CN116452158B - Method, device, equipment and medium for managing index of random extraction of suppliers - Google Patents

Method, device, equipment and medium for managing index of random extraction of suppliers Download PDF

Info

Publication number
CN116452158B
CN116452158B CN202310720969.5A CN202310720969A CN116452158B CN 116452158 B CN116452158 B CN 116452158B CN 202310720969 A CN202310720969 A CN 202310720969A CN 116452158 B CN116452158 B CN 116452158B
Authority
CN
China
Prior art keywords
project manager
provider
project
qualification
suppliers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202310720969.5A
Other languages
Chinese (zh)
Other versions
CN116452158A (en
Inventor
徐慧欣
王青
张永鹏
许峰华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bosi Data Mining Technology Co ltd
Original Assignee
Bosi Digital Acquisition Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bosi Digital Acquisition Technology Development Co ltd filed Critical Bosi Digital Acquisition Technology Development Co ltd
Priority to CN202310720969.5A priority Critical patent/CN116452158B/en
Publication of CN116452158A publication Critical patent/CN116452158A/en
Application granted granted Critical
Publication of CN116452158B publication Critical patent/CN116452158B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/08Auctions
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

The application provides a method, a device, equipment and a medium for managing a target randomly extracted by a provider, wherein the method comprises the following steps: checking information provided by a provider, and binding the information after the checking is passed; and the project manager is checked in the steps of extraction, label application and performance, whether the suppliers accord with the regulations is judged, the suppliers are prevented from violating the regulations, powerful support is provided for randomly extracting and inviting the suppliers to purchase engineering projects through the supplier library, and positive effects are played in the aspects of improving purchase efficiency and reducing purchase cost.

Description

Method, device, equipment and medium for managing index of random extraction of suppliers
Technical Field
The application relates to the field of electronic bidding, in particular to a method, a device, equipment and a medium for managing a bid for random extraction of suppliers.
Background
In order to explore and solve the borrowing, leaning and resale qualification problems in the engineering field, aiming at engineering type provider information acquisition and refinement to project responsible persons (managers), qualification certificates, numbers and the like, a sharing and checking mechanism of provider qualification and project responsible person (manager) qualification is established in cooperation with a building department, the project responsible person (manager) and project binding provided in a provider bidding response link is realized, and the forensic construction management requirements that one project responsible person (manager) must not accept 2 or more engineering construction projects at the same time are realized; and in the project acceptance link, the purchasing person is urged to strictly perform the performance management, and the project responsible person (manager) information is checked to form the purchasing transaction and the performance overall process check management.
The prior bid response flow of the project extraction suppliers is not applied on the whole line, the business realization of the project extraction suppliers also generates a list by means of the extraction of a supplier library separated by a bidding system, and then the extraction list is transferred to the bidding system by a mode of manually inserting key for decryption; the extraction of the supplier library is carried out according to the basic information filled by the supplier and the enterprise qualification information, the authenticity of the filled information of the supplier is not checked authoritatively or checked manually, and the staff qualification of the supplier is not included in the random extraction condition; therefore, the existing suppliers provide the problems of registration, imposter borrowing qualification, purchasing activity handling, subcontracting and the like of the unreal information or false information, thereby disturbing the purchasing market order and seriously affecting the purchasing fairness and fairness.
Disclosure of Invention
The application aims to solve the technical problem of providing a method, a device, equipment and a medium for managing the index randomly extracted by suppliers, which provide powerful support for randomly extracting and inviting suppliers to purchase engineering projects through a supplier library and play a positive role in improving purchase efficiency and reducing purchase cost.
In a first aspect, the present application provides a method for managing a bid for random extraction by a provider, including:
step 1, checking information provided by a provider, and binding the information after the information passes the checking;
step 2, confirming a project manager of a provider when the provider is selected, judging whether the project manager is in a building state through a building service platform, if not, binding the project manager to the extracted project, adding the provider into an extraction library, and modifying the project manager into the building state; if yes, deleting the provider; extracting required suppliers from the extraction library, and then unbinding project managers corresponding to the non-extracted suppliers to generate an extraction result;
step 3, in the link of the supplier's label, detect whether the project manager of the supplier changes, if change, the supplier breaks rules; if not, the provider continues to offer services on an offer basis;
step 4, in the step of performing acceptance checking, detecting whether the project manager of the provider is replaced or not, if not, not checking the project manager any more, uploading the project manager to prove photos and supervision opinions or purchasing opinions until the project acceptance checking is completed, and unbinding the project manager; if the project manager is in the building state, judging whether the project manager is in the building state through the building service platform, if the project manager is not in the building state, binding the project manager to the project, modifying the project manager into the building state, uploading a project manager evidence and a supervision opinion or a purchasing opinion until the project acceptance is completed, unbinding the project manager; if in the established state, the provider violates the contract.
In a second aspect, the present application provides a device for managing a random extraction of a vendor, including:
the binding module is used for verifying the information provided by the provider, and binding the information after the verification is passed;
the extraction module is used for confirming a project manager of a provider when the provider is selected, judging whether the project manager is in a building state through the building service platform, if not, binding the project manager to the extracted project, adding the provider into an extraction library, and modifying the project manager into the building state; if yes, deleting the provider; extracting required suppliers from the extraction library, and then unbinding project managers corresponding to the non-extracted suppliers to generate an extraction result;
the label-applying verification module is used for detecting whether a project manager of a provider is replaced or not in a label-applying link of the provider, and if so, the provider breaks the contract; if not, the provider continues to offer services on an offer basis;
the performance verification module is used for detecting whether the project manager of the provider is replaced or not in a performance acceptance link, if not, the project manager is not checked any more, and uploading the project manager to prove photos and manager comments or purchasing comments until the project acceptance is completed, and unbinding the project manager; if the project manager is in the building state, judging whether the project manager is in the building state through the building service platform, if the project manager is not in the building state, binding the project manager to the project, modifying the project manager into the building state, uploading a project manager evidence and a supervision opinion or a purchasing opinion until the project acceptance is completed, unbinding the project manager; if in the established state, the provider violates the contract.
In a third aspect, the application provides an electronic device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, the processor implementing the method of the first aspect when executing the program.
In a fourth aspect, the present application provides a computer readable storage medium having stored thereon a computer program which when executed by a processor implements the method of the first aspect.
One or more technical solutions provided in the embodiments of the present application at least have the following technical effects or advantages:
the embodiment of the application provides a method, a device, equipment and a medium for managing the random extraction of suppliers,
the qualification data of the suppliers are all from the data which are consistent after verification of the building platform, so that false registration is solved. When checking qualification, the qualification information under the current supplier organization is checked together, and the suppliers need to upload the social security payment evidence of personnel, so that the problem of borrowing the qualification is solved. In the step of performing acceptance, whether the winning suppliers and project managers are the same person needs to be continuously checked, so that the subcontracting problem is solved; considering that the project manager of the provider leaves the provider due to job variation, the project manager needs to be rechecked after being changed; the method provides powerful support for randomly extracting the purchasing engineering project through the provider library to invite the provider, and plays a positive role in improving purchasing efficiency and reducing purchasing cost; the problems that the suppliers provide unreal information or false information for registration, impersonation borrowing, purchasing activity manipulation, subcontracting and the like are solved, and purchasing market order is guaranteed, so that purchasing is fair and fair.
The foregoing description is only an overview of the present application, and is intended to be implemented in accordance with the teachings of the present application in order that the same may be more clearly understood and to make the same and other objects, features and advantages of the present application more readily apparent.
Drawings
The application will be further described with reference to examples of embodiments with reference to the accompanying drawings.
FIG. 1 is a flow chart of a method according to a first embodiment of the application;
fig. 2 is a schematic structural diagram of a device in a second embodiment of the present application.
Detailed Description
The technical scheme in the embodiment of the application has the following overall thought:
a. in the step of maintaining personnel information of a supplier library, when the qualification information of a supplier practitioner is maintained, the authenticity of personnel qualification is checked with a building service platform, and after the verification is passed, the personnel qualification and the personnel information are bound, so that the personnel is ensured to be qualified and the personnel is not staff hanging;
b. for the project competitive negotiation purchasing items in the form of extracting the suppliers, the supplier confirmation link is required to fill the project responsible person (manager) of the suppliers into the confirmation information in the supplier extraction process, at this time, the system can check with the building service platform whether the project state of the project responsible person (manager) filled by the suppliers is under construction, if the state check is passed, that is, the project responsible person (manager) is not bound to other projects, the project to be extracted can be smoothly bound to. After binding is completed, the system pushes the "under construction" state of the project responsible person (manager) to the service platform. When the provider is completely extracted, the system pushes the "non-build" state of the project manager again to the build service platform after the provider is not extracted. If the provider is pumped, but the provider does not acquire the purchase file, the system will also push the "not under construction" status of the project principal (manager) to the living building service platform again, informing the living building service platform that the project principal (manager) has unbindd from the project.
c. In the link of the supplier's response, the system will check again whether the information of the project responsible person (manager) is under construction, and the project responsible person (manager) can be allowed to replace at this stage in consideration of the variation of personnel in the supplier, and the replaced project responsible person (manager) will also check with the building service platform whether to be under construction. After the verification result passes, the system binds the project responsible person (manager) to the project, then performs bid evaluation work, decides whether to continuously bind the project responsible person (manager) or unbind according to the bid result, and if the supplier does not bid, the system informs the service platform of unbind of the project responsible person (manager), namely, the unbind state. The project signs a contract, and the information of the project responsible person (manager) needs to be supplemented to the contract content.
d. In the step of performing acceptance inspection, the replacement of the project responsible person (manager) is also supported, and the replaced project responsible person (manager) can also check whether to be under construction or not with the construction service platform. When the buyer performs the verification, two accessories of the photo and the supervision opinion (or the buyer opinion) need to be uploaded by a project manager (responsible person). Until project acceptance is completed, the system unbinds the project responsible person (manager) and pushes the unbindd 'non-building' state to the building service platform.
Example 1
As shown in fig. 1, this embodiment provides a method for managing a bid for random extraction of a provider, which is characterized by comprising:
step 1, checking information provided by a provider, wherein the information provided by the provider comprises the following steps: personnel social security receipt proof information, enterprise qualification, and personnel qualification, the personnel qualification comprising: project manager qualification, safety production A certification qualification, safety production B certification qualification, safety production C certification qualification and set construction site professional qualification, verifying personnel social security receipt proof information and all qualification, and verifying whether the suppliers are effective and confirm the extraction of project managers participating in engineering, whether the enterprise scale of the suppliers meets the conditions, whether the selected purchasing intention items contain the items of the extracted projects, whether the service area selected by the suppliers comprises the service area required by the set projects, whether the mechanism qualification of the suppliers meets the requirements, and whether the suppliers are in an avoidance list or not in the effective period; after the verification is passed, binding the information;
step 2, confirming a project manager of a provider when the provider is selected, judging whether the project manager is in a building state through a building service platform, if not, binding the project manager to the extracted project, adding the provider into an extraction library, and modifying the project manager into the building state; if yes, deleting the provider; setting a unique ID number for each provider in the extraction library; acquiring a specified number of suppliers by generating a random number and randomly selecting the random number from the extraction library; and records its ID; then unbinding the project manager corresponding to the provider which is not extracted, modifying the project manager state into a non-building state, generating an extraction result, and encrypting the extraction result through a DES algorithm;
step 3, in the link of the supplier's label, detect whether the project manager of the supplier changes, if change, the supplier breaks rules; if not, the provider continues to offer services on an offer basis;
preferably, if not replaced, the project manager is no longer checked; if the project manager is replaced, judging whether the project manager is in a building state through the building service platform, if not, binding the project manager to the extracted project, and modifying the project manager to be in the building state; if the provider is under construction, the provider is violated;
step 4, in the step of performing acceptance checking, detecting whether the project manager of the provider is replaced or not, if not, not checking the project manager any more, uploading the project manager to prove photos and supervision opinions or purchasing opinions until the project acceptance checking is completed, and unbinding the project manager; if the project manager is in the building state, judging whether the project manager is in the building state through the building service platform, if the project manager is not in the building state, binding the project manager to the project, modifying the project manager into the building state, uploading a project manager evidence and a supervision opinion or a purchasing opinion until the project acceptance is completed, unbinding the project manager; if in the established state, the provider violates the contract.
Based on the same inventive concept, the application also provides a device corresponding to the method in the first embodiment, and the details of the second embodiment are shown.
Example two
As shown in fig. 2, in this embodiment, there is provided a device for managing a bid for random extraction of a provider, including:
the binding module is used for verifying information provided by a provider, wherein the information provided by the provider comprises the following components: personnel social security receipt proof information, enterprise qualification, and personnel qualification, the personnel qualification comprising: project manager qualification, safety production A certification qualification, safety production B certification qualification, safety production C certification qualification and set construction site professional qualification, verifying personnel social security receipt proof information and all qualification, and verifying whether the suppliers are effective and confirm the extraction of project managers participating in engineering, whether the enterprise scale of the suppliers meets the conditions, whether the selected purchasing intention items contain the items of the extracted projects, whether the service area selected by the suppliers comprises the service area required by the set projects, whether the mechanism qualification of the suppliers meets the requirements, and whether the suppliers are in an avoidance list or not in the effective period; after the verification is passed, binding the information;
the extraction module is used for confirming a project manager of a provider when the provider is selected, judging whether the project manager is in a building state through the building service platform, if not, binding the project manager to the extracted project, adding the provider into an extraction library, and modifying the project manager into the building state; if yes, deleting the provider; setting a unique ID number for each provider in the extraction library; acquiring a specified number of suppliers by generating a random number and randomly selecting the random number from the extraction library; and records its ID; then unbinding the project manager corresponding to the provider which is not extracted, modifying the project manager state into a non-building state, generating an extraction result, and encrypting the extraction result through a DES algorithm;
the label-applying verification module is used for detecting whether a project manager of a provider is replaced or not in a label-applying link of the provider, and if so, the provider breaks the contract; if not, the provider continues to offer services on an offer basis;
preferably, if not replaced, the project manager is no longer checked; if the project manager is in the building state, the project manager is bound to the extracted project, and the project manager is modified to be in the building state; if in the under-construction state, the provider violations;
the performance verification module is used for detecting whether the project manager of the provider is replaced or not in a performance acceptance link, if not, the project manager is not checked any more, and uploading the project manager to prove photos and manager comments or purchasing comments until the project acceptance is completed, and unbinding the project manager; if the project manager is in the building state, judging whether the project manager is in the building state through the building service platform, if the project manager is not in the building state, binding the project manager to the project, modifying the project manager into the building state, uploading a project manager evidence and a supervision opinion or a purchasing opinion until the project acceptance is completed, unbinding the project manager; if in the established state, the provider violates the contract.
Since the device described in the second embodiment of the present application is a device for implementing the method described in the first embodiment of the present application, based on the method described in the first embodiment of the present application, a person skilled in the art can understand the specific structure and the deformation of the device, and thus the detailed description thereof is omitted herein. All devices used in the method according to the first embodiment of the present application are within the scope of the present application.
Based on the same inventive concept, the application provides an electronic device embodiment corresponding to the first embodiment, and the details of the third embodiment are shown in the specification.
Example III
The present embodiment provides an electronic device including a memory, a processor, and a computer program stored in the memory and executable on the processor, where the processor executes the computer program to implement the implementation of the first embodiment.
Since the electronic device described in this embodiment is a device for implementing the method in the first embodiment of the present application, those skilled in the art will be able to understand the specific implementation of the electronic device and various modifications thereof based on the method described in the first embodiment of the present application, so how the electronic device implements the method in the embodiment of the present application will not be described in detail herein. The apparatus used to implement the methods of embodiments of the present application will be within the scope of the intended protection of the present application.
Based on the same inventive concept, the application provides a storage medium corresponding to the first embodiment, and the detail of the fourth embodiment is shown in the specification.
Example IV
The present embodiment provides a computer-readable storage medium having stored thereon a computer program which, when executed by a processor, can implement the implementation of the first embodiment.
It will be appreciated by those skilled in the art that embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems) and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flowchart illustrations and/or block diagrams, and combinations of flows and/or blocks in the flowchart illustrations and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
While specific embodiments of the application have been described above, it will be appreciated by those skilled in the art that the specific embodiments described are illustrative only and not intended to limit the scope of the application, and that equivalent modifications and variations of the application in light of the spirit of the application will be covered by the claims of the present application.

Claims (6)

1. A method for managing the random extraction of a vendor, comprising:
step 1, checking information provided by a provider, wherein the information provided by the provider comprises the following steps: personnel social security receipt proof information, enterprise qualification, and personnel qualification, the personnel qualification comprising: project manager qualification, safety production A certification qualification, safety production B certification qualification, safety production C certification qualification and set construction site professional qualification, verifying personnel social security receipt proof information and all qualification, and verifying whether the suppliers are effective and confirm the extraction of project managers participating in engineering, whether the enterprise scale of the suppliers meets the conditions, whether the selected purchasing intention items contain the items of the extracted projects, whether the service area selected by the suppliers comprises the service area required by the set projects, whether the mechanism qualification of the suppliers meets the requirements, and whether the suppliers are in an avoidance list or not in the effective period; after the verification is passed, binding the information;
step 2, confirming a project manager of a provider when the provider is selected, judging whether the project manager is in a building state through a building service platform, if not, binding the project manager to the extracted project, adding the provider into an extraction library, and modifying the project manager into the building state; if yes, deleting the provider; setting a unique ID number for each provider in the extraction library; acquiring a specified number of suppliers by generating a random number and randomly selecting the random number from the extraction library; and records its ID; then unbinding the project manager corresponding to the non-extracted provider, modifying the project manager state into a non-established state, and generating an extraction result;
step 3, in the link of the supplier's label, detect whether the project manager of the supplier changes, if change, the supplier breaks rules; if not, the provider continues to offer services on an offer basis;
step 4, in the step of performing acceptance checking, detecting whether the project manager of the provider is replaced or not, if not, not checking the project manager any more, uploading the project manager to prove photos and supervision opinions or purchasing opinions until the project acceptance checking is completed, and unbinding the project manager; if the project manager is in the building state, judging whether the project manager is in the building state through the building service platform, if the project manager is not in the building state, binding the project manager to the project, modifying the project manager into the building state, uploading a project manager evidence and a supervision opinion or a purchasing opinion until the project acceptance is completed, unbinding the project manager; if in the established state, the provider violates the contract.
2. The method for managing the random extraction of marketers from a supplier of claim 1, wherein said step 2 further includes: and encrypting the extraction result through a DES algorithm.
3. A marketer management device for randomly extracting suppliers, comprising:
the binding module is used for verifying information provided by a provider, wherein the information provided by the provider comprises the following components: personnel social security receipt proof information, enterprise qualification, and personnel qualification, the personnel qualification comprising: project manager qualification, safety production A certification qualification, safety production B certification qualification, safety production C certification qualification and set construction site professional qualification, verifying personnel social security receipt proof information and all qualification, and verifying whether the suppliers are effective and confirm the extraction of project managers participating in engineering, whether the enterprise scale of the suppliers meets the conditions, whether the selected purchasing intention items contain the items of the extracted projects, whether the service area selected by the suppliers comprises the service area required by the set projects, whether the mechanism qualification of the suppliers meets the requirements, and whether the suppliers are in an avoidance list or not in the effective period; after the verification is passed, binding the information;
the extraction module is used for confirming a project manager of a provider when the provider is selected, judging whether the project manager is in a building state through the building service platform, if not, binding the project manager to the extracted project, adding the provider into an extraction library, and modifying the project manager into the building state; if yes, deleting the provider; setting a unique ID number for each provider in the extraction library; acquiring a specified number of suppliers by generating a random number and randomly selecting the random number from the extraction library; and records its ID; then unbinding the project manager corresponding to the non-extracted provider, modifying the project manager state into a non-established state, and generating an extraction result;
the label-applying verification module is used for detecting whether a project manager of a provider is replaced or not in a label-applying link of the provider, and if so, the provider breaks the contract; if not, the provider continues to offer services on an offer basis;
the performance verification module is used for detecting whether the project manager of the provider is replaced or not in a performance acceptance link, if not, the project manager is not checked any more, and uploading the project manager to prove photos and manager comments or purchasing comments until the project acceptance is completed, and unbinding the project manager; if the project manager is in the building state, judging whether the project manager is in the building state through the building service platform, if the project manager is not in the building state, binding the project manager to the project, modifying the project manager into the building state, uploading a project manager evidence and a supervision opinion or a purchasing opinion until the project acceptance is completed, unbinding the project manager; if in the established state, the provider violates the contract.
4. A vendor randomly extracted bid management device of claim 3, wherein said extraction module further comprises: and encrypting the extraction result through a DES algorithm.
5. An electronic device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, wherein the processor implements the method of any one of claims 1 and 2 when the program is executed by the processor.
6. A computer readable storage medium, on which a computer program is stored, characterized in that the program, when being executed by a processor, implements the method according to any one of claims 1 and 2.
CN202310720969.5A 2023-06-19 2023-06-19 Method, device, equipment and medium for managing index of random extraction of suppliers Active CN116452158B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310720969.5A CN116452158B (en) 2023-06-19 2023-06-19 Method, device, equipment and medium for managing index of random extraction of suppliers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310720969.5A CN116452158B (en) 2023-06-19 2023-06-19 Method, device, equipment and medium for managing index of random extraction of suppliers

Publications (2)

Publication Number Publication Date
CN116452158A CN116452158A (en) 2023-07-18
CN116452158B true CN116452158B (en) 2023-10-13

Family

ID=87122373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310720969.5A Active CN116452158B (en) 2023-06-19 2023-06-19 Method, device, equipment and medium for managing index of random extraction of suppliers

Country Status (1)

Country Link
CN (1) CN116452158B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106251082A (en) * 2016-08-08 2016-12-21 青岛金智高新技术有限公司 System for managing stock service of business
CN108197910A (en) * 2018-03-27 2018-06-22 四川国际招标有限责任公司 A kind of project for bidding project verification management system
CN109784681A (en) * 2018-12-26 2019-05-21 中国大唐集团科学技术研究院有限公司 Power engineering project investment management system
CN110162548A (en) * 2018-02-09 2019-08-23 国网河北省电力有限公司物资分公司 Big data analysis system for electric power bidding project
CN111833158A (en) * 2019-04-23 2020-10-27 中国石化工程建设有限公司 Industry design product frame-type bid-attracting management platform

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030101127A1 (en) * 2000-11-30 2003-05-29 Cornelius Michael Anfred Network-based system for the management of construction bids
US20100268651A1 (en) * 2009-04-20 2010-10-21 Olga Raskina Automatic generation of a scenario used to optimize a bid award schedule

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106251082A (en) * 2016-08-08 2016-12-21 青岛金智高新技术有限公司 System for managing stock service of business
CN110162548A (en) * 2018-02-09 2019-08-23 国网河北省电力有限公司物资分公司 Big data analysis system for electric power bidding project
CN108197910A (en) * 2018-03-27 2018-06-22 四川国际招标有限责任公司 A kind of project for bidding project verification management system
CN109784681A (en) * 2018-12-26 2019-05-21 中国大唐集团科学技术研究院有限公司 Power engineering project investment management system
CN111833158A (en) * 2019-04-23 2020-10-27 中国石化工程建设有限公司 Industry design product frame-type bid-attracting management platform

Also Published As

Publication number Publication date
CN116452158A (en) 2023-07-18

Similar Documents

Publication Publication Date Title
US20230334480A1 (en) Decentralized title transfer and validation of assets
CA3071976C (en) Distributed ledger interaction systems and methods
TWI829626B (en) Blockchain-based method and system for specifying the recipient of an electronic communication
US20200402062A1 (en) Data processing method, apparatus and computer-readable non-transitory storage medium
EP3779760B1 (en) Blockchain-based data processing method and apparatus, and electronic device
CN109657501B (en) Traceable anti-tampering chip research and development transaction data storage method and system
CN110599348B (en) Method, device, equipment and storage medium for stock right incentive
TW201931270A (en) Carbon trading system and carbon trading platform
WO2022261650A2 (en) Systems and methods for maintenance of nft assets
US20230100422A1 (en) Systems and Methods for Transaction Management in NFT-Directed Environments
CN116686253A (en) Method and system for tracking unexpired transaction output (UTXO) tokens in a distributed ledger-technology based network
CN116579788A (en) Supply chain management method, system, equipment and storage medium based on block chain
EP3688717A1 (en) Method for executing smart contracts through electronic processing means using the blockchain technology
Dash et al. Artificial intelligence models for blockchain-based intelligent networks systems: Concepts, methodologies, tools, and applications
CN110766403A (en) Data processing device and method based on block chain and storage medium
CN110738569A (en) Transaction certificate processing method, device and system based on block chain
CN116452158B (en) Method, device, equipment and medium for managing index of random extraction of suppliers
CN110866830A (en) Data processing method based on block chain and related device
US20230022234A1 (en) Physical Item Control
CN114781940B (en) Carbon transaction management method and device
CN114723534A (en) E-commerce transaction rationality judgment method based on block chain and related equipment
CN114491662A (en) Block chain-based data asset auditing method, system and equipment
CN114862517A (en) Automobile leasing method and device based on block chain
CN109615397A (en) Security identifier authentication method and device based on block chain
CN116091049B (en) Payment method and device based on big data and blockchain and cloud platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 350200 4th floor, R & D building 2, 33 Donghu Road, digital Fujian Industrial Park, Changle District, Fuzhou City, Fujian Province

Patentee after: Bosi Data Mining Technology Co.,Ltd.

Address before: 350005 4th floor, No. 2 R & D building, No. 33, Donghu Road, digital Fujian Industrial Park, Changle District, Fuzhou City, Fujian Province

Patentee before: Bosi Digital Acquisition Technology Development Co.,Ltd.

CP03 Change of name, title or address