CN116258485A - Seamless docking method of ground wire information reliability and master station system - Google Patents

Seamless docking method of ground wire information reliability and master station system Download PDF

Info

Publication number
CN116258485A
CN116258485A CN202310549296.1A CN202310549296A CN116258485A CN 116258485 A CN116258485 A CN 116258485A CN 202310549296 A CN202310549296 A CN 202310549296A CN 116258485 A CN116258485 A CN 116258485A
Authority
CN
China
Prior art keywords
grounding
grounding device
reliability
docking
pressure resistance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310549296.1A
Other languages
Chinese (zh)
Other versions
CN116258485B (en
Inventor
胡铁斌
曾建鑫
许建远
丁鹏
任锦标
王达
杨样
郑忠仁
梁国金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maoming Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Maoming Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maoming Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Maoming Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN202310549296.1A priority Critical patent/CN116258485B/en
Publication of CN116258485A publication Critical patent/CN116258485A/en
Application granted granted Critical
Publication of CN116258485B publication Critical patent/CN116258485B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Data Mining & Analysis (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Computer And Data Communications (AREA)
  • Measurement Of Resistance Or Impedance (AREA)

Abstract

The invention relates to a seamless interfacing method of ground wire information reliability and a master station system, which has the technical scheme that: acquiring operation information of a grounding device; judging the grounding reliability of the grounding device according to the operation information of the grounding device; determining an access requirement of the grounding device; determining a corresponding docking form according to the access requirement; performing data conversion on the grounding reliability according to the docking form to obtain docking data; the method has the advantage that the grounding information reliability of each grounding device can be fed back in time so as to ensure that the whole grounding wire management process is controllable.

Description

Seamless docking method of ground wire information reliability and master station system
Technical Field
The invention relates to the technical field of power system management, in particular to a seamless connection method of ground wire information reliability and a master station system.
Background
The grounding wire is an essential safety tool for electric work in the power industry, and is the most direct protection measure for protecting workers from electric shock injury. In actual work, because the grounding wire is frequently used and the operation looks simple, the paralyzed idea is easily generated, and the phenomenon of wrong hanging or removing of the grounding wire occurs, and the live installation of the grounding wire or the wrong power transmission accident of the grounding wire is caused.
At present, the inspection of the ground wire is mainly finished by manpower, and because the overhaul quantity of the distribution network lines is large, the coverage area is wide, the sites are various, and the requirements of field operators on the ground wire detection device are accurate, flexible and light; and the communication modes adopted by the grounding devices are different, so that the ground wire information reliability of the grounding devices is required to be in seamless butt joint with the master station system, and the requirement of maintenance of a distribution network line is met.
Disclosure of Invention
Aiming at the defects existing in the prior art, the invention aims to provide a seamless butt joint method of ground wire information reliability and a master station system, which has the advantages of timely feeding back the ground wire information reliability of each grounding device to ensure that the whole process of ground wire management is controllable.
The technical aim of the invention is realized by the following technical scheme: the seamless interfacing method of the ground wire information reliability and the master station system comprises the following steps:
acquiring operation information of a grounding device;
judging the grounding reliability of the grounding device according to the operation information of the grounding device;
determining an access requirement of the grounding device;
determining a corresponding docking form according to the access requirement;
and performing data conversion on the grounding reliability according to the docking form to obtain docking data.
Optionally, the acquiring the operation information of the grounding device includes:
under the condition of power failure, controlling the grounding device to perform a disconnection operation, and acquiring a first grounding pressure value of the grounding device in a disconnection state;
under the condition of power failure, controlling the grounding device to perform closing operation, and acquiring a second grounding pressure value of the grounding device in a closed state;
and calculating according to the first grounding pressure value and the second grounding pressure value to obtain a pressure resistance value change value of the grounding device.
Optionally, the determining the grounding reliability of the grounding device according to the operation information of the grounding device includes:
identifying the operation state of the grounding device according to the pressure resistance value change value;
and judging the grounding reliability of the grounding device according to the working state.
Optionally, the identifying the operation state of the grounding device according to the pressure resistance change value includes:
comparing the pressure resistance value change value with a preset pressure resistance value change value; if the pressure resistance change value is larger than a preset pressure resistance change value, judging the reliable operation state of the grounding device; and if the pressure resistance change value is smaller than the preset pressure resistance change value, judging that the operation state of the grounding device is an unreliable state.
Optionally, the determining the access requirement of the grounding device includes:
acquiring whether the operation state of the grounding device is changed, if so, judging that the grounding device has an access requirement for modifying the grounding reliability; if not, judging that the grounding device does not need to modify the access requirement of the grounding reliability.
Optionally, the determining a corresponding docking form according to the access requirement includes:
according to the communication protocol of the grounding device corresponding to the access requirement;
and converting the communication protocol of the grounding device into a TCP/IP protocol.
Optionally, the performing data conversion on the grounding reliability according to the docking form to obtain docking data includes:
and converting the data format of the grounding reliability of the grounding device into the data format of the corresponding TCP/IP protocol according to the docking form to obtain the corresponding docking data.
The seamless interfacing system of ground wire information reliability and master station system includes: the operation acquisition module is used for acquiring operation information of the grounding device;
the reliability judging module is used for judging the grounding reliability of the grounding device according to the operation information of the grounding device;
the requirement determining module is used for determining the access requirement of the grounding device;
the form matching module is used for determining a corresponding docking form according to the access requirement;
and the data conversion module is used for carrying out data conversion on the grounding reliability according to the docking form to obtain docking data.
A computer device comprising a memory storing a computer program and a processor implementing the steps of the method described above when the processor executes the computer program.
A computer readable storage medium having stored thereon a computer program which, when executed by a processor, performs the steps of the method described above.
In summary, the invention has the following beneficial effects: the grounding reliability of the grounding device can be identified through the operation information of the grounding device, and whether the grounding device has an access requirement for accessing a master station system or not is determined according to whether the grounding reliability of the grounding device changes or not; under the condition of access requirement, determining the butt joint form of the grounding device, performing data conversion, and accessing the master station system after obtaining butt joint data, thereby realizing seamless butt joint of the ground wire information reliability and the master station system and ensuring that the whole management process of the ground wire is controllable.
Drawings
FIG. 1 is a schematic flow chart of the present invention;
FIG. 2 is a block diagram of the present invention when assembled;
fig. 3 is an internal structural diagram of a computer device in an embodiment of the present invention.
Detailed Description
In order that the objects, features and advantages of the invention will be readily understood, a more particular description of the invention will be rendered by reference to specific embodiments thereof which are illustrated in the appended drawings. Several embodiments of the invention are presented in the figures. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein.
In the present invention, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "secured," and the like are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art according to the specific circumstances. The terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include one or more such feature.
In the present invention, unless expressly stated or limited otherwise, a first feature "above" or "below" a second feature may include both the first and second features being in direct contact, as well as the first and second features not being in direct contact but being in contact with each other through additional features therebetween. Moreover, a first feature being "above," "over" and "on" a second feature includes the first feature being directly above and obliquely above the second feature, or simply indicating that the first feature is higher in level than the second feature. The first feature being "under", "below" and "beneath" the second feature includes the first feature being directly under and obliquely below the second feature, or simply means that the first feature is less level than the second feature. The terms "vertical," "horizontal," "left," "right," "up," "down," and the like are used for descriptive purposes only and are not to indicate or imply that the devices or elements being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the invention.
The present invention will be described in detail below with reference to the accompanying drawings and examples.
The invention provides a seamless interfacing method of ground wire information reliability and a master station system, as shown in figure 1, comprising the following steps:
step 100, acquiring operation information of a grounding device;
step 200, judging the grounding reliability of the grounding device according to the operation information of the grounding device;
step 300, determining the access requirement of the grounding device;
step 400, determining a corresponding docking form according to the access requirement;
and 500, performing data conversion on the grounding reliability according to the docking form to obtain docking data.
In practical application, because the operation conditions of the grounding device are different, the operation information of the grounding device is generally required to be acquired when the grounding device operates, the grounding reliability of the grounding device can be identified through the operation information of the grounding device, and whether the grounding device has an access requirement for accessing a master station system is determined according to whether the grounding reliability of the grounding device changes; under the condition of access requirement, determining the butt joint form of the grounding device, performing data conversion, and accessing the master station system after obtaining butt joint data, thereby realizing seamless butt joint of the ground wire information reliability and the master station system and ensuring that the whole management process of the ground wire is controllable.
Further, the acquiring the operation information of the grounding device includes:
under the condition of power failure, controlling the grounding device to perform a disconnection operation, and acquiring a first grounding pressure value of the grounding device in a disconnection state;
under the condition of power failure, controlling the grounding device to perform closing operation, and acquiring a second grounding pressure value of the grounding device in a closed state;
and calculating according to the first grounding pressure value and the second grounding pressure value to obtain a pressure resistance value change value of the grounding device.
In practical application, the grounding pressure value of the grounding device is detected through the resistance type stress sensor, when the grounding operation is carried out, the grounding device is controlled to be respectively opened and closed, different pressure resistance change values are generated according to the resistance type stress sensor, and the operation information of the grounding device can be obtained through different voltage drops generated in the resistor through the built-in constant current source.
Optionally, the determining the grounding reliability of the grounding device according to the operation information of the grounding device includes:
identifying the operation state of the grounding device according to the pressure resistance value change value;
and judging the grounding reliability of the grounding device according to the working state.
In practical applications, the grounding state of the grounding device can be determined according to the pressure resistance change value, and whether the grounding device is well grounded can be determined through the grounding state conversion, so that the grounding reliability of the grounding device is determined.
Optionally, the identifying the operation state of the grounding device according to the pressure resistance value change value includes:
comparing the pressure resistance value change value with a preset pressure resistance value change value; if the pressure resistance change value is larger than a preset pressure resistance change value, judging the reliable operation state of the grounding device; and if the pressure resistance change value is smaller than the preset pressure resistance change value, judging that the operation state of the grounding device is an unreliable state.
In practical application, the minimum value of the pressure resistance change value under the normal grounding state is obtained through multiple times of measurement in advance and is used as a preset pressure resistance change value, and the pressure resistance change value of the corresponding grounding device is compared with the preset pressure resistance change value, so that the grounding reliability of the grounding device is judged.
Further, the determining the access requirement of the grounding device includes:
acquiring whether the operation state of the grounding device is changed, if so, judging that the grounding device has an access requirement for modifying the grounding reliability; if not, judging that the grounding device does not need to modify the access requirement of the grounding reliability.
In practical application, the access requirement is only generated when the grounding reliability of the grounding device is changed, so that the synchronization of irrelevant data can be reduced, and the data transmission resources are saved.
Further, the determining a corresponding docking form according to the access requirement includes:
according to the communication protocol of the grounding device corresponding to the access requirement;
and converting the communication protocol of the grounding device into a TCP/IP protocol.
In practical applications, since the communication protocols of the grounding devices may be different, the communication protocols of the corresponding grounding devices need to be converted into a unified TCP/IP protocol, and data docking is performed at the same time.
Further, the performing data conversion on the grounding reliability according to the docking form to obtain docking data includes:
and converting the data format of the grounding reliability of the grounding device into the data format of the corresponding TCP/IP protocol according to the docking form to obtain the corresponding docking data.
In practical application, because the data formats under different communication protocols are different, various data formats of TCP/IP protocol are required to be unified, so that the processing speed of the master station system after receiving the data is improved.
As shown in fig. 2, the present invention further provides a seamless interfacing system between ground wire information reliability and a master station system, including:
a job acquisition module 10 for acquiring job information of the grounding device;
a reliability determination module 20 for determining the grounding reliability of the grounding device according to the operation information of the grounding device;
a requirement determining module 30, configured to determine an access requirement of the grounding device;
a form matching module 40, configured to determine a corresponding docking form according to the access requirement;
the data conversion module 50 is configured to perform data conversion on the grounding reliability according to the docking form, so as to obtain docking data.
The specific limitation of the seamless interfacing system of the ground wire information reliability and the master station system can be referred to the limitation of the seamless interfacing method of the ground wire information reliability and the master station system hereinabove, and the description thereof will not be repeated here. The above ground wire information reliability and each module in the seamless interfacing system of the master station system may be implemented in whole or in part by software, hardware, and combinations thereof. The above modules may be embedded in hardware or may be independent of a processor in the computer device, or may be stored in software in a memory in the computer device, so that the processor may call and execute operations corresponding to the above modules.
In one embodiment, a computer device is provided, which may be a server, the internal structure of which may be as shown in fig. 3. The computer device includes a processor, a memory, a network interface, and a database connected by a system bus. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, computer programs, and a database. The internal memory provides an environment for the operation of the operating system and computer programs in the non-volatile storage media. The computer program, when executed by the processor, implements a seamless interfacing method of ground wire information reliability with the primary station system.
It will be appreciated by those skilled in the art that the structure shown in fig. 3 is merely a block diagram of some of the structures associated with the present application and is not limiting of the computer device to which the present application may be applied, and that a particular computer device may include more or fewer components than shown, or may combine certain components, or have a different arrangement of components.
In one embodiment, a computer device is provided comprising a memory and a processor, the memory having stored therein a computer program, the processor when executing the computer program performing the steps of: acquiring operation information of a grounding device;
judging the grounding reliability of the grounding device according to the operation information of the grounding device;
determining an access requirement of the grounding device;
determining a corresponding docking form according to the access requirement;
and performing data conversion on the grounding reliability according to the docking form to obtain docking data.
In one embodiment, the acquiring the operation information of the grounding device includes:
under the condition of power failure, controlling the grounding device to perform a disconnection operation, and acquiring a first grounding pressure value of the grounding device in a disconnection state;
under the condition of power failure, controlling the grounding device to perform closing operation, and acquiring a second grounding pressure value of the grounding device in a closed state;
and calculating according to the first grounding pressure value and the second grounding pressure value to obtain a pressure resistance value change value of the grounding device.
In one embodiment, the determining the grounding reliability of the grounding device according to the operation information of the grounding device includes:
identifying the operation state of the grounding device according to the pressure resistance value change value;
and judging the grounding reliability of the grounding device according to the working state.
In one embodiment, the identifying the operation state of the grounding device according to the pressure resistance value change value includes:
comparing the pressure resistance value change value with a preset pressure resistance value change value; if the pressure resistance change value is larger than a preset pressure resistance change value, judging the reliable operation state of the grounding device; and if the pressure resistance change value is smaller than the preset pressure resistance change value, judging that the operation state of the grounding device is an unreliable state.
In one embodiment, the determining the access requirement of the grounding device includes:
acquiring whether the operation state of the grounding device is changed, if so, judging that the grounding device has an access requirement for modifying the grounding reliability; if not, judging that the grounding device does not need to modify the access requirement of the grounding reliability.
In one embodiment, the determining the corresponding docking form according to the access requirement includes:
according to the communication protocol of the grounding device corresponding to the access requirement;
and converting the communication protocol of the grounding device into a TCP/IP protocol.
In one embodiment, the performing data conversion on the grounding reliability according to the docking form to obtain docking data includes:
and converting the data format of the grounding reliability of the grounding device into the data format of the corresponding TCP/IP protocol according to the docking form to obtain the corresponding docking data.
Those skilled in the art will appreciate that implementing all or part of the above described methods may be accomplished by way of a computer program stored on a non-transitory computer readable storage medium, which when executed, may comprise the steps of the embodiments of the methods described above. Any reference to memory, storage, database, or other medium used in the various embodiments provided herein may include non-volatile and/or volatile memory. The nonvolatile memory can include Read Only Memory (ROM), programmable ROM (PROM), electrically Programmable ROM (EPROM), electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double Data Rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous Link DRAM (SLDRAM), memory bus direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), among others.
The technical features of the above embodiments may be arbitrarily combined, and all possible combinations of the technical features in the above embodiments are not described for brevity of description, however, as long as there is no contradiction between the combinations of the technical features, they should be considered as the scope of the description.
The above description is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above examples, and all technical solutions belonging to the concept of the present invention belong to the protection scope of the present invention. It should be noted that modifications and adaptations to the present invention may occur to one skilled in the art without departing from the principles of the present invention and are intended to be within the scope of the present invention.

Claims (10)

1. The seamless interfacing method of the ground wire information reliability and the master station system is characterized by comprising the following steps:
acquiring operation information of a grounding device;
judging the grounding reliability of the grounding device according to the operation information of the grounding device;
determining an access requirement of the grounding device;
determining a corresponding docking form according to the access requirement;
and performing data conversion on the grounding reliability according to the docking form to obtain docking data.
2. The method of claim 1, wherein the obtaining the operation information of the grounding device comprises:
under the condition of power failure, controlling the grounding device to perform a disconnection operation, and acquiring a first grounding pressure value of the grounding device in a disconnection state;
under the condition of power failure, controlling the grounding device to perform closing operation, and acquiring a second grounding pressure value of the grounding device in a closed state;
and calculating according to the first grounding pressure value and the second grounding pressure value to obtain a pressure resistance value change value of the grounding device.
3. The method according to claim 2, wherein the determining the grounding reliability of the grounding device based on the operation information of the grounding device comprises:
identifying the operation state of the grounding device according to the pressure resistance value change value;
and judging the grounding reliability of the grounding device according to the working state.
4. A method according to claim 3, wherein said identifying the operating state of the grounding device based on the pressure resistance change value comprises:
comparing the pressure resistance value change value with a preset pressure resistance value change value; if the pressure resistance change value is larger than a preset pressure resistance change value, judging the reliable operation state of the grounding device; and if the pressure resistance change value is smaller than the preset pressure resistance change value, judging that the operation state of the grounding device is an unreliable state.
5. The method of claim 4, wherein the determining the access requirement of the grounding device comprises:
acquiring whether the operation state of the grounding device is changed, if so, judging that the grounding device has an access requirement for modifying the grounding reliability; if not, judging that the grounding device does not need to modify the access requirement of the grounding reliability.
6. The method of claim 5, wherein said determining a corresponding docking modality based on said access requirements comprises:
according to the communication protocol of the grounding device corresponding to the access requirement;
and converting the communication protocol of the grounding device into a TCP/IP protocol.
7. The method of claim 6, wherein said performing data conversion on said ground reliability according to said docking format to obtain docking data comprises:
and converting the data format of the grounding reliability of the grounding device into the data format of the corresponding TCP/IP protocol according to the docking form to obtain the corresponding docking data.
8. The seamless interfacing system of ground wire information reliability and master station system, characterized by comprising:
the operation acquisition module is used for acquiring operation information of the grounding device;
the reliability judging module is used for judging the grounding reliability of the grounding device according to the operation information of the grounding device;
the requirement determining module is used for determining the access requirement of the grounding device;
the form matching module is used for determining a corresponding docking form according to the access requirement;
and the data conversion module is used for carrying out data conversion on the grounding reliability according to the docking form to obtain docking data.
9. A computer device comprising a memory and a processor, the memory storing a computer program, characterized in that the processor implements the steps of the method of any of claims 1 to 7 when the computer program is executed.
10. A computer readable storage medium, on which a computer program is stored, characterized in that the computer program, when being executed by a processor, implements the steps of the method of any of claims 1 to 7.
CN202310549296.1A 2023-05-16 2023-05-16 Seamless docking method of ground wire information reliability and master station system Active CN116258485B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310549296.1A CN116258485B (en) 2023-05-16 2023-05-16 Seamless docking method of ground wire information reliability and master station system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310549296.1A CN116258485B (en) 2023-05-16 2023-05-16 Seamless docking method of ground wire information reliability and master station system

Publications (2)

Publication Number Publication Date
CN116258485A true CN116258485A (en) 2023-06-13
CN116258485B CN116258485B (en) 2023-08-04

Family

ID=86686572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310549296.1A Active CN116258485B (en) 2023-05-16 2023-05-16 Seamless docking method of ground wire information reliability and master station system

Country Status (1)

Country Link
CN (1) CN116258485B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE905049C (en) * 1943-02-18 1954-02-25 Aeg Device for determining the resistance of earth electrodes
JPH07218574A (en) * 1994-01-31 1995-08-18 Toshiba Corp Fault locating system
CN101826757A (en) * 2010-04-29 2010-09-08 杭州市电力局 Method and device for managing earth wire
CN102509245A (en) * 2011-10-21 2012-06-20 亿达信息技术有限公司 Temporary grounding wire management method and system
CN203491471U (en) * 2013-09-25 2014-03-19 国家电网公司 Anti-error type electric ground wire operating lever
KR20220081473A (en) * 2020-12-09 2022-06-16 한국전력공사 System for monitoring ground fault and operating method thereof
CN116047362A (en) * 2023-03-31 2023-05-02 广东电网有限责任公司茂名供电局 Grounding reliability detection method, system, medium and computer based on pressure detection

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE905049C (en) * 1943-02-18 1954-02-25 Aeg Device for determining the resistance of earth electrodes
JPH07218574A (en) * 1994-01-31 1995-08-18 Toshiba Corp Fault locating system
CN101826757A (en) * 2010-04-29 2010-09-08 杭州市电力局 Method and device for managing earth wire
CN102509245A (en) * 2011-10-21 2012-06-20 亿达信息技术有限公司 Temporary grounding wire management method and system
CN203491471U (en) * 2013-09-25 2014-03-19 国家电网公司 Anti-error type electric ground wire operating lever
KR20220081473A (en) * 2020-12-09 2022-06-16 한국전력공사 System for monitoring ground fault and operating method thereof
CN116047362A (en) * 2023-03-31 2023-05-02 广东电网有限责任公司茂名供电局 Grounding reliability detection method, system, medium and computer based on pressure detection

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘家军;刘超;王睿;: "电力线路停电检修挂接地线监测单元的研制", 电网与清洁能源, no. 10, pages 28 - 33 *

Also Published As

Publication number Publication date
CN116258485B (en) 2023-08-04

Similar Documents

Publication Publication Date Title
CN110837956A (en) Underground cable inspection task distribution method and device
CN109754095B (en) Deployment information generation method and device, computer equipment and storage medium
CN110942455A (en) Method and device for detecting missing of cotter pin of power transmission line and computer equipment
CN112684247A (en) User electricity stealing detection method and device, computer equipment and storage medium
CN112511422A (en) Data transmission method and device, computer equipment and storage medium
CN116258485B (en) Seamless docking method of ground wire information reliability and master station system
CN108471114B (en) Power transmission line state evaluation method and device, computer equipment and storage medium
CN113923207A (en) Computer network monitoring method and terminal
CN116051080A (en) Method and system for managing ground wires of operation site
CN109819052B (en) Remote diagnosis method, device, computer equipment and storage medium
CN109558956B (en) Offline estimation method and device for metering equipment, computer equipment and storage medium
CN113626227A (en) Abnormal log information reporting method, intelligent terminal and storage medium
CN115378841B (en) Method and device for detecting state of equipment accessing cloud platform, storage medium and terminal
CN111611138A (en) Log data capturing method and device, computer equipment and storage medium
CN116136985A (en) Substation security risk online identification method and system
CN116520192B (en) Grounding information diagnosis method based on tide fingerprint identification
CN115729756A (en) Test-accompanied hard disk, and method and system for test-accompanied server based on test-accompanied hard disk
CN116662312A (en) Grounding data correction method based on big data
CN110954780A (en) Underground cable fault detection method and device based on block chain
CN110647450B (en) Method and device for repairing break point of business process, computer equipment and storage medium
CN114690747B (en) Method, device, equipment and storage medium for troubleshooting and diagnosing equipment problems
CN116308278A (en) Maintenance management method and system based on OSB bus
CN114004583B (en) Component information processing method, device, computer equipment and storage medium
CN116017199A (en) Grounding detection information uploading method and device based on ubiquitous Internet of things
CN112163211B (en) Distribution network box management method and device, computer equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant