Prior art keywords
design change
construction unit
unit user
price
instruction input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310185049.8A
Other languages
Chinese (zh)
Inventor
吴淑婷
李娜
周伟强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Construction Engineering Supervision Co Ltd
Original Assignee
Guangzhou Construction Engineering Supervision Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Construction Engineering Supervision Co Ltd filed Critical Guangzhou Construction Engineering Supervision Co Ltd
Priority to CN202310185049.8A priority Critical patent/CN116228153A/en
Publication of CN116228153A publication Critical patent/CN116228153A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method, a system, equipment and a medium for managing engineering project design change price, wherein the method comprises the following steps: responding to an information uploading instruction, a model comparison instruction and an engineering material comparison instruction input by a construction unit user, receiving design change price information, defining a design change part of an engineering model through a model comparison window, determining a new material and a current comprehensive unit price through the engineering material comparison window based on the design change price information and a contract bid limit price file, and then reporting to a supervision unit end; responding to an audit instruction input by a supervision unit user, acquiring a modification result generated by modifying the report information by the supervision unit user through an audit window, and reporting the modification result to a construction unit end; and responding to an audit instruction input by the construction unit user, and acquiring a design change price account generated by modifying the modification result by the construction unit user through an audit window. The invention can shorten the reporting and approval time of design change price.

Description

Engineering project design change price management method, system, equipment and medium
Technical Field
The present invention relates to the field of engineering management technology, and in particular, to a method, a system, an apparatus, and a computer readable storage medium for managing engineering project design change costs.
Background
Engineering project design changes refer to modification of design contents (including functions, scales, equipment, materials, engineering quantities and the like), design standards and technical standards expressed in construction drawing and design files which are approved and implemented by a design unit, and perfection and design supplement of construction drawing design omission. The cost of the design change caused by the design change has an important influence on the construction cost of the entire construction project. In the process from the declaration of the design change price by the construction party to the approval by the final office, the related data required by the change needs to be reported, the type of the change price is determined, and the newly added material, unit price and the like generated by the design change are determined. When a large number of design changes occur in the engineering project construction process, the reporting time and the approval time of the design change price have a certain influence on the construction period.
The existing engineering project design change price management method generally needs to manually formulate paper reporting materials according to the design change content, and then report the paper reporting materials to related departments for verification.
Disclosure of Invention
The invention provides a method, a system, equipment and a medium for managing design change price of engineering projects, which are used for solving the technical problems that in the prior art, the efficiency of reporting by making paper reporting materials is low, so that the reporting time and the checking time of the design change price are prolonged.
In order to solve the above technical problems, a first aspect of the present invention provides a method for managing design change costs of engineering projects, including the following steps:
receiving design change price information of an engineering project to be changed in response to an information uploading instruction input by a construction unit user;
responding to a model comparison instruction input by a construction unit user, starting a model comparison window for editing by the construction unit user based on a pre-uploaded original engineering model and a design change engineering model so as to define a plurality of design change parts according to a part marking instruction input by the construction unit user;
responding to an engineering material comparison instruction input by a construction unit user, starting an engineering material comparison window for editing by the construction unit user based on the design change price information and a pre-uploaded contract bidding price limiting file to determine a plurality of newly-added materials and a current comprehensive unit price according to a material screening instruction input by the construction unit user, and reporting the plurality of design change positions, the plurality of newly-added materials and the current comprehensive unit price to a supervision unit end;
responding to an audit instruction input by a supervision unit user, starting an audit window edited by the supervision unit user to acquire a modification result generated by modifying the design change parts, the new materials and the current comprehensive unit price by the supervision unit user, and reporting the modification result to a construction unit end;
and responding to an audit instruction input by a construction unit user, and starting an audit window edited by the construction unit user to acquire a design change price account generated by modifying the modification result by the construction unit user.
As a preferred solution, the method specifically obtains the original engineering model and the contract bid limit file by the following steps:
and receiving the original engineering model and the contract bidding price limit file in response to an information uploading instruction input by the construction unit user.
As a preferable scheme, the method specifically obtains the design change engineering model through the following steps:
and receiving the design change engineering model in response to an information uploading instruction input by a design unit user.
Preferably, the method further comprises the steps of:
responding to an information supplementing instruction input by a supervision unit user, starting a supplementing mark window edited by the supervision unit user to obtain an information supplementing mark result generated by the supervision unit user for supplementing and marking the design change parts, the new materials and the current comprehensive unit price, and feeding the information supplementing mark result back to a construction unit end;
responding to the information supplementing instruction input by the construction unit user, and starting an information supplementing window edited by the construction unit user to acquire the supplementing information uploaded by the construction unit user;
updating the design change parts, the new materials and the current comprehensive unit price according to the supplementary information, and reporting the updated design change parts, the updated new materials and the current comprehensive unit price to the supervision unit end.
Preferably, the method further comprises the steps of:
and responding to a classification instruction input by a construction unit user, classifying the design change plan of the project to be changed according to a preset classification strategy based on the design change price standing account.
Preferably, the method further comprises the steps of:
and in response to a remark instruction input by the construction unit user, starting a remark window edited by the construction unit user to acquire change reason remark information generated by remark the design change price information in the design change price account of the construction unit user.
Preferably, the original engineering model and the design change engineering model are BIM models or engineering models constructed through graphic calculation amount software.
The second aspect of the embodiment of the invention provides an engineering project design change price management system, which comprises a construction unit end, a supervision unit end, a construction unit end and a server end;
the construction unit end is used for:
receiving design change price information of an engineering project to be changed in response to an information uploading instruction input by a construction unit user;
responding to the model comparison instruction input by the construction unit user, and starting a model comparison window edited by the construction unit user based on a pre-uploaded original engineering model and a design change engineering model to acquire a part marking instruction input by the construction unit user;
the server side is configured to:
according to the position marking instruction input by the construction unit user, a plurality of design change positions are defined;
the construction unit end is further used for:
responding to the engineering material comparison instruction input by the construction unit user, and starting an engineering material comparison window edited by the construction unit user based on the design change price information and a contract bidding limit file uploaded in advance to acquire a material screening instruction input by the construction unit user;
the server side is further configured to:
determining a plurality of newly-added materials and current comprehensive unit price according to a material screening instruction input by a construction unit user, and reporting the plurality of design change parts, the plurality of newly-added materials and the current comprehensive unit price to a supervision unit end;
the supervision unit end is used for:
responding to an audit instruction input by a supervision unit user, and starting an audit window edited by the supervision unit user to acquire a modification result generated by modifying the design change parts, the new materials and the current comprehensive unit price by the supervision unit user;
the server side is further configured to:
reporting the modification result to a construction unit end;
the construction unit end is used for:
and responding to an audit instruction input by a construction unit user, and starting an audit window edited by the construction unit user to acquire a design change price account generated by modifying the modification result by the construction unit user.
A third aspect of an embodiment of the present invention provides an engineering project design change tariff management apparatus, including a memory, a processor, and a computer program stored in the memory and executable on the processor, the processor implementing the engineering project design change tariff management method of any one of the first aspects when the computer program is executed.
A fourth aspect of the embodiments of the present invention provides a computer readable storage medium, the computer readable storage medium including a stored computer program, wherein the computer program when run controls a device in which the computer readable storage medium is located to execute the engineering project design change tariff management method according to any one of the first aspects.
Compared with the prior art, the method and the device have the advantages that the design change price of the engineering project is systematically and standardized, paper reporting materials are not required to be additionally formulated, and meanwhile, the reporting time and the checking time of the design change price can be effectively shortened, so that the reporting and checking efficiency of the design change price can be improved.
Drawings
FIG. 1 is a flow chart of a method for managing engineering project design change costs in an embodiment of the invention;
FIG. 2 is a schematic diagram of a project design change price management system in an embodiment of the invention.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1, a first aspect of the present invention provides a method for managing costs of engineering project design changes, including steps S1 to S5 as follows:
step S1, receiving design change price information of an engineering project to be changed in response to an information uploading instruction input by a construction unit user;
step S2, responding to a model comparison instruction input by a construction unit user, starting a model comparison window for editing by the construction unit user based on a pre-uploaded original engineering model and a design change engineering model so as to define a plurality of design change parts according to a part marking instruction input by the construction unit user;
step S3, responding to the engineering material comparison instruction input by the construction unit user, starting an engineering material comparison window edited by the construction unit user based on the design change price information and a pre-uploaded contract bidding price limit file to determine a plurality of newly-added materials and current comprehensive unit price according to the material screening instruction input by the construction unit user, and reporting the plurality of design change positions, the plurality of newly-added materials and the current comprehensive unit price to a supervision unit end;
s4, responding to an audit instruction input by a supervision unit user, starting an audit window edited by the supervision unit user to acquire a modification result generated by modifying the design change parts, the new materials and the current comprehensive unit price by the supervision unit user, and reporting the modification result to a construction unit end;
and step S5, in response to an audit instruction input by a construction unit user, starting an audit window edited by the construction unit user to acquire a design change price account generated by modifying the modification result by the construction unit user.
It should be noted that, in order to realize that in the process of reporting and validating the price of the design change, the relevant validation user can accurately and clearly know the changed engineering building site, in this embodiment, in response to the model comparison instruction input by the construction unit user, based on the original engineering model and the design change engineering model uploaded in advance, a model comparison window for editing by the construction unit user is started, where the model comparison window includes the original engineering model and the design change engineering model, the construction unit user can compare the site of the change in the engineering model in the model comparison window, and by acquiring the site marking instruction input by the construction unit user in the model comparison window, a plurality of design change sites in the engineering model can be clarified, so that the situation of unclear price caused by multiple changes of the same engineering building site can be avoided.
Further, since the design change of the engineering project may require new materials, so that the design change price is changed, in this embodiment, in response to the engineering material comparison instruction input by the construction unit user, the engineering material comparison window for editing by the construction unit user is enabled based on the design change price information uploaded by the construction unit user and the contract bid limit file uploaded in advance, and it is understood that the contract bid limit file defines the engineering materials and the comprehensive unit price required by the original engineering project, so that the design change price information is compared with the contract bid limit file, and the engineering materials required to be newly added and the comprehensive unit price after the specific design change can be screened out. And determining a plurality of newly-added materials and the current comprehensive unit price by acquiring a material screening instruction of a construction unit user in an engineering material comparison window.
Furthermore, the determined design change positions, the determined new materials and the current comprehensive unit price are reported to a supervision unit end for verification, and paper reporting materials are not required to be additionally formulated, so that the time consumed in the reporting process is effectively shortened.
Further, in response to an audit instruction input by a user of the supervision unit, the report information of the design change parts, the new materials and the current comprehensive unit price is loaded to an audit window, and an audit process of the supervision unit end is completed by acquiring a modification result generated by the supervision unit user modifying the report information in the audit window, and the modification result is reported to the construction unit end for approval.
Further, in response to an audit instruction input by a construction unit user, loading a modification result of the supervision unit end to an audit window, and completing an audit process of the construction unit end by acquiring a design change price account finally generated by the construction unit user modifying the modification result in the audit window.
According to the engineering project design change price management method, the design change price of the engineering project is systematically and standardized, paper reporting materials are not required to be additionally formulated, and meanwhile reporting time and approval time of the design change price can be effectively shortened.
As a preferred solution, the method specifically obtains the original engineering model and the contract bid limit file by the following steps:
and receiving the original engineering model and the contract bidding price limit file in response to an information uploading instruction input by the construction unit user.
As a preferable scheme, the method specifically obtains the design change engineering model through the following steps:
and receiving the design change engineering model in response to an information uploading instruction input by a design unit user.
Preferably, the method further comprises the steps of:
responding to an information supplementing instruction input by a supervision unit user, starting a supplementing mark window edited by the supervision unit user to obtain an information supplementing mark result generated by the supervision unit user for supplementing and marking the design change parts, the new materials and the current comprehensive unit price, and feeding the information supplementing mark result back to a construction unit end;
responding to the information supplementing instruction input by the construction unit user, and starting an information supplementing window edited by the construction unit user to acquire the supplementing information uploaded by the construction unit user;
updating the design change parts, the new materials and the current comprehensive unit price according to the supplementary information, and reporting the updated design change parts, the updated new materials and the current comprehensive unit price to the supervision unit end.
It is worth to say that, by the construction unit end report a plurality of design change positions, a plurality of new materials and the current comprehensive unit price these report information probably have information missing condition, when the supervision unit user found the information missing condition in the approval process, respond to the information supplement instruction of supervision unit user input, enable the supplement mark window that supplies supervision unit user to edit in order to obtain the information supplement mark result that supervision unit user carries out the supplement mark to the above-mentioned report information, thereby can clearly point out the information that has missing in the report information, and feed back to the construction unit end, instruct construction unit user to carry out information supplement.
After the supplementary information uploaded by the construction unit user is obtained, the information updating is carried out on a plurality of design change positions, a plurality of new materials and the current comprehensive unit price with information missing conditions according to the supplementary information, and the updated plurality of design change positions, the updated plurality of new materials and the current comprehensive unit price are re-reported to a supervision unit end for approval.
Preferably, the method further comprises the steps of:
and responding to a classification instruction input by a construction unit user, classifying the design change plan of the project to be changed according to a preset classification strategy based on the design change price standing account.
It should be noted that, since the same engineering building site may undergo multiple design changes, so as to generate multiple design change costs, the present embodiment provides a data arrangement manner, which specifically includes: and responding to a classification instruction input by a construction unit user, deriving a design change price account, and classifying the design change plan of the project to be changed according to a preset classification strategy.
As an optional embodiment, the classification policy specifically classifies the design change price amount according to the design change price amount, for example, when the design change price amount is greater than 100 ten thousand yuan, the corresponding design change plan is a type of design change; when the price amount of the design change is 20 ten thousand yuan to 100 ten thousand yuan, the corresponding design change plan is a second-class design change; when the price amount of the design change is less than 20 ten thousand yuan, the corresponding design change plan is three types of design change.
Preferably, the method further comprises the steps of:
and in response to a remark instruction input by the construction unit user, starting a remark window edited by the construction unit user to acquire change reason remark information generated by remark the design change price information in the design change price account of the construction unit user.
Preferably, the original engineering model and the design change engineering model are BIM models or engineering models constructed through graphic calculation amount software.
Preferably, in the present embodiment, in the process of reporting and validating the design change price, the validating flow information of the current design change price is recorded in real time according to the node of the information transmission. And responding to a flow checking instruction input by the construction unit user/the design unit user/the construction unit user/the supervision unit user, and transmitting current approval flow information to the construction unit end/the design unit end/the construction unit end/the supervision unit end.
By systematically and standardizing the design change price and recording the current approval process information in real time, the remote synchronization requirement of a user on approval of the design change price can be met.
Preferably, after the design change price ledger is generated, the design change price ledger is sent to the design unit end/construction unit end/supervision unit end in response to a ledger viewing instruction input by the design unit user/construction unit user/supervision unit user.
Referring to fig. 2, a second aspect of the embodiment of the present invention provides an engineering project design change price management system, which includes a construction unit end 201, a supervision unit end 202, a construction unit end 203, and a server end 205;
the construction unit end 201 is configured to:
receiving design change price information of an engineering project to be changed in response to an information uploading instruction input by a construction unit user;
responding to the model comparison instruction input by the construction unit user, and starting a model comparison window edited by the construction unit user based on a pre-uploaded original engineering model and a design change engineering model to acquire a part marking instruction input by the construction unit user;
the server 205 is configured to:
according to the position marking instruction input by the construction unit user, a plurality of design change positions are defined;
the construction unit end 201 is further configured to:
responding to the engineering material comparison instruction input by the construction unit user, and starting an engineering material comparison window edited by the construction unit user based on the design change price information and a contract bidding limit file uploaded in advance to acquire a material screening instruction input by the construction unit user;
the server 205 is further configured to:
determining a plurality of newly-added materials and a current comprehensive unit price according to a material screening instruction input by a construction unit user, and reporting the plurality of design change parts, the plurality of newly-added materials and the current comprehensive unit price to a supervision unit end 202;
the supervision unit end 202 is configured to:
responding to an audit instruction input by a supervision unit user, and starting an audit window edited by the supervision unit user to acquire a modification result generated by modifying the design change parts, the new materials and the current comprehensive unit price by the supervision unit user;
the server 205 is further configured to:
reporting the modification result to a construction unit end 203;
the construction unit end 203 is configured to:
and responding to an audit instruction input by a construction unit user, and starting an audit window edited by the construction unit user to acquire a design change price account generated by modifying the modification result by the construction unit user.
Preferably, the construction unit end 203 is further configured to:
and receiving the original engineering model and the contract bidding price limit file in response to an information uploading instruction input by the construction unit user.
Preferably, the system further comprises a design unit end 204 for:
and receiving the design change engineering model in response to an information uploading instruction input by a design unit user.
Preferably, the supervision unit end 202 is further configured to:
responding to an information supplementing instruction input by the supervision unit user, starting a supplementing mark window edited by the supervision unit user to obtain an information supplementing mark result generated by the supervision unit user for supplementing and marking the design change parts, the new materials and the current comprehensive unit price;
the server 205 is further configured to:
feeding back the information supplementary marking result to the construction unit end 201;
the construction unit end 201 is further configured to:
responding to the information supplementing instruction input by the construction unit user, and starting an information supplementing window edited by the construction unit user to acquire the supplementing information uploaded by the construction unit user;
the server 205 is further configured to:
and updating the design change parts, the new materials and the current comprehensive unit price according to the supplementary information, and reporting the updated design change parts, new materials and the current comprehensive unit price to the supervision unit end 202.
Preferably, the construction unit end 203 is further configured to:
and responding to a classification instruction input by a construction unit user, classifying the design change plan of the project to be changed according to a preset classification strategy based on the design change price standing account.
Preferably, the construction unit end 203 is further configured to:
and in response to a remark instruction input by the construction unit user, starting a remark window edited by the construction unit user to acquire change reason remark information generated by remark the design change price information in the design change price account of the construction unit user.
Preferably, the original engineering model and the design change engineering model are BIM models or engineering models constructed through graphic calculation amount software.
According to the engineering project design change price management system provided by the embodiment of the invention, through systematic and standardized management of the design change price of the engineering project, the reporting time and the checking time of the design change price can be effectively shortened while additional paper reporting materials are not required to be formulated, so that the reporting and checking efficiency of the design change price can be improved.
A third aspect of the embodiments of the present invention provides an engineering project design change tariff management apparatus, including a memory, a processor, and a computer program stored in the memory and executable on the processor, the processor implementing the engineering project design change tariff management method according to any of the embodiments of the first aspect when the computer program is executed.
The terminal equipment can be computing equipment such as a desktop computer, a notebook computer, a palm computer, a cloud server and the like. The terminal device may include, but is not limited to, a processor, a memory. The terminal device may also include input and output devices, network access devices, buses, and the like.
The processor may be a central processing unit (Central Processing Unit, CPU), other general purpose processors, digital signal processors (Digital Signal Processor, DSP), application specific integrated circuits (Application Specific Integrated Circuit, ASIC), field programmable gate arrays (Field-Prog rammable Gate Array, FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or the like. The general purpose processor may be a microprocessor or the processor may be any conventional processor or the like, which is a control center of the terminal device, and which connects various parts of the entire terminal device using various interfaces and lines.
The memory may be used to store the computer program and/or module, and the processor may implement various functions of the terminal device by running or executing the computer program and/or module stored in the memory and invoking data stored in the memory. The memory may mainly include a storage program area and a storage data area, wherein the storage program area may store an operating system, an application program (such as a sound playing function, an image playing function, etc.) required for at least one function, and the like; the storage data area may store data (such as audio data, phonebook, etc.) created according to the use of the handset, etc. In addition, the memory may include high-speed random access memory, and may also include non-volatile memory, such as a hard disk, memory, plug-in hard disk, smart Media Card (SMC), secure Digital (SD) Card, flash Card (Flash Card), at least one disk storage device, flash memory device, or other volatile solid-state storage device.
A fourth aspect of the embodiments of the present invention provides a computer readable storage medium, the computer readable storage medium including a stored computer program, wherein the computer program when run controls a device in which the computer readable storage medium is located to execute the engineering project design change tariff management method according to any of the embodiments of the first aspect.
From the above description of the embodiments, it will be clear to those skilled in the art that the present invention may be implemented by means of software plus necessary hardware platforms, but may of course also be implemented entirely in hardware. With such understanding, all or part of the technical solution of the present invention contributing to the background art may be embodied in the form of a software product, which may be stored in a storage medium, such as ROM/RAM, a magnetic disk, an optical disk, etc., including several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to perform the method described in the embodiments or some parts of the embodiments of the present invention.
While the foregoing is directed to the preferred embodiments of the present invention, it will be appreciated by those skilled in the art that changes and modifications may be made without departing from the principles of the invention, such changes and modifications are also intended to be within the scope of the invention.

Claims (10)

1. The engineering project design change price management method is characterized by comprising the following steps of:
receiving design change price information of an engineering project to be changed in response to an information uploading instruction input by a construction unit user;
responding to a model comparison instruction input by a construction unit user, starting a model comparison window for editing by the construction unit user based on a pre-uploaded original engineering model and a design change engineering model so as to define a plurality of design change parts according to a part marking instruction input by the construction unit user;
responding to an engineering material comparison instruction input by a construction unit user, starting an engineering material comparison window for editing by the construction unit user based on the design change price information and a pre-uploaded contract bidding price limiting file to determine a plurality of newly-added materials and a current comprehensive unit price according to a material screening instruction input by the construction unit user, and reporting the plurality of design change positions, the plurality of newly-added materials and the current comprehensive unit price to a supervision unit end;
responding to an audit instruction input by a supervision unit user, starting an audit window edited by the supervision unit user to acquire a modification result generated by modifying the design change parts, the new materials and the current comprehensive unit price by the supervision unit user, and reporting the modification result to a construction unit end;
and responding to an audit instruction input by a construction unit user, and starting an audit window edited by the construction unit user to acquire a design change price account generated by modifying the modification result by the construction unit user.
2. The engineering project design change price management method of claim 1, wherein the method specifically obtains the original engineering model and the contract bid limit file by:
and receiving the original engineering model and the contract bidding price limit file in response to an information uploading instruction input by the construction unit user.
3. The engineering project design change tariff management method of claim 2, wherein the method specifically obtains the design change engineering model by:
and receiving the design change engineering model in response to an information uploading instruction input by a design unit user.
4. A method of engineering project design change tariff management as defined in claim 3, wherein the method further comprises the steps of:
responding to an information supplementing instruction input by a supervision unit user, starting a supplementing mark window edited by the supervision unit user to obtain an information supplementing mark result generated by the supervision unit user for supplementing and marking the design change parts, the new materials and the current comprehensive unit price, and feeding the information supplementing mark result back to a construction unit end;
responding to the information supplementing instruction input by the construction unit user, and starting an information supplementing window edited by the construction unit user to acquire the supplementing information uploaded by the construction unit user;
updating the design change parts, the new materials and the current comprehensive unit price according to the supplementary information, and reporting the updated design change parts, the updated new materials and the current comprehensive unit price to the supervision unit end.
5. The engineering project design change price management method of claim 4, wherein the method further comprises the steps of:
and responding to a classification instruction input by a construction unit user, classifying the design change plan of the project to be changed according to a preset classification strategy based on the design change price standing account.
6. The engineering project design change price management method of claim 5, wherein the method further comprises the steps of:
and in response to a remark instruction input by the construction unit user, starting a remark window edited by the construction unit user to acquire change reason remark information generated by remark the design change price information in the design change price account of the construction unit user.
7. The engineering project design change cost management method according to claim 6, wherein the original engineering model and the design change engineering model are BIM models or engineering models constructed by graphic computation software.
8. The engineering project design change price management system is characterized by comprising a construction unit end, a supervision unit end, a construction unit end and a server end;
the construction unit end is used for:
receiving design change price information of an engineering project to be changed in response to an information uploading instruction input by a construction unit user;
responding to the model comparison instruction input by the construction unit user, and starting a model comparison window edited by the construction unit user based on a pre-uploaded original engineering model and a design change engineering model to acquire a part marking instruction input by the construction unit user;
the server side is configured to:
according to the position marking instruction input by the construction unit user, a plurality of design change positions are defined;
the construction unit end is further used for:
responding to the engineering material comparison instruction input by the construction unit user, and starting an engineering material comparison window edited by the construction unit user based on the design change price information and a contract bidding limit file uploaded in advance to acquire a material screening instruction input by the construction unit user;
the server side is further configured to:
determining a plurality of newly-added materials and current comprehensive unit price according to a material screening instruction input by a construction unit user, and reporting the plurality of design change parts, the plurality of newly-added materials and the current comprehensive unit price to a supervision unit end;
the supervision unit end is used for:
responding to an audit instruction input by a supervision unit user, and starting an audit window edited by the supervision unit user to acquire a modification result generated by modifying the design change parts, the new materials and the current comprehensive unit price by the supervision unit user;
the server side is further configured to:
reporting the modification result to a construction unit end;
the construction unit end is used for:
and responding to an audit instruction input by a construction unit user, and starting an audit window edited by the construction unit user to acquire a design change price account generated by modifying the modification result by the construction unit user.
9. An engineering project design change tariff management apparatus comprising a memory, a processor and a computer program stored in the memory and executable on the processor, the processor implementing the engineering project design change tariff management method of any one of claims 1 to 7 when executing the computer program.
10. A computer readable storage medium, characterized in that the computer readable storage medium comprises a stored computer program, wherein the computer program, when run, controls a device in which the computer readable storage medium is located to perform the engineering project design change tariff management method of any one of claims 1 to 7.
CN202310185049.8A 2023-02-27 2023-02-27 Engineering project design change price management method, system, equipment and medium Pending CN116228153A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310185049.8A CN116228153A (en) 2023-02-27 2023-02-27 Engineering project design change price management method, system, equipment and medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310185049.8A CN116228153A (en) 2023-02-27 2023-02-27 Engineering project design change price management method, system, equipment and medium

Publications (1)

Publication Number Publication Date
CN116228153A true CN116228153A (en) 2023-06-06

Family

ID=86582050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310185049.8A Pending CN116228153A (en) 2023-02-27 2023-02-27 Engineering project design change price management method, system, equipment and medium

Country Status (1)

Country Link
CN (1) CN116228153A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116934369A (en) * 2023-07-17 2023-10-24 佛山市盈科工程造价咨询事务所有限公司 Engineering cost real-time analysis management method, system, terminal and storage medium
CN117033399A (en) * 2023-07-20 2023-11-10 北京梦诚科技有限公司 Method and system for managing engineering quantity change

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116934369A (en) * 2023-07-17 2023-10-24 佛山市盈科工程造价咨询事务所有限公司 Engineering cost real-time analysis management method, system, terminal and storage medium
CN117033399A (en) * 2023-07-20 2023-11-10 北京梦诚科技有限公司 Method and system for managing engineering quantity change
CN117033399B (en) * 2023-07-20 2024-06-04 北京梦诚科技有限公司 Method and system for managing engineering quantity change

Similar Documents

Publication Publication Date Title
WO2020233048A1 (en) Customized software generation method and system, and electronic device and storage medium
CN116228153A (en) Engineering project design change price management method, system, equipment and medium
CN111221726A (en) Test data generation method and device, storage medium and intelligent equipment
CN109815464A (en) PDF document generation method, device, electronic equipment and storage medium
CN111199145A (en) Method, device, storage medium and electronic equipment for generating value-added tax report
CN107295377A (en) Moviemaking method, apparatus and system
US20220113847A1 (en) Online collaborative document processing method and device
CN110866382A (en) Document generation method, device, terminal equipment and medium
CN110837727A (en) Document template generation method and device, terminal equipment and medium
CN112667631B (en) Automatic editing method, device, equipment and storage medium for business field
CN110211006B (en) Contract risk analysis method and device and storage medium
CN110659190A (en) Quality report generation method, quality report generation device, quality report generation equipment and computer readable storage medium
CN117251157A (en) User interface generation method, device, equipment and medium
CN115952777A (en) Drop page design method and device, electronic equipment and storage medium
CN113935295A (en) Valuation table summarizing method, valuation table summarizing device, valuation table summarizing equipment and valuation table summarizing medium
CN114398226A (en) Network asset report generation method and device
CN112650763A (en) Configuration method of product quota, related equipment and storage medium
CN111027196A (en) Simulation analysis task processing method and device for power equipment and storage medium
CN111401395A (en) Data processing method, terminal equipment and storage medium
CN112199428B (en) Application management system, method and terminal equipment of functional data block
CN112733516B (en) Method, device, equipment and storage medium for processing quick message
CN111882294B (en) Method and device for flow approval
CN111813838B (en) Data processing method and device and electronic equipment
CN114862566A (en) Product configuration system, product configuration method, electronic device, and medium
CN116880820A (en) Visual generation method and device for application, terminal equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination