CN116128170A - Photovoltaic power station power ultra-short-term prediction method and device and related equipment - Google Patents

Photovoltaic power station power ultra-short-term prediction method and device and related equipment Download PDF

Info

Publication number
CN116128170A
CN116128170A CN202310417715.6A CN202310417715A CN116128170A CN 116128170 A CN116128170 A CN 116128170A CN 202310417715 A CN202310417715 A CN 202310417715A CN 116128170 A CN116128170 A CN 116128170A
Authority
CN
China
Prior art keywords
time period
time
time sequence
actual measurement
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310417715.6A
Other languages
Chinese (zh)
Other versions
CN116128170B (en
Inventor
张东晓
陈云天
赵辛
蒋春碧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Dongli Digital Energy Technology Co ltd
Ningbo Oriental University Of Technology Temporary Name
Shenzhen Fenghe Digital Intelligence Technology Co ltd
Original Assignee
Shenzhen Fenghe Digital Intelligence Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Fenghe Digital Intelligence Technology Co ltd filed Critical Shenzhen Fenghe Digital Intelligence Technology Co ltd
Priority to CN202310417715.6A priority Critical patent/CN116128170B/en
Publication of CN116128170A publication Critical patent/CN116128170A/en
Application granted granted Critical
Publication of CN116128170B publication Critical patent/CN116128170B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2474Sequence data queries, e.g. querying versioned data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Fuzzy Systems (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Quality & Reliability (AREA)
  • Mathematical Physics (AREA)
  • Probability & Statistics with Applications (AREA)
  • Software Systems (AREA)
  • Computational Linguistics (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The application discloses a photovoltaic power station power ultra-short-term prediction method, a device and related equipment, wherein the method comprises the following steps: acquiring a weather forecast time sequence of a photovoltaic power station in a first time period, a cloud picture time sequence in a second time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the second time period and a third time period; and inputting the weather forecast time sequence, the cloud image time sequence, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence into a trained power prediction model to obtain a power prediction time sequence in a first time period. The cloud picture time sequence is generated by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and cloud picture in advance. The power value can be predicted based on weather forecast data, historical cloud layer pictures, historical irradiation intensity actual measurement data and historical power actual measurement data, and the power value prediction method has important application value.

Description

Photovoltaic power station power ultra-short-term prediction method and device and related equipment
Technical Field
The application relates to the technical field of photovoltaic power generation, in particular to a photovoltaic power station power ultra-short-term prediction method, device and related equipment.
Background
As photovoltaic power generation systems are increasingly used, more and more photovoltaic power sources are connected into a power distribution network, which brings great challenges to the planning, operation, control and other aspects of the power system. Because the solar radiation quantity is closely related to meteorological conditions, the inherent characteristics of randomness and fluctuation of the output power of the photovoltaic power generation system are caused. Under the condition that the mismatch of the power storage facility and the new energy grid-connected power is difficult to change in a short period, the large-scale photovoltaic power generation system can cause great impact on the safe and stable operation of the power system when being connected to the power grid, and the method is also a key technical problem to be solved when the photovoltaic power generation system is connected to the power grid in a large scale.
The technical research of developing photovoltaic power generation power prediction has very important significance for the stable operation of an electric power system: the effective photovoltaic power generation prediction is beneficial to the overall arrangement of conventional energy sources and power generation planning of photovoltaic power generation by a power system dispatching department, and the operation mode of a power grid is reasonably arranged; the influence of photovoltaic access on a power grid is effectively reduced, and the safety and stability of the operation of the power grid are improved; the rotary standby and running cost of the power system is reduced, so that solar energy resources are fully utilized, and greater economic and social benefits are obtained.
With the wide application of machine learning algorithms in various industries, machine learning algorithms are also applied to predict photovoltaic power generation. How to construct an effective machine learning model to predict photovoltaic power generation is a technical problem worthy of deep exploration.
Disclosure of Invention
In view of the above, the application provides a photovoltaic power station power ultra-short-term prediction method, device and related equipment, so as to realize ultra-short-term prediction of the photovoltaic power station generated power.
In order to achieve the above object, a first aspect of the present application provides a photovoltaic power station power ultra-short term prediction method, including:
acquiring a weather forecast time sequence of a photovoltaic power station in a first time period, a cloud picture time sequence in a second time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the second time period and a third time period;
inputting the weather forecast time sequence, the cloud image time sequence, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence into a trained power prediction model to obtain a power prediction time sequence in a first time period;
the cloud picture time sequence in the second time period is generated by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud picture in the second time period in advance;
The power prediction model is obtained by training a weather forecast time sequence in a fourth time period, a cloud image time sequence in a fifth time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fifth time period and a sixth time period as training samples, and an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fourth time period as sample labels;
the second time period is before the first time period, the second time period is different from the first time period by a preset first time interval, the third time period is before the second time period, the third time period is different from the first time period by a preset second time interval, and the lengths of the first time period, the second time period and the third time period are consistent;
the fifth time period is before the fourth time period, the fifth time period and the fourth time period differ by the first time interval, the sixth time period is before the fourth time period and the fifth time period, the sixth time period and the fourth time period differ by the second time interval, and the lengths of the fourth time period, the fifth time period and the sixth time period are consistent.
Preferably, the power prediction model comprises an image pre-processing unit, a first circulating neural network layer, a first fully-connected layer, a second circulating neural network layer, a second fully-connected layer, a third circulating neural network layer and a fourth fully-connected layer;
the cloud picture time sequence is input to the image pre-processing unit, and the image pre-processing unit performs feature extraction and flattening processing on the cloud picture time sequence to obtain a processed cloud picture time sequence;
the processed cloud image time sequence is input to the first cyclic neural network layer, and the first cyclic neural network layer performs feature extraction on the processed cloud image time sequence to obtain a first feature representation;
the first full-connection layer performs linear superposition on the first characteristic representation to obtain a first output result;
the weather forecast time sequence and the irradiation intensity actual measurement time sequence are input to the second circulating neural network layer, and the second circulating neural network layer performs feature extraction on the weather forecast time sequence and the irradiation intensity actual measurement time sequence to obtain a second feature representation;
the second full-connection layer performs linear superposition on the second characteristic representation to obtain a second output result;
The first output result and the second output result are input to the third full-connection layer after being combined, the third full-connection layer maps the first output result and the second output result into a first sample label space to obtain a third output result, and the third output result comprises irradiation intensity prediction data;
the third output result and the power actual measurement time sequence are merged and then input to the third circulating neural network layer, and the third circulating neural network layer performs feature extraction on the third output result and the power actual measurement time sequence to obtain a third feature representation;
and the fourth full connection layer maps the third characteristic representation into a second sample tag space to obtain a power prediction time sequence.
Preferably, the weather forecast time sequence includes a temperature forecast time sequence, a humidity forecast time sequence, a wind speed forecast time sequence, a wind direction forecast time sequence, and an irradiation intensity forecast time sequence;
the number of the neurons of the third full-connection layer is more than or equal to 2, and 1 neuron in the third full-connection layer corresponds to an irradiation intensity predicted value; the number of the neurons of the fourth full-connection layer is 1, and the neurons of the fourth full-connection layer correspond to a power predicted value.
Preferably, the training process of the power prediction model includes:
acquiring a historical weather forecast data set, a historical cloud layer picture set, a historical wind speed actual measurement data set, a historical wind direction actual measurement data set, a historical irradiation intensity actual measurement data set and a historical power actual measurement data set of the photovoltaic power station, wherein the historical weather forecast data set comprises weather forecast data of a plurality of historical time points, the historical cloud layer picture set comprises cloud layer pictures of the plurality of historical time points, the historical irradiation intensity actual measurement data set comprises irradiation intensity actual measurement data of the plurality of historical time points, and the historical power actual measurement data set comprises power actual measurement data of the plurality of historical time points;
respectively carrying out data processing on the historical weather forecast data set, the historical cloud layer picture set, the historical wind speed actual measurement data set, the historical wind direction actual measurement data set, the historical irradiation intensity actual measurement data set and the historical power actual measurement data set to obtain a historical weather forecast time sequence, a target historical cloud layer picture set, a historical wind speed actual measurement time sequence, a historical wind direction actual measurement time sequence, a historical irradiation intensity actual measurement time sequence and a historical power actual measurement time sequence, wherein the data processing is used for realizing data standardization and data completion;
Generating a historical cloud picture time sequence by using the historical wind speed actual measurement time sequence, the historical wind direction actual measurement time sequence and the target historical cloud picture set;
constructing a training set based on the historical weather forecast time sequence, the historical cloud image time sequence, the historical irradiation intensity actual measurement time sequence and the historical power actual measurement time sequence;
and training the power prediction model based on the training set and a preset loss function.
Preferably, the loss function is:
Figure SMS_1
where n is the number of samples in the training set,
Figure SMS_2
for a preset weight coefficient, +.>
Figure SMS_3
and />
Figure SMS_4
Respectively, the power measured value and the irradiation intensity measured value of the ith sample, < + >>
Figure SMS_5
and />
Figure SMS_6
The power predicted value and the irradiation intensity predicted value of the ith sample are respectively obtained.
Preferably, the first time period is from a preset time to 4 hours after the preset time, the preset time is within 20 minutes from the current time, the preset first time interval is 4 hours, and the preset second time interval is 24 hours;
the process for obtaining the weather forecast time sequence of the photovoltaic power station in the first time period, the cloud image time sequence in the second time period, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence in the second time period and the third time period comprises the following steps:
Acquiring weather forecast data of a photovoltaic power station in a first time period, wherein the weather forecast data comprises temperature forecast data, humidity forecast data, wind speed forecast data, wind direction forecast data and irradiation intensity forecast data;
performing interpolation operation on the weather forecast data to obtain a temperature forecast time sequence, a humidity forecast time sequence, a wind speed forecast time sequence, a wind direction forecast time sequence and an irradiation intensity forecast time sequence;
acquiring wind speed measured data, wind direction measured data, irradiation intensity measured data, power measured data and cloud layer pictures of the photovoltaic power station in a second time period;
respectively carrying out interpolation operation on the wind speed measured data, the wind direction measured data, the irradiation intensity measured data and the power measured data to obtain a wind speed measured time sequence, a wind direction measured time sequence, an irradiation measured time sequence and a power measured time sequence in a second time period;
generating a cloud picture time sequence in the second time period by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud picture in the second time period;
obtaining the irradiation intensity measured data and the power measured data of the photovoltaic power station in a third time period, and respectively carrying out interpolation operation on the irradiation intensity measured data and the power measured data to obtain an irradiation intensity measured time sequence and a power measured time sequence in the third time period;
Each time series within the same time period has the same time point and sequence length.
Preferably, the process of generating the cloud image time sequence in the second time period by using the wind speed actually measured time sequence, the wind direction actually measured time sequence and the cloud image picture in the second time period includes:
converting each cloud picture in the second time period into a size of
Figure SMS_7
Wherein w is the width of the cloud picture, h is the height of the cloud picture, and c is the number of channels of the cloud picture;
expanding each sequence element in the measured wind speed time sequence in the second time period into a size of
Figure SMS_8
The value of each matrix element in the wind speed matrix is equal to the actually measured wind speed value of the sequence element;
expanding each sequence element in the measured wind direction time sequence in the second time period to a size of
Figure SMS_9
The values of each matrix element in the wind direction matrix are equal to the measured wind direction values of the sequence elements;
and combining the wind speed matrix, the wind direction matrix and the cloud picture matrix corresponding to the same time point to obtain a cloud picture matrix embedded with the wind direction and the wind speed, and forming a cloud picture time sequence by the cloud picture matrix embedded with the wind direction and the wind speed in the second time period.
The second aspect of the present application provides a photovoltaic power plant power ultrashort-term prediction apparatus, comprising:
the data acquisition unit is used for acquiring weather forecast time sequences of the photovoltaic power station in a first time period, cloud picture time sequences in a second time period, irradiation intensity actual measurement time sequences and power actual measurement time sequences in the second time period and a third time period;
the power prediction unit is used for inputting the weather forecast time sequence, the cloud image time sequence, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence into a trained power prediction model to obtain a power prediction time sequence in a first time period;
the cloud picture time sequence in the second time period is generated by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud picture in the second time period in advance;
the power prediction model is obtained by training a weather forecast time sequence in a fourth time period, a cloud image time sequence in a fifth time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fifth time period and a sixth time period as training samples, and an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fourth time period as sample labels;
The second time period is before the first time period, the second time period is different from the first time period by a preset first time interval, the third time period is before the second time period, the third time period is different from the first time period by a preset second time interval, and the lengths of the first time period, the second time period and the third time period are consistent;
the fifth time period is before the fourth time period, the fifth time period and the fourth time period differ by the first time interval, the sixth time period is before the fourth time period and the fifth time period, the sixth time period and the fourth time period differ by the second time interval, and the lengths of the fourth time period, the fifth time period and the sixth time period are consistent.
A third aspect of the present application provides a photovoltaic power plant power ultrashort-term prediction apparatus, comprising: a memory and a processor;
the memory is used for storing programs;
and the processor is used for executing the program to realize each step of the photovoltaic power station power ultra-short-term prediction method.
A fourth aspect of the present application provides a computer readable storage medium having stored thereon a computer program which, when executed by a processor, implements the steps of a photovoltaic power plant power ultra-short term prediction method as described above.
According to the technical scheme, firstly, the weather forecast time sequence of the photovoltaic power station in the first time period, the cloud image time sequence in the second time period, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence in the second time period and the third time period are obtained. The cloud picture time sequence in the second time period is generated by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud picture in the second time period in advance, and the time correlation information of the cloud picture can be better captured by embedding the wind speed and the wind direction in the meteorological data in the cloud picture. Before the first time period, the second time period is a cloud picture time sequence, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the second time period are all historical actual measurement data; and the second time period differs from the first time period by a preset first time interval. The third time period is before the second time period, namely the irradiation intensity actually measured time sequence and the power actually measured time sequence in the third time period are both historical actually measured data; and the third time period is different from the first time period by a preset second time interval, and the preset second time interval has a sunlight periodicity attribute, so that the meteorological data of the third time period has a certain reference meaning for the first time period. Further, the lengths of the first period, the second period, and the third period are uniform. It is understood that each point in time in each time period corresponds to a point in time of each element in the time series within the time period. And then, inputting the weather forecast time sequence, the cloud image time sequence, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence into a trained power prediction model to obtain a power prediction time sequence in a first time period. It should be noted that, the power prediction model is obtained by training a weather forecast time sequence in a fourth time period, a cloud image time sequence in a fifth time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fifth time period and a sixth time period as training samples, and an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fourth time period as sample labels. Wherein the fifth time period precedes the fourth time period, and the fifth time period differs from the fourth time period by the first time interval, the sixth time period precedes the fourth time period and the fifth time period, and the sixth time period differs from the fourth time period by the second time interval, and the fourth time period, the fifth time period, and the sixth time period are identical in length. According to the power prediction model, the correlation between the cloud layer picture and the wind speed and the wind direction, the correlation between the weather data and the weather actual measurement data, the correlation between the weather forecast data and the weather actual measurement data and the correlation between the weather data and the photovoltaic power station power are utilized, so that the power prediction model can predict the power value based on the weather forecast data, the historical cloud layer picture, the historical irradiation intensity actual measurement data and the historical power actual measurement data, and the power prediction model has important application value.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings that are required to be used in the embodiments or the description of the prior art will be briefly described below, and it is obvious that the drawings in the following description are only embodiments of the present application, and that other drawings may be obtained according to the provided drawings without inventive effort to a person skilled in the art.
Fig. 1 is a schematic diagram of a photovoltaic power plant power ultra-short term prediction method disclosed in an embodiment of the present application;
fig. 2 illustrates a schematic diagram of a first time period, a second time period, and a first time point according to an embodiment of the present application;
fig. 3 illustrates a schematic diagram of a third time period, a fourth time period, and a second time point disclosed in an embodiment of the present application;
FIG. 4 illustrates training samples and sample tags employed in model training as disclosed in embodiments of the present application;
FIG. 5 is a schematic diagram of a power prediction model disclosed in an embodiment of the present application;
fig. 6 is a schematic diagram of a photovoltaic power station power ultra-short term prediction apparatus disclosed in an embodiment of the present application;
fig. 7 is a schematic diagram of a photovoltaic power station power ultra-short term prediction apparatus disclosed in an embodiment of the present application.
Detailed Description
The following description of the embodiments of the present application will be made clearly and fully with reference to the accompanying drawings, in which it is evident that the embodiments described are only some, but not all, of the embodiments of the present application. All other embodiments, which can be made by one of ordinary skill in the art without undue burden from the present disclosure, are within the scope of the present disclosure.
The machine learning model applied to photovoltaic power generation power prediction mainly comprises a cyclic neural network model, a convolutional neural network model and a transducer series model. Based on given data, such as numerical weather forecast, photovoltaic power station power, meteorological monitoring data, full sky imager data, etc., such machine learning methods train a model to learn the mapping of given data to photovoltaic power generation power, and this trained model is then used to predict the power generation power of the power station for future time periods.
The observed quantity for predicting the photovoltaic power generation power includes the following components: 1) Data of numerical weather forecast: forecasting temperature, forecasting humidity, forecasting wind speed, forecasting wind direction and forecasting irradiation intensity; 2) Site weather monitoring data: measured temperature, measured humidity, measured wind speed, measured wind direction, and measured irradiation intensity; 3) Actual power generated; 4) Sky cloud layer distribution pictures shot by all-sky imaging instrument and sun shielding condition. The numerical weather forecast data is updated every 4 hours, and the spatial resolution can reach 1 km. The full-sky imager takes a cloud picture every 30 seconds, and the spatial resolution is sub-kilometers. The purpose of using the cloud picture is to capture the relationship between the cloud change and the solar radiation intensity. By looking at the cloud picture at multiple moments in time, we can predict the change in the cloud. The change of the cloud has a great relation with the weather change, wherein the wind speed and the wind direction are important influencing factors, and the cloud image data are combined with the wind speed and the wind direction data in an attempt to predict the solar radiation intensity and the power generated by the photovoltaic power station.
The method for predicting the power of the photovoltaic power station in an ultra-short period is described below. Referring to fig. 1, the photovoltaic power station power ultra-short term prediction method provided in the embodiment of the present application may include the following steps:
step S101, a weather forecast time sequence of a photovoltaic power station in a first time period, a cloud picture time sequence in a second time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the second time period and a third time period are obtained.
It is understood that the first time period, the second time period, and the third time period are uniform in length.
The weather forecast time sequence in the first time period consists of weather forecast data of each time point in the first time period, wherein the weather forecast data can comprise temperature, humidity, wind speed, wind direction, irradiation intensity, ultraviolet intensity and the like.
The cloud image time sequence in the second time period is generated by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud layer picture in the second time period in advance. It can be understood that the cloud layer picture in the second time period is a cloud picture shot by using the full-sky imager in the second time period, and the shooting time points of the cloud picture correspond to each time point of the wind speed actual measurement time sequence and the wind direction actual measurement time sequence in the second time period one by one.
The measured time sequence of the irradiation intensity in the second time period consists of measured data of the irradiation intensity at each time point in the second time period, the measured time sequence of the power in the second time period consists of measured data of the power at each time point in the second time period, and each time point of the measured time sequence of the irradiation intensity in the second time period corresponds to each time point of the measured time sequence of the power in the second time period one by one.
The measured time sequence of the irradiation intensity in the third time period consists of measured data of the irradiation intensity at each time point in the third time period, the measured time sequence of the power in the third time period consists of measured data of the power at each time point in the third time period, and each time point of the measured time sequence of the irradiation intensity in the third time period corresponds to each time point of the measured time sequence of the power in the third time period one by one.
Step S102, inputting the weather forecast time sequence, the cloud image time sequence, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence into a trained power prediction model to obtain a power prediction time sequence in a first time period.
The second time period is before the first time period, and the second time period is different from the first time period by a preset first time interval, as shown in fig. 2. Assuming that the ultra-short term prediction needs to predict the power generated by the photovoltaic power plant for 15 minutes to 4 hours (time resolution of 15 minutes), the preset first time interval is 4 hours, and the first time period starting time point and the second time period ending time point are different by 15 minutes. The third time period is before the second time period, and the third time period is different from the first time period by a preset second time interval. The preset second time interval has a solar periodical attribute or other related attributes, so that the meteorological data of the second time period has a certain reference meaning for the first time period. It can be understood that there are a plurality of time points in each time period, and each time point in each time period corresponds to each element in the time sequence in the time period one by one; the first time period, the second time period and the third time period are consistent in length.
By way of example, assuming now that it is 11 pm for 3 months 5 days, it is necessary to predict the power generated by a certain photovoltaic plant for 16 time points during the 3 months 5 days 12 pm to 15 pm 45 minutes. Then, the first time period may be set to be between 12 pm and 15 pm for 3 months 5 days, the second time period may be set to be between 8 am and 11 pm for 3 months 5 days, and the third time period may be set to be between 12 pm and 15 pm for 3 months 4 days.
The power prediction model is obtained by training a weather forecast time sequence in a fourth time period, a cloud image time sequence in a fifth time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fifth time period and a sixth time period as training samples, and an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fourth time period as sample labels.
As shown in fig. 3, the fifth time period precedes the fourth time period, and the fifth time period and the fourth time period differ by a first time interval, the sixth time period precedes the fourth time period and the fifth time period, and the sixth time period and the fourth time period differ by a second time interval, and the lengths of the fourth time period, the fifth time period, and the sixth time period are consistent. The time relation between the data adopted in the model training is consistent with the time relation between the data in the model application.
Illustratively, as shown in fig. 4, it is assumed that the fourth period is from 12 pm to 15 pm 45 minutes on 3 months 5 days, the fifth period is from 8 am to 11 pm 45 minutes on 3 months 5 days, and the sixth period is from 12 pm to 15 pm 45 minutes on 3 months 4 days. Then, the data in the dashed box in the figure is the training sample, and the data in the solid box is the sample label corresponding to the training sample. Wherein, (P) T, (P) RH, (P) WS, (P) WD, (P) IR respectively represent temperature forecast data, humidity forecast data, wind speed forecast data, wind direction forecast data and irradiation intensity forecast data; (M) WS, (M) WD, (M) IR, and (M) PV respectively represent measured wind speed data, measured wind direction data, measured irradiation intensity data, and measured power data.
According to the method, firstly, a weather forecast time sequence of a photovoltaic power station in a first time period, a cloud picture time sequence in a second time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the second time period and a third time period are obtained. The cloud picture time sequence in the second time period is generated by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud picture in the second time period in advance, and the time correlation information of the cloud picture can be better captured by embedding the wind speed and the wind direction in the meteorological data in the cloud picture. Before the first time period, the second time period is a cloud picture time sequence, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the second time period are all historical actual measurement data; and the second time period differs from the first time period by a preset first time interval. The third time period is before the second time period, namely the irradiation intensity actually measured time sequence and the power actually measured time sequence in the third time period are both historical actually measured data; and the third time period is different from the first time period by a preset second time interval, and the preset second time interval has a sunlight periodicity attribute, so that the meteorological data of the third time period has a certain reference meaning for the first time period. Further, the lengths of the first period, the second period, and the third period are uniform. It is understood that each point in time in each time period corresponds to a point in time of each element in the time series within the time period. And then, inputting the weather forecast time sequence, the cloud image time sequence, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence into a trained power prediction model to obtain a power prediction time sequence in a first time period. It should be noted that, the power prediction model is obtained by training a weather forecast time sequence in a fourth time period, a cloud image time sequence in a fifth time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fifth time period and a sixth time period as training samples, and an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fourth time period as sample labels. Wherein the fifth time period precedes the fourth time period, and the fifth time period differs from the fourth time period by the first time interval, the sixth time period precedes the fourth time period and the fifth time period, and the sixth time period differs from the fourth time period by the second time interval, and the fourth time period, the fifth time period, and the sixth time period are identical in length. According to the power prediction model, the correlation between the cloud layer picture and the wind speed and the wind direction, the correlation between the weather data and the weather actual measurement data, the correlation between the weather forecast data and the weather actual measurement data and the correlation between the weather data and the photovoltaic power station power are utilized, so that the power prediction model can predict the power value based on the weather forecast data, the historical cloud layer picture, the historical irradiation intensity actual measurement data and the historical power actual measurement data, and the power prediction model has important application value.
In some embodiments of the present application, the foregoing weather forecast time sequences may include a temperature forecast time sequence, a humidity forecast time sequence, a wind speed forecast time sequence, a wind direction forecast time sequence, and an irradiance intensity forecast time sequence.
In some embodiments of the present application, the first time period mentioned in step S101 is 4 hours after the preset time to the preset time, where, to meet the time requirement of the ultra-short-term prediction, the preset time differs from the current time by less than 20 minutes, for example, the preset time may be set to a time that differs from the current time by 15 minutes, the preset first time interval is 4 hours, and the preset second time interval is 24 hours.
The above setting of the time interval is applicable to the case where the weather is relatively stable and the weather conditions on adjacent dates are relatively close.
It will be appreciated that in the case of a time resolution of 15 minutes, where 4 data points are provided per hour, then 16 data points per time period will be provided and the length of the time series will be 16.
In some embodiments of the present application, the step S101 of obtaining the weather forecast time sequence, the cloud image time sequence, the radiation intensity actual measurement time sequence and the power actual measurement time sequence of the photovoltaic power station in the first time period, the second time period and the third time period may include:
S1, weather forecast data of the photovoltaic power station in a first time period are obtained.
Wherein the weather forecast data comprises temperature forecast data, humidity forecast data, wind speed forecast data, wind direction forecast data and irradiation intensity forecast data.
And S2, carrying out interpolation operation on the weather forecast data to obtain a temperature forecast time sequence, a humidity forecast time sequence, a wind speed forecast time sequence, a wind direction forecast time sequence and an irradiation intensity forecast time sequence.
And S3, acquiring wind speed measured data, wind direction measured data, irradiation intensity measured data, power measured data and cloud layer pictures of the photovoltaic power station in a second time period.
And S4, respectively carrying out interpolation operation on the wind speed actual measurement data, the wind direction actual measurement data, the irradiation intensity actual measurement data and the power actual measurement data to obtain a wind speed actual measurement time sequence, a wind direction actual measurement time sequence, an irradiation actual measurement time sequence and a power actual measurement time sequence in a second time period.
S5, generating a cloud image time sequence in the second time period by using the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud image picture in the second time period.
S6, obtaining the measured data of the irradiation intensity and the measured data of the power of the photovoltaic power station in the third time period, and respectively carrying out interpolation operation on the measured data of the irradiation intensity and the measured data of the power to obtain a measured time sequence of the irradiation intensity and a measured time sequence of the power in the third time period.
The interpolation operation aims at data completion, and after interpolation operation, each time sequence has the same time point and sequence length.
In some embodiments of the present application, the step S5 of generating the cloud image time sequence in the second period by using the wind speed measured time sequence, the wind direction measured time sequence, and the cloud image picture in the second period may include:
and S51, converting each cloud layer picture in the second time period into a cloud picture matrix with a size.
Wherein w is the width of the cloud picture, h is the height of the cloud picture, and c represents the channel number of the cloud picture. It will be appreciated that when the cloud picture is a color image, there are 3 channels, where c has a value of 3, i.e., the size of the cloud matrix is
Figure SMS_10
. When the actual cloud picture is not a color image, but a gray image or other type of image, the number of channels c should be adapted accordingly.
S52, expanding each sequence element in the wind speed actual measurement time sequence in the second time period into a size of
Figure SMS_11
Is a wind speed matrix of (a).
Wherein the values of each matrix element in the wind speed matrix are equal to the measured wind speed values of the sequence of elements.
Exemplary, assume that the wind speed measured time series within the second time period is at a time point
Figure SMS_12
The measured wind speed of the sequence element is 2.2m/s, thenThe wind speed matrix is: />
Figure SMS_13
S53, expanding each sequence element in the wind direction actual measurement time sequence in the second time period into a size of
Figure SMS_14
Is a wind direction matrix of (a).
Likewise, the value of each matrix element in the wind direction matrix is equal to the measured wind direction value of the sequence element.
S54, combining the wind speed matrix, the wind direction matrix and the cloud picture matrix corresponding to the same time point to obtain the cloud picture matrix embedded with the wind direction and the wind speed.
It will be appreciated that the size of the cloud matrix is
Figure SMS_15
. And finally, forming a cloud image time sequence by cloud image matrixes embedded with wind directions and wind speeds in the second time period. Illustratively, assume a time point +.>
Figure SMS_16
The cloud image time sequence at the point is +.>
Figure SMS_17
And assuming that the time series length is 16, wherein +.>
Figure SMS_18
Then the cloud image time series can be expressed as:
Figure SMS_19
it can be understood that, since the time resolution of the weather forecast data and the weather actual measurement data is different from that of the all-sky imager, specifically, the sampling frequency of the all-sky imager is higher than that of the numerical weather forecast data, we only select the pictures taken at the time corresponding to the numerical weather forecast and the actual measurement data, for example, assuming that the time resolution of the weather forecast data and the weather actual measurement data is 15 minutes and the data acquisition time corresponds to the 0 th, 15 th, 30 th and 45 th minutes of each hour, then, for the cloud pictures taken by the all-sky imager, only the cloud pictures taken at the 0 th, 15 th, 30 th and 45 th minutes of each time are selected.
In some embodiments of the present application, as shown in fig. 5, the power prediction model mentioned in step S102 may include an image Pre-processing unit (Pre), a first recurrent neural network layer (lstm_1), a first fully connected layer (fc_1), a second recurrent neural network layer (lstm_2), a second fully connected layer (fc_2), a third fully connected layer (fc_3), a third recurrent neural network layer (lstm_3), and a fourth fully connected layer (fc_4).
The first, second, and third recurrent neural network layers may be, for example, GRU networks (gated recurrent neural network, gated recurrent neural networks).
The workflow of each component in the power prediction model is as follows:
the cloud image time sequence is input to an image pre-processing unit, and the image pre-processing unit performs feature extraction and flattening processing on the cloud image time sequence to obtain a processed cloud image time sequence.
The processed cloud image time sequence is input to a first cyclic neural network layer, and the first cyclic neural network layer performs feature extraction on the processed cloud image time sequence to obtain a first feature representation.
The first fully connected layer linearly superimposes the first characteristic representation to obtain a first output result (Out 1).
The weather forecast time sequence and the irradiation intensity actual measurement time sequence are input into a second cyclic neural network layer, and the second cyclic neural network layer performs feature extraction on the weather forecast time sequence and the irradiation intensity actual measurement time sequence to obtain a second feature representation.
The second fully connected layer linearly superimposes the second representation of the feature to obtain a second output result (Out 2).
The first output result and the second output result are combined and then input to a third full-connection layer, the third full-connection layer maps the first output result and the second output result into a first sample tag space to obtain a third output result, and the third output result comprises irradiation intensity prediction data (IR).
And the third output result and the power actual measurement time sequence are combined and then input into a third cyclic neural network layer, and the third cyclic neural network layer performs feature extraction on the third output result and the power actual measurement time sequence to obtain a third feature representation.
The fourth full connection layer maps the third feature representation into a second sample tag space to obtain a power prediction time sequence.
Fig. 5 illustrates that the weather forecast time series includes a temperature forecast time series (P) T, a humidity forecast time series (P) RH, a wind speed forecast time series (P) WS, a wind direction forecast time series (P) WD, an irradiation intensity forecast time series (P) IR, and the irradiation intensity actual measurement time series includes an irradiation intensity actual measurement time series (M) ir_24 before 24 hours, and an irradiation intensity actual measurement time series (M) ir_4 before 4 hours.
Referring to fig. 5, the dimensions of the numerical weather forecast data and the site measured data input to the model are as follows
Figure SMS_20
Where bs is batch_size,16 is the length of the sequence data (covering a time frame of +.>
Figure SMS_21
) 9 is the number of features (corresponding to 6 time series). The dimension of the input to the convolutional neural network layer (CNN_1) is +.>
Figure SMS_22
(assuming that the cloud layer picture is a color image), the output of the model is the irradiation intensity and the photovoltaic power generation power of 16 time points, and the dimension of the labeling data is +.>
Figure SMS_23
In some embodiments of the present application, as shown in fig. 5, the image Pre-processing unit (Pre) may include 2 convolutional neural network layers (cnn_1 and cnn_2) connected in series in sequence. More specifically, the convolutional neural network layer, the cyclic neural network layer and the full-connection layer used in the power prediction model can be a convolutional neural network layer torch.nn.conv3d, a cyclic neural network layer torch.nn.lstm and a full-connection layer torch.nn.linear which are self-contained in the Py-Torch framework. The number of channels and convolution kernel sizes of the 2 convolutional neural network layers (cnn_1 and cnn_2), the number of neurons of the 3 convolutional neural network layers (lstm_1, lstm_2 and lstm_3), and the number of neurons of the first fully-connected layer (fc_1) and the second fully-connected layer (fc_2) in the image pre-processing unit may be determined according to actual needs.
In some embodiments of the present application, the number of neurons in the third fully connected layer is greater than or equal to 2, 1 neuron in the third fully connected layer corresponding to an irradiance intensity prediction; the number of neurons of the fourth fully connected layer is 1, and the neurons of the fourth fully connected layer correspond to power predictors.
Fig. 5 only illustrates the case where the number of neurons of the third fully connected layer is 2, with 1 more free neurons outputting the variable F. Since there are only 1 constrained neurons in the third fully connected layer, and the number of neurons in the first fully connected layer is greater than or equal to 2, then more unconstrained neurons can extract unnamed physical features from the data, so that the capability of extracting information from the model is enhanced, and the degree of freedom of the model is improved from the viewpoint of the intermediate output of the model.
In some embodiments of the present application, the foregoing training process of the power prediction model may include the following steps:
step S201, a historical weather forecast data set, a historical cloud layer picture set, a historical wind speed actual measurement data set, a historical wind direction actual measurement data set, a historical irradiation intensity actual measurement data set and a historical power actual measurement data set of a photovoltaic power station are obtained.
The historical weather forecast data set comprises weather forecast data of a plurality of historical time points, the historical cloud layer picture set comprises cloud layer pictures of the plurality of historical time points, the historical irradiation intensity actual measurement data set comprises irradiation intensity actual measurement data of the plurality of historical time points, and the historical power actual measurement data set comprises power actual measurement data of the plurality of historical time points.
Step S202, respectively carrying out data processing on a historical weather forecast data set, a historical cloud layer picture set, a historical wind speed actual measurement data set, a historical wind direction actual measurement data set, a historical irradiation intensity actual measurement data set and a historical power actual measurement data set to obtain a historical weather forecast time sequence, a target historical cloud layer picture set, a historical wind speed actual measurement time sequence, a historical wind direction actual measurement time sequence, a historical irradiation intensity actual measurement time sequence and a historical power actual measurement time sequence.
The data processing is used for realizing data standardization and data completion. Specifically, when a data loss occurs, interpolation is performed by using a suitable mathematical method to complement the missing data. After the data are completed, all the data are normalized by using a proper normalization method.
And step S203, generating a historical cloud picture time sequence by utilizing the historical wind speed actual measurement time sequence, the historical wind direction actual measurement time sequence and the target historical cloud picture set.
The specific generation method of the cloud image time sequence can be referred to the above description.
Step S204, a training set is constructed based on a historical weather forecast time sequence, a historical cloud image time sequence, a historical irradiation intensity actual measurement time sequence and a historical power actual measurement time sequence;
step S205, training the power prediction model based on the training set and a preset loss function.
Specifically, training samples in a training set are input into a power prediction model one by one to obtain output irradiation intensity prediction data and power prediction data, wherein the irradiation intensity prediction data is an intermediate output quantity, the power prediction data is a final output quantity, a loss value is calculated based on the output quantities, a loss function and a sample label corresponding to the training sample, and whether the power prediction model is trained is judged based on the loss value. If not, transmitting the loss value to a power prediction model for adjusting model parameters; if yes, determining the model at the moment as a finally adopted model, and obtaining a trained power prediction model.
In some embodiments of the present application, the mean square error (mean squared error, MSE) may be utilized to evaluate model performance. Based on this, the aforementioned loss function may be:
Figure SMS_24
where n is the number of samples in the training set,
Figure SMS_25
for a preset weight coefficient, +.>
Figure SMS_26
and />
Figure SMS_27
Respectively, the power measured value and the irradiation intensity measured value of the ith sample, < + >>
Figure SMS_28
and />
Figure SMS_29
The power predicted value and the irradiation intensity predicted value of the ith sample are respectively obtained.
The photovoltaic power station power ultra-short term prediction device provided by the embodiment of the application is described below, and the photovoltaic power station power ultra-short term prediction device described below and the photovoltaic power station power ultra-short term prediction method described above can be correspondingly referred to each other.
Referring to fig. 6, the photovoltaic power station power ultra-short term prediction apparatus provided in the embodiment of the present application may include:
a data acquisition unit 21, configured to acquire a weather forecast time sequence of the photovoltaic power station in a first time period, a cloud image time sequence in a second time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the second time period and a third time period;
the power prediction unit 22 is configured to input the weather forecast time sequence, the cloud image time sequence, the irradiation intensity actual measurement time sequence, and the power actual measurement time sequence into a trained power prediction model, so as to obtain a power prediction time sequence in a first time period;
The cloud picture time sequence in the second time period is generated by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud picture in the second time period in advance;
the power prediction model is obtained by training a weather forecast time sequence in a fourth time period, a cloud image time sequence in a fifth time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fifth time period and a sixth time period as training samples, and an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fourth time period as sample labels;
the second time period is before the first time period, the second time period is different from the first time period by a preset first time interval, the third time period is before the second time period, the third time period is different from the first time period by a preset second time interval, and the lengths of the first time period, the second time period and the third time period are consistent;
the fifth time period is before the fourth time period, the fifth time period and the fourth time period differ by the first time interval, the sixth time period is before the fourth time period and the fifth time period, the sixth time period and the fourth time period differ by the second time interval, and the lengths of the fourth time period, the fifth time period and the sixth time period are consistent.
The photovoltaic power station power ultra-short-term prediction device provided by the embodiment of the application can be applied to photovoltaic power station power ultra-short-term prediction equipment, such as a computer and the like. Alternatively, fig. 7 shows a block diagram of a hardware structure of the photovoltaic power plant power ultra-short term prediction apparatus, and referring to fig. 7, the hardware structure of the photovoltaic power plant power ultra-short term prediction apparatus may include: at least one processor 31, at least one communication interface 32, at least one memory 33 and at least one communication bus 34.
In the embodiment of the present application, the number of the processor 31, the communication interface 32, the memory 33, and the communication bus 34 is at least one, and the processor 31, the communication interface 32, and the memory 33 complete communication with each other through the communication bus 34;
the processor 31 may be a central processing unit CPU, or a specific integrated circuit ASIC (Application Specific Integrated Circuit), or one or more integrated circuits configured to implement embodiments of the present application, etc.;
the memory 33 may include a high-speed RAM memory, and may further include a non-volatile memory (non-volatile memory) or the like, such as at least one magnetic disk memory;
wherein the memory 33 stores a program, the processor 31 may call the program stored in the memory 33, the program being for:
Acquiring a weather forecast time sequence of a photovoltaic power station in a first time period, a cloud picture time sequence in a second time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the second time period and a third time period;
inputting the weather forecast time sequence, the cloud image time sequence, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence into a trained power prediction model to obtain a power prediction time sequence in a first time period;
the cloud picture time sequence in the second time period is generated by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud picture in the second time period in advance;
the power prediction model is obtained by training a weather forecast time sequence in a fourth time period, a cloud image time sequence in a fifth time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fifth time period and a sixth time period as training samples, and an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fourth time period as sample labels;
the second time period is before the first time period, the second time period is different from the first time period by a preset first time interval, the third time period is before the second time period, the third time period is different from the first time period by a preset second time interval, and the lengths of the first time period, the second time period and the third time period are consistent;
The fifth time period is before the fourth time period, the fifth time period and the fourth time period differ by the first time interval, the sixth time period is before the fourth time period and the fifth time period, the sixth time period and the fourth time period differ by the second time interval, and the lengths of the fourth time period, the fifth time period and the sixth time period are consistent.
Alternatively, the refinement function and the extension function of the program may be described with reference to the above.
The present embodiment also provides a computer-readable storage medium storing a program adapted to be executed by a processor, the program being configured to:
acquiring a weather forecast time sequence of a photovoltaic power station in a first time period, a cloud picture time sequence in a second time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the second time period and a third time period;
inputting the weather forecast time sequence, the cloud image time sequence, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence into a trained power prediction model to obtain a power prediction time sequence in a first time period;
The cloud picture time sequence in the second time period is generated by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud picture in the second time period in advance;
the power prediction model is obtained by training a weather forecast time sequence in a fourth time period, a cloud image time sequence in a fifth time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fifth time period and a sixth time period as training samples, and an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fourth time period as sample labels;
the second time period is before the first time period, the second time period is different from the first time period by a preset first time interval, the third time period is before the second time period, the third time period is different from the first time period by a preset second time interval, and the lengths of the first time period, the second time period and the third time period are consistent;
the fifth time period is before the fourth time period, the fifth time period and the fourth time period differ by the first time interval, the sixth time period is before the fourth time period and the fifth time period, the sixth time period and the fourth time period differ by the second time interval, and the lengths of the fourth time period, the fifth time period and the sixth time period are consistent.
Alternatively, the refinement function and the extension function of the program may be described with reference to the above.
To sum up:
according to the method, firstly, a weather forecast time sequence of a photovoltaic power station in a first time period, a cloud picture time sequence in a second time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the second time period and a third time period are obtained. The cloud picture time sequence in the second time period is generated by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud picture in the second time period in advance, and the time correlation information of the cloud picture can be better captured by embedding the wind speed and the wind direction in the meteorological data in the cloud picture. Before the first time period, the second time period is a cloud picture time sequence, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the second time period are all historical actual measurement data; and the second time period differs from the first time period by a preset first time interval. The third time period is before the second time period, namely the irradiation intensity actually measured time sequence and the power actually measured time sequence in the third time period are both historical actually measured data; and the third time period is different from the first time period by a preset second time interval, and the preset second time interval has a sunlight periodicity attribute, so that the meteorological data of the third time period has a certain reference meaning for the first time period. Further, the lengths of the first period, the second period, and the third period are uniform. It is understood that each point in time in each time period corresponds to a point in time of each element in the time series within the time period. And then, inputting the weather forecast time sequence, the cloud image time sequence, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence into a trained power prediction model to obtain a power prediction time sequence in a first time period. It should be noted that, the power prediction model is obtained by training a weather forecast time sequence in a fourth time period, a cloud image time sequence in a fifth time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fifth time period and a sixth time period as training samples, and an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fourth time period as sample labels. Wherein the fifth time period precedes the fourth time period, and the fifth time period differs from the fourth time period by the first time interval, the sixth time period precedes the fourth time period and the fifth time period, and the sixth time period differs from the fourth time period by the second time interval, and the fourth time period, the fifth time period, and the sixth time period are identical in length. According to the power prediction model, the correlation between the cloud layer picture and the wind speed and the wind direction, the correlation between the weather data and the weather actual measurement data, the correlation between the weather forecast data and the weather actual measurement data and the correlation between the weather data and the photovoltaic power station power are utilized, so that the power prediction model can predict the power value based on the weather forecast data, the historical cloud layer picture, the historical irradiation intensity actual measurement data and the historical power actual measurement data, and the power prediction model has important application value.
Finally, it is further noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
In the present specification, each embodiment is described in a progressive manner, and each embodiment focuses on the difference from other embodiments, and may be combined according to needs, and the same similar parts may be referred to each other.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1. The ultra-short-term power prediction method for the photovoltaic power station is characterized by comprising the following steps of:
acquiring a weather forecast time sequence of a photovoltaic power station in a first time period, a cloud picture time sequence in a second time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the second time period and a third time period;
inputting the weather forecast time sequence, the cloud image time sequence, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence into a trained power prediction model to obtain a power prediction time sequence in a first time period;
the cloud picture time sequence in the second time period is generated by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud picture in the second time period in advance;
The power prediction model is obtained by training a weather forecast time sequence in a fourth time period, a cloud image time sequence in a fifth time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fifth time period and a sixth time period as training samples, and an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fourth time period as sample labels;
the second time period is before the first time period, the second time period is different from the first time period by a preset first time interval, the third time period is before the second time period, the third time period is different from the first time period by a preset second time interval, and the lengths of the first time period, the second time period and the third time period are consistent;
the fifth time period is before the fourth time period, the fifth time period and the fourth time period differ by the first time interval, the sixth time period is before the fourth time period and the fifth time period, the sixth time period and the fourth time period differ by the second time interval, and the lengths of the fourth time period, the fifth time period and the sixth time period are consistent.
2. The method of claim 1, wherein the power prediction model comprises an image pre-processing unit, a first recurrent neural network layer, a first fully-connected layer, a second recurrent neural network layer, a second fully-connected layer, a third recurrent neural network layer, and a fourth fully-connected layer;
the cloud picture time sequence is input to the image pre-processing unit, and the image pre-processing unit performs feature extraction and flattening processing on the cloud picture time sequence to obtain a processed cloud picture time sequence;
the processed cloud image time sequence is input to the first cyclic neural network layer, and the first cyclic neural network layer performs feature extraction on the processed cloud image time sequence to obtain a first feature representation;
the first full-connection layer performs linear superposition on the first characteristic representation to obtain a first output result;
the weather forecast time sequence and the irradiation intensity actual measurement time sequence are input to the second circulating neural network layer, and the second circulating neural network layer performs feature extraction on the weather forecast time sequence and the irradiation intensity actual measurement time sequence to obtain a second feature representation;
The second full-connection layer performs linear superposition on the second characteristic representation to obtain a second output result;
the first output result and the second output result are input to the third full-connection layer after being combined, the third full-connection layer maps the first output result and the second output result into a first sample label space to obtain a third output result, and the third output result comprises irradiation intensity prediction data;
the third output result and the power actual measurement time sequence are merged and then input to the third circulating neural network layer, and the third circulating neural network layer performs feature extraction on the third output result and the power actual measurement time sequence to obtain a third feature representation;
and the fourth full connection layer maps the third characteristic representation into a second sample tag space to obtain a power prediction time sequence.
3. The method of claim 2, wherein the weather forecast time series includes a temperature forecast time series, a humidity forecast time series, a wind speed forecast time series, a wind direction forecast time series, and an irradiance intensity forecast time series;
the number of the neurons of the third full-connection layer is more than or equal to 2, and 1 neuron in the third full-connection layer corresponds to an irradiation intensity predicted value; the number of the neurons of the fourth full-connection layer is 1, and the neurons of the fourth full-connection layer correspond to a power predicted value.
4. The method of claim 2, wherein the training process of the power prediction model comprises:
acquiring a historical weather forecast data set, a historical cloud layer picture set, a historical wind speed actual measurement data set, a historical wind direction actual measurement data set, a historical irradiation intensity actual measurement data set and a historical power actual measurement data set of the photovoltaic power station, wherein the historical weather forecast data set comprises weather forecast data of a plurality of historical time points, the historical cloud layer picture set comprises cloud layer pictures of the plurality of historical time points, the historical irradiation intensity actual measurement data set comprises irradiation intensity actual measurement data of the plurality of historical time points, and the historical power actual measurement data set comprises power actual measurement data of the plurality of historical time points;
respectively carrying out data processing on the historical weather forecast data set, the historical cloud layer picture set, the historical wind speed actual measurement data set, the historical wind direction actual measurement data set, the historical irradiation intensity actual measurement data set and the historical power actual measurement data set to obtain a historical weather forecast time sequence, a target historical cloud layer picture set, a historical wind speed actual measurement time sequence, a historical wind direction actual measurement time sequence, a historical irradiation intensity actual measurement time sequence and a historical power actual measurement time sequence, wherein the data processing is used for realizing data standardization and data completion;
Generating a historical cloud picture time sequence by using the historical wind speed actual measurement time sequence, the historical wind direction actual measurement time sequence and the target historical cloud picture set;
constructing a training set based on the historical weather forecast time sequence, the historical cloud image time sequence, the historical irradiation intensity actual measurement time sequence and the historical power actual measurement time sequence;
and training the power prediction model based on the training set and a preset loss function.
5. The method of claim 4, wherein the loss function is:
Figure QLYQS_1
wherein ,
Figure QLYQS_2
for loss value, n is the number of samples in the training set, +.>
Figure QLYQS_3
For a preset weight coefficient, +.>
Figure QLYQS_4
and />
Figure QLYQS_5
Respectively, the power measured value and the irradiation intensity measured value of the ith sample, < + >>
Figure QLYQS_6
and />
Figure QLYQS_7
The power predicted value and the irradiation intensity predicted value of the ith sample are respectively obtained.
6. The method of claim 1, wherein the first time period is from a preset time to 4 hours after the preset time, the preset time differs from a current time by less than 20 minutes, the preset first time interval is 4 hours, and the preset second time interval is 24 hours;
The process for obtaining the weather forecast time sequence of the photovoltaic power station in the first time period, the cloud image time sequence in the second time period, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence in the second time period and the third time period comprises the following steps:
acquiring weather forecast data of a photovoltaic power station in a first time period, wherein the weather forecast data comprises temperature forecast data, humidity forecast data, wind speed forecast data, wind direction forecast data and irradiation intensity forecast data;
performing interpolation operation on the weather forecast data to obtain a temperature forecast time sequence, a humidity forecast time sequence, a wind speed forecast time sequence, a wind direction forecast time sequence and an irradiation intensity forecast time sequence;
acquiring wind speed measured data, wind direction measured data, irradiation intensity measured data, power measured data and cloud layer pictures of the photovoltaic power station in a second time period;
respectively carrying out interpolation operation on the wind speed measured data, the wind direction measured data, the irradiation intensity measured data and the power measured data to obtain a wind speed measured time sequence, a wind direction measured time sequence, an irradiation measured time sequence and a power measured time sequence in a second time period;
Generating a cloud picture time sequence in the second time period by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud picture in the second time period;
obtaining the irradiation intensity measured data and the power measured data of the photovoltaic power station in a third time period, and respectively carrying out interpolation operation on the irradiation intensity measured data and the power measured data to obtain an irradiation intensity measured time sequence and a power measured time sequence in the third time period;
each time series within the same time period has the same time point and sequence length.
7. The method according to any one of claims 1 to 6, wherein the generating the cloud image time series in the second period by using the wind speed measured time series, the wind direction measured time series, and the cloud image in the second period includes:
converting each cloud picture in the second time period into a sizeIs that
Figure QLYQS_8
Wherein w is the width of the cloud picture, h is the height of the cloud picture, and c is the number of channels of the cloud picture;
expanding each sequence element in the measured wind speed time sequence in the second time period into a size of
Figure QLYQS_9
The value of each matrix element in the wind speed matrix is equal to the actually measured wind speed value of the sequence element;
Expanding each sequence element in the measured wind direction time sequence in the second time period to a size of
Figure QLYQS_10
The values of each matrix element in the wind direction matrix are equal to the measured wind direction values of the sequence elements;
and combining the wind speed matrix, the wind direction matrix and the cloud picture matrix corresponding to the same time point to obtain a cloud picture matrix embedded with the wind direction and the wind speed, and forming a cloud picture time sequence by the cloud picture matrix embedded with the wind direction and the wind speed in the second time period.
8. A photovoltaic power plant power ultra-short term prediction device, comprising:
the data acquisition unit is used for acquiring weather forecast time sequences of the photovoltaic power station in a first time period, cloud picture time sequences in a second time period, irradiation intensity actual measurement time sequences and power actual measurement time sequences in the second time period and a third time period;
the power prediction unit is used for inputting the weather forecast time sequence, the cloud image time sequence, the irradiation intensity actual measurement time sequence and the power actual measurement time sequence into a trained power prediction model to obtain a power prediction time sequence in a first time period;
the cloud picture time sequence in the second time period is generated by utilizing the wind speed actual measurement time sequence, the wind direction actual measurement time sequence and the cloud picture in the second time period in advance;
The power prediction model is obtained by training a weather forecast time sequence in a fourth time period, a cloud image time sequence in a fifth time period, an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fifth time period and a sixth time period as training samples, and an irradiation intensity actual measurement time sequence and a power actual measurement time sequence in the fourth time period as sample labels;
the second time period is before the first time period, the second time period is different from the first time period by a preset first time interval, the third time period is before the second time period, the third time period is different from the first time period by a preset second time interval, and the lengths of the first time period, the second time period and the third time period are consistent;
the fifth time period is before the fourth time period, the fifth time period and the fourth time period differ by the first time interval, the sixth time period is before the fourth time period and the fifth time period, the sixth time period and the fourth time period differ by the second time interval, and the lengths of the fourth time period, the fifth time period and the sixth time period are consistent.
9. A photovoltaic power plant power ultra-short term prediction device, comprising: a memory and a processor;
the memory is used for storing programs;
the processor is configured to execute the program to implement the steps of the photovoltaic power station power ultra-short term prediction method according to any one of claims 1 to 7.
10. A computer readable storage medium, on which a computer program is stored, characterized in that the computer program, when being executed by a processor, implements the steps of the photovoltaic power plant power ultra-short term prediction method according to any one of claims 1-7.
CN202310417715.6A 2023-04-19 2023-04-19 Photovoltaic power station power ultra-short-term prediction method and device and related equipment Active CN116128170B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310417715.6A CN116128170B (en) 2023-04-19 2023-04-19 Photovoltaic power station power ultra-short-term prediction method and device and related equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310417715.6A CN116128170B (en) 2023-04-19 2023-04-19 Photovoltaic power station power ultra-short-term prediction method and device and related equipment

Publications (2)

Publication Number Publication Date
CN116128170A true CN116128170A (en) 2023-05-16
CN116128170B CN116128170B (en) 2023-06-23

Family

ID=86312189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310417715.6A Active CN116128170B (en) 2023-04-19 2023-04-19 Photovoltaic power station power ultra-short-term prediction method and device and related equipment

Country Status (1)

Country Link
CN (1) CN116128170B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116523145A (en) * 2023-06-29 2023-08-01 长江三峡集团实业发展(北京)有限公司 Photovoltaic power ultra-short-term prediction method and device, computer equipment and storage medium
CN117200971A (en) * 2023-09-11 2023-12-08 重庆千信新能源有限公司 New energy power data transmission method for photovoltaic module based on block chain

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107220723A (en) * 2017-04-20 2017-09-29 华北电力大学 A kind of predicting power of photovoltaic plant method
CN110059878A (en) * 2019-04-15 2019-07-26 中国计量大学 Based on CNN LSTM photovoltaic power generation power prediction model and its construction method
US20200041550A1 (en) * 2016-10-05 2020-02-06 Telecom Italia S.P.A. Method and system for estimating energy generation based on solar irradiance forecasting
CN111832800A (en) * 2020-05-28 2020-10-27 中国电力科学研究院有限公司 Photovoltaic power station power prediction method and device
US10996374B1 (en) * 2017-04-11 2021-05-04 DatalnfoCom USA, Inc. Short-term weather forecasting using artificial intelligence and hybrid data
CN113298303A (en) * 2021-05-19 2021-08-24 河海大学 Photovoltaic power prediction method for meteorological satellite cloud picture dynamic attention domain
CN114819257A (en) * 2022-03-09 2022-07-29 阳光智维科技有限公司 Irradiation calculation method, device and equipment
US20220373984A1 (en) * 2021-05-19 2022-11-24 Shandong University Hybrid photovoltaic power prediction method and system based on multi-source data fusion
CN115935809A (en) * 2022-11-25 2023-04-07 国网上海市电力公司 Photovoltaic power generation power interval prediction method based on cloud cover characteristic of foundation cloud cover

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200041550A1 (en) * 2016-10-05 2020-02-06 Telecom Italia S.P.A. Method and system for estimating energy generation based on solar irradiance forecasting
US10996374B1 (en) * 2017-04-11 2021-05-04 DatalnfoCom USA, Inc. Short-term weather forecasting using artificial intelligence and hybrid data
CN107220723A (en) * 2017-04-20 2017-09-29 华北电力大学 A kind of predicting power of photovoltaic plant method
CN110059878A (en) * 2019-04-15 2019-07-26 中国计量大学 Based on CNN LSTM photovoltaic power generation power prediction model and its construction method
CN111832800A (en) * 2020-05-28 2020-10-27 中国电力科学研究院有限公司 Photovoltaic power station power prediction method and device
CN113298303A (en) * 2021-05-19 2021-08-24 河海大学 Photovoltaic power prediction method for meteorological satellite cloud picture dynamic attention domain
US20220373984A1 (en) * 2021-05-19 2022-11-24 Shandong University Hybrid photovoltaic power prediction method and system based on multi-source data fusion
CN114819257A (en) * 2022-03-09 2022-07-29 阳光智维科技有限公司 Irradiation calculation method, device and equipment
CN115935809A (en) * 2022-11-25 2023-04-07 国网上海市电力公司 Photovoltaic power generation power interval prediction method based on cloud cover characteristic of foundation cloud cover

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘文杰 等: "基于时域卷积网络精细化光伏发电功率预测", 《供用电》, vol. 37, no. 10, pages 76 - 82 *
李昊: "基于时间和空间特征挖掘的风电功率超短期预测", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑(月刊)》, no. 02, pages 042 - 1896 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116523145A (en) * 2023-06-29 2023-08-01 长江三峡集团实业发展(北京)有限公司 Photovoltaic power ultra-short-term prediction method and device, computer equipment and storage medium
CN116523145B (en) * 2023-06-29 2023-10-20 长江三峡集团实业发展(北京)有限公司 Photovoltaic power ultra-short-term prediction method and device, computer equipment and storage medium
CN117200971A (en) * 2023-09-11 2023-12-08 重庆千信新能源有限公司 New energy power data transmission method for photovoltaic module based on block chain
CN117200971B (en) * 2023-09-11 2024-03-26 重庆千信新能源有限公司 New energy power data transmission method for photovoltaic module based on block chain

Also Published As

Publication number Publication date
CN116128170B (en) 2023-06-23

Similar Documents

Publication Publication Date Title
CN116128170B (en) Photovoltaic power station power ultra-short-term prediction method and device and related equipment
Harrou et al. Forecasting of photovoltaic solar power production using LSTM approach
Ghaderi et al. Deep forecast: Deep learning-based spatio-temporal forecasting
De Giorgi et al. Error analysis of hybrid photovoltaic power forecasting models: A case study of mediterranean climate
Jiao et al. A graph neural network based deep learning predictor for spatio-temporal group solar irradiance forecasting
CN110909919A (en) Photovoltaic power prediction method of depth neural network model with attention mechanism fused
Korkmaz et al. A novel short-term photovoltaic power forecasting approach based on deep convolutional neural network
Chen et al. Short-term load forecasting based on deep learning for end-user transformer subject to volatile electric heating loads
CN113988477A (en) Photovoltaic power short-term prediction method and device based on machine learning and storage medium
CN116865261B (en) Power load prediction method and system based on twin network
CN117216526B (en) Photovoltaic output prediction method and system based on artificial intelligence
Hussain et al. A hybrid deep learning-based network for photovoltaic power forecasting
CN116014722A (en) Sub-solar photovoltaic power generation prediction method and system based on seasonal decomposition and convolution network
CN116109018B (en) Photovoltaic power station power prediction method, device and related equipment
CN117036101A (en) Method and system for predicting resident demand response of virtual power plant based on federal learning
CN116612393A (en) Solar radiation prediction method, system, electronic equipment and storage medium
CN116362915A (en) Method and device for supplementing and aligning meteorological data of photovoltaic power station and related equipment
CN116402194A (en) Multi-time scale load prediction method based on hybrid neural network
CN112257938B (en) Photovoltaic power generation power prediction method and device
CN114971007A (en) Photovoltaic power generation prediction method and system based on multi-scale graph convolutional neural network
CN115241872A (en) Multi-mode photovoltaic power generation output power prediction method based on pure attention mechanism
CN113962432A (en) Wind power prediction method and system integrating three-dimensional convolution and light-weight convolution threshold unit
Wan et al. Turbine location wind speed forecast using convolutional neural network
CN111932007A (en) Power prediction method and device for photovoltaic power station and storage medium
Peng et al. A Hybrid Model for Solar Radiation Forecasting towards Energy Efficient Buildings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230711

Address after: 518000 1711, Block B, Jingang Center, Jingang Building, Heye Community, Xixiang Street, Bao'an District, Shenzhen, Guangdong

Patentee after: Shenzhen Fenghe Digital Intelligence Technology Co.,Ltd.

Patentee after: Ningbo Dongli Digital Energy Technology Co.,Ltd.

Patentee after: Ningbo Oriental University of Technology (temporary name)

Address before: 518000 1711, Block B, Jingang Center, Jingang Building, Heye Community, Xixiang Street, Bao'an District, Shenzhen, Guangdong

Patentee before: Shenzhen Fenghe Digital Intelligence Technology Co.,Ltd.

TR01 Transfer of patent right