CN1167870A - Method and apparatus for measuring position of cementing plug - Google Patents

Method and apparatus for measuring position of cementing plug Download PDF

Info

Publication number
CN1167870A
CN1167870A CN 97111752 CN97111752A CN1167870A CN 1167870 A CN1167870 A CN 1167870A CN 97111752 CN97111752 CN 97111752 CN 97111752 A CN97111752 A CN 97111752A CN 1167870 A CN1167870 A CN 1167870A
Authority
CN
China
Prior art keywords
plug
pressure
ring
cementing
mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 97111752
Other languages
Chinese (zh)
Other versions
CN1060246C (en
Inventor
李相方
管丛笑
隋秀香
车仕华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum Beijing
Original Assignee
China University of Petroleum Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing filed Critical China University of Petroleum Beijing
Priority to CN97111752A priority Critical patent/CN1060246C/en
Publication of CN1167870A publication Critical patent/CN1167870A/en
Application granted granted Critical
Publication of CN1060246C publication Critical patent/CN1060246C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A method and its apparatus for measuring the position of cementing plug are disclosed. Said measuring apparatus is composed of retainer ring of the cementing plug, pressure sensor, pressure signal measuring circuit, counter of plug position setting, A/D board and microcomputer. Its method includes position measuring method and time measuring method. For the position measuring method, a retainer ring of the plug is put in designed well segment in advance and when the plug is met with the retainer ring, mud pump pressure is raised. When the pressure is raised to a certain value, the lip of the retainer ring is sheared off and pressure is restored, so if designed well depth is reached can be determined. For the time measuring method, based on the known propogation speed of pressure wave in mud, the position of the plug can be calculated out according to the time difference between propogation and reflection of pressure wave between well head and plug.

Description

Measuring position of cementing plug method and device thereof
The present invention relates to a kind of measuring position of cementing plug method and device thereof.
At present, judging that the common method of plug where is by measuring the mud amount of pump when replacing mud in the cementing, is that the sleeve pipe internal volume calculates according to casing size.But because mud flow rate measurement mechanism (volume measuring tank or the turbine flowmeter) precision of most well cementation usefulness is not high, or calculates the mud amount that pumps into by the strokes per minute of measuring pump, because of being subjected to the influence of pump work efficient, this metering result also is inaccurate.Exist U type tube effect in the well cementation process in addition (in the cementing process, because the cement slurry density in the sleeve pipe is greater than the density of casing annulus mud, and cause in the sleeve pipe head of liquid greater than sleeve pipe casing annulus head of liquid, cause the interior cement paste of sleeve pipe by the dirty voluntarily phenomenon of density contrast), make the position of plug more be difficult to accurately determine.For the well cementation of unstable well, because annular space exposes caving in of stratum etc., easily cause the cementing process to be obstructed, pump pressure is raise.If when replacing mud amount near design flow at this moment, can judge by accident breaks thinks that plug has arrived float collar (retainer ring) and located, and stops for mud, causes the interior cement plug of pipe long, and annular space cement returns the high deficiency, fails to reach the requirement of well cementation.Sometimes, plug has arrived the float collar bruising, thinks that but it is because the annular space formation collapse causes that pump pressure raises by mistake, and takes to replace by force the mud measure, causes the float collar damage, is replaced sky in the pipe, can not guarantee the cementing quality at casing shoe place.For drilling liner cementing, when the drilling rod plug meets with sleeve pipe plug (bottom plug or Japan-China hungry area plug), whether cuts off pin, when meeting the float collar bruising, all is the key factors that guarantee that cementing operation is finished smoothly, and at the scene in the practice of construction, raise by pump pressure and to judge, do not accomplish sometimes.
By the patent US5105883 sleeve pipe limiting joint of RobertE.Bode invention, mainly there are the body (being equivalent to a short sleeve) of screw thread and the plug defining baffle of assembling in it to form by the two ends car.It generally is connected on the casing string apart from float collar 150-200 foot place, when cementing arrives it for the mud plug, will be subjected to the obstruction of plug defining baffle, thereby causes demonstrating for the mud plug and having arrived sleeve pipe limiting joint position for slush pump voltage rise height.The major defect of this method is the workload that has increased casing job, has changed the structure of casing string, and the intensity of decannulation limiting joint body should meet outside the requirement of Strength Design of Casing Strings, also will avoid when perforation, to the short sleeve location influence.Simultaneously, the pump pressure signal display apparatus simply is difficult to analyze some special circumstances, because in the mud process, cause that the reason of pump pressure rising is more, as annular space formation collapse, back pressure valve obstruction etc.This patent can't regularly be measured the position of plug in the down-hole, promptly can not measure at an arbitrary position, and its sleeve pipe limiting joint complex structure, might become nonvolatilly sometimes, so that influences oil field operation.
Show according to the field statistics data, owing to the inaccurate problem that causes of plug position judgment accounts for 10% of well cementation mouthful number.Therefore, in the cementing process, regularly, the location monitor out the plug position,, guarantee that cementing quality has crucial meaning assurance cementing dynamic process.On-the-spot urgent need has such method and instrument.
The objective of the invention is to replace in the mud process, the time that can arrive,, guarantee the raising of cementing quality so that in the cementing process, grasp its dynamic process at the position and the inquisitive position display plug of inquisitive time measurement plug in cementing.
The object of the present invention is achieved like this:
A kind of measuring position of cementing plug method, i.e. location survey method is characterized in:
(1). place the plug back-up ring in advance in the planned well section;
(2). for mud top plug, plug and back-up ring are collided and are obstructed, slush pump voltage rise height;
(3). ground-pressure pick-up continuous monitoring pump pressure also receives pump pressure rising signal;
(4). after pressure is elevated to certain value, cut off the protrusion piece of back-up ring, plug passes through, and pump pressure is restored;
(5). the shape of the amplitude of pump pressure rising, ripple and feature and known pump pressure lift mode contrast, can judge whether plug arrives the design well depth.
A kind of measuring position of cementing plug method, i.e. mensuration regularly is characterized in:
(1). slow closed-in well choma sky, replace mud with little discharge capacity;
(2). treat that pump pressure rising 0.5-1MP opens the well head annular space later on again, change over to normal for drilling mud practice;
(3). ground-pressure pick-up receives pressure rising signal, and the gaging pressure ripple transmits between well head and plug and the time difference of reflecting;
(4). according to the time difference and the spread speed of known pressure ripple in mud of compression wave transmission and reflection, can calculate the position of plug.
When annular space cave-in mud circulation is obstructed, do not need closed-in well choma sky, directly the gaging pressure ripple transmits between well head and plug and the time difference of reflecting, and the position that calculates plug according to the time difference and the spread speed of known pressure ripple in mud of compression wave transmission and reflection.
A kind of measuring position of cementing plug device, be characterized in: this device is made up of cementing plug ring washer, plug, pressure sensor, cementing plug Position Finding Device, microcomputer, in knowing the breach of sleeve pipe junction of plug reached position, needs place the plug ring washer, plug is collided with back-up ring forward by the mud top in sleeve pipe, pressure sensor is installed in well head mud entrance place, ground, and microcomputer is connected with pressure sensor by the cementing plug Position Finding Device.
Fig. 1 is a structured flowchart of the present invention;
Fig. 2 is a pressure signal measuring circuit schematic diagram of the present invention;
Fig. 3 is a plug desired location counting circuit schematic diagram of the present invention;
Fig. 4 is a plug ring washer structure chart of the present invention;
Fig. 5 is the lateral view of plug ring washer shown in Figure 4;
Fig. 6 puts into the schematic diagram of sleeve pipe for plug back-up ring of the present invention.
Among the above figure: 1-plug ring washer; The 2-plug; The 3-pressure sensor; 4-pressure signal measuring circuit; 5-plug desired location counting circuit; The 6-A/D plate; The 7-microcomputer; The 8-cementing head; The 9-pit shaft; The 10-casing string; 11-drilling fluid (mud); The 12-cement paste; The 13-float collar; The 14-centralizer; The 15-guide shoe; The 16-casing coupling.
The invention will be further described below in conjunction with embodiment:
A kind of measuring position of cementing plug method and device thereof, this device is made up of cementing plug ring washer, plug, pressure sensor, pressure signal measuring circuit, plug desired location counting circuit, A/D plate, microcomputer, microcomputer links by A/D plate, pressure signal measuring circuit and pressure sensor, realizes data acquisition and processing.The main cementing plug Position Finding Device of being made up of pressure signal measuring circuit and plug desired location counting circuit can directly show measurement result.Whole measuring system can be divided into location and two kinds of metering systems of timing.
1. location survey method
The location survey method is exactly the well section of following the tracks of the plug position at need, adds the plug ring washer in advance in its corresponding casing string, and when mud was replaced in cementing, plug and ring washer were collided and sent pressure signal, were determined the position at plug place by the ground-pressure pick-up reception.The plug ring washer is placed in the breach of sleeve pipe junction (it can not influence the intensity, latus rectum etc. of the connection of sleeve pipe and casing string, and place convenient, rapidly), and its structure is seen Fig. 4, Fig. 5 and Fig. 6.The plug back-up ring is the annulus of being made by the high temperature resistant nylon or the pig iron, some protrusion pieces are arranged on the annulus inner ring, the back-up ring outer diameter D is greater than casing inner diameter and smaller or equal to sleeve pipe junction breach internal diameter, back-up ring inner diameter d 1 equals casing inner diameter, the protrusion piece inner diameter d 2 of back-up ring is less than nuclear diameter in the plug, and the thickness h of back-up ring is smaller or equal to the width of sleeve pipe junction breach.The protrusion piece internal diameter of back-up ring is less than more than the nuclear diameter 5mm in the plug, and each protrudes piece length b along the circumferential direction is 20mm.Preferably three of protrusion pieces on the plug back-up ring, three protrude piece and are in hexagonal angle.Plug ring washer dimension D, d1 are complementary with the respective sleeve size respectively, and sleeve pipe commonly used has 244.5mm, 177.8mm, 139.7mm, 127mm several.For API standard round retaining ring pipe, h is 25.4mm.For in the mud process, continuously monitor the variation of pump pressure by pressure sensor in cementing, when plug and ring washer met, pump pressure raise, and pressure sensor will receive this pressure rising signal, through the position that signal circuit is handled, analysis draws the plug place.After pressure is elevated to certain numerical value, will cuts off three and protrude piece, pump pressure is restored, and plug passes through, and collides with next ring washer again, follows the tracks of the position that plug is arrived with this in replacing the mud process.
For getting rid of the erroneous judgement that pump pressure that other reason causes raises and causes, the amplitude that raises according to pump pressure (compression wave), the shape and the feature of ripple, with the known pump pressure lift mode of this method relatively, judge that whether genuine and back-up ring collide for the mud plug.
2. mensuration regularly
Regularly mensuration is exactly to replace in the mud process in cementing, can measure the residing position of plug at any time.Measuring method is carried out in two kinds of situation, and the one, under the empty situation of permission closed-in well choma, carry out; The 2nd, in well, carry out under the constricted flow situation.Specifically be described below respectively:
In cementing in the mud process, when needs know that what position plug arrive, slow closed-in well choma sky earlier, again with little discharge capacity for mud, allow pump pressure raise behind 0.5~1MPa, can open the well head annular space, change normal cementing job over to.Owing to have plug in the sleeve pipe, the mud pressure ripple is delivered to behind the plug the reflected back well head from well head, gathers this pressure wave signal by the pressure sensor that is installed in well head.The position H that can calculate plug according to the time difference △ T and the spread speed V of compression wave in mud of compression wave transmission and reflection. H = 1 2 V · ΔT
When reasons such as cave-in takes place cause cementing to replace mud to be obstructed, can closed-in well choma sky, but directly utilize the back pump pressure rising signal that is obstructed to detect the position of plug, its principle is same as a kind of measuring method.
In order to improve the precision of regularly measuring the plug position, need to survey the spread speed of accurate compression wave in mud of living in, can be when plug arrives permanent position (as certain plug ring washer well depth or the float collar well depth in the location survey), measure pressure rising signal one time, be delivered to the reflection interval behind the permanent position and calculate the spread speed of compression wave in mud exactly according to compression wave, draw the residing position of plug when regularly measuring exactly with this.
In the well cementation process, first lower casing string, and place the plug back-up ring, and then cement injection.Before the cement injection, first circulating mud, then by the cementing head cement injection, has annotated design flow after, replace mud top plug, make the plug ring washer of plug, until the bruising of arrival float collar by placing in advance on the tubing string.Simultaneously, cement paste returns into annular space through guide shoe and needs sealing well section in the pipe.For available above-mentioned two kinds of methods in the mud process tracking measurement is being carried out in the plug position.
The cementing plug Position Finding Device comprises pressure signal processing circuit, plug desired location counting circuit and A/D plate, and measured value shows with voltage signal, and is converted to data signal input Computer Processing by the A/D plate and draws measurement result.Fig. 3 is a plug desired location counting circuit schematic diagram of the present invention, and REF is that preset level value, Z1 are that ann reset end, Z2 are that clear terminal, FG1~FG6 are counting indicator lamp signal among the figure.
In addition, because the present invention has carried out continuously or the tracking and monitoring that is interrupted cementing plug, thereby can detect the U type tube effect that produces in the cementing process, be beneficial to the cementing process is carried out dynamic analysis and control, and can arrive the required pump of float collar bruising towards sum thereby calculate plug according to calculating pump efficiency (the actual output liquid amount of pump is the ratio of corresponding casing string internal volume output liquid amount theoretical with it) for mud plug position.These all are the powerful measure that improve well cementation success rate and cementing quality.Certainty of measurement of the present invention is 0.3 meter.

Claims (10)

1. measuring position of cementing plug method, i.e. location survey method is characterized in that:
(1). place the plug back-up ring in advance in the planned well section;
(2). for mud top plug, plug and back-up ring are collided and are obstructed, slush pump voltage rise height;
(3). ground-pressure pick-up continuous monitoring pump pressure also receives pump pressure rising signal;
(4). after pressure is elevated to certain value, cut off the protrusion piece of back-up ring, plug passes through, and pump pressure is restored;
(5). the shape of the amplitude of pump pressure rising, ripple and feature and known pump pressure lift mode contrast, can judge whether plug arrives the design well depth.
2. measuring position of cementing plug method according to claim 1 is characterized in that:
(1). place the plug back-up ring simultaneously in a plurality of planned well sections;
(2). plug is counted by back-up ring;
(3). can judge plug place well depth according to counting and pressure wave signal.
3. measuring position of cementing plug method, i.e. mensuration regularly is characterized in that:
(1). slow closed-in well choma sky, replace mud with little discharge capacity;
(2). treat that pump pressure rising 0.5-1MP opens the well head annular space later on again, change over to normal for drilling mud practice;
(3). ground-pressure pick-up receives pressure rising signal, and the gaging pressure ripple transmits between well head and plug and the time difference of reflecting;
(4). according to the time difference and the spread speed of known pressure ripple in mud of compression wave transmission and reflection, can calculate the position of plug.
4. measuring position of cementing plug method according to claim 3, it is characterized in that: when annular space cave-in mud circulation is obstructed, do not need closed-in well choma sky, directly the gaging pressure ripple transmits between well head and plug and the time difference of reflecting, and the position that calculates plug according to the time difference and the spread speed of known pressure ripple in mud of compression wave transmission and reflection.
5. according to claim 3 or 4 described measuring position of cementing plug methods, it is characterized in that: more accurate for making calculating, transmission and the reflection interval of available location survey method gaging pressure ripple between the plug of well head and permanent position, calculate the spread speed of compression wave in mud.
6. measuring position of cementing plug device, it is characterized in that: this device is made up of cementing plug ring washer, plug, pressure sensor, cementing plug Position Finding Device, microcomputer, in knowing the breach of sleeve pipe junction of plug reached position, needs place the plug ring washer, plug is collided with back-up ring forward by the mud top in sleeve pipe, pressure sensor is installed in well head mud entrance place, ground, and microcomputer is connected with pressure sensor by the cementing plug Position Finding Device.
7. measuring position of cementing plug device according to claim 6 is characterized in that: the cementing plug Position Finding Device in this device comprises pressure signal measuring circuit, plug desired location counting circuit and A/D plate.
8. measuring position of cementing plug device according to claim 6, it is characterized in that: the plug back-up ring in this device is the annulus of being made by the high temperature resistant nylon or the pig iron, some protrusion pieces are arranged on the annulus inner ring, the back-up ring outer diameter D is greater than casing inner diameter and smaller or equal to sleeve pipe junction breach internal diameter, back-up ring inner diameter d 1 equals casing inner diameter, the protrusion piece inner diameter d 2 of back-up ring is less than nuclear diameter in the plug, and the thickness h of back-up ring is smaller or equal to the width of sleeve pipe junction breach.
9. measuring position of cementing plug device according to claim 8 is characterized in that: the protrusion piece internal diameter of the plug back-up ring in this device is less than more than the nuclear diameter 5mm in the plug, and each protrudes piece length b along the circumferential direction is 20mm.
10. according to Claim 8 or 9 described measuring position of cementing plug devices, it is characterized in that: the protrusion piece on the plug back-up ring inner ring in this device is three, and three protrude pieces and are in hexagonal angle.
CN97111752A 1997-05-07 1997-05-07 Method and apparatus for measuring position of cementing plug Expired - Fee Related CN1060246C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN97111752A CN1060246C (en) 1997-05-07 1997-05-07 Method and apparatus for measuring position of cementing plug

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN97111752A CN1060246C (en) 1997-05-07 1997-05-07 Method and apparatus for measuring position of cementing plug

Publications (2)

Publication Number Publication Date
CN1167870A true CN1167870A (en) 1997-12-17
CN1060246C CN1060246C (en) 2001-01-03

Family

ID=5171844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN97111752A Expired - Fee Related CN1060246C (en) 1997-05-07 1997-05-07 Method and apparatus for measuring position of cementing plug

Country Status (1)

Country Link
CN (1) CN1060246C (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103913743A (en) * 2014-03-27 2014-07-09 中国石油集团川庆钻探工程有限公司工程技术研究院 Device for tracking and positioning rubber plug through sonar
CN104594851A (en) * 2015-02-02 2015-05-06 中国石油集团渤海钻探工程有限公司 Intelligent well cementing equipment
CN104847338A (en) * 2015-03-24 2015-08-19 胜利油田长龙橡塑有限责任公司 Ultrasonic tracking and positioning system of well cementation rubber plug
CN104975847A (en) * 2015-07-29 2015-10-14 西南石油大学 Oil gas cementing top cement plug position monitoring device and detection method thereof
CN107387065A (en) * 2017-08-29 2017-11-24 西安漫垣机电设备有限公司 A kind of cementing plug dynamic tracking instruction system and method
CN108825214A (en) * 2017-05-03 2018-11-16 中国石油化工股份有限公司 Cementing plug positioning system and its localization method
CN109403911A (en) * 2017-08-15 2019-03-01 中国石油化工股份有限公司 Well cementation tubing string and cementing method
CN110924927A (en) * 2019-11-15 2020-03-27 长江大学 Method, device and equipment for downlink real-time positioning of well cementation rubber plug and storage medium

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4510994A (en) * 1984-04-06 1985-04-16 Camco, Incorporated Pump out sub
US4674573A (en) * 1985-09-09 1987-06-23 Bode Robert E Method and apparatus for placing cement plugs in wells
US4907649A (en) * 1987-05-15 1990-03-13 Bode Robert E Restriction subs for setting cement plugs in wells
US5105883A (en) * 1991-04-01 1992-04-21 Bode Robert E Casing restriction sub
CN1080687A (en) * 1992-07-02 1994-01-12 邓友明 Dark method in oil tube conveying gun perforation school and special-purpose depth correction instrument device

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103913743A (en) * 2014-03-27 2014-07-09 中国石油集团川庆钻探工程有限公司工程技术研究院 Device for tracking and positioning rubber plug through sonar
CN104594851A (en) * 2015-02-02 2015-05-06 中国石油集团渤海钻探工程有限公司 Intelligent well cementing equipment
CN104594851B (en) * 2015-02-02 2017-02-01 中国石油集团渤海钻探工程有限公司 Intelligent well cementing equipment
CN104847338A (en) * 2015-03-24 2015-08-19 胜利油田长龙橡塑有限责任公司 Ultrasonic tracking and positioning system of well cementation rubber plug
CN104975847A (en) * 2015-07-29 2015-10-14 西南石油大学 Oil gas cementing top cement plug position monitoring device and detection method thereof
CN104975847B (en) * 2015-07-29 2017-06-16 西南石油大学 A kind of oil gas well cementation top cement plug position monitoring device and its detection method
CN108825214A (en) * 2017-05-03 2018-11-16 中国石油化工股份有限公司 Cementing plug positioning system and its localization method
CN108825214B (en) * 2017-05-03 2021-07-27 中国石油化工股份有限公司 Well cementation rubber plug positioning system and positioning method thereof
CN109403911A (en) * 2017-08-15 2019-03-01 中国石油化工股份有限公司 Well cementation tubing string and cementing method
CN109403911B (en) * 2017-08-15 2021-09-24 中国石油化工股份有限公司 Well cementing pipe column and well cementing method
CN107387065A (en) * 2017-08-29 2017-11-24 西安漫垣机电设备有限公司 A kind of cementing plug dynamic tracking instruction system and method
CN110924927A (en) * 2019-11-15 2020-03-27 长江大学 Method, device and equipment for downlink real-time positioning of well cementation rubber plug and storage medium

Also Published As

Publication number Publication date
CN1060246C (en) 2001-01-03

Similar Documents

Publication Publication Date Title
CN101251605B (en) Method for forecasting advanced geology for tunnel construction
EP0278671A1 (en) Method and apparatus for measurement of fluid flow in a drilling rig return line
CN1060246C (en) Method and apparatus for measuring position of cementing plug
US4295366A (en) Drilling fluid circulating and monitoring system and method
CN101542071A (en) Downhole load cell
RU2179637C1 (en) Procedure determining characteristics of well, face zone and pool and device for its realization
US20220364459A1 (en) Method and system for monitoring and controlling fluid movement through a wellbore
CN109709018B (en) Tunnel rich water fault broken zone permeability coefficient in-situ measuring device
CN105651349A (en) Drilling fluid flow quantitative detection while drilling system and application thereof
CN105804724B (en) Ultrasonic liquid level monitoring device for petroleum drilling
CN106837303B (en) Method for determining drilling depth in real time according to operation parameters of hydraulic drilling machine
EP0657622A2 (en) Method and apparatus for investigating drill string stand-off and drilling fluid sound speed while drilling
CN101852077A (en) Overflow detection method based on shaft liquid level measurement
CN206091960U (en) Multi -functional pit shaft detection device
CN1609577A (en) Method for detecting sleeve fluid-loss point utilizing direct-reading ultrasound flowmete
CN1060247C (en) Method and apparatus for measuring position of mud loss
CN108868602B (en) Directional drilling crossing construction monitoring system and monitoring method
US4807201A (en) Groundwater pressure measurement
CN112832224B (en) Coastal highway sludge soft soil foundation performance monitoring device, system and method
GB2199952A (en) Method and apparatus for measuring load on a rock bolt
CN112302634B (en) Method for judging and identifying positions and accumulation degree of rock debris bed
CN114622893A (en) Underground leakage measurement-while-drilling device and method and leakage plugging system
CN110657349A (en) Mine tailing paste slurry ring pipe test system and system operation method
EP0401003B1 (en) Radioactive densometer system
CN216642201U (en) Orifice pipe device suitable for intelligent water regime monitored control system of hole of spying in pit

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee