CN116822876A - Method and device for processing power grid technical improvement investment project and computer equipment - Google Patents

Method and device for processing power grid technical improvement investment project and computer equipment Download PDF

Info

Publication number
CN116822876A
CN116822876A CN202310779003.9A CN202310779003A CN116822876A CN 116822876 A CN116822876 A CN 116822876A CN 202310779003 A CN202310779003 A CN 202310779003A CN 116822876 A CN116822876 A CN 116822876A
Authority
CN
China
Prior art keywords
investment
project
power grid
technical improvement
projects
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310779003.9A
Other languages
Chinese (zh)
Inventor
杨悦勇
王玲
张奇
梁展鹏
江雪菲
王军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Energy Development Research Institute of China Southern Power Grid Co Ltd
Original Assignee
Energy Development Research Institute of China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Energy Development Research Institute of China Southern Power Grid Co Ltd filed Critical Energy Development Research Institute of China Southern Power Grid Co Ltd
Priority to CN202310779003.9A priority Critical patent/CN116822876A/en
Publication of CN116822876A publication Critical patent/CN116822876A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application relates to a processing method, a device and computer equipment for a power grid technical improvement investment project. The method comprises the following steps: determining comprehensive scores of all investment projects of the technical improvement of the power grid; screening the investment projects of the technical improvement of the power grid according to the comprehensive scores of the investment projects and the initial investment sum of the technical improvement of the power grid to obtain candidate investment project combinations of the technical improvement of the power grid; updating the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the power grid technical improvement to obtain the updated investment sum of the power grid technical improvement; screening the investment projects of the technical improvement of the power grid according to the updated investment sum to obtain updated investment project combinations; and carrying out item classification treatment on the updated investment item combination to obtain the target investment item combination for technical improvement of the power grid. By adopting the method, the decision accuracy of the technical improvement investment project of the power grid can be improved.

Description

Method and device for processing power grid technical improvement investment project and computer equipment
Technical Field
The present application relates to the field of investment technology for power grid technology improvement projects, and in particular, to a method, an apparatus, a computer device, a storage medium, and a computer program product for processing a power grid technology improvement investment project.
Background
With the increasing demand of society for electricity, the investment scale of power grid projects is also increasing. The technical improvement project of the power grid refers to technical improvement on equipment or lines with unreasonable design or high energy consumption in the power grid, so that the equipment or lines are more energy-saving, more reasonable in process and better in operation reliability. In the process of power grid construction and maintenance, a power grid technical improvement project needs to comprehensively consider the operation condition and social responsibility of an enterprise to carry out project optimization, accurately grasp project investment capacity and scientifically make an investment plan, and has important significance for power construction and enterprise development.
At present, the investment research on the technical improvement project of the power grid is less, the index system of the basic unit is unhooked from the investment requirement and the investment capacity of the superior unit, so that the investment sum cannot be reasonably configured, and the benefit of the screened investment project or project combination output is lower.
Disclosure of Invention
In view of the foregoing, it is desirable to provide a method, an apparatus, a computer device, a computer readable storage medium, and a computer program product for processing a grid technical improvement investment project, which can improve the decision accuracy of the grid technical improvement investment project.
In a first aspect, the application provides a method for processing a power grid technical improvement investment project. The method comprises the following steps:
determining comprehensive scores of all investment projects of the technical improvement of the power grid;
screening the investment projects of the technical improvement of the power grid according to the comprehensive scores of the investment projects and the initial investment sum of the technical improvement of the power grid to obtain candidate investment project combinations of the technical improvement of the power grid;
updating the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the power grid technical improvement to obtain the updated investment sum of the power grid technical improvement;
screening the investment projects of the technical improvement of the power grid according to the updated investment sum to obtain updated investment project combinations;
and carrying out item classification treatment on the updated investment item combination to obtain the target investment item combination for technical improvement of the power grid.
In one embodiment, updating the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the grid technical improvement to obtain the updated investment sum of the grid technical improvement comprises:
Determining an investment scale adjustment factor for the initial investment aggregate according to the aggregate score of the candidate investment aggregate and the historical aggregate score of the historical investment aggregate;
and adjusting the initial investment sum through the investment scale adjustment coefficient to obtain the updated investment sum of the technical improvement of the power grid.
In one embodiment, before updating the initial investment sum based on the total score of the candidate investment project portfolio and the historical total score of the historical investment project portfolio for grid engineering improvement, further comprising:
obtaining a comprehensive score of each candidate investment item in the candidate investment item combination;
and carrying out weighted average treatment on the comprehensive scores of the candidate investment projects to obtain the total score of the candidate investment project combination.
In one embodiment, determining a composite score for each investment item for a grid improvement includes:
carrying out scoring mapping treatment on the project data of each investment project through a project scoring mapping model to obtain single scores of each investment project;
and fusing the single scores of the investment projects to obtain the comprehensive scores of the investment projects.
In one embodiment, the screening the investment projects of the technical improvement of the power grid according to the comprehensive score of each investment project and the initial total investment amount of the technical improvement of the power grid to obtain candidate investment project combinations of the technical improvement of the power grid includes:
sequencing the investment projects according to the comprehensive scores of the investment projects to obtain project sequencing results of the investment projects;
screening candidate investment projects meeting the initial investment sum of the technical improvement of the power grid from the investment projects according to the project sorting result;
and combining the candidate investment projects to obtain the candidate investment project combination.
In one embodiment, after performing item classification processing on the updated investment item combination to obtain the target investment item combination for the grid technical improvement, the method further comprises:
determining project indexes of the target investment project combination according to the technical improvement professional management requirement information of the power grid;
and performing benefit evaluation on the target investment project combination according to the project index to obtain input-output data of the target investment project combination.
In a second aspect, the application also provides a processing device for the technical improvement investment project of the power grid. The device comprises:
The project score determining module is used for determining the comprehensive score of each investment project of the technical improvement of the power grid;
the investment project screening module is used for screening the investment projects of the technical improvement of the power grid according to the comprehensive scores of the investment projects and the initial investment sum of the technical improvement of the power grid to obtain candidate investment project combinations of the technical improvement of the power grid;
the investment sum updating module is used for updating the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the power grid technical improvement to obtain the updated investment sum of the power grid technical improvement;
the investment project updating module is used for screening the investment projects of the technical improvement of the power grid according to the updated investment sum to obtain updated investment project combinations;
and the investment project determining module is used for carrying out project classification processing on the updated investment project combination to obtain the target investment project combination for the technical improvement of the power grid.
In a third aspect, the present application also provides a computer device. The computer device comprises a memory storing a computer program and a processor which when executing the computer program performs the steps of:
Determining comprehensive scores of all investment projects of the technical improvement of the power grid;
screening the investment projects of the technical improvement of the power grid according to the comprehensive scores of the investment projects and the initial investment sum of the technical improvement of the power grid to obtain candidate investment project combinations of the technical improvement of the power grid;
updating the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the power grid technical improvement to obtain the updated investment sum of the power grid technical improvement;
screening the investment projects of the technical improvement of the power grid according to the updated investment sum to obtain updated investment project combinations;
and carrying out item classification treatment on the updated investment item combination to obtain the target investment item combination for technical improvement of the power grid.
In a fourth aspect, the present application also provides a computer-readable storage medium. The computer readable storage medium having stored thereon a computer program which when executed by a processor performs the steps of:
determining comprehensive scores of all investment projects of the technical improvement of the power grid;
screening the investment projects of the technical improvement of the power grid according to the comprehensive scores of the investment projects and the initial investment sum of the technical improvement of the power grid to obtain candidate investment project combinations of the technical improvement of the power grid;
Updating the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the power grid technical improvement to obtain the updated investment sum of the power grid technical improvement;
screening the investment projects of the technical improvement of the power grid according to the updated investment sum to obtain updated investment project combinations;
and carrying out item classification treatment on the updated investment item combination to obtain the target investment item combination for technical improvement of the power grid.
In a fifth aspect, the present application also provides a computer program product. The computer program product comprises a computer program which, when executed by a processor, implements the steps of:
determining comprehensive scores of all investment projects of the technical improvement of the power grid;
screening the investment projects of the technical improvement of the power grid according to the comprehensive scores of the investment projects and the initial investment sum of the technical improvement of the power grid to obtain candidate investment project combinations of the technical improvement of the power grid;
updating the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the power grid technical improvement to obtain the updated investment sum of the power grid technical improvement;
Screening the investment projects of the technical improvement of the power grid according to the updated investment sum to obtain updated investment project combinations;
and carrying out item classification treatment on the updated investment item combination to obtain the target investment item combination for technical improvement of the power grid.
The processing method, the processing device, the computer equipment, the storage medium and the computer program product of the investment projects for the technical improvement of the power grid determine the comprehensive scores of the investment projects for the technical improvement of the power grid; screening the investment projects of the technical improvement of the power grid according to the comprehensive scores of the investment projects and the initial investment sum of the technical improvement of the power grid to obtain candidate investment project combinations of the technical improvement of the power grid; then updating the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the power grid technical improvement to obtain the updated investment sum of the power grid technical improvement; screening the technically improved investment projects of the power grid according to the updated investment sum to obtain updated investment project combinations; and carrying out project classification treatment on the updated investment project combinations to obtain target investment project combinations for technical improvement of the power grid. By adopting the method, the initial investment sum can be updated by screening out the candidate investment combinations, the updated investment project combinations can be screened out by updating the optimized updated investment combinations, the allocation rationality of the investment sum is improved, the decision accuracy of the technical improvement investment projects of the power grid is improved, and finally, the updated investment project combinations are classified from the professional category of the power grid, so that the target investment project combinations in the professional scale level are obtained, and the decision accuracy of the technical improvement investment projects of the power grid is further improved.
Drawings
FIG. 1 is a flow diagram of a method of processing a grid technical improvement investment project in one embodiment;
FIG. 2 is a flow chart of the updated investment sum step for obtaining a grid improvement in one embodiment;
FIG. 3 is a flow chart of a method for processing a grid improvement investment project in another embodiment;
FIG. 4 is a block diagram of a processing device for a grid technical improvement investment project in one embodiment;
fig. 5 is an internal structural diagram of a computer device in one embodiment.
Detailed Description
The present application will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present application more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the application.
It should be noted that, the user information (including but not limited to user equipment information, user personal information, etc.) and the data (including but not limited to data for analysis, stored data, presented data, etc.) related to the present application are information and data authorized by the user or sufficiently authorized by each party, and the collection, use and processing of the related data need to comply with the related laws and regulations and standards of the related country and region.
In one embodiment, as shown in fig. 1, a method for processing a technical improvement investment project of a power grid is provided, and the embodiment is applied to a terminal for illustration by the method, it is to be understood that the method can also be applied to a server, and can also be applied to a system comprising the terminal and the server, and is realized through interaction of the terminal and the server. In this embodiment, the method includes the steps of:
step S101, determining a composite score of each investment project of the grid improvement.
The technical improvement of the power grid refers to technical improvement of equipment or lines with unreasonable design or high energy consumption in the power grid. The investment project refers to a project requiring investment to be technically improved in the power grid, for example, the investment project can be a technical upgrade of a certain transformer substation, and can also be a power transmission line optimization of a certain area. The comprehensive score refers to scoring information on the whole investment project.
Specifically, the terminal determines a scoring index of each investment project aiming at the technical improvement of the power grid, and performs scoring processing on project data of each investment project according to the scoring index to obtain a comprehensive score of each investment project. The project data may be present information of an investment project, project basic data, or the like.
Step S102, screening the investment projects of the power grid technical improvement according to the comprehensive scores of the investment projects and the initial investment sum of the power grid technical improvement to obtain candidate investment project combinations of the power grid technical improvement.
The initial total investment amount refers to the total investment amount which is preliminarily set for the investment project of the technical improvement of the power grid. An investment portfolio refers to a collection of items that result from multiple investment portfolios.
Specifically, the terminal determines screening priority of each investment project according to comprehensive scores of each investment project; further, according to the screening priority of each investment project, screening single candidate investment projects within the range of the initial investment sum of the technical improvement of the power grid from each investment project; and finally, combining a plurality of candidate investment projects according to a certain rule or randomly to obtain a candidate investment project combination for technical improvement of the power grid.
Step S103, updating the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the power grid technical improvement to obtain the updated investment sum of the power grid technical improvement.
Wherein, the historical investment project combination refers to a target investment project combination of a historical time period. For example, the historical investment portfolio may be a target investment portfolio for the last year.
Specifically, the terminal determines whether to increase the initial investment sum or decrease the initial investment sum according to the magnitude relation between the total score of the candidate investment project combination and the historical total score of the historical investment project of the grid technical improvement, and then the terminal obtains the updated investment sum of the grid technical improvement.
Step S104, screening the investment projects of the technical improvement of the power grid according to the updated investment sum to obtain an updated investment project combination.
Specifically, after obtaining the updated investment sum, the terminal may screen out the individual investment items within the updated investment sum again from the investment items according to the screening priority of the investment items, and then combine to obtain the updated investment item combination.
Step S105, carrying out project classification processing on the updated investment project combinations to obtain target investment project combinations for technical improvement of the power grid.
Specifically, the terminal obtains project specialty categories, specialty scales and project level solution problems of the power grid from the project database. And carrying out item classification processing on the updated investment item combination according to the item specialty category, specialty scale and item level solution problem to obtain target investment item combinations of all specialty levels corresponding to the item level solution problem, so that the obtained target investment item combinations meet the requirements of the power grid specialty item levels, and the rationality of the obtained target investment item combinations is improved.
In the processing method of the investment projects for the technical improvement of the power grid, the comprehensive score of each investment project for the technical improvement of the power grid is determined; screening the investment projects of the technical improvement of the power grid according to the comprehensive scores of the investment projects and the initial investment sum of the technical improvement of the power grid to obtain candidate investment project combinations of the technical improvement of the power grid; then updating the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the power grid technical improvement to obtain the updated investment sum of the power grid technical improvement; screening the technically improved investment projects of the power grid according to the updated investment sum to obtain updated investment project combinations; and carrying out project classification treatment on the updated investment project combinations to obtain target investment project combinations for technical improvement of the power grid. By adopting the method, the initial investment sum can be updated by screening out the candidate investment combinations, the updated investment project combinations can be screened out by updating the optimized updated investment combinations, the allocation rationality of the investment sum is improved, the decision accuracy of the technical improvement investment projects of the power grid is improved, and finally, the updated investment project combinations are classified from the professional category of the power grid, so that the target investment project combinations in the professional scale level are obtained, and the decision accuracy of the technical improvement investment projects of the power grid is further improved.
In one embodiment, as shown in fig. 2, step S103, updates the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the grid technical improvement to obtain the updated investment sum of the grid technical improvement, which specifically includes the following contents:
step S201, determining the investment scale adjustment coefficient of the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination.
Wherein the total score refers to a project score calculated by the composite score of each investment project in the investment project portfolio (such as a candidate investment project portfolio or a historical investment project portfolio).
Specifically, the terminal first determines a total score for the candidate portfolio of investment items and a historical total score for the historical portfolio of investment items. Then, the terminal divides the total score of the candidate investment project combination and the historical total score of the historical investment project combination to obtain an investment scale adjustment coefficient of the initial investment total.
The investment scale adjustment coefficient can be calculated by the following formula: investment scale adjustment factor = total score of candidate portfolios/(historical total score of historical portfolios).
Step S202, the initial investment sum is adjusted through the investment scale adjustment coefficient, and the updated investment sum of the technical improvement of the power grid is obtained.
Specifically, the terminal performs weighting treatment on the initial investment sum through the investment scale adjustment coefficient, and takes the result obtained by the weighting treatment as the updated investment sum of the technical improvement of the power grid.
The updated investment sum can be calculated by the following formula: updated investment sum = initial investment sum x investment scale adjustment factor.
As can be seen from the calculation formula of the investment scale adjustment coefficient, when the total score of the candidate investment project combination is higher than the historical total score of the historical investment project of the technical improvement of the power grid, the investment scale of the technical improvement of the power grid is increased, namely the updated investment total is larger than the initial investment total; when the total score of the candidate investment project combination is smaller than the historical total score of the historical investment project of the technical improvement of the power grid, the investment scale of the technical improvement of the power grid is reduced, namely the updated investment sum is smaller than the initial investment sum.
In this embodiment, the investment scale adjustment factor of the initial investment sum is determined by the total score of the candidate investment project portfolio and the historical total score of the historical investment project portfolio; and the initial investment sum is adjusted through the investment scale adjustment coefficient to obtain updated investment sum of the technical improvement of the power grid, and the investment sum is accurately adjusted according to the actual change condition of the total score by combining the historical total score and the total score of the current candidate investment project combination, so that the obtained updated investment sum is more accurate, and the configuration rationality of the investment sum is improved.
In one embodiment, in the step S103, before updating the initial investment sum according to the total score of the candidate investment project portfolio and the historical total score of the historical investment project portfolio of the grid engineering improvement, the method further includes: obtaining comprehensive scores of all candidate investment projects in the candidate investment project combination; and carrying out weighted average treatment on the comprehensive scores of the candidate investment projects to obtain the total score of the candidate investment project combination.
Specifically, the terminal may obtain a composite score for each candidate investment item within the candidate investment item portfolio; the comprehensive scores of the candidate investment projects are weighted and averaged, and then the terminal obtains the total score of the candidate investment project combination; similarly, the terminal may perform a weighted average process on the composite scores of each of the historical investment items in the historical investment item portfolio to obtain a historical total score for the historical investment item portfolio. If the historical total score is stored in the historical investment project combination in the past, the terminal can also directly inquire to obtain the historical total score.
In practical applications, the total score of the candidate investment projects can also be calculated by the following formula: total score of candidate investment project portfolio = Σ (single project investment x composite score of candidate investment projects)/(Σ single project investment).
In this embodiment, by obtaining a composite score for each candidate investment item in the candidate investment item portfolio; and carrying out weighted average processing on the comprehensive scores of the candidate investment projects to obtain the total score of the candidate investment project combination, and reasonably acquiring the total score of the candidate investment project combination and the historical total score of the historical investment project combination, so that the terminal in the subsequent step calculates an investment scale adjustment coefficient based on the total score and the historical total score, thereby realizing the updating of the initial investment total.
In one embodiment, the step S101 is to determine a comprehensive score of each investment project of the grid technical improvement, which specifically includes the following contents: carrying out scoring mapping treatment on item data of each investment item through an item scoring mapping model to obtain single scores of each investment item; and fusing the single scores of the investment projects to obtain the comprehensive score of each investment project.
The project score mapping model is a model for mapping and obtaining single scores of investment projects according to project data of the investment projects. A single score refers to the score of an investment item in a single evaluation dimension.
Specifically, the terminal trains and obtains a project scoring mapping model according to comprehensive scores, evaluation dimensionality and scoring scores, scoring weights and project data of the historical investment projects. And the terminal inputs the project data of each investment project into a project scoring mapping model so as to obtain a single score of each investment project under each evaluation dimension according to the project data of each investment project by the project scoring mapping model. The terminal fuses the single scores of the investment projects, and can directly add all the single scores or can weight the single scores according to the score weight so as to obtain the comprehensive scores of the investment projects.
In practical application, the comprehensive score of the historical investment project can be obtained through calculation in the mode provided in the step S101, and can also be directly filled in by project responsible personnel with the technical improvement of the power grid according to project planning or investigation. The evaluation dimension and scoring score are based on the index system and project preference method. The scoring weights may be determined by expert scoring and analytic hierarchy processes. For example, the evaluation dimension may include three aspects of technical effect, economic benefit, and other effects.
The technical effects are as follows: for quantifying the contribution of investment projects to technical effects. Filling index values for metering automatic terminal coverage rate, automatic meter reading rate, millions of customer complaint rate and electricity selling electronic settlement rate according to project planning or scientific research respectively, and dividing the index values by the implementation cost of investment projects to obtain the benefit-investment ratio of the index; and (3) for the practical evaluation score of the metering automation system, filling in the index value according to project planning or investigation, obtaining the sorting score of the index based on the sorting of the index, and dividing the sorting score by the implementation cost of the investment project to obtain the benefit-investment ratio of the index. And finally, obtaining index scores by adopting a normalization method for each index, and calculating single scores of technical effects of investment projects by combining index weights.
Economic benefit: for quantifying the contribution of investment projects to economic benefits. For the average retirement period and the electric charge error rate of the metering terminal equipment, filling in index values according to project planning or scientific research respectively, and dividing the index values by the implementation cost of investment projects to obtain the benefit-investment ratio of the index; and filling in index values according to project planning or scientific research for obtaining the electric power index, obtaining the sorting score of the index based on the sorting of the index, and dividing the sorting score by the implementation cost of the investment project to obtain the benefit-investment ratio of the index. And finally, obtaining index scores by adopting a normalization method for each index, and calculating the single scores of the economic benefits of the projects by combining the index weights.
Regarding the scoring weight, the technical effect is 70% of the weight of the composite score, and the economic benefit is 30% of the weight of the composite score. Further, the weight ratio of the evaluation index with finer granularity in each evaluation dimension may include: the coverage rate and the automatic meter reading rate of the metering automatic terminal respectively account for 20% of the weight of the technical effect; millions of customer complaints account for 30% of the technical effect weight; the electricity selling electronic settlement rate and the metering automation system are practical, respectively account for 15% of the technical effect weight, the average retirement period and the electricity fee error rate of the metering terminal equipment respectively account for 40% of the economic benefit weight, and the obtained electric power index accounts for 20% of the economic benefit weight.
In the embodiment, through an item scoring mapping model, scoring mapping processing is carried out on item data of each investment item, so as to obtain single scores of each investment item; the single scores of the investment projects are fused to obtain the comprehensive score of each investment project, and reasonable acquisition of the comprehensive score of each investment project is realized through the project score mapping model without relying on experts to score the project. In addition, the comprehensive scores of the investment projects are determined through the single scores of multiple evaluation dimensions, so that the comprehensiveness and the accuracy of the comprehensive scores of all the investment projects can be improved, and the target investment project combination of the power grid technical improvement can be determined more comprehensively and accurately.
In one embodiment, the step S102 is to screen the investment projects of the grid improvement according to the comprehensive score of each investment project and the initial investment sum of the grid improvement, so as to obtain a candidate investment project combination of the grid improvement, which specifically includes the following contents: sequencing the investment projects according to the comprehensive scores of the investment projects to obtain project sequencing results of the investment projects; screening candidate investment projects meeting the initial investment sum of the technical improvement of the power grid from all the investment projects according to the project sequencing result; and combining the candidate investment projects to obtain a candidate investment project combination.
Specifically, the terminal can sort the investment projects according to the sequence from large to small of the comprehensive scores of the investment projects to obtain the project sorting result of the investment projects; determining screening priority of each investment project according to the project sequencing result; and screening candidate investment projects from all the investment projects based on screening priority within the range of the initial investment sum of the technical improvement of the power grid. And the terminal combines the candidate investment projects to obtain a candidate investment project combination.
In this embodiment, the terminal sorts the investment projects according to the comprehensive scores of the investment projects to obtain the project sorting result of the investment projects; then screening candidate investment projects meeting the initial investment sum of the technical improvement of the power grid from all the investment projects according to the project sequencing result; and finally, combining the candidate investment projects to obtain a candidate investment project combination, and preferentially screening the candidate investment projects with better comprehensive scores in the range of the initial investment sum to form the candidate investment project combination, thereby improving the accuracy of the obtained candidate investment project combination.
In one embodiment, in step S105, after performing item classification processing on the updated investment item combination to obtain the target investment item combination for grid improvement, the method further includes: determining project indexes of a target investment project combination according to professional management requirement information of power grid technical improvement; and performing benefit evaluation on the target investment project combination according to the project index to obtain input-output data of the target investment project combination.
Wherein, the project index refers to an index for evaluating the input-output benefit of the target investment portfolio. Input-output data refers to data related to investment projects in terms of power production and scale input. For example, input-output data may include: metering automatic terminal coverage rate, automatic meter reading rate, electronic settlement rate of electricity selling, average retirement period of metering terminal equipment and error rate of electricity charge.
Specifically, the terminal optimizes and classifies project indexes compiled based on detail projects according to project professional categories according to professional management requirement information of technical improvement of the power grid, and project indexes of a target investment project combination are obtained. And the terminal comprehensively determines all professional scale level information (such as problem to be solved) and all scale level information (problem to be solved) in the technical improvement of the power grid. And the terminal carries out benefit evaluation on the target investment project combination according to the project index, the scale level information and the professional scale level information to obtain input-output data of the target investment project combination.
In the embodiment, project indexes of a target investment project combination are determined according to professional management requirement information of power grid technical improvement; and performing benefit evaluation on the target investment project combination according to project indexes to obtain input-output data of the target investment project combination, and combining professional level information and scale level information in power grid technical improvement to obtain the input-output data of the target investment project through joint evaluation, so that hooks between the input-output data and project benefits are realized, and the decision accuracy of the power grid technical improvement investment project is improved.
In one embodiment, as shown in fig. 3, another method for processing a technical improvement investment project of a power grid is provided, and the method is applied to a terminal for illustration, and includes the following steps:
step S301, carrying out scoring mapping processing on item data of each investment item through an item scoring mapping model to obtain single scores of each investment item; and fusing the single scores of the investment projects to obtain the comprehensive score of each investment project.
Step S302, sorting the investment projects according to the comprehensive scores of the investment projects to obtain project sorting results of the investment projects.
Step S303, screening candidate investment projects meeting the initial investment sum of the technical improvement of the power grid from all investment projects according to the project sorting result; and combining the candidate investment projects to obtain a candidate investment project combination.
Step S304, obtaining the comprehensive score of each candidate investment project in the candidate investment project combination.
Step S305, carrying out weighted average processing on the comprehensive scores of the candidate investment projects to obtain the total score of the candidate investment project combination.
Step S306, determining an investment scale adjustment coefficient of the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination; and adjusting the initial investment sum through the investment scale adjustment coefficient to obtain the updated investment sum of the technical improvement of the power grid.
Step S307, screening the investment projects of the technical improvement of the power grid according to the updated investment sum to obtain an updated investment project combination.
Step S308, carrying out project classification processing on the updated investment project combinations to obtain target investment project combinations for technical improvement of the power grid.
Step S309, determining project indexes of the target investment project combination according to the professional management requirement information of the technical improvement of the power grid; and performing benefit evaluation on the target investment project combination according to the project index to obtain input-output data of the target investment project combination.
The processing method of the technical improvement investment project of the power grid can realize the following beneficial effects: the initial investment sum can be updated by screening out candidate investment combinations, updated investment project combinations can be screened out by updating optimized updated investment combinations, allocation rationality of the investment sum is improved, decision accuracy of technical improvement investment projects of the power grid is improved, and finally, the updated investment project combinations are classified from professional categories of the power grid to obtain target investment project combinations on the professional scale level, so that the decision accuracy of the technical improvement investment projects of the power grid is further improved.
It should be understood that, although the steps in the flowcharts related to the embodiments described above are sequentially shown as indicated by arrows, these steps are not necessarily sequentially performed in the order indicated by the arrows. The steps are not strictly limited to the order of execution unless explicitly recited herein, and the steps may be executed in other orders. Moreover, at least some of the steps in the flowcharts described in the above embodiments may include a plurality of steps or a plurality of stages, which are not necessarily performed at the same time, but may be performed at different times, and the order of the steps or stages is not necessarily performed sequentially, but may be performed alternately or alternately with at least some of the other steps or stages.
Based on the same inventive concept, the embodiment of the application also provides a processing device for the power grid technical improvement investment project, which is used for realizing the processing method for the power grid technical improvement investment project. The implementation of the solution provided by the device is similar to the implementation described in the above method, so the specific limitation in the embodiments of the processing device for one or more grid technical improvement investment projects provided below may refer to the limitation of the processing method for the grid technical improvement investment projects hereinabove, and will not be repeated herein.
In one embodiment, as shown in fig. 4, there is provided a processing apparatus 400 for a grid improvement investment project, comprising: an item score determination module 401, an investment item screening module 402, an investment sum update module 403, an investment item update module 404, and an investment item determination module 405, wherein:
the project score determining module 401 is configured to determine a composite score of each investment project of the grid improvement.
And the investment project screening module 402 is configured to screen the investment projects of the power grid technical improvement according to the comprehensive score of each investment project and the initial investment sum of the power grid technical improvement, so as to obtain candidate investment project combinations of the power grid technical improvement.
The investment sum updating module 403 is configured to update the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the grid technical improvement, so as to obtain an updated investment sum of the grid technical improvement.
And the investment project updating module 404 is configured to screen investment projects of technical improvement of the power grid according to the updated investment sum, so as to obtain an updated investment project combination.
The investment project determining module 405 is configured to perform project classification processing on the updated investment project portfolio to obtain a target investment project portfolio for grid technical improvement.
In one embodiment, the investment sum updating module 403 is further configured to determine an investment scale adjustment factor for the initial investment sum based on the total score of the candidate investment project portfolio and the historical total score of the historical investment project portfolio; and adjusting the initial investment sum through the investment scale adjustment coefficient to obtain the updated investment sum of the technical improvement of the power grid.
In one embodiment, the processing device 400 of the grid technical improvement investment project further comprises a total score determining module for obtaining a composite score of each candidate investment project in the candidate investment project portfolio; and carrying out weighted average treatment on the comprehensive scores of the candidate investment projects to obtain the total score of the candidate investment project combination.
In one embodiment, the project score determining module 401 is further configured to perform score mapping processing on project data of each investment project through a project score mapping model, so as to obtain a single score of each investment project; and fusing the single scores of the investment projects to obtain the comprehensive score of each investment project.
In one embodiment, the investment project screening module 402 is further configured to rank the investment projects according to the comprehensive score of each investment project, so as to obtain a project ranking result of each investment project;
Screening candidate investment projects meeting the initial investment sum of the technical improvement of the power grid from all the investment projects according to the project sequencing result; and combining the candidate investment projects to obtain a candidate investment project combination.
In one embodiment, the processing device 400 of the power grid technical improvement investment project further comprises an input-output measuring and calculating module, which is used for determining project indexes of the target investment project combination according to professional management requirement information of the power grid technical improvement; and performing benefit evaluation on the target investment project combination according to the project index to obtain input-output data of the target investment project combination.
The various modules in the processing device of the grid technical improvement investment project can be fully or partially implemented by software, hardware and combinations thereof. The above modules may be embedded in hardware or may be independent of a processor in the computer device, or may be stored in software in a memory in the computer device, so that the processor may call and execute operations corresponding to the above modules.
In one embodiment, a computer device is provided, which may be a terminal, and the internal structure of which may be as shown in fig. 5. The computer device includes a processor, a memory, an input/output interface, a communication interface, a display unit, and an input means. The processor, the memory and the input/output interface are connected through a system bus, and the communication interface, the display unit and the input device are connected to the system bus through the input/output interface. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and computer programs in the non-volatile storage media. The input/output interface of the computer device is used to exchange information between the processor and the external device. The communication interface of the computer device is used for carrying out wired or wireless communication with an external terminal, and the wireless mode can be realized through WIFI, a mobile cellular network, NFC (near field communication) or other technologies. The computer program, when executed by a processor, implements a method for processing a grid technical improvement investment project. The display unit of the computer device is used for forming a visual picture, and can be a display screen, a projection device or a virtual reality imaging device. The display screen can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer equipment can be a touch layer covered on the display screen, can also be a key, a track ball or a touch pad arranged on the shell of the computer equipment, and can also be an external keyboard, a touch pad or a mouse and the like.
It will be appreciated by those skilled in the art that the structure shown in FIG. 5 is merely a block diagram of some of the structures associated with the present inventive arrangements and is not limiting of the computer device to which the present inventive arrangements may be applied, and that a particular computer device may include more or fewer components than shown, or may combine some of the components, or have a different arrangement of components.
In an embodiment, there is also provided a computer device comprising a memory and a processor, the memory having stored therein a computer program, the processor implementing the steps of the method embodiments described above when the computer program is executed.
In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored which, when executed by a processor, carries out the steps of the method embodiments described above.
In an embodiment, a computer program product is provided, comprising a computer program which, when executed by a processor, implements the steps of the method embodiments described above.
Those skilled in the art will appreciate that implementing all or part of the above described methods may be accomplished by way of a computer program stored on a non-transitory computer readable storage medium, which when executed, may comprise the steps of the embodiments of the methods described above. Any reference to memory, database, or other medium used in embodiments provided herein may include at least one of non-volatile and volatile memory. The nonvolatile Memory may include Read-Only Memory (ROM), magnetic tape, floppy disk, flash Memory, optical Memory, high density embedded nonvolatile Memory, resistive random access Memory (ReRAM), magnetic random access Memory (Magnetoresistive Random Access Memory, MRAM), ferroelectric Memory (Ferroelectric Random Access Memory, FRAM), phase change Memory (Phase Change Memory, PCM), graphene Memory, and the like. Volatile memory can include random access memory (Random Access Memory, RAM) or external cache memory, and the like. By way of illustration, and not limitation, RAM can be in the form of a variety of forms, such as static random access memory (Static Random Access Memory, SRAM) or dynamic random access memory (Dynamic Random Access Memory, DRAM), and the like. The databases referred to in the embodiments provided herein may include at least one of a relational database and a non-relational database. The non-relational database may include, but is not limited to, a blockchain-based distributed database, and the like. The processor referred to in the embodiments provided in the present application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic unit, a data processing logic unit based on quantum computing, or the like, but is not limited thereto.
The technical features of the above embodiments may be arbitrarily combined, and all possible combinations of the technical features in the above embodiments are not described for brevity of description, however, as long as there is no contradiction between the combinations of the technical features, they should be considered as the scope of the description.
The foregoing examples illustrate only a few embodiments of the application and are described in detail herein without thereby limiting the scope of the application. It should be noted that it will be apparent to those skilled in the art that several variations and modifications can be made without departing from the spirit of the application, which are all within the scope of the application. Accordingly, the scope of the application should be assessed as that of the appended claims.

Claims (10)

1. A method for processing a grid technical improvement investment project, the method comprising:
determining comprehensive scores of all investment projects of the technical improvement of the power grid;
screening the investment projects of the technical improvement of the power grid according to the comprehensive scores of the investment projects and the initial investment sum of the technical improvement of the power grid to obtain candidate investment project combinations of the technical improvement of the power grid;
Updating the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the power grid technical improvement to obtain the updated investment sum of the power grid technical improvement;
screening the investment projects of the technical improvement of the power grid according to the updated investment sum to obtain updated investment project combinations;
and carrying out item classification treatment on the updated investment item combination to obtain the target investment item combination for technical improvement of the power grid.
2. The method of claim 1, wherein updating the initial investment aggregate based on the aggregate score of the candidate investment portfolio and the historical aggregate score of the historical investment portfolio for grid engineering improvement to obtain an updated investment aggregate for the grid engineering improvement comprises:
determining an investment scale adjustment factor for the initial investment aggregate according to the aggregate score of the candidate investment aggregate and the historical aggregate score of the historical investment aggregate;
and adjusting the initial investment sum through the investment scale adjustment coefficient to obtain the updated investment sum of the technical improvement of the power grid.
3. The method of claim 1, further comprising, prior to updating the initial investment aggregate based on the aggregate score of the candidate investment portfolio and the historical aggregate score of the grid technologically improved historical investment portfolio:
obtaining a comprehensive score of each candidate investment item in the candidate investment item combination;
and carrying out weighted average treatment on the comprehensive scores of the candidate investment projects to obtain the total score of the candidate investment project combination.
4. The method of claim 1, wherein determining a composite score for each investment item for a grid improvement comprises:
carrying out scoring mapping treatment on the project data of each investment project through a project scoring mapping model to obtain single scores of each investment project;
and fusing the single scores of the investment projects to obtain the comprehensive scores of the investment projects.
5. The method of claim 1, wherein said screening said grid technically improved investment items based on said composite score for each investment item and said initial total investment amount for said grid technically improved to obtain a candidate combination of said grid technically improved investment items comprises:
Sequencing the investment projects according to the comprehensive scores of the investment projects to obtain project sequencing results of the investment projects;
screening candidate investment projects meeting the initial investment sum of the technical improvement of the power grid from the investment projects according to the project sorting result;
and combining the candidate investment projects to obtain the candidate investment project combination.
6. The method according to any one of claims 1 to 5, further comprising, after performing a project classification process on the updated investment project portfolio to obtain the grid technically improved target investment project portfolio:
determining project indexes of the target investment project combination according to the technical improvement professional management requirement information of the power grid;
and performing benefit evaluation on the target investment project combination according to the project index to obtain input-output data of the target investment project combination.
7. A processing device for a grid technical improvement investment project, the device comprising:
the project score determining module is used for determining the comprehensive score of each investment project of the technical improvement of the power grid;
the investment project screening module is used for screening the investment projects of the technical improvement of the power grid according to the comprehensive scores of the investment projects and the initial investment sum of the technical improvement of the power grid to obtain candidate investment project combinations of the technical improvement of the power grid;
The investment sum updating module is used for updating the initial investment sum according to the total score of the candidate investment project combination and the historical total score of the historical investment project combination of the power grid technical improvement to obtain the updated investment sum of the power grid technical improvement;
the investment project updating module is used for screening the investment projects of the technical improvement of the power grid according to the updated investment sum to obtain updated investment project combinations;
and the investment project determining module is used for carrying out project classification processing on the updated investment project combination to obtain the target investment project combination for the technical improvement of the power grid.
8. A computer device comprising a memory and a processor, the memory storing a computer program, characterized in that the processor implements the steps of the method of any of claims 1 to 6 when the computer program is executed.
9. A computer readable storage medium, on which a computer program is stored, characterized in that the computer program, when being executed by a processor, implements the steps of the method of any of claims 1 to 6.
10. A computer program product comprising a computer program, characterized in that the computer program, when being executed by a processor, implements the steps of the method of any of claims 1 to 6.
CN202310779003.9A 2023-06-28 2023-06-28 Method and device for processing power grid technical improvement investment project and computer equipment Pending CN116822876A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310779003.9A CN116822876A (en) 2023-06-28 2023-06-28 Method and device for processing power grid technical improvement investment project and computer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310779003.9A CN116822876A (en) 2023-06-28 2023-06-28 Method and device for processing power grid technical improvement investment project and computer equipment

Publications (1)

Publication Number Publication Date
CN116822876A true CN116822876A (en) 2023-09-29

Family

ID=88123701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310779003.9A Pending CN116822876A (en) 2023-06-28 2023-06-28 Method and device for processing power grid technical improvement investment project and computer equipment

Country Status (1)

Country Link
CN (1) CN116822876A (en)

Similar Documents

Publication Publication Date Title
CN109377265A (en) Site selecting method, device, equipment and storage medium
Zhang et al. Impact of structure on unified efficiency for Chinese service sector—A two-stage analysis
US20190066235A1 (en) Systems and methods for energy management
CN109345050A (en) A kind of quantization transaction prediction technique, device and equipment
CN111008870A (en) Regional logistics demand prediction method based on PCA-BP neural network model
CN114926305A (en) Electric power material management and control method and device, computer equipment and storage medium
CN116050947A (en) Method, device, computer equipment and storage medium for evaluating vehicle dispatching effect
CN113256324A (en) Data asset pricing method, device, computer equipment and storage medium
Shou et al. Forecasting the price trends of digital currency: a hybrid model integrating the stochastic index and grey Markov chain methods
Dotoli et al. A Nash equilibrium simulation model for the competitiveness evaluation of the auction based day ahead electricity market
CN108921425A (en) A kind of method, system and the server of asset item classifcation of investment
CN109948926A (en) A kind of highway concrete-bridge maintenance technology Selection Method based on project period
CN116822876A (en) Method and device for processing power grid technical improvement investment project and computer equipment
CN115358476A (en) Demand response potential prediction method, demand response potential prediction device, computer equipment and storage medium
CN114444782A (en) Enterprise asset management method and device, storage medium and computer equipment
CN112070354A (en) Power grid equipment operation efficiency evaluation method
CN113177682A (en) Power grid enterprise comprehensive performance evaluation method and device based on system dynamics theory
CN112766726A (en) Method for making power grid operation standard cost adjustment coefficient
Jakob et al. GCPM: A? exible package to explore credit portfolio risk
CN117933677B (en) Regional frequency modulation-based associated data prediction method and device for hydropower plant
CN117217939A (en) Method and device for determining newly added asset
CN116070781B (en) Electric energy metering equipment demand prediction method and device and computer equipment
CN114037151B (en) Medium and low voltage distribution network investment configuration optimization method and device and storage medium
Zheng et al. Network Monitoring and Early Warning System of Economic Benefit Decline in Ecological, Agricultural and Pastoral Areas.
CN107045657A (en) Analyzing Total Electricity Consumption calculating system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination