CN116873008B - Arrangement method and device for signal system reconstruction trackside equipment - Google Patents
Arrangement method and device for signal system reconstruction trackside equipment Download PDFInfo
- Publication number
- CN116873008B CN116873008B CN202311155107.9A CN202311155107A CN116873008B CN 116873008 B CN116873008 B CN 116873008B CN 202311155107 A CN202311155107 A CN 202311155107A CN 116873008 B CN116873008 B CN 116873008B
- Authority
- CN
- China
- Prior art keywords
- annunciator
- signal system
- judging whether
- axle
- interlocking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 39
- 238000012545 processing Methods 0.000 claims abstract description 24
- 238000005520 cutting process Methods 0.000 claims description 24
- 238000004088 simulation Methods 0.000 claims description 9
- 238000004364 calculation method Methods 0.000 claims description 8
- 239000007787 solid Substances 0.000 claims description 4
- 230000008707 rearrangement Effects 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000011664 signaling Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000014509 gene expression Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000003137 locomotive effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/50—Trackside diagnosis or maintenance, e.g. software upgrades
- B61L27/53—Trackside diagnosis or maintenance, e.g. software upgrades for trackside elements or systems, e.g. trackside supervision of trackside control system conditions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L1/00—Devices along the route controlled by interaction with the vehicle or train
- B61L1/16—Devices for counting axles; Devices for counting vehicles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L25/00—Recording or indicating positions or identities of vehicles or trains or setting of track apparatus
- B61L25/06—Indicating or recording the setting of track apparatus, e.g. of points, of signals
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Health & Medical Sciences (AREA)
- Biomedical Technology (AREA)
- General Health & Medical Sciences (AREA)
- Automation & Control Theory (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The application provides a method and a device for arranging trackside equipment for signal system reconstruction, wherein the method comprises the following steps: s1, judging whether a first annunciator of an original signal system meets preset conditions or not; s2, if so, judging whether the first signal machine is a virtual signal machine or not; s3, correspondingly processing the first annunciator and re-distributing a second annunciator according to the judgment result; s4, judging whether a first axle counting of the original signal system meets the preset condition or not; s5, if yes, the first shaft is removed, and the second shaft is rearranged. The application considers whether the first annunciator and the first axle counting need to be modified or not, and further considers whether the first annunciator is a virtual annunciator or in step S2, and correspondingly processes the first annunciator according to different judging results. Compared with the prior art, the application has the advantages that the consideration is more comprehensive, the interference of the existing equipment can be effectively eliminated, and the applicable range is more comprehensive. The device has the same beneficial effects.
Description
Technical Field
The application relates to the technical field of replacement and reconstruction of rail transit signal systems, in particular to a method and a device for arranging signal system reconstruction trackside equipment.
Background
The existing trackside equipment arrangement method is mainly aimed at a new project, but is different from the newly-built trackside equipment arrangement of a line, and the interference of the existing equipment needs to be considered for the line reconstruction, so that the application range of the existing trackside equipment arrangement method is not comprehensive, and the implementation of the reconstruction project cannot be guided.
Therefore, providing a method and a device for arranging the signal system reconstruction trackside equipment, which can avoid the interference of the existing equipment and has a more comprehensive application range, is a problem to be solved by the person skilled in the art.
Disclosure of Invention
The application aims to provide a method and a device for arranging the signal system reconstruction trackside equipment, wherein the method has clear logic, safety, effectiveness, reliability and simple and convenient operation, can avoid the interference of considering space limitation and the existing equipment, and has more comprehensive application range.
Based on the above purpose, the technical scheme provided by the application is as follows:
a signal system reconstruction trackside equipment arrangement method comprises the following steps:
s1, judging whether a first annunciator of an original signal system meets preset conditions or not;
if not, the first annunciator is connected into a new signal system through the inversing operation;
s2, if so, judging whether the first signal machine is a virtual signal machine or not;
s3, correspondingly processing the first annunciator and re-distributing a second annunciator according to the judgment result;
s31, if the judgment result is yes, the first annunciator is canceled, and the second annunciator is rearranged at the first annunciator arrangement position, wherein the second annunciator is an entity annunciator;
s32, if the judgment result is negative, dismantling the first annunciator and the corresponding control cable, and re-arranging the second annunciator according to the traction calculation simulation result and the preset warning mark position
S4, judging whether a first axle counting of the original signal system meets the preset condition or not;
if not, the first metering shaft is connected into a new signal system through a reverse cutting operation;
s5, if yes, removing the first shaft, and re-arranging a second shaft;
wherein, the back-cutting operation comprises the following steps:
inserting a switching device between a first interlocking indoor device of the original signal system and an interlocking outdoor device of the original signal system;
accessing a second interlock indoor device of the original signal system into the inverted cutting device;
switching, by the switching device, connection between the interlocking outdoor device and the first interlocking indoor device and the second interlocking indoor device, respectively;
wherein, the interlocking outdoor equipment includes: the first annunciator or the first shaft.
Preferably, the re-arranging the second axle comprises the steps of:
acquiring the shortest distance between the front end of the train head of the new signal system and the second axle according to a preset formula;
acquiring a first minimum tolerance distance of the first metering axis to the interference source and a second minimum tolerance distance of the second metering axis to the interference source, and determining a maximum value between the first minimum tolerance distance and the second minimum tolerance distance;
judging whether the distance between the second axle counting and the center of the platform is not smaller than the shortest distance;
judging whether the distance between the second metering shaft and the first metering shaft is not smaller than the maximum value;
and if the judgment results are yes, determining the layout position of the second axle counting and laying the second axle counting.
Preferably, the preset formula is specifically:
L1=M1+M2+M3+M3*M1
wherein L1 is the shortest distance between the front end of the train head and the second axle, M1 is the mounting error of the accurate parking transponder, M2 is the solid envelope of the train, and M3 is the maximum retrogressive distance.
A signaling system retrofit trackside equipment placement apparatus comprising:
the first judging module is used for judging whether a first annunciator of the original signal system meets preset conditions or not;
the second judging module is used for judging whether the first annunciator is a virtual annunciator or not when the first judging result is yes;
the processing module is used for correspondingly processing the first annunciator and rearranging the second annunciator according to the second judging result;
the processing module is specifically configured to cancel the first annunciator and rearrange the second annunciator at a first annunciator arrangement position when the second determination result is yes, where the second annunciator is an entity annunciator;
the processing module is specifically further configured to, when the second determination result is no, remove the first annunciator and the corresponding control cable, and re-arrange the second annunciator according to the traction calculation simulation result and the preset warning mark position;
the third judging module is used for judging whether the first axle counting of the original signal system meets the preset condition or not;
and the layout module is used for dismantling the first axle counting and re-layout the second axle counting when the third judging result is yes.
The application provides a signal system reconstruction trackside equipment arrangement method, which comprises the steps of judging whether a first signal machine of an original signal system meets preset conditions or not, and judging whether the first signal machine is a virtual signal machine or not when the first signal machine meets the preset conditions; according to whether the first annunciator is a virtual annunciator or not, two different processing modes exist, the first annunciator is correspondingly processed, and the second annunciator is rearranged; judging whether a first axle counting of an original signal system meets a preset condition or not; and when the first metering shaft meets the preset condition, the first metering shaft is removed, and the second metering shaft is rearranged. In the actual application process, the preset conditions are specifically as follows: the failure rate for the first annunciator or the first axle is high or the current operation requirement is not met. I.e. steps S1 and S4 are to determine if the first annunciator and the first shaft in the original signaling system need to be retrofitted.
The application considers whether the first annunciator and the first axle counting need to be modified or not, and further considers whether the first annunciator is a virtual annunciator or in step S2, and correspondingly processes the first annunciator according to different judging results. Compared with the prior art, the scheme is more comprehensive in consideration, can effectively eliminate the interference of the existing equipment, and is more comprehensive in application range.
The application also provides a device for arranging the signal system reconstruction trackside equipment, which solves the same technical problems, belongs to the same technical conception and has the same beneficial effects as the method, and is not repeated here.
Drawings
In order to more clearly illustrate the embodiments of the application or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the application, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a flow chart of a method for arranging a signal system modified trackside equipment according to an embodiment of the present application;
FIG. 2 is a flow chart of a back-cutting operation provided in an embodiment of the present application;
FIG. 3 is a flowchart of step S3 provided in an embodiment of the present application;
FIG. 4 is a flow chart illustrating a second axis re-arrangement provided by an embodiment of the present application;
fig. 5 is a schematic structural diagram of an arrangement device of a signal system reconstruction trackside equipment according to an embodiment of the present application.
Detailed Description
The following description of the embodiments of the present application will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present application, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the application without making any inventive effort, are intended to be within the scope of the application.
The embodiment of the application is written in a progressive manner.
The embodiment of the application provides a method and a device for arranging a signal system reconstruction trackside device. The method mainly solves the technical problems that in the prior art, the interference of the existing equipment needs to be considered in the process of modifying the line, and the application range of the existing trackside equipment arrangement method is not comprehensive.
As shown in fig. 1, a method for arranging a signal system reconstruction trackside equipment comprises the following steps:
s1, judging whether a first annunciator of an original signal system meets preset conditions or not;
if not, the first annunciator is connected into a new signal system through the inversing operation;
s2, if so, judging whether the first signal machine is a virtual signal machine or not;
s3, correspondingly processing the first annunciator and rearranging the second annunciator according to the judgment result;
s4, judging whether a first axle counting of the original signal system meets preset conditions or not;
if not, the first metering axle is connected into a new signal system through the reverse cutting operation
S5, if yes, removing the first shaft, and re-arranging the second shaft;
wherein, the back-cutting operation comprises the following steps:
A1. inserting a switching device between a first interlocking indoor device of an original signal system and an interlocking outdoor device of the original signal system;
A2. accessing a second interlocking indoor device of the original signal system into the inverted cutting device;
A3. switching connection between the interlocking outdoor equipment and the first interlocking indoor equipment and the second interlocking indoor equipment respectively through the inverted cutting equipment;
wherein, interlocking outdoor equipment includes: a first annunciator or a first shaft.
In step S1, it is determined whether the first annunciator (i.e., the annunciator used in the prior art) of the original signaling system needs to be modified; specifically, a fault threshold can be formulated according to the average fault rate of a specific model of the annunciator, when the fault threshold is exceeded, the annunciator needs to be modified, and when the fault threshold is not exceeded, the annunciator does not need to be modified; or determining whether the existing used annunciator meets the use requirement according to the formulated operation requirement of the urban rail transit signal system;
if the first annunciator does not need to be modified, the first annunciator is connected into a new system through the inverted cutting operation;
in step S2, when the first annunciator needs to be modified, judging whether the annunciator used in the prior art is a virtual annunciator or;
in step S3, when the existing signal machine is a virtual signal machine, selecting a first processing mode for processing, and redistributing a second signal machine (i.e. a new signal machine); when the existing used annunciator is an entity annunciator, processing according to a second processing mode, and re-distributing the second annunciator;
in step S4, judging whether the first axle counting of the original signal system needs to be modified; likewise, a fault threshold can be formulated according to the average fault rate of the axle counting of a certain specific signal; or according to the formulated operation requirement of the urban rail transit signal system;
if the first metering shaft does not need to be modified, the first metering shaft is connected into a new system through a reverse cutting operation;
in step S5, when the first axle counting needs to be modified, the first axle counting is removed, and the second axle counting is rearranged.
As shown in fig. 2, the back-cutting operation includes the steps of:
A1. inserting a switching device between a first interlocking indoor device of an original signal system and an interlocking outdoor device of the original signal system;
A2. accessing a second interlocking indoor device of the original signal system into the inverted cutting device;
A3. switching connection between the interlocking outdoor equipment and the first interlocking indoor equipment and the second interlocking indoor equipment respectively through the inverted cutting equipment;
wherein, interlocking outdoor equipment includes: a first annunciator or a first shaft.
In the actual application process, when the failure rate of the first annunciator is low and the operation requirement can be met, namely, the first annunciator does not need to be modified; or when the first metering shaft has low failure rate and can meet the operation requirement, namely, the first metering shaft does not need to be modified; the new signal system can be accessed by a reverse cut operation.
In step A1, a reverse cutting device is inserted between an interlocking indoor device (i.e., an existing interlocking indoor device) and an interlocking outdoor device (i.e., an existing interlocking outdoor device) in an original signal system;
in the step A2, a second interlocking indoor device (namely a new interlocking indoor device) of the original signal system is accessed into the inverted cutting device;
in step A3, the switching between the existing interlocking indoor equipment and the new interlocking indoor equipment is realized through the inverted cutting equipment, namely, the other end of the interlocking outdoor equipment (namely, the first annunciator or the first shaft counting) is switched between the existing interlocking indoor equipment and the new interlocking indoor equipment, namely, the existing interlocking indoor equipment and the new interlocking indoor equipment are redundant, and when one of the interlocking indoor equipment fails, the switching can be performed through the inverted cutting equipment.
As shown in fig. 3, preferably, the first annunciator is correspondingly processed and the second annunciator is rearranged according to the judgment result, and the method comprises the following steps:
s31, if the judgment result is yes, the first annunciator is canceled, and a second annunciator is rearranged at the first annunciator arrangement position, wherein the second annunciator is a physical annunciator;
s32, if the judgment result is negative, the first annunciator and the corresponding control cable are removed, and the second annunciator is rearranged according to the traction calculation simulation result and the preset warning mark position.
In the actual application process, when the first annunciator is a virtual annunciator, after the virtual annunciator is canceled, the second annunciator, namely the new entity annunciator, is rearranged at the original setting position of the virtual annunciator under the scene of a station with the reverse outbound or turn-back blocking requirement. When the first annunciator is an entity annunciator, verifying whether the position set by the first annunciator meets the set operation requirement through traction calculation simulation, and if not, dismantling the first annunciator; after the first annunciator is dismantled, a second entity annunciator is newly arranged according to the traction calculation simulation result and the preset warning mark position, the operation habit is further kept unchanged, and the name or serial number of the second entity annunciator is defined to be the same as that of the first entity annunciator.
As shown in fig. 4, the second axle is preferably rearranged, comprising the steps of:
B1. acquiring the shortest distance between the front end of the train head of the new signal system and the second metering shaft according to a preset formula;
b2, obtaining a first minimum tolerance distance of the first axis to the interference source and a second minimum tolerance distance of the second axis to the interference source, and determining a maximum value between the first minimum tolerance distance and the second minimum tolerance distance;
B3. judging whether the distance between the second axle counting and the center of the platform is not smaller than the shortest distance;
B4. judging whether the distance between the second metering shaft and the first metering shaft is not smaller than the maximum value;
B5. if the judgment results are yes, determining the layout position of the second axle counting, and laying the second axle counting.
Preferably, the preset formula is specifically:
L1=M1+M2+M3+M3*M1
wherein, L1 is the shortest distance between the front end of the train locomotive and the second axle, M1 is the installation error of the accurate parking transponder, M2 is the solid envelope of the train, and M3 is the maximum retrogressive distance.
In this embodiment, in order to detect the entrance and exit of a train from a station, a second in-station axle AC1 and a second out-station axle AC4 are required to be provided at the station. Because the original signal system is also provided with the first inbound meter axis AC2 and the first outbound meter axis AC3, the new design axis needs to comprehensively consider the performance requirement of the new signal system and the interference problem between the new meter axis and the old meter axis, and the determination method of the position of the new design axis is as follows:
in the step B1, calculating the shortest distance L1 between the front end of the train head of the new system and the meter axis through a preset formula: the specific preset formula is shown in the formula, and M1, M2 and M3 in the formula are all acquired by collecting or calling a database;
in the step B2, determining the minimum tolerance distance L2 of the first axle to the interference source; determining the minimum tolerance distance L3 of the newly designed second axle to the interference source; and determining a maximum value max between L2 and L3; the specific measurement mode can be realized through actual measurement or traction simulation;
b3 to B5, judging whether the distance between the newly designed second metering axle and the center of the platform is more than or equal to L1, if so, further judging that the distance L4 between the first metering axle and the second metering axle is more than or equal to max (L2, L3); if the first counting shaft is also satisfied, determining the layout position of the second counting shaft, and laying the second counting shaft at the layout position.
As shown in fig. 5, a signal system retrofit rail side equipment arrangement device includes:
the first judging module is used for judging whether a first annunciator of the original signal system meets preset conditions or not;
the second judging module is used for judging whether the first annunciator is a virtual annunciator or not when the first judging result is yes;
the processing module is used for correspondingly processing the first annunciator and redistributing the second annunciator according to the second judging result;
the processing module is specifically configured to cancel the first annunciator and rearrange a second annunciator at the first annunciator arrangement position when the second judgment result is yes, where the second annunciator is a physical annunciator;
the processing module is specifically used for dismantling the first annunciator and the corresponding control cable when the second judgment result is negative, and re-arranging the second annunciator according to the traction calculation simulation result and the preset warning mark position;
the third judging module is used for judging whether the first axle counting of the original signal system meets the preset condition or not;
and the layout module is used for dismantling the first axle and re-laying the second axle when the third judgment result is yes.
The application also provides a signal system reconstruction trackside equipment arrangement device which is provided with a first judging module, a second judging module, a processing module, a third judging module and a layout module; in the working process, the first judging module judges whether the first annunciator of the original signal system meets the preset condition or not, and sends a judging result to the second judging module; the second judging module judges whether the first annunciator is a virtual annunciator or not when the first judging result is yes, and sends the second judging result to the processing module; the processing module correspondingly processes the first annunciator and rearranges the second annunciator according to the second judging result; the third judging module is used for judging whether the first axle counting of the original signal system meets the preset condition or not and sending a third judging result to the layout module; and when the third judging result is yes, the layout module removes the first axle counting and re-lays the second axle counting.
In the embodiments provided in the present application, it should be understood that the disclosed method and apparatus may be implemented in other manners. The above-described embodiment of the apparatus is merely illustrative, for example, the division of modules is merely a logic function division, and there may be other division manners in actual implementation, such as: multiple modules or components may be combined, or may be integrated into another system, or some features may be omitted, or not performed. In addition, the various components shown or discussed may be coupled or directly coupled or communicatively coupled to each other via some interface, whether indirectly coupled or communicatively coupled to devices or modules, whether electrically, mechanically, or otherwise.
In addition, each functional module in each embodiment of the present application may be integrated in one processor, or each module may be separately used as one device, or two or more modules may be integrated in one device; the functional modules in the embodiments of the present application may be implemented in hardware, or may be implemented in a form of hardware plus a software functional unit.
Those of ordinary skill in the art will appreciate that: all or part of the steps for implementing the above method embodiments may be implemented by program instructions and associated hardware, where the program instructions may be stored in a computer readable storage medium, and where the program instructions, when executed, perform steps comprising the above method embodiments; and the aforementioned storage medium includes: a mobile storage device, a Read Only Memory (ROM), a magnetic disk or an optical disk, or the like, which can store program codes.
It should be appreciated that the use of "systems," "devices," "units," and/or "modules" in this disclosure is but one way to distinguish between different components, elements, parts, portions, or assemblies at different levels. However, if other words can achieve the same purpose, the word can be replaced by other expressions.
As used in the specification and in the claims, the terms "a," "an," "the," and/or "the" are not specific to a singular, but may include a plurality, unless the context clearly dictates otherwise. In general, the terms "comprises" and "comprising" merely indicate that the steps and elements are explicitly identified, and they do not constitute an exclusive list, as other steps or elements may be included in a method or apparatus. The inclusion of an element defined by the phrase "comprising one … …" does not exclude the presence of additional identical elements in a process, method, article, or apparatus that comprises an element.
The terms "first" and "second" are used below for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include one or more such feature.
If a flowchart is used in the present application, the flowchart is used to describe the operations performed by a system according to an embodiment of the present application. It should be appreciated that the preceding or following operations are not necessarily performed in order precisely. Rather, the steps may be processed in reverse order or simultaneously. Also, other operations may be added to or removed from these processes.
The method and the device for arranging the signal system reconstruction trackside equipment are described in detail. The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (2)
1. The method for arranging the signal system reconstruction trackside equipment is characterized by comprising the following steps of:
s1, judging whether a first annunciator of an original signal system meets preset conditions, wherein the method specifically comprises the following steps: setting a fault threshold according to the average fault rate of the first annunciator, judging whether the actual fault rate of the first annunciator exceeds a preset fault threshold, and if so, meeting a preset condition;
if not, the first annunciator is connected into a new signal system through the inversing operation;
s2, if so, judging whether the first signal machine is a virtual signal machine or not;
s3, correspondingly processing the first annunciator and re-distributing a second annunciator according to the judgment result;
s31, if the judgment result is yes, the first annunciator is canceled, and the second annunciator is rearranged at the first annunciator arrangement position, wherein the second annunciator is an entity annunciator;
s32, if the judgment result is negative, removing the first annunciator and the corresponding control cable, and re-arranging the second annunciator according to the traction calculation simulation result and the preset warning mark position;
s4, judging whether a first axle counting of the original signal system meets the preset condition or not, wherein the method specifically comprises the following steps: setting a fault threshold according to the average fault rate of the first metering shaft, judging whether the actual fault rate of the first metering shaft exceeds a preset fault threshold, and if so, meeting a preset condition;
if not, the first metering shaft is connected into a new signal system through a reverse cutting operation
S5, if yes, removing the first shaft, and re-arranging a second shaft;
wherein,
the back-cutting operation comprises the following steps:
inserting a switching device between a first interlocking indoor device of the original signal system and an interlocking outdoor device of the original signal system;
accessing a second interlock indoor device of the original signal system into the inverted cutting device;
switching, by the switching device, connection between the interlocking outdoor device and the first interlocking indoor device and the second interlocking indoor device, respectively;
wherein, the interlocking outdoor equipment includes: the first annunciator or the first shaft;
the re-arrangement of the second axle comprises the following steps:
acquiring the shortest distance between the front end of the train head of the new signal system and the second axle according to a preset formula;
acquiring a first minimum tolerance distance of the first metering axis to the interference source and a second minimum tolerance distance of the second metering axis to the interference source, and determining a maximum value between the first minimum tolerance distance and the second minimum tolerance distance;
judging whether the distance between the second axle counting and the center of the platform is not smaller than the shortest distance;
judging whether the distance between the second metering shaft and the first metering shaft is not smaller than the maximum value;
if the judgment results are yes, determining the layout position of the second axle counting, and laying the second axle counting;
the preset formula specifically comprises the following steps:
L1=M1+M2+M3+M3*M1
wherein L1 is the shortest distance between the front end of the train head and the second axle, M1 is the mounting error of the accurate parking transponder, M2 is the solid envelope of the train, and M3 is the maximum retrogressive distance.
2. A signal system retrofit trackside equipment placement apparatus, comprising:
the first judging module is used for judging whether the first annunciator of the original signal system meets the preset condition or not, and specifically comprises the following steps: setting a fault threshold according to the average fault rate of the first annunciator, judging whether the actual fault rate of the first annunciator exceeds a preset fault threshold, and if so, meeting a preset condition;
the switching module is used for switching the first annunciator into a new signal system through switching operation when the first judging result is negative;
the second judging module is used for judging whether the first annunciator is a virtual annunciator or not when the first judging result is yes;
the processing module is used for correspondingly processing the first annunciator and rearranging the second annunciator according to the second judging result;
the processing module is specifically configured to cancel the first annunciator and rearrange the second annunciator at a first annunciator arrangement position when the second determination result is yes, where the second annunciator is an entity annunciator;
the processing module is specifically further configured to, when the second determination result is no, remove the first annunciator and the corresponding control cable, and re-arrange the second annunciator according to the traction calculation simulation result and the preset warning mark position;
the third judging module is configured to judge whether the first axle count of the original signal system meets the preset condition, and specifically is: setting a fault threshold according to the average fault rate of the first metering shaft, judging whether the actual fault rate of the first metering shaft exceeds a preset fault threshold, and if so, meeting a preset condition;
the back-cutting module is further configured to access the first axle to a new signal system through a back-cutting operation when the third determination result is negative;
the layout module is used for dismantling the first axle counting and re-layout the second axle counting when the third judging result is yes;
wherein,
the back-cutting operation comprises the following steps:
inserting a switching device between a first interlocking indoor device of the original signal system and an interlocking outdoor device of the original signal system;
accessing a second interlock indoor device of the original signal system into the inverted cutting device;
switching, by the switching device, connection between the interlocking outdoor device and the first interlocking indoor device and the second interlocking indoor device, respectively;
wherein, the interlocking outdoor equipment includes: the first annunciator or the first shaft;
the re-arrangement of the second axle comprises the following steps:
acquiring the shortest distance between the front end of the train head of the new signal system and the second axle according to a preset formula;
acquiring a first minimum tolerance distance of the first metering axis to the interference source and a second minimum tolerance distance of the second metering axis to the interference source, and determining a maximum value between the first minimum tolerance distance and the second minimum tolerance distance;
judging whether the distance between the second axle counting and the center of the platform is not smaller than the shortest distance;
judging whether the distance between the second metering shaft and the first metering shaft is not smaller than the maximum value;
if the judgment results are yes, determining the layout position of the second axle counting, and laying the second axle counting;
the preset formula specifically comprises the following steps:
L1=M1+M2+M3+M3*M1
wherein L1 is the shortest distance between the front end of the train head and the second axle, M1 is the mounting error of the accurate parking transponder, M2 is the solid envelope of the train, and M3 is the maximum retrogressive distance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311155107.9A CN116873008B (en) | 2023-09-08 | 2023-09-08 | Arrangement method and device for signal system reconstruction trackside equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311155107.9A CN116873008B (en) | 2023-09-08 | 2023-09-08 | Arrangement method and device for signal system reconstruction trackside equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN116873008A CN116873008A (en) | 2023-10-13 |
CN116873008B true CN116873008B (en) | 2023-11-21 |
Family
ID=88268534
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202311155107.9A Active CN116873008B (en) | 2023-09-08 | 2023-09-08 | Arrangement method and device for signal system reconstruction trackside equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116873008B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005014783A (en) * | 2003-06-26 | 2005-01-20 | Hitachi Ltd | Signal security system |
CN201201617Y (en) * | 2008-09-25 | 2009-03-04 | 卡斯柯信号有限公司 | Dynamic tracking apparatus for train position in city rail traffic signal system |
DE102015210427A1 (en) * | 2015-06-08 | 2016-12-08 | Siemens Aktiengesellschaft | Method and device for determining a driving license for a tracked vehicle |
WO2021077831A1 (en) * | 2019-10-21 | 2021-04-29 | 中车大连机车研究所有限公司 | Locomotive fire prevention and control system |
CN114280918A (en) * | 2021-12-29 | 2022-04-05 | 交控科技股份有限公司 | Multidirectional interlocking back-cutting system and track control system |
CN115092223A (en) * | 2022-06-30 | 2022-09-23 | 中铁工程设计咨询集团有限公司 | Reverse cutting equipment for rail transit signal system |
WO2022213554A1 (en) * | 2021-04-06 | 2022-10-13 | 卡斯柯信号有限公司 | Urban rail transit fusion signal system and use method |
CN115848452A (en) * | 2022-11-25 | 2023-03-28 | 通号城市轨道交通技术有限公司 | Method and device for updating rail transit signal system |
-
2023
- 2023-09-08 CN CN202311155107.9A patent/CN116873008B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005014783A (en) * | 2003-06-26 | 2005-01-20 | Hitachi Ltd | Signal security system |
CN201201617Y (en) * | 2008-09-25 | 2009-03-04 | 卡斯柯信号有限公司 | Dynamic tracking apparatus for train position in city rail traffic signal system |
DE102015210427A1 (en) * | 2015-06-08 | 2016-12-08 | Siemens Aktiengesellschaft | Method and device for determining a driving license for a tracked vehicle |
WO2021077831A1 (en) * | 2019-10-21 | 2021-04-29 | 中车大连机车研究所有限公司 | Locomotive fire prevention and control system |
WO2022213554A1 (en) * | 2021-04-06 | 2022-10-13 | 卡斯柯信号有限公司 | Urban rail transit fusion signal system and use method |
CN114280918A (en) * | 2021-12-29 | 2022-04-05 | 交控科技股份有限公司 | Multidirectional interlocking back-cutting system and track control system |
CN115092223A (en) * | 2022-06-30 | 2022-09-23 | 中铁工程设计咨询集团有限公司 | Reverse cutting equipment for rail transit signal system |
CN115848452A (en) * | 2022-11-25 | 2023-03-28 | 通号城市轨道交通技术有限公司 | Method and device for updating rail transit signal system |
Non-Patent Citations (2)
Title |
---|
天津地铁1号线信号系统改造工程技术方案;于雪松;;数字通信世界(04);全文 * |
轨道交通运营线信号系统改造转辙机倒接试验技术方案;倪伟华;;科技传播(13);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN116873008A (en) | 2023-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110203257B (en) | Train operation scheduling method and system under rail transit incident | |
WO2017067509A1 (en) | Method of controlling hybrid operation of trains having different formation lengths and communication-based train control system | |
CN111144727B (en) | Urban rail transit arrival passenger flow toughness evaluation system and method | |
US20140012438A1 (en) | System, method, and computer-readable medium for track circuit monitoring and alerting in automatic train control systems | |
CN113264086B (en) | Train interval protection control method and device based on TACS (train operating System) | |
US8328143B2 (en) | Method for isolation of vital functions in a centralized train control system | |
CN116985876B (en) | Determination method and device of redundancy judgment time, electronic equipment and storage medium | |
CN110733532A (en) | train control method and device based on mobile block | |
CN117302296A (en) | Method and device for determining fault occupation of shaft counting section | |
CN116873008B (en) | Arrangement method and device for signal system reconstruction trackside equipment | |
CN108288019B (en) | Method and device for identifying preventive maintenance object of urban rail transit | |
CN115115174A (en) | Regional multi-standard rail transit global function target analysis method and device | |
CN110920684B (en) | Method and device for determining train position information, electronic equipment and storage medium | |
KR101902556B1 (en) | Monitoring system for a train and method therefor | |
CN112109770B (en) | Axle counting fault detection method and device, electronic equipment and storage medium | |
CN111680849B (en) | Method for calculating station passing capacity under abnormal event, storage medium and terminal | |
CN109272204B (en) | Method for evaluating network reserve capacity of urban subway | |
CN109532956B (en) | Driving control method and device suitable for VBTC (visual basic control) system | |
CN112214876A (en) | Axis modeling method and device in CBTC signal testing system and electronic equipment | |
KR20190115986A (en) | Automatic train protection display | |
CN114368419B (en) | Train operation occupation information comparison method and device, electronic equipment and storage medium | |
JP7475375B2 (en) | Method and program for risk assessment of transportation systems | |
CN115782957A (en) | Axle counting reset method and device | |
Rüdiger et al. | Formalization of train integrity monitoring systems | |
CN114590291B (en) | Automatic generation method and device for emergency stop area based on turnout |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |