CN116147263A - Power plant energy storage cooling water circulation equipment - Google Patents

Power plant energy storage cooling water circulation equipment Download PDF

Info

Publication number
CN116147263A
CN116147263A CN202310016621.8A CN202310016621A CN116147263A CN 116147263 A CN116147263 A CN 116147263A CN 202310016621 A CN202310016621 A CN 202310016621A CN 116147263 A CN116147263 A CN 116147263A
Authority
CN
China
Prior art keywords
hole
cooling
cavity
power
heat dissipation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310016621.8A
Other languages
Chinese (zh)
Inventor
王忠言
王松寒
司瑞才
李佳
刘希闻
姚卓宏
周驰
杨小芬
金樱子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Jilin Electric Power Co Ltd
Priority to CN202310016621.8A priority Critical patent/CN116147263A/en
Publication of CN116147263A publication Critical patent/CN116147263A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D17/00Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces
    • F25D17/02Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating liquids, e.g. brine
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D23/00General constructional features
    • F25D23/003General constructional features for cooling refrigerating machinery

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

本发明公开了一种电厂储能冷却水循环设备,属于电厂储能冷却技术领域,该设备包括排气管道,所述排气管道外侧固定有壳体,所述排气管道内外两侧分别插接有第一冷却管与第二冷却管,所述第一冷却管与第二冷却管相互连通连接,所述壳体内分别开设有相互连通的动力腔与散热腔,所述第二冷却管与动力腔连通连接,所述第一冷却管与散热腔连通连接,所述动力腔内滑动安装有活塞,所述散热腔外侧固定有散热风机,所述第一冷却管与第二冷却管外端分别连接有第一导管与第二导管,所述动力腔内腔一端面两侧开设有第一通孔及第二通孔,所述第二导管两端分别与第一通孔及第二通孔连接。本发明可以同时对排气管道内外两侧进行冷却,提高冷却效率。

Figure 202310016621

The invention discloses energy storage cooling water circulation equipment for power plants, which belongs to the technical field of energy storage cooling for power plants. The equipment includes an exhaust pipe, a casing is fixed on the outside of the exhaust pipe, and the inner and outer sides of the exhaust pipe are plugged respectively. There are a first cooling pipe and a second cooling pipe, the first cooling pipe and the second cooling pipe are connected to each other, and a power chamber and a heat dissipation chamber respectively connected to each other are opened in the housing, and the second cooling pipe and the power chamber are connected to each other. cavity, the first cooling pipe is connected to the cooling cavity, a piston is slidably installed in the power cavity, a cooling fan is fixed outside the cooling cavity, and the outer ends of the first cooling tube and the second cooling tube are respectively A first conduit and a second conduit are connected, and a first through hole and a second through hole are opened on both sides of the inner cavity of the power cavity, and the two ends of the second conduit are connected to the first through hole and the second through hole respectively. connect. The invention can simultaneously cool the inner and outer sides of the exhaust pipe and improve the cooling efficiency.

Figure 202310016621

Description

一种电厂储能冷却水循环设备A power plant energy storage cooling water circulation equipment

技术领域technical field

本发明涉及电厂储能冷却技术领域,尤其涉及一种电厂储能冷却水循环设备。The invention relates to the technical field of energy storage cooling for power plants, in particular to energy storage cooling water circulation equipment for power plants.

背景技术Background technique

目前,在进行火力发电时,主要采用燃煤的方式,对水分进行加热,产生水蒸气,将化学能转化为热能,带动叶轮及转子转动,将热能转化为动能,配合定子切割磁感线,将机械能转化为电能,因此,在进行火力发电时,会产生大量的高温水蒸气,而为避免对周围环境温度造成影响,且对排气管道进行保护,在排出水蒸气时,需要对其进行降温,但是,现有电厂冷却设备,在对管道进行散热时,大多将散热管环绕于管道外围,虽然可以对管道进行保护,却无法保证对水蒸气的散热效果,难以避免对周围环境温度造成影响。At present, when performing thermal power generation, coal is mainly used to heat water to generate water vapor, convert chemical energy into thermal energy, drive the impeller and rotor to rotate, convert thermal energy into kinetic energy, and cooperate with the stator to cut the magnetic field lines. Convert mechanical energy into electrical energy. Therefore, a large amount of high-temperature water vapor will be generated during thermal power generation. In order to avoid affecting the temperature of the surrounding environment and protect the exhaust pipe, it is necessary to conduct water vapor discharge when it is discharged. However, most of the existing power plant cooling equipment surrounds the pipes with heat dissipation pipes around the periphery of the pipes. Although the pipes can be protected, the heat dissipation effect on water vapor cannot be guaranteed, and it is difficult to avoid damage to the surrounding environment temperature. Influence.

发明内容Contents of the invention

针对现有技术存在的不足,本发明的目的在于提供一种电厂储能冷却水循环设备,以解决现有技术中的上述不足之处。Aiming at the deficiencies in the prior art, the object of the present invention is to provide an energy storage cooling water circulation equipment for a power plant to solve the above deficiencies in the prior art.

为实现上述目的,本发明提供如下技术方案:一种电厂储能冷却水循环设备,包括排气管道,所述排气管道外侧固定有壳体,所述排气管道内外两侧分别插接有第一冷却管与第二冷却管,所述第一冷却管与第二冷却管相互连通连接,所述壳体内分别开设有相互连通的动力腔与散热腔,所述第二冷却管与动力腔连通连接,所述第一冷却管与散热腔连通连接,所述动力腔内滑动安装有活塞,所述散热腔外侧固定有散热风机。In order to achieve the above object, the present invention provides the following technical solutions: a power plant energy storage cooling water circulation equipment, including an exhaust pipe, a casing is fixed on the outside of the exhaust pipe, and a second A cooling pipe and a second cooling pipe, the first cooling pipe and the second cooling pipe are connected to each other, a power chamber and a heat dissipation chamber respectively connected to each other are opened in the housing, and the second cooling pipe communicates with the power chamber connected, the first cooling pipe communicates with the heat dissipation chamber, a piston is slidably installed in the power chamber, and a heat dissipation fan is fixed outside the heat dissipation chamber.

进一步,所述第一冷却管与第二冷却管外端分别连接有第一导管与第二导管,所述动力腔内腔一端面两侧开设有第一通孔和第二通孔,所述第二导管两端分别与第一通孔和第二通孔连接,所述散热腔内腔一侧开设有与第一导管连接的第五通孔,所述动力腔另一端面两侧开设有与散热腔内腔连通的第三通孔和第四通孔。Further, the outer ends of the first cooling pipe and the second cooling pipe are respectively connected with a first conduit and a second conduit, and a first through hole and a second through hole are opened on both sides of the inner cavity of the power chamber. The two ends of the second conduit are respectively connected to the first through hole and the second through hole, a fifth through hole connected to the first conduit is opened on one side of the inner cavity of the heat dissipation cavity, and a fifth through hole connected to the first conduit is opened on the other end surface of the power cavity. The third through hole and the fourth through hole communicated with the inner cavity of the cooling cavity.

进一步,所述第一通孔和第二通孔内端面分别转动安装有第一密封板与第二密封板,所述第三通孔和第四通孔外端面分别转动安装有第三密封板与第四密封板。Further, the inner end surfaces of the first through hole and the second through hole are respectively rotatably installed with a first sealing plate and the second sealing plate, and the outer end surfaces of the third through hole and the fourth through hole are respectively rotatably installed with a third sealing plate with the fourth sealing plate.

进一步,所述动力腔内转动安装有与活塞中部螺纹配合的往复丝杠,所述散热风机的输出轴与往复丝杠之间转动安装有通过锥齿轮组与两者相互啮合的转动杆。Further, a reciprocating lead screw threadedly fitted in the middle of the piston is installed in the power cavity, and a rotating rod is installed between the output shaft of the heat dissipation fan and the reciprocating lead screw through a bevel gear set to mesh with the two.

进一步,所述散热腔一侧等间距开设有多个散热通腔,所述散热通腔两端与外界相通,且所述散热通腔与散热风机位置匹配。Further, a plurality of heat dissipation cavities are equally spaced on one side of the heat dissipation cavity, both ends of the heat dissipation cavity communicate with the outside world, and the positions of the heat dissipation cavity and the heat dissipation fan are matched.

通过上述设计方案,本发明可以带来如下有益效果:Through the above design scheme, the present invention can bring the following beneficial effects:

1、本发明提出的电厂储能冷却水循环设备,设置第一冷却管与第二冷却管,通过活塞,可以将水分在第一冷却管、第二冷却管、动力腔及散热腔内进行循环引导,配合散热风机,可以对散热腔内部水分进行散热,从而可以循环对排气管道内外两侧进行散热,可以同时对排气管道及排气管道内部水蒸气进行散热,从而保证散热效率。1. The power plant energy storage cooling water circulation equipment proposed by the present invention is equipped with a first cooling pipe and a second cooling pipe, and the water can be circulated and guided in the first cooling pipe, the second cooling pipe, the power chamber and the heat dissipation chamber through the piston , with the heat dissipation fan, it can dissipate the moisture inside the heat dissipation cavity, so that the heat can be circulated on both sides of the exhaust pipe, and the exhaust pipe and the water vapor inside the exhaust pipe can be dissipated at the same time, so as to ensure the heat dissipation efficiency.

2、本发明提出的电厂储能冷却水循环设备,设置转动杆,在散热风机内部电机带动散热扇叶转动时,可以同时带动往复丝杠进行转动,通过往复丝杠与活塞之间的螺纹配合,可以带动活塞在动力腔内进行往复运动,配合四个密封板,可以带动水分循环运动,提高冷却效率。2. The power plant energy storage cooling water circulation equipment proposed by the present invention is equipped with a rotating rod. When the internal motor of the cooling fan drives the cooling fan blades to rotate, it can simultaneously drive the reciprocating screw to rotate. Through the threaded cooperation between the reciprocating screw and the piston, It can drive the piston to reciprocate in the power chamber, and cooperate with four sealing plates to drive the water circulation and improve the cooling efficiency.

附图说明Description of drawings

图1为本发明的整体外部结构示意图;Fig. 1 is a schematic diagram of the overall external structure of the present invention;

图2为本发明的排气管道内部结构示意图;Fig. 2 is a schematic diagram of the internal structure of the exhaust pipe of the present invention;

图3为本发明的壳体内部结构示意图;Fig. 3 is a schematic diagram of the internal structure of the housing of the present invention;

图4为本发明的动力腔内部结构示意图;Fig. 4 is a schematic diagram of the internal structure of the power chamber of the present invention;

图5为本发明的往复丝杠处外部结构示意图。Fig. 5 is a schematic diagram of the external structure of the reciprocating lead screw of the present invention.

附图标记说明:1-排气管道;2-壳体;3-第二冷却管;4-第五通孔;5-第一冷却管;6-第二导管;7-第一导管;8-动力腔;9-散热腔;10-活塞;11-往复丝杠;12-散热通腔;13-第二通孔;131-第一密封板;14-第一通孔;141-第二密封板;15-第三通孔;151-第三密封板;16-第四通孔;161-第四密封板;17-转动杆;18-输出轴;19-散热风机。Explanation of reference numerals: 1-exhaust pipe; 2-housing; 3-second cooling pipe; 4-fifth through hole; 5-first cooling pipe; 6-second conduit; 7-first conduit; 8 -power chamber; 9-radiation chamber; 10-piston; 11-reciprocating screw; 12-radiation cavity; 13-second through hole; 131-first sealing plate; Sealing plate; 15-the third through hole; 151-the third sealing plate; 16-the fourth through hole; 161-the fourth sealing plate; 17-rotating rod; 18-output shaft; 19-radiating fan.

具体实施方式Detailed ways

为了更清楚地说明本发明,下面结合优选实施例和附图对本发明做进一步的说明。本领域技术人员应当理解,下面所具体描述的内容是说明性的而非限制性的,不应以此限制本发明的保护范围。除非另作定义,此处使用的技术术语或者科学术语应当为本发明所属领域内具有一般技能的人士所理解的通常意义。为了避免混淆本发明的实质,公知的方法、过程、流程、元件和电路并没有详细叙述。In order to illustrate the present invention more clearly, the present invention will be further described below in conjunction with preferred embodiments and accompanying drawings. Those skilled in the art should understand that the content specifically described below is illustrative rather than restrictive, and should not limit the protection scope of the present invention. Unless otherwise defined, the technical terms or scientific terms used herein shall have the usual meanings understood by those skilled in the art to which the present invention belongs. In order not to obscure the essence of the present invention, well-known methods, procedures, procedures, components and circuits have not been described in detail.

参照图1-5,一种电厂储能冷却水循环设备,包括排气管道1,排气管道1外侧固定有壳体2,排气管道1内外两侧分别插接有第一冷却管5与第二冷却管3,第一冷却管5与第二冷却管3相互连通连接,壳体2内分别开设有相互连通的动力腔8与散热腔9,第二冷却管3与动力腔8连通连接,第一冷却管5与散热腔9连通连接,动力腔8内滑动安装有活塞10,散热腔9外侧固定有散热风机19。Referring to Figures 1-5, a power plant energy storage cooling water circulation equipment includes an exhaust pipe 1, a casing 2 is fixed on the outside of the exhaust pipe 1, and a first cooling pipe 5 and a second Two cooling pipes 3, the first cooling pipe 5 and the second cooling pipe 3 are connected to each other, the housing 2 is respectively provided with a power chamber 8 and a heat dissipation chamber 9 connected to each other, the second cooling pipe 3 is connected to the power chamber 8, The first cooling pipe 5 communicates with the heat dissipation chamber 9 , a piston 10 is slidably installed in the power chamber 8 , and a heat dissipation fan 19 is fixed outside the heat dissipation chamber 9 .

具体的,设置散热风机19,将空气引导至散热腔9内,可以对散热腔9内部水分进行散热,通过在动力腔8内部运动的活塞10,配合气压,可以带动水分在第一冷却管5、第二冷却管3、动力腔8与散热腔9内循环运动,从而可以对排气管道1内外两侧进行持续降温冷却,既可以对排气管道1进行降温,保证排气管道1运行稳定,且可以对排气管道1内部水蒸气进行降温,避免对周围环境温度造成影响。Specifically, a heat dissipation fan 19 is provided to guide the air into the heat dissipation chamber 9 to dissipate the moisture inside the heat dissipation chamber 9, and the piston 10 moving inside the power chamber 8 and the air pressure can drive the water to flow in the first cooling pipe 5. , the second cooling pipe 3, the power chamber 8 and the heat dissipation chamber 9 are circulated, so that the internal and external sides of the exhaust pipe 1 can be continuously cooled, and the exhaust pipe 1 can be cooled to ensure the stable operation of the exhaust pipe 1 , and can cool the water vapor inside the exhaust pipe 1 to avoid affecting the ambient temperature.

第一冷却管5与第二冷却管3外端分别连接有第一导管7与第二导管6,动力腔8内腔一端面两侧开设有第一通孔14及第二通孔13,第二导管6两端分别与第一通孔14及第二通孔13连接,散热腔9内腔一侧开设有与第一导管7连接的第五通孔4,动力腔8另一端面两侧开设有与散热腔9内腔连通的第三通孔15及第四通孔16,第一通孔14及第二通孔13内端面分别转动安装有第一密封板131与第二密封板141,第三通孔15及第四通孔16外端面分别转动安装有第三密封板151与第四密封板161,动力腔8内转动安装有与活塞10中部螺纹配合的往复丝杠11,散热风机19的输出轴18与往复丝杠11之间转动安装有通过锥齿轮组与两者相互啮合的转动杆17。The outer ends of the first cooling pipe 5 and the second cooling pipe 3 are respectively connected with a first conduit 7 and a second conduit 6, and a first through hole 14 and a second through hole 13 are provided on both sides of the inner cavity of the power chamber 8. The two ends of the two conduits 6 are respectively connected to the first through hole 14 and the second through hole 13. One side of the cooling chamber 9 is provided with a fifth through hole 4 connected to the first conduit 7, and the other end surface of the power chamber 8 is on both sides. A third through hole 15 and a fourth through hole 16 communicating with the inner cavity of the heat dissipation chamber 9 are opened, and the inner end surfaces of the first through hole 14 and the second through hole 13 are respectively rotatably installed with a first sealing plate 131 and a second sealing plate 141 , the third through hole 15 and the fourth through hole 16 outer end surfaces are respectively rotatably installed with a third sealing plate 151 and a fourth sealing plate 161, and a reciprocating lead screw 11 threaded with the middle part of the piston 10 is rotatably installed in the power chamber 8 to dissipate heat. Between the output shaft 18 of the blower fan 19 and the reciprocating lead screw 11, a rotary rod 17 which is engaged with the two through a bevel gear set is rotatably installed.

具体的,在启动散热风机19内部电机,带动外侧散热扇叶转动时,通过转动杆17及两组锥齿轮组,可以带动往复丝杠11在动力腔8内转动,在动力腔8对活塞10运动方向的限制下,转动的往复丝杠11,通过其与活塞10之间的螺纹配合,可以带动活塞10在动力腔8内往复运动,当活塞10向一侧运动时,增大一侧动力腔8内部气压,并且另一侧动力腔8内部气压降低,从而开启第二密封板141及第三密封板151,并关闭第一密封板131与第四密封板161,反之,活塞10向另一侧运动时,四个密封板开启及关闭情况与上述情况相反,以上述方式,不断通过第一通孔14及第二通孔13与第二导管6,将第一冷却管5与第二冷却管3内部水分引入动力腔8内,再通过第三通孔15及第四通孔16,将动力腔8内部水分注入散热腔9内,而随着散热腔9内部水分的增加,通过第一导管7,可以将散热腔9内部水分注入第二冷却管3与第一冷却管5,通过上述方式,完成水分的循环引导。Specifically, when the internal motor of the cooling fan 19 is started to drive the outer cooling fan blades to rotate, the reciprocating lead screw 11 can be driven to rotate in the power chamber 8 through the rotating rod 17 and two groups of bevel gear sets, and the piston 10 in the power chamber 8 Under the limitation of the movement direction, the rotating reciprocating lead screw 11 can drive the piston 10 to reciprocate in the power chamber 8 through the threaded cooperation between it and the piston 10. When the piston 10 moves to one side, the power on one side is increased. chamber 8, and the air pressure inside the power chamber 8 on the other side decreases, thereby opening the second sealing plate 141 and the third sealing plate 151, and closing the first sealing plate 131 and the fourth sealing plate 161, otherwise, the piston 10 moves to the other side. When one side moves, the opening and closing conditions of the four sealing plates are opposite to the above-mentioned situation. In the above-mentioned manner, the first through-hole 14, the second through-hole 13 and the second conduit 6 are passed continuously to connect the first cooling pipe 5 and the second through-hole. The moisture inside the cooling pipe 3 is introduced into the power cavity 8, and then through the third through hole 15 and the fourth through hole 16, the moisture inside the power cavity 8 is injected into the cooling cavity 9, and as the moisture inside the cooling cavity 9 increases, through the third through hole 15 and the fourth through hole 16. A conduit 7 can inject moisture inside the heat dissipation chamber 9 into the second cooling pipe 3 and the first cooling pipe 5, and through the above-mentioned method, the circulation and guidance of the moisture is completed.

散热腔9一侧等间距开设有多个散热通腔12,散热通腔12两端与外界相通,且散热通腔12与散热风机19位置匹配。One side of the heat dissipation cavity 9 is equidistantly provided with a plurality of heat dissipation through cavities 12 , both ends of the heat dissipation through cavities 12 communicate with the outside world, and the positions of the heat dissipation through cavities 12 and the heat dissipation fans 19 match.

具体的,在启动散热风机19时,通过散热风机19前端扇叶,可以对外界空气进行引导,使其穿过散热通腔12,设置散热通腔12,提高散热腔9内部水分与外界空气的接触面积,从而提高散热效率。Specifically, when the cooling fan 19 is started, the outside air can be guided through the fan blades at the front end of the cooling fan 19 so that it passes through the cooling cavity 12, and the cooling cavity 12 is set to improve the relationship between the moisture in the cooling cavity 9 and the outside air. Contact area, thereby improving heat dissipation efficiency.

Claims (5)

1. Energy storage cooling water circulation equipment of power plant, including exhaust duct (1), its characterized in that: the utility model discloses a cooling device for a gas turbine, including exhaust duct (1), casing (2) is fixed with in the exhaust duct (1) outside, the inside and outside both sides of exhaust duct (1) peg graft respectively have first cooling tube (5) and second cooling tube (3), first cooling tube (5) are connected with second cooling tube (3) intercommunication each other, power chamber (8) and heat dissipation chamber (9) of intercommunication each other have been seted up in casing (2) respectively, second cooling tube (3) are connected with power chamber (8) intercommunication, first cooling tube (5) are connected with heat dissipation chamber (9) intercommunication, sliding mounting has piston (10) in power chamber (8), heat dissipation chamber (9) outside is fixed with radiator fan (19).
2. The power plant energy storage cooling water circulation device according to claim 1, wherein: the cooling device is characterized in that the outer ends of the first cooling pipe (5) and the second cooling pipe (3) are respectively connected with a first guide pipe (7) and a second guide pipe (6), a first through hole (14) and a second through hole (13) are formed in two sides of one end face of an inner cavity of the power cavity (8), two ends of the second guide pipe (6) are respectively connected with the first through hole (14) and the second through hole (13), a fifth through hole (4) connected with the first guide pipe (7) is formed in one side of the inner cavity of the heat dissipation cavity (9), and a third through hole (15) and a fourth through hole (16) which are communicated with the inner cavity of the heat dissipation cavity (9) are formed in two sides of the other end face of the power cavity (8).
3. The power plant energy storage cooling water circulation device according to claim 2, characterized in that: the inner end surfaces of the first through hole (14) and the second through hole (13) are respectively rotatably provided with a first sealing plate (131) and a second sealing plate (141), and the outer end surfaces of the third through hole (15) and the fourth through hole (16) are respectively rotatably provided with a third sealing plate (151) and a fourth sealing plate (161).
4. A power plant energy storage cooling water circulation device according to claim 3, characterized in that: the power cavity (8) is rotationally provided with a reciprocating screw (11) in threaded fit with the middle part of the piston (10), and a rotating rod (17) meshed with the output shaft (18) of the heat radiation fan (19) and the reciprocating screw (11) through a bevel gear set is rotationally arranged between the output shaft and the reciprocating screw.
5. The power plant energy storage cooling water circulation device according to claim 1, wherein: a plurality of radiating through cavities (12) are formed in one side of the radiating cavity (9) at equal intervals, two ends of the radiating through cavities (12) are communicated with the outside, and the radiating through cavities (12) are matched with the radiating fan (19) in position.
CN202310016621.8A 2023-01-06 2023-01-06 Power plant energy storage cooling water circulation equipment Pending CN116147263A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310016621.8A CN116147263A (en) 2023-01-06 2023-01-06 Power plant energy storage cooling water circulation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310016621.8A CN116147263A (en) 2023-01-06 2023-01-06 Power plant energy storage cooling water circulation equipment

Publications (1)

Publication Number Publication Date
CN116147263A true CN116147263A (en) 2023-05-23

Family

ID=86355635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310016621.8A Pending CN116147263A (en) 2023-01-06 2023-01-06 Power plant energy storage cooling water circulation equipment

Country Status (1)

Country Link
CN (1) CN116147263A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116952047A (en) * 2023-09-04 2023-10-27 河北大唐国际丰润热电有限责任公司 Power plant circulating water monitoring and adjusting integrated device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116952047A (en) * 2023-09-04 2023-10-27 河北大唐国际丰润热电有限责任公司 Power plant circulating water monitoring and adjusting integrated device
CN116952047B (en) * 2023-09-04 2024-02-13 河北大唐国际丰润热电有限责任公司 Power plant circulating water monitoring and adjusting integrated device

Similar Documents

Publication Publication Date Title
CN105351231A (en) Air blower cooling structure
CN116147263A (en) Power plant energy storage cooling water circulation equipment
CN110729855A (en) Motor with cooling structure
CN218717285U (en) Rapid heat dissipation device for wind driven generator
CN219328238U (en) A power plant energy storage cooling water circulation equipment
CN204560099U (en) A kind of intelligent frequency convertor cooling device
CN217873127U (en) Heat dissipation structure of wind power generating set and wind power generating set
CN215333493U (en) High-temperature plug-in fan with water-cooling bearing box
CN210769216U (en) Supercritical carbon dioxide compression cooling system
CN207283314U (en) A kind of motor of built-in adjustable sound arrester
CN102427284B (en) Wind-driven generator
CN109057887B (en) Supercritical working medium turbine shell heat preservation and internal and external convection cooling device and working method thereof
CN221647264U (en) A vortex type air-cooled blower housing
CN221863355U (en) Heat abstractor of liquid cooling energy storage equipment
CN206611296U (en) A kind of water-cooling motor
CN222046015U (en) Water cooling device of wind driven generator
CN222052804U (en) A motor with good heat dissipation
CN218033094U (en) Waste heat utilization device for boiler steam turbine
CN204013146U (en) High heat radiation asynchronous machine
CN204465226U (en) A cooling motor
CN215007795U (en) Heat radiator for high voltage transformer
CN221299296U (en) Gas power generation waste heat pipe heat abstractor
CN220748581U (en) Cooling tower fan
CN221002874U (en) Cooling device of steam turbine
CN215444167U (en) Internal heat dissipation structure of turbine generator set

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination