CN116451899A - Comprehensive management information platform for building curtain wall project - Google Patents

Comprehensive management information platform for building curtain wall project Download PDF

Info

Publication number
CN116451899A
CN116451899A CN202310417070.6A CN202310417070A CN116451899A CN 116451899 A CN116451899 A CN 116451899A CN 202310417070 A CN202310417070 A CN 202310417070A CN 116451899 A CN116451899 A CN 116451899A
Authority
CN
China
Prior art keywords
curtain wall
module
project
cost
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310417070.6A
Other languages
Chinese (zh)
Inventor
谢燕武
郭康康
张晓峰
高发全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Curtain Wall Co Ltd
Original Assignee
CSCEC Curtain Wall Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Curtain Wall Co Ltd filed Critical CSCEC Curtain Wall Co Ltd
Priority to CN202310417070.6A priority Critical patent/CN116451899A/en
Publication of CN116451899A publication Critical patent/CN116451899A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a comprehensive management information platform for building curtain wall projects, which comprises a BIM database, an engineering building management module and a cost management module; the BIM database is used for constructing a building model, a curtain wall unit component model and a processing component model; the engineering building management module is used for generating material coding information of curtain wall installation materials and tracking the processing, transportation and installation of the curtain wall installation materials according to the material coding information; the cost management module is used for recording daily construction expenditure information of a curtain wall installation site, generating expenditure cost data according to the daily construction expenditure information, and determining cost deviation data and cost deviation reasons according to the expenditure cost data. The template and the reference value are provided for successful construction of future projects, the processing, transportation and installation of curtain wall installation materials can be tracked, and the construction cost is statistically analyzed.

Description

Comprehensive management information platform for building curtain wall project
Technical Field
The invention relates to the technical field of engineering project management, in particular to a comprehensive management information platform for building curtain wall projects.
Background
Along with the continuous progress and development of society, building curtain wall has become the main exterior form of modern building, and in the modern building's age of becoming higher, big, complicacy, diversification, the production and the project management of building curtain wall construction enterprise have also taken place profound changes thereupon, how to improve curtain wall construction management level becomes the important direction of project development and construction enterprise, how to carry out high-efficient organization and operation to company's production material, production data, produces bigger social and economic benefits, is the important subject of trade and enterprise always.
However, in the current construction progress management and control process, relevant technicians mostly check the actual progress condition progress and report the progress confirmation form and the image data, the calculation and comparison process is complex, the difference between the current construction progress and the expected construction progress cannot be quickly obtained, the construction quality of the current project cannot be quickly calculated and only intuitively displayed, and unified specification and management are lacked.
Disclosure of Invention
In view of the foregoing, it is necessary to provide a comprehensive management information platform for building curtain wall projects, which is used for solving the technical problems that in the prior art, relevant technicians check the progress of actual progress conditions, fill progress confirmation tables and image data, and the calculation and comparison processes are complex, so that the difference between the current construction progress and the expected construction progress is inconvenient to quickly acquire, and the current engineering construction quality cannot be quickly calculated and intuitively displayed.
In order to solve the technical problems, in a first aspect, the invention provides a comprehensive management information platform for building curtain wall projects, which comprises a BIM database, an engineering building management module and a cost management module;
the BIM database is used for constructing a building model, a curtain wall unit component model and a processing component model, and determining a construction scheme of the building curtain wall according to the building model, the curtain wall unit component model and the processing component model;
the engineering building management module is used for generating material coding information of curtain wall installation materials and tracking the processing, transportation and installation of the curtain wall installation materials according to the material coding information;
the cost management module is used for recording daily construction expenditure information of a curtain wall installation site, generating expenditure cost data according to the daily construction expenditure information, and determining cost deviation data and cost deviation reasons according to the expenditure cost data.
In some possible implementations, the BIM database includes an entry sub-module, a BIM modeling module, and a storage sub-module;
the entry submodule is used for entering project information of building curtain wall projects, and the project information comprises one or more of the following: project name, project address, project manager, contact, construction unit, design unit, construction unit, investigation unit, supervision unit, audit unit, construction animation, construction drawing, blanking list and process scheme;
the BIM modeling module is used for acquiring a three-dimensional model of a building according to the construction drawing, loading the three-dimensional model of the building in BIM modeling software, and constructing a curtain wall unit component model according to the three-dimensional model of the building; dividing the curtain wall unit component model into a plurality of units, rendering a formed curtain wall effect, deriving a detailed view of the curtain wall unit component model, numbering the detailed view of the curtain wall unit component model, and processing and producing according to the detailed view of the curtain wall unit component model;
the storage sub-module is used for storing the project information, the building model, the curtain wall unit component model and the processing component model, and model data, retail price, cost price and stock quantity of various curtain wall installation materials, and also storing a blank report.
In some possible implementations, the BIM modeling module is further used to determine materials, model numbers, dimensions, elevations, angles, node treatments, pipeline headroom, detail structural information for installing the curtain wall unitizing element model.
In some possible implementations, the BIM database further includes a display sub-module for invoking and displaying the building model, curtain wall unit component model, and tooling component model in the storage sub-module, as well as model data, retail price, cost price, and inventory of various curtain wall mounting materials, according to the received input instructions.
In some possible implementations, the engineering building management module includes a code entry sub-module, a code scanning identification sub-module, a cargo pipe sub-module;
the coding input submodule is used for inputting material coding information of curtain wall installation materials and generating material coding images according to the material coding information;
the code scanning identification sub-module is used for automatically identifying the codes of the material coded images of the curtain wall installation materials;
and the goods pipe module is used for tracking the processing, transportation and installation of curtain wall installation materials according to the identification result of the material coding image.
In some possible implementations, the system further comprises a bidding module, wherein the bidding module is used for determining a bidding scheme and making a project management plan; wherein the project management plan includes: project summarization of bidding projects, project work description, project work decomposition WBS, workflow, project progress planning and control, project resource expense planning, project quality management planning, project communication planning and project risk management planning; and generating project information according to the bid result.
In some possible implementations, the cost management module includes a cost pre-operator module, a cost monitoring sub-module, and a cost kernel sub-module;
the cost pre-operator module is used for determining budget expenditure cost data, wherein the budget expenditure cost data comprises budget material cost, budget labor cost and budget construction cost;
the cost monitoring sub-module is used for recording daily construction expenditure information of a curtain wall installation site and generating expenditure cost data according to the daily construction expenditure information;
the cost kernel operator module is used for determining cost deviation data according to the budget expenditure cost data and the expenditure cost data, and counting material cost deviation, labor cost deviation and construction cost deviation.
In some possible implementations, the engineering building management module further includes a construction period prediction sub-module configured to generate a first construction period according to the project information, determine average air temperature data and average days of precipitation data within the first construction period, determine a delay indicator according to the average air temperature data and the average days of precipitation data, and determine a second construction period according to the delay indicator and the first construction period.
In some possible implementation manners, the system further comprises a user management module, wherein the user management module is internally provided with user information in a building curtain wall project participating unit, judges the input user information, and if the user information does not accord with the input user information, the user information does not enter the building curtain wall project participating unit, and if the user information accords with the input user information, the user information passes through a design unit, a building unit or an auditing unit which belong to the building project;
the user management module comprises an account list function sub-module and a role management function sub-module, wherein the role management function sub-module is used for adding user accounts or deleting user accounts and editing user information, and the account list function sub-module is used for searching keywords of accounts or account users and displaying item items containing the accounts or the account users in a form of a table.
In some possible implementations, the user information includes an account number, an account user, a unit to which the account user belongs, a job position, a contact, and an email box.
The beneficial effects of adopting the embodiment are as follows: all data of a building model, a curtain wall appearance model, a processing component model, a construction animation, a symbol library, a processing drawing, a blanking list, a process scheme and a bidding scheme which are generated in the BIM application process are imported into the BIM library, templates and reference values are provided for successful construction of future projects, processing, transportation and installation of curtain wall installation materials can be tracked, construction cost is statistically analyzed, the problem that processing and installation errors are caused by different versions of the existing design and construction drawing is solved, the unordered state that BIM information is not managed by people, stored in a scattered manner and found everywhere when needed is thoroughly solved, the problem that in the prior art, relevant technicians check the actual progress condition progress, fill progress confirmation forms and image data, calculate and compare the process more complicated is solved, and the method is inconvenient for quickly acquiring the difference between the current construction progress and the expected construction progress, and cannot quickly calculate and intuitively display the technical problem of the current engineering construction quality.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following description will briefly explain the drawings needed in the description of the embodiments, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and that other drawings can be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic structural diagram of a comprehensive management information platform for building curtain wall projects.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. It will be apparent that the described embodiments are only some, but not all, embodiments of the invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Some of the block diagrams shown in the figures are functional entities and do not necessarily correspond to physically or logically separate entities. These functional entities may be implemented in software or in one or more hardware modules or integrated circuits or in different networks and/or processor systems and/or microcontroller systems.
Reference herein to "an embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment may be included in at least one embodiment of the invention. The appearances of such phrases in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. Those of skill in the art will explicitly and implicitly appreciate that the embodiments described herein may be combined with other embodiments.
Fig. 1 is a schematic structural diagram of a comprehensive management information platform for building curtain wall projects, as shown in fig. 1, in which, in this embodiment, a comprehensive management information platform for building curtain wall projects 100 includes a BIM database 120, an engineering building management module 130 and a cost management module 140;
the BIM database 120 is used for constructing a building model, a curtain wall unit component model and a processing component model, and determining a construction scheme of the building curtain wall according to the building model, the curtain wall unit component model and the processing component model;
the engineering building management module 130 is used for generating material coding information of curtain wall installation materials and tracking the processing, transportation and installation of the curtain wall installation materials according to the material coding information;
the cost management module 140 is configured to record daily construction expenditure information of a curtain wall installation site, generate expenditure cost data according to the daily construction expenditure information, and determine cost deviation data and cost deviation reasons according to the expenditure cost data.
In this embodiment, a three-dimensional model of a building, a curtain wall unit and a processing component is constructed through a BIM (Building Information Modeling, building information model), and 3D model information describing is performed on the project, which includes complete engineering information description, for example, design information: structure, member, material, property; construction information: working procedure, equipment, purchase, processing, cost, quality, construction progress and manpower resource; item information: safety, construction management and project maintenance; operation information: project application systems, property management, and the like. Engineering information management of the whole project process and whole process management of the building life cycle can be realized. The project manager can be helped to better know the information such as the installation effect, the component materials, the size and the like, and planning is performed more accurately. BIM technology can carry out the stereoscopic simulation with curtain work progress to know whole work progress more clearly, avoid because of communicating unsmoothly, understand problem and the mistake that leads to such as unclear in the construction period, improved the completion quality of time limit for a project, curtain engineering project manager can look over through three-dimensional simulator to carry out reasonable adjustment, make the engineering reach the design standard. When understanding the complex part of the project or the two-dimensional drawing is unclear, the three-dimensional condition of the complex node is clearly analyzed through the creation of the BIM technology virtual model, the three-dimensional model is utilized for arrangement before construction, the corresponding construction scheme and technical mating are made in advance, reworking, construction period delay and the like caused by errors in the construction process are avoided, quality, cost and progress control are facilitated, and fine management of the project is realized.
Because the curtain wall construction is very complicated, the related working links are more, such as facade modeling, device proposal, process flow and the like, the BIM technology can save a great deal of time cost and labor cost in curtain wall engineering project management. The engineering building management module 130 is used for generating material coding information of curtain wall installation materials and tracking the processing, transportation and installation of the curtain wall installation materials according to the material coding information; the material statistics, ordering, purchasing, manufacturing, transportation, inventory, approach and other links are controlled and managed, so that the material quality and supply are ensured to be timely, and the construction progress requirement is met.
Based on the above embodiment, as a preferred implementation manner, the BIM database 120 includes an input submodule 121, a BIM modeling module 122 and a storage submodule 123;
the entry submodule 121 is configured to enter project information of a building curtain wall project, where the project information includes one or more of the following: project name, project address, project manager, contact, construction unit, design unit, construction unit, investigation unit, supervision unit, audit unit, construction animation, construction drawing, blanking list and process scheme;
the BIM modeling module 122 is configured to obtain a three-dimensional model of a building according to the construction drawing, load the three-dimensional model of the building into BIM modeling software, and construct a curtain wall unit component model according to the three-dimensional model of the building; dividing the curtain wall unit component model into a plurality of units, rendering a formed curtain wall effect, deriving a detailed view of the curtain wall unit component model, numbering the detailed view of the curtain wall unit component model, and processing and producing according to the detailed view of the curtain wall unit component model;
the storage sub-module 123 is configured to store the project information, the building model, the curtain wall unit component model, the processing component model, and model data, retail price, cost price, and inventory of various curtain wall installation materials, and also store a blank report.
Based on the above examples, as a preferred implementation, the BIM modeling module 122 is further configured to determine materials, models, dimensions, elevations, angles, node treatments, pipeline headroom, and detail configuration information for installing the curtain wall unit component model.
In some possible implementations, the BIM database 120 further includes a display sub-module 124, and the display sub-module 124 is configured to call and display the building model, the curtain wall unit component model, and the tooling component model in the storage sub-module, as well as model data, retail prices, cost prices, and inventory amounts of various curtain wall mounting materials, according to the received input instructions.
Based on the above embodiment, as a preferred implementation manner, the engineering building management module 130 includes a code entry sub-module 131, a code scanning identification sub-module 132, and a cargo pipe sub-module 133;
the code input sub-module 131 is configured to input material code information of curtain wall installation materials, and generate a material code image according to the material code information;
the code scanning identification sub-module 132 is used for automatically identifying the codes of the material coded images of the curtain wall installation materials;
the cargo pipe module 133 is configured to track processing, transportation, and installation of curtain wall installation materials according to the identification result of the material coding image.
In curtain wall engineering, curtain wall enterprises serve as middleware nodes for connecting construction units and material suppliers, various parties involved in the curtain wall engineering such as material quality, specification model, equipment, processing information and the like are added into BIM, production processing to construction fine management is realized through two-dimensional code or RFID (Radio Frequency Identification ) technology, and all links such as material statistics, ordering, purchasing, manufacturing, transportation, inventory, approach and the like are controlled and managed, so that the material quality and supply are guaranteed, the construction progress requirements are met, and the parties involved in the curtain wall engineering are coordinated better.
On the basis of the above embodiment, as a preferred implementation manner, the method further comprises a bidding module 110, wherein the bidding module 110 is used for determining a bidding scheme and making a project management plan; wherein the project management plan includes: project summarization of bidding projects, project work description, project work decomposition WBS, workflow, project progress planning and control, project resource expense planning, project quality management planning, project communication planning and project risk management planning; and generating project information according to the bid result.
Based on the above embodiments, as a preferred implementation manner, the cost management module 140 includes a cost pre-operator module 141, a cost monitoring sub-module 142, and a cost kernel sub-module 143;
the cost pre-operator module 141 is configured to determine budget expense cost data, where the budget expense cost data includes a budget material cost, a budget labor cost, and a budget construction cost;
the cost monitoring sub-module 142 is configured to record daily construction expenditure information of a curtain wall installation site, and generate expenditure cost data according to the daily construction expenditure information;
the cost kernel sub-module 143 is configured to determine cost deviation data according to the budget expense cost data and the expense cost data, and to count material cost deviation, labor cost deviation, and construction cost deviation.
On the basis of the foregoing embodiment, as a preferred implementation manner, the engineering building management module 130 further includes a construction period prediction submodule 134, where the construction period prediction submodule 134 is configured to generate a first construction period according to the project information, determine average air temperature data and average days of precipitation in the first construction period, determine a delay indicator according to the average air temperature data and the average days of precipitation, and determine a second construction period according to the delay indicator and the first construction period.
On the basis of the above embodiment, as a preferred implementation manner, the system further includes a user management module 150, in which user information in a building curtain wall project participating unit is built, and the user management module judges the input user information, if the user information does not accord with the input user information, if the user information accords with the input user information, the user information is classified into a design unit, a construction unit or an audit unit in the building project;
the user management module 150 includes an account list function sub-module 151 and a role management function sub-module 152, where the role management function sub-module 151 is configured to add or delete user accounts and edit user information, and the account list function sub-module 152 is configured to search keywords of an account or an account user, and display item entries containing the account or the account user in a form of a table.
On the basis of the above embodiment, as a preferred implementation manner, the user information includes an account number, an account user, a unit to which the account user belongs, a position, a contact way and an email box.
Those skilled in the art will appreciate that all or part of the flow of the methods of the embodiments described above may be accomplished by way of a computer program stored in a computer readable storage medium to instruct related hardware (e.g., a processor, a controller, etc.). The computer readable storage medium is a magnetic disk, an optical disk, a read-only memory or a random access memory.
The above describes a building curtain wall project comprehensive management information platform provided by the invention in detail, and specific examples are applied to describe the principle and implementation of the invention, and the description of the above examples is only used for helping to understand the method and core ideas of the invention; meanwhile, as those skilled in the art will have variations in the specific embodiments and application scope in light of the ideas of the present invention, the present description should not be construed as limiting the present invention.

Claims (10)

1. The comprehensive management information platform for the building curtain wall project is characterized by comprising a BIM database, an engineering building management module and a cost management module;
the BIM database is used for constructing a building model, a curtain wall unit component model and a processing component model, and determining a construction scheme of the building curtain wall according to the building model, the curtain wall unit component model and the processing component model;
the engineering building management module is used for generating material coding information of curtain wall installation materials and tracking the processing, transportation and installation of the curtain wall installation materials according to the material coding information;
the cost management module is used for recording daily construction expenditure information of a curtain wall installation site, generating expenditure cost data according to the daily construction expenditure information, and determining cost deviation data and cost deviation reasons according to the expenditure cost data.
2. The building curtain project integrated management information platform of claim 1, wherein the BIM database comprises an entry sub-module, a BIM modeling module, and a storage sub-module;
the entry submodule is used for entering project information of building curtain wall projects, and the project information comprises one or more of the following: project name, project address, project manager, contact, construction unit, design unit, construction unit, investigation unit, supervision unit, audit unit, construction animation, construction drawing, blanking list and process scheme;
the BIM modeling module is used for acquiring a three-dimensional model of a building according to the construction drawing, loading the three-dimensional model of the building in BIM modeling software, and constructing a curtain wall unit component model according to the three-dimensional model of the building; dividing the curtain wall unit component model into a plurality of units, rendering a formed curtain wall effect, deriving a detailed view of the curtain wall unit component model, numbering the detailed view of the curtain wall unit component model, and processing and producing according to the detailed view of the curtain wall unit component model;
the storage sub-module is used for storing the project information, the building model, the curtain wall unit component model and the processing component model, and model data, retail price, cost price and stock quantity of various curtain wall installation materials, and also storing a blank report.
3. The building curtain project integrated management information platform of claim 2, wherein the BIM modeling module is further configured to determine material, model, size, elevation, angle, node processing, pipeline clearance, detail structure information for installing a curtain wall unitized component model.
4. The building curtain wall project integrated management information platform according to claim 2, wherein the BIM database further comprises a display sub-module for calling and displaying the building model, the curtain wall unit member model and the processing component model in the storage sub-module, and model data, retail prices, cost prices and inventory amounts of various curtain wall installation materials according to the received input instruction.
5. The integrated management information platform for building curtain wall projects according to claim 1, wherein the engineering building management module comprises a code input sub-module, a code scanning identification sub-module and a cargo pipe module;
the coding input submodule is used for inputting material coding information of curtain wall installation materials and generating material coding images according to the material coding information;
the code scanning identification sub-module is used for automatically identifying the codes of the material coded images of the curtain wall installation materials;
and the goods pipe module is used for tracking the processing, transportation and installation of curtain wall installation materials according to the identification result of the material coding image.
6. The building curtain wall project comprehensive management information platform according to claim 1, further comprising a bidding module, wherein the bidding module is used for determining a bidding scheme and making a project management plan; wherein the project management plan includes: project summarization of bidding projects, project work description, project work decomposition WBS, workflow, project progress planning and control, project resource expense planning, project quality management planning, project communication planning and project risk management planning; and generating project information according to the bid result.
7. The building curtain project comprehensive management information platform of claim 2, wherein the cost management module comprises a cost pre-operator module, a cost monitoring sub-module and a cost kernel sub-module;
the cost pre-operator module is used for determining budget expenditure cost data, wherein the budget expenditure cost data comprises budget material cost, budget labor cost and budget construction cost;
the cost monitoring sub-module is used for recording daily construction expenditure information of a curtain wall installation site and generating expenditure cost data according to the daily construction expenditure information;
the cost kernel operator module is used for determining cost deviation data according to the budget expenditure cost data and the expenditure cost data, and counting material cost deviation, labor cost deviation and construction cost deviation.
8. The building curtain wall project integrated management information platform of claim 7, wherein the engineering building management module further comprises a construction period prediction sub-module for generating a first construction period according to the project information, determining average air temperature data and average precipitation days data in the first construction period, determining a delay index according to the average air temperature data and the average precipitation days data, and determining a second construction period according to the delay index and the first construction period.
9. The integrated management information platform of the building curtain wall project according to claim 1, further comprising a user management module, wherein the user management module is internally provided with user information in a building unit of the building curtain wall project, judges the input user information, and does not enter if the user information is inconsistent, and if the user information is consistent, the user information is distributed to a design unit, a construction unit or an audit unit in the building project;
the user management module comprises an account list function sub-module and a role management function sub-module, wherein the role management function sub-module is used for adding user accounts or deleting user accounts and editing user information, and the account list function sub-module is used for searching keywords of accounts or account users and displaying item items containing the accounts or the account users in a form of a table.
10. The building curtain project integrated management information platform of claim 9, wherein the user information includes an account number, an account user, a unit to which the account user belongs, a job position, a contact way, and an email box.
CN202310417070.6A 2023-04-17 2023-04-17 Comprehensive management information platform for building curtain wall project Pending CN116451899A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310417070.6A CN116451899A (en) 2023-04-17 2023-04-17 Comprehensive management information platform for building curtain wall project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310417070.6A CN116451899A (en) 2023-04-17 2023-04-17 Comprehensive management information platform for building curtain wall project

Publications (1)

Publication Number Publication Date
CN116451899A true CN116451899A (en) 2023-07-18

Family

ID=87128413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310417070.6A Pending CN116451899A (en) 2023-04-17 2023-04-17 Comprehensive management information platform for building curtain wall project

Country Status (1)

Country Link
CN (1) CN116451899A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117495316A (en) * 2024-01-03 2024-02-02 长沙市住房和城乡建设局 Intelligent building method and system based on EMPC mode
CN117910119A (en) * 2024-03-20 2024-04-19 中南建筑设计院股份有限公司 PLM-based building curtain wall three-dimensional design modeling method and system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117495316A (en) * 2024-01-03 2024-02-02 长沙市住房和城乡建设局 Intelligent building method and system based on EMPC mode
CN117495316B (en) * 2024-01-03 2024-04-09 长沙市住房和城乡建设局 Intelligent building method and system based on EMPC mode
CN117910119A (en) * 2024-03-20 2024-04-19 中南建筑设计院股份有限公司 PLM-based building curtain wall three-dimensional design modeling method and system

Similar Documents

Publication Publication Date Title
CN116451899A (en) Comprehensive management information platform for building curtain wall project
CN111754138B (en) Engineering construction progress plan management and control system and method based on BIM model
Li et al. A project-based quantification of BIM benefits
US7574379B2 (en) Method and system of using artifacts to identify elements of a component business model
US10628769B2 (en) Method and system for a cross-domain enterprise collaborative decision support framework
EP1862956A1 (en) Systems and methods for assignment generation in a value flow environment
US20150120370A1 (en) Advanced planning in a rapidly changing high technology electronics and computer industry through massively parallel processing of data using a distributed computing environment
Fernandes Advantages and disadvantages of BIM platforms on construction site
CN116680648A (en) Service fusion data generation method and system for digital twin city
CN111651818A (en) BIM model rapid change method
WO2016171662A1 (en) Method and system for cross discipline data validation checking in a multidisciplinary engineering system
Stefanovic et al. Methodology for modeling and analysis of supply networks
Ghannadpour et al. Reducing rework and increasing the civil projects quality, through total quality management (TQM), by using the concept of building information modeling (BIM)
Uzairuddin et al. Digital monitoring and modeling of construction supply chain management scheme with BIM and GIS: An overview
CN117744914A (en) BIM-based construction digital management method, platform and computer equipment
Polivka et al. Selection of the ERP System with Regard to the Global 4th Industrial Revolution
CN116821223A (en) Industrial visual control platform and method based on digital twinning
Pullan Decision support tool using concurrent engineering framework for agile manufacturing
NOVIKOV et al. Improving the enterprise resource planning system based on digital modules of the industry 4.0 concept
Hänel et al. Operational business intelligence meets manufacturing
US20160189074A1 (en) Method and system for an enterprise process engine for intelligence and collaboration
US20140149186A1 (en) Method and system of using artifacts to identify elements of a component business model
Pullan et al. Object-oriented modelling of manufacturing information system for collaborative design
US11327471B2 (en) Building and tracking of an automation engineering environment
CN117131562A (en) Construction method and system for multiuser CAD hierarchical annotation collaborative design

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication