CN116837840A - Flood prevention equipment for hydraulic engineering and application method thereof - Google Patents

Flood prevention equipment for hydraulic engineering and application method thereof Download PDF

Info

Publication number
CN116837840A
CN116837840A CN202311030321.1A CN202311030321A CN116837840A CN 116837840 A CN116837840 A CN 116837840A CN 202311030321 A CN202311030321 A CN 202311030321A CN 116837840 A CN116837840 A CN 116837840A
Authority
CN
China
Prior art keywords
fixed
mounting
fixing
gear
limiting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311030321.1A
Other languages
Chinese (zh)
Inventor
张峰
程明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202311030321.1A priority Critical patent/CN116837840A/en
Publication of CN116837840A publication Critical patent/CN116837840A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/14Components for drivers inasmuch as not specially for a specific driver construction
    • E02D7/16Scaffolds or supports for drivers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/14Components for drivers inasmuch as not specially for a specific driver construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses flood control equipment for hydraulic engineering and a use method thereof, wherein the flood control equipment comprises a supporting box body; the adjusting mechanism comprises four supporting feet, two connecting plates, two mounting boxes, two groups of moving parts and adjusting parts, one side outer surface of each mounting box is fixedly connected to two sides of a supporting box body, the adjusting parts are arranged on the mounting boxes and are used for rotating and driving through adjusting motors, two limiting plates are adjusted to fix the wood piles, the mounting parts are used for driving the wood piles to rotate to a proper position through the rotation and driving of the connecting motors, meanwhile, the wood piles are filled in the vacant positions, a user can conveniently fix the wood piles of different specifications and pile the piles quickly, the piling efficiency is improved, the distance between the supporting feet is adjusted through the rotation and driving of the mounting motors, flood control equipment is supported through the pushing of fixing cylinders, the staff integrally rotates the flood control equipment, the flood control equipment rotates by taking a fixing disc as a pivot, the distance between the wood piles can be adjusted according to actual conditions, and the piling effect is improved.

Description

Flood prevention equipment for hydraulic engineering and application method thereof
Technical Field
The invention belongs to the technical field of flood control equipment, and particularly relates to flood control equipment for hydraulic engineering and a use method thereof.
Background
The flood control equipment is a flood control emergency tool and equipment, the pile planting machine is a novel special matched device special for pile planting operations such as building a steel-wood-soil-stone combined dam blocking breach, embankment reinforcement and the like, the flood control emergency tool and equipment are one of the winning material conditions for flood control emergency, the pile planting machine replaces the traditional manual ramming operation mode, the mechanization of flood control emergency pile driving is realized, and the pile planting machine has the advantages of being high in practicability, operability, reliability, stability and persistence, simple and convenient to operate, fast in pile planting speed, capable of continuous operation, energy-saving, labor-saving and the like compared with manual pile planting, and is particularly suitable for the pile planting of wood piles or steel pipes in dam reinforcement, flood control emergency breach blocking, lake-pond bank maintenance, building construction and fence operation before flood.
The existing pile planting machine for hydraulic engineering is used for placing the wooden piles at the bottom of the pile planting machine in actual use, workers place the pile planting machine at the top of the wooden piles to pile, the wooden piles with different specifications cannot be fixed, the wooden piles are easily shifted in the pile driving process, the working efficiency of the pile planting machine is poor, meanwhile, the existing pile planting machine for hydraulic engineering is used for pile driving, equidistant pile driving cannot be carried out according to actual conditions in the pile driving process, and the pile driving effect of the pile planting machine is poor.
Disclosure of Invention
The invention aims at: the utility model provides a flood control equipment for hydraulic engineering and application method thereof, rotate through the accommodate motor, thereby make the bracing piece drive fixed bevel gear and rotate, through the meshing of fixed bevel gear and installation bevel gear, thereby make the connection threaded rod rotate, slide in the connecting cylinder through one of them connecting rod, thereby make screw thread section of thick bamboo promote the limiting plate and remove, close accommodate motor when adjusting to suitable position, according to the high regulation of stake machine body and stop gear's of stake position, rotate through the fixed motor, thereby make fixed threaded rod rotate, spacing through the gag lever post, can make the backup pad drive stop gear remove, simultaneously the fixed plate drives pile mechanism and moves suitable position, thereby connect the motor rotation thereby drive connecting gear rotation simultaneously, through the meshing of connecting gear and fixed gear ring, can make the mounting member rotate, thereby drive the stake and rotate suitable position, when rotating suitable position, the stake of different specifications is fast, improve pile driving efficiency, rotate through the installing motor, make the installing gear rotate, can make the fixed gear drive the fixed threaded rod through the meshing of installing gear and drive screw rod, can make the fixed gear rotate, can drive the pivot through the adjustable distance between the two-way support device, can be according to the practical distance adjustment, the two-way adjustable air cylinder, can be realized, the distance is adjustable, the distance is improved, the whole can be used for the distance is realized.
The technical scheme adopted by the invention is as follows: flood control equipment for hydraulic engineering and a use method thereof, comprising the following steps:
supporting the box body;
the adjusting mechanism comprises four supporting feet, two connecting plates, two mounting boxes, two groups of moving parts and adjusting parts, wherein the outer surfaces of one sides of the two mounting boxes are fixedly connected to the two sides of a supporting box body, the adjusting parts are arranged on the mounting boxes, each connecting plate is arranged on the adjusting part, each two supporting feet are fixedly connected to the bottom of each connecting plate close to the edge, and each group of moving parts are arranged at the bottom of each connecting plate;
the pile driver comprises a pile driver body, a supporting component and a power component, wherein the power component is arranged in a supporting box body, the supporting component is arranged on the power component, and the pile driver body is arranged on the supporting component; and
the limiting mechanism comprises a mounting part, a rotating part, six groups of limiting parts and a fixing part, wherein the mounting part is arranged on the piling mechanism, each group of limiting parts and the rotating part are arranged on the mounting part, and the fixing part is arranged on the limiting part.
Each group of moving parts comprises a fixed rod, a fixed disc and a fixed air cylinder, wherein the fixed rods are fixedly connected to the bottom of the connecting plate, the fixed disc is fixedly connected to the bottom of the fixed rod, and the top of the fixed air cylinder is rotatably sleeved at the extension end of the fixed disc.
Wherein, adjusting part includes two-way threaded rods, two installation motors, two installation gears and two fixed gears, every two-way threaded rods all rotates and runs through in the both sides surface of installation case, every the equal thread bush of connecting plate locates the one end of two-way threaded rods, every fixed gear all fixes the cover and locates the surface of two-way threaded rods, every installation motor all fixed connection in the lower inner wall of installation case, every installation gear all fixed cover locates the output of installation motor, every installation gear all with fixed gear intermeshing.
The power component comprises a fixed motor, a fixed threaded rod and two limiting rods, wherein the fixed motor is fixedly connected to one side inner wall of the supporting box body, the bottom end of the fixed threaded rod is fixedly connected with the output end of the fixed motor, the top end of the fixed threaded rod is rotatably connected to the upper inner wall of the supporting box body, and the two limiting rods are fixedly connected between the upper inner wall and the lower inner wall of the supporting box body.
The support component comprises a fixing plate, a mounting plate and a fixing telescopic rod, wherein the fixing plate is sleeved on the outer surface of the fixing threaded rod, the fixing plate is sleeved on the outer surfaces of the two limiting rods in a sliding mode, one side of the mounting plate is fixedly connected with one side of the outer surface of the fixing plate, the fixing telescopic rod is fixedly connected with the bottom end of the mounting plate, and the extension end of the fixing telescopic rod is fixedly connected with the top of the pile planting machine body.
Wherein, the installation component includes backup pad, fixed box, installed part, spacing ring and a plurality of spacing wheel, the surface of fixed threaded rod is located to backup pad thread bush, and the surface of two gag levers is located to backup pad sliding sleeve, one side surface and backup pad one side fixed connection of fixed box, the installed part rotates and inlays between the upper and lower inner wall of locating the fixed box, a plurality of spacing wheel all rotates and connects between the upper and lower inner wall of fixed box, the surface of installed part is located to spacing ring fixed sleeve, and the spacing ring rotates and inlays between locating a plurality of spacing wheels.
The rotating component comprises a fixed gear ring, a connecting gear and a connecting motor, wherein the connecting motor is fixedly connected to the bottom of the fixed box, the connecting gear is fixedly sleeved at the output end of the connecting motor, the fixed gear ring is fixedly sleeved at the outer surface of the mounting piece, and the fixed gear ring is meshed with the connecting gear.
Wherein, every group limit part all includes limiting plate, two connecting cylinders, two connecting rods and two coupling springs, two the one end of connecting cylinder all with mounting fixed connection, every the one end of connecting rod all slides and inlays between the inner wall of locating the connecting cylinder, every coupling spring all fixed connection between connecting cylinder and connecting rod, every the equal fixed connection in one side surface of limiting plate of the other end of connecting rod.
The fixed part comprises a regulating motor, a supporting rod, a fixed conical gear, a mounting conical gear, six connecting threaded rods and six threaded cylinders, wherein the regulating motor is fixedly connected to the bottom of a mounting piece, the supporting rod is fixedly connected to the output end of the regulating motor, the fixed conical gear is fixedly sleeved on the outer surface of the supporting rod, one end of each threaded cylinder is fixedly connected to one outer surface of one limiting plate, the threaded cylinders are slidably embedded between the inner walls of the mounting piece, one end of each connecting threaded rod is in threaded connection with the threaded cylinder, each mounting conical gear is fixedly sleeved on the other end of the connecting threaded rod, and the mounting conical gears are meshed with the fixed conical gears.
The application method of the flood control equipment for the hydraulic engineering comprises the following steps:
step one, pile distance adjustment: according to the practical situation, the distance required for piling is adjusted, the installation motor is started firstly, the installation motor rotates, so that the installation gear rotates, the fixed gear drives the bidirectional threaded rod to rotate through the engagement of the installation gear and the fixed gear, the two connecting plates can move through the rotation of the bidirectional threaded rod, the distance between supporting legs is adjusted, the installation motor can be closed after the distance is adjusted to a proper distance, and the flood control equipment is moved to a proper position;
step two, fixing the wood pile: according to the diameter of the wood pile, the distance between the two limiting plates is adjusted, the adjusting motor is started, the adjusting motor rotates, so that the supporting rod drives the fixed bevel gear to rotate, the connecting threaded rod rotates through the engagement of the fixed bevel gear and the mounting bevel gear, the threaded cylinder slides in the connecting cylinder through one connecting rod, so that the threaded cylinder pushes the limiting plates to move, when the adjusting motor is adjusted to a proper position, the adjusting motor is closed, the positions of the pile planting machine body and the limiting mechanism are adjusted according to the height of the wood pile, the fixed threaded rod rotates through the rotation of the fixed motor, the supporting plate drives the limiting mechanism to move through the limiting of the limiting rod, and meanwhile the fixing plate drives the piling mechanism to move to a proper position;
step three, piling and fixing: after inserting a plurality of stake between two limiting plates, then drive into underground with the stake through planting stake machine body, through the promotion of fixed cylinder, can support flood control equipment, the staff wholly rotates flood control equipment, flood control equipment uses the fixed disk as the fulcrum rotation this moment, thereby the connection motor rotates simultaneously and drives the connecting gear and rotate, through the meshing of connecting gear and fixed ring gear, can make the installed part rotate, thereby drive the stake and rotate suitable position, when rotatory 180 degrees, the stake is mended in the position of vacancy, can facilitate the quick convenient pile of user.
In summary, due to the adoption of the technical scheme, the beneficial effects of the invention are as follows:
(1) According to the invention, the supporting rod drives the fixed bevel gear to rotate through the rotation of the adjusting motor, the connecting threaded rod is rotated through the engagement of the fixed bevel gear and the mounting bevel gear, the threaded cylinder is driven to move through the sliding of one connecting rod in the connecting cylinder, the adjusting motor is closed when the adjusting motor is adjusted to a proper position, the positions of the pile planting machine body and the limiting mechanism are adjusted according to the height of the pile, the fixed threaded rod is rotated through the rotation of the fixed motor, the supporting plate drives the limiting mechanism to move through the limiting of the limiting rod, the fixing plate drives the pile driving mechanism to move to a proper position, the connecting motor is connected to drive the connecting gear to rotate, the mounting piece is driven to rotate through the engagement of the connecting gear and the fixing gear ring, the pile is driven to rotate to a proper position, when the connecting gear is rotated to a proper position, the pile is filled in a vacant position, a user can conveniently pile different specifications of piles, and the pile driving efficiency is improved.
(2) According to the invention, the mounting motor is rotated to enable the mounting gear to rotate, the fixed gear can drive the bidirectional threaded rod to rotate through the engagement of the mounting gear and the fixed gear, and the two connecting plates can be moved through the rotation of the bidirectional threaded rod, so that the distance between supporting legs is adjusted, the mounting motor can be closed to push by the fixed cylinder after the distance is adjusted to a proper distance, flood prevention equipment can be supported, workers integrally rotate the flood prevention equipment, at the moment, the flood prevention equipment rotates by taking the fixed disc as a fulcrum, the distance between wood piles can be adjusted according to actual conditions, and the piling effect is improved.
Drawings
FIG. 1 is a front perspective view of the present invention;
FIG. 2 is a front perspective partial cross-sectional view of the present invention;
FIG. 3 is an enlarged view of portion A of the present invention;
FIG. 4 is a front perspective semi-cutaway view of the present invention;
FIG. 5 is a top perspective partial cross-sectional view of the present invention;
FIG. 6 is a side perspective partial cross-sectional view of the present invention;
FIG. 7 is a partial top perspective cross-sectional view of the present invention;
FIG. 8 is an enlarged view of portion B of the present invention;
fig. 9 is a partial front perspective cross-sectional view of the present invention.
The marks in the figure: 1. supporting the box body; 2. a pile driving mechanism; 201. fixing a motor; 202. fixing a threaded rod; 203. a limit rod; 204. a fixing plate; 205. a mounting plate; 206. fixing the telescopic rod; 207. a pile planting machine body; 3. a limiting mechanism; 301. a support plate; 302. a fixed box; 303. a mounting member; 304. a limiting wheel; 305. a limiting ring; 306. fixing the gear ring; 307. a connecting gear; 308. connecting with a motor; 309. a limiting plate; 310. a connecting cylinder; 311. a connecting rod; 312. a connecting spring; 313. adjusting a motor; 314. a support rod; 315. fixing the bevel gear; 316. installing a bevel gear; 317. connecting a threaded rod; 318. a thread cylinder; 4. an adjusting mechanism; 401. supporting feet; 402. a connecting plate; 403. a fixed rod; 404. a fixed plate; 405. a fixed cylinder; 406. a mounting box; 407. a two-way threaded rod; 408. installing a motor; 409. installing a gear; 410. the gear is fixed.
Detailed Description
The present invention will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present invention more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the invention.
Example 1
Referring to fig. 1-9: the invention provides a technical scheme that: flood control equipment for hydraulic engineering and a use method thereof, comprising the following steps: supporting the box body 1; the adjusting mechanism 4 comprises four supporting legs 401, two connecting plates 402, two mounting boxes 406, two groups of moving parts and adjusting parts, wherein the outer surfaces of one sides of the two mounting boxes 406 are fixedly connected to two sides of the supporting box body 1, the adjusting parts are arranged on the mounting boxes 406, each connecting plate 402 is arranged on the adjusting part, each two supporting legs 401 are fixedly connected to the bottom of each connecting plate 402 near the edge, and each group of moving parts are arranged at the bottom of each connecting plate 402; pile driving mechanism 2, pile driving mechanism 2 includes pile planting machine body 207, supporting component and power component, the power component is set up in supporting box body 1, the supporting component is set up on the power component, pile planting machine body 207 is set up on the supporting component; and the limiting mechanism 3 comprises a mounting part, a rotating part, six groups of limiting parts and a fixing part, wherein the mounting part is arranged on the piling mechanism 2, each group of limiting parts and the rotating part are arranged on the mounting part, and the fixing part is arranged on the limiting part.
In this embodiment: the setting of supporting box 1 is used for supporting, the setting of adjustment mechanism 4 can be according to the distance between the actual conditions regulation stake, the setting of four supporting legs 401 is used for supporting, the setting of two connecting plates 402 is used for installing four supporting legs 401, the setting of two mounting boxes 406 is used for installing adjusting part, the setting of two sets of moving part is used for equidistant piling, the setting of pile driving mechanism 2 can drive the stake into the ground, the setting of pile planting machine body 207 is used for piling, the setting of supporting part is used for supporting pile planting machine body 207, the setting of power component is used for adjusting the position of pile planting machine body 207 and stop gear 3, the setting of stop gear 3 can facilitate the user to carry out quick fixed pile driving to the stake of different specifications, the setting of installing part is used for installing, the setting of rotating part is used for adjusting installing part, the setting of six sets of stop parts is used for spacing, the setting of fixed part is used for fixing the stake, the structure and principle of pile planting machine body 207 belong to prior art, its model is not described in detail here and can be selected according to the actual use condition.
Specifically, each group of moving parts includes a fixing rod 403, a fixing plate 404 and a fixing cylinder 405, the fixing rod 403 is fixedly connected to the bottom of the connecting plate 402, the fixing plate 404 is fixedly connected to the bottom of the fixing rod 403, and the top of the fixing cylinder 405 is rotatably sleeved on the extending end of the fixing plate 404.
In this embodiment: the setting of dead lever 403 plays the effect of supporting, is used for installing fixed cylinder 405 simultaneously, and the setting of fixed disk 404 is used for supporting, can equally spaced pile through the cooperation of fixed disk 404 and fixed cylinder 405, and fixed cylinder 405's setting is used for promoting, and fixed cylinder 405's structure and principle belong to prior art, do not make detailed description here, and its model can be selected according to the actual use condition.
Specifically, the adjusting part includes two bi-directional threaded rods 407, two installation motors 408, two installation gears 409 and two fixed gears 410, every bi-directional threaded rod 407 all rotates and runs through in the both sides surface of installation case 406, every connecting plate 402 all the screw thread cover is located the one end of two bi-directional threaded rods 407, every fixed gear 410 all the fixed cover is located the surface of bi-directional threaded rod 407, every installation motor 408 all fixed connection is in the lower inner wall of installation case 406, every installation gear 409 all the fixed cover is located the output of installation motor 408, every installation gear 409 all with fixed gear 410 intermeshing.
In this embodiment: the outer surface of the bi-directional threaded rod 407 is engraved with two opposite threads, two connecting plates 402 are respectively located on two different threads, the two mounting motors 408 are used for providing rotating force, the two mounting gears 409 and the two fixed gears 410 are used for transmission, the mounting motors 408 rotate, so that the mounting gears 409 rotate, the fixed gears 410 can drive the bi-directional threaded rod 407 to rotate through the engagement of the mounting gears 409 and the fixed gears 410, the two connecting plates 402 can be moved through the rotation of the bi-directional threaded rod 407, and therefore the distance between the supporting feet 401 is adjusted, the structure and principle of the mounting motors 408 belong to the prior art, the detailed description is omitted here, and the model can be selected according to actual use conditions.
Specifically, the power component includes fixed motor 201, fixed threaded rod 202 and two gag lever posts 203, and fixed motor 201 fixed connection is in one side inner wall of supporting box 1, and fixed threaded rod 202's bottom and fixed motor 201's output fixed connection, and fixed threaded rod 202's top rotate connect in the upper inner wall of supporting box 1, and two gag lever posts 203 fixed connection are between the upper and lower inner wall of supporting box 1.
In this embodiment: the setting of fixed motor 201 is used for providing the rotation, and the setting of two gag lever posts 203 is used for spacingly, rotates through fixed motor 201 to make fixed threaded rod 202 rotate, through the spacing of gag lever post 203, can make stop gear 3 and pile mechanism 2 remove suitable position, and fixed motor 201's structure and principle belong to prior art, do not make detailed description here, and its model can be selected according to the in-service use condition.
Specifically, the support component includes fixed plate 204, mounting panel 205 and fixed telescopic link 206, and the surface of fixed threaded rod 202 is located to fixed plate 204 thread bush, and the surface of two gag lever posts 203 is located to fixed plate 204 slip cap, and one side surface fixed connection of mounting panel 205 is in one side surface of fixed plate 204, and fixed telescopic link 206 fixed connection is in the bottom of mounting panel 205, and fixed telescopic link 206's extension end fixed connection is in the top of planting stake machine body 207.
In this embodiment: the setting of fixed plate 204 is used for supporting mounting panel 205, and mounting panel 205 is used for supporting fixed telescopic link 206, and the setting of fixed telescopic link 206 is used for adjusting the position of planting stake machine body 207, and the structure and the principle through fixed telescopic link 206 belong to prior art, and not described in detail here, its model can be selected according to actual use condition.
Specifically, the installation component includes backup pad 301, fixed box 302, mounting 303, spacing ring 305 and a plurality of spacing wheel 304, the surface of fixed threaded rod 202 is located to backup pad 301 thread bush, and the surface of two gag levers 203 is located to backup pad 301 slip cap, one side surface of fixed box 302 and backup pad 301 one side fixed connection, mounting 303 rotate and inlay between the upper and lower inner wall of fixed box 302, a plurality of spacing wheels 304 all rotate and connect between the upper and lower inner wall of fixed box 302, the surface of mounting 303 is located to spacing ring 305 fixed cover, and spacing ring 305 rotates and inlays between a plurality of spacing wheels 304.
In this embodiment: the setting of backup pad 301 is used for connecting fixed case 302, and fixed case 302's setting is used for installing installed part 303, and a plurality of mounting holes have been seted up to the surface of installed part 303 for the setting of installation stake, spacing ring 305 and a plurality of spacing wheel 304 is used for supporting installed part 303.
Specifically, the rotating component includes a fixed gear ring 306, a connecting gear 307 and a connecting motor 308, the connecting motor 308 is fixedly connected to the bottom of the fixed box 302, the connecting gear 307 is fixedly sleeved at the output end of the connecting motor 308, the fixed gear ring 306 is fixedly sleeved at the outer surface of the mounting member 303, and the fixed gear ring 306 is meshed with the connecting gear 307.
In this embodiment: the fixed gear ring 306 and the connecting gear 307 are driven by the connecting motor 308 to rotate to drive the connecting gear 307 to rotate, the mounting member 303 can be rotated by the engagement of the connecting gear 307 and the fixed gear ring 306, the connecting motor 308 is used for providing rotating force, and the structure and principle of the connecting motor 308 belong to the prior art, and the model of the connecting motor 308 can be selected according to actual use conditions.
Specifically, each group of limiting components includes a limiting plate 309, two connecting cylinders 310, two connecting rods 311 and two connecting springs 312, one ends of the two connecting cylinders 310 are fixedly connected with the mounting member 303, one end of each connecting rod 311 is slidably embedded between the inner walls of the connecting cylinders 310, each connecting spring 312 is fixedly connected between the connecting cylinder 310 and the connecting rod 311, and the other end of each connecting rod 311 is fixedly connected to one side outer surface of the limiting plate 309.
In this embodiment: the arrangement of the two connecting cylinders 310, the two connecting rods 311 and the two connecting springs 312 is used for supporting the limiting plate 309, and meanwhile, the limiting plate 309 is used for fixing the wood piles.
Specifically, the fixed part includes accommodate motor 313, bracing piece 314, fixed conical gear 315, installation conical gear 316, six connecting threaded rods 317 and six screw thread section of thick bamboo 318, accommodate motor 313 fixed connection is in the bottom of installed part 303, bracing piece 314 fixed connection is in the output of accommodate motor 313, the surface of bracing piece 314 is located to fixed conical gear 315 fixed cover, the one end of every screw thread section of thick bamboo 318 is all fixed connection in one side surface of one of them limiting plate 309, and screw thread section of thick bamboo 318 slip inlays and locate between the inner wall of installed part 303, the one end of every connecting threaded rod 317 all with screw thread section of thick bamboo 318 threaded connection, the other end of connecting threaded rod 317 is all fixed to the equal fixed cover of every installing conical gear 316, install conical gear 316 and fixed conical gear 315 intermeshing.
In this embodiment: the setting of adjusting motor 313 is used for providing the rotation force, the setting of bracing piece 314 is used for supporting fixed conical gear 315, the setting of fixed conical gear 315 and installation conical gear 316 is used for the transmission, six connection threaded rods 317 and six screw thread section of thick bamboo 318's cooperation can make screw thread section of thick bamboo 318 remove, adjusting motor 313 rotates, thereby make bracing piece 314 drive fixed conical gear 315 rotation, through the meshing of fixed conical gear 315 and installation conical gear 316, thereby make connection threaded rod 317 rotate, slide in connecting section of thick bamboo 310 through one of them connecting rod 311, thereby make screw thread section of thick bamboo 318 promote limiting plate 309 and remove, adjusting motor 313's structure and principle belong to prior art, do not make detailed description here, its model can be selected according to the actual use condition.
The flood control equipment for hydraulic engineering and the use method thereof provided by the embodiment of the invention are described in detail below, and the use method comprises the following steps: step one, pile distance adjustment: according to the actual conditions, the distance required for piling is adjusted, the installation motor 408 is started firstly, the installation motor 408 rotates, so that the installation gear 409 rotates, the fixed gear 410 drives the bi-directional threaded rod 407 to rotate through the engagement of the installation gear 409 and the fixed gear 410, and the two connection plates 402 can move through the rotation of the bi-directional threaded rod 407, so that the distance between the support legs 401 is adjusted, the installation motor 408 can be closed after the distance is adjusted to a proper distance, and flood control equipment can be moved to a proper position; step two, fixing the wood pile: according to the diameter of the wood pile, the distance between the two limiting plates 309 is adjusted, the adjusting motor 313 is started, the adjusting motor 313 rotates, so that the supporting rod 314 drives the fixed conical gear 315 to rotate, the connecting threaded rod 317 rotates through the engagement of the fixed conical gear 315 and the mounting conical gear 316, the threaded cylinder 318 slides in the connecting cylinder 310, so that the limiting plates 309 are pushed to move, when the adjusting motor 313 is closed at a proper position, the positions of the pile planter body 207 and the limiting mechanism 3 are adjusted according to the height of the wood pile, the fixed motor 201 rotates, the fixed threaded rod 202 rotates, the supporting plate 301 drives the limiting mechanism 3 to move through the limit of the limiting rod 203, and meanwhile the fixing plate 204 drives the piling mechanism 2 to move to a proper position; step three, piling and fixing: after the piles are driven into the ground through the pile planting machine body 207, the flood control equipment can be supported through pushing of the fixed air cylinder 405, the flood control equipment integrally rotates by workers, at the moment, the flood control equipment rotates by taking the fixed disc 404 as a pivot, meanwhile, the connecting motor 308 rotates to drive the connecting gear 307 to rotate, the mounting piece 303 can rotate through meshing of the connecting gear 307 and the fixed gear ring 306, so that the piles are driven to rotate to a proper position, when the piles are rotated by 180 degrees, the flood control equipment is restored to the original state through the fixed air cylinder 405, meanwhile, the piles are supplemented at the vacant positions, and the fast and convenient piling can be achieved by a user.
The foregoing description of the preferred embodiments of the invention is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the invention.

Claims (10)

1. Flood control equipment for hydraulic engineering and a use method thereof are characterized by comprising the following steps:
supporting the box body (1);
the adjusting mechanism (4), the adjusting mechanism (4) comprises four supporting feet (401), two connecting plates (402), two mounting boxes (406), two groups of moving parts and adjusting parts, wherein one side outer surface of each mounting box (406) is fixedly connected to two sides of a supporting box body (1), the adjusting parts are arranged on the mounting boxes (406), each connecting plate (402) is arranged on the adjusting parts, each two supporting feet (401) are fixedly connected to the bottom of each connecting plate (402) close to the edge, and each group of moving parts are arranged at the bottom of each connecting plate (402);
the pile driver comprises a pile driver body (207), a supporting component and a power component, wherein the power component is arranged in a supporting box body (1), the supporting component is arranged on the power component, and the pile driver body (207) is arranged on the supporting component; and
the limiting mechanism (3), the limiting mechanism (3) comprises a mounting part, a rotating part, six groups of limiting parts and a fixing part, wherein the mounting part is arranged on the piling mechanism (2), each group of limiting parts and the rotating part are arranged on the mounting part, and the fixing part is arranged on the limiting part.
2. Flood control equipment for hydraulic engineering and use method thereof as claimed in claim 1, wherein: each group of moving parts comprises a fixing rod (403), a fixing disc (404) and a fixing air cylinder (405), wherein the fixing rods (403) are fixedly connected to the bottom of the connecting plate (402), the fixing discs (404) are fixedly connected to the bottom of the fixing rods (403), and the top of each fixing air cylinder (405) is rotatably sleeved at the extending end of each fixing disc (404).
3. Flood control equipment for hydraulic engineering and use method thereof as claimed in claim 2, wherein: the adjusting part comprises two bidirectional threaded rods (407), two mounting motors (408), two mounting gears (409) and two fixed gears (410), each bidirectional threaded rod (407) rotates to penetrate through the outer surfaces of two sides of the mounting box (406), each connecting plate (402) is sleeved on one end of each bidirectional threaded rod (407), each fixed gear (410) is fixedly sleeved on the outer surface of each bidirectional threaded rod (407), each mounting motor (408) is fixedly connected to the lower inner wall of the mounting box (406), each mounting gear (409) is fixedly sleeved on the output end of the mounting motor (408), and each mounting gear (409) is meshed with each fixed gear (410).
4. A flood control apparatus for hydraulic engineering and a method of using the same as claimed in claim 3, wherein: the power component comprises a fixed motor (201), a fixed threaded rod (202) and two limiting rods (203), wherein the fixed motor (201) is fixedly connected to one side inner wall of the supporting box body (1), the bottom end of the fixed threaded rod (202) is fixedly connected with the output end of the fixed motor (201), the top end of the fixed threaded rod (202) is rotationally connected to the upper inner wall of the supporting box body (1), and the two limiting rods (203) are fixedly connected between the upper inner wall and the lower inner wall of the supporting box body (1).
5. Flood control apparatus for hydraulic engineering and method of using the same as claimed in claim 4, wherein: the supporting component comprises a fixing plate (204), a mounting plate (205) and a fixing telescopic rod (206), wherein the fixing plate (204) is sleeved on the outer surface of a fixing threaded rod (202), the fixing plate (204) is sleeved on the outer surfaces of two limiting rods (203) in a sliding mode, one side of the mounting plate (205) is fixedly connected with one side of the outer surface of the fixing plate (204), the fixing telescopic rod (206) is fixedly connected with the bottom end of the mounting plate (205), and the extension end of the fixing telescopic rod (206) is fixedly connected with the top of a pile planting machine body (207).
6. Flood control apparatus for hydraulic engineering and method of using the same as claimed in claim 5, wherein: the mounting component comprises a supporting plate (301), a fixed box (302), a mounting piece (303), a limiting ring (305) and a plurality of limiting wheels (304), wherein the supporting plate (301) is sleeved on the outer surface of a fixed threaded rod (202), the supporting plate (301) is sleeved on the outer surfaces of two limiting rods (203) in a sliding mode, one side of the outer surface of the fixed box (302) is fixedly connected with one side of the supporting plate (301), the mounting piece (303) is rotationally embedded between the upper inner wall and the lower inner wall of the fixed box (302), the limiting wheels (304) are rotationally connected between the upper inner wall and the lower inner wall of the fixed box (302), the limiting ring (305) is fixedly sleeved on the outer surface of the mounting piece (303), and the limiting ring (305) is rotationally embedded between the limiting wheels (304).
7. The flood control device for hydraulic engineering and the use method thereof as claimed in claim 6, wherein: the rotating component comprises a fixed gear ring (306), a connecting gear (307) and a connecting motor (308), wherein the connecting motor (308) is fixedly connected to the bottom of the fixed box (302), the connecting gear (307) is fixedly sleeved at the output end of the connecting motor (308), the fixed gear ring (306) is fixedly sleeved at the outer surface of the mounting piece (303), and the fixed gear ring (306) is meshed with the connecting gear (307).
8. Flood control apparatus for hydraulic engineering and method of using the same as claimed in claim 7, wherein: every group limit part all includes limiting plate (309), two connecting cylinders (310), two connecting rods (311) and two connecting springs (312), two the one end of connecting cylinder (310) all with mounting (303) fixed connection, every the one end of connecting rod (311) all slides and inlays between the inner wall of connecting cylinder (310), every connecting spring (312) all fixed connection between connecting cylinder (310) and connecting rod (311), every the other end of connecting rod (311) all fixed connection in one side surface of limiting plate (309).
9. Flood control apparatus for hydraulic engineering and method of using the same as claimed in claim 8, wherein: the fixed part comprises an adjusting motor (313), a supporting rod (314), fixed conical gears (315), installation conical gears (316), six connecting threaded rods (317) and six threaded cylinders (318), the adjusting motor (313) is fixedly connected to the bottom of the installation piece (303), the supporting rod (314) is fixedly connected to the output end of the adjusting motor (313), the fixed conical gears (315) are fixedly sleeved on the outer surface of the supporting rod (314), one end of each threaded cylinder (318) is fixedly connected to one outer surface of one limiting plate (309), the threaded cylinders (318) are slidably embedded between the inner walls of the installation piece (303), one end of each connecting threaded rod (317) is in threaded connection with the threaded cylinder (318), each installation conical gear (316) is fixedly sleeved on the other end of the connecting threaded rod (317), and the installation conical gears (316) are meshed with the fixed conical gears (315).
10. The use method of the flood control device for hydraulic engineering, which is characterized by being applied to the flood control device for hydraulic engineering according to any one of claims 1 to 9, comprises the following steps:
s1, pile distance adjustment: according to the practical situation, the distance required for piling is adjusted, the installation motor (408) is started firstly, the installation motor (408) rotates, so that the installation gear (409) rotates, the fixed gear (410) can drive the bi-directional threaded rod (407) to rotate through the engagement of the installation gear (409) and the fixed gear (410), the two connecting plates (402) can be moved through the rotation of the bi-directional threaded rod (407), the distance between the supporting feet (401) is adjusted, the installation motor (408) can be closed after the distance is adjusted to a proper distance, and flood control equipment is moved to a proper position;
s2, fixing the wood pile: according to the diameter of a wood pile, the distance between two limiting plates (309) is adjusted, an adjusting motor (313) is started, the adjusting motor (313) rotates, so that a supporting rod (314) drives a fixed conical gear (315) to rotate, a connecting threaded rod (317) rotates through engagement of the fixed conical gear (315) and an installation conical gear (316), one connecting rod (311) slides in a connecting cylinder (310), a threaded cylinder (318) pushes the limiting plates (309) to move, when the adjusting motor (313) is closed at a proper position, the positions of a pile planting machine body (207) and a limiting mechanism (3) are adjusted according to the height of the wood pile, the fixed threaded rod (202) rotates through rotation of a fixed motor (201), the supporting plate (301) drives the limiting mechanism (3) to move through limiting of the limiting rod (203), and meanwhile, the fixing plate (204) drives a pile driving mechanism (2) to move to a proper position;
s3, piling and fixing: after a plurality of wood piles are inserted between two limiting plates (309), the wood piles are driven into the ground through the pile planting machine body (207), the flood control equipment can be supported through pushing of the fixing air cylinder (405), the flood control equipment is integrally rotated by workers, at the moment, the flood control equipment rotates by taking the fixing disc (404) as a fulcrum, meanwhile, the connecting motor (308) rotates to drive the connecting gear (307) to rotate, the mounting piece (303) can be rotated through meshing of the connecting gear (307) and the fixing gear ring (306), the wood piles are driven to rotate to a proper position, when the wood piles are rotated by 180 degrees, the flood control equipment is restored to the original state through the fixing air cylinder (405), meanwhile, the wood piles are supplemented at the vacant positions, and the fast and convenient piling of a user can be facilitated.
CN202311030321.1A 2023-08-16 2023-08-16 Flood prevention equipment for hydraulic engineering and application method thereof Pending CN116837840A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311030321.1A CN116837840A (en) 2023-08-16 2023-08-16 Flood prevention equipment for hydraulic engineering and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311030321.1A CN116837840A (en) 2023-08-16 2023-08-16 Flood prevention equipment for hydraulic engineering and application method thereof

Publications (1)

Publication Number Publication Date
CN116837840A true CN116837840A (en) 2023-10-03

Family

ID=88165397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311030321.1A Pending CN116837840A (en) 2023-08-16 2023-08-16 Flood prevention equipment for hydraulic engineering and application method thereof

Country Status (1)

Country Link
CN (1) CN116837840A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117822578A (en) * 2024-03-05 2024-04-05 华北建工工程集团有限公司 Pile driver capable of adjusting and adapting to terrain for constructional engineering
CN117822578B (en) * 2024-03-05 2024-06-04 华北建工工程集团有限公司 Pile driver capable of adjusting and adapting to terrain for constructional engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117822578A (en) * 2024-03-05 2024-04-05 华北建工工程集团有限公司 Pile driver capable of adjusting and adapting to terrain for constructional engineering
CN117822578B (en) * 2024-03-05 2024-06-04 华北建工工程集团有限公司 Pile driver capable of adjusting and adapting to terrain for constructional engineering

Similar Documents

Publication Publication Date Title
CN109187081A (en) A kind of soil sample acquisition device used for geological prospecting
CN207013786U (en) Construction site packaged type cutter device
CN114833192B (en) Ecological prosthetic devices of mine soil
CN108049822A (en) A kind of horizontal directional drilling machine of the raising Drilling Precision based on Internet of Things
CN116837840A (en) Flood prevention equipment for hydraulic engineering and application method thereof
CN112814700B (en) Shield area foundation pit support structure and construction process
CN110080200B (en) Foundation tamping device for constructional engineering
CN215906595U (en) Highway bridge and culvert supporting structure for bridge engineering
CN214883701U (en) Positioning frame for PCMW construction method
CN213267898U (en) Adjustable supporting device of geotechnical engineering
CN110761284B (en) Slope anchor for building municipal works
CN110080199B (en) Foundation rammer compactor for building
CN202467648U (en) Warped power head and vehicle-mounted coal bed gas drilling machine using same
CN220927897U (en) Auxiliary fixing mechanism for mine restoration
CN101871316A (en) Piling machine
CN206680821U (en) A kind of horizontal static pressure compaction equipment of self-drilling type of existing line subgrade defect regulation
CN215482940U (en) Piling device for industrial and civil buildings
CN219528924U (en) Subway tunnel inner wall drilling equipment
CN215165554U (en) Pile driver for civil engineering
CN218990169U (en) Pile driving supporting structure for waterproof curtain steel pipe pile
CN117090303B (en) Building steel structure and construction process thereof
CN216811803U (en) Nuclear power station steam turbine barring system
CN216007218U (en) Municipal administration building drainage structures
CN213897165U (en) Slope supporting structure for mine restoration
CN214739765U (en) Be used for civil engineering construction strutting arrangement convenient to remove

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination