CN116394448A - Calender for processing high-pressure rubber pipe - Google Patents
Calender for processing high-pressure rubber pipe Download PDFInfo
- Publication number
- CN116394448A CN116394448A CN202310670989.6A CN202310670989A CN116394448A CN 116394448 A CN116394448 A CN 116394448A CN 202310670989 A CN202310670989 A CN 202310670989A CN 116394448 A CN116394448 A CN 116394448A
- Authority
- CN
- China
- Prior art keywords
- frame
- calender
- pipe
- water
- heating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010438 heat treatment Methods 0.000 claims abstract description 56
- 238000003490 calendering Methods 0.000 claims abstract description 48
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 91
- 239000000463 material Substances 0.000 claims description 39
- 238000007664 blowing Methods 0.000 claims 1
- 230000001105 regulatory effect Effects 0.000 abstract description 6
- 238000005096 rolling process Methods 0.000 description 9
- 238000009434 installation Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 238000007774 anilox coating Methods 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000004049 embossing Methods 0.000 description 1
- 238000005187 foaming Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000005498 polishing Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C43/00—Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
- B29C43/22—Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor of articles of indefinite length
- B29C43/24—Calendering
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C43/00—Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
- B29C43/32—Component parts, details or accessories; Auxiliary operations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C43/00—Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
- B29C43/32—Component parts, details or accessories; Auxiliary operations
- B29C43/44—Compression means for making articles of indefinite length
- B29C43/46—Rollers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C43/00—Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
- B29C43/32—Component parts, details or accessories; Auxiliary operations
- B29C43/52—Heating or cooling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C43/00—Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
- B29C43/32—Component parts, details or accessories; Auxiliary operations
- B29C43/58—Measuring, controlling or regulating
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29L—INDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
- B29L2007/00—Flat articles, e.g. films or sheets
- B29L2007/002—Panels; Plates; Sheets
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Casting Or Compression Moulding Of Plastics Or The Like (AREA)
Abstract
The invention relates to the technical field of high-pressure rubber tube processing, and provides a calender for high-pressure rubber tube processing, which is convenient for a calender roll to keep parallel work, and prevents a rubber sheet from having inconsistent transverse sections, thereby improving the heated uniformity of the rubber sheet, further ensuring the uniform calendering of the rubber sheet, and comprises a frame and more than two calender rolls, wherein the calender rolls are arranged in the frame, the calender rolls are hollow, and a communication port is formed at the right end of the calender rolls, and the calender further comprises: eccentric regulating wheel, heating circulating pipe and interval adjusting screw, eccentric regulating wheel setting are in the frame, install regulation actuating mechanism in the frame, eccentric regulating wheel is connected with regulation actuating mechanism, and the heating circulating pipe rotates the intercommunication department of seting up on the calender roll to with be used for carrying out the calendering temperature control mechanism of heating to the temperature of calender roll and be connected, install interval adjustment mechanism in the frame, interval adjusting screw is connected with interval adjustment mechanism.
Description
Technical Field
The invention relates to the technical field of high-pressure rubber tube processing, in particular to a calender for high-pressure rubber tube processing.
Background
The processing of the high-pressure rubber tube is widely applied to the fields of petrochemical industry, coal, electric power, transportation, medical equipment, mechanical manufacture, mining, ships, automobiles and the like, a calender is an essential device in the processing of the high-pressure rubber tube, the calender is a processing machine for pressing and expanding materials (rubber, plastic, foaming materials and the like) to be processed into sheet-shaped finished products with certain thickness and surface shape at a certain temperature, the calender generally comprises more than two rollers, each roller comprises a mirror roller, an embossing roller, an anilox roller, a polishing roller and the like, each roller has different functions, and the calender can finish the processing requirements of different materials to be processed through the combination of different rollers and the control of the roller temperature;
when the existing calender is used for processing a high-pressure rubber pipe, the horizontal state of the calender rollers is easy to deviate after the calender is used for a long time, so that the adjustment of the distance between the two ends of the calender rollers is inconsistent, the two calender rollers are high on one side and low on the other side, the working planes of the two calender rollers are not parallel, the thickness of the transverse section of a rolled film is inconsistent, when the transverse section of the film is inconsistent, the film is heated unevenly on one side, the ductility of the film is affected when the film is heated unevenly, and the uniformity of film rolling is caused.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the invention provides the calender for processing the high-pressure rubber tube, which is convenient for the calender rollers to work in parallel, and prevents the condition that the transverse sections of the rubber sheets are inconsistent, thereby improving the uniformity of heating the rubber sheets and further ensuring the uniformity of calendering the rubber sheets.
(II) technical scheme
In order to achieve the above purpose, the present invention provides the following technical solutions: the utility model provides a calender is used in processing of high pressure rubber tube, includes frame and more than two calender rolls, the calender roll sets up in the frame, the calender roll is the cavity setting, and the intercommunication mouth has been seted up to the right-hand member of calender roll, still includes: eccentric regulating wheel, heating circulating pipe and interval adjusting screw, eccentric regulating wheel sets up in the frame, install adjustment actuating mechanism in the frame, eccentric regulating wheel is connected with adjustment actuating mechanism, the heating circulating pipe rotates the intercommunication and is in the intercommunication mouth department of seting up on the calender roll, and with be used for right the calender temperature control mechanism that the temperature of calender roll heated is connected, interval adjusting screw sets up in the frame, install interval adjustment mechanism in the frame, interval adjusting screw is connected with interval adjustment mechanism.
In order to drive the eccentric adjusting wheels to adjust the horizontal angle of the calendaring roller, preferably, the adjusting driving mechanism comprises at least two sliding blocks, the two sliding blocks are both connected to the frame in a sliding way, the eccentric adjusting wheels are connected to the sliding blocks in a rotating way, the calendaring roller is connected between the two eccentric adjusting wheels in a rotating way, one eccentric adjusting wheel close to the left end is provided with a first motor through a mounting frame, and the output end of the first motor penetrates through the mounting frame and is fixedly connected with the calendaring roller to drive the calendaring roller to rotate; the connecting gear is meshed with the eccentric adjusting wheel, a second motor is installed on the sliding block through the installation frame, the output end of the second motor penetrates through the installation frame and is fixedly connected with the driving gear, and the driving gear is meshed with the connecting gear.
In order to heat the temperature of the calendering roller, and then increase the ductility of the calendering of rubber materials, further, the calendering temperature control mechanism includes the water tank, the water tank sets up in the frame, install the heater on the water tank, install the water pump on the water tank, the input of water pump runs through the water tank and extends to in the water tank, the output intercommunication of water pump has the upper water pipe, the top of upper water pipe with the heating circulating pipe intercommunication for in carrying the water of heating into the calendering roller, keep the temperature of the surface of the film that is calendered, install the water circulation mechanism that is used for the hot water circulation in the calendering roller on the heating circulating pipe.
In order to adjust the interval between a plurality of calender rolls, still further, interval adjustment mechanism includes the third motor, the third motor is installed in the frame, the output of third motor run through the frame and with interval adjusting screw fixed connection, fixedly connected with lifter block on the slider, set up screw and threaded connection on the lifter block on the interval adjusting screw.
In order to carry out the backward flow to the water in the calender roll, as the further scheme of this scheme, water circulation mechanism includes the circulating pump, the circulating pump is installed on heating circulating pipe, the input intercommunication of circulating pump has the back flow, the back flow runs through heating circulating pipe and extends to in the calender roll, the output and the heating circulating pipe intercommunication of circulating pump, the last intercommunication of heating circulating pipe has the downcomer, the bottom and the water tank intercommunication of downcomer, install accuse water valve on the downcomer.
In order to preheat the rubber material pressure time delay, as the still further scheme of this scheme, install in the frame and be used for preheating the preheating mechanism of rubber material calendering the preceding, preheating mechanism includes preheating box, preheating box fixed connection is in the frame, preheating box internal fixation has the heating pipe, install the fan on the preheating box for blow the heat that the heating pipe gives off to the rubber material on.
In order to carry out feeding to the rubber material pressure delay that needs the calendering, on the basis of the aforesaid scheme, install the feed mechanism that is used for carrying out feeding to the rubber material of processing high-pressure rubber pipe in the frame, feed mechanism includes the feeding case, feeding case fixed connection is in the frame, install first electric jar in the frame, the output of first electric jar runs through the feeding case and fixedly connected with feed plate.
(III) beneficial effects
Compared with the prior art, the invention provides the calender for processing the high-pressure rubber pipe, which has the following beneficial effects:
according to the invention, when the horizontal position of the rolling roller is offset after the rolling roller is used for a long time, the eccentric adjusting wheel is driven to finely adjust and rotate by the adjusting driving mechanism arranged on the frame, so that the horizontal position of the rolling roller is adjusted, hot water is conveyed into the rolling roller by the rolling temperature control mechanism arranged on the frame through the heating circulation pipe, and the rolled rubber material is uniformly heated, so that the ductility of the rubber material is improved.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of a part of a spacing adjustment mechanism according to the present invention;
FIG. 3 is a schematic view of a part of the water circulation mechanism of the present invention;
FIG. 4 is a schematic view of a part of a calendaring temperature-controlling mechanism according to the present invention;
FIG. 5 is a schematic perspective view of a part of the adjustment drive mechanism of the present invention;
FIG. 6 is a schematic perspective view of the combination of the circulation pump, the return pipe and the calender roll;
FIG. 7 is a schematic view of a part of a preheating mechanism according to the present invention;
fig. 8 is a schematic perspective view of a part of the feeding mechanism of the present invention.
In the figure: 1. a frame; 2. a calender roll; 3. an eccentric adjusting wheel; 4. heating the circulation pipe; 5. a pitch adjustment screw;
100. adjusting the driving mechanism; 101. a slide block; 102. a first motor; 103. a connecting gear; 104. a second motor; 105. a drive gear;
200. a calendaring temperature control mechanism; 201. a water tank; 202. a heater; 203. a water pump; 204. a water supply pipe;
300. a spacing adjustment mechanism; 301. a third motor; 302. a lifting block;
400. a water circulation mechanism; 401. a circulation pump; 402. a return pipe; 403. a water supply pipe; 404. a water control valve;
500. a preheating mechanism; 501. a preheating box; 502. heating pipes; 503. a blower;
600. a feed mechanism; 601. a feed box; 602. a first electric cylinder; 603. and a feeding plate.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
1-8, please refer to a calender for processing high-pressure rubber pipe, which comprises a frame 1 and more than two calender rolls 2, wherein the calender rolls 2 are arranged in the frame 1, the calender rolls 2 are hollow, and a communication port is formed in the right end of the calender rolls 2, and the calender further comprises: eccentric adjustment wheel 3, heating circulating pipe 4 and interval adjusting screw 5, eccentric adjustment wheel 3 sets up in frame 1, install on the frame 1 and adjust actuating mechanism 100, eccentric adjustment wheel 3 is connected with adjusting actuating mechanism 100, heating circulating pipe 4 rotates the intercommunication and is in the intercommunication mouth department of seting up on the calender roll 2, and with be used for right calender temperature control mechanism 200 that calender roll 2's temperature heated is connected, interval adjusting screw 5 sets up in frame 1, install interval adjustment mechanism 300 on the frame 1, interval adjusting screw 5 is connected with interval adjustment mechanism 300.
The adjusting driving mechanism 100 comprises at least two sliding blocks 101, wherein the two sliding blocks 101 are both in sliding connection with the frame 1, the eccentric adjusting wheels 3 are in rotating connection with the sliding blocks 101, the calendaring roller 2 is in rotating connection between the two eccentric adjusting wheels 3, a first motor 102 is installed on one eccentric adjusting wheel 3 close to the left end through a mounting frame, and the output end of the first motor 102 penetrates through the mounting frame and is fixedly connected with the calendaring roller 2 to drive the calendaring roller 2 to rotate; the first motor 102 arranged on the mounting frame drives the calendaring roller 2 to rotate, so that the rubber material is calendared.
The connecting gear 103 is rotationally connected to the sliding block 101, the connecting gear 103 is meshed with the eccentric adjusting wheel 3, the sliding block 101 is provided with a second motor 104 through a mounting frame, the output end of the second motor 104 penetrates through the mounting frame and is fixedly connected with a driving gear 105, the driving gear 105 is meshed with the connecting gear 103, the driving gear 105 is driven to be meshed with the connecting gear 103 through the second motor 104 mounted on the mounting frame, and then the connecting gear 103 is driven to be meshed with the eccentric adjusting wheel 3 and finely adjusted to rotate, so that the horizontal positions of the two ends of the calendaring roller 2 are finely adjusted.
The calendaring temperature control mechanism 200 comprises a water tank 201, the water tank 201 is arranged on the frame 1, a heater 202 is arranged on the water tank 201, a water pump 203 is arranged on the water tank 201, the input end of the water pump 203 penetrates through the water tank 201 and extends into the water tank 201, the output end of the water pump 203 is communicated with a water supply pipe 204, the top end of the water supply pipe 204 is communicated with the heating circulation pipe 4 and is used for conveying heated water into the calendaring roller 2, the temperature of the surface of a rolled film is kept, the water in the water tank 201 is heated by the heater 202 arranged on the water tank 201, and the heated water in the water tank 201 is pumped out and conveyed into the heating circulation pipe 4 by the water pump 203 arranged on the water tank 201, so that the heated water is conveyed into the calendaring roller 2 by the heating circulation pipe 4, the temperature of the calendaring roller 2 is improved, and the water circulation mechanism 400 for circulating the heated water in the calendaring roller 2 is arranged on the heating circulation pipe 4.
The space adjusting mechanism 300 comprises a third motor 301, the third motor 301 is installed on the frame 1, the output end of the third motor 301 penetrates through the frame 1 and is fixedly connected with the space adjusting screw 5, a lifting block 302 is fixedly connected to the sliding block 101, a screw hole is formed in the lifting block 302 and is in threaded connection with the space adjusting screw 5, the space adjusting screw 5 is driven to rotate through the third motor 301 installed on the frame 1, the lifting block 302 fixedly connected to the sliding block 101 is driven to lift, and then the space between the plurality of calendaring rollers 2 is adjusted.
The water circulation mechanism 400 comprises a circulation pump 401, the circulation pump 401 is arranged on a heating circulation pipe 4, the input end of the circulation pump 401 is communicated with a return pipe 402, the return pipe 402 penetrates through the heating circulation pipe 4 and extends into the calendaring roller 2, the output end of the circulation pump 401 is communicated with the heating circulation pipe 4, a water drain pipe 403 is communicated with the heating circulation pipe 4, the bottom end of the water drain pipe 403 is communicated with the water tank 201, a water control valve 404 is arranged on the water drain pipe 403, and water cooled in the calendaring roller 2 is pumped out through the return pipe 402 by the circulation pump 401 arranged on the heating circulation pipe 4 and is conveyed into the water tank 201 for heating through the water drain pipe 403 communicated with the heating circulation pipe 4.
The preheating mechanism 500 for preheating the rubber material before calendering is installed on the frame 1, the preheating mechanism 500 includes preheating box 501, preheating box 501 fixed connection is on the frame 1, fixedly connected with heating pipe 502 in the preheating box 501, install fan 503 on the preheating box 501 for blow the heat that gives off to heating pipe 502 to the rubber material, give off the heat through heating pipe 502 of installing on the preheating box 501, and blow the heat that gives off to heating pipe 502 to the rubber material through the fan 503 of installing on the preheating box 501 to preheat.
Install the feed mechanism 600 that is used for carrying out feeding to the rubber materials of processing high-pressure rubber tube on the frame 1, feed mechanism 600 includes feeding case 601, feeding case 601 fixed connection is on frame 1, install first electric jar 602 on the frame 1, the output of first electric jar 602 runs through feeding case 601 and fixedly connected with feed plate 603, drives feed plate 603 through the first electric jar 602 of installing on the feeding case 601 and promotes rubber materials to promote between two calender rolls 2 with rubber materials.
In summary, in the calender for processing a high-pressure rubber tube, when a rubber material is subjected to pressure delay, the third motor 301 installed on the frame 1 drives the interval adjusting screw 5 to rotate, so as to drive the lifting block 302 fixedly connected on the sliding block 101 to lift, and further adjust the interval between the plurality of calender rolls 2, after the interval adjustment, the first motor 102 installed on the installation frame drives the calender rolls 2 to rotate, so as to calender the rubber material, when the calender rolls 2 are used for a long time and the horizontal position of the calender rolls 2 deviates, the second motor 104 installed on the installation frame drives the driving gear 105 to be meshed with the connecting gear 103, so as to drive the connecting gear 103 to be meshed with the eccentric adjusting wheel 3 and finely adjusted to rotate, so that the horizontal position of two ends of the calender rolls 2 is finely adjusted and corrected, after the calender rolls 2 are corrected, the heater 202 installed through the water tank 201 heats the water in the water tank 201, the water heated in the water tank 201 is pumped out through the water pump 203 installed on the water tank 201 and is conveyed into the heating circulation pipe 4, thereby conveying the hot water into the calendaring roller 2 through the heating circulation pipe 4, thereby increasing the temperature of the calendaring roller 2, and further heating the rubber material when calendaring, leading the rubber material to be heated more uniformly, having higher ductility, after the hot water in the calendaring roller 2 is cooled down, the water cooled down in the calendaring roller 2 is pumped out through the circulation pump 401 installed on the heating circulation pipe 4 through the return pipe 402 and is conveyed into the water tank 201 through the water pipe 403 communicated with the heating circulation pipe 4 for heating, the water heated in the water tank 201 is pumped out through the water pump 203 installed on the water tank 201 and is conveyed into the heating circulation pipe 4, thereby conveying the hot water into the calendaring roller 2 again through the heating circulation pipe 4, the rolling roller 2 heats the rubber material by circulating and reciprocating in this way;
in the second embodiment, when the rubber material enters the calender to contact with the calender roll 2, if the rubber material is directly contacted with the temperature on the calender roll 2, the heating of the rubber material is also easy to be uneven, therefore, preliminary preheating is needed for the rubber material, when the rubber material is preheated, the heating pipe 502 arranged on the preheating box 501 emits heat, and the fan 503 arranged on the preheating box 501 blows the heat emitted by the heating pipe 502 to the rubber material to preheat, so that the temperature of the rubber material is effectively and gradually heated;
when the calender rolls and loads rubber materials, the rubber materials are usually fed between the two rolling rollers 2 by an operator in a handheld manner, so that the loading is dangerous, and therefore, when the rubber materials are loaded, the feeding plate 603 is driven by the first electric cylinder 602 arranged on the feeding box 601 to push the rubber materials, so that the rubber materials are pushed between the two rolling rollers 2, and the danger of the operator when the rubber materials are loaded is reduced;
when the distance between the plurality of calender rolls 2 is adjusted, the two sliding blocks 101 close to the top end are connected with lifting blocks 302 which are driven by two distance adjusting screws 5 respectively, so that the distance between the two calender rolls 2 close to the top end is independently driven;
two protective housing fixedly connected with in the frame hurt operating personnel in order to prevent that inner structure from moving.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a calender is used in processing of high pressure rubber tube, includes frame (1) and more than two calender roll (2), calender roll (2) set up in frame (1), calender roll (2) are the cavity setting, and the intercommunication mouth has been seted up to the right-hand member of calender roll (2), its characterized in that still includes:
the eccentric adjusting wheel (3), the eccentric adjusting wheel (3) is arranged on the frame (1), an adjusting driving mechanism (100) is arranged on the frame (1), and the eccentric adjusting wheel (3) is connected with the adjusting driving mechanism (100);
the heating circulation pipe (4) is rotationally communicated with a communication port formed in the calendaring roller (2) and is connected with a calendaring temperature control mechanism (200) for heating the temperature of the calendaring roller (2);
the device comprises a rack (1), wherein the rack (1) is provided with a spacing adjusting mechanism (300), the spacing adjusting mechanism (300) is arranged on the rack (1), the spacing adjusting mechanism (5) is connected with the spacing adjusting mechanism (300), the adjusting driving mechanism (100) comprises at least two sliding blocks (101), the two sliding blocks (101) are all in sliding connection with the rack (1), an eccentric adjusting wheel (3) is rotationally connected with the sliding blocks (101), a calendaring roller (2) is rotationally connected between the two eccentric adjusting wheels (3), a first motor (102) is arranged on one eccentric adjusting wheel (3) close to the left end through a mounting frame, and the output end of the first motor (102) penetrates through the mounting frame and is fixedly connected with the calendaring roller (2) so as to drive the calendaring roller (2) to rotate;
the novel eccentric adjusting device is characterized in that a connecting gear (103) is rotationally connected to the sliding block (101), the connecting gear (103) is meshed with the eccentric adjusting wheel (3), a second motor (104) is installed on the sliding block (101) through a mounting frame, the output end of the second motor (104) penetrates through the mounting frame and is fixedly connected with a driving gear (105), and the driving gear (105) is meshed with the connecting gear (103).
2. The calender for high-pressure hose processing according to claim 1, wherein the calendering temperature control mechanism (200) comprises a water tank (201), the water tank (201) is arranged on the frame (1), a heater (202) is arranged on the water tank (201), a water pump (203) is arranged on the water tank (201), an input end of the water pump (203) penetrates through the water tank (201) and extends into the water tank (201), an output end of the water pump (203) is communicated with a water supply pipe (204), a top end of the water supply pipe (204) is communicated with the heating circulation pipe (4) for conveying heated water into the calendering roller (2) to keep the surface temperature of a calendered film, and a water circulation mechanism (400) for circulating hot water in the calendering roller (2) is arranged on the heating circulation pipe (4).
3. The calender for processing the high-pressure rubber pipe according to claim 2, wherein the interval adjusting mechanism (300) comprises a third motor (301), the third motor (301) is installed on the frame (1), an output end of the third motor (301) penetrates through the frame (1) and is fixedly connected with the interval adjusting screw (5), a lifting block (302) is fixedly connected to the sliding block (101), and a screw hole is formed in the lifting block (302) and is in threaded connection with the interval adjusting screw (5).
4. A calender for processing a high-pressure rubber hose according to claim 3, wherein the water circulation mechanism (400) comprises a circulation pump (401), the circulation pump (401) is installed on the heating circulation pipe (4), a return pipe (402) is communicated with the input end of the circulation pump (401), the return pipe (402) penetrates through the heating circulation pipe (4) and extends into the calender roll (2), the output end of the circulation pump (401) is communicated with the heating circulation pipe (4), a sewer pipe (403) is communicated with the heating circulation pipe (4), the bottom end of the sewer pipe (403) is communicated with the water tank (201), and a water control valve (404) is installed on the sewer pipe (403).
5. The calender for processing the high-pressure rubber pipe according to claim 4, wherein a preheating mechanism (500) for preheating a rubber material before calendering is installed on the frame (1), the preheating mechanism (500) comprises a preheating box (501), the preheating box (501) is fixedly connected to the frame (1), a heating pipe (502) is fixedly connected to the preheating box (501), and a fan (503) is installed on the preheating box (501) and is used for blowing heat emitted by the heating pipe (502) onto the rubber material.
6. The calender for processing the high-pressure rubber pipe according to claim 5, wherein a feeding mechanism (600) for feeding rubber materials for processing the high-pressure rubber pipe is installed on the frame (1), the feeding mechanism (600) comprises a feeding box (601), the feeding box (601) is fixedly connected to the frame (1), a first electric cylinder (602) is installed on the frame (1), and an output end of the first electric cylinder (602) penetrates through the feeding box (601) and is fixedly connected with a feeding plate (603).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310670989.6A CN116394448A (en) | 2023-06-08 | 2023-06-08 | Calender for processing high-pressure rubber pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310670989.6A CN116394448A (en) | 2023-06-08 | 2023-06-08 | Calender for processing high-pressure rubber pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN116394448A true CN116394448A (en) | 2023-07-07 |
Family
ID=87018385
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310670989.6A Pending CN116394448A (en) | 2023-06-08 | 2023-06-08 | Calender for processing high-pressure rubber pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116394448A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117183189A (en) * | 2023-10-21 | 2023-12-08 | 南通尚善模塑科技有限公司 | Calender |
CN117341100A (en) * | 2023-12-04 | 2024-01-05 | 华能中天节能科技集团有限责任公司 | Rubber material heating equipment |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2512597Y (en) * | 2001-12-11 | 2002-09-25 | 瑞安市东瑞印刷包装机械有限公司 | Central distance micro regulating mechanism for soft cutting circular press mould cutter roller |
CN102744118A (en) * | 2012-06-29 | 2012-10-24 | 常州市龙鑫化工机械有限公司 | Roller press capable of accurately controlling gaps among rollers and pressure |
CN203262208U (en) * | 2013-06-05 | 2013-11-06 | 福娃集团有限公司 | Worm rod adjusting device for thickness of rice cracker blank |
CN105211141A (en) * | 2015-11-14 | 2016-01-06 | 山东银鹰炊事机械有限公司 | Oodle maker roll seam automatic mechanism and method |
CN208788921U (en) * | 2018-08-09 | 2019-04-26 | 绍兴博瑞挤出设备有限公司 | A kind of cleaning plant of cast film equipment |
CN111015391A (en) * | 2019-12-03 | 2020-04-17 | 广州科盛隆纸箱包装机械有限公司 | Disassembly-free high-precision repairing device and method for large roller shaft |
CN211807376U (en) * | 2020-03-24 | 2020-10-30 | 中金液压胶管股份有限公司 | Rubber tube film calender capable of automatically recycling and feeding leftover materials |
CN111873290A (en) * | 2020-08-10 | 2020-11-03 | 广州立芯智能科技有限公司 | Rubber calender |
CN112248342A (en) * | 2020-10-23 | 2021-01-22 | 新亚特电缆股份有限公司 | 30kV is flexible power cable for EMUs |
CN215751291U (en) * | 2021-07-21 | 2022-02-08 | 杭州屹辰实业有限公司 | Pneumatic type shoe leather compounding machine compression roller adjusting device |
CN219055067U (en) * | 2022-12-10 | 2023-05-23 | 常州力拓塑胶有限公司 | Plastic product calender |
-
2023
- 2023-06-08 CN CN202310670989.6A patent/CN116394448A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2512597Y (en) * | 2001-12-11 | 2002-09-25 | 瑞安市东瑞印刷包装机械有限公司 | Central distance micro regulating mechanism for soft cutting circular press mould cutter roller |
CN102744118A (en) * | 2012-06-29 | 2012-10-24 | 常州市龙鑫化工机械有限公司 | Roller press capable of accurately controlling gaps among rollers and pressure |
CN203262208U (en) * | 2013-06-05 | 2013-11-06 | 福娃集团有限公司 | Worm rod adjusting device for thickness of rice cracker blank |
CN105211141A (en) * | 2015-11-14 | 2016-01-06 | 山东银鹰炊事机械有限公司 | Oodle maker roll seam automatic mechanism and method |
CN208788921U (en) * | 2018-08-09 | 2019-04-26 | 绍兴博瑞挤出设备有限公司 | A kind of cleaning plant of cast film equipment |
CN111015391A (en) * | 2019-12-03 | 2020-04-17 | 广州科盛隆纸箱包装机械有限公司 | Disassembly-free high-precision repairing device and method for large roller shaft |
CN211807376U (en) * | 2020-03-24 | 2020-10-30 | 中金液压胶管股份有限公司 | Rubber tube film calender capable of automatically recycling and feeding leftover materials |
CN111873290A (en) * | 2020-08-10 | 2020-11-03 | 广州立芯智能科技有限公司 | Rubber calender |
CN112248342A (en) * | 2020-10-23 | 2021-01-22 | 新亚特电缆股份有限公司 | 30kV is flexible power cable for EMUs |
CN215751291U (en) * | 2021-07-21 | 2022-02-08 | 杭州屹辰实业有限公司 | Pneumatic type shoe leather compounding machine compression roller adjusting device |
CN219055067U (en) * | 2022-12-10 | 2023-05-23 | 常州力拓塑胶有限公司 | Plastic product calender |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117183189A (en) * | 2023-10-21 | 2023-12-08 | 南通尚善模塑科技有限公司 | Calender |
CN117183189B (en) * | 2023-10-21 | 2024-06-21 | 南通尚善模塑科技有限公司 | Calender |
CN117341100A (en) * | 2023-12-04 | 2024-01-05 | 华能中天节能科技集团有限责任公司 | Rubber material heating equipment |
CN117341100B (en) * | 2023-12-04 | 2024-03-08 | 华能中天节能科技集团有限责任公司 | Rubber material heating equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN116394448A (en) | Calender for processing high-pressure rubber pipe | |
US11752714B2 (en) | Light guide film production device | |
CN102145493B (en) | Hobbing cutter slitting machine | |
CN105217969A (en) | A kind of full-automatic glass thermocompressor being applied to double glazing and producing | |
KR200460345Y1 (en) | A Manufacturing Apparatus of the Corrugated Plate | |
CN116213501A (en) | Panel roll extrusion levelling device | |
CN213890876U (en) | Five-roller drum type vulcanization production line for conveying belt | |
CN114179280A (en) | Flat press for pressing PVC or rubber particles into coil plate | |
CN112248318B (en) | A vulcanizer for PVC floor production and processing | |
CN219806454U (en) | Pretreatment device for raw materials for producing plastic uptake products | |
CN210759344U (en) | Steel belt type circulating template and fiber reinforced material forming equipment | |
CN113896435A (en) | Toughened glass manufacturing system | |
CN221231323U (en) | Steel plate straightening device for building civil engineering | |
CN220995788U (en) | Novel embossing roller | |
CN217373375U (en) | Sheet continuous extrusion conveying device | |
CN220447165U (en) | PVC panel subtracts heavy processing equipment | |
CN218928414U (en) | Microcrystal drying and foaming device in extrusion molding foaming composite type heat-insulating plate production line | |
CN221254644U (en) | Profile steel heat treatment device capable of improving efficiency | |
CN216182770U (en) | Laminating machine that tectorial membrane roughness is good and work efficiency is high | |
CN217099140U (en) | Edge pressing device of plastic film bag making machine | |
CN107650505A (en) | A kind of composite plastic film preheating apparatus for precoating type laminating machine | |
CN216329557U (en) | Novel calender for producing and processing rubber conveyer belt | |
CN116352949B (en) | Calendering device and technology for SPC stone plastic floor | |
CN218080009U (en) | Square tube four-corner edge heating shape correcting device | |
CN116022520B (en) | Conveying system for cooling tower filler production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20230707 |
|
RJ01 | Rejection of invention patent application after publication |