CN116872366A - Pre-buried construction equipment of building engineering house construction wall body - Google Patents

Pre-buried construction equipment of building engineering house construction wall body Download PDF

Info

Publication number
CN116872366A
CN116872366A CN202310846358.5A CN202310846358A CN116872366A CN 116872366 A CN116872366 A CN 116872366A CN 202310846358 A CN202310846358 A CN 202310846358A CN 116872366 A CN116872366 A CN 116872366A
Authority
CN
China
Prior art keywords
limiting
wall body
fixed
driver
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310846358.5A
Other languages
Chinese (zh)
Other versions
CN116872366B (en
Inventor
袁艳
袁海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Ningxiang Construction Engineering Co ltd
Original Assignee
Jiangsu Ningxiang Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Ningxiang Construction Engineering Co ltd filed Critical Jiangsu Ningxiang Construction Engineering Co ltd
Priority to CN202310846358.5A priority Critical patent/CN116872366B/en
Publication of CN116872366A publication Critical patent/CN116872366A/en
Application granted granted Critical
Publication of CN116872366B publication Critical patent/CN116872366B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/14Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/14Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
    • B28D1/146Tools therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/10Devices for levelling, e.g. templates or boards

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application relates to the field of house engineering, in particular to a construction device for pre-burying a building wall body in a building engineering house, which comprises a movable locking vehicle, wherein a lifting machining driver is fixed in the center of the movable locking vehicle, the lifting machining driver drives a limiting lifting platform to longitudinally lift on the movable locking vehicle through threaded fit, the limiting lifting platform is driven to slide in a limiting manner to a plurality of wall body drilling groove machining devices for drilling groove machining, the wall body drilling groove machining devices are connected with a jacking uniformly-coating device through threaded fit, and a fixed concrete sealing coating soil additive is inserted on the limiting lifting platform; the application has the advantages that the wall body pre-embedding construction with corresponding positions being quickly adjustable in batches can be performed, and the problem of quick and automatic grooving can be performed by combining with the actual house condition.

Description

Pre-buried construction equipment of building engineering house construction wall body
Technical Field
The application relates to the field of house engineering, in particular to construction equipment for pre-burying a building wall body of a building engineering house.
Background
In the house decoration construction process, holes, grooves and open spaces are often needed to be drilled on the house wall, so that the embedded adding device for wires, pipelines, household appliances and the like used after decoration is convenient, the utilization space is effectively saved, the space of the whole house is tidier and cleaner, and the reasonable utilization of the house space is facilitated; the wall body embedded structure processing equipment similar to the one in the patent number CN202110314790.0 is installed fast, and the wall body embedded structure processing equipment comprises a bottom plate, a positioning device, a telescopic bracket, a connecting plate, a placing device and an adjusting device, wherein the positioning device is uniformly installed on the bottom plate, the telescopic bracket is connected between the bottom plate and the connecting plate, the placing device is uniformly installed on the connecting plate, and the placing devices which are correspondingly arranged front and back are connected through the adjusting device. The application can solve the problems that a simple clamp can only clamp a single anchor bar, the clamping of each anchor bar needs repeated clamping, the clamping efficiency is low, the orientation of the bent part at the upper end of the clamped anchor bar is difficult to keep consistent, and the yield of the welded embedded part is low; but the device can't carry out the pre-buried construction of wall body of quick adjustable in batches to house wall body's electric wire and pipeline, promotes the efficiency of construction efficiency of house construction fitment.
Therefore, the prior art scheme has the defect that the wall body pre-embedding construction with corresponding positions capable of being adjusted rapidly in batches cannot be performed, and the grooving can not be performed rapidly and automatically in combination with the actual house condition.
Disclosure of Invention
Therefore, the application aims to solve the technical problems that in the prior art, wall body pre-embedding construction with corresponding positions capable of being adjusted rapidly in batches cannot be performed, and rapid and automatic slotting cannot be performed in combination with actual house conditions.
The technical scheme is that the construction equipment for pre-burying the building wall body in the building engineering house comprises a movable locking vehicle, wherein a lifting machining driver is fixed at the center of the movable locking vehicle, the lifting machining driver drives a limiting lifting platform to longitudinally lift on the movable locking vehicle through threaded fit, the limiting lifting platform is driven to slide a plurality of wall body drilling groove machining devices for drilling groove machining in a limiting mode, the wall body drilling groove machining devices are connected with a jacking uniformly-coating device through threaded fit, and a concrete sealing and coating additive is fixedly inserted on the limiting lifting platform.
Preferably, the lower extreme of removal locking car evenly fix a plurality of locking truckles that conveniently remove, the both ends of removal locking car pass through the fixed anchor fixing bolt that is used for the lower margin to be fixed of screw thread fit connection, the fixed two symmetrical vertical spacing supporting tables of upper end of removal locking car are provided with longitudinal groove in the vertical spacing supporting table.
Preferably, the lifting processing driver comprises a lifting driver and a central rotating screw rod, wherein the lifting driver is fixed at the lower end of the movable locking vehicle, and the lifting driver drives the central rotating screw rod to rotate in the movable locking vehicle through gear engagement.
Preferably, two ends of the limiting lifting platform slide in longitudinal grooves of two symmetrical longitudinal limiting support platforms through limiting sliding blocks, and the center of the limiting lifting platform is connected to the center rotating screw rod through threaded fit; the upper end of the limiting lifting table is fixedly provided with a plugboard through a supporting plate, the center of the plugboard is connected to a central rotating screw rod through threaded fit, two parallel threaded plates are piled on the limiting lifting table, two transverse limiting grooves are symmetrically formed in the limiting lifting table, and a plurality of adjusting limiting tables are slidably arranged in the transverse limiting grooves through limiting sliding blocks; two coagulation bin adding grooves for inserting the coagulation sealing soil adder are symmetrically arranged on the limiting lifting table.
Preferably, the wall body boring groove processor include that center inserts the platform, fixed revolving stage, adjusts the screw thread platform, extends screw rod and boring groove processing case, the spacing grafting of center insert the platform in the plugboard, the both ends of center insert the platform are fixed with two fixed revolving stages respectively, rotate on the fixed revolving stage and connect and adjust the screw thread platform, adjust the screw thread platform and connect the extension screw rod through the screw thread cooperation, the one end of extension screw rod is pegged graft in the center insert the platform, the other end of extension screw rod rotates and connects in boring groove processing case.
Preferably, the lower end of the drill groove processing box is fixedly provided with a longitudinal adding limit sliding table, and the drill groove processing box is limited and slides on the adjusting limit table through the front and rear adding limit sliding tables; the pressurizing drill driver is fixed on the drilling groove processing box and drives the drilling driver to slide back and forth on the drilling groove processing box through gear-rack meshing
Preferably, the drilling driver slides back and forth in the drilling groove processing box through the motor seat, the drilling driver drives the drilling groove drill bit to rotate through the coupling connection, a thread groove is formed in the drilling groove drill bit, a plurality of drilling fluted disc fixing grooves are uniformly communicated and formed in the thread groove, and a longitudinal fluted disc is fixed on the drilling fluted disc fixing grooves; .
Preferably, the outer wall of the longitudinal fluted drill fluted disc is uniformly provided with arc-shaped teeth.
Preferably, the tight even ware of wiping in top include to wipe even connection fixed station, the fluting, the spring shaft, spacing stripper plate, the center fixed axle, torsional spring and extend and wipe even board, wipe even connection fixed station and pass through the bolt fastening and adjust spacing bench, wipe even connection fixed station and be provided with the fluting, wipe even connection fixed station and go up the grafting and be provided with the spring shaft, spacing stripper plate slides through the spring shaft and peg graft in wiping even connection fixed station, spacing stripper plate's upper end slides and is being wiped even connection fixed station through spacing slider, spring setting of spring shaft is being wiped between even connection fixed station and the spacing stripper plate, be fixed with the center fixed axle on the spacing stripper plate, cup jointed the torsional spring on the center fixed axle, two both ends of torsional spring extend respectively and wipe even board, two extend and wipe even board symmetry and rotate on the center fixed axle.
Preferably, the side end of the concrete sealing and plastering additive device is fixedly and communicated with a side opening frame, and a plurality of sliding communication valve tube plates are arranged in the side opening frame in a limiting sliding manner; the movable locking vehicle is rotationally provided with a wire-releasing inner-hidden wire driving roller.
Additional features and advantages of the application will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the application. The objectives and other advantages of the application will be realized and attained by the structure particularly pointed out in the written description and claims thereof as well as the appended drawings.
The technical scheme of the application is further described in detail through the drawings and the embodiments.
Drawings
The accompanying drawings are included to provide a further understanding of the application and are incorporated in and constitute a part of this specification, illustrate the application and together with the embodiments of the application, serve to explain the application. In the drawings:
FIG. 1 is a schematic view of the overall first direction structure of the present application;
FIG. 2 is a schematic diagram of the overall second direction structure of the present application;
FIG. 3 is a schematic view of the construction of the mobile locking vehicle of the present application;
FIG. 4 is a schematic view of a partial connection structure of the present application;
FIG. 5 is a schematic diagram of a partial connection structure of the present application;
FIG. 6 is a schematic view of the structure of the limit lifting platform of the present application;
FIG. 7 is a schematic view of a wall body groove drilling machine according to the present application;
FIG. 8 is a schematic diagram of a wall grooving machine according to the present application;
FIG. 9 is a schematic diagram III of a wall body groove drilling machine according to the present application;
FIG. 10 is a schematic view of the structure of the slot-drilling bit of the present application;
FIG. 11 is a schematic diagram of a second embodiment of the fluted drill of the present application;
FIG. 12 is a schematic view of a third construction of the slot-drilling bit of the present application;
FIG. 13 is a schematic view of the structure of a longitudinal fluted drill fluted disc of the present application;
FIG. 14 is a schematic view of a partial connection structure of the present application;
FIG. 15 is a schematic view of a top wiper of the present application;
FIG. 16 is a schematic diagram of a top wiper of the present application;
fig. 17 is a schematic structural view of the concrete sealing applicator of the present application.
In the figure: the locking vehicle 1 is moved; a lift machining driver 2; a limit lifting table 3; a wall body groove drilling processor 4; tightly pushing up the troweling device 5; a concrete seal applicator 6; a built-in wire driving roller 7; locking the castor 8; anchor fixing bolts 9; a longitudinal limit support table 10; a lift driver 11; a center-rotation screw 12; a plug board 13; side-by-side thread plates 14; a transverse limit groove 15; a coagulation bin addition tank 16; a center plug-in stand 17; a fixed turntable 18; adjusting the screw table 19; an extension screw 20; a drill groove processing box 21; a limit sliding table 22 is added back and forth; a pressurized drill driver 23; a borehole driver 24; a slot drill 25; a thread groove 26; drilling a fluted disc fixing groove 27; longitudinal fluted drill fluted disc 28; a position adjustment limit table 29; the fixed table 30 is uniformly connected by wiping; slotting 31; a spring shaft 32; a limit pressing plate 33; a central fixed shaft 34; a torsion spring 35; an extension troweling plate 36; a side opening frame 37; sliding communication valve tube sheet 38.
Detailed Description
In order that the above-recited objects, features and advantages of the present application will become more readily apparent, a more particular description of the application will be rendered by reference to the appended drawings and appended detailed description.
In the description of the present application, it should be understood that the directions or positional relationships indicated by the terms "intermediate," "top," "bottom," "inner," "outer," and the like are based on the directions or positional relationships shown in the drawings, are merely for convenience in describing the present application and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present application. The terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include one or more such feature. In the description of the present application, the meaning of "a plurality" is two or more, unless explicitly defined otherwise.
In addition, unless explicitly stated or limited otherwise, the terms "mounted," "connected," "secured," and the like should be construed broadly, as for example, they may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art according to the specific circumstances.
In the present application, unless expressly stated or limited otherwise, a first feature "above" or "below" a second feature may include both the first and second features being in direct contact, as well as the first and second features not being in direct contact but being in contact with each other through additional features therebetween. Moreover, a first feature being "above," "over" and "on" a second feature includes the first feature being directly above and obliquely above the second feature, or simply indicating that the first feature is higher in level than the second feature. The first feature being "under", "below" and "beneath" the second feature includes the first feature being directly under and obliquely below the second feature, or simply means that the first feature is less level than the second feature.
The first embodiment is as follows:
as shown in fig. 1 and 2, the construction equipment for pre-burying the building wall body of the building engineering house comprises a movable locking vehicle 1, wherein a lifting machining driver 2 is fixed at the center of the movable locking vehicle 1, the lifting machining driver 2 drives a limiting lifting table 3 to longitudinally lift on the movable locking vehicle 1 through threaded fit, a plurality of wall body drilling groove processors 4 for drilling groove processing are driven to slide on the limiting lifting table 3 in a limiting manner, a jacking and wiping device 5 is connected on the wall body drilling groove processors 4 through threaded fit, and a concrete sealing and smearing additive 6 is fixedly inserted on the driving limiting lifting table 3.
The working principle and beneficial effects of the embodiment are as follows: moving the movable locking vehicle 1 to a designated area processed into a position, and fixing the movable locking vehicle 1 after determining the position; according to the positions of the processed drilling grooves, the distance adjustment is carried out on a plurality of wall body drilling groove processors 4 on the movable locking vehicle 1, so that the drill bits of the wall body drilling groove processors 4 are close to the surface of a wall body to be processed, and the positions are determined by combining different horizontal planes and gradients; further driving a wall body boring groove processor 4 to carry out drilling processing on a specified wall body, driving a lifting processing driver 2 on a movable locking vehicle 1 to rotate a limiting lifting table 3 after the specified wall body boring groove processor is processed to a specified depth, further enabling a plurality of wall body boring groove processors 4 to rise simultaneously, continuously scraping out wall body fragments upwards in combination with the condition of a drill bit of the wall body boring groove processor 4, further enabling processed holes to gradually become long grooves, not adding corresponding wires into the long grooves in the continuous process of forming the long grooves, adding cover concrete sealing soil into a concrete sealing soil adder 6, enabling the concrete sealing soil to flow into the long grooves, and enabling a continuously upward pushing and evenly-smearing device 5 to squeeze and evenly-smear the added cover concrete sealing soil, so that flexible wires are automatically added into a specified wall body space in batches; if hard substances such as pipelines and the like need to be buried, the grooves can be drilled in advance, then the buried pipelines are added, and then cover coagulation sealing and plastering is automatically carried out by pushing up a plastering device 5; and further, the wall body pre-embedding construction which can be used for quickly adjusting corresponding positions in batches is realized, and the grooving can be quickly and automatically carried out in combination with the actual house condition.
The second embodiment is as follows:
as shown in fig. 3 and 6, a construction device for embedding a wall body in a building engineering house is provided, wherein a plurality of locking casters 8 which are convenient to move are uniformly fixed at the lower end of a movable locking vehicle 1, two ends of the movable locking vehicle 1 are connected with anchor fixing bolts 9 which are used for fixing the anchors through screw thread matching, two symmetrical longitudinal limiting support platforms 10 are fixed at the upper end of the movable locking vehicle 1, and longitudinal grooves are formed in the longitudinal limiting support platforms 10.
The working principle and beneficial effects of the embodiment are as follows: the movable locking vehicle 1 is moved to a space of a designated position area through a plurality of locking casters 8 convenient to move, and the movable locking vehicle is inserted into the ground through rotating anchor fixing bolts 9 at two ends, so that the whole device is fixed; two symmetrical longitudinal limit support tables 10 are fixed at the upper end of the movable locking vehicle 1, and longitudinal grooves are arranged in the longitudinal limit support tables 10 to carry out longitudinal lifting restraint and limit sliding, so that longitudinal lifting driving is facilitated.
And a third specific embodiment:
as shown in fig. 3-17, the lifting processing driver 2 comprises a lifting driver 11 and a central rotating screw rod 12, wherein the lifting driver 11 is fixed at the lower end of the movable locking vehicle 1, and the lifting driver 11 drives the central rotating screw rod 12 to rotate in the movable locking vehicle 1 through gear engagement.
The working principle and beneficial effects of the embodiment are as follows: the lower end of the movable locking vehicle 1 drives the central rotating screw rod 12 to rotate through the lifting driver 11, and then the limiting lifting platform 3 with the wall body drilling groove processor 4, the jacking trowel 5 and the concrete sealing trowel adder 6 is driven through threaded fit through the rotating central rotating screw rod 12 to longitudinally slide between two symmetrical longitudinal limiting support platforms 10, and the longitudinal limiting support platforms 10 are internally provided with longitudinal grooves to achieve the effect of lifting driving.
The specific embodiment IV is as follows:
as shown in fig. 3-17, in a construction device for pre-burying a building wall of a building engineering house, two ends of a limiting lifting platform 3 slide in longitudinal grooves of two symmetrical longitudinal limiting support platforms 10 through limiting sliding blocks, and the center of the limiting lifting platform 3 is connected to a center rotary screw 12 through threaded fit; the upper end of the limiting lifting platform 3 is fixedly provided with a plugboard 13 through a supporting plate, the center of the plugboard 13 is connected to the central rotary screw rod 12 through threaded fit, two side-by-side threaded plates 14 are piled on the limiting lifting platform 3, two transverse limiting grooves 15 are symmetrically formed in the limiting lifting platform 3, and a plurality of adjusting limiting platforms 29 are slidably arranged in the transverse limiting grooves 15 through limiting sliding blocks; two coagulation bin adding grooves 16 for inserting the coagulation sealing soil adder 6 are symmetrically arranged on the limit lifting table 3.
The working principle and beneficial effects of the embodiment are as follows: the limiting lifting table 3 is longitudinally driven to lift through the rotating central rotating screw rod 12, a plurality of wall body groove drilling machines 4 are inserted into the plugboard 13, and the positions of the plurality of wall body groove drilling machines 4 are determined and fixed by connecting the plurality of adjusting limiting tables 29 to the two side-by-side threaded plates 14; the plurality of adjusting and limiting tables 29 are convenient to slide and fix through the transverse limiting grooves 15; two coagulation bin adding grooves 16 for inserting the coagulation sealing soil additives 6 are symmetrically formed in the limiting lifting table 3, so that the two coagulation sealing soil additives 6 can be conveniently inserted, added and detached; meanwhile, the lifting limiting lifting table 3 is convenient for quick batch processing and preparation of the longitudinal long grooves.
Fifth embodiment:
as shown in fig. 3-17, the wall body drilling groove processor 4 comprises a central inserting table 17, a fixed rotary table 18, an adjusting threaded table 19, an extending screw 20 and a drilling groove processing box 21, wherein the central inserting table 17 is inserted into the inserting plate 13 in a limiting manner, two fixed rotary tables 18 are respectively fixed at two ends of the central inserting table 17, the adjusting threaded table 19 is connected to the fixed rotary table 18 in a rotating manner, the adjusting threaded table 19 is connected with the extending screw 20 in a threaded fit manner, one end of the extending screw 20 is inserted into the central inserting table 17, and the other end of the extending screw 20 is connected to the drilling groove processing box 21 in a rotating manner.
The working principle and beneficial effects of the embodiment are as follows: the central insertion platform 17 is inserted into the insertion plate 13 to perform limit insertion; through the fixed revolving stage 18 at center insertion platform 17 both ends, conveniently carry out manual rotation regulation to the regulation screw thread platform 19 at both ends, through rotation regulation screw thread platform 19 on fixed revolving stage 18, and then make the outside displacement of extension screw rod 20 drive drill groove processing case 21 on adjusting spacing platform 29 through screw-thread fit, and then make the drill groove drill bit 25 can laminate to appointed wall body position, conveniently carry out the drive of drilling, avoid invalid processing, the degree of depth and the distance of the processing position of the different wall body drill groove processors 4 of convenient control simultaneously, make its different environment carry out the processing of stable controllable cell body.
Specific embodiment six:
as shown in fig. 3-17, a construction device for pre-burying a building wall body in a building engineering house is provided, wherein a front-back adding limit sliding table 22 is fixed at the lower end of a drilling groove processing box 21, and the drilling groove processing box 21 is limited and slides on an adjusting limit table 29 through the front-back adding limit sliding table 22; the drill housing 21 is fixed with a pressurizing drill driver 23, and the pressurizing drill driver 23 drives a drilling driver 24 to slide back and forth on the drill housing 21 through rack and pinion engagement.
The working principle and beneficial effects of the embodiment are as follows: the drill groove processing box 21 is driven by the extension screw 20 to be limited by the front-rear addition limiting sliding table 22 and slides on the fixed adjusting limiting table 29, so that the pressurizing drill driver 23 is propped against the wall, when drilling is needed, the position at the lower end is driven, the pressurizing drill driver 23 is further controlled to drive the drilling driver 24 to slide front and rear in the drill groove processing box 21 through gear rack meshing, the pressurizing drill driver 23 is further used for extruding the drilling driver 24 and the drill groove bit 25, and the wall is conveniently drilled by the drill groove bit 25 and simultaneously extruded inwards, so that the determination of the drilling position is completed.
Seventh embodiment:
as shown in fig. 3-17, in the construction equipment for pre-burying the building wall of the building engineering house, the drilling driver 24 slides back and forth in the drilling groove processing box 21 through a motor base, the drilling driver 24 drives the drilling groove drill bit 25 to rotate through a coupling connection, a thread groove 26 is arranged in the drilling groove drill bit 25, a plurality of drilling fluted disc fixing grooves 27 are uniformly communicated on the thread groove 26, and a longitudinal fluted disc 28 is fixed on the drilling fluted disc fixing groove 27; the outer wall of the longitudinal fluted drill fluted disc 28 is uniformly provided with arc-shaped teeth.
The working principle and beneficial effects of the embodiment are as follows: the thread groove 26 is formed in the groove drilling bit 25, so that the wall powder can be transported in the rotation process, and drilling is facilitated; through being fixed with vertical groove on boring fluted disc fixed slot 27 and boring fluted disc 28, conveniently use when drilling, simultaneously through the setting of a plurality of arc teeth, and then when carrying out slotted hole processing to the wall body, through the drive of rotatory central rotatory screw 12, and then make all boring slot drill bit 25 under the drive of plugboard 13 and spacing elevating platform 3 hold down, make boring slot drill bit 25 upwards shift, carry out the fluting to the wall body, conveniently process out just the method and carry out the fluting of wall body pipeline and the pre-buried extension to the height of electric wire, be convenient for carry out pre-buried processing.
Eighth embodiment:
as shown in fig. 3-17, a construction device for embedding a wall body in a building engineering house is constructed, the jacking and leveling device 5 comprises a leveling connection fixing table 30, a slot 31, a spring shaft 32, a limiting extrusion plate 33, a central fixing shaft 34, a torsion spring 35 and an extension leveling plate 36, the leveling connection fixing table 30 is fixed on an adjusting limiting table 29 through bolts, the leveling connection fixing table 30 is provided with the slot 31, the leveling connection fixing table 30 is provided with the spring shaft 32 in an inserted manner, the limiting extrusion plate 33 is slidably inserted into the leveling connection fixing table 30 through the spring shaft 32, the upper end of the limiting extrusion plate 33 is slidably arranged on the leveling connection fixing table 30 through a limiting sliding block, a spring of the spring shaft 32 is arranged between the leveling connection fixing table 30 and the limiting extrusion plate 33, the central fixing shaft 34 is fixed on the limiting extrusion plate 33, the torsion spring 35 is sleeved on the central fixing shaft 34, two ends of the torsion spring 35 are fixedly connected with two extension leveling plates 36 respectively, and the two extension leveling plates 36 symmetrically rotate on the central fixing shaft 34.
The working principle and beneficial effects of the embodiment are as follows: the concrete sealing and plastering device has the advantages that concrete sealing and plastering device 6 is filled with concrete sealing and plastering materials which are appointed to be used through pipelines, the evenly-smeared connecting and fixing table 30 is connected to the adjusting and limiting table 29 through bolts, the concrete sealing and plastering device is convenient to install and detach, the grooves 31 are convenient for adding the positions of the concrete sealing and plastering materials, the limiting extrusion plates 33 are slidably inserted into the evenly-smeared connecting and fixing table 30 through the spring shafts 32, the arrangement of springs on the spring shafts 32 is convenient for providing extrusion power, the concrete sealing and plastering materials are evenly smeared on a wall body, the arrangement of the central fixing shafts 34 and the torsion springs 35 is adopted, the torsion springs 35 acting force is generated between the two extending and smeared plates 36, and the two extending and smeared plates 36 are enabled to be capable of trowelling and extruding the concrete sealing and plastering materials.
Detailed description nine:
as shown in fig. 3-17, a side opening frame 37 is fixedly and communicated with the side end of the concrete sealing and plastering additive 6, and a plurality of sliding communication valve tube plates 38 are arranged in the side opening frame 37 in a limiting sliding manner; the movable locking vehicle 1 is rotatably provided with a wire-releasing concealed wire driving roller 7.
The working principle and beneficial effects of the embodiment are as follows: adding concrete sealing soil into the concrete sealing soil adder 6 through a pipeline, wherein the concrete sealing soil adder 6 is convenient to install, fix and disassemble, and a plurality of sliding communication valve tube plates 38 are slid on a side opening frame 37 at the side end of the concrete sealing soil adder 6; the communicated sliding communication valve tube plate 38 adds concrete sealing soil into the just processed long groove, encapsulates the added electric wire pipeline and the like, and performs extrusion trowelling in the upward process through the two extension trowelling plates 36; when the unreeled materials such as wires and the like are added and then added into the elongated slot which extends upwards to form a slot, the concrete sealing soil in the concrete sealing soil adder 6 is enabled to fall into the elongated slot through the sliding communication valve tube plates 38 at specific positions, and trowelling and edge sealing are continuously carried out upwards through the sliding communication valve tube plates 38; if all the media are hard pipelines and the like, the positions of the media are changed, so that the media such as the pipelines and the like are added after slotting, then concrete sealing soil is added, and then the edges are uniformly smeared.
The above description is not intended to limit the application to the particular embodiments disclosed, but to limit the application to the particular embodiments disclosed, as variations, modifications, additions or substitutions within the spirit and scope of the application as disclosed in the accompanying claims.

Claims (10)

1. The utility model provides a pre-buried construction equipment of building engineering house construction wall body which characterized in that:
including removing locking car (1), the center of removing locking car (1) is fixed with lift processing driver (2), and lift processing driver (2) drive spacing elevating platform (3) through screw-thread fit and vertically go up and down on removing locking car (1), drive spacing elevating platform (3) go up spacing a plurality of wall body boring groove processors (4) that are used for boring groove processing, connect tight even ware (5) in top through screw-thread fit on wall body boring groove processor (4), drive spacing elevating platform (3) go up grafting fixed concrete sealing and smearing soil adder (6).
2. The construction equipment for pre-burying a building wall body for building engineering houses according to claim 1, wherein: the lower extreme of removal locking car (1) evenly fix a plurality of locking truckles (8) that conveniently remove, the both ends of removal locking car (1) are used for lower margin fixed rag fixing bolt (9) through screw-thread fit connection, the upper end of removal locking car (1) is fixed two symmetrical vertical spacing brace table (10), is provided with longitudinal groove in vertical spacing brace table (10).
3. The construction equipment for pre-burying a building wall body for building engineering houses according to claim 2, wherein: the lifting machining driver (2) comprises a lifting driver (11) and a central rotating screw rod (12), wherein the lifting driver (11) is fixed at the lower end of the movable locking vehicle (1), and the lifting driver (11) drives the central rotating screw rod (12) to rotate in the movable locking vehicle (1) through gear engagement.
4. A construction equipment for embedding a wall body in a building engineering house construction according to claim 3, wherein: the two ends of the limiting lifting table (3) slide in the longitudinal grooves of the two symmetrical longitudinal limiting support tables (10) through limiting sliding blocks, and the center of the limiting lifting table (3) is connected to the center rotary screw (12) through threaded fit; the upper end of the limiting lifting table (3) is fixedly provided with a plugboard (13) through a supporting plate, the center of the plugboard (13) is connected to a central rotating screw rod (12) through threaded fit, two side-by-side threaded plates (14) are stacked and fixed on the limiting lifting table (3), two transverse limiting grooves (15) are symmetrically formed in the limiting lifting table (3), and a plurality of adjusting limiting tables (29) are arranged in the transverse limiting grooves (15) in a sliding mode through limiting sliding blocks; two concrete bin adding grooves (16) for inserting the concrete sealing and plastering additive device (6) are symmetrically arranged on the limiting lifting table (3).
5. The construction equipment for pre-burying a building wall body for building engineering houses according to claim 4, wherein: the wall body boring groove processor (4) include that center inserts platform (17), fixed revolving stage (18), adjust screw thread platform (19), extension screw (20) and boring groove processing case (21), center inserts the spacing grafting of platform (17) in plugboard (13), both ends of center inserts platform (17) are fixed with two fixed revolving stages (18) respectively, rotate on fixed revolving stage (18) and connect and adjust screw thread platform (19), adjust screw thread platform (19) and connect extension screw (20) through the screw thread cooperation, the one end grafting of extension screw (20) is in center insert platform (17), the other end rotation of extension screw (20) is connected in boring groove processing case (21).
6. The construction equipment for pre-burying a building wall body for building engineering houses according to claim 5, wherein: the lower end of the drill groove processing box (21) is fixedly provided with a longitudinal adding limit sliding table (22), and the drill groove processing box (21) is limited and slides on an adjusting limit table (29) through the front and back adding limit sliding table (22); a pressurizing drill driver (23) is fixed on the drill groove processing box (21), and the pressurizing drill driver (23) drives a drilling driver (24) to slide back and forth on the drill groove processing box (21) through gear-rack meshing.
7. The construction equipment for pre-burying a building wall body for building engineering houses according to claim 6, wherein: the drilling driver (24) slides back and forth in the drilling groove processing box (21) through the motor cabinet, the drilling driver (24) drives the drilling groove drill bit (25) to rotate through the coupling joint, a thread groove (26) is formed in the drilling groove drill bit (25), a plurality of drilling fluted disc fixing grooves (27) are uniformly communicated and formed in the thread groove (26), and a longitudinal fluted disc (28) is fixed on the drilling fluted disc fixing grooves (27).
8. The construction equipment for pre-burying a building wall body for building engineering houses according to claim 7, wherein: the outer wall of the longitudinal fluted drill fluted disc (28) is uniformly provided with arc-shaped teeth.
9. The construction equipment for pre-burying a building wall body for building engineering houses according to claim 4, wherein: the jacking and evenly wiping device (5) comprises a evenly wiping connection fixing table (30), a slot (31), a spring shaft (32), a limiting extrusion plate (33), a central fixing shaft (34), a torsion spring (35) and an extending and evenly wiping plate (36), wherein the evenly wiping connection fixing table (30) is fixed on an adjusting and limiting table (29) through bolts, the slot (31) is formed in the evenly wiping connection fixing table (30), the spring shaft (32) is inserted and connected onto the evenly wiping connection fixing table (30), the limiting extrusion plate (33) is inserted and connected onto the evenly wiping connection fixing table (30) in a sliding mode through the spring shaft (32), the upper end of the limiting extrusion plate (33) is arranged on the evenly wiping connection fixing table (30) and between the limiting extrusion plate (33), the central fixing shaft (34) is fixed on the evenly wiping connection fixing table (30), the torsion spring (35) is sleeved on the central fixing shaft (34), two ends of the torsion spring (35) are respectively and fixedly connected with two extending and evenly wiping plates (36), and the two evenly wiping plates (36) are symmetrically rotated on the fixing shaft (34).
10. The construction equipment for pre-burying a building wall body for building engineering houses according to claim 4, wherein: the side end of the concrete sealing and plastering additive device (6) is fixedly and communicated with a side opening frame (37), and a plurality of sliding communication valve tube plates (38) are arranged in the side opening frame (37) in a limiting sliding manner; the movable locking vehicle (1) is rotationally provided with a wire-releasing inner-hidden wire driving roller (7).
CN202310846358.5A 2023-07-11 2023-07-11 Pre-buried construction equipment of building engineering house construction wall body Active CN116872366B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310846358.5A CN116872366B (en) 2023-07-11 2023-07-11 Pre-buried construction equipment of building engineering house construction wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310846358.5A CN116872366B (en) 2023-07-11 2023-07-11 Pre-buried construction equipment of building engineering house construction wall body

Publications (2)

Publication Number Publication Date
CN116872366A true CN116872366A (en) 2023-10-13
CN116872366B CN116872366B (en) 2024-03-01

Family

ID=88258090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310846358.5A Active CN116872366B (en) 2023-07-11 2023-07-11 Pre-buried construction equipment of building engineering house construction wall body

Country Status (1)

Country Link
CN (1) CN116872366B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006013176A1 (en) * 2006-03-22 2007-09-27 Johann Zimmermann Flush mounted installation socket for building installation engineering, is fastened at rough wall to be cleaned, where protective foil is pulled from attached double-sided tape at rear-side of socket for pre-assembling socket at wall
CN208594723U (en) * 2018-05-02 2019-03-12 刘满仓 Multi-functional indoor construction carry machine
CN111216252A (en) * 2020-03-09 2020-06-02 中国建筑第二工程局有限公司 Wall drilling device and method for building construction
CN111421682A (en) * 2020-04-27 2020-07-17 福州晋安尧琦侗科技有限公司 Construction wall body fluting buried line repair equipment
CN111873190A (en) * 2020-08-07 2020-11-03 何传洲 Building indoor grooving and buried wire repairing integrated equipment
CN112127642A (en) * 2020-08-06 2020-12-25 杭州旭京装饰工程有限公司 Wall building equipment
CN112720874A (en) * 2020-12-29 2021-04-30 广州市月亮湾建设工程有限公司 Wall surface ditching construction method for interior decoration construction
CN113020850A (en) * 2021-03-24 2021-06-25 佛山市缇诺卫浴有限公司 Wall body embedded structure processing equipment of quick installation
CN214885321U (en) * 2021-06-17 2021-11-26 张华荣 Ancient building house restores with safe type auxiliary device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006013176A1 (en) * 2006-03-22 2007-09-27 Johann Zimmermann Flush mounted installation socket for building installation engineering, is fastened at rough wall to be cleaned, where protective foil is pulled from attached double-sided tape at rear-side of socket for pre-assembling socket at wall
CN208594723U (en) * 2018-05-02 2019-03-12 刘满仓 Multi-functional indoor construction carry machine
CN111216252A (en) * 2020-03-09 2020-06-02 中国建筑第二工程局有限公司 Wall drilling device and method for building construction
CN111421682A (en) * 2020-04-27 2020-07-17 福州晋安尧琦侗科技有限公司 Construction wall body fluting buried line repair equipment
CN112127642A (en) * 2020-08-06 2020-12-25 杭州旭京装饰工程有限公司 Wall building equipment
CN111873190A (en) * 2020-08-07 2020-11-03 何传洲 Building indoor grooving and buried wire repairing integrated equipment
CN112720874A (en) * 2020-12-29 2021-04-30 广州市月亮湾建设工程有限公司 Wall surface ditching construction method for interior decoration construction
CN113020850A (en) * 2021-03-24 2021-06-25 佛山市缇诺卫浴有限公司 Wall body embedded structure processing equipment of quick installation
CN214885321U (en) * 2021-06-17 2021-11-26 张华荣 Ancient building house restores with safe type auxiliary device

Also Published As

Publication number Publication date
CN116872366B (en) 2024-03-01

Similar Documents

Publication Publication Date Title
CN211083097U (en) Detachable temporary support is used in building engineering construction
CN116872366B (en) Pre-buried construction equipment of building engineering house construction wall body
CN111021525B (en) Installation base of integration pump station
CN117381446B (en) Machining device and machining method for mounting end cover of hydraulic device
CN215144861U (en) Double-end mirror image deep hole bores
CN117140225B (en) Hydraulic breaking hammer front cylinder inner hole processing positioning device
CN216227071U (en) Electric piping fluting device is used in building electromechanical installation
CN112127246A (en) Plastic film equipment is pasted with road to road construction
CN214604914U (en) Bamboo wood goods production is with brush gluey equipment
CN213350917U (en) Tubular product drilling equipment that house product was used
CN212705892U (en) Port deburring device for production of reinforced concrete drain pipe
CN215483003U (en) Municipal administration drainage pipeline hole groove supporting construction
CN212918869U (en) Pipeline outer wall rust cleaning equipment of polishing in building field
CN212357893U (en) Road roller tube clamping plate
CN112681434A (en) Construction machine for building foundation pit construction and construction method using same
CN220060120U (en) Mounting structure of hydraulic station
CN216759685U (en) Adjustable slurry pump assembly table
CN218746954U (en) Woodwork surface polishing device
CN218627356U (en) Buried device
CN214574256U (en) Construction machinery for building foundation pit
CN218018402U (en) Vertical rotary platform is used in material processing
CN219261457U (en) Unit type aluminum plate curtain wall connecting structure
CN217762849U (en) Total powerstation light adjusting device for building engineering specialty
CN220637026U (en) Location frock convenient to adjust
CN219130844U (en) Hydraulic connecting rod support hole class processing equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant