining the analysis result, and further calculating the influence degree value of interference influence between adjacent parts on equipment faults according to the evaluation value;
s3, monitoring the performance index change condition of the current equipment in real time, and judging whether the current equipment has a fault risk or not by combining the performance index change condition;
and S4, further receiving an early warning signal according to the judgment result in the S3, combining and analyzing the current equipment performance index data detection value with the analysis result in the S2, and taking corresponding measures under the condition that the current index data detection value is abnormal.
2. The intelligent management method using data analysis technology according to claim 1, wherein the method of S1 comprises the steps of:
step 1001, recording the equipment fault analysis report in the monitoring area acquired in the step S1 as a set A,
A={A 1 ,A 2 ,A 3 ,...,A n },
wherein A is n The method comprises the steps of representing a fault set corresponding to an nth device, wherein n represents the total number of device fault analysis reports in a historical monitoring area;
step 1002, extracting a fault characteristic value corresponding to each fault in a fault set corresponding to an nth device, wherein the fault corresponds to a unique fault characteristic value, and the fault characteristic value is a database preset value;
step 1003, repeating step 1002 to obtain corresponding fault characteristic values of the corresponding devices, and combining the fault characteristic values of the corresponding devices to obtain a fault part set of the corresponding devices, which is denoted as a set B,
B={G 1 (B),G 2 (B),G 3 (B),...,G n (B)},
wherein G is n (B) A part set indicating that the nth device has a fault.
3. The intelligent management method using data analysis technology according to claim 2, wherein the method of S2 comprises the steps of:
step 2001, obtaining a part set with faults of the nth equipment in step 1003, marking machining equipment corresponding to the faulty parts in the part set as a set C,
C=(C 1 ,C 2 ,C 3 ,...,C m ),
C m representing machining equipment corresponding to an mth faulty part of the nth equipment;
step 2002, the relation between the wear time of the machining equipment corresponding to the mth fault part of the nth equipment and the precision of the machined part is recorded as M m (t),
M m (t)=φ 1 *N(t)+φ 2 *Q(t),
Wherein phi is 1 And phi 2 Presetting a scale factor, N (t) table for a databaseShowing the change of the wear amount of the blade of the machining equipment along with time, Q (t) shows the change of heat energy along with time when the machining equipment is operated,
wherein t is E [0, beta ],
when t is E [0, t 1 ) When the operation of the machining equipment is earlier, N (t) =a 1 t 2 ,a 1 <0,
When t is E [ t ] 1 ,t 2 ) When the machining equipment represents the middle operation period of the machining equipment, N (t) =t/a 2 ,a 2 >0,
When t is E [ t ] 2 ,β]The time indicates the later operation period of the mechanical processing equipment, and N (t) = (a) 3 t) 2 ,a 3 >0,
Wherein a is 1 ,a 2 ,a 3 Presetting a constant for a database, t 1 ,t 2 Beta is a preset constant for the database,
q (t) =μ×n×Δd (t), N representing the normal contact force between the blade and the machined part, μ representing the coefficient of friction, Δd (t) representing the average distance value between the initial position of the blade of the machining device and the machined part, the coefficient of friction being a database preset constant;
step 2003, repeating the step 2002 to analyze that the operation time of the nth equipment is t h The relation between the wear time of the machining equipment corresponding to each faulty part and the precision of the machined part is recorded as a set D (t h ),
D(t h )={M 1 (t h ),M 2 (t h ),M 3 (t h ),...,M m (t h )},
Setting the operation time of the nth equipment to be t h When the machining equipment corresponding to each fault part is used, the precision values of the parts produced by the machining equipment at different operation stages are compared with the reference intervals of the corresponding standard parts, the reference values of the standard parts are database preset constants,
if the precision of the corresponding processed part exceeds the reference interval of the standard part, marking abnormality, eliminating the corresponding part,
if the precision of the corresponding processed part does not exceed the reference interval of the standard part, marking is normal;
step 2004, extracting the normal processed parts, carrying out combination analysis on adjacent parts in pairs according to the production flow, judging whether interference influence exists in the combination use between the adjacent parts,
combining standard part reference intervals of the corresponding processed parts in any group of combinations to obtain standard reference values of the corresponding processed part precision, and recording the standard reference values as (delta) 1 /2,δ 2 /2),δ 1 And/2 represents the reference value delta of the standard part corresponding to the machined part of the first machining equipment in any combination 2 And/2 represents the standard part reference value corresponding to the machined part of the second machining equipment in any combination,
obtaining the precision values of the machined parts corresponding to different operation stages of the corresponding machining equipment in the current combination, and recording the precision values as { (W) b1 ,W b2 ,W b3 ),(W c1 ,W c2 ,W c3 ) W, where W b1 Representing the precision value, W, of the machined part corresponding to the earlier operation stage of the previous machining equipment in the combination c2 Representing the precision value, W, of the machined part corresponding to the earlier operation stage of the latter machining equipment in the combination b2 Representing the precision value, W, of the machined part corresponding to the middle operation period of the previous machining equipment in the combination c2 Representing the precision value, W, of the machined part corresponding to the middle operation period of the latter machining equipment in the combination b3 Representing the precision value, W, of the machined part corresponding to the last operation period of the previous machining equipment in the combination c3 Representing the precision value of the machined part corresponding to the later operation period of the latter machining equipment in the combination, carrying out pairwise combination analysis on the precision values of the machining equipment corresponding to different stages,
inquiring the using time of the corresponding equipment under the corresponding combination condition through historical data, calculating fault influence degree values generated when the machined parts corresponding to different operation stages of the mechanical machining equipment are used in combination, and recording as G b—c
G b—c =-h 1 *T+h 2
Wherein h is 1 Represents a first coefficient, h 2 Representing the second systemThe number, T, represents the device usage duration.
4. A method of intelligent management using data analysis techniques according to claim 3, wherein said method of S3 comprises the steps of:
step 3001, setting the current equipment performance index data detection period as η;
step 3002, using an origin o as a reference point, using a line from west to east in a direction crossing the origin o as an x-axis, and using a line from south to north in a direction crossing the origin o as a y-axis, to construct a first plane rectangular coordinate system;
step 3003, normalizing the data in each period detection report, labeling the normalized data in a first plane rectangular coordinate system to obtain corresponding coordinate points, calculating the difference between adjacent coordinate points,
if the difference value between the adjacent points exceeds the preset value, sending out an early warning signal to judge that the current equipment has fault risk,
if the difference value between the adjacent points does not exceed the preset value, continuing monitoring.
5. The intelligent management method using a data analysis technology according to claim 4, wherein in S4, according to the judgment result in S3, an early warning signal is further received and a corresponding measure is taken in combination with the performance index data detection value of the current equipment, if the early warning signal exists, a factory return maintenance request is sent to the current equipment, a fault position corresponding to the abnormality of the performance index data detection value of the current equipment is obtained, a processed part related to the fault position is extracted, whether the extracted processed part precision is not up to standard is judged, if the single processed part precision is not up to standard, an early warning signal is sent, a fault risk is judged for the current equipment, if the processed part related to the fault position is up to standard, interference influence among the processed parts related to up to standard is further analyzed, the fault influence degree value generated when the corresponding processed parts in the history data are used in combination is matched, when the fault influence degree value is judged to exceed the preset value, the fault risk exists for the current equipment, and when the fault influence degree value is judged not to exceed the preset value, the fault risk does not exist.
6. An intelligent management system applying data analysis technology, characterized in that the system comprises the following modules:
and a data preprocessing module: the data preprocessing module is used for analyzing equipment fault reports in the monitoring area in the historical data and further preprocessing the fault data by combining the equipment fault analysis results;
part precision analysis module: the part precision analysis module is used for analyzing the relation between the abrasion degree of the mechanical processing equipment and the precision of the processed part, further evaluating the precision of the corresponding part by combining the analysis result, and analyzing the interference influence effect between two adjacent parts according to the evaluation result;
and a fault risk judging module: the fault risk judging module is used for monitoring the performance index change condition of the current equipment in real time and further judging whether the current equipment has fault risk according to the monitoring result;
and a fault management module: the fault management module is used for combining the early warning signals, further sending a factory return maintenance request to the equipment fault, and tracing the equipment fault reason according to the detection condition of the corresponding equipment performance index data.
7. The intelligent management system applying data analysis technology according to claim 6, wherein the data preprocessing module comprises a data acquisition unit and a data processing unit:
the data acquisition unit is used for extracting equipment fault analysis reports in the monitoring area by combining the historical database;
the data processing unit is used for further analyzing the fault equipment by combining the data of the data acquisition unit and extracting the fault reason.
8. The intelligent management system applying data analysis technology according to claim 7, wherein the component precision analysis module comprises a precision analysis unit, a precision comparison unit and a fault influence analysis unit:
the precision analysis unit is used for further analyzing whether the precision value of the machined part has abnormal conditions or not according to the abrasion conditions of the machining equipment in different operation stages;
the precision comparison unit is used for combining the analysis result of the precision analysis module, removing abnormal values and further analyzing whether mutual interference influences exist when the related parts are used in combination;
the fault influence analysis unit is used for monitoring the corresponding service lives of the parts produced by the mechanical processing equipment in different operation stages in real time when the parts are combined and used, and further analyzing the influence degree value of the parts produced by the mechanical processing equipment in different operation stages on equipment faults when the parts are combined and used according to the service lives.
9. The intelligent management system applying data analysis technology according to claim 8, wherein the failure risk determination module includes a device monitoring unit and an early warning unit:
the device monitoring unit is used for monitoring performance index data of the current device in real time;
the early warning unit is used for analyzing whether abnormal conditions exist in the difference value between the adjacent performance index data in the equipment monitoring module and sending an early warning signal in combination with the analysis result.
10. The intelligent management system applying data analysis technology according to claim 9, wherein the fault management module comprises an early warning signal receiving unit and an equipment fault management unit:
the early warning signal receiving unit is used for monitoring the analysis result of the early warning unit in real time and receiving an early warning signal;
the equipment fault management unit is used for further sending a factory return maintenance request to the corresponding equipment according to the early warning signal, carrying out preliminary evaluation on the current equipment according to the service time of the current equipment and combining the fault influence analysis unit to obtain a corresponding fault condition, further tracing the corresponding fault part according to the fault condition, and taking corresponding measures on the fault part.
CN202311179856.5A 2023-09-13 2023-09-13 Intelligent management system and method applying data analysis technology Pending CN117113104A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311179856.5A CN117113104A (en) 2023-09-13 2023-09-13 Intelligent management system and method applying data analysis technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311179856.5A CN117113104A (en) 2023-09-13 2023-09-13 Intelligent management system and method applying data analysis technology

Publications (1)

Publication Number Publication Date
CN117113104A true CN117113104A (en) 2023-11-24

Family

ID=88805512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311179856.5A Pending CN117113104A (en) 2023-09-13 2023-09-13 Intelligent management system and method applying data analysis technology

Country Status (1)

Country Link
CN (1) CN117113104A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117851956A (en) * 2024-03-07 2024-04-09 深圳市森树强电子科技有限公司 Electromechanical equipment fault diagnosis method, system and terminal based on data analysis

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090132860A1 (en) * 2007-11-21 2009-05-21 Inventec Corporation System and method for rapidly diagnosing bugs of system software
CN111160685A (en) * 2019-09-23 2020-05-15 上海安恪企业管理咨询有限公司 Maintenance decision method based on equipment comprehensive health condition analysis and management
CN115293629A (en) * 2022-08-19 2022-11-04 福赛轴承(嘉兴)有限公司 Production and processing method and system for rolling bearing part
CN115345485A (en) * 2022-08-17 2022-11-15 珠海爱浦京软件股份有限公司 Intelligent factory equipment data analysis management system and method based on big data
CN116432469A (en) * 2023-04-23 2023-07-14 黑龙江木水网络科技有限公司 Data channel management system and method based on big data
CN116627757A (en) * 2023-05-09 2023-08-22 黑龙江起速网络科技有限公司 Integrated data digital analysis storage system and method based on artificial intelligence

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090132860A1 (en) * 2007-11-21 2009-05-21 Inventec Corporation System and method for rapidly diagnosing bugs of system software
CN111160685A (en) * 2019-09-23 2020-05-15 上海安恪企业管理咨询有限公司 Maintenance decision method based on equipment comprehensive health condition analysis and management
CN115345485A (en) * 2022-08-17 2022-11-15 珠海爱浦京软件股份有限公司 Intelligent factory equipment data analysis management system and method based on big data
CN115293629A (en) * 2022-08-19 2022-11-04 福赛轴承(嘉兴)有限公司 Production and processing method and system for rolling bearing part
CN116432469A (en) * 2023-04-23 2023-07-14 黑龙江木水网络科技有限公司 Data channel management system and method based on big data
CN116627757A (en) * 2023-05-09 2023-08-22 黑龙江起速网络科技有限公司 Integrated data digital analysis storage system and method based on artificial intelligence

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117851956A (en) * 2024-03-07 2024-04-09 深圳市森树强电子科技有限公司 Electromechanical equipment fault diagnosis method, system and terminal based on data analysis
CN117851956B (en) * 2024-03-07 2024-05-10 深圳市森树强电子科技有限公司 Electromechanical equipment fault diagnosis method, system and terminal based on data analysis

Similar Documents

Publication Publication Date Title
US20210241544A1 (en) Platform for analyzing health of heavy electric machine and analysis method using the same
CN117113104A (en) Intelligent management system and method applying data analysis technology
CN116701984B (en) Automatic fault diagnosis system of numerical control machine tool based on machine learning
CN112173636B (en) Method for detecting faults of belt conveyor carrier roller by inspection robot
CN116360367A (en) Industrial equipment Internet of things data acquisition method and system
WO2019043600A1 (en) Remaining useful life estimator
CN116028887B (en) Analysis method of continuous industrial production data
CN115220396A (en) Intelligent monitoring method and system for numerical control machine tool
CN114971351A (en) Equipment multi-index health condition assessment method based on entropy method
CN114664063A (en) Equipment grading alarm method based on general index trend analysis
CN115165326A (en) Fan fault diagnosis method through mechanical transmission chain lubricating oil (grease) impurity analysis
CN117115169A (en) Intelligent recognition method for abnormal deformation of surface of die-casting die of automobile part
CN116485578B (en) Integrated management method and system for steel smelting workshop
CN114997521A (en) Method and system for monitoring, early warning and fault prediction of environmental protection equipment
CN114626558A (en) Intelligent industrial production equipment management method and system
CN113294295A (en) System and method for detecting turbine performance and operational anomalies
CN113407520A (en) Power network safety data cleaning system and method based on machine learning
CN116551467B (en) Cutter abrasion state identification method based on internet of things monitoring data
CN117310422B (en) Initiating explosive device resistor performance test method and system
CN117420811B (en) Production line quality monitoring method and system for automatic production
CN117057676B (en) Multi-data fusion fault analysis method, equipment and storage medium
CN117851956B (en) Electromechanical equipment fault diagnosis method, system and terminal based on data analysis
CN117892093B (en) Monitoring parameter data interaction processing method, processing system and processing equipment
CN115682898A (en) Five-axis machining center linear guide rail fault detection method and system
CN113532631A (en) Intelligent manufactured product identification and detection method based on machine hearing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination