CN116245257A - Multi-robot scheduling method and device - Google Patents

Multi-robot scheduling method and device Download PDF

Info

Publication number
CN116245257A
CN116245257A CN202310503813.1A CN202310503813A CN116245257A CN 116245257 A CN116245257 A CN 116245257A CN 202310503813 A CN202310503813 A CN 202310503813A CN 116245257 A CN116245257 A CN 116245257A
Authority
CN
China
Prior art keywords
task
robot
information
preset
tasks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310503813.1A
Other languages
Chinese (zh)
Other versions
CN116245257B (en
Inventor
彭云龙
安丽
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ji Hua Laboratory
Original Assignee
Ji Hua Laboratory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ji Hua Laboratory filed Critical Ji Hua Laboratory
Priority to CN202310503813.1A priority Critical patent/CN116245257B/en
Publication of CN116245257A publication Critical patent/CN116245257A/en
Application granted granted Critical
Publication of CN116245257B publication Critical patent/CN116245257B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The application relates to the technical field of multi-robot scheduling and discloses a multi-robot scheduling method and device. The method is used for scheduling a plurality of robots, and comprises the following steps: step S1, road network vector diagram data, robot information and target task information of a patrol area are obtained, step S2, task allocation is carried out on a corresponding robot in the robot information according to the road network vector diagram data and the target task information and by combining a preset allocated position inheritance rule, a preset auction mechanism and a preset task allocation standard, a task allocation result is obtained, step S3, the task allocation result is optimized through a tabu search algorithm, an optimized task allocation result is obtained, and step S4, based on the optimized task allocation result, the corresponding robot in the robot information starts to execute tasks; the method and the device not only can reasonably distribute the task points, but also can reasonably arrange the task execution sequence, thereby improving the system execution efficiency.

Description

Multi-robot scheduling method and device
Technical Field
The application relates to the technical field of multi-robot scheduling, in particular to a multi-robot scheduling method and device.
Background
Along with the development of science and technology, the artificial intelligence technology is mature, and the construction of wisdom garden and wisdom commodity circulation has brought a series of facility for people. The traditional manual inspection, logistics distribution and other works have the problems of high labor intensity, low execution efficiency, overhigh labor cost and the like. Therefore, the inspection security work, logistics park distribution and the like are going to the intelligent inspection and intelligent logistics based on the artificial intelligence technology, and robots are used for replacing the work of inspection personnel or distribution personnel, so that the inspection and distribution work efficiency can be improved, higher economic benefits are achieved, and the convenience of inspection and distribution work is greatly improved.
However, when a plurality of inspection and distribution robots exist in the system, the inspection and distribution robots are reasonably distributed and scheduled in consideration of the difference of the capacity of each inspection and distribution robot for executing different tasks and the fault tolerance capacity, so that the system efficiency becomes a complex optimization problem.
Therefore, in order to solve the technical problems of reasonable distribution and scheduling among inspection and distribution robots with different capacities, a scheduling method of robots is needed.
Disclosure of Invention
The purpose of the application is to provide a multi-robot scheduling method and a multi-robot scheduling device, which are used for referring to a commodity auction mechanism, bidding is carried out on target points through different robots, reasonable task points are distributed, meanwhile, task execution sequences are reasonably distributed through a tabu search algorithm in a parallel computing mode, and the system execution efficiency is improved.
In a first aspect, the present application provides a multi-robot scheduling method, including:
step S1, road network vector diagram data, robot information and target task information of a patrol area are obtained;
step S2, task allocation is carried out on the corresponding robots in the robot information according to the road network vector diagram data and the target task information by combining a preset allocated position inheritance rule, a preset auction mechanism and a preset task allocation standard, so as to obtain a task allocation result;
step S3, optimizing the task distribution result through a tabu search algorithm to obtain an optimized task distribution result;
and S4, starting to execute tasks by the corresponding robots in the robot information based on the optimized task allocation result.
The multi-robot scheduling method provided by the embodiment of the application can realize the scheduling of robots, bid on target points by different robots by referring to a commodity auction mechanism, reasonable task points are distributed, meanwhile, the task execution sequence is reasonably distributed by a tabu search algorithm in a parallel computing mode, and the system execution efficiency is improved.
Optionally, the target task information includes a plurality of small node tasks; the step S2 includes:
step S21, setting the running path data and the movement corner data required by the robot to complete the task as task execution cost indexes;
step S22, calculating task execution cost values of the robots corresponding to the robot information for completing the tasks of the plurality of small nodes according to the road network vector diagram data, the target task information and the preset task allocation standard;
step S23, extracting the minimum value of task execution cost values corresponding to all small node tasks based on the preset auction mechanism and the allocated position inheritance rule, and allocating the small node tasks corresponding to the minimum value to the robots corresponding to the minimum value to obtain the task allocation result.
The multi-robot scheduling method provided by the application can realize the scheduling of robots, and by referring to a commodity auction mechanism, bidding is carried out on target points through different robots, so that reasonable task points are distributed.
Optionally, the step S22 includes:
step S221, calculating running path data and movement corner data of the corresponding robot in the robot information for completing the tasks of the plurality of small nodes according to the road network vector diagram data, the target task information and the preset task allocation standard;
step S222, based on a preset weight coefficient, carrying out weighted operation on the running path data and the movement corner data to obtain a task execution cost value of the robot for completing the tasks of the plurality of small nodes.
Optionally, the step S3 includes:
step S31, judging whether the task number of each robot in the task allocation result is larger than a preset threshold value; if yes, go to step S32; if not, executing step S33;
step S32, rearranging task execution sequences of robots with the number of tasks being greater than the preset threshold value through the tabu search algorithm to obtain an optimal task arrangement sequence, and optimizing the task distribution result based on the optimal task arrangement sequence to obtain the optimized task distribution result;
and step S33, determining the task allocation result as the optimized task allocation result.
The multi-robot scheduling method can realize scheduling of robots, reasonably arrange task execution sequences through a tabu search algorithm in a parallel computing mode, and improve system execution efficiency.
Optionally, after the step S4, the method further includes:
when the task is incomplete due to the robot fault in the task execution process, the incomplete task is selected as the task to be distributed, and the step S2 is executed in a return mode.
In a second aspect, the present application further provides a multi-robot scheduling apparatus, including:
the acquisition module is used for acquiring road network vector diagram data, robot information and target task information of the inspection area;
the allocation module is used for allocating tasks to the corresponding robots in the robot information according to the road network vector diagram data and the target task information by combining a preset allocated position inheritance rule, a preset auction mechanism and a preset task allocation standard to obtain a task allocation result;
the optimization module is used for optimizing the task distribution result through a tabu search algorithm to obtain an optimized task distribution result;
and the execution module is used for starting to execute the task by the corresponding robot in the robot information based on the optimized task allocation result.
The multi-robot scheduling device provided by the application can realize the scheduling of robots, bid on target points through different robots by referring to a commodity auction mechanism, reasonable task points are distributed, meanwhile, the task execution sequence is reasonably distributed through a tabu search algorithm in a parallel computing mode, and the system execution efficiency is improved.
Optionally, the target task information includes a plurality of small node tasks; the distribution module comprises:
the setting sub-module is used for setting the running path data and the movement corner data required by the robot to finish the task as task execution cost indexes;
the calculation sub-module is used for calculating the task execution cost value of the corresponding robot in the robot information for completing the tasks of the plurality of small nodes according to the road network vector diagram data, the target task information and the preset task allocation standard;
and the allocation sub-module is used for extracting the minimum value in the task execution cost value corresponding to each small node task based on the preset auction mechanism and the allocated position inheritance rule, and allocating the small node task corresponding to the minimum value to the robot corresponding to the minimum value to obtain the task allocation result.
The multi-robot scheduling device provided by the application can realize the scheduling of robots, and bid on target points through different robots by referring to a commodity auction mechanism, so that reasonable task points are distributed.
Optionally, the computing submodule includes:
the calculation unit is used for calculating the running path data and the movement corner data of the corresponding robots in the robot information for completing the tasks of the plurality of small nodes according to the road network vector diagram data, the target task information and the preset task allocation standard;
and the weighting unit is used for carrying out weighting operation on the running path data and the movement corner data based on a preset weight coefficient to obtain a task execution cost value of the robot for completing the tasks of the plurality of small nodes.
Optionally, the optimizing module includes:
the judging sub-module is used for judging whether the task number of each robot in the task allocation result is larger than a preset threshold value; if yes, triggering the optimization submodule to execute the corresponding steps; if not, triggering the determination submodule to execute the corresponding step;
the optimizing sub-module is used for rearranging task execution sequences of robots with the number of tasks being larger than the preset threshold value through the tabu search algorithm to obtain an optimal task arrangement sequence, and optimizing the task distribution result based on the optimal task arrangement sequence to obtain the optimized task distribution result;
and the determining submodule is used for determining the task distribution result as the optimized task distribution result.
Optionally, the apparatus further comprises:
and the return module is used for selecting the unfinished task as the task to be distributed when the task is unfinished due to the robot fault in the task execution process, and triggering the distribution module to execute the corresponding steps.
As can be seen from the foregoing, in the multi-robot scheduling method and apparatus provided by the present application, through step S1, road network vector diagram data, robot information and target task information of a patrol area are obtained, step S2, according to the road network vector diagram data and the target task information, a preset assigned position inheritance rule, a preset auction mechanism and a preset task allocation standard are combined, task allocation is performed on a corresponding robot in the robot information, a task allocation result is obtained, step S3, the task allocation result is optimized through a tabu search algorithm, an optimized task allocation result is obtained, step S4, based on the optimized task allocation result, the corresponding robot in the robot information starts to execute tasks, thereby realizing scheduling of multiple robots, referring to a commodity auction mechanism, price is given to target points through different robots, reasonable task points are allocated, and simultaneously, through a parallel calculation mode, task execution sequences are reasonably arranged through a tabu search algorithm, and system execution efficiency is improved.
Additional features and advantages of the application will be set forth in the description which follows, and in part will be apparent from the description, or may be learned by practice of the embodiments of the application. The objects and other advantages of the present application may be realized and attained by the structure particularly pointed out in the written description and drawings.
Drawings
Fig. 1 is a flowchart of a multi-robot scheduling method according to an embodiment of the present application.
Fig. 2 is another flowchart of a multi-robot scheduling method according to an embodiment of the present application.
Fig. 3 is a schematic structural diagram of a multi-robot scheduling system according to an embodiment of the present application.
Fig. 4 is a schematic diagram of a task execution sequence of a robot according to an embodiment of the present invention.
Fig. 5 is a schematic process diagram of an auction mechanism according to an embodiment of the present application.
Fig. 6 is a schematic diagram of domain solution set generation of a tabu search algorithm according to an embodiment of the present application.
Fig. 7 is a schematic structural diagram of a multi-robot scheduling device according to an embodiment of the present application.
Description of the reference numerals: 301. a robot; 302. road network and nodes; 303. a goods shelf; 501. a full connection road network; 502. a first round of auction; 503. a second round of auction; 504. a third round of auction; 601. generating a candidate solution; 701. an acquisition module; 702. a distribution module; 703. an optimization module; 704. and executing the module.
Detailed Description
The following description of the embodiments of the present application will be made clearly and completely with reference to the drawings in the embodiments of the present application, and it is apparent that the described embodiments are only some embodiments of the present application, not all embodiments. The components of the embodiments of the present application, which are generally described and illustrated in the figures herein, may be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the present application, as provided in the accompanying drawings, is not intended to limit the scope of the application, as claimed, but is merely representative of selected embodiments of the application. All other embodiments, which can be made by those skilled in the art based on the embodiments of the present application without making any inventive effort, are intended to be within the scope of the present application.
It should be noted that: like reference numerals and letters denote like items in the following figures, and thus once an item is defined in one figure, no further definition or explanation thereof is necessary in the following figures. Meanwhile, in the description of the present application, the terms "first", "second", and the like are used only to distinguish the description, and are not to be construed as indicating or implying relative importance.
Referring to fig. 1, fig. 1 is a flowchart of a multi-robot scheduling method according to an embodiment of the present application. The multi-robot scheduling method is used for scheduling a plurality of robots and comprises the following steps:
step S101, road network vector diagram data, robot information and target task information of a patrol area are obtained;
the target task information includes a plurality of small node tasks and a target total task, and the plurality of small node tasks form the target total task.
The robot information includes information of a plurality of executable robots, and the robot information is composed of information of the plurality of executable robots.
Step S102, task allocation is carried out on the corresponding robots in the robot information according to the road network vector diagram data and the target task information by combining a preset allocated position inheritance rule, a preset auction mechanism and a preset task allocation standard, so as to obtain a task allocation result;
it should be noted that, the preset assigned position inheritance rule is that, when a new round of auction bidding is performed, if any robot assigns (bids) a small node task on a round, the robot needs to perform cost calculation (bidding) on the basis of assigning the small node task, that is, calculates the cost from the position where the robot completes the previous round of task to the position where the task completes the new round of auction.
The preset auction mechanism is in a form of bidding, and task allocation is carried out by taking minimum task execution cost from an executable robot in the system to each small node task as a reference.
The preset task allocation standard is that the total cost of executing all executable robot tasks in the system is minimum, and the task allocation standard is an execution target of the system.
The movement angle data is the accumulation of rotation angles used by the executable robot to complete the task.
In the embodiment of the invention, running path data and movement corner data required by a robot to complete a task are set as task execution cost indexes, task execution cost values of a plurality of small node tasks, which are completed by the corresponding robot, in the robot information are calculated according to road network vector diagram data, target task information and preset task allocation standards, minimum values in the task execution cost values corresponding to the small node tasks are extracted based on a preset auction mechanism and an allocated position inheritance rule, and the small node tasks corresponding to the minimum values are allocated to the robots corresponding to the minimum values, so that a task allocation result is obtained.
Step S103, optimizing a task distribution result through a tabu search algorithm to obtain an optimized task distribution result;
in the embodiment of the invention, judging whether the task number of each robot in the task allocation result is larger than a preset threshold value; if yes, rearranging the tasks of the robot with the number of the tasks being larger than a preset threshold value through a tabu search algorithm to obtain an optimal task arrangement sequence, and optimizing a task distribution result based on the optimal task arrangement sequence to obtain an optimized task distribution result; if not, determining the task allocation result as the optimized task allocation result.
Step S104, based on the optimized task allocation result, the corresponding robot in the robot information starts to execute the task.
In the embodiment of the invention, based on the optimized task allocation result, after the corresponding robot in the robot information starts to execute the task, when the task is incomplete due to the occurrence of the robot fault in the task execution process, the task which is not complete is selected as the task to be allocated, and the execution step S102 is returned.
As can be seen from the foregoing, in the multi-robot scheduling method provided in the embodiment of the present application, road network vector diagram data, robot information and target task information of a patrol area are obtained through step S101, step S102 performs task allocation on a corresponding robot in the robot information according to a preset allocated position inheritance rule, a preset auction mechanism and a preset task allocation standard in combination with the road network vector diagram data and the target task information, so as to obtain a task allocation result, step S103 optimizes the task allocation result through a tabu search algorithm, so as to obtain an optimized task allocation result, step S104 starts to execute tasks for the corresponding robot in the robot information based on the optimized task allocation result, thereby realizing scheduling of the multi-robot, competing for the target point by different robots based on a commodity auction mechanism, allocating reasonable task points, and simultaneously reasonably distributing task execution orders through a tabu search algorithm in a parallel computing manner, so as to improve system execution efficiency.
Referring to fig. 2, fig. 2 is another flowchart of a multi-robot scheduling method according to an embodiment of the present application. The multi-robot scheduling method is used for scheduling a plurality of robots and comprises the following steps:
step S201, road network vector diagram data, robot information and target task information of a patrol area are obtained; the target task information comprises a plurality of small node tasks;
in the embodiment of the invention, road network vector diagram data, robot information and target task information are acquired, wherein the robot information comprises an executable robot set
Figure SMS_1
, wherein ,r1 ,r 2 ,…,r n Representing an executable robot, the target task information including a small node task l m And target general task->
Figure SMS_2
, wherein ,l1 ,l 2 ,…,l m Representing small node tasks, wherein the target total task consists of a plurality of small node tasks.
In a specific implementation, the road network vector diagram data of the inspection area is a set formed by road network nodes, wherein the road network nodes roadNode are shown in the following formula:
Figure SMS_3
wherein ,
Figure SMS_4
is the current road network node id with uniqueness,/->
Figure SMS_5
,/>
Figure SMS_6
,/>
Figure SMS_7
The coordinate values of x, y and z of the current road network node are respectively +.>
Figure SMS_8
Is a successor node taking the current road network node as a source node, and is +.>
Figure SMS_9
Is the course angle from the current road network node to the corresponding subsequent node.
Executable robot refers to a robot that can be normally connected to a server, and an executable robot set
Figure SMS_10
Refers to a collection of robots that can normally connect to a server.
Target general task
Figure SMS_11
Is a small node task set expressed by a road network node id. Small node tasks (i.e., task points) are typically road network nodes.
Referring to fig. 3, fig. 3 is a schematic structural diagram of a multi-robot scheduling system provided in an embodiment of the present application, where 301 is a robot, 302 is a road network and a node, 303 is a shelf, the multi-robot scheduling system includes a central server, various robots 301 with obstacle avoidance and tracking functions, the central server is responsible for storing the road network, collecting task information, and communicating and data interaction between the robots 301, and completing scheduling functions of the robots 301 based on current state information of the robots 301; the robot 301 can perform inspection, logistics distribution, and the like. The multi-robot scheduling system adopts a multi-robot scheduling method based on fusion of an auction mechanism and tabu search to complete tasks such as inspection or delivery.
Step S202, setting the running path data and the movement corner data required by the robot to complete the task as task execution cost indexes;
in the embodiment of the invention, the task execution cost can be indexes such as a robot running path, robot running time, robot movement corner and the like, and the robot task execution cost C is defined by taking the running path data and the movement corner data of the robot as the cost by considering the kinematic constraint of the robot.
Step S203, calculating task execution cost values of the corresponding robots in the robot information for completing the tasks of the plurality of small nodes according to the road network vector diagram data, the target task information and the preset task allocation standard;
in an alternative embodiment, step S203 includes:
step S2031, calculating running path data and movement corner data of a plurality of small node tasks completed by a corresponding robot in the robot information according to road network vector diagram data, target task information and preset task allocation standards;
step S2032, performing a weighted operation on the running path data and the movement corner data based on a preset weight coefficient, to obtain a task execution cost value for the robot to complete the tasks of the plurality of small nodes.
According to the method and the device, running path data and movement corner data of the robot for completing the tasks of the small nodes in the robot information are calculated according to road network vector diagram data, target task information and preset task allocation standards, and weighting operation is carried out on the running path data and the movement corner data based on preset weight coefficients, so that task execution cost values of the robot for completing the tasks of the small nodes are obtained.
In a specific implementation, the robots are respectively calculated
Figure SMS_12
Task execution cost values (bids) to all inode tasks. The calculation formula of the running path data specifically comprises the following steps:
Figure SMS_13
wherein ,
Figure SMS_16
for the path data of the robot, +.>
Figure SMS_18
Is a robot r i The position is located to the road network node +.>
Figure SMS_21
The shortest path is obtained based on an A-path searching algorithm (if a task point is assigned to the current robot in the previous round, the position of the shortest path is the position where the task point is completed in the previous round); it should be noted that, according to the assigned position inheritance rule, if the current robot has bid successfully in the last round of auction, it is necessary to perform cost calculation (bidding) again based on the execution of the last round of small node tasks, for example, assume that robot r 1 The previous round (or several previous rounds) of auction is assigned a small node task l 1 Then, in the current round of small node task I 2 In the auction of (a), robot r 1 Then task l is required at the small node 1 Bidding on the basis of (i) i.e. on the basis of the small node task/ 2 In the auction of (a), robot r 1 When bidding, calculating robot r 1 Task l at small node 1 Completing the task from the position to the small node task 2 Completing the task execution cost value of the position where the task is located if the robot r 1 No small node task/is assigned in the last (or previous) round of auctions 1 Then do not needTask l at small node 1 Bidding on the basis of (i) i.e. computing robot r 1 In original position to small node task 2 Completing the task execution cost value of the position where the task is located; />
Figure SMS_15
Is the robot at the current t moment +.>
Figure SMS_19
Is (are) the electric quantity of the battery>
Figure SMS_22
Is robot +.>
Figure SMS_24
The energy consumption of unit distance ensures that the robot can smoothly execute the task of the small node; if the cost is->
Figure SMS_14
Then indicate robot +.>
Figure SMS_17
Cannot complete the task of the small node->
Figure SMS_20
Bidding of the small node task is not participated; />
Figure SMS_23
Indicating that the robot cannot complete the small node task, else is bidding not to participate in the small node task.
Accordingly, for the current robot r i The position of the node is located to the road network node l j The travel distance of a shortest path, i.e. the path
Figure SMS_25
The calculation formula for calculating the movement corner data of the path is specifically as follows:
Figure SMS_26
wherein ,
Figure SMS_27
For the movement angle data of the robot, +.>
Figure SMS_28
Is the heading angle of the current small node task of the robot on the path P, the range is +.>
Figure SMS_29
,/>
Figure SMS_30
Is the heading angle of the robot for the next nodelet task on path P, the range is +.>
Figure SMS_31
The motion corner data is estimated by the accumulation of the rotation angles of the robot on all the subtask nodes of the path P.
The robot is obtained by weighting the running path data and the movement corner data of the robot
Figure SMS_32
To the task point->
Figure SMS_33
Task execution cost value->
Figure SMS_34
The weighting formula is specifically as follows:
Figure SMS_35
wherein ,
Figure SMS_37
is robot->
Figure SMS_40
To the task point->
Figure SMS_42
Auction bid (i.e. robot +.>
Figure SMS_38
To the task point->
Figure SMS_41
The task execution cost value of (2), K is a scaling factor,/->
Figure SMS_43
Is a weight coefficient in which
Figure SMS_44
。K、/>
Figure SMS_36
The setting can be preset according to the actual needs, for example, K=100,>
Figure SMS_39
but is not limited thereto.
Step S204, extracting the minimum value in the task execution cost value corresponding to each small node task based on a preset auction mechanism and a preset allocated position inheritance rule, and allocating the small node task corresponding to the minimum value to the robot corresponding to the minimum value to obtain a task allocation result;
in the embodiment of the invention, task allocation is performed through a preset auction mechanism and a preset allocated position inheritance rule, the minimum value in the task execution cost value corresponding to the small node task is extracted, and the small node task is allocated to the robot corresponding to the minimum value, so that a task allocation result is obtained.
In a specific implementation, referring to fig. 4, fig. 4 is a schematic diagram of a task execution sequence of a robot according to an embodiment of the present application, where,
Figure SMS_47
the method is characterized in that a task execution sequence is adopted, and figures in square grids are small node tasks; selecting the minimum bid (the minimum value in the task execution cost value) of the current round +.>
Figure SMS_52
(robot to task Point->
Figure SMS_56
Minimum value in the task execution cost values) of the robot>
Figure SMS_46
And task Point->
Figure SMS_51
Task Point->
Figure SMS_55
Assigning to robots +.>
Figure SMS_59
Updating the robot according to the update task execution sequence formula>
Figure SMS_45
Task execution sequence->
Figure SMS_49
Target total task set->
Figure SMS_53
I.e. task of small node +.>
Figure SMS_57
Add robot->
Figure SMS_48
Task execution sequence->
Figure SMS_50
Little node task->
Figure SMS_54
From the target total task set->
Figure SMS_58
And (5) removing. The update task execution sequence formula is specifically:
Figure SMS_60
Figure SMS_61
referring to fig. 5, fig. 5 is a schematic process diagram of an auction mechanism according to an embodiment of the present application, in which 501 is a fully connected network, 502 is a first round of auctions, 503 is a second round of auctions, 504 is a third round of auctions, and r 1 、r 2 Is a robot, l 1 、l 2 、l 3 For a small node task, the dotted line segment corresponds to a number to represent the task execution cost from each robot to the current small node task, the arrow segment corresponds to a number to represent the minimum task execution cost from each robot to the current small node task, and the arrow represents the assignment of the current robot to execute the current small node task; repeating the above steps until the collection
Figure SMS_64
Empty (all small node tasks are allocated). It should be noted that when the robot is +_ in the course of making a new auction bid>
Figure SMS_65
The previous round of assignment (bidding) of the small node task +.>
Figure SMS_67
Robot->
Figure SMS_63
Is required to be at->
Figure SMS_66
On the basis of (a) a cost calculation (bid), i.e. +.>
Figure SMS_68
Figure SMS_69
Representation robot r i Task->
Figure SMS_62
Task l to small node j Is a task execution cost value.
Step S205, judging whether the number of tasks of each robot in the task allocation result is larger than a preset threshold value; if yes, go to step S206; if not, executing step S207;
in the embodiment of the invention, the robot in the task allocation result is obtained
Figure SMS_70
Corresponding task execution sequence->
Figure SMS_71
Judging whether the task number of each robot in the task allocation result is greater than a preset threshold, for example, the preset threshold is set to be 1, and judging whether the task number of the robot is greater than 1, namely, the robot r i Task number->
Figure SMS_72
If yes, go to step S206; if not, step S207 is performed.
Step S206, rearranging the task execution sequence of the robot with the number of tasks larger than a preset threshold value through a tabu search algorithm to obtain an optimal task arrangement sequence, and optimizing a task distribution result based on the optimal task arrangement sequence to obtain an optimized task distribution result;
in the embodiment of the invention, a tabu search algorithm is applied to reorganize the task execution sequence of the robot with the number of tasks larger than a preset threshold (i.e. reorganize the sequence of the tasks in the task execution sequence), for example, when the preset threshold is set to 1, the task execution sequence of the robot with the number of tasks larger than 1 is reorganized to obtain an optimal task arrangement sequence, and based on the optimal task arrangement sequence, the task distribution result is optimized to obtain an optimized task distribution result.
In a specific implementation, a tabu search algorithm is utilized and is based on
Figure SMS_74
(task execution cost of robot to complete all task pointsSum is minimum) task execution sequence +.>
Figure SMS_77
Task rearrangement is performed to obtain a robot +.>
Figure SMS_79
New task execution sequence->
Figure SMS_75
(i.e., optimal task orchestration sequence) based on the auction algorithm results described above->
Figure SMS_76
As a current robot->
Figure SMS_78
Is the initial solution of (1), i.e. the current solution->
Figure SMS_80
Current optimal solution->
Figure SMS_73
Setting the maximum iteration number Z of the algorithm, setting a tabu table H to be empty, and enabling the current iteration number Z to be=0;
the following iterative process is performed: judging whether the algorithm meets the termination condition z<Z, i.e. whether the current iteration number Z reaches the maximum iteration number Z, if so, then
Figure SMS_81
Ending the iteration, otherwise, continuing to execute the iteration process;
referring to fig. 6, fig. 6 is a schematic diagram illustrating generation of a domain solution set of a tabu search algorithm according to an embodiment of the present application, where 601 is a candidate solution generation, and numbers in squares are small node tasks. Each iteration process includes:
1) Constructing a current solution based on the rule N under the constraint of a tabu table H
Figure SMS_82
Domain solution set->
Figure SMS_83
I.e.
Figure SMS_84
. The rule N is +.>
Figure SMS_85
The constraint of the tabu list H means that the position exchange is not carried out on the exchange task point pairs in the tabu list H; if under the constraint of the tabu list H, it results in +.>
Figure SMS_86
And based on the scofflaw, the optimal state (optimal solution, namely optimal exchange task point) in the tabu table H is forbidden.
2) Based on all solutions S in the domain solution set S generated by the steps, S is a set of task execution sequences generated in the iterative process, S is a task execution sequence generated in the iterative process, and corresponding objective function values are calculated
Figure SMS_88
Selecting the optimal solution x in the field solution set S, namely +.>
Figure SMS_90
,/>
Figure SMS_92
Representing arbitrary solution S within the field solution set S, let +.>
Figure SMS_89
Updating the tabu table H will generate the exchange task point pair corresponding to the optimal solution x (assumed to be
Figure SMS_91
) Is added to the tabu table H as a constraint of the tabu table H. After updating, if->
Figure SMS_93
Then the optimal solution is updated, i.e. +.>
Figure SMS_94
Otherwise, the optimal solution is not updated. Said objective function->
Figure SMS_87
Refers to a robot r i And completing the journey of the task points according to the sequence of the task execution sequence s.
3) The current iteration number z=z+1.
Based on the tabu search algorithm
Figure SMS_95
For optimization purposes is robot +>
Figure SMS_96
According to->
Figure SMS_97
The task sequence of (a) completes the path (cost) sum of all task points, wherein the path and the calculation cost are planned based on an A-based algorithm between the task points.
Step S207, determining that the task allocation result is the optimized task allocation result;
in the embodiment of the invention, if the number of tasks of the robot is smaller than or equal to the preset threshold, the preset threshold is assumed to be 1, that is, when the number of tasks of the robot is smaller than or equal to 1, the task allocation result is determined to be the optimal solution, and the task allocation result is determined to be the optimized task allocation result.
Step S208, based on the optimized task allocation result, the corresponding robot in the robot information starts to execute the task;
in an alternative embodiment, after step S208, the method further includes:
when the task is incomplete due to the robot fault in the task execution process, the task which is not complete is selected as the task to be distributed, and the execution step S202 is returned.
In the embodiment of the invention, the corresponding robot is assigned based on the optimized task allocation result
Figure SMS_100
Starting to execute the task when the task is executedJourney robot->
Figure SMS_101
Failure results in a new task execution sequence +.>
Figure SMS_103
Incomplete, new task execution sequence +.>
Figure SMS_99
The remaining tasks in the set are stored in the target total task set +.>
Figure SMS_102
Returning to step S202, if the system receives a new task point + ->
Figure SMS_104
Or task set->
Figure SMS_105
Storing the task in the target total task set +.>
Figure SMS_98
Step S202 is executed back.
Referring to fig. 7, fig. 7 is a schematic structural diagram of a multi-robot scheduling device provided in an embodiment of the present application, configured to schedule a plurality of robots, where the multi-robot scheduling device includes:
the acquisition module 701 is configured to acquire road network vector diagram data, robot information and target task information of a patrol area;
the allocation module 702 is configured to perform task allocation on a corresponding robot in the robot information according to the road network vector diagram data and the target task information, and by combining a preset allocated position inheritance rule, a preset auction mechanism and a preset task allocation standard, to obtain a task allocation result;
the optimizing module 703 is configured to optimize the task allocation result through a tabu search algorithm, and obtain an optimized task allocation result;
and the execution module 704 is configured to start executing the task by the corresponding robot in the robot information based on the optimized task allocation result.
The multi-robot scheduling device provided by the embodiment of the application can realize the scheduling of robots, bid on target points through different robots by referring to a commodity auction mechanism, reasonable task points are distributed, meanwhile, task execution sequences are reasonably distributed through a tabu search algorithm in a parallel computing mode, and the system execution efficiency is improved.
In some embodiments, the target task information includes a plurality of small node tasks; the allocation module 702 includes:
the setting sub-module is used for setting the running path data and the movement corner data required by the robot to finish the task as task execution cost indexes;
the calculation sub-module is used for calculating the task execution cost value of the corresponding robot in the robot information for completing the tasks of the plurality of small nodes according to the road network vector diagram data, the target task information and the preset task allocation standard;
and the allocation sub-module is used for extracting the minimum value in the task execution cost value corresponding to each small node task based on a preset auction mechanism and an allocated position inheritance rule, and allocating the small node task corresponding to the minimum value to the robot corresponding to the minimum value to obtain a task allocation result.
The multi-robot scheduling device provided by the embodiment of the application can realize the scheduling of robots, and bid on target points through different robots by referring to a commodity auction mechanism, so that reasonable task points are distributed.
In some embodiments, the computing submodule includes:
the calculation unit is used for calculating the running path data and the movement corner data of a plurality of small nodes of the corresponding robot in the robot information according to the road network vector diagram data, the target task information and the preset task allocation standard;
the weighting unit is used for carrying out weighting operation on the running path data and the movement corner data based on a preset weight coefficient to obtain a task execution cost value for the robot to finish a plurality of small node tasks.
In some embodiments, the optimization module 703 includes:
the judging sub-module is used for judging whether the number of tasks of each robot in the task allocation result is larger than a preset threshold value; if yes, triggering the optimization submodule to execute the corresponding steps; if not, triggering the determination submodule to execute the corresponding step;
the optimizing sub-module is used for rearranging the task execution sequences of the robots with the task numbers larger than a preset threshold value through a tabu search algorithm to obtain an optimal task arrangement sequence, optimizing the task distribution result based on the optimal task arrangement sequence, and obtaining an optimized task distribution result;
and the determining submodule is used for determining the task distribution result as the optimized task distribution result.
In some embodiments, the apparatus further comprises:
and the return module is used for selecting the unfinished task as the task to be distributed when the task is unfinished due to the robot fault in the task execution process, and triggering the distribution module 702 to execute the corresponding steps.
As can be seen from the above, the multi-robot scheduling device provided by the embodiment of the application can realize scheduling of multiple robots, and by referring to a commodity auction mechanism, bidding is performed on target points through different robots, reasonable task points are distributed, and meanwhile, task execution sequences are reasonably distributed through a tabu search algorithm in a parallel computing manner, so that the system execution efficiency is improved.
In the embodiments provided in the present application, it should be understood that the disclosed apparatus and method may be implemented in other manners. The above-described apparatus embodiments are merely illustrative, for example, the division of the units is merely a logical function division, and there may be other manners of division in actual implementation, and for example, multiple units or components may be combined or integrated into another system, or some features may be omitted, or not performed. Alternatively, the coupling or direct coupling or communication connection shown or discussed with each other may be through some communication interface, device or unit indirect coupling or communication connection, which may be in electrical, mechanical or other form.
Further, the units described as separate units may or may not be physically separate, and units displayed as units may or may not be physical units, may be located in one place, or may be distributed over a plurality of network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
Furthermore, functional modules in various embodiments of the present application may be integrated together to form a single portion, or each module may exist alone, or two or more modules may be integrated to form a single portion.
In this document, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions.
The foregoing is merely exemplary embodiments of the present application and is not intended to limit the scope of the present application, and various modifications and variations may be suggested to one skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims (10)

1. A multi-robot scheduling method, comprising:
step S1, road network vector diagram data, robot information and target task information of a patrol area are obtained;
step S2, task allocation is carried out on the corresponding robots in the robot information according to the road network vector diagram data and the target task information by combining a preset allocated position inheritance rule, a preset auction mechanism and a preset task allocation standard, so as to obtain a task allocation result;
step S3, optimizing the task distribution result through a tabu search algorithm to obtain an optimized task distribution result;
and S4, starting to execute tasks by the corresponding robots in the robot information based on the optimized task allocation result.
2. The multi-robot scheduling method of claim 1, wherein the target task information comprises a plurality of small node tasks; the step S2 includes:
step S21, setting the running path data and the movement corner data required by the robot to complete the task as task execution cost indexes;
step S22, calculating task execution cost values of the robots corresponding to the robot information for completing the tasks of the plurality of small nodes according to the road network vector diagram data, the target task information and the preset task allocation standard;
step S23, extracting the minimum value of task execution cost values corresponding to all small node tasks based on the preset auction mechanism and the allocated position inheritance rule, and allocating the small node tasks corresponding to the minimum value to the robots corresponding to the minimum value to obtain the task allocation result.
3. The multi-robot scheduling method according to claim 2, wherein the step S22 comprises:
step S221, calculating running path data and movement corner data of the corresponding robot in the robot information for completing the tasks of the plurality of small nodes according to the road network vector diagram data, the target task information and the preset task allocation standard;
step S222, based on a preset weight coefficient, carrying out weighted operation on the running path data and the movement corner data to obtain a task execution cost value of the robot for completing the tasks of the plurality of small nodes.
4. The multi-robot scheduling method according to claim 1, wherein the step S3 comprises:
step S31, judging whether the task number of each robot in the task allocation result is larger than a preset threshold value; if yes, go to step S32; if not, executing step S33;
step S32, rearranging task execution sequences of robots with the number of tasks being greater than the preset threshold value through the tabu search algorithm to obtain an optimal task arrangement sequence, and optimizing the task distribution result based on the optimal task arrangement sequence to obtain the optimized task distribution result;
and step S33, determining the task allocation result as the optimized task allocation result.
5. The multi-robot scheduling method according to claim 1, further comprising, after the step S4:
when the task is incomplete due to the robot fault in the task execution process, the incomplete task is selected as the task to be distributed, and the step S2 is executed in a return mode.
6. A multi-robot scheduling apparatus, comprising:
the acquisition module is used for acquiring road network vector diagram data, robot information and target task information of the inspection area;
the allocation module is used for allocating tasks to the corresponding robots in the robot information according to the road network vector diagram data and the target task information by combining a preset allocated position inheritance rule, a preset auction mechanism and a preset task allocation standard to obtain a task allocation result;
the optimization module is used for optimizing the task distribution result through a tabu search algorithm to obtain an optimized task distribution result;
and the execution module is used for starting to execute the task by the corresponding robot in the robot information based on the optimized task allocation result.
7. The multi-robot scheduling device of claim 6, wherein the target task information comprises a plurality of small node tasks; the distribution module comprises:
the setting sub-module is used for setting the running path data and the movement corner data required by the robot to finish the task as task execution cost indexes;
the calculation sub-module is used for calculating the task execution cost value of the corresponding robot in the robot information for completing the tasks of the plurality of small nodes according to the road network vector diagram data, the target task information and the preset task allocation standard;
and the allocation sub-module is used for extracting the minimum value in the task execution cost value corresponding to each small node task based on the preset auction mechanism and the allocated position inheritance rule, and allocating the small node task corresponding to the minimum value to the robot corresponding to the minimum value to obtain the task allocation result.
8. The multi-robot scheduling device of claim 7, wherein the computing sub-module comprises:
the calculation unit is used for calculating the running path data and the movement corner data of the corresponding robots in the robot information for completing the tasks of the plurality of small nodes according to the road network vector diagram data, the target task information and the preset task allocation standard;
and the weighting unit is used for carrying out weighting operation on the running path data and the movement corner data based on a preset weight coefficient to obtain a task execution cost value of the robot for completing the tasks of the plurality of small nodes.
9. The multi-robot scheduling device of claim 6, wherein the optimization module comprises:
the judging sub-module is used for judging whether the task number of each robot in the task allocation result is larger than a preset threshold value; if yes, triggering the optimization submodule to execute the corresponding steps; if not, triggering the determination submodule to execute the corresponding step;
the optimizing sub-module is used for rearranging task execution sequences of robots with the number of tasks being larger than the preset threshold value through the tabu search algorithm to obtain an optimal task arrangement sequence, and optimizing the task distribution result based on the optimal task arrangement sequence to obtain the optimized task distribution result;
and the determining submodule is used for determining the task distribution result as the optimized task distribution result.
10. The multi-robot scheduling device of claim 6, further comprising:
and the return module is used for selecting the unfinished task as the task to be distributed when the task is unfinished due to the robot fault in the task execution process, and triggering the distribution module to execute the corresponding steps.
CN202310503813.1A 2023-05-06 2023-05-06 Multi-robot scheduling method and device Active CN116245257B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310503813.1A CN116245257B (en) 2023-05-06 2023-05-06 Multi-robot scheduling method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310503813.1A CN116245257B (en) 2023-05-06 2023-05-06 Multi-robot scheduling method and device

Publications (2)

Publication Number Publication Date
CN116245257A true CN116245257A (en) 2023-06-09
CN116245257B CN116245257B (en) 2023-09-12

Family

ID=86624602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310503813.1A Active CN116245257B (en) 2023-05-06 2023-05-06 Multi-robot scheduling method and device

Country Status (1)

Country Link
CN (1) CN116245257B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103279793A (en) * 2013-04-25 2013-09-04 北京航空航天大学 Task allocation method for formation of unmanned aerial vehicles in certain environment
CN104155999A (en) * 2014-07-31 2014-11-19 海南大学 Time-sensitive task dynamic allocation algorithm in battlefield environment for multiple unmanned aerial vehicles
CN106875090A (en) * 2017-01-09 2017-06-20 中南大学 A kind of multirobot distributed task scheduling towards dynamic task distributes forming method
CN109839933A (en) * 2019-02-20 2019-06-04 哈尔滨工程大学 A kind of multi-robot Task Allocation based on VDSOM algorithm
CN110264062A (en) * 2019-08-12 2019-09-20 南京邮电大学 Distributed more AGV dynamic task allocations and its paths planning method and system
CN111716356A (en) * 2020-06-18 2020-09-29 南京邮电大学 Method for cooperation of humanoid multi-robot
CN112591568A (en) * 2020-12-15 2021-04-02 海南大学 Device sharing method for fusion of data and information facing intention calculation and reasoning
CN112733421A (en) * 2020-12-01 2021-04-30 南京航空航天大学 Task planning method for cooperative fight against earth by unmanned aerial vehicle
CN112785132A (en) * 2021-01-14 2021-05-11 北京理工大学 Task allocation method for multi-robot mobile shelf for intelligent warehouse
US20220035374A1 (en) * 2020-07-29 2022-02-03 Zhejiang University Scheduling method and system for fully autonomous waterborne inter terminal transportation
CN115186878A (en) * 2022-06-22 2022-10-14 湖南大学无锡智能控制研究院 Multi-AGV online task allocation method and system
CN115796530A (en) * 2022-12-05 2023-03-14 广东工业大学 Robot logistics scheduling optimization method for simultaneously delivering and taking goods
CN115952942A (en) * 2023-03-13 2023-04-11 季华实验室 Multi-target inspection scheduling planning method and device, electronic equipment and storage medium

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103279793A (en) * 2013-04-25 2013-09-04 北京航空航天大学 Task allocation method for formation of unmanned aerial vehicles in certain environment
CN104155999A (en) * 2014-07-31 2014-11-19 海南大学 Time-sensitive task dynamic allocation algorithm in battlefield environment for multiple unmanned aerial vehicles
CN106875090A (en) * 2017-01-09 2017-06-20 中南大学 A kind of multirobot distributed task scheduling towards dynamic task distributes forming method
CN109839933A (en) * 2019-02-20 2019-06-04 哈尔滨工程大学 A kind of multi-robot Task Allocation based on VDSOM algorithm
CN110264062A (en) * 2019-08-12 2019-09-20 南京邮电大学 Distributed more AGV dynamic task allocations and its paths planning method and system
CN111716356A (en) * 2020-06-18 2020-09-29 南京邮电大学 Method for cooperation of humanoid multi-robot
US20220035374A1 (en) * 2020-07-29 2022-02-03 Zhejiang University Scheduling method and system for fully autonomous waterborne inter terminal transportation
CN112733421A (en) * 2020-12-01 2021-04-30 南京航空航天大学 Task planning method for cooperative fight against earth by unmanned aerial vehicle
CN112591568A (en) * 2020-12-15 2021-04-02 海南大学 Device sharing method for fusion of data and information facing intention calculation and reasoning
CN112785132A (en) * 2021-01-14 2021-05-11 北京理工大学 Task allocation method for multi-robot mobile shelf for intelligent warehouse
CN115186878A (en) * 2022-06-22 2022-10-14 湖南大学无锡智能控制研究院 Multi-AGV online task allocation method and system
CN115796530A (en) * 2022-12-05 2023-03-14 广东工业大学 Robot logistics scheduling optimization method for simultaneously delivering and taking goods
CN115952942A (en) * 2023-03-13 2023-04-11 季华实验室 Multi-target inspection scheduling planning method and device, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN116245257B (en) 2023-09-12

Similar Documents

Publication Publication Date Title
Liang et al. Mobility-aware charging scheduling for shared on-demand electric vehicle fleet using deep reinforcement learning
Abdullah et al. Reinforcement learning based EV charging management systems–a review
Liu et al. Distributed and energy-efficient mobile crowdsensing with charging stations by deep reinforcement learning
CN110632907B (en) Scheduling optimization method and system for distributed assembly type replacement flow shop
Wan et al. Residential energy management with deep reinforcement learning
WO2020176381A1 (en) Joint order dispatching and fleet management for online ride-sharing platforms
Bogyrbayeva et al. A reinforcement learning approach for rebalancing electric vehicle sharing systems
CN107317872B (en) Scheduling method of multi-type tasks in space crowdsourcing
Erick et al. Reinforcement learning approaches to power management in grid-tied microgrids: A review
Kiaee Integration of electric vehicles in smart grid using deep reinforcement learning
Salameh et al. A digital ecosystem cooperative model: An application on microgrids
CN110851247A (en) Cost optimization scheduling method for constrained cloud workflow
Leite et al. Solving an energy resource management problem with a novel multi-objective evolutionary reinforcement learning method
Paudel et al. A deep reinforcement learning approach for power management of battery-assisted fast-charging EV hubs participating in day-ahead and real-time electricity markets
Yu et al. Extended-cbba-based task allocation algorithm for on-orbit assembly spacecraft
Zhang et al. Dynamic scheduling for flexible job shop with insufficient transportation resources via graph neural network and deep reinforcement learning
Ming et al. Cooperative modular reinforcement learning for large discrete action space problem
CN116245257B (en) Multi-robot scheduling method and device
CN109886574B (en) Multi-robot task allocation method based on improved threshold method
Mutingi et al. Home Health Care staff scheduling: Effective grouping approaches
Mei et al. A Multi-robot Task Allocation and Path Planning Method for Warehouse System
Wen et al. Multi-robot task allocation based on combinatorial auction
Xiong et al. Interpretable Deep Reinforcement Learning for Optimizing Heterogeneous Energy Storage Systems
CN107562914B (en) Resource mask based demand response resource rapid positioning method
Zhang et al. Hybrid Artificial Neural Networks Based Models for Electricity Spot Price Forecasting-A Review

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant