CN116518541A - Control method, device and equipment of intelligent equipment based on air conditioner and air conditioner - Google Patents

Control method, device and equipment of intelligent equipment based on air conditioner and air conditioner Download PDF

Info

Publication number
CN116518541A
CN116518541A CN202310620733.4A CN202310620733A CN116518541A CN 116518541 A CN116518541 A CN 116518541A CN 202310620733 A CN202310620733 A CN 202310620733A CN 116518541 A CN116518541 A CN 116518541A
Authority
CN
China
Prior art keywords
air conditioner
intelligent
equipment
power consumption
list information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310620733.4A
Other languages
Chinese (zh)
Inventor
江晨菊
矫立涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haier Air Conditioner Gen Corp Ltd
Qingdao Haier Smart Technology R&D Co Ltd
Qingdao Haier Air Conditioning Electric Co Ltd
Haier Smart Home Co Ltd
Original Assignee
Qingdao Haier Air Conditioner Gen Corp Ltd
Qingdao Haier Smart Technology R&D Co Ltd
Qingdao Haier Air Conditioning Electric Co Ltd
Haier Smart Home Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Air Conditioner Gen Corp Ltd, Qingdao Haier Smart Technology R&D Co Ltd, Qingdao Haier Air Conditioning Electric Co Ltd, Haier Smart Home Co Ltd filed Critical Qingdao Haier Air Conditioner Gen Corp Ltd
Priority to CN202310620733.4A priority Critical patent/CN116518541A/en
Publication of CN116518541A publication Critical patent/CN116518541A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/46Improving electric energy efficiency or saving
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/61Control or safety arrangements characterised by user interfaces or communication using timers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention provides a control method, a control device and a control device of intelligent equipment based on an air conditioner and the air conditioner, and relates to the technical field of air conditioners. The control method of the intelligent equipment based on the air conditioner comprises the following steps: recording the running condition of an air conditioner, and generating air conditioner list information according to the running condition of the air conditioner; acquiring an equipment identifier of intelligent equipment connected with the air conditioner through communication; generating equipment list information of the intelligent equipment according to the equipment identifier; and controlling the operation time of the intelligent equipment based on the air conditioner list information and the equipment list information. The embodiment of the invention can more intelligently control the operation time of the intelligent equipment and save electric resources.

Description

Control method, device and equipment of intelligent equipment based on air conditioner and air conditioner
Technical Field
The present invention relates to the field of air conditioning technologies, and in particular, to a control method, an apparatus, a device for an intelligent device based on an air conditioner, and an air conditioner.
Background
At present, household appliances are more and more, people cannot live in various appliances, and although the life of people is facilitated, the energy consumption is also increasing day by day.
The air conditioner can provide heating or refrigerating for people, but when the air conditioner heats or refrigerates, the power consumption of the air conditioner is very large in a plurality of intelligent household appliances, and other intelligent household appliances sometimes cannot provide convenience for users, but still consume power, for example, the users forget to turn off the lamp and go out, but the lamp is always on, so that resources are wasted greatly, and dangerous risks exist.
Therefore, how to control the intelligent operation of the intelligent device based on the operation of the air conditioner is a technical problem to be solved at present.
Disclosure of Invention
The invention provides a control method, a control device and a control device for intelligent equipment based on an air conditioner, and the air conditioner, which can control the operation time of the intelligent equipment more intelligently and save electric resources.
In a first aspect, the present invention provides a control method for an intelligent device based on an air conditioner, including:
recording the running condition of an air conditioner, and generating air conditioner list information according to the running condition of the air conditioner;
acquiring an equipment identifier of intelligent equipment connected with the air conditioner through communication;
generating equipment list information of the intelligent equipment according to the equipment identifier;
and controlling the operation time of the intelligent equipment based on the air conditioner list information and the equipment list information.
Preferably, according to the control method of the intelligent device based on the air conditioner provided by the invention, the generating air conditioner list information according to the running condition of the air conditioner includes:
analyzing and processing the running condition of the air conditioner to obtain the running duration and the running power of the air conditioner;
and calculating the power consumption of the air conditioner according to the operation time length and the operation power, and generating the air conditioner list information according to the power consumption of the air conditioner and a preset expense rule.
Preferably, according to the control method of the intelligent device based on the air conditioner provided by the present invention, the generating the device list information of the intelligent device according to the device identifier includes:
acquiring the power consumption of the equipment corresponding to each intelligent equipment according to the equipment identifier;
sequencing a plurality of intelligent devices according to the power consumption of the devices to obtain the ordered intelligent devices;
and generating the ordered device list information according to the device power consumption and the expense rule of the ordered intelligent device.
Preferably, according to the method for controlling an intelligent device based on an air conditioner provided by the present invention, before the step of controlling the operation duration of the intelligent device based on the air conditioner list information and the device list information, the method includes:
determining the use priority of the air conditioner and the intelligent equipment from the air conditioner and the plurality of intelligent equipment according to the requirements of users;
under the condition that the use priority of the air conditioner is greater than that of the intelligent equipment, acquiring indoor environment temperature, and judging whether the air conditioner reaches a starting condition according to the indoor environment temperature;
if yes, sending prompt information to a user, and receiving air conditioner operation information fed back by the user according to the prompt information;
and determining the air conditioner operation time length of the air conditioner according to the air conditioner operation information and the air conditioner list information, and controlling the air conditioner to operate the air conditioner operation time length.
Preferably, according to the control method of the intelligent device based on the air conditioner provided by the invention, the determining the air conditioner operation time of the air conditioner according to the air conditioner operation information and the air conditioner list information includes:
determining command duration of the air conditioner according to the air conditioner operation information;
comparing the air conditioner electricity consumption expense in the air conditioner list information with a preset air conditioner electricity consumption threshold value;
determining a compensation duration under the condition that the electricity consumption expense of the air conditioner is larger than the electricity consumption threshold value of the air conditioner;
and calculating the command duration and the compensation duration to obtain the air conditioner operation duration.
Preferably, according to the method for controlling an intelligent device based on an air conditioner provided by the present invention, the controlling the operation duration of the intelligent device based on the air conditioner list information and the device list information includes:
calculating the equipment power consumption expense in the equipment list information and the air conditioner power consumption expense in the air conditioner list information to obtain total power consumption expense;
comparing the total power consumption expense with a preset total power consumption threshold;
determining intelligent equipment with power consumption larger than a standard power consumption threshold from a plurality of intelligent equipment under the condition that the total power consumption is larger than the total power consumption threshold;
acquiring the power consumption time length of the intelligent equipment with the power consumption larger than the standard power consumption threshold;
and calculating the power consumption time length and the compensation time length to obtain the equipment operation time length, and controlling the intelligent equipment to operate the equipment operation time length.
In a second aspect, the present invention further provides a control device of an intelligent device based on an air conditioner, where the device includes:
the recording module is used for recording the running condition of the air conditioner and generating air conditioner list information according to the running condition of the air conditioner;
the acquisition module is used for acquiring the equipment identifier of the intelligent equipment which is connected with the air conditioner through communication;
the generating module is used for generating equipment list information of the intelligent equipment according to the equipment identifier;
and the control module is used for controlling the operation time of the intelligent equipment based on the air conditioner list information and the equipment list information.
In a third aspect, the present invention also provides an electronic device, including a memory, a processor, and a computer program stored on the memory and executable on the processor, where the processor implements the steps of the method for controlling an air conditioner-based intelligent device as described in any of the above when the program is executed.
In a fourth aspect, the present invention also provides a non-transitory computer readable storage medium, on which a computer program is stored, which when executed by a processor, implements the steps of the method for controlling an air-conditioning based intelligent appliance as described in any of the above.
In a fifth aspect, the present invention also provides a computer program product comprising a computer program which, when executed by a processor, implements the steps of the method of controlling an air-conditioning based intelligent appliance as described in any of the above.
In a sixth aspect, the present invention further provides an air conditioner, including a controller, where the controller is connected to a smart device through a communication signal, and the controller is executed to implement the steps of the control method of the air conditioner-based smart device as described in any one of the above.
The invention provides a control method, a device, equipment and an air conditioner of intelligent equipment based on an air conditioner, wherein the air conditioner list information is generated according to the running condition of the air conditioner by recording the running condition of the air conditioner; acquiring an equipment identifier of intelligent equipment connected with the air conditioner through communication; generating equipment list information of the intelligent equipment according to the equipment identifier; and controlling the operation time of the intelligent equipment based on the air conditioner list information and the equipment list information. The operation time of the intelligent equipment can be controlled more intelligently, and the electric resource is saved.
Drawings
In order to more clearly illustrate the invention or the technical solutions of the prior art, the following description will briefly explain the drawings used in the embodiments or the description of the prior art, and it is obvious that the drawings in the following description are some embodiments of the invention, and other drawings can be obtained according to the drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic flow chart of a control method of an intelligent device based on an air conditioner;
FIG. 2 is a second flow chart of a control method of an intelligent device based on an air conditioner according to the present invention;
fig. 3 is a schematic structural diagram of a control device of an intelligent air-conditioning-based device provided by the invention;
fig. 4 is a schematic structural diagram of an electronic device provided by the present invention.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the present invention more apparent, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings, and it is apparent that the described embodiments are some embodiments of the present invention, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
The following describes a control method, a device and equipment for intelligent equipment based on an air conditioner and the air conditioner with reference to fig. 1 to 4.
As shown in fig. 1, which is one of implementation flow diagrams of a control method of an intelligent device based on an air conditioner according to an embodiment of the present invention, the control method of the intelligent device based on the air conditioner may include, but is not limited to, steps S100 to S400.
S100, recording the running condition of an air conditioner, and generating air conditioner list information according to the running condition of the air conditioner;
s200, acquiring an equipment identifier of intelligent equipment connected with the air conditioner through communication;
s300, generating equipment list information of the intelligent equipment according to the equipment identifier;
s400, controlling the operation time length of the intelligent equipment based on the air conditioner list information and the equipment list information.
It should be noted that, the execution body of the control method of the intelligent device based on the air conditioner in the embodiment of the application may be a hardware device with data information processing capability and/or necessary software for driving the hardware device to work.
Alternatively, the execution body may include, but is not limited to, workstations, servers, computers, user terminals, and other intelligent devices. The user terminal comprises, but is not limited to, a mobile phone, a computer, intelligent voice interaction equipment, intelligent household appliances, vehicle-mounted terminals and the like.
In step S100 of some embodiments, an operation condition of an air conditioner is recorded, and air conditioner list information is generated according to the operation condition of the air conditioner.
It can be understood that the server records the operation condition of the air conditioner, and the operation condition of the air conditioner at least comprises, but is not limited to, a single-day operation time of the air conditioner, a single-month operation time of the air conditioner, a single-day operation power of the air conditioner, and a single-month operation power of the air conditioner.
Further, the step of generating the air conditioner list information according to the operation condition of the air conditioner may specifically be: firstly, analyzing and processing the running condition of the air conditioner to obtain the running duration and the running power of the air conditioner. And calculating the power consumption of the air conditioner according to the operation time length and the operation power, and generating the air conditioner list information according to the power consumption of the air conditioner and a preset expense rule.
When the air conditioner stops running, the running condition of the air conditioner is analyzed, the single-day running time of the air conditioner and the single-day running power of the air conditioner are analyzed, and then the single-day running time and the single-day running power are calculated to obtain the single-day power consumption of the air conditioner. Taking a month as an example, the daily power consumption needs to be calculated.
Acquiring a preset expense rule, acquiring unit price of each degree of electric quantity according to the expense rule, and calculating single-day power consumption and unit price of each degree of electric quantity to obtain single-day power consumption expense of the air conditioner.
The air conditioner list information at least comprises the single-day power consumption expense, the single-month power consumption expense, the power consumption corresponding to each day and the daily operation time.
In step S200 of some embodiments, a device identifier of an intelligent device communicatively connected to the air conditioner is obtained.
It may be understood that, after the step of recording the operation condition of the air conditioner in the step S100 and generating the air conditioner list information according to the operation condition of the air conditioner, the specific implementation steps may be: and acquiring the equipment identifier of the intelligent equipment which is connected with the air conditioner through communication.
It should be noted that the smart device at least includes, but is not limited to: intelligent stereo, intelligent television, intelligent kitchen ware, intelligent refrigerator, intelligent washing machine, etc.
Each intelligent device has a unique device identifier, and corresponding device information can be acquired according to the device identifier of each intelligent device.
In step S300 of some embodiments, device inventory information of the intelligent devices is generated according to the device identification.
It may be understood that, after the step of acquiring the device identifier of the intelligent device connected to the air conditioner through communication in step S200 is performed, the specific performing steps may be: acquiring the power consumption of the equipment corresponding to each intelligent equipment according to the equipment identifier;
sequencing a plurality of intelligent devices according to the power consumption of the devices to obtain the ordered intelligent devices;
and generating the ordered device list information according to the device power consumption and the expense rule of the ordered intelligent device.
Further, the power consumption of the device corresponding to each intelligent device is obtained according to the device identifier of each intelligent device, and it is to be noted that the power consumption of the device is a single month power consumption of each intelligent device. And sequencing the plurality of intelligent devices according to the power consumption of the device, for example, sequencing the intelligent devices from high to low according to the power consumption of the device, thereby obtaining a plurality of ordered intelligent devices.
And calculating the power consumption of the equipment according to the unit price of each degree of electric quantity of the expense rule to obtain ordered equipment list information.
It should be noted that, the device list information at least includes a device identifier, a device power consumption and a device power consumption cost, where the device power consumption cost is orderly, so that it is more convenient to refer to and determine which intelligent device is relatively power-consuming.
In step S400 of some embodiments, the operation duration of the intelligent device is controlled based on the air-conditioning manifest information and the device manifest information.
It may be understood that, after the step of generating the device list information of the intelligent device according to the device identifier in step S300 is performed, the specific performing steps may be: calculating the equipment power consumption expense in the equipment list information and the air conditioner power consumption expense in the air conditioner list information to obtain total power consumption expense;
comparing the total power consumption expense with a preset total power consumption threshold;
determining intelligent equipment with power consumption larger than a standard power consumption threshold from a plurality of intelligent equipment under the condition that the total power consumption is larger than the total power consumption threshold;
acquiring the power consumption time length of the intelligent equipment with the power consumption larger than the standard power consumption threshold;
and calculating the power consumption time length and the compensation time length to obtain the equipment operation time length, and controlling the intelligent equipment to operate the equipment operation time length.
Further, the equipment power consumption expense in the equipment list information and the air conditioner power consumption expense in the air conditioner list information are summed up and calculated to obtain the total power consumption expense. The total electricity consumption cost is the sum of the electricity consumption cost of all intelligent devices and the electricity consumption cost of the air conditioner.
Taking one month as a preset time period and one month as 30 days as an example. And comparing the total power consumption cost with a preset total power consumption threshold, and determining the intelligent equipment with power consumption greater than a standard power consumption threshold from a plurality of intelligent equipment if the total power consumption cost of all the intelligent equipment is greater than the total power consumption threshold. Such as a smart oven, a smart grill. For example, 20 days at this time, then in the next 10 days, the operation duration of the intelligent device with the power consumption greater than the standard power consumption threshold is controlled, so as to reduce the overall power consumption.
Firstly, acquiring a single-day power consumption time length of the intelligent equipment with the power consumption larger than the standard power consumption threshold, performing difference calculation processing on the power consumption time length and the compensation time length, namely subtracting the compensation time length from the power consumption time length to obtain the equipment operation time length, controlling the intelligent equipment to operate the equipment operation time length, and realizing automatic power failure when the corresponding intelligent equipment is operated to the equipment operation time length. And the corresponding information prompt is sent to the terminal equipment of the user or the user is informed in the form of voice broadcasting.
In some embodiments of the present invention, before the step of controlling the operation time length of the smart device based on the air-conditioner inventory information and the device inventory information, the method includes:
determining the use priority of the air conditioner and the intelligent equipment from the air conditioner and the plurality of intelligent equipment according to the requirements of users;
under the condition that the use priority of the air conditioner is greater than that of the intelligent equipment, acquiring indoor environment temperature, and judging whether the air conditioner reaches a starting condition according to the indoor environment temperature;
if yes, sending prompt information to a user, and receiving air conditioner operation information fed back by the user according to the prompt information;
and determining the air conditioner operation time length of the air conditioner according to the air conditioner operation information and the air conditioner list information, and controlling the air conditioner to operate the air conditioner operation time length.
It is understood that, from the air conditioner and the plurality of intelligent devices, the use priorities of the air conditioner and the intelligent devices are determined according to the needs of the user, for example, whether the weather is cold or hot, and then whether the use priority of the air conditioner is higher than the use priority of other intelligent devices is determined according to the needs of the user.
And under the condition that the use priority of the air conditioner is greater than that of the intelligent equipment, acquiring the indoor environment temperature, and comparing the indoor environment temperature with a preset temperature threshold value to judge whether the air conditioner reaches a starting condition.
If the temperature difference between the indoor environment temperature and the temperature threshold value is relatively large, the air conditioner is determined to reach the starting condition. If the temperature difference between the indoor environment temperature and the temperature threshold is small, it is determined that the air conditioner does not reach the starting condition.
When the air conditioner reaches a starting condition, sending prompt information to a user, receiving air conditioner operation information fed back by the user, determining air conditioner operation time of the air conditioner according to the air conditioner operation information and the air conditioner list information, and controlling the air conditioner to operate the air conditioner operation time.
In some embodiments of the present invention, the determining the air conditioner operation duration of the air conditioner according to the air conditioner operation information and the air conditioner list information includes:
determining command duration of the air conditioner according to the air conditioner operation information;
comparing the air conditioner electricity consumption expense in the air conditioner list information with a preset air conditioner electricity consumption threshold value;
determining a compensation duration under the condition that the electricity consumption expense of the air conditioner is larger than the electricity consumption threshold value of the air conditioner;
and calculating the command duration and the compensation duration to obtain the air conditioner operation duration.
It can be understood that the air conditioner operation information fed back by the user at least comprises a cooling mode/heating mode, an air conditioner starting time and an air conditioner stopping time.
And calculating the air conditioner starting time and the air conditioner stopping time, and determining the command duration of the air conditioner.
Comparing the air conditioner power consumption expense in the air conditioner list information with a preset air conditioner power consumption threshold, determining a compensation time length under the condition that the air conditioner power consumption expense is larger than the air conditioner power consumption threshold, and performing difference calculation processing on the command time length and the compensation time length, namely subtracting the compensation time length from the command time length to obtain the air conditioner operation time length, namely controlling the air conditioner to operate for a small amount of time, so that heat supply or cold supply can be realized, the requirement of a user is met, and electricity saving can be realized.
It should be noted that the compensation time length is set according to the requirement, and is smaller than the command time length.
Further, if the electricity consumption expense of the air conditioner is smaller than the electricity consumption threshold value of the air conditioner, controlling the operation of the air conditioner according to the command duration.
As shown in fig. 2, a second flow chart of the control method of the intelligent device based on the air conditioner provided by the invention is that a data collector is arranged in the air conditioner to collect data of the service condition of the air conditioner, the service condition of the air conditioner can include information such as refrigeration, heating, opening time, air quantity and the like, a data analysis chart is formed in natural month, and a visual list is made for the service condition of the air conditioner of the user in the month. The user can clearly see the use condition of the air conditioner in the month through the list, and the use condition of the air conditioner can be adjusted according to the list. And the electricity consumption condition can be checked at any time.
Furthermore, the air conditioner can also be connected with a household electricity bill, and can be connected with other household appliances in parallel, so that an energy bill can be automatically output every month, a user can know which time is more in electricity consumption, and the user can be recommended to use electricity more in a saving way. And a daily/weekly/monthly electricity utilization early warning can be set, so that an early warning line can send out an alarm.
Furthermore, the air conditioner can be linked with other household appliances, and if no person in the space can dim the illumination when the air conditioner is detected to be started. If a certain appliance is powered on for more than one hour, a query is sent to the user as to whether the power needs to be continued. The user can also control the electric appliances through the linkage detail and can check which electric appliances are on, so that the whole household electric quantity consumption is controlled.
The invention provides a control method, a device, equipment and an air conditioner of intelligent equipment based on an air conditioner, wherein the air conditioner list information is generated according to the running condition of the air conditioner by recording the running condition of the air conditioner; acquiring an equipment identifier of intelligent equipment connected with the air conditioner through communication; generating equipment list information of the intelligent equipment according to the equipment identifier; and controlling the operation time of the intelligent equipment based on the air conditioner list information and the equipment list information. The operation time of the intelligent equipment can be controlled more intelligently, and the electric resource is saved.
The control device of the intelligent air-conditioning-based device provided by the invention is described below, and the control device of the intelligent air-conditioning-based device described below and the control method of the intelligent air-conditioning-based device described above can be referred to correspondingly.
As shown in fig. 3, the structure of the control device of the intelligent equipment based on the air conditioner provided by the invention is schematically shown, and the control device of the intelligent equipment based on the air conditioner comprises:
the recording module 310 is used for recording the running condition of the air conditioner and generating air conditioner list information according to the running condition of the air conditioner;
an obtaining module 320, configured to obtain an equipment identifier of an intelligent device connected to the air conditioner through communication;
a generating module 330, configured to generate device list information of the intelligent device according to the device identifier;
and the control module 340 is configured to control an operation duration of the intelligent device based on the air conditioner list information and the device list information.
Preferably, according to the control device for an intelligent device based on an air conditioner provided by the present invention, the recording module 310 is specifically configured to analyze and process the operation condition of the air conditioner to obtain the operation duration and the operation power of the air conditioner;
and calculating the power consumption of the air conditioner according to the operation time length and the operation power, and generating the air conditioner list information according to the power consumption of the air conditioner and a preset expense rule.
Preferably, according to the control device for an intelligent device based on an air conditioner provided by the present invention, the generating module 330 is specifically configured to obtain, according to the device identifier, a device power consumption corresponding to each intelligent device;
sequencing a plurality of intelligent devices according to the power consumption of the devices to obtain the ordered intelligent devices;
and generating the ordered device list information according to the device power consumption and the expense rule of the ordered intelligent device.
Preferably, according to the control device for an intelligent device based on an air conditioner provided by the invention, before the step of controlling the operation duration of the intelligent device based on the air conditioner list information and the device list information, the device is further configured to determine the usage priority of the air conditioner and the intelligent device from the air conditioner and the plurality of intelligent devices according to the requirements of a user;
under the condition that the use priority of the air conditioner is greater than that of the intelligent equipment, acquiring indoor environment temperature, and judging whether the air conditioner reaches a starting condition according to the indoor environment temperature;
if yes, sending prompt information to a user, and receiving air conditioner operation information fed back by the user according to the prompt information;
and determining the air conditioner operation time length of the air conditioner according to the air conditioner operation information and the air conditioner list information, and controlling the air conditioner to operate the air conditioner operation time length.
Preferably, according to the control device of the intelligent equipment based on the air conditioner provided by the invention, the device is further used for determining the command duration of the air conditioner according to the air conditioner operation information;
comparing the air conditioner electricity consumption expense in the air conditioner list information with a preset air conditioner electricity consumption threshold value;
determining a compensation duration under the condition that the electricity consumption expense of the air conditioner is larger than the electricity consumption threshold value of the air conditioner;
and calculating the command duration and the compensation duration to obtain the air conditioner operation duration.
Preferably, according to the control device for an intelligent air conditioner, the control module 340 is configured to calculate a device power consumption cost in the device list information and an air conditioner power consumption cost in the air conditioner list information, so as to obtain a total power consumption cost;
comparing the total power consumption expense with a preset total power consumption threshold;
determining intelligent equipment with power consumption larger than a standard power consumption threshold from a plurality of intelligent equipment under the condition that the total power consumption is larger than the total power consumption threshold;
acquiring the power consumption time length of the intelligent equipment with the power consumption larger than the standard power consumption threshold;
and calculating the power consumption time length and the compensation time length to obtain the equipment operation time length, and controlling the intelligent equipment to operate the equipment operation time length.
The invention provides a control method, a device, equipment and an air conditioner of intelligent equipment based on an air conditioner, wherein the air conditioner list information is generated according to the running condition of the air conditioner by recording the running condition of the air conditioner; acquiring an equipment identifier of intelligent equipment connected with the air conditioner through communication; generating equipment list information of the intelligent equipment according to the equipment identifier; and controlling the operation time of the intelligent equipment based on the air conditioner list information and the equipment list information. The operation time of the intelligent equipment can be controlled more intelligently, and the electric resource is saved.
Fig. 4 illustrates a physical schematic diagram of an electronic device, as shown in fig. 4, which may include: processor 410, communication interface (Communications Interface) 420, memory 430 and communication bus 440, wherein processor 410, communication interface 420 and memory 430 communicate with each other via communication bus 440. The processor 410 may invoke logic instructions in the memory 430 to perform a method of controlling an air-conditioning based smart device, the method comprising: recording the running condition of an air conditioner, and generating air conditioner list information according to the running condition of the air conditioner; acquiring an equipment identifier of intelligent equipment connected with the air conditioner through communication; generating equipment list information of the intelligent equipment according to the equipment identifier; and controlling the operation time of the intelligent equipment based on the air conditioner list information and the equipment list information.
Further, the logic instructions in the memory 430 described above may be implemented in the form of software functional units and may be stored in a computer-readable storage medium when sold or used as a stand-alone product. Based on this understanding, the technical solution of the present invention may be embodied essentially or in a part contributing to the prior art or in a part of the technical solution, in the form of a software product stored in a storage medium, comprising several instructions for causing a computer device (which may be a personal computer, a server, a network device, etc.) to perform all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a random access Memory (RAM, random Access Memory), a magnetic disk, or an optical disk, or other various media capable of storing program codes.
In another aspect, the present invention also provides a computer program product, where the computer program product includes a computer program, where the computer program can be stored on a non-transitory computer readable storage medium, and when the computer program is executed by a processor, the computer can execute the control method of the air conditioner-based intelligent device provided by the above methods, and the method includes: recording the running condition of an air conditioner, and generating air conditioner list information according to the running condition of the air conditioner; acquiring an equipment identifier of intelligent equipment connected with the air conditioner through communication; generating equipment list information of the intelligent equipment according to the equipment identifier; and controlling the operation time of the intelligent equipment based on the air conditioner list information and the equipment list information.
In still another aspect, the present invention also provides a non-transitory computer readable storage medium having stored thereon a computer program which, when executed by a processor, is implemented to perform the control method of an air conditioner-based intelligent device provided by the above methods, the method comprising: recording the running condition of an air conditioner, and generating air conditioner list information according to the running condition of the air conditioner; acquiring an equipment identifier of intelligent equipment connected with the air conditioner through communication; generating equipment list information of the intelligent equipment according to the equipment identifier; and controlling the operation time of the intelligent equipment based on the air conditioner list information and the equipment list information.
The apparatus embodiments described above are merely illustrative, wherein the elements illustrated as separate elements may or may not be physically separate, and the elements shown as elements may or may not be physical elements, may be located in one place, or may be distributed over a plurality of network elements. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment. Those of ordinary skill in the art will understand and implement the present invention without undue burden.
From the above description of the embodiments, it will be apparent to those skilled in the art that the embodiments may be implemented by means of software plus necessary general hardware platforms, or of course may be implemented by means of hardware. Based on this understanding, the foregoing technical solution may be embodied essentially or in a part contributing to the prior art in the form of a software product, which may be stored in a computer readable storage medium, such as ROM/RAM, a magnetic disk, an optical disk, etc., including several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the method described in the respective embodiments or some parts of the embodiments.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solution of the present invention, and are not limiting; although the invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical scheme described in the foregoing embodiments can be modified or some technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims (10)

1. The control method of the intelligent equipment based on the air conditioner is characterized by comprising the following steps of:
recording the running condition of an air conditioner, and generating air conditioner list information according to the running condition of the air conditioner;
acquiring an equipment identifier of intelligent equipment connected with the air conditioner through communication;
generating equipment list information of the intelligent equipment according to the equipment identifier;
and controlling the operation time of the intelligent equipment based on the air conditioner list information and the equipment list information.
2. The method for controlling an intelligent air conditioner-based device according to claim 1, wherein,
the generating air conditioner list information according to the running condition of the air conditioner comprises the following steps:
analyzing and processing the running condition of the air conditioner to obtain the running duration and the running power of the air conditioner;
and calculating the power consumption of the air conditioner according to the operation time length and the operation power, and generating the air conditioner list information according to the power consumption of the air conditioner and a preset expense rule.
3. The method for controlling an intelligent air conditioner-based device according to claim 2, wherein,
the generating the device list information of the intelligent device according to the device identifier comprises the following steps:
acquiring the power consumption of the equipment corresponding to each intelligent equipment according to the equipment identifier;
sequencing a plurality of intelligent devices according to the power consumption of the devices to obtain the ordered intelligent devices;
and generating the ordered device list information according to the device power consumption and the expense rule of the ordered intelligent device.
4. The method for controlling an intelligent air conditioner-based device according to claim 1, wherein,
before the step of controlling the operation duration of the intelligent device based on the air-conditioning inventory information and the device inventory information, the method includes:
determining the use priority of the air conditioner and the intelligent equipment from the air conditioner and the plurality of intelligent equipment according to the requirements of users;
under the condition that the use priority of the air conditioner is greater than that of the intelligent equipment, acquiring indoor environment temperature, and judging whether the air conditioner reaches a starting condition according to the indoor environment temperature;
if yes, sending prompt information to a user, and receiving air conditioner operation information fed back by the user according to the prompt information;
and determining the air conditioner operation time length of the air conditioner according to the air conditioner operation information and the air conditioner list information, and controlling the air conditioner to operate the air conditioner operation time length.
5. The method for controlling an intelligent air conditioner-based device according to claim 4, wherein,
the determining the air conditioner operation duration of the air conditioner according to the air conditioner operation information and the air conditioner list information comprises the following steps:
determining command duration of the air conditioner according to the air conditioner operation information;
comparing the air conditioner electricity consumption expense in the air conditioner list information with a preset air conditioner electricity consumption threshold value;
determining a compensation duration under the condition that the electricity consumption expense of the air conditioner is larger than the electricity consumption threshold value of the air conditioner;
and calculating the command duration and the compensation duration to obtain the air conditioner operation duration.
6. The method for controlling an intelligent air conditioner-based device according to claim 5, wherein,
the controlling the operation duration of the intelligent device based on the air conditioner list information and the equipment list information includes:
calculating the equipment power consumption expense in the equipment list information and the air conditioner power consumption expense in the air conditioner list information to obtain total power consumption expense;
comparing the total power consumption expense with a preset total power consumption threshold;
determining intelligent equipment with power consumption larger than a standard power consumption threshold from a plurality of intelligent equipment under the condition that the total power consumption is larger than the total power consumption threshold;
acquiring the power consumption time length of the intelligent equipment with the power consumption larger than the standard power consumption threshold;
and calculating the power consumption time length and the compensation time length to obtain the equipment operation time length, and controlling the intelligent equipment to operate the equipment operation time length.
7. A control device of an intelligent device based on an air conditioner, the device comprising:
the recording module is used for recording the running condition of the air conditioner and generating air conditioner list information according to the running condition of the air conditioner;
the acquisition module is used for acquiring the equipment identifier of the intelligent equipment which is connected with the air conditioner through communication;
the generating module is used for generating equipment list information of the intelligent equipment according to the equipment identifier;
and the control module is used for controlling the operation time of the intelligent equipment based on the air conditioner list information and the equipment list information.
8. An electronic device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, characterized in that the processor implements the steps of the control method of the air-conditioning based intelligent appliance according to any of claims 1 to 6 when the program is executed by the processor.
9. A non-transitory computer readable storage medium, on which a computer program is stored, characterized in that the computer program, when executed by a processor, implements the steps of the control method of an air-conditioning-based smart device according to any one of claims 1 to 6.
10. An air conditioner comprising a controller, wherein the controller is connected to a smart device by a communication signal, the controller when executed implementing the steps of the air conditioner-based smart device control method of any one of claims 1 to 6.
CN202310620733.4A 2023-05-29 2023-05-29 Control method, device and equipment of intelligent equipment based on air conditioner and air conditioner Pending CN116518541A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310620733.4A CN116518541A (en) 2023-05-29 2023-05-29 Control method, device and equipment of intelligent equipment based on air conditioner and air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310620733.4A CN116518541A (en) 2023-05-29 2023-05-29 Control method, device and equipment of intelligent equipment based on air conditioner and air conditioner

Publications (1)

Publication Number Publication Date
CN116518541A true CN116518541A (en) 2023-08-01

Family

ID=87403056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310620733.4A Pending CN116518541A (en) 2023-05-29 2023-05-29 Control method, device and equipment of intelligent equipment based on air conditioner and air conditioner

Country Status (1)

Country Link
CN (1) CN116518541A (en)

Similar Documents

Publication Publication Date Title
US9124132B2 (en) Automated demand response gateway
US10557876B2 (en) System and method for home energy monitor and control
US9146548B2 (en) System and method for energy consumption management
JP6076960B2 (en) Energy consumption management
EP2504807B1 (en) Network system for a component
CN109469966B (en) Electric heating control method and device for air conditioner compressor
KR20120072016A (en) System for providing energy management in home network interworking with smart grid, method and apparatus for providing energy management in home network interworking with smart grid
CN105446156A (en) Method, device and system for controlling household electric appliance based on artificial intelligence
CN113669912A (en) Water heater heating method and system
KR20120076659A (en) Load control method for load contol apparatus
CN113395193B (en) Equipment control method and device, computer equipment and storage medium
CN115017006A (en) Auxiliary energy-saving control method and system for data center
CN108063438B (en) Control method and device for direct-current micro-grid system
CN107577150A (en) A kind of electric quantity controlling method, electronic equipment and computer-readable recording medium
US20130245851A1 (en) Network system
US9407114B2 (en) Network system and control method thereof
US20120101646A1 (en) Interactive system for price-point control of power consumption
CN116518541A (en) Control method, device and equipment of intelligent equipment based on air conditioner and air conditioner
CN115933421A (en) Energy-saving control method and device for electrical equipment and electrical equipment
CN110120617B (en) Method for turning off household electrical appliance and intelligent socket
CN110553356A (en) Air conditioner control method, device and system and computer storage medium
CN114488837A (en) Control method and device of intelligent household equipment, storage medium and equipment
JP2014099985A (en) Power demand control system and method
CA3180902A1 (en) Load detection and prioritization for an energy management system
JP5935003B2 (en) Power control apparatus, power management system and program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination