CN116791663A - Jacket foundation and construction method thereof - Google Patents
Jacket foundation and construction method thereof Download PDFInfo
- Publication number
- CN116791663A CN116791663A CN202310602176.3A CN202310602176A CN116791663A CN 116791663 A CN116791663 A CN 116791663A CN 202310602176 A CN202310602176 A CN 202310602176A CN 116791663 A CN116791663 A CN 116791663A
- Authority
- CN
- China
- Prior art keywords
- socket
- foundation
- wall
- rod
- foundation pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
- E02D27/425—Foundations for poles, masts or chimneys specially adapted for wind motors masts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/06—Placing concrete under water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/16—Foundations formed of separate piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Foundations (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域Technical field
本申请涉及导管架的技术领域,尤其是涉及一种导管架基础及其施工方法This application relates to the technical field of jackets, and in particular to a jacket foundation and its construction method.
背景技术Background technique
导管架基础是用于安装海上风电机的基础型式,一般包括吸附于海床的基础桩,以及与基础桩相连的支撑桁架,支撑桁架的顶部露出海平面以安装风电机。现导管架基础多在路上加工完成后,通过起重船将导管架整体吊装至海底使基础桩固定至海床上,而为了与海域深度相适应,导管架基础的整体高度较高,且重量较大,尤其是对于深远海域中高度更高的导管架基础,对起重船吊装能力的要求较高,增加了安装成本。The jacket foundation is a type of foundation used to install offshore wind turbines. It generally includes foundation piles adsorbed on the seabed, and support trusses connected to the foundation piles. The top of the support truss is exposed to the sea level for installing wind turbines. Nowadays, after the jacket foundation is mostly processed on the road, the jacket is hoisted to the seabed as a whole by a crane ship to fix the foundation piles to the seabed. In order to adapt to the depth of the sea, the overall height of the jacket foundation is higher and the weight is relatively heavy. Large, especially for higher-height jacket foundations in far-reaching sea areas, the requirements for the hoisting capacity of the crane ship are higher, which increases the installation cost.
发明内容Contents of the invention
为了减少导管架基础安装时对起重船吊装能力的要求,本申请提供一种导管架基础及其施工方法。In order to reduce the requirements for the hoisting capacity of the crane ship when installing the jacket foundation, this application provides a jacket foundation and its construction method.
第一方面,本申请提供一种导管架基础,采用如下的技术方案:In the first aspect, this application provides a jacket foundation, adopting the following technical solutions:
一种导管架基础,包括:A jacket foundation consisting of:
基础结构,包括基础桩、连接座以及第一吊耳,所述基础桩数量为两个以上,所述连接座连接于各相邻两个所述基础桩之间,所述第一吊耳连接于所述连接座上,且所述基础桩具有开口朝上的套接腔;The foundation structure includes foundation piles, connecting seats and first lifting lugs. The number of the foundation piles is more than two. The connecting seats are connected between two adjacent foundation piles. The first lifting lugs are connected to each other. On the connecting seat, the foundation pile has a socket cavity with an upward opening;
桁架结构,包括支撑桁架、插接座以及第二吊耳,所述第二吊耳连接于所述支撑桁架上,所述插接座设置于所述支撑桁架底部,且所述插接座与所述基础桩一一对应,以使所述插接座插接至对应所述基础桩的所述套接腔中;The truss structure includes a support truss, a socket and a second lifting eye. The second lifting eye is connected to the support truss. The socket is provided at the bottom of the support truss, and the socket is connected to the support truss. The foundation piles are in one-to-one correspondence, so that the sockets are plugged into the socket cavities corresponding to the foundation piles;
其中,当所述插接座与所述基础桩插接配合时,所述插接座外壁与所述基础桩内壁围合成灌浆腔,以使所述插接座与对应的所述基础桩灌浆连接。Wherein, when the socket is plugged and matched with the foundation pile, the outer wall of the socket and the inner wall of the foundation pile enclose a grouting cavity, so that the socket and the corresponding foundation pile are grouted. connect.
通过采用上述技术方案,在海中安装时,将基础结构与桁架结构拼接形成完整的导管架基础,使得通过起重船对导管架基础进行吊装时,起重船通过与第一吊耳及第二吊耳的配合将基础结构与桁架结构分开吊装,以减少起重船单次吊装时的高度与重量,减少导管架基础安装时对起重船吊装能力的要求。By adopting the above technical solution, when installing in the sea, the basic structure and the truss structure are spliced to form a complete jacket foundation, so that when the jacket foundation is hoisted by a crane ship, the crane ship passes through the first lifting lug and the second lifting lug. The cooperation of the lifting lugs separates the basic structure and the truss structure for lifting, so as to reduce the height and weight of the crane ship during a single hoisting, and reduce the requirements for the lifting capacity of the crane ship during the foundation installation of the jacket.
可选的,所述插接座内部中空,且所述插接座内具有延伸至所述灌浆腔中的灌浆管线。Optionally, the socket is hollow inside, and there is a grouting line extending into the grouting cavity.
通过采用上述技术方案,灌浆管线设置于插接座内,能够使得插接座与基础桩配合时,灌浆管线不易与基础桩干涉,从而使灌浆管线能够顺利延伸至灌浆腔中。By adopting the above technical solution, the grouting pipeline is arranged in the socket, so that when the socket is matched with the foundation pile, the grouting pipeline is not easy to interfere with the foundation pile, so that the grouting pipeline can smoothly extend into the grouting cavity.
可选的,所述插接座靠近所述支撑桁架的一端设置有抵接座,当所述插接座于所述基础桩内移动至,所述抵接座与所述基础桩相抵时,所述抵接座将所述套接腔闭口。Optionally, an abutment seat is provided at one end of the socket near the support truss. When the socket moves within the foundation pile and the abutment seat abuts the foundation pile, The abutting seat closes the socket cavity.
通过采用上述技术方案,抵接座与基础桩的配合能够对插接座的位置进行限定,同时使灌浆腔中的灌浆料不易外流过多而造成浪费。By adopting the above technical solution, the cooperation between the abutment seat and the foundation pile can limit the position of the socket and at the same time prevent the grouting material in the grouting cavity from flowing out too much and causing waste.
可选的,所述插接座外壁上围合有抗剪键。Optionally, a shear-resistant key is enclosed on the outer wall of the socket.
通过采用上述技术方案,抗剪键能够提高灌浆料与插接座之间的接触面积,并且使插接座与基础桩连接后不易位移。By adopting the above technical solution, the shear key can increase the contact area between the grouting material and the socket, and prevent the socket from being easily displaced after being connected to the foundation pile.
可选的,所述插接座呈圆筒状,所述插接座上具有多个沿所述插接座周向分布的导向座,所述导向座上具有倾斜面,所述倾斜面沿靠近所述支撑桁架方向朝上倾斜,以在所述插接座与所述基础桩插接过程中,对所述插接座进行导向,使得所述插接座与所述基础桩同轴设置。Optionally, the socket is cylindrical, has a plurality of guide seats distributed along the circumference of the socket, has an inclined surface on the guide seat, and the inclined surface is along the The direction close to the support truss is tilted upward to guide the socket during the insertion process of the socket and the foundation pile, so that the socket and the foundation pile are coaxially arranged. .
通过采用上述技术方案,通过导向座上倾斜面的导向,使插接座在插入基础桩时,调节自身与基础桩之间的相对位置,从而使插接座与基础桩同轴设置,进而使得灌浆腔中的灌浆料厚度均匀,提高插接座与基础桩的连接效果。By adopting the above technical solution, through the guidance of the inclined surface on the guide seat, when the socket is inserted into the foundation pile, the relative position between itself and the foundation pile is adjusted, so that the socket and the foundation pile are coaxially arranged, thereby making The thickness of the grouting material in the grouting cavity is uniform, which improves the connection effect between the socket and the foundation pile.
可选的,所述插接座外壁上套设有两个套环,两个所述套环沿所述插接座轴向分布,所述导向座包括,Optionally, two collars are set on the outer wall of the socket, and the two collars are distributed axially along the socket, and the guide seat includes,
倾斜杆,铰接于所述套环外壁上;a tilting rod, hinged on the outer wall of the collar;
铰接杆,铰接于所述倾斜杆远离所述套环的一端;A hinged rod, hinged to an end of the tilt rod away from the collar;
连接勾,连接于所述铰接杆远离所述倾斜杆的一端;A connecting hook, connected to one end of the hinge rod away from the tilt rod;
其中,所述插接座内具有对所述连接勾进行锁定的锁定组件,所述连接勾受所述锁定组件锁定时,所述连接勾抵接于所述套环外壁并定位,两个所述套环上的导向座镜像对称,且所述导向座对所述插接座的移动进行导向;Wherein, the plug socket has a locking component for locking the connecting hook. When the connecting hook is locked by the locking component, the connecting hook abuts against the outer wall of the collar and is positioned, and the two The guide seat on the collar is mirror symmetrical, and the guide seat guides the movement of the plug socket;
所述基础桩于所述套接腔内壁处设置有磁吸件,且所述基础桩于所述套接腔内具有解锁件,所述解锁件用于解除所述锁定组件对所述连接勾的锁定,以使所述连接勾受所述磁吸件吸引抵接于所述套接腔内壁;The foundation pile is provided with a magnetic piece on the inner wall of the socket cavity, and the foundation pile has an unlocking piece in the socket cavity. The unlocking piece is used to release the locking component from the locking hook. , so that the connecting hook is attracted by the magnetic piece and abuts against the inner wall of the socket cavity;
所述基础桩于所述套接腔内壁上设置有与所述连接勾对应的把手,所述插接座内具有与套环配合的拉绳,将拉绳向靠近所述支撑桁架方向拉动时,带动两个所述套环转动并向相互靠近方向移动,以使得所述连接勾勾设至对应的所述把手上,且同个所述导向座中的倾斜杆与所述铰接杆沿同一直线方向延伸。The foundation pile is provided with a handle corresponding to the connecting hook on the inner wall of the socket cavity. There is a pull cord in the socket that matches the collar. When the pull cord is pulled in the direction close to the support truss, Drive the two collars to rotate and move closer to each other, so that the connecting hooks are hooked onto the corresponding handles, and the tilt rod and the hinge rod in the same guide base are along the same straight line. direction extension.
通过采用上述技术方案,通过锁定组件将连接勾进行锁定,能够在插接座插接基础桩的过程中,使导向座保持对插接座的导向,且通过解锁件将连接勾解锁后,连接勾抵接于插接座内部处,再通过拉绳拉动带动连接勾勾设至对应的把手上,即能够使导向座连接基础桩与插接座,从而提高插接座的稳定性。By adopting the above technical solution and locking the connecting hook through the locking component, the guide base can maintain the guidance of the socket during the process of plugging the socket into the foundation pile, and after the connecting hook is unlocked through the unlocking piece, the connection The hook is in contact with the inside of the socket, and then the connecting hook is hooked to the corresponding handle by pulling the rope, so that the guide seat can connect the foundation pile and the socket, thereby improving the stability of the socket.
可选的,所述锁定组件包括,Optionally, the locking component includes:
安装盒,连接于所述插接座内壁,沿所述插接座轴向延伸,且底部穿设出所述插接座底部并开口;An installation box is connected to the inner wall of the socket, extends along the axial direction of the socket, and has a bottom that penetrates the bottom of the socket and has an opening;
移动座,沿垂直于所述插接座轴向移动于所述安装盒内;The moving base moves in the installation box along the axial direction perpendicular to the socket;
定位杆,与所述移动座连接,并延伸出所述安装盒外部;A positioning rod is connected to the moving base and extends out of the installation box;
弹性件,位于所述安装盒内,并与所述移动座配合,给予所述移动座向靠近所述插接座外壁方向移动的趋势;An elastic member is located in the installation box and cooperates with the movable base to give the movable base a tendency to move closer to the outer wall of the socket;
其中,处于同一垂直线的所述移动座位于同个所述安装盒中,当所述移动座抵接于所述安装盒靠近所述插接座外壁的一侧时,所述定位杆同时穿设于所述插接座、所述套环以及所述连接勾上;Wherein, the movable seats in the same vertical line are located in the same installation box. When the movable seats abut against the side of the installation box close to the outer wall of the socket, the positioning rods pass through the same installation box at the same time. Located on the socket, the collar and the connecting hook;
所述移动座远离所述支撑桁架的一侧具有导向斜面,所述解锁件包括设置于所述基础桩上的压杆,所述压杆位于所述套接腔内,并与所述安装盒相对应,且所述压杆顶部具有尖头;The side of the movable seat away from the support truss has a guide slope, and the unlocking member includes a pressure rod provided on the foundation pile. The pressure rod is located in the socket cavity and is opposite to the installation box. Correspondingly, the top of the pressure rod has a pointed tip;
当所述插接座逐渐进入所述套接腔时,所述尖头与所述导向斜面配合,将所述移动座向远离所述插接座外壁移动,以使所述定位杆脱离所述套环与所述连接勾。When the socket gradually enters the socket cavity, the tip cooperates with the guide slope to move the movable seat away from the outer wall of the socket so that the positioning rod is separated from the socket. Ring with the connecting hook.
通过采用上述技术方案,移动座未受到压杆作用使,通过弹性件带动定位杆将连接勾锁定,当压杆进入安装盒内时,压杆通过尖头与移动座的导向斜面配合将连接勾解锁,同时压杆与移动座的配合对插接座的移动进行导向,从而压杆在对连接勾进行解锁的同时能够稳定插接座。By adopting the above technical solution, the movable base is not affected by the pressure rod, and the elastic member drives the positioning rod to lock the connecting hook. When the pressure rod enters the installation box, the pressure rod cooperates with the guide slope of the movable base through the tip to lock the connecting hook. Unlock, and at the same time, the cooperation between the pressure rod and the movable base guides the movement of the socket, so that the pressure rod can stabilize the socket while unlocking the connection hook.
可选的,所述套环内壁具有延伸至所述插接座中的行程柱,所述插接座上具有供所述行程柱滑移的行程槽,所述行程槽沿所述插接座周向倾斜延伸;所述插接座内具有横轴,所述横轴上铰接有转杆,其中一个所述套环上的所述行程柱与所述转杆一端之间连接有第一绳,另一个所述套环上的所述行程柱与所述拉绳之间连接有第二绳,且所述拉绳连接于所述转杆远离所述第一绳的一端。Optionally, the inner wall of the collar has a travel column extending into the socket, and the socket has a travel groove for the travel column to slide, and the travel groove extends along the socket. Circumferentially extending obliquely; there is a horizontal axis in the socket, a rotating rod is hinged on the horizontal axis, and a first rope is connected between the travel column on one of the collars and one end of the rotating rod. , a second rope is connected between the travel column on the other collar and the pull rope, and the pull rope is connected to an end of the rotating rod away from the first rope.
通过采用上述技术方案,行程槽的倾斜延伸使行程柱受拉绳拉动时,沿插接座轴向移动的同时进行转动,从而在插接座插接至基础桩过程中,导向座与相对的把手错位,且拉绳的拉动使所有导向座同时与相对的把手正位,提高操作的便利程度。By adopting the above technical solution, the inclined extension of the stroke groove causes the stroke column to rotate along the axial direction of the socket when it is pulled by the pull rope. Therefore, when the socket is plugged into the foundation pile, the guide seat and the opposite The handles are misaligned, and the pulling of the drawstring causes all guide seats to be aligned with the opposite handles at the same time, improving the convenience of operation.
第二方面,本申请提供一种导管架基础的施工方法,采用如下的技术方案:In the second aspect, this application provides a construction method for jacket foundation, adopting the following technical solution:
一种导管架基础的施工方法,包括以下步骤,A construction method for jacket foundation, including the following steps:
S1,将基础结构与桁架结构分别运输至指定海域;S1, transport the basic structure and truss structure to the designated sea area respectively;
S2,通过起重船与第一吊耳配合将基础结构下吊至海床处,使基础结构与海床固定后;S2, hoist the basic structure to the seabed through the cooperation of the crane ship and the first lifting lug, so that the basic structure and the seabed are fixed;
S3,通过起重船与第二吊耳配合将桁架结构下吊至对应的基础结构处,使插接座竖直向下插入对应基础桩的套接腔中;S3, the truss structure is hoisted to the corresponding foundation structure through the cooperation of the crane boat and the second lifting lug, so that the socket is inserted vertically downward into the socket cavity of the corresponding foundation pile;
S4,将高强度灌浆料填入灌浆腔中,灌浆完成后拆除吊具。S4, fill the high-strength grouting material into the grouting cavity, and remove the spreader after grouting is completed.
综上所述,本申请包括以下至少一种有益效果:To sum up, this application includes at least one of the following beneficial effects:
1.通过将基础结构与桁架结构先分离后连接的方式,使起重船单次吊装的高度与重量降低,从而能够减少导管架基础安装时对起重船吊装能力的要求,降低安装成本;1. By first separating the base structure and the truss structure and then connecting it, the height and weight of a single hoisting by the crane ship can be reduced, thereby reducing the requirements for the hoisting capacity of the crane ship during the foundation installation of the jacket and reducing installation costs;
2.通过导向座倾斜面对插接座的导向,使得插接座与基础桩同轴设置,从而均匀灌浆腔中灌浆料的厚度,提高插接座与基础桩的连接效果。2. By tilting the guide seat to guide the socket, the socket and the foundation pile are coaxially arranged, thereby uniformizing the thickness of the grouting material in the grouting cavity and improving the connection effect between the socket and the foundation pile.
附图说明Description of the drawings
图1是本申请实施例一的结构示意图;Figure 1 is a schematic structural diagram of Embodiment 1 of the present application;
图2是本申请实施例一的爆炸结构示意图;Figure 2 is a schematic diagram of the explosion structure of Embodiment 1 of the present application;
图3是图2中A处的放大结构示意图;Figure 3 is an enlarged structural schematic diagram of position A in Figure 2;
图4是本申请实施例一灌浆管线的透视图;Figure 4 is a perspective view of a grouting pipeline according to Embodiment 1 of the present application;
图5是本申请实施例二的爆炸结构示意图;Figure 5 is a schematic diagram of the explosion structure of Embodiment 2 of the present application;
图6是图5中B处的放大结构示意图;Figure 6 is an enlarged structural schematic diagram of position B in Figure 5;
图7是本申请实施例二插接座的俯视图;Figure 7 is a top view of the socket according to the second embodiment of the present application;
图8是本申请实施例二安装盒的剖视图;Figure 8 is a cross-sectional view of the installation box according to the second embodiment of the present application;
图9是图8中C处的放大结构示意图;Figure 9 is an enlarged structural schematic diagram of C in Figure 8;
图10是本申请实施例二连接筒内部的结构示意图;Figure 10 is a schematic structural diagram of the interior of the connecting tube in Embodiment 2 of the present application;
图11是展示本申请实施例二插接座下部结构的剖视图;Figure 11 is a cross-sectional view showing the lower structure of the socket in Embodiment 2 of the present application;
图12是展示本申请实施例二插接座上部结构的剖视图。Figure 12 is a cross-sectional view showing the upper structure of the socket according to the second embodiment of the present application.
附图标记说明:1、基础结构;101、基础桩;1011、吸力筒;1012、连接筒;102、连接座;103、第一吊耳;2、套接腔;3、桁架结构;31、支撑桁架;32、插接座;33、第二吊耳;4、灌浆管线;5、抵接座;6、抗剪键;7、导向座;71、倾斜杆;72、铰接杆;73、连接勾;8、倾斜面;9、套环;10、把手;11、拉绳;12、安装盒;13、移动座;14、定位杆;15、弹性件;16、导向斜面;17、压杆;18、尖头;19、行程柱;20、行程槽;21、横轴;22、转杆;23、第一绳;24、第二绳;25、肋板;26、定点;27、导向杆;28、通槽。Explanation of reference signs: 1. Basic structure; 101. Foundation pile; 1011. Suction cylinder; 1012. Connecting cylinder; 102. Connecting seat; 103. First lifting eye; 2. Socket cavity; 3. Truss structure; 31. Support Truss; 32. Socket seat; 33. Second lifting eye; 4. Grouting pipeline; 5. Butt seat; 6. Shear key; 7. Guide seat; 71. Inclined rod; 72. Hinge rod; 73. Connection Hook; 8. Inclined surface; 9. Collar; 10. Handle; 11. Pull rope; 12. Installation box; 13. Moving base; 14. Positioning rod; 15. Elastic member; 16. Guide slope; 17. Pressure rod ; 18. Pointed head; 19. Stroke column; 20. Stroke groove; 21. Horizontal axis; 22. Rotating rod; 23. First rope; 24. Second rope; 25. Rib; 26. Fixed point; 27. Guide Rod; 28, slot.
具体实施方式Detailed ways
以下结合附图1-12对本申请作进一步详细说明。The present application will be further described in detail below with reference to Figures 1-12.
实施例一:Example 1:
本申请实施例公开一种导管架基础。参照图1,导管架基础包括基础结构1以及桁架结构3。The embodiment of the present application discloses a jacket foundation. Referring to FIG. 1 , the jacket foundation includes a base structure 1 and a truss structure 3 .
参照图2,其中,基础结构1包括基础桩101、连接座102以及第一吊耳103。基础桩101包括吸力筒1011以及连接筒1012,吸力筒1011为现有的导管架吸力筒1011,用于沿竖直方向吸附至海床以将基础结构1固定。吸力筒1011数量为两个以上,本实施例中为三个,三个吸力筒1011沿正三角形的各角分布,连接筒1012与吸力筒1011一一对应,连接筒1012呈圆筒状,连接筒1012形成开口朝上的套接腔2,并同轴固定于吸力筒1011顶部。Referring to FIG. 2 , the foundation structure 1 includes foundation piles 101 , connecting seats 102 and first lifting lugs 103 . The foundation pile 101 includes a suction cylinder 1011 and a connecting cylinder 1012. The suction cylinder 1011 is the existing jacket suction cylinder 1011, which is used to adsorb to the seabed in the vertical direction to fix the foundation structure 1. The number of suction cylinders 1011 is two or more, three in this embodiment. The three suction cylinders 1011 are distributed along each corner of the equilateral triangle. The connecting cylinder 1012 corresponds to the suction cylinder 1011 one by one. The connecting cylinder 1012 is cylindrical and connected. The cylinder 1012 forms a socket cavity 2 with an upward opening, and is coaxially fixed to the top of the suction cylinder 1011.
连接座102呈杆状结构,具有三个,三个连接座102分别连接于各相邻两个连接筒1012外壁,且连接座102长度方向垂直连接筒1012轴线方向,以使得连接座102与连接筒1012形成正三角状。第一吊耳103固定于连接座102顶部,每个连接座102上第一吊耳103数量均为两个,且两个第一吊耳103与自身靠近的连接筒1012之间的距离相等。安装时,起重船通过第一吊耳103将基础结构1整体吊起,并下放至海中进行安装。The connecting seats 102 have a rod-shaped structure and have three. The three connecting seats 102 are respectively connected to the outer walls of two adjacent connecting tubes 1012, and the length direction of the connecting seats 102 is perpendicular to the axis direction of the connecting tubes 1012, so that the connecting seats 102 are connected to The tube 1012 forms an equilateral triangle shape. The first lifting lugs 103 are fixed on the top of the connecting base 102. The number of the first lifting lugs 103 on each connecting base 102 is two, and the distance between the two first lifting lugs 103 and the connecting tube 1012 close to them is equal. During installation, the crane ship lifts the entire basic structure 1 through the first lifting lug 103 and lowers it to the sea for installation.
桁架结构3包括支撑桁架31、插接座32以及第二吊耳33。支撑桁架31由钢管拼接架设而成,用于安装并支撑海上风电机。第二吊耳33安装于支撑桁架31顶部,用于与起重船配合。The truss structure 3 includes a support truss 31 , a socket 32 and a second lifting eye 33 . The support truss 31 is made of spliced steel pipes and is used to install and support offshore wind turbines. The second lifting eye 33 is installed on the top of the support truss 31 and is used to cooperate with the crane ship.
参照图3和图4,插接座32固定于支撑桁架31底部,并且插接座32的数量与位置均与连接筒1012一一对应。插接座32呈沿竖直方向延伸的圆筒状,且插接座32的外径小于连接筒1012的内径,插接座32底部闭口,且插接座32底部固定有多个肋板25,肋板25沿插接座32周向分布,且肋板25到插接座32中轴线的水平距离沿向下方向逐渐减少,以在海中进行破流,使桁架结构3移动的更加顺畅。Referring to FIGS. 3 and 4 , the sockets 32 are fixed to the bottom of the support truss 31 , and the number and position of the sockets 32 correspond to the connecting barrel 1012 one-to-one. The socket 32 is in the shape of a cylinder extending in the vertical direction, and the outer diameter of the socket 32 is smaller than the inner diameter of the connecting tube 1012 . The bottom of the socket 32 is closed, and a plurality of ribs 25 are fixed at the bottom of the socket 32 . , the ribs 25 are distributed circumferentially along the socket 32, and the horizontal distance between the ribs 25 and the central axis of the socket 32 gradually decreases in the downward direction to break the current in the sea and make the truss structure 3 move more smoothly.
插接座32内具有灌浆管线4,灌浆管线4从插接座32内穿设过插接座32筒壁进入插接座32外部,且灌浆管线4具有两条,两条灌浆管线4的出口上下设置。灌浆管线4通过支撑桁架31延伸至海平面上的起重船上,连接灌浆设备。插接座32靠近支撑桁架31的一端外壁固定围合有抵接座5,抵接座5呈与插接座32同轴设置的圆环状,抵接座5外径大于连接筒1012外径。There is a grouting pipeline 4 in the socket 32. The grouting pipeline 4 passes through the socket 32 through the cylinder wall of the socket 32 and enters the outside of the socket 32. The grouting pipeline 4 has two outlets, two outlets of the grouting pipeline 4. Set up and down. The grouting pipeline 4 extends to the crane ship on the sea level through the support truss 31 and is connected to the grouting equipment. The outer wall of one end of the socket 32 close to the support truss 31 is fixedly enclosed with an abutment seat 5. The abutment seat 5 is in the shape of an annular ring arranged coaxially with the socket 32. The outer diameter of the abutment seat 5 is larger than the outer diameter of the connecting tube 1012. .
参照图1和图2,桁架结构3安装时,起重机通过第二吊耳33将桁架结构3下放至海中,使插接座32与连接筒1012对应,将插接座32沿竖直方向朝下插入对应的连接筒1012中,直至抵接座5抵接于连接筒1012顶部,此时,抵接座5将连接筒1012的套接腔2上方闭口,且插接座32外壁与连接筒1012内壁之间围合行程灌浆腔,通过灌浆管线4将高强灌浆料注入灌浆腔内,即能够使得插接座32与连接筒1012通过灌浆连接,即使基础结构1与桁架结构3相对固定。Referring to Figures 1 and 2, when the truss structure 3 is installed, the crane lowers the truss structure 3 into the sea through the second lifting eye 33, so that the socket 32 corresponds to the connecting tube 1012, and the socket 32 faces downward in the vertical direction. Insert into the corresponding connecting tube 1012 until the abutting seat 5 abuts the top of the connecting tube 1012. At this time, the abutting seat 5 closes the top of the socket cavity 2 of the connecting tube 1012, and the outer wall of the socket 32 is in contact with the inner wall of the connecting tube 1012. The stroke grouting cavity is enclosed between them, and high-strength grouting material is injected into the grouting cavity through the grouting pipeline 4, that is, the socket 32 and the connecting barrel 1012 can be connected through grouting, even if the base structure 1 and the truss structure 3 are relatively fixed.
此外,为了便于观测灌浆料的灌入情况,连接筒1012顶部的侧壁上开设有溢浆口,灌浆时,海水通过溢浆口被灌浆料挤出,当灌浆料从溢浆口流出时,指示灌浆料将灌浆腔填满。In addition, in order to facilitate the observation of the filling situation of the grouting material, an overflow port is provided on the side wall of the top of the connecting tube 1012. During grouting, seawater is squeezed out by the grouting material through the overflow port. When the grouting material flows out from the overflow port, Instruct the grouting material to fill the grout cavity.
参照图3,进一步的,在另一实施例中,插接座32外壁上围合有抗剪键6,抗剪键6具有多个,抗剪键6呈与插接座32同轴设置的圆环状,且多个抗剪键6沿插接座32轴向均匀间隔分布。连接筒1012与插接座32配合时,抗剪键6与连接筒1012内壁之间具有空隙,以使得灌浆料能够在灌浆腔中流动,且抗剪键6增加灌浆料与插接座32的接触面积,提高插接座32的稳定性。Referring to Figure 3, further, in another embodiment, the outer wall of the socket 32 is surrounded by a shear-resistant key 6. There are multiple shear-resistant keys 6, and the shear-resistant keys 6 are arranged coaxially with the socket 32. It is circular and has a plurality of shear keys 6 evenly spaced along the axial direction of the socket 32 . When the connecting tube 1012 cooperates with the socket 32, there is a gap between the shear key 6 and the inner wall of the connecting tube 1012, so that the grouting material can flow in the grouting cavity, and the shear key 6 increases the friction between the grouting material and the socket 32. The contact area improves the stability of the socket 32.
本申请实施例一种导管架基础的实施原理为:先通过第一吊耳103将基础结构1下吊至海床处进行固定,然后通过第二吊耳33将桁架结构3下吊至海床处与基础结构1配合,使插接座32插接至对应的连接筒1012内,再通过灌浆管线4将高强灌浆料灌入灌浆腔中,以使得基础结构1与桁架结构3相连。The implementation principle of a jacket foundation in the embodiment of the present application is as follows: first lift the foundation structure 1 to the seabed through the first lifting lugs 103 for fixation, and then lift the truss structure 3 to the seabed through the second lifting lugs 33 Cooperate with the basic structure 1 so that the socket 32 is plugged into the corresponding connecting tube 1012, and then the high-strength grouting material is poured into the grouting cavity through the grouting pipeline 4, so that the basic structure 1 is connected to the truss structure 3.
实施例二:Example 2:
插接座32插接至连接筒1012时,由于插接座32的外径小于连接筒1012的内径,使得插接座32不易与连接筒1012同轴,从而使连接筒1012内壁到插接座32外壁的距离不一,造成灌浆料沿插接座32周向的厚度不一,不仅影响插接座32与连接筒1012之间的连接效果,还影响吸力筒1011对桁架结构3的支撑效果,因此,为了解决上述问题,本申请实施例提供一种导管架基础。When the plug base 32 is plugged into the connecting barrel 1012, since the outer diameter of the plug base 32 is smaller than the inner diameter of the connecting barrel 1012, the plug base 32 is not easily coaxial with the connecting barrel 1012, so that the inner wall of the connecting barrel 1012 reaches the plug base. The distance between the outer walls of 32 is different, causing the thickness of the grouting material to be different along the circumferential direction of the socket 32, which not only affects the connection effect between the socket 32 and the connecting tube 1012, but also affects the supporting effect of the suction tube 1011 on the truss structure 3 , Therefore, in order to solve the above problems, embodiments of the present application provide a jacket foundation.
一种导管架基础,与实施例一的不同之处在于,参照图2,本申请实施例插接座32外壁不具有抗剪键6,而具有两个套环9,两个套环9沿插接座32轴向分布,且套环9呈与插接座32同轴设置的圆环状,套环9的外径小于连接筒1012内径。A jacket foundation. The difference from Embodiment 1 is that, referring to Figure 2, the outer wall of the socket 32 in the embodiment of the present application does not have a shear key 6, but has two collars 9. The two collars 9 are along the The socket 32 is axially distributed, and the collar 9 is in the shape of a ring arranged coaxially with the socket 32 . The outer diameter of the collar 9 is smaller than the inner diameter of the connecting tube 1012 .
参照图6,每个套环9外壁上均连接有三个导向座7,导向座7沿套环9周向均匀间隔设置,且每个导向座7包括倾斜杆71、铰接杆72以及连接勾73。倾斜杆71铰接于套环9外壁上,铰接杆72铰接于倾斜杆71远离套环9的一端,连接勾73固定于铰接杆72远离倾斜杆71的一端,且处于插接座32上部套环9上的铰接杆72位于倾斜杆71上方,处于插接座32下部套环9上的铰接杆72位于倾斜杆71下方。Referring to Figure 6, three guide seats 7 are connected to the outer wall of each collar 9. The guide seats 7 are evenly spaced along the circumferential direction of the collar 9, and each guide seat 7 includes a tilt rod 71, a hinge rod 72 and a connecting hook 73. . The tilt rod 71 is hinged on the outer wall of the collar 9, the hinge rod 72 is hinged on the end of the tilt rod 71 away from the collar 9, the connecting hook 73 is fixed on the end of the hinge rod 72 away from the tilt rod 71, and is located on the upper collar of the socket 32 The hinge rod 72 on the socket 9 is located above the tilt rod 71 , and the hinge rod 72 on the collar 9 at the lower part of the socket 32 is located below the tilt rod 71 .
插接座32中具有锁定组件,锁定组件用于将连接勾73定位,以使得倾斜杆71与铰接杆72相对定位。The socket 32 has a locking component, which is used to position the connecting hook 73 so that the tilt rod 71 and the hinge rod 72 are relatively positioned.
当锁定组件将连接勾73锁定时,连接勾73抵接于套环9外壁上,同个套环9上的连接勾73位于同一水平面上,此时倾斜杆71、铰接杆72以及套环9外壁围合成三角形,将此时倾斜杆71与铰接杆72连接处的铰接点为定点26,将同个套环9上所有定点26连接形成的圆的外径与连接筒1012的内径一致,且此时两个套环9上的导向座7沿两个套环9之间的水平中线镜像对称。When the locking assembly locks the connecting hook 73, the connecting hook 73 is in contact with the outer wall of the collar 9, and the connecting hooks 73 on the same collar 9 are located on the same horizontal plane. At this time, the tilt rod 71, the hinge rod 72 and the collar 9 The outer wall forms a triangle, and the hinge point at the connection between the inclined rod 71 and the hinge rod 72 is the fixed point 26. The outer diameter of the circle formed by connecting all the fixed points 26 on the same collar 9 is consistent with the inner diameter of the connecting tube 1012, and At this time, the guide seats 7 on the two collars 9 are mirror symmetrical along the horizontal center line between the two collars 9 .
参照图5和图6,同时,当锁定组件将连接勾73锁定时,位于插接座32上方套环9上的倾斜杆71形成倾斜面8,倾斜面8沿远离插接座32方向朝靠近支撑桁架31倾斜;位于插接座32下方套环9上的铰接杆72也形成倾斜面8,倾斜面8沿远离插接座32方向朝靠近支撑桁架31倾斜。Referring to Figures 5 and 6, at the same time, when the locking assembly locks the connecting hook 73, the inclined rod 71 on the collar 9 above the socket 32 forms an inclined surface 8, and the inclined surface 8 approaches in the direction away from the socket 32. The support truss 31 is inclined; the hinge rod 72 located on the collar 9 below the socket 32 also forms an inclined surface 8, and the inclined surface 8 is inclined in a direction away from the socket 32 and toward the support truss 31.
从而在插接座32向下插接至连接筒1012的过程中,当倾斜面8抵接于连接筒1012端面时,插接座32与连接筒1012偏心,且经过倾斜面8的导向能够使插接座32向与连接筒1012同轴的位置偏移,以使得当抵接座5抵接于连接筒1012端面时,插接座32与连接筒1012同轴设置。Therefore, when the socket 32 is inserted downward into the connecting tube 1012, when the inclined surface 8 abuts the end surface of the connecting tube 1012, the socket 32 and the connecting tube 1012 are eccentric, and the guidance of the inclined surface 8 can make the socket 32 eccentric. The plug socket 32 is offset to a coaxial position with the connecting barrel 1012 , so that when the abutment base 5 abuts against the end surface of the connecting barrel 1012 , the plug socket 32 and the connecting barrel 1012 are coaxially arranged.
连接筒1012于套接腔2内具有用于解除锁定组件对连接勾73锁定的解锁件,且连接筒1012于套接腔2内周壁上嵌设有磁吸件,磁吸件为嵌设于套接腔2内周壁上的磁条(未在图中显示),磁条与导向座7的位置相对应并沿竖直方向延伸,且磁条内表面与连接筒1012内壁处于同一圆弧面,在其他实施例中,磁吸件也可以为位于连接筒1012筒壁内的磁环。连接勾73由能够被磁条的磁性吸引的金属制成。The connecting barrel 1012 has an unlocking piece in the socket cavity 2 for unlocking the connecting hook 73 by the locking component, and the connecting barrel 1012 is embedded with a magnetic piece on the inner peripheral wall of the socket cavity 2. The magnetic piece is embedded in the socket cavity. 2. The magnetic strip on the inner peripheral wall (not shown in the figure) corresponds to the position of the guide seat 7 and extends in the vertical direction, and the inner surface of the magnetic strip is on the same arc surface as the inner wall of the connecting tube 1012. In other cases, In embodiments, the magnetic attraction member may also be a magnetic ring located in the wall of the connecting barrel 1012 . The connecting hook 73 is made of metal that can be magnetically attracted by the magnetic strip.
当解锁件将连接勾73的锁定解除时,所有连接勾73受到磁条的吸引而带动铰接杆72向靠近连接筒1012内壁方向移动,使得连接勾73抵接于连接筒1012内壁上。When the unlocking member unlocks the connecting hooks 73, all the connecting hooks 73 are attracted by the magnetic strips and drive the hinge rods 72 to move closer to the inner wall of the connecting tube 1012, so that the connecting hooks 73 abut against the inner wall of the connecting tube 1012.
参照图7和图8,具体的,锁定组件包括安装盒12、移动座13、定位杆14以及弹性件15。安装盒12固定于插接座32内壁上并具有三个,三个安装盒12沿插接座32周向均匀间隔分布,且三个安装盒12的位置分别与套环9上的各导向座7相对应。安装盒12呈内部中空结构并沿插接座32轴向延伸,且安装盒12底部穿设过插接座32底部并开口,以使得安装盒12内部与插接座32外部连通。Referring to FIGS. 7 and 8 , specifically, the locking assembly includes a mounting box 12 , a moving base 13 , a positioning rod 14 and an elastic member 15 . There are three installation boxes 12 fixed on the inner wall of the socket 32. The three installation boxes 12 are evenly spaced along the circumferential direction of the socket 32, and the positions of the three installation boxes 12 are respectively aligned with the guide seats on the collar 9. 7 corresponds. The installation box 12 has an internal hollow structure and extends axially along the socket 32 . The bottom of the installation box 12 passes through the bottom of the socket 32 and is open, so that the inside of the installation box 12 communicates with the outside of the socket 32 .
参照图7和图9,安装盒12内壁远离插接座32内壁的一侧固定有导向杆27,导向杆27呈方形,导向杆27沿垂直于插接座32轴线的水平方向向靠近插接座32内壁延伸,且导向杆27未与安装盒12靠近插接座32一侧的内壁连接,移动座13沿导向杆27长度方向滑动套设于导向杆27外壁上,以使得移动座13移动于安装盒12内。每个安装盒12内移动座13数量具有两个,两个移动座13沿竖直方向分布,两个移动座13分别与两个套环9上位于同一垂直线上的两个导向座7相对应。Referring to Figures 7 and 9, a guide rod 27 is fixed on the inner wall of the installation box 12 away from the inner wall of the socket 32. The guide rod 27 is square, and the guide rod 27 approaches the socket in a horizontal direction perpendicular to the axis of the socket 32. The inner wall of the seat 32 extends, and the guide rod 27 is not connected to the inner wall of the installation box 12 close to the socket 32. The movable seat 13 slides along the length direction of the guide rod 27 and is sleeved on the outer wall of the guide rod 27, so that the movable seat 13 moves in the installation box 12. There are two movable seats 13 in each installation box 12. The two movable seats 13 are distributed in the vertical direction. The two movable seats 13 are respectively connected with the two guide seats 7 on the two collars 9 located on the same vertical line. correspond.
定位杆14呈L状并与移动座13一一对应,定位杆14的短边定位于对应的移动座13上,定位杆14的长边位于安装盒12外部,并与对应移动座13的导向杆27相平行,且安装盒12盒壁上开设有供定位杆14短边穿设过安装盒12并与移动座13一同移动的通槽28。The positioning rod 14 is L-shaped and corresponds to the moving base 13 one-to-one. The short side of the positioning rod 14 is positioned on the corresponding moving base 13. The long side of the positioning rod 14 is located outside the installation box 12 and is in contact with the guide of the corresponding moving base 13. The rods 27 are parallel, and the wall of the installation box 12 is provided with a through slot 28 for the short side of the positioning rod 14 to pass through the installation box 12 and move together with the moving base 13 .
弹性件15位于安装盒12内并与导向杆27一一对应,为套设于对应导向杆27外壁上的弹簧,弹簧相对的两端分别连接安装盒12内壁与移动座13外壁,且弹簧的弹力给予移动座13向靠近插接座32内壁方向移动的趋势。The elastic member 15 is located in the installation box 12 and corresponds to the guide rod 27 one-to-one. It is a spring set on the outer wall of the corresponding guide rod 27. The opposite ends of the spring are respectively connected to the inner wall of the installation box 12 and the outer wall of the moving base 13, and the spring The elastic force gives the movable base 13 a tendency to move closer to the inner wall of the socket 32 .
当弹簧带动移动座13抵接于安装盒12靠近插接座32内壁的一侧内壁时,定位杆14的长杆同时穿设过插接座32、套环9以及与移动座13对应的连接勾73上,插接座32、套环9以及连接勾73上具有对应的通孔,以使得定位杆14对导向座7进行锁定。When the spring drives the movable base 13 to abut against the inner wall of the installation box 12 close to the inner wall of the socket 32 , the long rod of the positioning rod 14 simultaneously passes through the socket 32 , the collar 9 and the connection corresponding to the movable base 13 The hook 73 , the plug seat 32 , the collar 9 and the connecting hook 73 have corresponding through holes, so that the positioning rod 14 can lock the guide seat 7 .
参照图9和图10,每个移动座13底部靠近插接座32内壁的一侧均具有导向斜面16,导向斜面16沿远离插接座32内壁方向朝远离抵接座5方向倾斜。解锁件包括定位于连接筒1012于套接腔2内底壁上的压杆17,压杆17呈方形长条状,压杆17的数量与位置与安装盒12一一对应,并沿竖直方向向上延伸,安装盒12底部的开口与压杆17的形状相适应。压杆17顶端具有尖头18,尖头18的尖端位于压杆17靠近套接腔2内侧壁的一侧。Referring to FIGS. 9 and 10 , the bottom side of each moving base 13 close to the inner wall of the socket 32 has a guide slope 16 . The guide slope 16 is inclined away from the inner wall of the socket 32 and away from the abutment seat 5 . The unlocking member includes a pressure rod 17 positioned on the inner bottom wall of the connecting barrel 1012 of the socket cavity 2. The pressure rod 17 is in the shape of a square strip. The number and position of the pressure rods 17 correspond to the installation box 12 one by one, and are arranged along the vertical direction. Extending upward, the opening at the bottom of the installation box 12 adapts to the shape of the pressure rod 17 . The top of the pressure rod 17 has a tip 18 , and the tip of the tip 18 is located on the side of the pressure rod 17 close to the inner wall of the socket cavity 2 .
当位于插接座32下方的导向座7以锁定状态完全进入套接腔2内时,压杆17沿竖直方向插接至对应的安装盒12内,随插接座32逐渐下移,压杆17从下至上逐个与移动座13配合。When the guide seat 7 located below the socket 32 fully enters the socket cavity 2 in a locked state, the pressure rod 17 is inserted into the corresponding installation box 12 in the vertical direction. As the socket 32 gradually moves downward, the pressure rod 17 17 cooperate with the mobile base 13 one by one from bottom to top.
具体的,压杆17的尖头18先进入导向斜面16与安装盒12内壁之间的空间与导向斜面16配合,之后逐渐将移动座13向靠近弹簧方向压,使得移动座13带动定位杆14一同向靠近弹簧方向移动并挤压弹簧。当压杆17的尖头18完全经过移动座13时,导向杆27不与压杆17干涉,且定位杆14的长边脱离套环9与连接勾73,从而解除定位杆14对套环9与连接勾73的锁定,以使得连接勾73受磁吸向靠近插接座32内壁移动。Specifically, the tip 18 of the pressure rod 17 first enters the space between the guide slope 16 and the inner wall of the installation box 12 to cooperate with the guide slope 16, and then gradually presses the movable base 13 toward the spring, so that the movable base 13 drives the positioning rod 14 Together, move closer to the spring and squeeze the spring. When the tip 18 of the pressure rod 17 completely passes through the movable seat 13, the guide rod 27 does not interfere with the pressure rod 17, and the long side of the positioning rod 14 is separated from the collar 9 and the connecting hook 73, thereby releasing the positioning rod 14 from the collar 9 The connecting hook 73 is locked, so that the connecting hook 73 is magnetically attracted to move closer to the inner wall of the socket 32 .
参照图11,每个套环9内壁上均固定有三个行程柱19,三个行程柱19沿水平方向穿设过插接座32筒壁进入插接座32内,且三个行程柱19沿套环9周向均匀间隔分布,插接座32筒壁上开设有与行程柱19一一对应的行程槽20,行程柱19经过行程槽20进入连接座102内,且行程槽20沿插接座32周向方向朝远离抵接座5倾斜延伸开设,以使得行程柱19于行程槽20内移动时,能够带动套环9转动的同时沿插接座32轴向移动。Referring to Figure 11, three travel columns 19 are fixed on the inner wall of each collar 9. The three travel columns 19 pass through the wall of the socket 32 in the horizontal direction and enter the socket 32, and the three travel columns 19 extend along the The collars 9 are evenly spaced in the circumferential direction. The cylinder wall of the socket 32 is provided with a stroke groove 20 corresponding to the stroke column 19. The stroke column 19 enters the connecting seat 102 through the stroke groove 20, and the stroke groove 20 is inserted along the The seat 32 extends obliquely away from the abutment seat 5 in the circumferential direction, so that when the travel column 19 moves in the travel groove 20 , it can drive the collar 9 to rotate and move axially along the socket 32 .
参照图10和图11,连接筒1012于套接腔2内壁上固定有把手10,把手10呈开口朝向连接筒1012内壁的U型结构,且把手10与导向座7一一对应。当插接座32与连接筒1012插接配合的过程中,把手10与导向座7始终位于不同的垂直线上,以使得插接座32下移过程中不会受到把手10的干涉。10 and 11 , the connecting barrel 1012 has a handle 10 fixed on the inner wall of the socket cavity 2 . The handle 10 has a U-shaped structure with the opening facing the inner wall of the connecting barrel 1012 , and the handle 10 corresponds to the guide base 7 one-to-one. When the socket 32 is plugged and matched with the connecting barrel 1012, the handle 10 and the guide seat 7 are always located on different vertical lines, so that the socket 32 will not be interfered by the handle 10 during the downward movement.
其中,当导向座7处于锁定状态时,位于插接座32上部套环9的行程柱19抵接于对应行程槽20的上端内壁,且位于插接座32下部套环9的行程柱19抵接于对应行程槽20的下端内壁,定位杆14与导向座7的配合限制套环9相对插接座32位移;When the guide seat 7 is in the locked state, the travel column 19 located on the upper collar 9 of the socket 32 abuts against the upper inner wall of the corresponding travel groove 20 , and the travel post 19 located on the lower collar 9 of the socket 32 contacts the upper end wall of the corresponding travel groove 20 . Connected to the lower end inner wall of the corresponding stroke groove 20, the cooperation between the positioning rod 14 and the guide seat 7 limits the displacement of the collar 9 relative to the socket 32;
而当所有导向座7均处于解锁状态,且抵接座5与连接筒1012相抵时,所有把手10均位于上下两个套环9上的连接勾73之间,将两个套环9向相互靠近的方向移动,即能够带动套环9转动至连接勾73与对应的把手10处于同一垂直线上的位置,并使连接勾73勾设至把手10上。When all the guide seats 7 are in the unlocked state, and the abutment seat 5 is against the connecting tube 1012, all the handles 10 are located between the connecting hooks 73 on the upper and lower collars 9, and the two collars 9 are directed toward each other. Moving in the approaching direction can drive the collar 9 to rotate to a position where the connecting hook 73 and the corresponding handle 10 are on the same vertical line, and the connecting hook 73 can be hooked onto the handle 10 .
参照图12,为了带动两个套环9向相互靠近方向移动,插接座32内与上部套环9相对的内壁上固定有横轴21,横轴21沿水平方向延伸,且横轴21外壁上铰接套设有转杆22。位于插接座32上方套环9上的行程柱19均固定连接有第一绳23,且第一绳23远离行程杆的一端固定连接于转杆22的一端。Referring to Figure 12, in order to drive the two collars 9 to move closer to each other, a horizontal shaft 21 is fixed on the inner wall of the socket 32 opposite to the upper collar 9. The horizontal shaft 21 extends in the horizontal direction, and the outer wall of the horizontal shaft 21 The upper hinge sleeve is provided with a rotating rod 22. The stroke posts 19 on the collar 9 above the socket 32 are fixedly connected to the first rope 23 , and the end of the first rope 23 away from the stroke rod is fixedly connected to one end of the rotating rod 22 .
参照图11和图12,转杆22远离第一绳23的一端固定连接有拉绳11,位于插接座32下方套环9上的行程柱19均固定连接有第二绳24,拉绳11下端向下延伸至与插接座32对应的位置上,第二绳24远离行程柱19的一端连接至拉绳11上。Referring to Figures 11 and 12, the end of the rotating rod 22 away from the first rope 23 is fixedly connected to the pull rope 11, and the travel column 19 on the collar 9 below the socket 32 is fixedly connected to the second rope 24. The pull rope 11 The lower end extends downward to a position corresponding to the socket 32 , and one end of the second rope 24 away from the travel column 19 is connected to the pull rope 11 .
拉绳11上端向上延伸至起重船上并与收卷设备相连,当导向座7解锁抵接座5与连接筒1012相抵时,通过收卷设备将拉绳11收卷,以向上拉动拉绳11,从而带动第二绳24以及与第二绳24连接的行程轴沿行程槽20向上移动,且转杆22一端向上移动,转杆22连接有第一绳23的一端向下移动,以使得第一绳23以及与第一绳23连接的行程轴沿行程槽20向下移动,从而带动两个套环9向相互靠近方向移动,并且使连接勾73勾设至对应的把手10上。The upper end of the pull rope 11 extends upward to the crane ship and is connected to the winding device. When the guide seat 7 is unlocked and the abutment seat 5 abuts the connecting tube 1012, the pull rope 11 is rolled up by the winding device to pull the pull rope 11 upward. , thereby driving the second rope 24 and the stroke axis connected to the second rope 24 to move upward along the stroke groove 20, and one end of the rotating rod 22 moves upward, and the end of the rotating rod 22 connected to the first rope 23 moves downward, so that the second rope 24 moves upward. The first rope 23 and the stroke axis connected to the first rope 23 move downward along the stroke groove 20 , thereby driving the two collars 9 to move closer to each other, and allowing the connecting hook 73 to be hooked onto the corresponding handle 10 .
当行程杆抵接于行程槽20端部以使得两个套环9之间距离最短时,每个导向座7中的倾斜杆71与铰接杆72均沿同一直线方向延伸,且位于插接座32上部的导向座7沿远离套环9方向朝靠近抵接座5延伸,位于插接座32下部的导向座7沿原来套环9方向朝远离抵接座5延伸,从而使插接座32与连接筒1012同轴,并限制插接座32在连接筒1012内移动。此外,两个套环9在移动过程中始终覆盖行程槽20,且两个套环9之间距离最短时,套环9上与定位杆14配合的通孔和插接座32上与定位杆14配合的通孔相错开。When the stroke rod abuts the end of the stroke groove 20 so that the distance between the two collars 9 is the shortest, the tilt rod 71 and the hinge rod 72 in each guide seat 7 extend in the same straight direction and are located in the socket. The guide seat 7 at the upper part of 32 extends in the direction away from the collar 9 and toward the abutment seat 5, and the guide seat 7 at the lower part of the socket 32 extends in the direction away from the original collar 9 and away from the abutment seat 5, so that the socket 32 It is coaxial with the connecting barrel 1012 and limits the movement of the plug socket 32 within the connecting barrel 1012 . In addition, the two collars 9 always cover the travel groove 20 during the movement, and when the distance between the two collars 9 is the shortest, the through hole on the collar 9 that matches the positioning rod 14 and the socket 32 are in contact with the positioning rod. 14 The matching through holes are staggered.
本申请实施例一种导管架基础的实施原理为:插接座32向下插入连接筒1012内时,导向座7被锁定并形成倾斜面8,插接座32通过倾斜面8的导向与连接筒1012同轴。当抵接座5与连接筒1012相抵时,压杆17已将锁定组件的锁定解除,使得连接勾73带动铰接杆72吸引至插接座32内壁上。然后向上拉动拉绳11,带动第一绳23向上移动且第二绳24向下移动,从而使得两个套环9向相互靠近的方向移动,同时两个套环9转动至连接勾73勾设于对应的把手10上,从而限制插接座32在连接筒1012内移动。The implementation principle of a jacket foundation in the embodiment of the present application is: when the socket 32 is inserted downward into the connecting barrel 1012, the guide seat 7 is locked and forms an inclined surface 8, and the socket 32 is guided and connected by the inclined surface 8 Barrel 1012 coaxial. When the abutment seat 5 abuts the connecting barrel 1012 , the pressure rod 17 has unlocked the locking component, so that the connecting hook 73 drives the hinge rod 72 to be attracted to the inner wall of the socket 32 . Then pull the pull rope 11 upward to drive the first rope 23 to move upward and the second rope 24 to move downward, thereby causing the two collars 9 to move toward each other, and at the same time, the two collars 9 rotate to the connecting hook 73 and hook up. on the corresponding handle 10, thereby restricting the movement of the socket 32 in the connection barrel 1012.
本申请还提供一种导管架基础的施工方法。This application also provides a construction method for a jacket foundation.
一种导管架基础施工方法,包括以下步骤:A jacket foundation construction method includes the following steps:
S1,将基础结构1与桁架结构3分别运输至指定海域;S1, transport the basic structure 1 and the truss structure 3 to the designated sea area respectively;
S2,通过起重船与第一吊耳103配合将基础结构1下吊至海床处,基础结构1保持连接筒1012位于吸力筒1011上方的状态,基础结构1到达海床处时,通过吸力筒1011与海床相固定,且连接筒1012呈竖直的状态;S2, the crane ship cooperates with the first lifting lug 103 to hoist the basic structure 1 to the seabed. The basic structure 1 keeps the connecting tube 1012 above the suction tube 1011. When the basic structure 1 reaches the seabed, the basic structure 1 is lifted to the seabed by suction. The tube 1011 is fixed to the seabed, and the connecting tube 1012 is in a vertical state;
S3,在一实施例中,通过起重船与第二吊耳33配合将桁架结构3下吊至对应的基础结构1处,桁架结构3保持插接座32位于支撑桁架31底部的状态,使插接座32竖直向下插入对应连接筒1012的套接腔2中;S3, in one embodiment, the truss structure 3 is hoisted to the corresponding base structure 1 by cooperation of the crane ship and the second lifting lug 33, and the truss structure 3 keeps the plug socket 32 at the bottom of the support truss 31, so that The plug socket 32 is inserted vertically downward into the socket cavity 2 of the corresponding connection barrel 1012;
在一实施例中,通过起重船与第二吊耳33配合将桁架结构3下吊至对应的基础结构1处,桁架结构3保持插接座32位于支撑桁架31底部的状态,插接座32向下插入对应连接筒1012的套接腔2内,且插接座32受到倾斜面8的导向,调节至与连接筒1012同轴的位置。当抵接座5与连接筒1012端面相抵时,起重船上通过收卷设备向上拉动拉绳11,使两个套环9向相互靠近方向移动至,连接勾73勾住对应的把手10;In one embodiment, the truss structure 3 is hoisted to the corresponding base structure 1 by the crane ship cooperating with the second lifting lug 33. The truss structure 3 keeps the plug socket 32 at the bottom of the support truss 31. The plug socket 32 is inserted downward into the socket cavity 2 corresponding to the connecting barrel 1012, and the socket 32 is guided by the inclined surface 8 and adjusted to a coaxial position with the connecting barrel 1012. When the abutment seat 5 and the end surface of the connecting tube 1012 abut, the pull rope 11 is pulled upward through the rewinding device on the crane, so that the two collars 9 move toward each other, and the connecting hook 73 hooks the corresponding handle 10;
S4,通过灌浆管道将高强度灌浆料填入灌浆腔中,灌浆完成后拆除吊具。S4, fill the high-strength grouting material into the grouting cavity through the grouting pipe, and remove the spreader after the grouting is completed.
以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The above are all preferred embodiments of the present application, and are not intended to limit the scope of protection of the present application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application shall be covered by the scope of protection of the present application. Inside.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310602176.3A CN116791663B (en) | 2023-05-25 | 2023-05-25 | Jacket foundation and construction method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310602176.3A CN116791663B (en) | 2023-05-25 | 2023-05-25 | Jacket foundation and construction method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN116791663A true CN116791663A (en) | 2023-09-22 |
| CN116791663B CN116791663B (en) | 2025-09-26 |
Family
ID=88033667
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310602176.3A Active CN116791663B (en) | 2023-05-25 | 2023-05-25 | Jacket foundation and construction method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116791663B (en) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN203475461U (en) * | 2013-08-13 | 2014-03-12 | 广东明阳风电产业集团有限公司 | A connection structure between offshore wind turbine jacket and seabed pile foundation |
| CN110144925A (en) * | 2019-05-27 | 2019-08-20 | 中国能源建设集团广东省电力设计研究院有限公司 | Fan system, jacket foundation and its construction method |
| CN211547794U (en) * | 2019-11-22 | 2020-09-22 | 福建省水利水电勘测设计研究院 | Multi-cylinder jacket foundation connected by grouting |
| KR102388594B1 (en) * | 2021-08-23 | 2022-04-21 | 주식회사케이베츠 | Installation method of jacket structure for supporting offshore structure using stabbing system |
| CN114991148A (en) * | 2022-06-30 | 2022-09-02 | 福建永福电力设计股份有限公司 | Split type suction pile jacket installation positioning frame and construction method thereof |
-
2023
- 2023-05-25 CN CN202310602176.3A patent/CN116791663B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN203475461U (en) * | 2013-08-13 | 2014-03-12 | 广东明阳风电产业集团有限公司 | A connection structure between offshore wind turbine jacket and seabed pile foundation |
| CN110144925A (en) * | 2019-05-27 | 2019-08-20 | 中国能源建设集团广东省电力设计研究院有限公司 | Fan system, jacket foundation and its construction method |
| CN211547794U (en) * | 2019-11-22 | 2020-09-22 | 福建省水利水电勘测设计研究院 | Multi-cylinder jacket foundation connected by grouting |
| KR102388594B1 (en) * | 2021-08-23 | 2022-04-21 | 주식회사케이베츠 | Installation method of jacket structure for supporting offshore structure using stabbing system |
| CN114991148A (en) * | 2022-06-30 | 2022-09-02 | 福建永福电力设计股份有限公司 | Split type suction pile jacket installation positioning frame and construction method thereof |
Also Published As
| Publication number | Publication date |
|---|---|
| CN116791663B (en) | 2025-09-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113309080B (en) | Construction method of double-casing cast-in-situ bored pile | |
| JP2017166278A (en) | Bar arrangement method in enlarged-bottom part of cast-in-place enlarged-bottom pile and creation method of pile using the bar arrangement method | |
| CN110092290A (en) | A kind of steel reinforcement cage pay-off method of recyclable hangs muscle | |
| CN111155520A (en) | Offshore large-diameter steel pipe pile erecting method and pile erecting device thereof | |
| CN114592517A (en) | Construction technology of self-weight hammering of pile body with enlarged pile boot | |
| EP0013602A1 (en) | Apparatus and method for anchoring an off-shore structure | |
| CN116374080B (en) | Annular anchor recycling tool and annular anchor recycling method | |
| CN117248554B (en) | An anchoring device and a construction method for the anchoring device. | |
| US4257720A (en) | Apparatus and method for driving members into the ocean floor | |
| CN117166474A (en) | Construction method of hoisting and aligning ultra-long prestressed pipe piles with pile positions | |
| CN115369857B (en) | Pre-buried screw-locked prefabricated underground continuous wall vertical connection structure | |
| KR102221270B1 (en) | Assisting apparatus for pulling out inclined pile and method for pulling out inclined pile at marine | |
| CN114014145A (en) | A recyclable steel cage hoisting device and hoisting method | |
| JP5390919B2 (en) | Removal method of earth retaining members | |
| CN116791663B (en) | Jacket foundation and construction method thereof | |
| CN116084399A (en) | Reducing pile for jacket and jacket leveling method | |
| CN113463625B (en) | Immersed tube and construction method of immersed tube filling pile | |
| CN119021186A (en) | A foundation treatment device and its integrated hole-guiding and vibrating equipment | |
| US12467271B2 (en) | Recyclable cylindrical structure and usage method thereof | |
| CN115679945B (en) | Deep water buried hollow pile string type umbrella-shaped supporting telescopic internal mold device | |
| CN116104084B (en) | Channel steel construction equipment | |
| CN116374081A (en) | Ring anchor installation tool and ring anchor installation method | |
| CN116181035B (en) | Bored concrete pile construction platform based on harbour engineering | |
| CN213926262U (en) | Pile stabilizing platform | |
| CN109505245B (en) | Construction method of shallow-covering-layer anchor pile type construction channel in ocean deep water area |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |