CN116965683A - Water purifier and control method, system, equipment and medium thereof - Google Patents

Water purifier and control method, system, equipment and medium thereof Download PDF

Info

Publication number
CN116965683A
CN116965683A CN202310957912.7A CN202310957912A CN116965683A CN 116965683 A CN116965683 A CN 116965683A CN 202310957912 A CN202310957912 A CN 202310957912A CN 116965683 A CN116965683 A CN 116965683A
Authority
CN
China
Prior art keywords
water
load
preset
target
water purifier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310957912.7A
Other languages
Chinese (zh)
Inventor
王通
张锦超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Fotile Kitchen Ware Co Ltd
Original Assignee
Ningbo Fotile Kitchen Ware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Fotile Kitchen Ware Co Ltd filed Critical Ningbo Fotile Kitchen Ware Co Ltd
Priority to CN202310957912.7A priority Critical patent/CN116965683A/en
Publication of CN116965683A publication Critical patent/CN116965683A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47JKITCHEN EQUIPMENT; COFFEE MILLS; SPICE MILLS; APPARATUS FOR MAKING BEVERAGES
    • A47J31/00Apparatus for making beverages
    • A47J31/44Parts or details or accessories of beverage-making apparatus
    • A47J31/52Alarm-clock-controlled mechanisms for coffee- or tea-making apparatus ; Timers for coffee- or tea-making apparatus; Electronic control devices for coffee- or tea-making apparatus
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47JKITCHEN EQUIPMENT; COFFEE MILLS; SPICE MILLS; APPARATUS FOR MAKING BEVERAGES
    • A47J31/00Apparatus for making beverages
    • A47J31/44Parts or details or accessories of beverage-making apparatus
    • A47J31/52Alarm-clock-controlled mechanisms for coffee- or tea-making apparatus ; Timers for coffee- or tea-making apparatus; Electronic control devices for coffee- or tea-making apparatus
    • A47J31/525Alarm-clock-controlled mechanisms for coffee- or tea-making apparatus ; Timers for coffee- or tea-making apparatus; Electronic control devices for coffee- or tea-making apparatus the electronic control being based on monitoring of specific process parameters
    • A47J31/5253Alarm-clock-controlled mechanisms for coffee- or tea-making apparatus ; Timers for coffee- or tea-making apparatus; Electronic control devices for coffee- or tea-making apparatus the electronic control being based on monitoring of specific process parameters of temperature
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47JKITCHEN EQUIPMENT; COFFEE MILLS; SPICE MILLS; APPARATUS FOR MAKING BEVERAGES
    • A47J31/00Apparatus for making beverages
    • A47J31/44Parts or details or accessories of beverage-making apparatus
    • A47J31/52Alarm-clock-controlled mechanisms for coffee- or tea-making apparatus ; Timers for coffee- or tea-making apparatus; Electronic control devices for coffee- or tea-making apparatus
    • A47J31/525Alarm-clock-controlled mechanisms for coffee- or tea-making apparatus ; Timers for coffee- or tea-making apparatus; Electronic control devices for coffee- or tea-making apparatus the electronic control being based on monitoring of specific process parameters
    • A47J31/5255Alarm-clock-controlled mechanisms for coffee- or tea-making apparatus ; Timers for coffee- or tea-making apparatus; Electronic control devices for coffee- or tea-making apparatus the electronic control being based on monitoring of specific process parameters of flow rate

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The present disclosure provides a water purifier, and a control method, a system, a device and a medium thereof, wherein the control method includes: acquiring the number of actual water consumption of the water purifier in a first preset period; acquiring a comparison result of the actual water consumption number and the preset water consumption number of the water purifier, and determining the current machine load of the water purifier based on the comparison result; determining a target hot water load of the water purifier based on the current machine load and the current time period; and controlling the water production of the water purifier based on the target hot water load. According to the intelligent water purifying machine, the current machine load of the water purifier is determined according to the comparison result of the actual water consumption number of the water purifier and the preset water consumption number, the target hot water load of the water purifier is determined according to the current machine load and the current time period, intelligent regulation and control of water of the water purifying machine are achieved according to the target hot water load, the actual running load of the water purifier is matched with the actual water consumption number, energy waste is reduced, water consumption experience of a user is improved, and product performance of the water purifier is improved.

Description

Water purifier and control method, system, equipment and medium thereof
Technical Field
The disclosure relates to the technical field of intelligent household appliances, in particular to a water purifier and a control method, a system, equipment and a medium thereof.
Background
The water purifier used in public places such as offices is easy to cause the problem that the preset water consumption number and the actual water consumption number of the water purifier are not matched due to uncertainty of the number of users, and the water purifier can be operated in overload or in too low load, so that hot water is supplied excessively or insufficiently. For example: (1) The water purifier is designed for about 50 persons, but the actual water consumption is only 10 persons, if the water purifier is operated according to the standard of 50 persons, the hot water is excessively supplied, and the excessive hot water is stored in the hot water tank for a long time, so that night water and thousand water can be formed, and the water purifier needs to discharge excessive hot water every day. The hot water is supplied excessively, so that more hot water needs to be discharged, and great energy waste is caused. (2) The water purifier is designed for about 50 persons, but the actual water consumption number is 100 persons, and if the water purifier is operated according to the standard of 50 persons, hot water supply is not up, and bad water consumption experience is brought to users.
In addition, the demand of users for hot water is different in different time periods in a day, especially in public places such as offices, the hot water consumption in the morning is larger than that in the afternoon and is larger than that in the night. The current water purifier does not consider that the hot water load of the water purifier is adjusted according to different time periods in one day, the water level of hot water is adjusted, and the water consumption experience of a user is reduced.
Disclosure of Invention
The technical problem to be solved by the present disclosure is to overcome the defects that in the prior art, the preset water consumption number of the water purifier is not matched with the actual water consumption number, and the water consumption experience of a user is reduced due to energy waste caused by adjusting the hot water load according to different time periods in a day, and to provide a water purifier and a control method, a system, equipment and a medium thereof.
The technical problems are solved by the following technical scheme:
the present disclosure provides a control method of a water purifier, the control method comprising:
acquiring the number of actual water consumption of the water purifier within a first preset period;
acquiring a comparison result of the actual water consumption number and the preset water consumption number of the water purifier, and determining the current machine load of the water purifier based on the comparison result;
determining a target hot water load of the water purifier based on the current machine load and a current time period;
and controlling the water purifier to produce water based on the target hot water load.
Preferably, the step of obtaining the number of actual water consumption of the water purifier in the first preset period includes:
acquiring accumulated water taking duration and water outlet flow of the water purifier within the first preset period;
Determining the water consumption in the first preset period based on the accumulated water intake duration and the water outlet flow;
determining the actual water consumption based on the water consumption;
and/or the number of the groups of groups,
the step of obtaining a comparison result of the actual water consumption number and the preset water consumption number of the water purifier, and determining the current machine load of the water purifier based on the comparison result comprises the following steps:
taking the ratio or the difference between the actual water consumption number and the preset water consumption number as the comparison result;
and determining the current machine load based on a first preset range in which the comparison result is located, wherein the current machine load corresponds to the first preset range, or determining the current machine load based on the product of the comparison result and the preset machine load of the water purifier.
Preferably, the step of determining the target hot water load of the water purifier based on the current machine load and the current time period comprises:
determining a target adjustment coefficient based on a second preset range of the current time period;
wherein the target adjustment coefficient corresponds to the second preset range;
the target hot water load is determined based on a product of the target adjustment factor and the current machine load.
Preferably, the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset working period is greater than the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset non-working period;
and/or the number of the groups of groups,
the second preset range is a target adjustment coefficient corresponding to the preset morning working period and is larger than the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset afternoon working period;
and/or the number of the groups of groups,
the second preset range is that the target adjustment coefficient corresponding to the preset evening non-working period is larger than the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset morning non-working period, and the second preset range is that the target adjustment coefficient corresponding to the preset morning non-working period is larger than the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset late night non-working period.
Preferably, the water purifier comprises a plurality of water pumps and a plurality of heating devices;
the step of controlling the water purifier to produce water based on the target hot water load comprises the following steps:
determining a target water level of the water purifier based on the target hot water load;
determining a corresponding number of the water pumps and the heating devices based on the target water level;
And controlling the water purifier to produce water by the water pumps and the heating devices in corresponding numbers.
Preferably, the step of determining the corresponding number of water pumps and heating devices based on the target water level comprises:
determining the current season;
determining that the corresponding number of the water pumps is a first number and the corresponding number of the heating devices is a second number in response to the target water level being a first water level and the season being winter;
determining that the corresponding number of water pumps is a third number and the corresponding number of heating devices is a fourth number in response to the target water level being the first water level and the season not being winter;
wherein the first number is less than the third number, and the second number is greater than the fourth number;
determining that the corresponding number of water pumps is a fifth number in response to the target water level being a second water level and the season being summer;
determining that the corresponding number of water pumps is a sixth number in response to the target water level being the second water level and the season not being summer;
wherein the fifth number is greater than the sixth number, and the first water level is greater than the second water level.
Preferably, the step of controlling the water purifier to produce water based on the target hot water load further includes:
acquiring continuous unmanned water taking time of the water purifier;
reducing the target hot water load in response to the continuous unmanned water intake time period being longer than a first preset time period;
performing water production control on the water purifier based on the reduced target hot water load;
and/or the number of the groups of groups,
the step of controlling the water purifier to produce water based on the target hot water load further comprises:
acquiring the number of times of taking hot water in a second preset time period;
increasing the target hot water load in response to the number of hot water fetches being greater than a preset number;
and controlling the water purifier to produce water based on the increased target hot water load.
The present disclosure also provides a control system of a water purifier, the control system comprising:
the actual water consumption number acquisition module is used for acquiring the actual water consumption number of the water purifier in a first preset period;
the current machine load determining module is used for obtaining a comparison result of the actual water consumption number and the preset water consumption number of the water purifier and determining the current machine load of the water purifier based on the comparison result;
A target hot water load determining module for determining a target hot water load of the water purifier based on the current machine load and a current time period;
and the water production control module is used for controlling the water production of the water purifier based on the target hot water load.
Preferably, the actual water consumption number acquisition module comprises:
the duration and flow obtaining unit is used for obtaining accumulated water taking duration and water outlet flow of the water purifier in the first preset period;
the water consumption determining unit is used for determining the water consumption in the first preset period based on the accumulated water taking duration and the water outlet flow;
and the actual water consumption number determining unit is used for determining the actual water consumption number based on the water consumption.
Preferably, the current machine load determination module includes:
a comparison result obtaining unit, configured to use a ratio or a difference between the actual water consumption number and the preset water consumption number as the comparison result;
and the current machine load determining unit is used for determining the current machine load based on a first preset range where the comparison result is located, wherein the current machine load corresponds to the first preset range, or determining the current machine load based on the product of the comparison result and the preset machine load of the water purifier.
Preferably, the target hot water load determining module includes:
a target adjustment coefficient determining unit, configured to determine a target adjustment coefficient based on a second preset range in which the current time period is located;
wherein the target adjustment coefficient corresponds to the second preset range;
a target hot water load determination unit for determining the target hot water load based on a product of the target adjustment coefficient and the current machine load.
Preferably, the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset working period is greater than the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset non-working period;
and/or the number of the groups of groups,
the second preset range is a target adjustment coefficient corresponding to the preset morning working period and is larger than the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset afternoon working period;
and/or the number of the groups of groups,
the second preset range is that the target adjustment coefficient corresponding to the preset evening non-working period is larger than the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset morning non-working period, and the second preset range is that the target adjustment coefficient corresponding to the preset morning non-working period is larger than the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset late night non-working period.
Preferably, the water purifier comprises a plurality of water pumps and a plurality of heating devices;
the water making control module comprises:
a target water level determining unit for determining a target water level of the water purifier based on the target hot water load;
a number determining unit for determining the corresponding number of the water pumps and the heating devices based on the target water level;
and the water production control unit is used for controlling the water purifier to produce water by the water pumps and the heating devices in corresponding quantity.
Preferably, the number determining unit includes a season determining sub-unit and a number determining sub-unit;
the season determining subunit is used for determining the current season;
the quantity determination subunit is used for determining that the corresponding quantity of the water pumps is a first quantity and the corresponding quantity of the heating devices is a second quantity in response to the target water level being a first water level and the season being winter;
the quantity determination subunit is further configured to determine, in response to the target water level being the first water level and the season not being winter, that the corresponding quantity of the water pumps is a third quantity and the corresponding quantity of the heating devices is a fourth quantity;
wherein the first number is less than the third number, and the second number is greater than the fourth number;
The quantity determination subunit is further configured to determine, in response to the target water level being a second water level and the season being summer, a corresponding quantity of the water pumps to be a fifth quantity;
the number determination subunit is further configured to determine, in response to the target water level being the second water level and the season not being summer, a corresponding number of the water pumps to be a sixth number;
wherein the fifth number is greater than the sixth number, and the first water level is greater than the second water level.
Preferably, the water making control module further comprises a continuous unmanned water taking duration obtaining unit and a target hot water load adjusting unit;
the continuous unmanned water taking duration acquisition unit is used for acquiring the continuous unmanned water taking duration of the water purifier;
the target hot water load adjusting unit is used for reducing the target hot water load in response to the fact that the continuous unmanned water taking time is longer than a first preset time period;
the water production control unit is also used for controlling the water production of the water purifier based on the reduced target hot water load.
Preferably, the water making control module further comprises a hot water taking frequency acquisition unit;
the hot water taking frequency acquisition unit is used for acquiring hot water taking frequency in a second preset duration;
The target hot water load adjusting unit is used for increasing the target hot water load in response to the hot water taking times being greater than preset times;
the water production control unit is also used for controlling the water production of the water purifier based on the increased target hot water load.
The present disclosure also provides a water purifier including a control system of the water purifier as described above.
The disclosure also provides an electronic device comprising a memory, a processor and a computer program stored on the memory and used for running on the processor, wherein the processor realizes the control method of the water purifier when executing the computer program.
The present disclosure also provides a computer-readable storage medium having stored thereon a computer program which, when executed by a processor, implements a control method of a water purifier as described above.
On the basis of conforming to the common knowledge in the art, the preferred conditions can be arbitrarily combined to obtain the preferred examples of the disclosure.
The positive progress effect of the present disclosure is:
according to the method and the device, the current machine load of the water purifier is determined according to the comparison result of the actual water consumption number of the water purifier and the preset water consumption number, the target hot water load of the water purifier is determined according to the current machine load and the current time period, and the water preparation control is carried out on the water purifier according to the target hot water load, so that the intelligent adjustment and control of the water purification mechanism according to the current time period are realized, the actual running load of the water purifier is matched with the actual water consumption number, the energy waste is reduced, the water consumption experience of a user is improved, and the product performance of the water purifier is improved.
Drawings
Fig. 1 is a flowchart of a control method of a water purifier according to embodiment 1 of the present disclosure.
Fig. 2 is a first flowchart of a control method of the water purifier according to embodiment 2 of the present disclosure.
Fig. 3 is a flowchart of determining a current machine load of a water purifier according to a water usage amount according to embodiment 2 of the present disclosure.
Fig. 4 is a flowchart of determining the number of actual water users according to embodiment 2 of the present disclosure.
Fig. 5 is a flowchart of determining a current machine load of a water purifier according to embodiment 2 of the present disclosure.
Fig. 6 is a flowchart of determining a target hot water load according to embodiment 2 of the present disclosure.
Fig. 7 is a second flowchart of a control method of the water purifier according to embodiment 2 of the present disclosure.
Fig. 8 is a third flowchart of a control method of the water purifier according to embodiment 2 of the present disclosure.
Fig. 9 is a fourth flowchart of a control method of the water purifier according to embodiment 2 of the present disclosure.
Fig. 10 is a fifth flowchart of a control method of the water purifier according to embodiment 2 of the present disclosure.
Fig. 11 is a flowchart of adjusting a target hot water load according to embodiment 2 of the present disclosure.
Fig. 12 is a schematic block diagram of a control system of a water purifier according to embodiment 3 of the present disclosure.
Fig. 13 is a schematic block diagram of a control system of a water purifier according to embodiment 4 of the present disclosure.
Fig. 14 is a schematic structural diagram of a water purifier according to embodiment 5 of the present disclosure.
Fig. 15 is a schematic structural diagram of an electronic device according to embodiment 6 of the present disclosure.
Detailed Description
The present disclosure is further illustrated by way of examples below, but is not thereby limited to the scope of the examples described.
Example 1
The present embodiment provides a control method of a water purifier, as shown in fig. 1, including:
s101, acquiring the number of actual water consumption of the water purifier in a first preset period.
S102, obtaining a comparison result of the actual water consumption number and the preset water consumption number of the water purifier, and determining the current machine load of the water purifier based on the comparison result.
The preset water consumption number of the water purifier is a default use number set by a factory, and the preset water consumption number of the water purifier of different models can be different. In addition, the number of the preset water users can be flexibly adjusted according to the current time period.
S103, determining a target hot water load of the water purifier based on the current machine load and the current time period.
S104, controlling the water purifier to produce water based on the target hot water load.
In this embodiment, according to the comparison result of the actual water consumption number of the water purifier and the preset water consumption number, the current machine load of the water purifier is determined, according to the current machine load and the current time period, the target hot water load of the water purifier is determined, and the water production control is performed on the water purifier according to the target hot water load, so that the intelligent regulation and control of the water production mechanism according to the current time period are realized, the actual running load of the water purifier is matched with the actual water consumption number, the energy waste is reduced, the water consumption experience of a user is improved, and the product performance of the water purifier is improved.
Example 2
The present embodiment provides a control method of a water purifier, which is a further improvement of embodiment 1.
In one embodiment, as shown in fig. 2, step S101 includes:
s1011, acquiring accumulated water intake duration and water outlet flow of the water purifier in a first preset period;
s1012, determining the water consumption in a first preset period based on the accumulated water intake duration and the water outlet flow;
s1013, determining the number of actual water consumption based on the water consumption.
Specifically, the actual water consumption number is determined according to the water consumption, and then the current machine load is determined according to the comparison result of the actual water consumption number and the preset water consumption number.
Referring to fig. 3, to determine the current machine load of the water purifier according to the water consumption, the detailed flow is as follows: determining the current machine load of the water purifier according to the water consumption, and firstly judging whether the current machine load is a working day or not; if not, waiting for the working day and returning to the step of judging whether the working day is the working day or not; if yes, the accumulated hot water taking time in one day is cleared, the accumulated cold water taking time in one day is cleared, the water consumption and the number of people are recorded from five points in the morning, then the actual water consumption and the number of people are determined, the current machine load of the water purifier is determined, and finally a flag that the current machine load judgment of the water purifier is completed is set to 1 (namely, the current machine load judgment is completed).
The times given herein are just one example and may be adjusted according to actual needs.
Referring to fig. 4, to determine the number of actual water usage, the detailed flow is as follows: after the water consumption and the number of people are recorded from five points in the morning, judging whether a person presses a hot water key; if no person presses the hot water key, judging whether a person presses the cold water key; if someone presses the hot water key, accumulating hot water taking time in one day for timing, and judging whether to turn off the hot water; if the hot water is not closed, returning to the step of accumulating the hot water taking time length in one day for timing;
if the hot water is turned off, accumulating hot water taking time in one day to stop timing, and judging whether a person presses a cold water key; if no person presses the cold water key, returning to the step of judging whether a person presses the hot water key; if someone presses the cold water key, accumulating cold water taking time in one day for timing, and judging whether to turn off cold water; if the cold water is not closed, returning to the step of accumulating cold water taking time in one day for timing;
if the cold water is turned off, accumulating cold water time in one day to stop timing, and judging whether the current time is more than ten minutes at night; if the current time is not more than ten minutes at night, returning to the step of judging whether a person presses the hot water key;
If the present time is greater than ten night, the total hot water amount in one day=the total cold water amount in one second, the actual water consumption in one day= (total hot water amount in one day+total cold water amount in one day)/(water consumption in one day of the average person).
The times given herein are just one example and may be adjusted according to actual needs.
Recording the accumulated water taking time of the hot water and the cold water of the water purifier in a first preset period, and calculating the accumulated hot water taking amount and the accumulated cold water taking amount in one day according to the water outlet flow of the hot water and the water outlet flow of the cold water of the water purifier respectively, wherein the sum of the accumulated hot water taking amount and the accumulated cold water taking amount is the water consumption in one day, the water drinking amount of a general person in one day is 1.5L according to an empirical value, and the quotient of the water consumption in one day and the water drinking amount of the general person in one day is the actual water consumption number in one day.
According to the scheme, the accumulated water taking time length and the water outlet flow of the water purifier in the first preset period are acquired, the water consumption is obtained according to the accumulated water taking time length and the water outlet flow, the actual water consumption is further obtained according to the water consumption calculation, the accuracy and the reliability of the actual water consumption are guaranteed, the current machine load of the water purifier is determined according to the water consumption, and the accuracy and the rationality of the current machine load are guaranteed.
In one embodiment, step S102 includes:
s1021, taking the ratio or the difference between the actual water consumption number and the preset water consumption number as a comparison result;
s1022, determining the current machine load based on the first preset range where the comparison result is located;
wherein the current machine load corresponds to a first preset range.
Specifically, taking the ratio as an example, the ratio of the actual water consumption number and the preset water consumption number in one day is taken as a comparison result, and when the ratio is larger, the current machine load is larger. According to different ranges of the ratio, different current machine loads are respectively corresponding. And the product of the proportional coefficient and the preset machine load of the water purifier can be used as the current machine load according to different ranges of the ratio.
Referring to fig. 5, to determine the current machine load of the water purifier, the detailed flow is as follows: after determining the actual water consumption, reading the preset water consumption of the water purifier, and judging whether the ratio is more than 200% or not, wherein the ratio of the actual water consumption to the preset water consumption=the actual water consumption in one day/the preset water consumption;
if the ratio is greater than 200%, the current machine load is above 200%; if the ratio is not more than 200%, judging whether the ratio is more than 150%; if the ratio is greater than 150%, the current machine load is above 150%; if the ratio is not more than 150%, judging whether the ratio is more than 125%; if the ratio is greater than 125%, the current machine load is above 125%; if the ratio is not more than 125%, judging whether the ratio is more than 75%; if the ratio is more than 75%, the current machine load is proper and is about 100%; if the ratio is not more than 75%, judging whether the ratio is more than 50%; if the ratio is more than 50%, the current machine load is less than 75%, and the number of users is too small; if the ratio is not more than 50%, the current machine load is less than 50% and the number of users is very small.
The ratios given herein are just one example and may be adjusted according to actual needs.
In the scheme, the ratio or the difference value of the actual water consumption number and the preset water consumption number is used as a comparison result, and different current machine loads are respectively corresponding to different ranges of the comparison result, so that the accuracy and the rationality of the current machine load setting are ensured.
In another embodiment, step S102 includes:
s1023, determining the current machine load based on the product of the comparison result and the preset machine load of the water purifier.
In the scheme, the ratio of the actual water consumption number to the preset water consumption number can be used as a comparison result, and the product of the ratio and the preset machine load of the water purifier is used as the current machine load, so that the accuracy and the rationality of the current machine load setting are ensured.
In one embodiment, step S103 includes:
s1031, determining a target adjustment coefficient based on a second preset range of the current time period;
wherein the target adjustment coefficient corresponds to a second preset range;
s1032, determining a target hot water load based on a product of the target adjustment factor and the current machine load.
In different time periods of the day, the demand of users for hot water is different, the hot water consumption in the morning is larger than that in the afternoon, and the hot water consumption in the night is larger than that in the evening, and the water purifier needs to adjust the supply of cold and hot water according to different time periods. The target hot water load is the time period hot water load of the water purifier, and the total hot water load of the water purifier is equal to the time period hot water load, namely the target hot water load.
In the specific implementation process, when the second preset range is a preset working period, the corresponding target adjustment coefficient is larger than the corresponding target adjustment coefficient when the second preset range is a preset non-working period; the second preset range is a target adjustment coefficient corresponding to the preset working period in the morning and is larger than the target adjustment coefficient corresponding to the second preset range in the preset working period in the afternoon; the second preset range is that the target adjustment coefficient corresponding to the preset evening non-working period is larger than the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset morning non-working period, and the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset morning non-working period is larger than the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset late evening non-working period.
Wherein, the preset morning working period and the preset afternoon working period belong to preset working periods, and the preset evening non-working period, the preset morning non-working period and the preset late night non-working period belong to preset non-working periods; the preset working period, the preset non-working period and the like can be preset or defined according to actual needs.
Specifically, the split time points of the preset operating period and the preset non-operating period may be set by themselves, such as 7 points and 18 points; the divided time points of the morning and afternoon of the preset morning working period and the preset afternoon working period can be set by oneself, such as 11 points; the split time points of evening and late night of the preset evening non-working period and the preset late night non-working period can be set by themselves, such as 22 points; the split time points of late night and early morning of the preset late night non-working period and the preset early morning non-working period may be set by themselves, for example, 5 points.
The 5 time periods may be set to be continuous or discontinuous, and continuous may be such that 24 hours a day are covered.
Referring to fig. 6, to determine the target hot water load, the detailed flow is as follows: starting to determine a target hot water load, firstly judging whether a finished mark is 1 according to the current machine load of the water purifier; if the current machine load judgment completed mark of the water purifier is not 1 (namely, the current machine load judgment is not completed), determining the current machine load of the water purifier according to the water consumption, and returning to the step of judging whether the current machine load judgment completed mark of the water purifier is 1 or not;
if the current machine load judgment of the water purifier is completed (namely, the current machine load judgment is completed) is marked as 1, judging whether the current time is from 5 to 7 in the morning; if the current time is 5 to 7 in the morning, the target hot water load of the water purifier=current machine load is 50%;
if the current time is not from 5 to 7 in the morning, judging whether the current time is from 7 to 11 in the morning; if the current time is 7 to 11 a.m., the target hot water load of the water purifier=current machine load 130%;
If the current time is not from 7 to 11 in the morning, judging whether the current time is from 11 to 6 in the afternoon; if the present time is from 11 a.m. to 6 a.m., the target hot water load of the water purifier=the current machine load;
if the current time is not from 11 to 6 pm, judging whether the current time is from 6 pm to 10 pm; if the current time is from 6 pm to 10 pm, the target hot water load of the water purifier=the current machine load is 70%;
if the current time is not from 6 pm to 10 pm, the target hot water load of the water purifier=the current machine load is 20%.
The values given herein are just examples and can be adjusted according to actual needs.
In the scheme, different time periods correspond to different target adjustment coefficients, the target adjustment coefficients are determined according to the second preset range of the time periods, the product of the target adjustment coefficients and the current machine load is used as the target hot water load, adjustment of the target hot water load according to the different time periods is achieved, and accuracy and reliability of the target hot water load are guaranteed.
In one embodiment, the water purifier includes several water pumps and several heating devices;
Step S104 includes:
s1041, determining a target water level of the water purifier based on the target hot water load;
s1042, determining the corresponding number of the water pumps and the heating devices based on the target water level;
s1043, controlling the water purifier to produce water by the corresponding number of water pumps and heating devices.
Specifically, the heating device can be a heating pipe, corresponding target water levels are respectively determined according to different ranges of target hot water loads, the number of the water pumps and the heating pipes are respectively determined according to the size of the target water levels, and the water purifier is controlled to enter water to produce water according to the number of the water pumps and the heating pipes. The method comprises the steps of judging to different degrees according to different target hot water loads, determining different target water levels, and judging whether one water pump is started to produce water or two water pumps are started to produce water, and whether one heating pipe is started to heat or two heating pipes are started to heat. When the water consumption is small, the number of actual water consumption is small, the current machine load is small, the target hot water load is small, and the target water level is small, so that water can be produced by only one water pump and one heating pipe for heating.
In the scheme, the target hot water load is determined according to the time period and the current machine load, the current machine load is determined according to the number of actual water consumption, and the number of the water pumps and the heating pipes is determined according to the target water level corresponding to the target hot water load, so that the water production capacity of the water purifier is determined according to the time period and the number of actual water consumption, and the accuracy and the rationality of water control of the water purifier are ensured.
In one embodiment, as shown in fig. 7, step S1042 includes:
s10421, determining the current season;
s10422, determining that the corresponding number of the water pumps is the first number and the corresponding number of the heating devices is the second number in response to the target water level being the first water level and the season being winter;
s10423, determining that the corresponding number of the water pumps is the third number and the corresponding number of the heating devices is the fourth number in response to the target water level being the first water level and the season not being winter;
wherein the first number is less than the third number and the second number is greater than the fourth number;
s10424, determining that the corresponding number of the water pumps is a fifth number in response to the target water level being the second water level and the season being summer;
s10425, determining that the corresponding number of the water pumps is a sixth number in response to the target water level being the second water level and the season not being summer;
wherein the fifth number is greater than the sixth number and the first water level is greater than the second water level.
After the target water level is determined, further, the number of water pumps and heating pipes can be determined in combination with seasons.
Referring to fig. 8, a third flowchart of a control method of the water purifier is shown as follows: the water purifier is electrified by water, a target hot water load is determined, and whether the target hot water load is more than 120% or not is judged;
If the target hot water load is greater than 120%, the hot water tank water level of the water purifier runs at the highest 6-grid water level, water supplementing and heating are carried out at the highest speed, the double water pumps are started to produce water, the double heating pipes are started to heat, the number of people is over or under, the target hot water load is adjusted, and the process is finished;
if the target hot water load is not more than 120%, judging whether the target hot water load is more than 100%; if the target hot water load is greater than 100%, the hot water tank water level runs at 5 grid water levels, water supplementing and heating are carried out at the highest speed, a double water pump is started to produce water, a double heating pipe is started to heat, the number of people is over or under, the target hot water load is adjusted, and the process is finished;
if the target hot water load is not more than 100%, judging whether the target hot water load is more than 80%; if the target hot water load is greater than 80%, the hot water tank water level runs at 4 grids, and whether the water purifier is in winter or not is judged according to the date of the water purifier; if the water is produced by a single water pump in winter, the double heating pipes are opened for heating, the number of people is over or under, the target hot water load is adjusted, and the process is finished; if the current water heating device is not used for winter, the double water pumps are started, the single heating pipes are started for heating, the number of people is over or under, the target hot water load is adjusted, and the process is finished;
If the target hot water load is not more than 80%, judging whether the target hot water load is more than 60%; if the target hot water load is greater than 60%, the hot water tank water level runs at 3 grids, and whether the water purifier is in summer or not is judged according to the date of the water purifier; if the number of people is too large or too small, the target hot water load is adjusted, and the process is finished; if the current time is not summer, a single water pump is started to produce water, a single heating pipe is started to heat, the number of people is over or under, the target hot water load is adjusted, and the process is finished;
if the target hot water load is not more than 60%, judging whether the target hot water load is more than 30%; if the target hot water load is greater than 30%, the hot water tank water level runs at 2 grids, a single water pump is started to produce water, a single heating pipe is started to heat, the number of people is over or under, the target hot water load is adjusted, and the process is finished;
if the target hot water load is not more than 30%, the hot water tank water level runs at 1 grid water level, a single water pump is started to produce water, a single heating pipe is started to heat, the number of people is over or under, the target hot water load is adjusted, and the process is finished.
The percentages and the number of water grids given herein are just one example and can be adjusted according to the actual needs.
In the scheme, the quantity of the water pump and the heating pipes is determined according to the target water level and seasons, so that the accuracy and the rationality of water control of the water purifying machine are ensured.
In an embodiment, as shown in fig. 9, step S104 further includes:
s1044, acquiring continuous unmanned water taking time of the water purifier;
s1045, reducing a target hot water load in response to the continuous unmanned water taking time being longer than a first preset time;
s1046, controlling the water purifier to produce water based on the reduced target hot water load.
Specifically, in the use process of the water purifier, a plurality of people receive water in one day, a few people receive water in one day, a plurality of people add duty at night, no people add duty, and people have a holiday, and the target hot water load of the water purifier needs to be flexibly adjusted to meet the demands of people in response to the emergency situations. When people are few, such as at night, the water consumption is small, and when no people take water for a long time, the target hot water load can be correspondingly reduced, and accordingly, only one water pump can be used for producing water, and one heating pipe can be used for heating.
In this scheme, through the judgement to the continuous unmanned water intaking duration of purifier, and then adjustment target hot water load has realized the too little intelligent regulation to the purifier of burst number, has reduced the energy waste.
In an embodiment, as shown in fig. 10, step S104 further includes:
s1047, obtaining the number of times of taking hot water in a second preset duration;
s1048, increasing a target hot water load in response to the hot water taking times being greater than preset times;
s1049, controlling the water purifier to produce water based on the increased target hot water load.
In this scheme, through the judgement to the time of getting hot water in the purifier second presets duration, and then adjustment target hot water load has realized the intelligent regulation to the purifier when the bursty number is too much, has fully satisfied people's water demand, has promoted user's water use experience.
Referring to fig. 11, a flowchart for adjusting the target hot water load is shown as follows: the method comprises the steps of starting to deal with excessive or insufficient people, adjusting target hot water load, and firstly judging whether the current time is greater than eight morning points; if the current time is not more than the eighth morning point, returning to the step of judging whether the current time is more than the eighth morning point after waiting; if the current time is more than eight points in the morning, judging whether the time of continuous unmanned water taking is more than 30 minutes;
if the continuous unmanned water taking time is not more than 30 minutes, the target hot water load is not changed, and the step of judging whether the continuous unmanned water taking time is more than 30 minutes is returned; if the continuous unmanned water taking time is more than 30 minutes, the target hot water load in the day is reduced by 5%, the continuous unmanned water taking time is recime, and whether the hot water taking times in 30 minutes are more than 20 times is judged;
If the number of times of taking hot water within 30 minutes is more than 20 times, indicating that a large amount of people suddenly use water, increasing the target hot water load within the day by 15 percent, and timing and reckoning the number of times of taking water within 30 minutes; if the number of times of taking hot water in 30 minutes is not more than 20 times, judging whether the number of times of taking hot water in 30 minutes is more than 10 times;
if the number of times of taking hot water in 30 minutes is more than 10 times, the load of the target hot water in the present day is increased by 5 percent, and the number of times of taking water in 30 minutes is counted again and counted; if the number of times of taking hot water within 30 minutes is not more than 10 times, the target hot water load is not changed, and the time of taking water within 30 minutes is counted again and counted.
The times, times and percentages given herein are just one example and may be adjusted according to actual needs.
The following describes the working principle of the control method of the water purifier according to the present embodiment with reference to specific examples:
calculating to obtain the water consumption in the first preset period according to the accumulated water taking time length and the water outlet flow of the water purifier in the first preset period, and determining the actual water consumption number according to the water consumption; determining a comparison result of the actual water consumption number and the preset water consumption number of the water purifier, and determining the current machine load according to different ranges of the comparison result; determining a target adjustment coefficient according to a second preset range of the current time period; taking the product of the current machine load and the target regulating coefficient as a target hot water load; in response to the continuous unmanned water intake time period of the water purifier being longer than a first preset time period, reducing a target hot water load; according to different ranges of the water purifier in which the times of taking the hot water in the second preset duration are located, correspondingly increasing the target hot water load; and determining a corresponding target water level according to different ranges of the target hot water load, and controlling the water purifier to produce water by a corresponding number of water pumps and heating devices according to the target water level and the current season.
In this embodiment, the actual water consumption is determined according to the water consumption, and the deviation of the actual water consumption and the preset water consumption is determined according to the comparison result of the actual water consumption and the preset water consumption, so as to determine the load degree of the water purifier, that is, the current machine load, and ensure the accuracy and rationality of the current machine load. According to the current machine load and the current time period, the target hot water loads of the water purifiers in different time periods are comprehensively obtained, the water preparation control is carried out on the water purifiers according to the target hot water loads, intelligent adjustment and control of water preparation of the water purifiers are achieved, the actual running load of the water purifiers is matched with the actual water consumption number, energy waste is reduced, water consumption experience of users is improved, and product performance of the water purifiers is improved.
Example 3
The present embodiment provides a control system of a water purifier, as shown in fig. 12, the control system includes:
the actual water consumption number acquisition module 1 is used for acquiring the actual water consumption number of the water purifier in a first preset period;
the current machine load determining module 2 is used for obtaining a comparison result of the actual water consumption number and the preset water consumption number of the water purifier and determining the current machine load of the water purifier based on the comparison result;
A target hot water load determining module 3 for determining a target hot water load of the water purifier based on the current machine load and the current time period;
and the water making control module 4 is used for controlling the water making of the water purifier based on the target hot water load.
The working principle of this embodiment is the same as that of the control method of the water purifier corresponding to embodiment 1, and will not be discussed here.
In this embodiment, according to the comparison result of the actual water consumption number of the water purifier and the preset water consumption number, the current machine load of the water purifier is determined, according to the current machine load and the current time period, the target hot water load of the water purifier is determined, and the water production control is performed on the water purifier according to the target hot water load, so that the intelligent regulation and control of the water production mechanism according to the current time period are realized, the actual running load of the water purifier is matched with the actual water consumption number, the energy waste is reduced, the water consumption experience of a user is improved, and the product performance of the water purifier is improved.
Example 4
The present embodiment provides a control system for a water purifier, which is a further improvement of embodiment 3, as shown in fig. 13.
In one embodiment, the actual water usage number acquisition module 1 includes:
A duration and flow obtaining unit 11, configured to obtain an accumulated water intake duration and a water outlet flow of the water purifier in a first preset period;
a water usage determining unit 12 for determining a water usage in a first preset period based on the accumulated water intake duration and the water output flow rate;
an actual water consumption number determination unit 13 for determining the actual water consumption number based on the water consumption amount.
In one embodiment, the current machine load determination module 2 includes:
a comparison result obtaining unit 21, configured to take a ratio or a difference between the actual water consumption number and the preset water consumption number as a comparison result;
the current machine load determining unit 22 is configured to determine a current machine load based on a first preset range in which the comparison result is located, where the current machine load corresponds to the first preset range, or determine the current machine load based on a product of the comparison result and a preset machine load of the water purifier.
In one embodiment, the target hot water load determination module 3 includes:
a target adjustment coefficient determining unit 31 for determining a target adjustment coefficient based on a second preset range in which the current time period is located;
wherein the target adjustment coefficient corresponds to a second preset range;
A target hot water load determination unit 32 for determining a target hot water load based on a product of the target adjustment coefficient and the current machine load.
In an embodiment, the target adjustment coefficient corresponding to the second preset range is greater than the target adjustment coefficient corresponding to the second preset range being the preset operating period.
In an embodiment, the target adjustment coefficient corresponding to the second preset range when the working period in the morning is preset is greater than the target adjustment coefficient corresponding to the second preset range when the working period in the afternoon is preset.
In one embodiment, the second preset range is that the target adjustment coefficient corresponding to the preset evening non-working period is greater than the target adjustment coefficient corresponding to the second preset range being that the target adjustment coefficient corresponding to the preset morning non-working period is greater than the target adjustment coefficient corresponding to the second preset range being that the preset evening non-working period.
In one embodiment, the water purifier includes several water pumps and several heating devices;
the water production control module 4 includes:
a target water level determining unit 41 for determining a target water level of the water purifier based on the target hot water load;
A number determining unit 42 for determining the corresponding number of water pumps and heating devices based on the target water level;
and a water producing control unit 43 for controlling the water purifier to produce water by the corresponding number of water pumps and heating devices.
In an embodiment, the number determination unit 42 includes a season determination sub-unit 421 and a number determination sub-unit 422;
the season determination subunit 421 is configured to determine a season in which the current time is located;
the number determining subunit 422 is configured to determine, in response to the target water level being the first water level and the season being winter, that the corresponding number of water pumps is the first number and the corresponding number of heating devices is the second number;
the number determination subunit 422 is further configured to determine, in response to the target water level being the first water level and the season not being winter, a corresponding number of water pumps being a third number and a corresponding number of heating devices being a fourth number;
wherein the first number is less than the third number and the second number is greater than the fourth number;
the number determination subunit 422 is further configured to determine, in response to the target water level being the second water level and the season being summer, a corresponding number of water pumps to be a fifth number;
the number determination subunit 422 is further configured to determine, in response to the target water level being the second water level and the season not being summer, a corresponding number of water pumps to be a sixth number;
Wherein the fifth number is greater than the sixth number and the first water level is greater than the second water level.
In an embodiment, the water production control module 4 further includes a continuous unmanned water intake duration acquisition unit 44 and a target hot water load adjustment unit 45;
a continuous unmanned water intake duration acquisition unit 44 for acquiring continuous unmanned water intake duration of the water purifier;
a target hot water load adjustment unit 45 for reducing the target hot water load in response to the continuous unmanned water intake time being longer than a first preset time period;
the water production control unit 43 is further configured to perform water production control on the water purifier based on the reduced target hot water load.
In an embodiment, the water making control module 4 further includes a hot water taking number acquisition unit 46;
a hot water taking number acquisition unit 46, configured to acquire hot water taking numbers within a second preset duration;
a target hot water load adjusting unit 45 for increasing the target hot water load in response to the number of times of hot water taking being greater than a preset number of times;
the water production control unit 43 is also used for controlling the water production of the water purifier based on the increased target hot water load.
The working principle of this embodiment is the same as that of the control method of the water purifier corresponding to embodiment 2, and will not be discussed here.
In this embodiment, the actual water consumption is determined according to the water consumption, and the deviation of the actual water consumption and the preset water consumption is determined according to the comparison result of the actual water consumption and the preset water consumption, so as to determine the load degree of the water purifier, that is, the current machine load, and ensure the accuracy and rationality of the current machine load. According to the current machine load and the current time period, the target hot water loads of the water purifiers in different time periods are comprehensively obtained, the water preparation control is carried out on the water purifiers according to the target hot water loads, intelligent adjustment and control of water preparation of the water purifiers are achieved, the actual running load of the water purifiers is matched with the actual water consumption number, energy waste is reduced, water consumption experience of users is improved, and product performance of the water purifiers is improved.
Example 5
The present embodiment provides a water purifier including the control system of the water purifier according to embodiment 3 or 4.
As shown in fig. 14, the water purifier comprises a hot water tank 81, wherein a top cover of the hot water tank 81 is not airtight, and is provided with an air outlet and an overflow port 82 which are communicated with the outside. The top cover of the hot water tank 81 is also provided with 6 water level probes 83,6, the top ends of the water level probes 83 are connected to the top cover of the hot water tank 81, the height of the water level in the hot water tank 81 can be judged according to the water level probes 83, and 6 water level probes 83 can realize 6-grid water level detection, namely 1 grid, 2 grids, 3 grids, 4 grids, 5 grids and 6 grids. The water purifier further includes a water inlet 84 and a hot water outlet 85 communicating with the hot water tank 81. The hot water tank 81 is internally provided with 2 heating devices, specifically heating pipes 86, and the two heating pipes 86 are arranged in parallel at the bottom of the hot water tank 81. The water purifier further includes a pressure tank, and the hot water tank 81 and the pressure tank enable the water purifier to discharge hot water and cold water. In addition, the water purifier also comprises a main control MCU (micro control unit) module, a water taking button, a water supplementing valve, a heat exhausting water valve, a water pump and the like. Two parallel water pumps can be arranged to control the water production of the hot water tank independently.
According to the integrated control system of the water purifier, the current machine load of the water purifier is determined according to the comparison result of the actual water consumption number of the water purifier and the preset water consumption number, the target hot water load of the water purifier is determined according to the current machine load and the current time period, and the water preparation control is carried out on the water purifier according to the target hot water load, so that the intelligent adjustment and control of the water purifier according to the current time period are realized, the actual running load of the water purifier is matched with the actual water consumption number, the energy waste is reduced, the water consumption experience of a user is improved, and the product performance of the water purifier is improved.
Example 6
Fig. 15 is a schematic structural diagram of an electronic device according to embodiment 6 of the present disclosure. Comprises a memory, a processor and a computer program stored on the memory and capable of running on the processor, wherein the processor executes the computer program to realize the control method of the water purifier in the embodiment. The electronic device 90 shown in fig. 15 is merely an example and should not be construed to limit the functionality and scope of use of the disclosed embodiments.
The electronic device 90 may be in the form of a general purpose computing device, which may be a server device, for example. Components of the electronic device 90 may include, but are not limited to: the at least one processor 91, the at least one memory 92, a bus 93 connecting the different system components, including the memory 92 and the processor 91.
The bus 93 includes a data bus, an address bus, and a control bus.
The memory 92 may include volatile memory such as Random Access Memory (RAM) 921 and/or cache memory 922, and may further include Read Only Memory (ROM) 923.
Memory 92 may also include a program/utility 925 having a set (at least one) of program modules 924, such program modules 924 including, but not limited to: an operating system, one or more application programs, other program modules, and program data, each or some combination of which may include an implementation of a network environment.
The processor 91 executes various functional applications and data processing, such as the control method of the water purifier in the above-described embodiment of the present disclosure, by running a computer program stored in the memory 92.
The electronic device 90 may also communicate with one or more external devices 94 (e.g., keyboard, pointing device, etc.). Such communication may occur through an input/output (I/O) interface 95. Also, model-generated electronic device 90 may also communicate with one or more networks such as a Local Area Network (LAN), a Wide Area Network (WAN), and/or a public network such as the internet via network adapter 96. As shown, the network adapter 96 communicates with other modules of the model-generated electronic device 90 via the bus 93. It should be appreciated that although not shown, other hardware and/or software modules may be used in connection with model-generating electronic device 90, including, but not limited to: microcode, device drivers, redundant processors, external disk drive arrays, RAID (disk array) systems, tape drives, data backup storage systems, and the like.
It should be noted that although several units/modules or sub-units/modules of an electronic device are mentioned in the above detailed description, such a division is merely exemplary and not mandatory. Indeed, the features and functionality of two or more units/modules described above may be embodied in one unit/module in accordance with embodiments of the present disclosure. Conversely, the features and functions of one unit/module described above may be further divided into ones that are embodied by a plurality of units/modules.
Example 7
The present embodiment provides a computer-readable storage medium having stored thereon a computer program which, when executed by a processor, implements the control method of the water purifier as in the above embodiment.
More specifically, among others, readable storage media may be employed including, but not limited to: portable disk, hard disk, random access memory, read only memory, erasable programmable read only memory, optical storage device, magnetic storage device, or any suitable combination of the foregoing.
In a possible implementation manner, the present disclosure may also be implemented in the form of a program product including a program code for causing a terminal device to execute a control method implementing the water purifier as in the above-described embodiment, when the program product is run on the terminal device.
Wherein the program code for carrying out the present disclosure may be written in any combination of one or more programming languages, and the program code may execute entirely on the user device, partly on the user device, as a stand-alone software package, partly on the user device, partly on a remote device or entirely on the remote device.
While specific embodiments of the present disclosure have been described above, it will be appreciated by those skilled in the art that this is by way of example only, and the scope of the disclosure is defined by the appended claims. Various changes and modifications to these embodiments may be made by those skilled in the art without departing from the principles and spirit of the disclosure, but such changes and modifications fall within the scope of the disclosure.

Claims (11)

1. A control method of a water purifier, the control method comprising:
acquiring the number of actual water consumption of the water purifier within a first preset period;
acquiring a comparison result of the actual water consumption number and the preset water consumption number of the water purifier, and determining the current machine load of the water purifier based on the comparison result;
determining a target hot water load of the water purifier based on the current machine load and a current time period;
And controlling the water purifier to produce water based on the target hot water load.
2. The method of controlling a water purifier as recited in claim 1, wherein the step of obtaining the number of actual water consumption of the water purifier within the first preset period of time comprises:
acquiring accumulated water taking duration and water outlet flow of the water purifier within the first preset period;
determining the water consumption in the first preset period based on the accumulated water intake duration and the water outlet flow;
determining the actual water consumption based on the water consumption;
and/or the number of the groups of groups,
the step of obtaining a comparison result of the actual water consumption number and the preset water consumption number of the water purifier, and determining the current machine load of the water purifier based on the comparison result comprises the following steps:
taking the ratio or the difference between the actual water consumption number and the preset water consumption number as the comparison result;
and determining the current machine load based on a first preset range in which the comparison result is located, wherein the current machine load corresponds to the first preset range, or determining the current machine load based on the product of the comparison result and the preset machine load of the water purifier.
3. The control method of a water purifier according to claim 1, wherein the step of determining a target hot water load of the water purifier based on the current machine load and a current time period comprises:
determining a target adjustment coefficient based on a second preset range of the current time period;
wherein the target adjustment coefficient corresponds to the second preset range;
the target hot water load is determined based on a product of the target adjustment factor and the current machine load.
4. The method according to claim 3, wherein the target adjustment coefficient corresponding to the second preset range is greater than the target adjustment coefficient corresponding to the second preset range being a preset non-operation period when the second preset range is a preset operation period;
and/or the number of the groups of groups,
the second preset range is a target adjustment coefficient corresponding to the preset morning working period and is larger than the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset afternoon working period;
and/or the number of the groups of groups,
the second preset range is that the target adjustment coefficient corresponding to the preset evening non-working period is larger than the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset morning non-working period, and the second preset range is that the target adjustment coefficient corresponding to the preset morning non-working period is larger than the target adjustment coefficient corresponding to the second preset range when the second preset range is the preset late night non-working period.
5. The control method of a water purifier as recited in claim 1, wherein the water purifier comprises a plurality of water pumps and a plurality of heating devices;
the step of controlling the water purifier to produce water based on the target hot water load comprises the following steps:
determining a target water level of the water purifier based on the target hot water load;
determining a corresponding number of the water pumps and the heating devices based on the target water level;
and controlling the water purifier to produce water by the water pumps and the heating devices in corresponding numbers.
6. The method of controlling a water purifier as recited in claim 5, wherein the step of determining the corresponding number of the water pumps and the heating means based on the target water level comprises:
determining the current season;
determining that the corresponding number of the water pumps is a first number and the corresponding number of the heating devices is a second number in response to the target water level being a first water level and the season being winter;
determining that the corresponding number of water pumps is a third number and the corresponding number of heating devices is a fourth number in response to the target water level being the first water level and the season not being winter;
Wherein the first number is less than the third number, and the second number is greater than the fourth number;
determining that the corresponding number of water pumps is a fifth number in response to the target water level being a second water level and the season being summer;
determining that the corresponding number of water pumps is a sixth number in response to the target water level being the second water level and the season not being summer;
wherein the fifth number is greater than the sixth number, and the first water level is greater than the second water level.
7. The method of controlling a water purifier according to any one of claims 1 to 6, wherein the step of controlling water production of the water purifier based on the target hot water load further comprises:
acquiring continuous unmanned water taking time of the water purifier;
reducing the target hot water load in response to the continuous unmanned water intake time period being longer than a first preset time period;
performing water production control on the water purifier based on the reduced target hot water load;
and/or the number of the groups of groups,
the step of controlling the water purifier to produce water based on the target hot water load further comprises:
acquiring the number of times of taking hot water in a second preset time period;
Increasing the target hot water load in response to the number of hot water fetches being greater than a preset number;
and controlling the water purifier to produce water based on the increased target hot water load.
8. A control system of a water purifier, the control system comprising:
the actual water consumption number acquisition module is used for acquiring the actual water consumption number of the water purifier in a first preset period;
the current machine load determining module is used for obtaining a comparison result of the actual water consumption number and the preset water consumption number of the water purifier and determining the current machine load of the water purifier based on the comparison result;
a target hot water load determining module for determining a target hot water load of the water purifier based on the current machine load and a current time period;
and the water production control module is used for controlling the water production of the water purifier based on the target hot water load.
9. A water purifier comprising the control system of the water purifier of claim 8.
10. An electronic device comprising a memory, a processor and a computer program stored on the memory for execution on the processor, wherein the processor implements the method of controlling a water purifier according to any one of claims 1-7 when executing the computer program.
11. A computer-readable storage medium, on which a computer program is stored, characterized in that the computer program, when being executed by a processor, implements a control method of a water purifier according to any one of claims 1-7.
CN202310957912.7A 2023-08-01 2023-08-01 Water purifier and control method, system, equipment and medium thereof Pending CN116965683A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310957912.7A CN116965683A (en) 2023-08-01 2023-08-01 Water purifier and control method, system, equipment and medium thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310957912.7A CN116965683A (en) 2023-08-01 2023-08-01 Water purifier and control method, system, equipment and medium thereof

Publications (1)

Publication Number Publication Date
CN116965683A true CN116965683A (en) 2023-10-31

Family

ID=88484629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310957912.7A Pending CN116965683A (en) 2023-08-01 2023-08-01 Water purifier and control method, system, equipment and medium thereof

Country Status (1)

Country Link
CN (1) CN116965683A (en)

Similar Documents

Publication Publication Date Title
CN111237989B (en) Building ventilation air conditioner control method and device based on load prediction
CN111550861B (en) Self-adaptive optimization control method, system and device for heat pump and electric heat storage equipment
CN106681964B (en) Energy Consumption of Public Buildings statistical audit method for splitting
US9350562B2 (en) Energy management control system and method based on cloud computing
CN104823119B (en) Radiant heating for environmental control system controls and method
CN116965684A (en) Water purifier and control method, system, equipment and medium thereof
Becker et al. Development of a hot water use data base
EP2779040A1 (en) Modeling energy conversion in systems
CN108931030A (en) A kind of energy-saving control method and system of river water source heat pump system
CN110220288A (en) Central air-conditioning system intelligent optimized control method and device based on big data cloud platform
CN109214720B (en) Economic parameter analysis and feedback system based on household energy consumption
CN109706999A (en) A kind of building secondary water-supply data acquisition and analysis system and method
CN116965683A (en) Water purifier and control method, system, equipment and medium thereof
CN116965682A (en) Water purifier and control method, system, equipment and medium thereof
CN112215472A (en) Clustering-based electric heating load response control method and device
CN114819662A (en) Electric heat scheduling method and system of heat storage electric boiler group considering user heat demand
CN113309173A (en) Water supply system optimization method and adjustment method for community water supply system
CN110701732A (en) Energy consumption data analysis method and system and energy saving method and system of central air conditioner
CN113534861B (en) Liquid level monitoring system and method based on Internet of things
CN115451493B (en) Fresh air system, control method and device thereof, and storage medium
CN219934098U (en) Energy-saving type heating system for public building
CN118208758B (en) Control method, controller and storage medium of prefabricated integrated heat exchanger unit
CN114726659B (en) Energy-saving control system and method for edge gateway
CN114723148A (en) Water supply method, equipment, medium and system based on survival rate dynamic balance
CN115234961B (en) Method and system for dynamically adjusting heat supply network based on meteorological parameters and position information

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination