CN116971522A - Light steel joist frame and suspension type glass curtain wall - Google Patents
Light steel joist frame and suspension type glass curtain wall Download PDFInfo
- Publication number
- CN116971522A CN116971522A CN202311069256.3A CN202311069256A CN116971522A CN 116971522 A CN116971522 A CN 116971522A CN 202311069256 A CN202311069256 A CN 202311069256A CN 116971522 A CN116971522 A CN 116971522A
- Authority
- CN
- China
- Prior art keywords
- wall
- keel
- extrusion plate
- fixedly connected
- light steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/885—Curtain walls comprising a supporting structure for flush mounted glazing panels
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
本发明涉及建筑施工技术领域,具体为一种轻钢龙骨框架及悬挂式玻璃幕墙,包括:主龙骨,主龙骨的一侧外壁设有对称的第一固定板,两个第一固定板的一侧外壁开设有第一安装槽;有益效果为:将多个角码通过自攻螺钉固定在主龙骨的一侧外壁,加强板通过滑槽安装在次龙骨的两端内壁,次龙骨的一端配合角码上的限位块安装在主龙骨的外壁,将幕墙的一端搭接在第二固定块的一侧后将其插接使其相邻一侧和主龙骨外壁接触,后拧动第一调节螺栓和第二调节螺栓使第一挤压板和第二挤压板的一侧外壁挤压幕墙对其进行固定,后继续安装上端的主龙骨和侧端的次龙骨,设置的连接组件提高龙骨之间的牢固性,同时挤压板的设置便于对幕墙进行拆装检修。
The invention relates to the technical field of building construction, specifically a light steel keel frame and a suspended glass curtain wall, including: a main keel. One side of the outer wall of the main keel is provided with a symmetrical first fixed plate. One of the two first fixed plates A first installation slot is provided on the side outer wall; the beneficial effect is: multiple corner codes are fixed on one side of the main keel wall through self-tapping screws, the reinforcing plate is installed on the inner walls of both ends of the sub-keel through the chute, and one end of the sub-keel matches The limit block on the corner code is installed on the outer wall of the main keel. Overlap one end of the curtain wall on one side of the second fixed block and insert it so that the adjacent side is in contact with the outer wall of the main keel. Then twist the first The adjusting bolt and the second adjusting bolt make one side of the first extrusion plate and the second extrusion plate press the curtain wall to fix them, and then continue to install the main keel at the upper end and the secondary keel at the side end. The connecting assembly is set to raise the keel. The firmness between them, and the setting of the extruded plate facilitate the disassembly, assembly and maintenance of the curtain wall.
Description
技术领域Technical field
本发明涉及建筑施工技术领域,具体为一种轻钢龙骨框架及悬挂式玻璃幕墙。The invention relates to the technical field of building construction, specifically a light steel keel frame and a suspended glass curtain wall.
背景技术Background technique
玻璃幕墙,是指由支承结构体系可相对主体结构有一定位移能力、不分担主体结构所受作用的建筑外围护结构或装饰结构。墙体有单层和双层玻璃两种,玻璃幕墙是一种美观新颖的建筑墙体装饰方法,是现代主义高层建筑时代的显著特征。Glass curtain wall refers to the building envelope or decorative structure whose supporting structure system has a certain displacement capacity relative to the main structure and does not share the effects of the main structure. There are two types of walls: single-layer and double-layer glass. Glass curtain wall is a beautiful and novel method of building wall decoration, and is a prominent feature of the era of modernist high-rise buildings.
现有技术中,传统的玻璃幕墙,是由横、竖龙骨将玻璃幕墙固定设置在主体结构上,竖龙骨与横龙骨是通过设置的角码,采用两个对穿的螺栓将其连接固定,这种固定横竖龙骨的方式,虽然可以满足施工要求,但是其牢固性较差,在楼层较高的地方,有较大的风压,时间长久之后,横龙骨就会在玻璃中立和外在风压的作用等作用力影响下,向下偏移或者发生变形,造成连接处的松动。为此,本发明提出一种轻钢龙骨框架及悬挂式玻璃幕墙用于解决上述问题。In the existing technology, the traditional glass curtain wall is fixed on the main structure by horizontal and vertical keels. The vertical keels and the horizontal keels are connected and fixed by two opposite bolts through the set corner codes. Although this method of fixing the horizontal and vertical keels can meet the construction requirements, its firmness is poor. At higher floors, there is greater wind pressure. After a long time, the horizontal keels will be neutralized between the glass and the external wind. Under the influence of pressure and other forces, it may shift downward or deform, causing the connection to loosen. To this end, the present invention proposes a light steel keel frame and a suspended glass curtain wall to solve the above problems.
发明内容Contents of the invention
本发明的目的在于提供一种轻钢龙骨框架及悬挂式玻璃幕墙,以解决上述背景技术中提出的传统的玻璃幕墙,是由横、竖龙骨将玻璃幕墙固定设置在主体结构上,竖龙骨与横龙骨是通过设置的角码,采用两个对穿的螺栓将其连接固定,这种固定横竖龙骨的方式,虽然可以满足施工要求,但是其牢固性较差,在楼层较高的地方,有较大的风压,时间长久之后,横龙骨就会在玻璃中立和外在风压的作用等作用力影响下,向下偏移或者发生变形,造成连接处的松动的问题。The purpose of the present invention is to provide a light steel keel frame and a suspended glass curtain wall to solve the problem of the traditional glass curtain wall proposed in the above background technology. The glass curtain wall is fixed on the main structure by horizontal and vertical keels, and the vertical keels and The horizontal keels are connected and fixed by setting corner codes and two opposing bolts. Although this method of fixing the horizontal and vertical keels can meet the construction requirements, its firmness is poor. In places with higher floors, there are Under the influence of large wind pressure and for a long time, the horizontal keel will shift downward or deform under the influence of glass neutrality and external wind pressure, causing the problem of loosening of the connection.
为实现上述目的,本发明提供如下技术方案:一种轻钢龙骨框架,包括:In order to achieve the above object, the present invention provides the following technical solution: a light steel keel frame, including:
主龙骨,所述主龙骨的一侧外壁设有对称的第一固定板,两个所述第一固定板的一侧外壁开设有第一安装槽,所述第一安装槽的内壁安装有多个第一固定块,所述第一固定块的一侧外壁开设有第一螺纹孔,所述第一固定块靠近第一螺纹孔两侧的外壁开设有第一限位孔,所述第一固定块靠近第一限位孔的一侧外壁安装有第一挤压板,所述第一挤压板的一侧外壁设有和第一限位孔内壁滑动连接的第一限位杆,所述第一挤压板远离第一限位杆的外壁开设有第一调节槽,所述第一调节槽的内壁安装有第一调节螺栓;Main keel, one side outer wall of the main keel is provided with a symmetrical first fixing plate, one side outer wall of the two first fixing plates is provided with a first installation groove, and the inner wall of the first installation groove is equipped with a plurality of A first fixed block is provided with a first threaded hole on one side of the outer wall of the first fixed block, and a first limiting hole is provided on the outer wall of the first fixed block close to both sides of the first threaded hole. A first extrusion plate is installed on one side of the outer wall of the fixed block close to the first limit hole, and a first limit rod is provided on one side of the outer wall of the first extrusion plate and is slidingly connected to the inner wall of the first limit hole, so A first adjustment groove is provided on the outer wall of the first extrusion plate away from the first limiting rod, and a first adjustment bolt is installed on the inner wall of the first adjustment groove;
次龙骨,所述次龙骨的两端侧壁分别安装在两根主龙骨的一侧外壁,所述次龙骨的两侧内壁开设有滑槽,所述次龙骨的一侧外壁设有两个对称的第二固定板,两个所述第二固定板的一侧外壁开设有第二安装槽,所述第二安装槽的内壁安装有多个第二固定块,所述第二固定块的一侧外壁开设有第二螺纹孔,所述第二固定块靠近第二螺纹孔两侧的外壁开设有第二限位孔,所述第二固定块靠近第二限位孔的一侧外壁安装有第二挤压板,所述第二挤压板的一侧外壁设有和第二限位孔内壁滑动连接的第二限位杆,所述第二挤压板远离第二限位杆的外壁开设有第二调节槽,所述第二调节槽的内壁安装有第二调节螺栓;及Sub keel, the two end side walls of the sub keel are respectively installed on one side of the outer wall of the two main keels, the inner walls of the two sides of the sub keel are provided with chute, and the one side outer wall of the sub keel is provided with two symmetrical The second fixing plate has a second mounting slot on one side of the outer wall of the two second fixing plates. A plurality of second fixing blocks are installed on the inner wall of the second mounting slot. One of the second fixing blocks A second threaded hole is provided on the side outer wall, a second limiting hole is provided on the outer wall of the second fixing block close to both sides of the second threaded hole, and a side outer wall of the second fixing block close to the second limiting hole is installed with A second extrusion plate, one side of the outer wall of the second extrusion plate is provided with a second limit rod slidingly connected to the inner wall of the second limit hole, and the second extrusion plate is away from the outer wall of the second limit rod. A second adjustment slot is provided, and a second adjustment bolt is installed on the inner wall of the second adjustment slot; and
连接组件,所述连接组件对主龙骨和次龙骨进行固定,所述连接组件包括角码、加强板、自攻螺钉和螺母。The connecting component fixes the main keel and the secondary keel. The connecting component includes corner codes, reinforcing plates, self-tapping screws and nuts.
优选的,所述第一固定板的一侧外壁和主龙骨的一侧外壁固定连接,所述第一固定块的两侧外壁固定连接有和第一安装槽内壁滑动连接的第一安装块。Preferably, one side of the outer wall of the first fixing plate is fixedly connected to one side of the outer wall of the main keel, and the two side outer walls of the first fixing block are fixedly connected with a first installation block that is slidingly connected to the inner wall of the first installation groove.
优选的,所述第一挤压板的一侧外壁和第一限位杆的一端侧壁固定连接,所述第一挤压板靠近第一限位杆的外壁固定连接有防滑垫。Preferably, one side outer wall of the first extrusion plate is fixedly connected to one end side wall of the first limit rod, and an anti-slip pad is fixedly connected to the outer wall of the first extrusion plate close to the first limit rod.
优选的,所述第一调节螺栓的外壁和第一挤压板及第一螺纹孔的内壁螺纹连接。Preferably, the outer wall of the first adjusting bolt is threadedly connected to the first extrusion plate and the inner wall of the first threaded hole.
优选的,所述第二固定板的一侧外壁和次龙骨的一侧外壁固定连接,所述第二安装块的两侧外壁固定连接有和第二安装槽内壁滑动连接的第二安装块。Preferably, one side of the outer wall of the second fixed plate is fixedly connected to one side of the outer wall of the sub-keel, and the two sides of the outer wall of the second mounting block are fixedly connected with a second mounting block that is slidingly connected to the inner wall of the second mounting groove.
优选的,所述第二挤压板的一侧外壁和第二限位杆的一端侧壁固定连接,所述第二挤压板靠近第二限位杆的外壁固定连接有防滑垫。Preferably, one side outer wall of the second extrusion plate is fixedly connected to one end side wall of the second limiter rod, and an anti-slip pad is fixedly connected to the outer wall of the second extrusion plate close to the second limiter rod.
优选的,所述第二调节螺栓的外壁和第二挤压板及第二螺纹孔的内壁螺纹连接。Preferably, the outer wall of the second adjusting bolt is threadedly connected to the second extrusion plate and the inner wall of the second threaded hole.
优选的,所述角码通过内壁安装有自攻螺钉对主龙骨和次龙骨进行固定,所述角码和主龙骨连接的一侧外壁固定连接有固定螺柱,所述角码凸出次龙骨的一端固定连接有和次龙骨外壁滑动连接的限位块。Preferably, the corner code is installed with self-tapping screws on the inner wall to fix the main keel and the secondary keel. The outer wall of one side where the corner code is connected to the main keel is fixedly connected with a fixing stud, and the corner code protrudes from the secondary keel. One end is fixedly connected with a limit block slidingly connected to the outer wall of the sub-keel.
优选的,所述加强板的两侧外壁固定连接有和滑槽内壁滑动连接的滑块,所述加强板的内壁和固定螺柱的外壁滑动连接,所述固定螺柱配合螺母对加强板和角码进行固定。Preferably, the outer walls on both sides of the reinforcing plate are fixedly connected with sliders that are slidingly connected to the inner wall of the chute. The inner wall of the reinforcing plate is slidingly connected to the outer wall of the fixing stud. The fixing stud cooperates with the nut to tighten the reinforcing plate and the inner wall of the chute. The corner code is fixed.
一种悬挂式玻璃幕墙,包括上述的轻钢龙骨框架。A suspended glass curtain wall includes the above-mentioned light steel keel frame.
与现有技术相比,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:
将多个角码通过自攻螺钉固定在主龙骨的一侧外壁,加强板通过滑槽安装在次龙骨的两端内壁,次龙骨的一端配合角码上的限位块安装在主龙骨的外壁,将幕墙的一端搭接在第二固定块的一侧后将其插接使其相邻一侧和主龙骨外壁接触,后拧动第一调节螺栓和第二调节螺栓使第一挤压板和第二挤压板的一侧外壁挤压幕墙对其进行固定,后继续安装上端的主龙骨和侧端的次龙骨,设置的连接组件提高龙骨之间的牢固性,同时挤压板的设置便于对幕墙进行拆装检修。Fix multiple corner codes on one side of the outer wall of the main keel through self-tapping screws. The reinforcing plate is installed on the inner walls of both ends of the sub-keel through the chute. One end of the sub-keel is installed on the outer wall of the main keel with the limit block on the corner code. , overlap one end of the curtain wall on one side of the second fixed block, plug it in so that the adjacent side contacts the outer wall of the main keel, and then twist the first adjusting bolt and the second adjusting bolt to make the first extrusion plate Extrude the curtain wall with one side of the outer wall of the second extrusion plate to fix it, and then continue to install the main keel at the upper end and the secondary keel at the side. The connecting components are provided to improve the firmness between the keels. At the same time, the extrusion plate is conveniently set Carry out disassembly and maintenance of curtain walls.
附图说明Description of the drawings
图1为本发明整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the present invention;
图2为本发明整体结构俯视剖视图;Figure 2 is a top cross-sectional view of the overall structure of the present invention;
图3为本发明整体结构侧视剖视图;Figure 3 is a side cross-sectional view of the overall structure of the present invention;
图4为本发明整体结构半剖图;Figure 4 is a half-section view of the overall structure of the present invention;
图5为本发明图2中A区域结构放大图;Figure 5 is an enlarged view of the structure of area A in Figure 2 of the present invention;
图6为本发明图2中B区域结构放大图;Figure 6 is an enlarged view of the structure of area B in Figure 2 of the present invention;
图7为本发明图3中C区域结构放大图;Figure 7 is an enlarged view of the structure of area C in Figure 3 of the present invention;
图8为本发明图3中D区域结构放大图;Figure 8 is an enlarged view of the structure of area D in Figure 3 of the present invention;
图9为本发明图4中E区域结构放大图。Figure 9 is an enlarged view of the structure of area E in Figure 4 of the present invention.
图中:主龙骨1、第一固定板11、第一安装槽12、第一固定块13、第一安装块131、第一螺纹孔132、第一限位孔133、第一挤压板14、第一限位杆141、第一调节槽142、第一调节螺栓143、次龙骨2、滑槽21、第二固定板22、第二安装槽221、第二固定块23、第二安装块231、第二螺纹孔232、第二限位孔233、第二挤压板24、第二限位杆241、第二调节槽242、第二调节螺栓243、连接组件3、角码31、固定螺柱311、限位块312、加强板32、滑块321、自攻螺钉33、螺母34。In the figure: main keel 1, first fixing plate 11, first mounting groove 12, first fixing block 13, first mounting block 131, first threaded hole 132, first limiting hole 133, first extrusion plate 14 , first limiting rod 141, first adjusting slot 142, first adjusting bolt 143, sub keel 2, chute 21, second fixing plate 22, second mounting slot 221, second fixing block 23, second mounting block 231. Second threaded hole 232, second limiting hole 233, second extrusion plate 24, second limiting rod 241, second adjusting slot 242, second adjusting bolt 243, connecting component 3, corner code 31, fixed Stud 311, limit block 312, reinforcing plate 32, slider 321, self-tapping screw 33, nut 34.
具体实施方式Detailed ways
为了使本发明的目的、技术方案进行清楚、完整地描述,及优点更加清楚明白,以下结合附图对本发明实施例进行进一步详细说明。应当理解,此处所描述的具体实施例是本发明一部分实施例,而不是全部的实施例,仅仅用以解释本发明实施例,并不用于限定本发明实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to clearly and completely describe the purpose and technical solution of the present invention, and make the advantages more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described here are part of the embodiments of the present invention, rather than all embodiments. They are only used to explain the embodiments of the present invention and are not used to limit the embodiments of the present invention. Those of ordinary skill in the art will not All other embodiments obtained without creative efforts belong to the scope of protection of the present invention.
在本发明的描述中,需要说明的是,术语“中心”、“中”、“上”、“下”、“左”、“右”、“内”、“外”、“顶”、“底”、“侧”、“竖直”、“水平”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“一”、“第一”、“第二”、“第三”、“第四”、“第五”、“第六”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the terms "center", "middle", "upper", "lower", "left", "right", "inner", "outer", "top", " The orientations or positional relationships indicated by "bottom", "side", "vertical", "horizontal", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying The devices or elements referred to must have a specific orientation, be constructed and operate in a specific orientation and therefore are not to be construed as limitations of the invention. In addition, the terms "a", "first", "second", "third", "fourth", "fifth" and "sixth" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance.
在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that, unless otherwise clearly stated and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense. For example, it can be a fixed connection or a detachable connection. Connection, or integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be an internal connection between two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood on a case-by-case basis.
出于简明和说明的目的,实施例的原理主要通过参考例子来描述。在以下描述中,很多具体细节被提出用以提供对实施例的彻底理解。然而明显的是,对于本领域普通技术人员,这些实施例在实践中可以不限于这些具体细节。在一些实例中,没有详细地描述公知方法和结构,以避免无必要地使这些实施例变得难以理解。另外,所有实施例可以互相结合使用。For purposes of simplicity and explanation, the principles of the embodiments are described primarily by reference to examples. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the embodiments. However, it will be apparent to those of ordinary skill in the art that these embodiments may be practiced without being limited to these specific details. In some instances, well-known methods and structures are not described in detail to avoid unnecessarily obscuring the embodiments. Additionally, all embodiments can be used in combination with each other.
请参阅图1至图9,本发明提供一种技术方案:一种轻钢龙骨框架,包括:Please refer to Figures 1 to 9. The present invention provides a technical solution: a light steel keel frame, including:
主龙骨1,主龙骨1的一侧外壁设有对称的第一固定板11,两个第一固定板11的一侧外壁开设有第一安装槽12,第一安装槽12的内壁安装有多个第一固定块13,第一固定块13的一侧外壁开设有第一螺纹孔132,第一固定块13靠近第一螺纹孔132两侧的外壁开设有第一限位孔133,第一固定块13靠近第一限位孔133的一侧外壁安装有第一挤压板14,第一挤压板14的一侧外壁设有和第一限位孔133内壁滑动连接的第一限位杆141,第一挤压板14远离第一限位杆141的外壁开设有第一调节槽142,第一调节槽142的内壁安装有第一调节螺栓143,第一固定板11的一侧外壁和主龙骨1的一侧外壁固定连接,第一固定块13的两侧外壁固定连接有和第一安装槽12内壁滑动连接的第一安装块131,第一挤压板14的一侧外壁和第一限位杆141的一端侧壁固定连接,第一挤压板14靠近第一限位杆141的外壁固定连接有防滑垫,第一调节螺栓143的外壁和第一挤压板14及第一螺纹孔132的内壁螺纹连接;Main keel 1, one side outer wall of the main keel 1 is provided with a symmetrical first fixing plate 11, one side outer wall of the two first fixing plates 11 is provided with a first installation groove 12, and the inner wall of the first installation groove 12 is equipped with a plurality of A first fixed block 13 is provided with a first threaded hole 132 on one side of the outer wall of the first fixed block 13. A first limiting hole 133 is provided on the outer wall of the first fixed block 13 close to the first threaded hole 132 on both sides. A first extrusion plate 14 is installed on one side of the outer wall of the fixed block 13 close to the first limit hole 133 . An outer wall of one side of the first extrusion plate 14 is provided with a first limit slidingly connected to the inner wall of the first limit hole 133 . Rod 141, the outer wall of the first extrusion plate 14 away from the first limiting rod 141 is provided with a first adjustment slot 142, the inner wall of the first adjustment slot 142 is equipped with a first adjustment bolt 143, and one side of the outer wall of the first fixed plate 11 It is fixedly connected to one side of the outer wall of the main keel 1. The first mounting block 131 is fixedly connected to both sides of the outer wall of the first fixing block 13 and is slidingly connected to the inner wall of the first mounting slot 12. One side of the outer wall of the first extrusion plate 14 is One end side wall of the first limit rod 141 is fixedly connected. The first extrusion plate 14 is fixedly connected with an anti-slip pad close to the outer wall of the first limit rod 141. The outer wall of the first adjustment bolt 143 is connected to the first extrusion plate 14 and the first extrusion plate 14. A threaded connection on the inner wall of the threaded hole 132;
次龙骨2,次龙骨2的两端侧壁分别安装在两根主龙骨1的一侧外壁,次龙骨2的两侧内壁开设有滑槽21,次龙骨2的一侧外壁设有两个对称的第二固定板22,两个第二固定板22的一侧外壁开设有第二安装槽221,第二安装槽221的内壁安装有多个第二固定块23,第二固定块23的一侧外壁开设有第二螺纹孔232,第二固定块23靠近第二螺纹孔232两侧的外壁开设有第二限位孔233,第二固定块23靠近第二限位孔233的一侧外壁安装有第二挤压板24,第二挤压板24的一侧外壁设有和第二限位孔233内壁滑动连接的第二限位杆241,第二挤压板24远离第二限位杆241的外壁开设有第二调节槽242,第二调节槽242的内壁安装有第二调节螺栓243,第二固定板22的一侧外壁和次龙骨2的一侧外壁固定连接,第二安装块23的两侧外壁固定连接有和第二安装槽221内壁滑动连接的第二安装块231,第二挤压板24的一侧外壁和第二限位杆241的一端侧壁固定连接,第二挤压板24靠近第二限位杆241的外壁固定连接有防滑垫,第二调节螺栓243的外壁和第二挤压板24及第二螺纹孔232的内壁螺纹连接;Sub keel 2, the two end side walls of sub keel 2 are respectively installed on one side of the outer wall of the two main keels 1. The inner walls of both sides of sub keel 2 are provided with chute 21. The outer wall of one side of sub keel 2 is provided with two symmetrical The second fixing plate 22 has a second mounting slot 221 on one side of the outer wall of the two second fixing plates 22. A plurality of second fixing blocks 23 are installed on the inner wall of the second mounting slot 221. One of the second fixing blocks 23 A second threaded hole 232 is formed in the side outer wall. A second limiting hole 233 is formed in the outer wall of the second fixing block 23 on both sides of the second threaded hole 232. A side outer wall of the second fixing block 23 is formed close to the second limiting hole 233. A second extrusion plate 24 is installed. One side of the outer wall of the second extrusion plate 24 is provided with a second limit rod 241 that is slidingly connected to the inner wall of the second limit hole 233. The second extrusion plate 24 is away from the second limiter. The outer wall of the rod 241 is provided with a second adjustment groove 242. The inner wall of the second adjustment groove 242 is equipped with a second adjustment bolt 243. One side of the outer wall of the second fixed plate 22 is fixedly connected to one side of the outer wall of the subkeel 2. The second installation The outer walls on both sides of the block 23 are fixedly connected to a second installation block 231 that is slidingly connected to the inner wall of the second installation groove 221. One outer wall of the second extrusion plate 24 is fixedly connected to one end side wall of the second limiting rod 241. The outer wall of the second extrusion plate 24 close to the second limiting rod 241 is fixedly connected with an anti-slip pad, and the outer wall of the second adjustment bolt 243 is threadedly connected to the inner wall of the second extrusion plate 24 and the second threaded hole 232;
连接组件3,连接组件3对主龙骨1和次龙骨2进行固定,连接组件3包括角码31、加强板32、自攻螺钉33和螺母34,角码31通过内壁安装有自攻螺钉33对主龙骨1和次龙骨2进行固定,角码31和主龙骨1连接的一侧外壁固定连接有固定螺柱311,角码31凸出次龙骨2的一端固定连接有和次龙骨2外壁滑动连接的限位块312,加强板32的两侧外壁固定连接有和滑槽21内壁滑动连接的滑块321,加强板32的内壁和固定螺柱311的外壁滑动连接,固定螺柱311配合螺母34对加强板和角码31进行固定;The connection component 3 fixes the main keel 1 and the secondary keel 2. The connection component 3 includes a corner code 31, a reinforcing plate 32, a self-tapping screw 33 and a nut 34. The corner code 31 is equipped with 33 pairs of self-tapping screws through the inner wall. The main keel 1 and the sub keel 2 are fixed. The corner code 31 is fixedly connected to the outer wall of the main keel 1 with a fixed stud 311. The one end of the corner code 31 protruding from the sub keel 2 is fixedly connected to the outer wall of the sub keel 2 and is slidingly connected. The limit block 312 is fixedly connected to the outer walls on both sides of the reinforcing plate 32 with a slider 321 that is slidingly connected to the inner wall of the chute 21. The inner wall of the reinforcing plate 32 is slidingly connected to the outer wall of the fixed stud 311. The fixed stud 311 cooperates with the nut 34. Fix the reinforcement plate and corner code 31;
一种悬挂式玻璃幕墙,包括上述的轻钢龙骨框架。A suspended glass curtain wall includes the above-mentioned light steel keel frame.
本装置工作时,首先通过预埋连接件将主龙骨固定在安装的墙面上,根据要求将多个角码31通过自攻螺钉33固定在主龙骨1的一侧外壁,后将加强板32通过滑槽21安装在次龙骨2的两端内壁,将次龙骨2的一端配合角码31上的限位块312安装在主龙骨1的外壁,后通过自攻螺钉33配合角码31进行固定。同时固定螺柱311穿过加强板312后通过螺母进行固定,后将第一挤压板14和第二挤压板24分别安装在第一安装槽12和第二安装槽221的内壁,将幕墙的一端搭接在第二固定块23的一侧后将其插接使其相邻一侧和主龙骨1外壁接触,后拧动第一调节螺栓143和第二调节螺栓243使第一挤压板14和第二挤压板24的一侧外壁挤压幕墙对其进行固定,后继续安装上端的主龙骨1和侧端的次龙骨2,在此基础上重复对幕墙进行安装固定,设置的连接组件提高龙骨之间的牢固性,同时挤压板的设置便于对幕墙进行拆装检修。When this device works, first fix the main keel on the installed wall through pre-embedded connectors, fix multiple corner codes 31 on one side of the outer wall of the main keel 1 through self-tapping screws 33 as required, and then fix the reinforcing plate 32 Install it on the inner walls of both ends of the sub keel 2 through the chute 21. Install one end of the sub keel 2 on the outer wall of the main keel 1 with the limit block 312 on the corner code 31, and then fix it with self-tapping screws 33 and the corner code 31. . At the same time, the fixing studs 311 pass through the reinforcing plate 312 and are fixed with nuts. Finally, the first extrusion plate 14 and the second extrusion plate 24 are installed on the inner walls of the first installation groove 12 and the second installation groove 221 respectively, and the curtain wall is One end of the second fixed block 23 is overlapped on one side of the second fixed block 23 and then plugged in so that the adjacent side contacts the outer wall of the main keel 1, and then the first adjusting bolt 143 and the second adjusting bolt 243 are screwed to make the first extrusion One side of the outer wall of the plate 14 and the second extrusion plate 24 squeezes the curtain wall to fix it, and then continues to install the main keel 1 at the upper end and the secondary keel 2 at the side end. On this basis, repeatedly install and fix the curtain wall, and set the connection The components improve the firmness between the keels, and the setting of the extrusion plate facilitates the disassembly, assembly and maintenance of the curtain wall.
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those of ordinary skill in the art will understand that various changes, modifications, and substitutions can be made to these embodiments without departing from the principles and spirit of the invention. and modifications, the scope of the invention is defined by the appended claims and their equivalents.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202311069256.3A CN116971522A (en) | 2023-08-24 | 2023-08-24 | Light steel joist frame and suspension type glass curtain wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202311069256.3A CN116971522A (en) | 2023-08-24 | 2023-08-24 | Light steel joist frame and suspension type glass curtain wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN116971522A true CN116971522A (en) | 2023-10-31 |
Family
ID=88481532
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202311069256.3A Pending CN116971522A (en) | 2023-08-24 | 2023-08-24 | Light steel joist frame and suspension type glass curtain wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116971522A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117702968A (en) * | 2024-02-04 | 2024-03-15 | 德州智南针机械科技有限公司 | Assembled building metal curtain wall structure convenient to dismantle curtain panel |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20090075296A (en) * | 2008-01-04 | 2009-07-08 | 성훈경 | Fixed frame for building |
| CN207144264U (en) * | 2017-08-10 | 2018-03-27 | 江苏常装建设有限公司 | A kind of curtain skeleton framework |
| CN110359572A (en) * | 2019-06-19 | 2019-10-22 | 北京首钢建设集团有限公司 | The mounting structure and its installation method of glass curtain wall |
| CN211114267U (en) * | 2019-08-01 | 2020-07-28 | 上海志豪实业有限公司 | Novel curtain wall keel device |
| CN215519409U (en) * | 2021-05-31 | 2022-01-14 | 中山中瑞建筑装饰工程有限公司 | Hidden frame type glass curtain wall convenient to disassemble and assemble |
-
2023
- 2023-08-24 CN CN202311069256.3A patent/CN116971522A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20090075296A (en) * | 2008-01-04 | 2009-07-08 | 성훈경 | Fixed frame for building |
| CN207144264U (en) * | 2017-08-10 | 2018-03-27 | 江苏常装建设有限公司 | A kind of curtain skeleton framework |
| CN110359572A (en) * | 2019-06-19 | 2019-10-22 | 北京首钢建设集团有限公司 | The mounting structure and its installation method of glass curtain wall |
| CN211114267U (en) * | 2019-08-01 | 2020-07-28 | 上海志豪实业有限公司 | Novel curtain wall keel device |
| CN215519409U (en) * | 2021-05-31 | 2022-01-14 | 中山中瑞建筑装饰工程有限公司 | Hidden frame type glass curtain wall convenient to disassemble and assemble |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117702968A (en) * | 2024-02-04 | 2024-03-15 | 德州智南针机械科技有限公司 | Assembled building metal curtain wall structure convenient to dismantle curtain panel |
| CN117702968B (en) * | 2024-02-04 | 2024-04-19 | 德州智南针机械科技有限公司 | Assembled building metal curtain wall structure convenient to dismantle curtain panel |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205637250U (en) | Glass curtain wall's moulding system | |
| CN116971522A (en) | Light steel joist frame and suspension type glass curtain wall | |
| CN206591681U (en) | A kind of connecting node of precast concrete partition wall and agent structure | |
| CN219887257U (en) | Novel frame brick curtain wall structure and novel frame brick curtain wall | |
| CN108385895A (en) | A kind of fast-assembling walling system | |
| CN208473060U (en) | A kind of metal curtain wall | |
| CN202299033U (en) | Back bolt stone curtain wall system | |
| CN201574519U (en) | A kind of gypsum fiberboard composite hollow wallboard | |
| CN106481014B (en) | Using the mineral wool abatvoix furred ceiling and its construction method of no sunpender keel installation | |
| CN211646807U (en) | Light gauge steel sound insulation construction | |
| CN213682965U (en) | Assembled combination sound insulation wallboard | |
| CN212715574U (en) | Outer facade stone material mounting structure | |
| CN217353194U (en) | Bilateral bidirectional stiffening shear wall plate | |
| CN219411467U (en) | Assembled hyperboloid aluminum plate furred ceiling structure | |
| CN115653218A (en) | Outdoor overhanging eave assembly type construction method | |
| CN220605462U (en) | A double-sided socket-type bridge bracket | |
| CN112177328A (en) | Building templates system of consolidating | |
| CN219118530U (en) | Assembled light indoor ceiling structure | |
| CN219158519U (en) | A prefabricated building base reinforcement structure | |
| CN219825763U (en) | Cross bearing support piece for glass curtain wall | |
| CN219569300U (en) | A prefabricated curtain wall installation structure | |
| CN202430871U (en) | A glue-injected curved unit curtain wall | |
| CN219219361U (en) | Assembled terminal building roof steel construction | |
| CN220107524U (en) | Bus bridge frame connected with high strength | |
| CN217734495U (en) | Aluminum plate curtain wall plate suspension system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |