CN116163541A - Construction channel convenient to install - Google Patents
Construction channel convenient to install Download PDFInfo
- Publication number
- CN116163541A CN116163541A CN202310270110.9A CN202310270110A CN116163541A CN 116163541 A CN116163541 A CN 116163541A CN 202310270110 A CN202310270110 A CN 202310270110A CN 116163541 A CN116163541 A CN 116163541A
- Authority
- CN
- China
- Prior art keywords
- stereotyped
- dull
- fixed block
- matching
- bracing piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 13
- 238000009434 installation Methods 0.000 claims 2
- 238000009826 distribution Methods 0.000 abstract description 3
- 230000013011 mating Effects 0.000 description 9
- 229910000831 Steel Inorganic materials 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- 230000009286 beneficial effect Effects 0.000 description 2
- 208000010392 Bone Fractures Diseases 0.000 description 1
- 206010017076 Fracture Diseases 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Abstract
The utility model provides a construction passageway of easy to assemble, includes a plurality of assembly parts that mutually support through locking mechanical system, the assembly part includes dull and stereotyped and bracing piece, the bracing piece has two, and two bracing piece symmetries set up in the bottom of dull and stereotyped, and the bracing piece includes fixed block and connecting rod, the fixed block is connected with dull and stereotyped bottom surface be equipped with the threaded rod on the dull and stereotyped top surface, the bottom of threaded rod pass behind dull and stereotyped and the fixed block with the top fixed connection of connecting rod, threaded rod and fixed block threaded connection are located and are equipped with the mounting groove between two bracing pieces on the side of dull and stereotyped, are connected with the connecting plate that can match the mounting groove on the side that the mounting groove was kept away from to the dull and stereotyped. Through using the assembly parts that a plurality of structures are the same, can assemble a complete construction passageway fast, the dead lever in connecting plate and the locking mechanical system has certain length moreover, can adjust the interval between two assembly parts to can adapt to the reinforcing bar net of various gap distributions.
Description
Technical Field
The invention relates to the technical field of building construction, in particular to a construction channel convenient to install.
Background
In concrete floor construction, workers often need to walk on the floor steel bars to perform other construction operations, and a direct problem caused by this is that the steel bars are easy to tread and deform, which affects the effective height of the concrete section of the floor, and thus the quality of the floor. When the floor concrete is poured, construction workers often set up one or two springboards to serve as temporary channels, and the channels often lead to damage of formed steel bars due to the fact that the width is insufficient, the formed steel bars are directly pressed, so that the situation that the thickness of a steel bar protection layer is insufficient or the steel bars are exposed is caused, the stress on the steel bars is also extremely bad, and the construction quality of the whole floor is affected.
Disclosure of Invention
The invention aims to solve the problems and provides a construction channel which is convenient to install.
The utility model provides a construction passageway of easy to assemble, includes a plurality of assembly parts that mutually support through locking mechanical system, the assembly part includes dull and stereotyped and bracing piece, the bracing piece has two, and two bracing piece symmetries set up in the bottom of dull and stereotyped, and the bracing piece includes fixed block and connecting rod, the fixed block is connected with dull and stereotyped bottom surface be equipped with the threaded rod on the dull and stereotyped top surface, the bottom of threaded rod pass behind dull and stereotyped and the fixed block with the top fixed connection of connecting rod, threaded rod and fixed block threaded connection are located and are equipped with the mounting groove between two bracing pieces on the side of dull and stereotyped, are connected with the connecting plate that can match the mounting groove on the side that the mounting groove was kept away from to the dull and stereotyped.
Further, locking mechanical system includes cooperation piece, cooperation board and dead lever, the top of joining in marriage the board is connected with one side that the dull and stereotyped bottom surface is close to the mounting groove, is equipped with the fixed orifices that switches on the side of joining in marriage the board, the one end and the fixed orifices threaded connection of dead lever, the top of cooperation piece is connected with one side that the dull and stereotyped bottom surface is close to the connecting plate, is equipped with the cooperation hole on the side that the cooperation piece was kept away from to the cooperation board, the cooperation hole is the screw hole.
Further, a rotating handle is connected to the fixed rod.
Further, a handle is connected to the top of the threaded rod.
Further, a reinforcing rib is arranged on the fixed block, one end of the reinforcing rib is connected with the side face of the fixed block, and the other end of the reinforcing rib is connected with the bottom face of the flat plate.
Further, a sleeve is arranged at the bottom of the fixed block, one end of the sleeve is matched and fixed with the fixed block, and the other end of the sleeve is matched with the top of the connecting rod.
Further, a foot sleeve is sleeved at the bottom end of the connecting rod.
The invention has the beneficial effects that: through using the same assembly parts of a plurality of structures, can assemble a complete construction passageway fast, can also adjust the length of backing lever according to the actual conditions on ground, ensure that the top surface of construction passageway is level and smooth, the dead lever in connecting plate and the locking mechanical system has certain length moreover, can adjust the interval between two assembly parts to can adapt to the reinforcing bar net of various gap distributions.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is a schematic view of the structure of the support bar of the present invention;
fig. 3 is a side cross-sectional view of the assembly of the present invention.
In the example drawings: 1-assembly part, 101-flat plate, 102-connecting plate 103-mounting groove, 104-fixed block, 105-connecting rod, 106-threaded rod, 107-rotating handle, 108-reinforcing rib, 109-sleeve, 110-foot cover, 2-locking mechanism, 201-matching plate, 202-fixed rod, 203-matching block, 204-fixed hole, 205-matching hole and 206-handle.
Detailed Description
For a clearer understanding of technical features, objects, and effects of the present invention, a specific embodiment of the present invention will be described with reference to the accompanying drawings.
Example 1
As shown in fig. 1-3, the invention provides a construction channel convenient to install, which comprises a plurality of assembly parts 1 matched with each other through a locking mechanism 2, wherein each assembly part 1 comprises a flat plate 101 and two support rods, the two support rods are symmetrically arranged at the bottom of the flat plate 101, each support rod comprises a fixed block 104 and a connecting rod 105, the fixed block 104 is connected with the bottom surface of the flat plate 101, a threaded rod 106 is arranged on the top surface of the flat plate 101, the bottom end of the threaded rod 106 passes through the flat plate 101 and the fixed block 104 and is fixedly connected with the top of the connecting rod 105, the threaded rod 106 is in threaded connection with the fixed block 104, a mounting groove 103 is formed between the two support rods on the side surface of the flat plate 101, and a connecting plate 102 capable of being matched with the mounting groove 103 is connected on the side surface of the flat plate 101 far away from the mounting groove 103.
In this embodiment, the locking mechanism 2 includes a mating block 203, a mating plate 201 and a fixing rod 202, where the top of the mating plate 201 is connected with one side of the bottom surface of the flat plate 101 near the mounting groove 103, a conductive fixing hole 204 is provided on the side surface of the mating plate 201, one end of the fixing rod 202 is in threaded connection with the fixing hole 204, the top of the mating block 203 is connected with one side of the bottom surface of the flat plate 101 near the connecting plate 102, a mating hole 205 is provided on the side surface of the mating block 203 far from the mating plate 201, and the mating hole 205 is a threaded hole. Further, a stem 206 is connected to the fixed rod 202. By the threaded connection of the fixing rod 202 and the fitting block 203, the position between the two fitting parts 1 can be stabilized, and the swivel handle 206 facilitates the force applied by the construction worker to rotate the fixing rod 202.
In this embodiment, a handle 107 is connected to the top of the threaded rod 106. The construction worker is facilitated to apply force to rotate the threaded rod 106.
In this embodiment, the fixing block 104 is provided with a reinforcing rib 108, one end of the reinforcing rib 108 is connected to a side surface of the fixing block 104, and the other end is connected to a bottom surface of the flat plate 101. The reinforcing ribs 108 are used for improving the stability of the connection between the flat plate 101 and the fixed block 104 and reducing the risk of fracture of the flat plate 101.
In this embodiment, a sleeve 109 is disposed at the bottom of the fixed block 104, one end of the sleeve 109 is engaged with and fixed to the fixed block 104, and the other end is engaged with the top of the connecting rod 105. The sleeve 109 can prevent foreign matters from entering the gap between the fixing block 104 and the connecting rod 105.
In this embodiment, a foot sleeve 110 is sleeved at the bottom end of the connecting rod 105. The unbalance of the flat plate 101 caused by excessive abrasion of the bottom of the connecting rod 105 can be avoided, and the foot cover 110 has low cost and is convenient to replace.
The working principle of the invention is as follows: during assembly of a construction channel, the front end of one assembly part 1 is matched with the rear end of the other assembly part 1, then the positions of the assembly parts are fixed by using a locking mechanism 2, a connecting plate 102 on the assembly part B is matched with a mounting groove 103 on the assembly part A by taking the assembly part A and the assembly part B as an example, then a fixing rod 202 on the assembly part A is rotated, the fixing rod 202 is in threaded connection with a matching block 203 on the assembly part B, all the assembly parts 1 are placed on a reinforcing mesh after being fixedly connected, a connecting rod 105 at the bottom of a flat plate 101 passes through a gap on the reinforcing mesh and then contacts the ground, and then the length of a supporting rod is adjusted by rotating a threaded rod 106 according to the actual condition of the ground, so that the flat plates 101 of all the assembly parts 1 are positioned on the same height horizontal plane.
The invention has the beneficial effects that: through using the same assembly parts of a plurality of structures, can assemble a complete construction passageway fast, can also adjust the length of backing lever according to the actual conditions on ground, ensure that the top surface of construction passageway is level and smooth, the dead lever in connecting plate and the locking mechanical system has certain length moreover, can adjust the interval between two assembly parts to can adapt to the reinforcing bar net of various gap distributions.
The foregoing has shown and described the basic principles and main features of the present invention and the advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present invention, and various changes and modifications may be made without departing from the spirit and scope of the invention, which is defined in the appended claims. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (7)
1. The utility model provides a construction passageway easy to assemble, its characterized in that, including a plurality of assembly parts (1) that mutually support through locking mechanical system (2), assembly parts (1) are including dull and stereotyped (101) and bracing piece, the bracing piece has two, and two bracing piece symmetries set up in the bottom of dull and stereotyped (101), and the bracing piece includes fixed block (104) and connecting rod (105), fixed block (104) are connected with the bottom surface of dull and stereotyped (101) be equipped with threaded rod (106) on the top surface of dull and stereotyped (101), the bottom of threaded rod (106) pass behind dull and stereotyped (101) and fixed block (104) with the top fixed connection of connecting rod (105), threaded rod (106) and fixed block (104) threaded connection are located between two bracing pieces on the side of dull and stereotyped (101), are connected with connecting plate (102) that can match mounting groove (103) on the side that mounting groove (103) were kept away from to dull and stereotyped (101).
2. The construction channel convenient to install according to claim 1, wherein the locking mechanism (2) comprises a matching block (203), a matching plate (201) and a fixing rod (202), the top of the matching plate (201) is connected with one side, close to the installation groove (103), of the bottom surface of the flat plate (101), a through fixing hole (204) is formed in the side surface of the matching plate (201), one end of the fixing rod (202) is in threaded connection with the fixing hole (204), the top of the matching block (203) is connected with one side, close to the connection plate (102), of the bottom surface of the flat plate (101), a matching hole (205) is formed in the side, far from the matching plate (201), of the matching block (203), and the matching hole (205) is a threaded hole.
3. A construction passageway according to claim 2, characterized in that a swivel handle (206) is connected to the fixing rod (202).
4. A construction passageway according to claim 1, characterized in that a handle (107) is connected to the top of the threaded rod (106).
5. The construction channel with convenient installation according to claim 1, wherein the fixed block (104) is provided with a reinforcing rib (108), one end of the reinforcing rib (108) is connected with the side surface of the fixed block (104), and the other end is connected with the bottom surface of the flat plate (101).
6. A construction passageway according to claim 1, characterized in that a sleeve (109) is provided at the bottom of the fixed block (104), one end of the sleeve (109) being fitted and fixed to the fixed block (104) and the other end being fitted to the top of the connecting rod (105).
7. A construction passageway according to claim 1, characterized in that a foot cover (110) is provided at the bottom end of the connecting rod (105).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310270110.9A CN116163541A (en) | 2023-03-20 | 2023-03-20 | Construction channel convenient to install |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310270110.9A CN116163541A (en) | 2023-03-20 | 2023-03-20 | Construction channel convenient to install |
Publications (1)
Publication Number | Publication Date |
---|---|
CN116163541A true CN116163541A (en) | 2023-05-26 |
Family
ID=86418473
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310270110.9A Pending CN116163541A (en) | 2023-03-20 | 2023-03-20 | Construction channel convenient to install |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116163541A (en) |
Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201245986Y (en) * | 2008-08-27 | 2009-05-27 | 河南泰宏房屋营造有限公司 | Packway special for adjustable cast-in-place board concrete pouring |
KR20140120601A (en) * | 2013-04-04 | 2014-10-14 | 전호형 | Foothold for Slab Construction of Structure and Structure Slab Construction Method Using The Same |
CN106121042A (en) * | 2016-08-25 | 2016-11-16 | 中冶建筑研究总院有限公司 | A kind of steel column flange form splicing node and installation method |
CN108951890A (en) * | 2018-08-02 | 2018-12-07 | 绍兴职业技术学院 | A kind of fixation device of prefabricated plate |
CN208733910U (en) * | 2018-09-07 | 2019-04-12 | 青岛三丰钢结构建筑有限公司 | A kind of steel-structure connecting plate |
CN208918423U (en) * | 2018-10-19 | 2019-05-31 | 徐有义 | A kind of construction site protective fence |
CN209211190U (en) * | 2018-09-21 | 2019-08-06 | 浙江东厦建工集团有限公司 | A kind of collapsible construction pedal |
CN110748225A (en) * | 2019-10-30 | 2020-02-04 | 徐州中能电力科技有限公司 | Be applied to steel pipe pole among power transmission and transformation circuit |
CN112502430A (en) * | 2020-12-16 | 2021-03-16 | 河北非筑名铝模科技有限公司 | Cement house construction system |
CN113585575A (en) * | 2021-07-28 | 2021-11-02 | 中国五冶集团有限公司 | Steel bar truss floor board strutting arrangement convenient to installation |
CN215717422U (en) * | 2021-05-19 | 2022-02-01 | 中国二冶集团有限公司 | Floor concrete placement prevents trampling device |
CN216109594U (en) * | 2021-10-26 | 2022-03-22 | 宁刚 | Construction engineering place construction is with scaffold frame of encorbelmenting of dismouting operation of being convenient for |
CN216277028U (en) * | 2021-09-29 | 2022-04-12 | 青岛金沙滩建设集团有限公司 | Assembled building material is with placing protector convenient to concatenation is dismantled |
CN216476454U (en) * | 2021-11-09 | 2022-05-10 | 比亚迪股份有限公司 | Floor reinforcing steel bar treading prevention platform |
CN217054426U (en) * | 2022-03-25 | 2022-07-26 | 四川华远建设工程有限公司 | Floor reinforcing bar protection device |
CN217129027U (en) * | 2022-04-15 | 2022-08-05 | 中核华泰建设有限公司 | Telescopic portable slab rib protection temporary bridge |
CN217759881U (en) * | 2022-03-12 | 2022-11-08 | 北京市政路桥股份有限公司 | Subway entrance mounting platform |
CN217871909U (en) * | 2021-09-14 | 2022-11-22 | 天津三建建筑工程有限公司 | Assembled reinforcing bar prevents trampling packway |
CN218117303U (en) * | 2022-06-23 | 2022-12-23 | 中铁建工集团有限公司 | Splicing type floor plate for protecting finished reinforcing steel bar products |
CN218324038U (en) * | 2022-09-21 | 2023-01-17 | 中建钢构工程有限公司 | Steel construction uninstallation is prevented collapsing from safety device |
CN218345839U (en) * | 2022-08-30 | 2023-01-20 | 中国十九冶集团有限公司 | Construction access road capable of being circulated |
-
2023
- 2023-03-20 CN CN202310270110.9A patent/CN116163541A/en active Pending
Patent Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201245986Y (en) * | 2008-08-27 | 2009-05-27 | 河南泰宏房屋营造有限公司 | Packway special for adjustable cast-in-place board concrete pouring |
KR20140120601A (en) * | 2013-04-04 | 2014-10-14 | 전호형 | Foothold for Slab Construction of Structure and Structure Slab Construction Method Using The Same |
CN106121042A (en) * | 2016-08-25 | 2016-11-16 | 中冶建筑研究总院有限公司 | A kind of steel column flange form splicing node and installation method |
CN108951890A (en) * | 2018-08-02 | 2018-12-07 | 绍兴职业技术学院 | A kind of fixation device of prefabricated plate |
CN208733910U (en) * | 2018-09-07 | 2019-04-12 | 青岛三丰钢结构建筑有限公司 | A kind of steel-structure connecting plate |
CN209211190U (en) * | 2018-09-21 | 2019-08-06 | 浙江东厦建工集团有限公司 | A kind of collapsible construction pedal |
CN208918423U (en) * | 2018-10-19 | 2019-05-31 | 徐有义 | A kind of construction site protective fence |
CN110748225A (en) * | 2019-10-30 | 2020-02-04 | 徐州中能电力科技有限公司 | Be applied to steel pipe pole among power transmission and transformation circuit |
CN112502430A (en) * | 2020-12-16 | 2021-03-16 | 河北非筑名铝模科技有限公司 | Cement house construction system |
CN215717422U (en) * | 2021-05-19 | 2022-02-01 | 中国二冶集团有限公司 | Floor concrete placement prevents trampling device |
CN113585575A (en) * | 2021-07-28 | 2021-11-02 | 中国五冶集团有限公司 | Steel bar truss floor board strutting arrangement convenient to installation |
CN217871909U (en) * | 2021-09-14 | 2022-11-22 | 天津三建建筑工程有限公司 | Assembled reinforcing bar prevents trampling packway |
CN216277028U (en) * | 2021-09-29 | 2022-04-12 | 青岛金沙滩建设集团有限公司 | Assembled building material is with placing protector convenient to concatenation is dismantled |
CN216109594U (en) * | 2021-10-26 | 2022-03-22 | 宁刚 | Construction engineering place construction is with scaffold frame of encorbelmenting of dismouting operation of being convenient for |
CN216476454U (en) * | 2021-11-09 | 2022-05-10 | 比亚迪股份有限公司 | Floor reinforcing steel bar treading prevention platform |
CN217759881U (en) * | 2022-03-12 | 2022-11-08 | 北京市政路桥股份有限公司 | Subway entrance mounting platform |
CN217054426U (en) * | 2022-03-25 | 2022-07-26 | 四川华远建设工程有限公司 | Floor reinforcing bar protection device |
CN217129027U (en) * | 2022-04-15 | 2022-08-05 | 中核华泰建设有限公司 | Telescopic portable slab rib protection temporary bridge |
CN218117303U (en) * | 2022-06-23 | 2022-12-23 | 中铁建工集团有限公司 | Splicing type floor plate for protecting finished reinforcing steel bar products |
CN218345839U (en) * | 2022-08-30 | 2023-01-20 | 中国十九冶集团有限公司 | Construction access road capable of being circulated |
CN218324038U (en) * | 2022-09-21 | 2023-01-17 | 中建钢构工程有限公司 | Steel construction uninstallation is prevented collapsing from safety device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110820773B (en) | Environment-friendly side slope reinforcing apparatus is used in municipal works construction | |
CN105587097B (en) | A kind of adjustable plane earth aerial construction | |
CN105672632A (en) | Adjustable distance and perpendicularity based exposed corner guard board sand-lime dressing system and construction method | |
CN116163541A (en) | Construction channel convenient to install | |
CN205189428U (en) | Push -pull system is opened to bent panel mount carbon fiber plate ground tackle | |
CN205296711U (en) | Can adjust supporting seat device of ground level degree | |
CN216305468U (en) | Building structure designs floor roof beam reinforced structure | |
CN219471202U (en) | Quick assembly disassembly mechanism for steel structure | |
CN214531881U (en) | Building templates frame with plywood protection mold insert | |
CN216042650U (en) | Building template with quick demoulding structure permeates water | |
CN215978443U (en) | Easy dismouting aluminum alloy wall template | |
CN218911770U (en) | Temporary support device for precast beam system conversion | |
CN214246567U (en) | Reusable wall connecting component | |
CN217602186U (en) | Safety protection frame suitable for limit construction is faced to super high-rise building | |
CN217679644U (en) | Structure for solving deletion of shear key under steel column by utilizing rear-mounted shear key | |
CN218757460U (en) | But reuse's bearing diagonal earth anchor | |
CN220705130U (en) | Positioning conduction assembly for quick installation of overhanging scaffold | |
CN114293763B (en) | Building template and floor pouring template system | |
CN215858243U (en) | Steel structure awning beam | |
CN114293586B (en) | Use method of high-low photovoltaic panel pouring structure for mountain environment | |
CN220580049U (en) | Concrete retaining wall template shaped steel support | |
CN217179812U (en) | Formwork support upright rod axial force monitoring device on high formwork supporting monitoring system | |
CN112963019B (en) | Building engineering post-cast strip strutting arrangement | |
CN210810095U (en) | Outdoor chair convenient to disassemble and assemble | |
CN216109857U (en) | Quick pin-connected panel faces frontier defense guardrail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |