CN116466658A CN202310273645.1A CN202310273645A CN116466658A CN 116466658 A CN116466658 A CN 116466658A CN 202310273645 A CN202310273645 A CN 202310273645A CN 116466658 A CN116466658 A CN 116466658A
Authority
CN
China
Prior art keywords
intermittent
reactant
parameter
sensor
carbonization chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310273645.1A
Other languages
Chinese (zh)
Inventor
江敏
朱安楠
王仁贵
高瑞冰
谢朝鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Science and Engineering WUSE
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN202310273645.1A priority Critical patent/CN116466658A/en
Publication of CN116466658A publication Critical patent/CN116466658A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32252Scheduling production, machining, job shop
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Coke Industry (AREA)

Abstract

The invention discloses a method, a system and a computer readable storage medium for managing a coal chemical intermittent process. The method comprises the steps of effectively dividing a coal chemical intermittent process, determining a control threshold value of a first reactant and a second reactant in a production stage, taking parameters obtained by a sensor in reaction equipment at a plurality of sampling points as variables, carrying out iterative optimization to update related parameters, identifying whether the current reaction state in the corresponding reaction stage is normal or not, judging that the intermittent process is normal when statistics of a non-intermittent period and statistics of an intermittent period are smaller than the control threshold value, and judging that the intermittent process is abnormal and an indicator gives an early warning when the statistics of the non-intermittent period and the statistics of the intermittent period are smaller than the control threshold value, otherwise, judging that the intermittent process is abnormal.

Description

Management method, system and computer readable storage medium for intermittent process of coal chemical industry
Technical Field
The invention relates to the field of coal chemical industry and automatic control, in particular to a method, a system and a computer readable storage medium for managing an intermittent process of coal chemical industry.
Background
In the coal chemical production application process, the intermittent process contained in the multiple reaction steps has the special conditions of multiple steps and multiple modes, in the coal blending coking process, part of intermediate and reactant preparation links are intermittent processes, the variability of different stages of the intermittent processes is strong, if the intermittent processes are not effectively monitored and controlled, the quality of the reactants or the intermediate produced in different batches is not high, and production safety accidents can be caused in serious cases. Because intermittent monitoring has stronger dynamic property, the nonlinear change characteristics lead to difficulty in monitoring production links through a macroscopic monitoring means.
In the prior art, CN113420815a discloses a nonlinear PLS intermittent process monitoring method of semi-supervised RSDAE, by establishing a semi-supervised robust sparse depth self-coding network RSDAE, extracting low-dimensional data features from a high-dimensional, noisy and sparse dataset, and constructing a PLS model to accurately predict hidden danger and practical problems possibly existing in the intermittent process. For another example, CN109828552B discloses an intermittent process fault monitoring and diagnosing method based on a width learning system, and the technical means is to perform accurate detection from two angles of online and offline through a manner of adaptively establishing a neural network monitoring model. The technical scheme can not solve the quality control problem in multiple operation modes and batches, and the problem of inaccurate evaluation of the reaction stage is easily caused by the diversity of the adjustable parameters. Accordingly, there is a need for further improvements in the art.
Disclosure of Invention
Aiming at the problems, the invention provides a management method for a coal chemical intermittent process. The method is applied to an intermittent process of mixed coking of a first reactant and a second reactant, and is used for determining a control threshold value of the first reactant and the second reactant in a production stage by effectively dividing the intermittent process of coal chemical industry, and identifying whether the current reaction state in the corresponding reaction stage is normal or not through iterative optimization updating of related parameters. Further, the invention also provides a system and a computer readable storage medium for realizing the intermittent process management method of the coal chemical industry.
The invention aims at realizing the following technical means:
a management method of a coal chemical intermittent process comprises the following steps:
step 1: the first reactant is added into a carbonization chamber, and the batch process T of the reaction is carried out 1 Comprises K 1 Sub-process, in batch process T 1 Setting m first check points;
step 2: the control unit sets a start factor lambda=1, sets a start time k=1, and records a first transmission in a plurality of sampling periodsFirst parameter f of sensor 1 Calculating a first threshold value beta after the sampling period is ended 1
Step 3: adding a second reactant into the carbonization chamber, and reacting in a batch process T 2 Comprises K 2 In a batch process T 2 Setting n second check points;
step 4: the control unit records a second parameter f acquired by a second sensor in a second check point in the carbonization chamber 2 Calculating a second threshold beta after the sampling period is ended 2
Step 5: if satisfy beta 1 ≥λβ 2 Step 6 is entered, otherwise, the memory cell updates k' =k+. DELTA.a, wherein DELTA.a is the step size of the time update iteration, and step 2 is returned;
step 6: intermittent process T before time k 1 Is a non-intermittent period, and the statistic in the non-intermittent period is U s Intermittent process T after time k 2 Is intermittent, and the statistic in the intermittent is U d
Step 7: if statistics U s Maximum value U of (2) s(max) ≤β 1 And statistics U d Maximum value U of (2) d(max) ≤β 2 Step 8, entering a step, otherwise, giving an early warning to the indicator;
step 8: the first reactant and the second reactant enter the coke oven.
In the present invention, the first parameter f 1 Including at least the temperature of the first reactant, the oxygen concentration.
In the present invention, the second parameter f 2 At least including the oven door smoke concentration, oven side pressure of the second reactant.
In the present invention, the first threshold value beta 1 And a second threshold beta 2 Respectively a load matrix P t1 (i, j), load matrix P t2 (i, j) chi-square distribution calculation result of principal component number.
In the present invention, statistics U s The set of first parameters obtained for each first checkpoint is a load matrix P t1 (i, j) and a load matrix P t2 Distance H between (i, j) 1 (d) System for managingMetering U d The set of second parameters obtained for each second checkpoint is found in the load matrix P t2 (i, j) and a load matrix P t1 Distance H between (i, j) 2 (d)。
In the present invention, at a first checkpoint prior to time k, the load matrix P t1 (i, j) and P t2 Distance H between (i, j) 1 (d),Load matrix P t2 (i, j) and P t1 Distance H between (i, j) 2 (d),/>Wherein t is 1 And t 2 Representing a different first checkpoint, t 1 ,t 2 ∈[1,k]。
A management system for implementing a management method for a coal chemical industry batch process, comprising: the carbonization chamber, the control unit, the storage unit, the first sensor, the second sensor, the indicator and the coke oven,
the carbonization chamber is used for mixing and reacting the first reactant and the second reactant;
the first sensor records a first parameter of the reaction process in the carbonization chamber according to a first check point;
a second sensor records a second parameter of the reaction process in the carbonization chamber according to a second check point;
the control unit is used for recording the first parameter and the second parameter acquired by the first sensor and the second sensor;
the storage unit records each reaction state of the intermittent process and can modify the parameter values of the starting factor lambda and the starting time k;
the indicator is composed of a timing circuit with an interrupt characteristic, and when triggered, the indicator gives out an audible alarm;
the coke oven is used for receiving the first reactant and the second reactant.
The management method, the system and the computer readable storage medium for implementing the intermittent process of the coal chemical industry have the following beneficial effects: the dynamic modeling is carried out through two reaction stages in the intermittent process of coal chemical industry, the parameter information obtained by monitoring the sensor is optimized, and the optimal online monitoring method is searched according to the change of the parameter and the operation process, so that the problem of poor repeatability in online monitoring in the mixing process of the first reactant and the second reactant in the same equipment is solved. In addition, by using the monitoring method and the monitoring system, the connectivity among different production batches is improved, and the production efficiency of coal blending and coking is improved laterally.
Drawings
FIG. 1 is a flow chart of the method for managing a coal chemical industry batch process of the present invention.
FIG. 2 is a hardware block diagram of a management system of the intermittent process management method for coal industry of the present invention.
Description of the embodiments
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
In the coking process, under the condition of the same coking time, the quality of the coke produced at different standard temperatures has certain difference. In the actual coking production process, the processing is carried out in the same equipment or a plurality of equipment, so that the processing process of products with relatively fixed quality or batches is obtained, and the intermittent process can be caused in the whole production process due to the small change of temperature, the change of batch property and the change of working condition of the reaction equipment in the material reaction process. In the practice of coal chemical industry, it is necessary to cycle multiple automated production batches over a limited duration of operating cycles to obtain batches of product.
Different actual production processes of different coal types are different, under the condition that the working state of equipment is constant, in order to carry out on-line monitoring on the intermittent process, the time interval dividing points of a non-intermittent period and an intermittent period are determined, and in the production period of a single batch, when the condition that the statistics exceeds a threshold value in the intermittent process is monitored on line, the production system is proved to have faults, and the production process needs to be stopped in time.
Example 1
The method for managing the intermittent process of the coal chemical industry solves the problem of influence of parameter change on time period judgment in the intermittent process of the coal chemical industry, is used for on-line monitoring of the intermittent process in the production link of the first reactant and the second reactant in the embodiment, and specifically comprises the following steps with reference to FIG. 1.
Step 1: the first sensor and the second sensor are arranged in the carbonization chamber, the carbonization chamber is used for mixing the second reactant and the first reactant, the second reactant and the first reactant are mixed after being weighed by the conveying belt, and the next production process is executed.
In this embodiment, the first sensor includes a plurality of sensor units, which have a multi-parameter sampling function, and any one of the sensor units includes a sensing control circuit, where the sensing control circuit is formed by a CMOS circuit and a P-type tube, and is turned off in a high-level state, and the sensor does not work; and conducting in a low level state, and enabling the sensor to work for the first time.
Step 2: adding a first reactant into the carbonization chamber, adding the first reactant into the carbonization chamber, and carrying out intermittent process T of reaction 1 Comprises K 1 Sub-process, in batch process T 1 Setting m first check points in a batch process T 1 After execution is completed, the data matrix recorded at each first checkpoint is K 1 ×m。
Step 3: the control unit sets a start factor lambda=1, sets a start time k=1, and records a first parameter f of the first sensor in a plurality of sampling periods 1 Calculating a first threshold value beta after the sampling period is ended 1 . Wherein the first parameter f 1 Including at least the temperature of the first reactant, the oxygen concentration.
Step 3: adding a second reactant into the carbonization chamber, and reacting in a batch process T 2 Comprises K 2 In a batch process T 2 Setting n second check points in batch process T 2 After execution is completed, the data matrix recorded at each second checkpoint is K 2 ×n。
Step 4: the control unit records a second parameter f acquired by a second sensor in each sampling point carbonization chamber 2 Calculating a second threshold beta after the sampling period is ended 2 . Wherein the second parameter f 2 At least comprisesFurnace door smoke dust concentration, furnace side pressure of the second reactant.
Step 5: if satisfy beta 1 ≥λβ 2 Step 6 is entered, otherwise, the memory cell updates k' =k+. DELTA.a, where DELTA.a is the step size of the time update iteration, and returns to step 3.
In particular, the sequential addition of increasing the number of residual correlation matrices can ensure that the first parameter and the second parameter extracted in this embodiment have the same variable correlation at the time k, and if the first parameter and the second parameter have similar characteristics in the time k, the unsteady link model formed by the time k has the same monitoring effect as the k period model formed by the first parameter and the second parameter, thereby meeting the requirement of beta 1 ≥λβ 2 Then can be based on the monitoring statistic U s And U d Deducing the change condition of the unsteady state link; if not meet beta 1 ≥λβ 2 Then the step 3 is required to be returned to enter the next time to participate in the second iteration until the iteration reaches the time of k' to meet the requirement of beta 1 ≥λβ 2 Until that point.
In the present embodiment, at the first checkpoint before the k-time, the load matrix P t1 (i, j) and P t2 Distance H between (i, j) 1 (d),Load matrix P t2 (i, j) and P t1 Distance H between (i, j) 2 (d),/>Wherein t is 1 And t 2 Representing a different first checkpoint, t 1 ,t 2 ∈[1,k]。
In this embodiment, dividing the non-intermittent period and the intermittent period by using the k time as a standard is affected by the start factor, if the start factor is selected to be larger, the time when the variable correlation has the difference cannot be divided into the same period, so that the period division result has no reference value; if the initial factor is selected to be smaller, the variable correlation is not divided accurately enough in two continuous and adjacent moments, and noise interference exists in time interval division. Therefore, it is necessary to determine the rationality of the start factor selection. The number of the clustering centers N=f (k), the time k is continuously changed in different iteration times, the function taking the time k as an independent variable is linearly increased along with the increase of the time k at a fixed step length delta a, the fact that the number of the clustering centers is gradually increased from 1 to a plurality of critical points is explained, and the selected initial factor is the most preferable; if the time k increases at a fixed step Δa without change, f (k) is a constant value, indicating that the selected start factor in the iteration is not optimal, and entering the iteration verification process after updating is needed.
Step 6: taking k as a demarcation point, recording an intermittent process before the moment k as a non-intermittent period, wherein the statistic in the non-intermittent period is U s The intermittent process after the recording time k is an intermittent period, and the statistic in the intermittent period is U d
In the present embodiment, statistics U s The set of first parameters obtained for each first checkpoint is a load matrix P t1 (i, j) and a load matrix P t2 Distance H between (i, j) 1 (d) Statistics U d The set of second parameters obtained for each second checkpoint is found in the load matrix P t2 (i, j) and a load matrix P t1 Distance H between (i, j) 2 (d)。
Step 7: if statistics U s Maximum value U of (2) s(max) ≤β 1 And statistics U d Maximum value U of (2) d(max) ≤β 2 And (3) indicating that the unstable process is in a normal stage, and if the quantized statistic maximum value of the variable parameter is in a control threshold range, the process runs normally, and entering a step (8), otherwise, indicating that the quantized statistic maximum value of the variable parameter is beyond the control threshold range, and giving an early warning to the indicator.
Step 8: the first reactant and the second reactant enter the coke oven.
Example two
Referring to fig. 2, a management system for implementing a management method of a coal chemical industry batch process, includes: the carbonization chamber, the control unit, the storage unit, the first sensor, the second sensor, the indicator and the coke oven,
the carbonization chamber is used for mixing and reacting the first reactant and the second reactant;
the first sensor records a first parameter of the reaction process in the carbonization chamber according to a first check point;
a second sensor records a second parameter of the reaction process in the carbonization chamber according to a second check point;
the control unit is used for recording the first parameter and the second parameter acquired by the first sensor and the second sensor;
the storage unit records each reaction state of the intermittent process and can modify the parameter values of the starting factor lambda and the starting time k;
the indicator is composed of a timing circuit with an interrupt characteristic, and when triggered, the indicator gives out an audible alarm;
the coke oven is used for receiving the first reactant and the second reactant.
Example III
The present embodiment describes a computer-readable storage medium having stored thereon a computer program which, when executed by a processor, implements the method of managing a coal chemical industry batch process.
For the purposes of this description, a "computer-readable storage medium" can be any means that can contain, store, communicate, propagate, or transport the program for use by or in connection with the instruction execution system, apparatus, or device. More specific examples (a non-exhaustive list) of the computer-readable storage medium would include the following: an electrical connection (electronic device) having one or more wires, a portable computer diskette (magnetic device), a random access memory unit (RAM), a read-only memory unit (ROM), an erasable programmable read-only memory unit (EPROM or flash memory unit), an optical fiber device, and a portable compact disc read-only memory unit (CDROM). In addition, the computer-readable storage medium may even be paper or other suitable medium on which the program is printed, as the program may be electronically captured, via, for instance, optical scanning of the paper or other medium, then compiled, interpreted, or otherwise processed in a suitable manner, if necessary, and then stored in a computer memory unit.
The foregoing description of the preferred embodiments of the invention is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention.

Claims (7)

1. The method for managing the intermittent process of the coal chemical industry is characterized by comprising the following steps of:
step 1: the first reactant is added into a carbonization chamber, and the batch process T of the reaction is carried out 1 Comprises K 1 Sub-process, in batch process T 1 Setting m first check points;
step 2: the control unit sets a start factor lambda=1, sets a start time k=1, and records a first parameter f of the first sensor in a plurality of sampling periods 1 Calculating a first threshold value beta after the sampling period is ended 1
Step 3: adding a second reactant into the carbonization chamber, and reacting in a batch process T 2 Comprises K 2 In a batch process T 2 Setting n second check points;
step 4: the control unit records a second parameter f acquired by a second sensor in a second check point in the carbonization chamber 2 Calculating a second threshold beta after the sampling period is ended 2
Step 5: if satisfy beta 1 ≥λβ 2 Step 6 is entered, otherwise, the memory cell updates k' =k+. DELTA.a, wherein DELTA.a is the step size of the time update iteration, and step 2 is returned;
step 6: intermittent process T before time k 1 Is a non-intermittent period, and the statistic in the non-intermittent period is U s Intermittent process T after time k 2 Is intermittent, and the statistic in the intermittent is U d
Step 7: if statistics U s Maximum value U of (2) s(max) ≤β 1 And statistics U d Maximum value U of (2) d(max) ≤β 2 Enter intoStep 8, otherwise, the indicator gives an early warning;
step 8: the first reactant and the second reactant enter the coke oven.
2. The method of claim 1, wherein the first parameter f1 comprises at least a temperature of the first reactant and an oxygen concentration.
3. The method of claim 1, wherein the second parameter f2 comprises at least a furnace door smoke concentration, a furnace side pressure of the second reactant.
4. The method for managing a batch process in coal chemical industry according to claim 1, wherein the first threshold value β 1 And a second threshold beta 2 Respectively a load matrix P t1 (i, j), load matrix P t2 (i, j) chi-square distribution calculation result of principal component number.
5. The method for managing a batch process in coal chemical industry according to claim 1, wherein the statistic U s The set of first parameters obtained for each first checkpoint is a load matrix P t1 (i, j) and a load matrix P t2 Distance H between (i, j) 1 (d) Statistics U d The set of second parameters obtained for each second checkpoint is found in the load matrix P t2 (i, j) and a load matrix P t1 Distance H between (i, j) 2 (d)。
6. The method for managing a batch process of coal industry according to claim 1, wherein the load matrix P is at a first check point before the k moment t1 (i, j) and P t2 Distance H between (i, j) 1 (d),Load matrix P t2 (i, j) and P t1 Distance H between (i, j) 2 (d),/>Wherein t is 1 And t 2 Representing a different first checkpoint, t 1 ,t 2 ∈[1,k]。
7. The management system for implementing a management method of a coal chemical industry batch process according to claim 1, comprising: the carbonization chamber, the control unit, the storage unit, the first sensor, the second sensor, the indicator and the coke oven,
the carbonization chamber is used for mixing and reacting the first reactant and the second reactant;
the first sensor records a first parameter of the reaction process in the carbonization chamber according to a first check point;
a second sensor records a second parameter of the reaction process in the carbonization chamber according to a second check point;
the control unit is used for recording the first parameter and the second parameter acquired by the first sensor and the second sensor;
the storage unit records each reaction state of the intermittent process and can modify the parameter values of the starting factor lambda and the starting time k;
the indicator is composed of a timing circuit with an interrupt characteristic, and when triggered, the indicator gives out an audible alarm;
the coke oven is used for receiving the first reactant and the second reactant.
CN202310273645.1A 2023-03-21 2023-03-21 Management method, system and computer readable storage medium for intermittent process of coal chemical industry Pending CN116466658A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310273645.1A CN116466658A (en) 2023-03-21 2023-03-21 Management method, system and computer readable storage medium for intermittent process of coal chemical industry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310273645.1A CN116466658A (en) 2023-03-21 2023-03-21 Management method, system and computer readable storage medium for intermittent process of coal chemical industry

Publications (1)

Publication Number Publication Date
CN116466658A true CN116466658A (en) 2023-07-21

Family

ID=87179670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310273645.1A Pending CN116466658A (en) 2023-03-21 2023-03-21 Management method, system and computer readable storage medium for intermittent process of coal chemical industry

Country Status (1)

Country Link
CN (1) CN116466658A (en)

Similar Documents

Publication Publication Date Title
CN111445103B (en) Power transmission cable production quality management feedback system based on industrial internet
JP2008059270A (en) Process abnormality diagnostic device and process monitoring system
CN106845826B (en) PCA-Cpk-based cold continuous rolling production line service quality state evaluation method
CN115876258B (en) Livestock and poultry breeding environment abnormity monitoring and alarming system based on multi-source data
CN117193222A (en) Intelligent quality control system based on industrial Internet of things and big data and control method thereof
CN111191855B (en) Water quality abnormal event identification and early warning method based on pipe network multi-element water quality time sequence data
CN116125242A (en) Object detection method and system
CN114266454A (en) Cigarette factory energy consumption abnormity monitoring and judging method and system thereof
CN117312879B (en) Injection molding machine production data supervision and early warning method, system and medium
CN116466658A (en) Management method, system and computer readable storage medium for intermittent process of coal chemical industry
CN106845825A (en) It is a kind of to be traced to the source and control method based on the cold rolling of strip steel quality problems for improving PCA
CN116589078B (en) Intelligent sewage treatment control method and system based on data fusion
CN117350435A (en) Method and system for managing industrial prawn culture equipment
CN112950908A (en) Data monitoring and early warning method, system, medium and electronic terminal
CN114358450B (en) Fermentation quality prediction system for mochi bread processing based on data processing
CN116914194A (en) Cloud-coordinated fuel cell residual service life remote monitoring method
CN116629447A (en) Intelligent detection system applied to PCBA products
CN115115213A (en) Method and device for retrospective analysis of quality characteristics of steel products
CN113671287B (en) Intelligent detection method, system and readable storage medium for power grid automation terminal
CN118068819B (en) Large model data management system for high quality diagnostics and decision making
CN113094351B (en) Knowledge mining and migration method for industrial automatic production process, intelligent terminal and storage medium
CN110648484A (en) Intelligent judgment early warning system for laser drilling and judgment method thereof
CN116823175B (en) Intelligent operation and maintenance method and system for petrochemical production informatization system
CN117314202B (en) Product carbon efficiency monitoring and optimizing method and system based on industrial Internet
WO2024130882A1 (en) Aging prediction method and system for heating component of power battery material firing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication