CN116681257A - Method and system for managing red line of land for industrial park - Google Patents

Method and system for managing red line of land for industrial park Download PDF

Info

Publication number
CN116681257A
CN116681257A CN202310715956.9A CN202310715956A CN116681257A CN 116681257 A CN116681257 A CN 116681257A CN 202310715956 A CN202310715956 A CN 202310715956A CN 116681257 A CN116681257 A CN 116681257A
Authority
CN
China
Prior art keywords
red line
land
line
red
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310715956.9A
Other languages
Chinese (zh)
Inventor
宗涵
张睿鑫
吕爽
吴文凯
颜辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cisdi Chongqing Environmental Consulting Co ltd
CISDI Engineering Co Ltd
Original Assignee
Cisdi Chongqing Environmental Consulting Co ltd
CISDI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cisdi Chongqing Environmental Consulting Co ltd, CISDI Engineering Co Ltd filed Critical Cisdi Chongqing Environmental Consulting Co ltd
Priority to CN202310715956.9A priority Critical patent/CN116681257A/en
Publication of CN116681257A publication Critical patent/CN116681257A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F18/00Pattern recognition
    • G06F18/20Analysing
    • G06F18/24Classification techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Quality & Reliability (AREA)
  • Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Primary Health Care (AREA)
  • Operations Research (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Bioinformatics & Computational Biology (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Evolutionary Biology (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Processing Or Creating Images (AREA)

Abstract

The invention discloses a method and a system for managing ground red lines for an industrial park, comprising the following steps: determining the original information of the land red line according to the source data and the basic attribute of the land red line; carrying out vector processing on the original information of the land red line to obtain a red line vector processing result; editing and modifying the red line vector processing result according to the actual situation or changing requirement of the park to obtain a red line vector changing result; and uniformly managing the red lines in the industrial park according to the original information, the red line vector processing result and the red line vector changing result. The method can carry out vectorization processing and centralized classification management on the red line data of the park, and improves the readability, the integrity and the retrievability of the red line data.

Description

Method and system for managing red line of land for industrial park
Technical Field
The invention relates to the field of planning management of industrial parks, in particular to a method and a system for managing land red lines for an industrial park.
Background
Land red lines are a protective measure delimited in land use planning by regional or urban planning departments for limiting and managing the development and utilization of land. The method aims to protect important ecological functional areas, farmlands, water source areas, ecological fragile areas, important cultural heritage areas and other areas, thereby ensuring reasonable utilization of land resources and sustainable development of ecological environment. In the process of planning and managing the land for the industrial park, the red line for planning is important data. The management ground red line is an important basis for dividing the factory authority into areas.
Currently, the red line management of land is mostly stored and data managed in dwg format. However, these techniques or methods have problems such as poor data visualization, inability to attach attribute information, low retrieval efficiency, inconvenience in acquiring history data, inability to perform red line analysis, and the like. Therefore, there is a need for a method and system for managing ground red lines for industrial parks that can solve the above problems.
Disclosure of Invention
Therefore, the invention aims to overcome the defects in the prior art, and provides the red line management method and system for the industrial park, which can carry out vectorization processing and centralized classification management on the red line data of the park, and improve the readability, the integrity and the retrievability of the red line data.
The red line management method for the industrial park comprises the following steps:
determining the original information of the land red line according to the source data and the basic attribute of the land red line;
carrying out vector processing on the original information of the land red line to obtain a red line vector processing result;
editing and modifying the red line vector processing result according to the actual situation or changing requirement of the park to obtain a red line vector changing result;
and uniformly managing the red lines in the industrial park according to the original information, the red line vector processing result and the red line vector changing result.
Further, according to the source data and the basic attribute of the red line of the park, the original information of the red line of the land is determined, and the method specifically comprises the following steps:
obtaining land red line division conditions of a park, and carding to obtain a land red line composition system of the park; the land red line composition system for the park comprises a whole factory red line, a process unit red line, an engineering area red line, an equipment installation red line, a dangerous area red line and a living area red line;
according to the composition system of the land red lines, acquiring associated data or attributes of each red line; wherein the original information comprises spatial information, attribute information and graphic information of red lines; the space information comprises a red line geographic range and point location geographic coordinates; the attribute information comprises land type, application type, name and area of the red line area; the graphic information includes a design file in the format of a geored line dwg.
Further, the original information of the land red line is subjected to vector processing to obtain a red line vector processing result, which specifically comprises the following steps:
making a land red line data processing rule: the input of red line original information of different places corresponds to different processing modes;
selecting corresponding data processing rules according to the acquired original information, and performing vector processing on the original information of the land red line to obtain red line vector processing results; wherein the vector processing includes vector design and vector conversion;
when the acquired red line drawing related information is spatial information, vector design is adopted: drawing a red line vector layer on the red line space information, and simultaneously inputting or connecting attribute information to the layer;
when the acquired red line drawing related information is graphic information, vector conversion is adopted: converting dwg design drawing and annotation of red line into vector layer, and supplementing and perfecting attribute after conversion.
Further, according to the actual situation or the changing requirement of the park, editing and modifying the red line vector processing result to obtain a red line vector changing result, which specifically comprises:
obtaining a land red line changing requirement, and aiming at making a modification scheme;
modifying the vector processing result of the target red line data according to the modification scheme to obtain a vector changing result of the red line data; wherein the modification comprises a modification to the graphical information or the attribute information.
Further, according to the original information, the red line vector processing result and the red line vector changing result, the red line in the industrial park is uniformly managed, and the method specifically comprises the following steps:
according to the red line composition system of the land used in the park and the characteristics of the red line data, a park red line data classification system is established; the classification system comprises classification according to red line land type, application type, area size, red line object and data version;
uniformly combing and classifying the original information, the red line vector processing result and the red line vector changing result according to the red line data classification system of the park to form a red line data resource library of the park;
and uniformly managing and applying the red lines of the park according to the red line data resource library.
An industrial park land red line management system comprises a land red line processing subsystem for processing land red line data, a land red line modification subsystem for modifying the land red line data and a land red line management subsystem for managing the land red line data.
Further, the geored line processing subsystem includes:
the geored line design module is used for designing red line vector data according to the input red line space information and attribute information;
the land red line vectorization module is used for vectorizing conversion of the red line design drawing according to the input red line graphic information and attribute information;
the red line filing module is used for submitting filing application of the result data aiming at the result of vectorization design or conversion of the red line original information, and storing the data after the filing is passed.
Further, the geored line modification subsystem includes:
the land red line segmentation module is used for segmenting a land red line of a certain land into two new land red lines;
the land red line merging module is used for merging two land red lines with public edges into a new land red line;
the land red line editing module is used for modifying the land red line data;
and the land red line changing module is used for submitting a changing application of the result data aiming at the changing result of the divided, combined or edited vector red line data, and storing the data after the change is passed.
Further, the geored line management subsystem includes:
the land red line resource management module is used for uniformly managing the original data, the vector processing data and the vector changing data of the red line;
the geored line inquiring module is used for quickly inquiring and displaying a target red line graph according to the red line information;
the geored line statistics module is used for rapidly completing mathematical statistics analysis of the red line according to the red line information;
the geored line comparison module is used for determining the difference of graphics or attributes among different red line data in a comparison and viewing mode;
the geored line analysis module is used for analyzing whether the built structure exceeds the red line specified range in the red line range;
the land red line export module is used for exporting the land red line related information of the park;
the land red line approval module is used for approving the application submitted by red line record and red line change;
and the geored line authority management module is used for managing the user authority in the industrial park red line management system.
The beneficial effects of the invention are as follows: according to the method and the system for managing the land red line of the industrial park, disclosed by the invention, the readability, the integrity and the safety of the red line data are improved by carrying out vectorization processing and centralized classification management application on various red line data of the park; through carrying out the design conversion, the information change of full flow, management application to red line data, solved the problem that current industry garden red line management technique exists in the aspect of data visualization, information integration, information retrieval, data application etc. in addition, when promoting each red line regional management and control quality and efficiency in the garden, also realized the coordinated management of garden public area construction.
Drawings
The invention is further described below with reference to the accompanying drawings and examples:
FIG. 1 is a schematic flow chart of a land red line management method according to the present invention;
FIG. 2 is a block diagram of a geodetic red line management system according to the present invention;
FIG. 3 is a schematic diagram of red line analysis for an industrial park according to the present invention;
FIG. 4 is a diagram showing the analysis results of the geored line analysis module according to the present invention.
Detailed Description
The invention is further described with reference to the accompanying drawings, in which:
the red line management method for the industrial park comprises the following steps:
and (5) obtaining information by using ground red lines: determining the original information of the land red line according to the source data and the basic attribute of the land red line;
land red line design conversion: carrying out vector processing on the original information of the land red line to obtain a red line vector processing result;
land red line data change: editing and modifying the red line vector processing result according to the actual situation or changing requirement of the park to obtain a red line vector changing result;
data management with ground red line: and uniformly managing the red lines in the industrial park according to the original information, the red line vector processing result and the red line vector changing result.
Firstly, obtaining red line information, obtaining source data and related basic attributes of red lines of a park, and determining original information of red line management; then carrying out vector design or conversion of the red line, carrying out design or conversion and other processing on the red line source data and related basic information according to rules, and obtaining vector processing results of the red line data; then, changing and adjusting the vector red line according to actual needs, editing and modifying the red line vector processing result according to actual conditions or changing needs of a park to obtain a red line vector changing result; and finally, carrying out red line management, and carrying out unified management on the red lines in the industrial park according to the red line original information, the vector processing result of the treated red line data and the vector changing result of the edited and modified red line data.
In this embodiment, according to the source data and the basic attribute of the red line of the campus, the original information of the red line of the land is determined, which specifically includes:
obtaining land red line division conditions of a park, and carding to obtain a land red line composition system of the park; the land red line composition system for the park comprises a whole factory red line, a process unit red line, an engineering area red line, an equipment installation red line, a dangerous area red line and a living area red line; wherein, the actual red line distribution situation is shown in fig. 3.
According to the composition system of the land red lines, acquiring associated data or attributes of each red line; wherein the original information comprises spatial information, attribute information and graphic information of red lines; the space information comprises a red line geographic range and point location geographic coordinates; the attribute information comprises land type, application type, name and area of the red line area; the graphic information includes a design file in the format of a geored line dwg.
The obtained red line original information needs to be stored and is input to a land red line resource management module.
In this embodiment, vector processing is performed on the original information of the land red line to obtain a red line vector processing result, which specifically includes:
making a land red line data processing rule: the input of red line original information of different places corresponds to different processing modes; the red line processing can be performed by utilizing a GIS technology, and the processing rules comprise vector design rules and vector conversion rules; vector design rules correspond to vector design processes, and vector conversion rules correspond to vector conversion processes;
selecting corresponding data processing rules according to the acquired original information, and performing vector processing on the original information of the land red line to obtain red line vector processing results; wherein the vector processing includes vector design and vector conversion;
when the acquired red line drawing related information is spatial information, vector design is adopted: drawing a red line vector layer on the red line space information, and simultaneously inputting or connecting attribute information to the layer;
when the acquired red line drawing related information is graphic information, vector conversion is adopted: converting dwg design drawing and annotation of red line into vector layer, and supplementing and perfecting attribute after conversion.
Specifically, inputting or uploading coordinates of a red line boundary positioning point in the land red line design module 211, generating a vector point according to the coordinates by adopting a vector design rule, generating a closed line by connecting points, and finally generating a red line surface, and simultaneously inputting or connecting attribute information to the layer; for the ambiguity of the space information, only the approximate range is available, and the manual drawing can be performed on a system map; uploading a dwg design file of the red line in the land red line vectorization module, converting a dwg design drawing of the red line and a mark thereof into a vector drawing layer by adopting a vector conversion rule, and supplementing and perfecting the attribute after conversion.
In this embodiment, editing and modifying the red line vector processing result according to the actual situation or the changing requirement of the park to obtain a red line vector changing result, which specifically includes:
obtaining a land red line changing requirement, and aiming at making a modification scheme;
modifying the vector processing result of the target red line data according to the modification scheme to obtain a vector changing result of the red line data; wherein the modification comprises a modification to the graphical information or the attribute information.
After the modification of the red line vector processing result is completed, the obtained vector change result needs to be checked and confirmed, and the result passes through and is stored in the land red line resource management module.
Specifically, the geored line segmentation module 221, the geored line merging module 222 and the geored line editing module 223 are used for carrying out rapid segmentation and merging of the red line data, and the mass processing of abundant and various custom editing and unified requirements, including red line expression patterns, graphic parameters, associated attributes and the like;
after the complete red line data is changed, a red line sound changing application is submitted in the land red line changing module 224, and the relevant changing result is stored in the land red line resource management module 231 after the application verification is passed.
In this embodiment, according to the original information, the red line vector processing result, and the red line vector changing result, the method performs unified management on the red line in the industrial park, and specifically includes:
according to the red line composition system of the land used in the park and the characteristics of the red line data, a park red line data classification system is established; the classification system comprises classification according to red line land type, application type, area size, red line object and data version;
uniformly combing and classifying the original information, the red line vector processing result and the red line vector changing result according to the red line data classification system of the park to form a red line data resource library of the park;
and uniformly managing and applying the red lines of the park according to the red line data resource library.
The invention also relates to a system for managing red lines of industrial parks, which corresponds to the method for managing red lines of industrial parks and can be understood as a system for realizing the method, as shown in fig. 2, and comprises the following steps: a geored line processing subsystem 210 for processing geored line data, a geored line modification subsystem 220 for modifying geored line data, and a geored line management subsystem 230 for managing geored line data.
In this embodiment, the geored line processing subsystem 210 includes:
the geored line design module 211 is used for designing red line vector data according to the input red line space information and attribute information; the online manual input or file uploading of the space information and the attribute information is supported, and three design modes are provided:
red line for drawing on webpage: manually drawing the ground red line on line through an input device;
inflection point coordinates generation ground red line: the ground red line can be automatically generated by manually inputting coordinates of the inflection points on the interface;
uploading land red line: the red line vector layer in shp format can be directly uploaded;
parameters such as color, line width, line type and the like of the land red line can be set in the design process.
The land red line vectorization module 212 is configured to perform vectorization conversion of the red line design drawing according to the input red line graphic information and attribute information; uploading a design file of the red line dwg, and converting the dwg into a shp format through the module;
the land red line filing module 213 is used for submitting a filing application of the result data for the result of vectorization design or conversion of the red line original information, and storing the data after the filing is passed. The record content comprises red line type, application, area and the like, the record application is input to the land red line approval module 237, and the record passing data are stored in the red line resource management module, so that the follow-up red line data can be conveniently supervised.
In this embodiment, the geored line modification subsystem 220 includes:
the ground red line dividing module 221 is configured to divide a certain ground red line into two new ground red lines; the method comprises the following steps: determining the divided nodes by means of map clicking or inputting, connecting the nodes into a broken line according to the generation sequence of the nodes, and dividing the land red line into two new land red lines along the broken line by the system;
the land red line merging module 222 is configured to merge two land red lines with a common edge into a new land red line;
the geored line editing module 223 is used for modifying geored line data; the method comprises custom modification and batch modification, and relates to a sign style, range, attribute and the like of a red line;
the land red line changing module 224 is configured to submit a change application of the result data to the modification result of the divided, combined or edited vector red line data, and store the data after the change. The change content includes red line type, use, area, etc., the change application is input to the land red line approval module 237, and the changed data is stored in the red line resource management module 231 after passing, so that the subsequent red line data can be conveniently monitored.
In this embodiment, the geored line management subsystem 230 includes:
the land red line resource management module 231 is configured to perform unified management on the original data, the vector processing data, and the vector changing data of the red line; the method comprises the steps of managing a red line resource multi-classification system and managing versions on the basis of classification management;
the geored line inquiring module 232 is used for quickly inquiring and displaying the target red line graph according to the red line information; the method comprises the following steps: inputting a red line attribute condition, automatically searching and loading a red line resource for loading a display load condition by a system, and then checking attribute table details of the red line by clicking; the red line information comprises a red line dwg design file, red line boundary locating point coordinates and a red line attribute information document; when the design drawing and the space information are acquired, corresponding geographic coordinates or projection coordinate information is also required to be acquired; the dwg design file comprises red line application marks besides red line design graphics; the attribute information document comprises red line attributes except the marks;
the geored line statistics module 233 is used for rapidly completing mathematical statistics analysis of the red line according to the red line information; all land red lines in the park can be counted according to the land type, the application type, the name, the area size and the like, and meanwhile, the public area of the whole factory can be indirectly divided according to the land red lines;
the geored line comparison module 234 is configured to determine, by means of comparison and viewing, differences in graphics or attributes between different red line data;
the land red line analysis module 235 is used for analyzing whether the built structure exceeds the red line specified range in the red line range; analyzing whether the overground and underground building structures in the red line range exceed the red line specified range, and carrying out classification statistics and space positioning on the building structures exceeding the red line so as to check the influence of related facilities on the overground and underground building structures of the public area and the adjacent unit connection interfaces in an offline manner; it is necessary to select a certain red line resource in the red line resource management module 231 and additionally upload a building vector layer of the same coordinate system as the red line as an analysis object, and the analysis result is shown in fig. 4.
A land red line deriving module 236 for deriving land red line related information for the campus; the method comprises the steps of exporting red line data and exporting a red line analysis report; the exportable data formats comprise dwg and shp, the exportable document types comprise PDF, WORD and the like, and the document contents comprise statistical reports, change reports and the like, so that information sharing and reference are facilitated;
the land red line approval module 237 is used for approving the application submitted by red line record and red line change; the module is only opened to an administrator or a user with approval authority;
the geored authority management module 238 is used to manage user authorities in the industrial park red authority management system. The data security is ensured; the module is only opened to an administrator, and the administrator configures viewing and using rights of various land red line data for system users with different roles through the module.
Finally, it is noted that the above embodiments are only for illustrating the technical solution of the present invention and not for limiting the same, and although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications and equivalents may be made thereto without departing from the spirit and scope of the technical solution of the present invention, which is intended to be covered by the scope of the claims of the present invention.

Claims (9)

1. A ground red line management method for an industrial park is characterized by comprising the following steps: comprising the following steps:
determining the original information of the land red line according to the source data and the basic attribute of the land red line;
carrying out vector processing on the original information of the land red line to obtain a red line vector processing result;
editing and modifying the red line vector processing result according to the actual situation or changing requirement of the park to obtain a red line vector changing result;
and uniformly managing the red lines in the industrial park according to the original information, the red line vector processing result and the red line vector changing result.
2. The industrial park land red line management method according to claim 1, wherein: according to the source data and basic attribute of the red line of the park, the original information of the red line of the land is determined, and the method specifically comprises the following steps:
obtaining land red line division conditions of a park, and carding to obtain a land red line composition system of the park; the land red line composition system for the park comprises a whole factory red line, a process unit red line, an engineering area red line, an equipment installation red line, a dangerous area red line and a living area red line;
according to the composition system of the land red lines, acquiring associated data or attributes of each red line; wherein the original information comprises spatial information, attribute information and graphic information of red lines; the space information comprises a red line geographic range and point location geographic coordinates; the attribute information comprises land type, application type, name and area of the red line area; the graphic information includes a design file in the format of a geored line dwg.
3. The industrial park land red line management method according to claim 1, wherein: carrying out vector processing on the original information of the land red line to obtain a red line vector processing result, which specifically comprises the following steps:
making a land red line data processing rule: the input of red line original information of different places corresponds to different processing modes;
selecting corresponding data processing rules according to the acquired original information, and performing vector processing on the original information of the land red line to obtain red line vector processing results; wherein the vector processing includes vector design and vector conversion;
when the acquired red line drawing related information is spatial information, vector design is adopted: drawing a red line vector layer on the red line space information, and simultaneously inputting or connecting attribute information to the layer;
when the acquired red line drawing related information is graphic information, vector conversion is adopted: converting dwg design drawing and annotation of red line into vector layer, and supplementing and perfecting attribute after conversion.
4. The industrial park land red line management method according to claim 1, wherein: editing and modifying the red line vector processing result according to the actual situation or changing requirement of the park to obtain a red line vector changing result, which specifically comprises the following steps:
obtaining a land red line changing requirement, and aiming at making a modification scheme;
modifying the vector processing result of the target red line data according to the modification scheme to obtain a vector changing result of the red line data; wherein the modification comprises a modification to the graphical information or the attribute information.
5. The industrial park land red line management method according to claim 1, wherein: according to the original information, the red line vector processing result and the red line vector changing result, the red line in the industrial park is uniformly managed, and the method specifically comprises the following steps:
according to the red line composition system of the land used in the park and the characteristics of the red line data, a park red line data classification system is established; the classification system comprises classification according to red line land type, application type, area size, red line object and data version;
uniformly combing and classifying the original information, the red line vector processing result and the red line vector changing result according to the red line data classification system of the park to form a red line data resource library of the park;
and uniformly managing and applying the red lines of the park according to the red line data resource library.
6. An industrial park land red line management system, which is characterized in that: the system comprises a geored line processing subsystem for processing geored line data, a geored line modification subsystem for modifying the geored line data, and a geored line management subsystem for managing the geored line data.
7. The industrial park land red line management system of claim 6, wherein: the geored line processing subsystem comprises:
the geored line design module is used for designing red line vector data according to the input red line space information and attribute information;
the land red line vectorization module is used for vectorizing conversion of the red line design drawing according to the input red line graphic information and attribute information;
the red line filing module is used for submitting filing application of the result data aiming at the result of vectorization design or conversion of the red line original information, and storing the data after the filing is passed.
8. The industrial park land red line management system of claim 6, wherein: the geored line modification subsystem comprises:
the land red line segmentation module is used for segmenting a land red line of a certain land into two new land red lines;
the land red line merging module is used for merging two land red lines with public edges into a new land red line;
the land red line editing module is used for modifying the land red line data;
and the land red line changing module is used for submitting a changing application of the result data aiming at the changing result of the divided, combined or edited vector red line data, and storing the data after the change is passed.
9. The industrial park land red line management system of claim 6, wherein: the geored line management subsystem comprises:
the land red line resource management module is used for uniformly managing the original data, the vector processing data and the vector changing data of the red line;
the geored line inquiring module is used for quickly inquiring and displaying a target red line graph according to the red line information;
the geored line statistics module is used for rapidly completing mathematical statistics analysis of the red line according to the red line information;
the geored line comparison module is used for determining the difference of graphics or attributes among different red line data in a comparison and viewing mode;
the geored line analysis module is used for analyzing whether the built structure exceeds the red line specified range in the red line range;
the land red line export module is used for exporting the land red line related information of the park;
the land red line approval module is used for approving the application submitted by red line record and red line change;
and the geored line authority management module is used for managing the user authority in the industrial park red line management system.
CN202310715956.9A 2023-06-16 2023-06-16 Method and system for managing red line of land for industrial park Pending CN116681257A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310715956.9A CN116681257A (en) 2023-06-16 2023-06-16 Method and system for managing red line of land for industrial park

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310715956.9A CN116681257A (en) 2023-06-16 2023-06-16 Method and system for managing red line of land for industrial park

Publications (1)

Publication Number Publication Date
CN116681257A true CN116681257A (en) 2023-09-01

Family

ID=87783607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310715956.9A Pending CN116681257A (en) 2023-06-16 2023-06-16 Method and system for managing red line of land for industrial park

Country Status (1)

Country Link
CN (1) CN116681257A (en)

Similar Documents

Publication Publication Date Title
Irizarry et al. Optimizing location of tower cranes on construction sites through GIS and BIM integration
CN107038259B (en) Operation method and system for constructing traffic network data
CN105550758A (en) GIS-based underground pipeline operation and maintenance system
Bastem et al. Development of historic building information modelling: A systematic literature review
CN107977766A (en) A kind of city operations emulation and overall planning system
CN104091005B (en) A kind of Overhead Line Project measures indoor and field integration system
CN111221867B (en) Protective building information management system
CN105976313A (en) Method and system for transforming CAD plane coordinate system to Baidu map coordinate system
CN112685820A (en) Digital power station delivery method, medium and equipment based on BIM and GIS
CN113050472A (en) Intelligent zero-direct-discharge dynamic sewage supervision system based on pipe network early warning analysis technology
Akanbi et al. Framework for developing IFC-based 3D documentation from 2D bridge drawings
Ding et al. BIM research vs BIM practice: a bibliometric-qualitative analysis from China
Cao et al. A digital twin (DT) framework at design and construction phases
CN105741280A (en) Fuzzy mathematic vector regional evaluation method and apparatus
Shariatpour et al. Urban 3D Modeling as a Precursor of City Information Modeling and Digital Twin for Smart City Era: A Case Study of the Narmak Neighborhood of Tehran City, Iran
CN116681257A (en) Method and system for managing red line of land for industrial park
CN116401736A (en) Urban green space automatic layout method based on artificial intelligence
Saeed et al. Building information modelling (BIM) and knowledge management in implementation for con-struction projects
Talipova et al. Perspectives of interactions CAD and GIS systems
Bin et al. Decision oriented intelligent transport information platform design research–case study of Hangzhou City
Li et al. Research on integrated management of urban rail transit project based on digital twin
Zheleznov et al. Analysis of international experience in the field of building information modelling of transport infrastructure objects
Wang et al. Research on 4D simulation technology of reconstruction engineering construction organization based on BIM
CN117609868B (en) House building BIM data classification method, system and medium based on subsection item logic
CN114820238B (en) Farmer house building site selection field real-time analysis method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination