CN116566848A - Data transmission method and acquisition method for operation and maintenance management system - Google Patents

Data transmission method and acquisition method for operation and maintenance management system Download PDF

Info

Publication number
CN116566848A
CN116566848A CN202310525193.1A CN202310525193A CN116566848A CN 116566848 A CN116566848 A CN 116566848A CN 202310525193 A CN202310525193 A CN 202310525193A CN 116566848 A CN116566848 A CN 116566848A
Authority
CN
China
Prior art keywords
data
gateway
maintenance management
instruction
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310525193.1A
Other languages
Chinese (zh)
Inventor
赵伍杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Huiyun Network Technology Co ltd
Original Assignee
Guangzhou Huiyun Network Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Huiyun Network Technology Co ltd filed Critical Guangzhou Huiyun Network Technology Co ltd
Priority to CN202310525193.1A priority Critical patent/CN116566848A/en
Publication of CN116566848A publication Critical patent/CN116566848A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/02Capturing of monitoring data
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/66Arrangements for connecting between networks having differing types of switching systems, e.g. gateways
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/04Processing captured monitoring data, e.g. for logfile generation
    • H04L43/045Processing captured monitoring data, e.g. for logfile generation for graphical visualisation of monitoring data
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Mining & Analysis (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a data transmission method and a data acquisition method for an operation and maintenance management system, which are characterized in that a received data checking instruction is analyzed to generate a corresponding data calling instruction and determine a first gateway, then the data calling instruction is sent to a first gateway appointed by a gateway platform, so that the first gateway calls first data according to the data calling instruction and feeds the first data back to the operation and maintenance management platform, after the first data is received and displayed, the first data is judged according to an alarm rule to determine whether alarm information needs to be sent, and if the alarm information needs to be sent, the corresponding alarm information is sent to the appointed first terminal according to the first data. According to the invention, the data storage and the data processing are respectively operated in the two systems, so that the problem of reduced operation rate caused by excessive data stored in the operation and maintenance system is avoided; the data is subjected to repeated judgment processing through the alarm rule to determine the specific position of the fault, so that the fault removing efficiency of the operation and maintenance system is improved, and the working pressure of operation and maintenance personnel is reduced.

Description

Data transmission method and acquisition method for operation and maintenance management system
Technical Field
The invention relates to the field of data transmission, in particular to a data transmission method and a data acquisition method for an operation and maintenance management system.
Background
Along with the progress of science and technology and the perfection of policies, companies, enterprises or medical institutions build respective operation and maintenance systems, and a set of corresponding and procedural maintenance means is provided for respective IT businesses.
However, the current operation and maintenance system is simple in data collection and data display, each data center needs to be provided with a single operation and maintenance department to operate and maintain the data of the data center, a large amount of manpower and material resources are consumed, the operation and maintenance system corresponding to each data center operates independently, if a communication fault of the data center occurs, the fault position is difficult to locate in the fault removal process, the fault processing efficiency is low, and the operation and maintenance efficiency is low.
Therefore, how to adjust all operation and maintenance data through one operation and maintenance system, and simultaneously improve operation and maintenance efficiency and reduce the obstacle removing working pressure of operation and maintenance personnel is a great difficulty in the industry.
Disclosure of Invention
The invention provides a data transmission method and a data acquisition method for an operation and maintenance management system, which are used for realizing the technical effects of realizing the adjustment of all operation and maintenance data of the operation and maintenance system, improving the operation and maintenance efficiency and reducing the working pressure of operation and maintenance personnel.
In order to solve the technical problems, the embodiment of the invention provides a data transmission method for an operation and maintenance management system, which is applied to an operation and maintenance management platform of the operation and maintenance management system;
the data transmission method comprises the following steps:
the operation and maintenance management platform receives a data viewing instruction, generates a data calling instruction according to the data viewing instruction, determines a corresponding first gateway, and then sends the data calling instruction to the first gateway appointed by the gateway platform, so that the first gateway can call and feed back appointed first data according to the data calling instruction;
the operation and maintenance management platform receives and displays the first data, judges whether alarm information needs to be sent according to preset alarm rules and the first data, and sends the alarm information to a designated first terminal according to the first data if the alarm information needs to be sent.
The data transmission method for the operation and maintenance system is applied to an operation and maintenance management platform, after receiving a data viewing instruction input by a user, the data viewing instruction is analyzed to obtain a data calling instruction, a specific storage position of data required to be viewed by the data viewing instruction is determined, namely, a gateway IP corresponding to a data center of the data storage is determined, and the determined gateway IP and the data calling instruction of the data center corresponding to the gateway are sent to the gateway platform, so that a designated gateway of the gateway platform calls and feeds back designated first data according to the data calling instruction. And after the related instruction is received, the corresponding data is called from the data center, so that the problem of operation rate reduction caused by excessive data stored in the operation and maintenance system is avoided, and meanwhile, the designated gateway is determined according to the instruction so as to call the corresponding data, and compared with the efficiency of directly calling the data according to the instruction, the efficiency is higher.
The operation and maintenance management platform judges and processes the received first data through a preset alarm rule, and sends alarm information to the specified terminal according to a judgment result when the first data is displayed, so that the specified terminal corresponds to an operation and maintenance person to rapidly determine a specific address of a fault according to the alarm information, the fault removal efficiency of the operation and maintenance system is further improved, and meanwhile, the working pressure of the operation and maintenance person is reduced.
As a preferred example, the operation and maintenance management platform receives a data viewing instruction, generates a data retrieving instruction according to the data viewing instruction, and determines a corresponding first gateway, specifically:
receiving and analyzing a data viewing instruction from a user, obtaining a first data type of first data to be viewed by the user, and determining a corresponding first gateway according to the first data type;
and combining the first gateway with a call instruction for the first data to generate the data call instruction.
The data type of first data required to be checked by a user is determined through the data checking instruction, a corresponding gateway is determined according to the first data, a data basis is provided for the data calling instruction generated subsequently, and meanwhile, the determined first gateway also provides a parameter basis for the subsequent gateway platform to collect the first data through the first gateway.
As a preferred example, the operation and maintenance management platform receives and displays the first data, specifically:
the operation and maintenance management platform receives the first data, invokes a preset relationship identification technology to identify the relationship of the first data, and determines the data with the association relationship in the first data;
and correlating the data with the incidence relation according to the determined incidence relation, and generating a CMDB view according to the correlated first data through a visualization technology and displaying the CMDB view in a centralized manner.
The data with the association relationship in the first data are determined through a preset relationship identification technology and are associated with each other, a reference basis is provided for the subsequent operation and maintenance personnel to evaluate the influence range of the fault, meanwhile, the image generated after the association shows the association of the data required to be checked by the user more clearly and definitely, the user can conveniently determine whether the equipment to be checked has the fault according to the displayed image, and the workload of the operation and maintenance personnel for analyzing the acquired data is reduced.
As a preferable example, the sending the alarm information to the designated first terminal according to the first data specifically includes:
and determining the first terminal corresponding to the appointed processing according to the associated first data, determining the corresponding alarm information according to the first terminal, and transmitting the alarm information to the corresponding first terminal according to a preset first transmission mode.
The appointed terminal is determined through the associated first data, and corresponding alarm information is sent to the appointed terminal, so that the possibility that the operation and maintenance personnel related to the fault receive the alarm information is improved, and the scientificity, the accuracy and the integrity of a terminal list for determining the alarm information to be sent are further improved.
Correspondingly, the embodiment of the invention also provides a data acquisition method for the operation and maintenance management system, which is applied to a gateway platform of the operation and maintenance management system; the gateway platform comprises a plurality of gateways including a first gateway;
the data acquisition method comprises the following steps:
a first gateway of the gateway platform receives and analyzes a data calling instruction from the operation and maintenance management platform, and first data are collected and called from a corresponding data center according to a preset first communication mode; the operation and maintenance management platform is used for receiving data access instructions from the data access platform, wherein the data access instructions are generated by the operation and maintenance management platform according to the received data access instructions;
the gateway platform sends the first data acquired by the first gateway to the operation and maintenance management platform so that the operation and maintenance management platform displays the first data, judges whether alarm information needs to be sent according to preset alarm rules and the first data, and sends the alarm information to a designated first terminal according to the first data if the alarm information needs to be sent.
According to the data acquisition method for the operation and maintenance system, the gateway platform receives the data calling instruction, the designated gateway is determined according to the gateway IP in the data calling instruction, the calling instruction is sent to the designated gateway after the designated gateway is determined, and the gateway platform only needs to send the data acquisition instruction to the designated gateway according to the instruction so that the corresponding designated gateway can acquire data, thereby improving the data acquisition efficiency and simplifying the data acquisition steps.
And meanwhile, the designated gateway collects designated first data through a data center correspondingly bound by the designated gateway in a first communication mode after receiving the calling command, and sends the collected first data to the operation and maintenance management platform through the network management platform after the collection is completed. Because the gateway and the data center are in one-to-one binding relation, the corresponding data center and the corresponding data can be determined by determining the gateway, and when the designated gateway receives a data acquisition command, the designated gateway only needs to acquire the data to the binding data center, so that the operation is simple and the acquisition efficiency is directly improved.
As a preferred example, the preset first communication mode is one of the following communication protocols:
agent interaction protocol, simple network management protocol, JMX protocol or IPMI protocol.
The invention provides the above communication protocols, which can realize that the gateway can collect the needed data from the corresponding data center and can adjust the first communication mode according to the actual needs.
As a preferable example, the data type of the first data is one of the following data:
server data, middleware data, database data, network device data, virtual resource data, or application data.
The invention provides that the above several data types can be invoked as first data by the corresponding gateway from the bound data center, which data types can be adjusted as required.
Correspondingly, the invention also provides an operation and maintenance management system, which comprises an operation and maintenance management platform and a gateway platform;
the operation and maintenance management platform is connected with the gateway platform through a TCP protocol;
the operation and maintenance management platform can execute the data transmission method aiming at the operation and maintenance management system;
the gateway platform may perform a data collection method for an operation and maintenance management system according to any one of the above.
As a preferred example, the operation and maintenance management platform comprises an instruction receiving module and a central service module;
the instruction receiving module is used for receiving and analyzing a data viewing instruction, receiving and displaying the first data, calling a preset alarm rule to judge whether alarm information needs to be sent according to the first data, and sending the alarm information to a designated first terminal according to the first data if the alarm information needs to be sent;
the central service module is used for obtaining a data calling instruction and determining a corresponding first gateway, and sending the data calling instruction to the first gateway appointed by the gateway platform after the data calling instruction is determined, so that the first gateway can call and feed back appointed first data according to the data calling instruction.
As a preferred example, the gateway platform comprises a data acquisition module and a data transmission module;
the data acquisition module is used for receiving and analyzing a data calling instruction from the operation and maintenance management platform, and acquiring and calling first data from a corresponding data center according to a preset first communication mode;
the data sending module is used for sending the collected first data to the operation and maintenance management platform so that the operation and maintenance management platform processes and displays the first data.
Drawings
Fig. 1: a flow diagram of an embodiment of a data transmission method for an operation and maintenance management system provided by the invention;
fig. 2: a flow diagram of another embodiment of a data transmission method for an operation and maintenance management system provided by the invention;
fig. 3: a flow diagram of an embodiment of a data acquisition method for an operation and maintenance management system provided by the invention;
fig. 4: the invention provides a structural schematic diagram of an embodiment of an operation and maintenance management system.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Example 1
Referring to fig. 1, a flow chart of an embodiment of a data transmission method for an operation and maintenance management system according to an embodiment of the present invention includes steps 101 to 104, where the steps are specifically as follows:
step 101: and the operation and maintenance management platform receives the data viewing instruction, generates a data calling instruction according to the data viewing instruction and determines a corresponding first gateway.
In this embodiment, the operation and maintenance management platform determines, through a data viewing instruction received from a user, data to be retrieved and a data center where the data is located, and determines a corresponding gateway according to the corresponding data center, so as to generate a data retrieving instruction corresponding to the data viewing instruction. In the prior art, each data center is provided with a corresponding operation and maintenance system, if the operation data of one data center needs to be checked, the operation and maintenance system corresponding to the data center is required to specially call the data needing to be checked, so that time and labor are wasted, the operation is complex, if the data center finds out a communication fault, the obstacle removing is quite laborious and the efficiency is low.
Therefore, the operation and maintenance management platform of the operation and maintenance management system monitors the data checking instruction input by the user in real time, analyzes the data checking instruction to generate the corresponding data calling instruction and determines the corresponding gateway, so that the data calling efficiency is improved, the calling operation is simplified, and the operation and maintenance personnel can check the operation and maintenance data in real time.
Step 102: and sending the data calling instruction to the first gateway appointed by the gateway platform, so that the first gateway can call and feed back the appointed first data according to the data calling instruction.
After receiving the data calling instruction, the gateway platform of the embodiment can directly call the corresponding first data from the data center associated with the first gateway through the first gateway according to the gateway IP determined in the instruction, and sends the called first data to the operation and maintenance management platform through the gateway platform.
Step 103: the operation and maintenance management platform receives and displays the first data, and judges whether alarm information needs to be sent or not according to preset alarm rules and the first data.
Step 104: and if the alarm information is determined to be required to be sent, sending the alarm information to the appointed first terminal according to the first data.
In this embodiment, after receiving the first data sent by the network management platform, the operation and maintenance management platform displays the first data to the user, and meanwhile, invokes a preset alarm rule to judge the first data to determine whether to send alarm information to the designated terminal. Firstly, the first data is subjected to one-time alarm judgment through the preset alarm rule, and alarm information is required to be sent to carry out alarm prediction, and the scientificity and the accuracy of the alarm prediction are improved through the alarm judgment through data comparison, so that a user can conveniently carry out obstacle removing processing on equipment which is likely to be faulty according to the alarm information, and further the efficiency of the obstacle removing processing is improved.
In summary, the data transmission method for an operation and maintenance system provided by the embodiment of the invention is applied to an operation and maintenance management platform, after receiving a data viewing instruction input by a user, the data viewing instruction is analyzed to obtain a data calling instruction, a specific storage position of data required to be viewed by the data viewing instruction, namely, a gateway IP corresponding to a data center of the data storage is determined, and the determined gateway IP and the data calling instruction of the data center corresponding to the gateway are sent to the gateway platform, so that a designated gateway of the gateway platform calls and feeds back designated first data according to the data calling instruction. And after the related instruction is received, the corresponding data is called from the data center, so that the problem of operation rate reduction caused by excessive data stored in the operation and maintenance system is avoided, and meanwhile, the designated gateway is determined according to the instruction so as to call the corresponding data, and compared with the efficiency of directly calling the data according to the instruction, the efficiency is higher.
The operation and maintenance management platform judges and processes the received first data through a preset alarm rule, and sends alarm information to the designated terminal according to a judgment result when the first data is displayed, so that the designated terminal corresponds to an operation and maintenance person to rapidly determine the fault occurrence address according to the alarm information, the obstacle removing efficiency of the operation and maintenance system is further improved, and meanwhile, the working pressure of the operation and maintenance person is reduced.
Meanwhile, the operation and maintenance management platform generates a corresponding data calling instruction only when receiving the data checking instruction and sends the data calling instruction to the gateway platform for calling corresponding data, so that the platform does not need to be in charge of storing a large amount of operation and maintenance data, the data storage pressure of the operation and maintenance management platform is reduced, hardware equipment resources are saved, and the efficiency of data analysis and operation is further improved.
Example two
Referring to fig. 2, fig. 2 is a flow chart of another embodiment of a data transmission method for an operation and maintenance management system according to the present invention, including steps 201 to 204, where each step is specifically as follows:
step 201: receiving and analyzing a data viewing instruction from a user, obtaining a first data type of first data to be viewed by the user, determining a corresponding first gateway according to the first data type, and combining the first gateway with a data retrieving instruction aiming at the first data to generate the data retrieving instruction.
In this embodiment, a data viewing instruction sent by a user is parsed, a first data type of first data to be viewed by the user is further determined, a corresponding data center is determined according to the first data type, a gateway IP of a first gateway associated with a data center corresponding to the first data type is further determined through gateways associated with each data center, the gateway IP of the first gateway and a call instruction for the first data are combined to generate a data call instruction, the call instruction is sent to a gateway platform, and the gateway platform calls the first data from the corresponding associated data center through the first gateway.
The data type of first data required to be checked by a user is determined through the data checking instruction, a corresponding gateway is determined according to the first data, a data basis is provided for the data calling instruction generated subsequently, and meanwhile, the determined first gateway also provides a parameter basis for the subsequent gateway platform to collect the first data through the first gateway.
Step 202: and sending the data calling instruction to the first gateway appointed by the gateway platform, so that the first gateway can call and feed back the appointed first data according to the data calling instruction.
Step 203: the operation and maintenance management platform receives the first data, invokes a preset relationship identification technology to identify the relationship of the first data, determines the data with the association relationship in the first data, associates the data with the association relationship according to the determined association relationship, and simultaneously generates a CMDB view according to the associated first data through a visualization technology and displays the CMDB view in a centralized manner on an image.
Step 202 of the present embodiment is the same as step 102 of the first embodiment, after receiving the first data fed back by the gateway platform, the present embodiment will invoke a relationship recognition technology preset by the platform to perform relationship recognition on the first data, so as to determine the association relationship between the data in the first data, associate the data having the association relationship with each other according to the determined association relationship, display the associated data, and directly display the association relationship between the data during image display, so that a user can more scientifically determine the region where the fault occurs and the influence range of the fault according to the determined association relationship between the data.
Meanwhile, the data with the association relationship in the first data are determined through a preset relationship identification technology and are associated with each other, a reference basis is provided for the subsequent operation and maintenance personnel to evaluate the influence range of the fault, meanwhile, the image generated after the association shows the association of the data required to be checked by the user more clearly and definitely, the user can conveniently determine whether the equipment to be checked has the fault according to the displayed image, and the workload of the operation and maintenance personnel for analyzing the acquired data is reduced.
According to the embodiment, the first data is displayed in a topological view mode through a front-end technology such as vue, visual service view management is provided for a user, real-time checking of service availability, health and busyness and real-time checking of a communication state and a device running state which are formed by the service are realized, and an effective monitoring means is provided for normal operation of the service.
Step 204: if the alarm information is determined to be required to be sent, determining the first terminal corresponding to the appointed processing according to the associated first data, determining the corresponding alarm information according to the first terminal, and sending the alarm information to the corresponding first terminal according to a preset first sending mode.
If the first data is judged according to the alarm rule and then the alarm information is required to be sent, namely the fault information is judged, the specific position where the fault occurs is determined according to the first data, the position possibly affected by the fault is determined according to the association relation between the data, the corresponding terminal is determined according to all the data related to the fault, and finally different alarm information is sent to the terminal for determining the fault data or determining the data possibly affected by the fault according to the corresponding data of the terminal, so that a user corresponding to the terminal, namely an operation and maintenance personnel, can perform basic preparation work on the fault and the fault removal work according to the alarm information, and the work efficiency of the operation and maintenance personnel is effectively improved.
Meanwhile, the appointed terminal is determined through the associated first data, and corresponding alarm information is sent to the appointed terminal, so that the possibility that the operation and maintenance personnel related to faults receive the alarm information is improved, and the scientificity, the accuracy and the integrity of a terminal list for determining the alarm information to be sent are further improved.
Example III
Referring to fig. 3, fig. 3 is a flow chart of an embodiment of a data collection method for an operation and maintenance management system according to the present invention, including steps 301 to 302, where each step is specifically as follows:
step 301: and the first gateway of the gateway platform receives and analyzes the data calling instruction from the operation and maintenance management platform, and collects and calls first data from the corresponding data center according to a preset first communication mode.
The gateway platform determines a first gateway corresponding to a gateway needing to execute data calling through the gateway IP in the received data calling instruction, and calls data of a data center associated with the gateway, namely first data, through the first gateway.
The first communication manner in this embodiment is one of the following communication protocols: agent interaction protocol, simple network management protocol, JMX protocol or IPMI protocol; the data type of the first data collected in this embodiment is one of the following data: server data, middleware data, database data, network device data, virtual resource data, or application data. When the gateway retrieves network equipment data including flow data of network equipment ports from the data center according to a simple network management protocol, the retrieved data includes port states, port sending rates, port receiving rates, port sending packet loss numbers, port receiving packet loss numbers and the like, and through monitoring the data, real-time monitoring of health conditions and network performances of various networks is realized.
In this embodiment, the data retrieving instruction received by the gateway platform may be obtained after processing the data transmission method in the first embodiment, or may be obtained after processing the data transmission method in the second embodiment, and the user may select a corresponding processing method according to needs.
Step 302: the gateway platform sends the first data acquired by the first gateway to the operation and maintenance management platform so that the operation and maintenance management platform displays the first data, judges whether alarm information needs to be sent according to preset alarm rules and the first data, and sends the alarm information to a designated first terminal according to the first data if the alarm information needs to be sent.
The gateway platform sends the first data acquired from the data center to the operation and maintenance management platform, so that the operation and maintenance management platform processes the first data, and whether alarm information needs to be sent to the appointed terminal is determined according to a processing result.
The operation and maintenance management platform in this embodiment performs a processing operation on the first data, where the processing method may be the data transmission method in the first embodiment or the data transmission method in the second embodiment, and the user may select the processing method according to an actual requirement.
According to the data acquisition method for the operation and maintenance system, the gateway platform receives the data calling instruction, the designated gateway is determined according to the gateway IP in the data calling instruction, the calling instruction is sent to the designated gateway after the designated gateway is determined, and the gateway platform only needs to send the data acquisition instruction to the designated gateway according to the instruction so that the corresponding designated gateway can acquire data, the data acquisition efficiency is improved, and the data acquisition steps are simplified.
And meanwhile, the designated gateway collects designated first data through a data center correspondingly bound by the designated gateway in a first communication mode after receiving the calling command, and sends the collected first data to the operation and maintenance management platform through the network management platform after the collection is completed. Because the gateway and the data center are in one-to-one binding relation, the corresponding data center and the corresponding data can be determined by determining the gateway, and when the designated gateway receives a data acquisition command, the designated gateway only needs to acquire the data to the binding data center, so that the operation is simple and the acquisition efficiency is directly improved.
The gateway platform in the embodiment periodically collects and sorts the data of each gateway at regular time, classifies and statistically uploads the collected data to the operation and maintenance management platform, and the data is saved by the database of the operation and maintenance management platform, so that data support is provided for the service system in each data.
In order to better explain the working principle and the step flow of the data transmission method and the data acquisition method for the operation and maintenance management system, the invention can be but not limited to the related description.
Accordingly, referring to fig. 4, fig. 4 is a schematic structural diagram of an embodiment of an operation and maintenance management system provided by the present invention, where the operation and maintenance management system includes an operation and maintenance management platform 401 and a gateway platform 402;
wherein, the operation and maintenance management platform 401 is connected with the gateway platform 402 through a TCP protocol;
the operation and maintenance management platform 401 may execute any one of the above data transmission methods for an operation and maintenance management system, including the data transmission method for an operation and maintenance management system described in the first embodiment and the data transmission method for an operation and maintenance management system described in the second embodiment;
the operation and maintenance management platform 401 further includes an instruction receiving module 401A and a central service module 401B, where the instruction receiving module 401A is configured to receive and parse a data viewing instruction, receive and display the first data, and call a preset alarm rule to determine whether alarm information needs to be sent according to the first data, and if it is determined that the alarm information needs to be sent, send the alarm information to a specified first terminal according to the first data; the central service module 401B is configured to obtain a data call instruction and determine a corresponding first gateway, and send the data call instruction to the first gateway specified by the gateway platform after determining, so that the first gateway calls and feeds back the specified first data according to the data call instruction.
The gateway platform 402 may perform a data collection method for an operation and maintenance management system as described in any of the above.
The gateway platform 402 further includes a data acquisition module 402A and a data transmission module 402B, where the data acquisition module 402A is configured to receive and parse a data retrieval instruction from the operation and maintenance management platform, and acquire and retrieve first data from a corresponding data center according to a preset first communication mode; the data sending module 402B is configured to send the collected first data to the operation and maintenance management platform, so that the operation and maintenance management platform processes and displays the first data.
In summary, the present invention provides a data transmission method and an acquisition method for an operation and maintenance management system, which are applied to an operation and maintenance management platform of the operation and maintenance management system, by analyzing a received data viewing instruction, a corresponding data calling instruction is generated and a first gateway is determined, then the data calling instruction is sent to a first gateway designated by a gateway platform, so that the first gateway calls first data according to the data calling instruction and feeds back the first data to the operation and maintenance management platform, after the operation and maintenance management platform receives and displays the first data, the operation and maintenance management platform determines whether to send alarm information according to a preset alarm rule, and if yes, the corresponding alarm information is sent to a designated first terminal according to the first data. According to the invention, the data storage and the data retrieval are operated in the data center and the operation and maintenance system, so that the problem of reduced operation rate caused by excessive data storage of the operation and maintenance system is avoided; the data is subjected to repeated judgment processing through the alarm rule to determine the specific position of the fault, so that the fault removing efficiency of the operation and maintenance system is improved, and the working pressure of operation and maintenance personnel is reduced.
The foregoing embodiments have been provided for the purpose of illustrating the general principles of the present invention, and are not to be construed as limiting the scope of the invention. It should be noted that any modifications, equivalent substitutions, improvements, etc. made by those skilled in the art without departing from the spirit and principles of the present invention are intended to be included in the scope of the present invention.

Claims (10)

1. The data transmission method for the operation and maintenance management system is characterized by being applied to an operation and maintenance management platform of the operation and maintenance management system;
the data transmission method comprises the following steps:
the operation and maintenance management platform receives a data viewing instruction, generates a data calling instruction according to the data viewing instruction, determines a corresponding first gateway, and then sends the data calling instruction to the first gateway appointed by the gateway platform, so that the first gateway can call and feed back appointed first data according to the data calling instruction;
the operation and maintenance management platform receives and displays the first data, judges whether alarm information needs to be sent according to preset alarm rules and the first data, and sends the alarm information to a designated first terminal according to the first data if the alarm information needs to be sent.
2. The method for data transmission for an operation and maintenance management system according to claim 1, wherein the operation and maintenance management platform receives a data viewing instruction, generates a data retrieving instruction according to the data viewing instruction, and determines a corresponding first gateway, specifically:
receiving and analyzing a data viewing instruction from a user, obtaining a first data type of first data to be viewed by the user, and determining a corresponding first gateway according to the first data type;
and combining the first gateway with a call instruction for the first data to generate the data call instruction.
3. The method for data transmission for an operation and maintenance management system according to claim 1, wherein the operation and maintenance management platform receives and displays the first data, specifically:
the operation and maintenance management platform receives the first data, invokes a preset relationship identification technology to identify the relationship of the first data, and determines the data with the association relationship in the first data;
and correlating the data with the incidence relation according to the determined incidence relation, and generating a CMDB view according to the correlated first data through a visualization technology and displaying the CMDB view in a centralized manner.
4. The method for transmitting data to an operation and maintenance management system according to claim 1, wherein the sending the alarm information to the designated first terminal according to the first data specifically comprises:
and determining the first terminal corresponding to the appointed processing according to the associated first data, determining the corresponding alarm information according to the first terminal, and transmitting the alarm information to the corresponding first terminal according to a preset first transmission mode.
5. The data acquisition method for the operation and maintenance management system is characterized by being applied to a gateway platform of the operation and maintenance management system; the gateway platform comprises a plurality of gateways including a first gateway;
the data acquisition method comprises the following steps:
a first gateway of the gateway platform receives and analyzes a data calling instruction from the operation and maintenance management platform, and first data are collected and called from a corresponding data center according to a preset first communication mode; the operation and maintenance management platform is used for receiving data access instructions from the data access platform, wherein the data access instructions are generated by the operation and maintenance management platform according to the received data access instructions;
the gateway platform sends the first data acquired by the first gateway to the operation and maintenance management platform so that the operation and maintenance management platform displays the first data, judges whether alarm information needs to be sent according to preset alarm rules and the first data, and sends the alarm information to a designated first terminal according to the first data if the alarm information needs to be sent.
6. The method for data collection of an operation and maintenance management system according to claim 5, wherein the preset first communication mode is one of the following communication protocols:
agent interaction protocol, simple network management protocol, JMX protocol or IPMI protocol.
7. The method for data collection of an operation and maintenance management system according to claim 5, wherein the data type of the first data is one of the following data:
server data, middleware data, database data, network device data, virtual resource data, or application data.
8. The operation and maintenance management system is characterized by comprising an operation and maintenance management platform and a gateway platform;
the operation and maintenance management platform is connected with the gateway platform through a TCP protocol;
the operation and maintenance management platform can execute a data transmission method for an operation and maintenance management system according to any one of claims 1-4;
the gateway platform may perform a data collection method for an operation and maintenance management system according to any one of claims 5-7.
9. The operation and maintenance management system according to claim 8, wherein the operation and maintenance management platform comprises an instruction receiving module and a central service module;
the instruction receiving module is used for receiving and analyzing a data viewing instruction, receiving and displaying the first data, calling a preset alarm rule to judge whether alarm information needs to be sent according to the first data, and sending the alarm information to a designated first terminal according to the first data if the alarm information needs to be sent;
the central service module is used for obtaining a data calling instruction and determining a corresponding first gateway, and sending the data calling instruction to the first gateway appointed by the gateway platform after the data calling instruction is determined, so that the first gateway can call and feed back appointed first data according to the data calling instruction.
10. The operation and maintenance management system according to claim 8, wherein the gateway platform comprises a data acquisition module and a data transmission module;
the data acquisition module is used for receiving and analyzing a data calling instruction from the operation and maintenance management platform, and acquiring and calling first data from a corresponding data center according to a preset first communication mode;
the data sending module is used for sending the collected first data to the operation and maintenance management platform so that the operation and maintenance management platform processes and displays the first data.
CN202310525193.1A 2023-05-11 2023-05-11 Data transmission method and acquisition method for operation and maintenance management system Pending CN116566848A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310525193.1A CN116566848A (en) 2023-05-11 2023-05-11 Data transmission method and acquisition method for operation and maintenance management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310525193.1A CN116566848A (en) 2023-05-11 2023-05-11 Data transmission method and acquisition method for operation and maintenance management system

Publications (1)

Publication Number Publication Date
CN116566848A true CN116566848A (en) 2023-08-08

Family

ID=87491099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310525193.1A Pending CN116566848A (en) 2023-05-11 2023-05-11 Data transmission method and acquisition method for operation and maintenance management system

Country Status (1)

Country Link
CN (1) CN116566848A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201608729U (en) * 2009-12-28 2010-10-13 青岛朗讯科技通讯设备有限公司 Intelligent data management system
CN108259605A (en) * 2018-01-17 2018-07-06 深圳市和讯华谷信息技术有限公司 A kind of data calling system and method based on multiple data centers
US20190243676A1 (en) * 2016-09-30 2019-08-08 Hangzhou Hikvision Digital Technology Co., Ltd. Cloud Storage Based Data Processing Method and System
CN115567605A (en) * 2022-09-23 2023-01-03 平安健康保险股份有限公司 Data center user request processing method, system, equipment and storage medium

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201608729U (en) * 2009-12-28 2010-10-13 青岛朗讯科技通讯设备有限公司 Intelligent data management system
US20190243676A1 (en) * 2016-09-30 2019-08-08 Hangzhou Hikvision Digital Technology Co., Ltd. Cloud Storage Based Data Processing Method and System
CN108259605A (en) * 2018-01-17 2018-07-06 深圳市和讯华谷信息技术有限公司 A kind of data calling system and method based on multiple data centers
CN115567605A (en) * 2022-09-23 2023-01-03 平安健康保险股份有限公司 Data center user request processing method, system, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN108989136B (en) Business end-to-end performance monitoring method and device
US6446028B1 (en) Method and apparatus for measuring the performance of a network based application program
US6856942B2 (en) System, method and model for autonomic management of enterprise applications
CN107294808A (en) The methods, devices and systems of interface testing
CN113179182B (en) Network supervision method, device, equipment and storage medium
CN112350854B (en) Flow fault positioning method, device, equipment and storage medium
CN110855493B (en) Application topological graph drawing device for mixed environment
CN112671933A (en) Data processing method and system
CN108462598A (en) A kind of daily record generation method, log analysis method and device
US20030145076A1 (en) Method and apparatus for network problem segment isolation
CN112350882A (en) Distributed network traffic analysis system and method
CN113760634A (en) Data processing method and device
EP3329407A1 (en) Application centric network experience monitoring
TWI448975B (en) Dispersing-type algorithm system applicable to image monitoring platform
CN111741007B (en) Financial business real-time monitoring system and method based on network layer message analysis
CN116204386B (en) Method, system, medium and equipment for automatically identifying and monitoring application service relationship
CN110609761B (en) Method and device for determining fault source, storage medium and electronic equipment
CN102480369A (en) Network management system and method for collecting performance
CN116566848A (en) Data transmission method and acquisition method for operation and maintenance management system
CN115080363B (en) System capacity evaluation method and device based on service log
KR100454950B1 (en) System for providing operating information of private branch exchange
CN113596170A (en) Load balancing equipment-based shutdown processing method, device, medium and equipment
KR20040001627A (en) System for managing fault of internet and method thereof
CN114158081B (en) End-to-end perception early warning method and device and computer equipment
CN105323098B (en) A kind of method for processing alarm message, apparatus and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20230808