CN116071043A - Fine management and control method for distribution network maintenance plan based on work order data - Google Patents

Fine management and control method for distribution network maintenance plan based on work order data Download PDF

Info

Publication number
CN116071043A
CN116071043A CN202211711808.1A CN202211711808A CN116071043A CN 116071043 A CN116071043 A CN 116071043A CN 202211711808 A CN202211711808 A CN 202211711808A CN 116071043 A CN116071043 A CN 116071043A
Authority
CN
China
Prior art keywords
maintenance
data
equipment
work order
distribution network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211711808.1A
Other languages
Chinese (zh)
Inventor
亓富军
庞伟超
赵福强
于贺贺
孙筱轩
刘聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Linyi Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linyi Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Linyi Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN202211711808.1A priority Critical patent/CN116071043A/en
Publication of CN116071043A publication Critical patent/CN116071043A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a distribution network maintenance plan refined management and control method based on worksheet data, which specifically comprises the following steps: receiving an overhaul application form, extracting the content of the overhaul application form, acquiring corresponding work order data, demarcating a network distribution area for maintenance based on the work order data, and calling topology data of the network distribution area for maintenance; based on the external interface, acquiring basic data corresponding to the distribution network area for maintenance, and determining an overhaul flow and equipment to be overhauled of each overhaul link in the overhaul flow based on the work order data, the basic data of the distribution network area for maintenance and the topology data; and obtaining maintenance constraint conditions, and carrying out maintenance planning according to the maintenance constraint conditions, the maintenance flow and equipment to be maintained in each maintenance link in the maintenance flow. The invention can combine the work order data with the basic data of the distribution network, and takes the work order data as a data source for the maintenance planning, thereby realizing the intelligent and automatic planning of the maintenance planning.

Description

Fine management and control method for distribution network maintenance plan based on work order data
Technical Field
The invention relates to the technical field of distribution network maintenance, in particular to a distribution network maintenance plan refined management and control method based on work order data.
Background
With the increasing of the power grid scale, the operation, maintenance and overhaul work of the power grid equipment is increased, the power grid is not operated in a full wiring mode most of the time, and the shutdown and overhaul of important equipment are likely to cause the problems of limited power supply output, reduced power supply capacity and reduced power supply reliability of the power grid, and the running risk of the power grid is increased. And if the "N-1" condition of the critical equipment occurs again during maintenance, it is highly likely to cause load loss and even cause large-area power failure. In order to avoid the problems, the equipment maintenance plan of the power grid needs to be compiled in advance. At present, maintenance planning is gradually becoming a core business process of a power grid company, but in the current maintenance planning management process, most of related work of maintenance planning is completed by manual work of staff, and the maintenance planning efficiency is too low. And the maintenance plan needs to consider the equipment state in the whole power grid, so that the workload is very large, and if the statistical analysis is still carried out by means of manpower, the speed is low and the error is easy to occur when the maintenance plan is constructed.
Disclosure of Invention
The invention aims to overcome the defects in the prior art, and provides a method for finely managing and controlling a distribution network maintenance plan based on work order data, which realizes the management of equipment to be overhauled by combining the work order data with basic data in a distribution network, and performs specific maintenance plan arrangement based on the equipment to be overhauled and maintenance constraint conditions, so that the problems of low efficiency and easy error in the existing maintenance plan arrangement process can be solved, the intelligent and finely managing and controlling of the maintenance plan can be realized, and the safety and stability of the operation of a power grid are improved.
The invention aims at realizing the following technical scheme:
a method for finely managing and controlling a distribution network maintenance plan based on work order data comprises the following steps:
receiving an overhaul application form, extracting the content of the overhaul application form, acquiring corresponding work order data, demarcating a network distribution area for maintenance based on the work order data, and calling topology data of the network distribution area for maintenance;
based on the external interface, acquiring basic data corresponding to the distribution network area for maintenance, and determining an overhaul flow and equipment to be overhauled of each overhaul link in the overhaul flow based on the work order data, the basic data of the distribution network area for maintenance and the topology data;
and obtaining maintenance constraint conditions, and carrying out maintenance planning according to the maintenance constraint conditions, the maintenance flow and equipment to be maintained in each maintenance link in the maintenance flow.
Further, after the basic data corresponding to the distribution network area for maintenance is obtained, the basic data are classified according to the external interface types, the corresponding basic data are respectively subjected to data verification according to the classification result, the basic data passing the data verification are subjected to format conversion, and various basic data are integrated into a uniform data format.
Furthermore, in the process of converting the format of the basic data passing through the data verification, various basic data of the same equipment are subjected to matching mapping based on the equipment name, and various basic data belonging to the same equipment are integrated according to the matching mapping result.
Further, the basic data comprises equipment account data, power grid equipment fixed inspection information, an annual calendar history inspection plan, a monthly calendar history inspection plan, equipment information to be eliminated and familial defect equipment information.
Furthermore, after the maintenance schedule is arranged according to maintenance constraint conditions, maintenance flow and equipment to be maintained in each maintenance link in the maintenance flow, the arranged maintenance schedule is also adjusted according to the implementation result of the maintenance schedule.
Furthermore, after the overhaul plan is arranged according to the overhaul constraint conditions, the overhaul flow and the overhaul equipment to be overhauled of each overhaul link in the overhaul flow, annual overhaul plan, monthly overhaul plan and weekly overhaul plan are also arranged based on the arranged overhaul plan.
Further, after determining an overhaul flow and equipment to be overhauled of each overhaul link in the overhaul flow based on the work order data and the basic data and the topology data of the distribution network area for maintenance, the overhaul ticket binding is further performed based on the work order data and the topology data, and the specific process of the overhaul ticket binding based on the work order data and the topology data is as follows: the method comprises the steps of obtaining position information of each equipment to be overhauled based on topology data of a distribution network area for maintenance, extracting an overhauling list corresponding to each equipment to be overhauled, determining the maintenance type of each equipment to be overhauled according to the overhauling list, screening the equipment to be overhauled according to the position information and the maintenance type, and binding overhauling tickets of the screened equipment to be overhauled which is located in the same line and has the same maintenance type.
Further, the overhaul constraint condition comprises a simultaneous overhaul constraint, a mutually exclusive overhaul constraint and a construction period constraint.
The beneficial effects of the invention are as follows:
the work order data corresponding to the overhaul application form can be combined with the basic data of the distribution network, and the work order data is used as a data source for overhaul plan programming, so that the intelligent and automatic programming of the overhaul plan is realized. And when determining specific maintenance plans, the maintenance planning is carried out according to specific maintenance constraint conditions, and the maintenance planning requirements under different conditions can be adjusted, so that the maintenance planning system is applicable to continuously-changing and increasingly-complex distribution network structures. Before the maintenance schedule is woven, the maintenance ticket is bound, so that the workload of the maintenance schedule arrangement can be reduced, and the efficiency is further improved.
Drawings
FIG. 1 is a schematic flow chart of the present invention.
Detailed Description
The invention is further described below with reference to the drawings and examples.
Examples:
a method for finely managing and controlling a distribution network maintenance plan based on work order data is shown in fig. 1, and comprises the following steps:
receiving an overhaul application form, extracting the content of the overhaul application form, acquiring corresponding work order data, demarcating a network distribution area for maintenance based on the work order data, and calling topology data of the network distribution area for maintenance;
based on the external interface, acquiring basic data corresponding to the distribution network area for maintenance, and determining an overhaul flow and equipment to be overhauled of each overhaul link in the overhaul flow based on the work order data, the basic data of the distribution network area for maintenance and the topology data;
and obtaining maintenance constraint conditions, and carrying out maintenance planning according to the maintenance constraint conditions, the maintenance flow and equipment to be maintained in each maintenance link in the maintenance flow.
The maintenance application form comprises a distribution network area, maintenance requirements and maintenance purposes, when maintenance planning is carried out, a specific maintenance flow can be determined based on the maintenance requirements and the maintenance purposes, and then the maintenance links of the maintenance flow are divided according to time sections.
The content extraction can be achieved by means of text recognition or the like.
When the maintenance constraint conditions are obtained and maintenance planning is carried out according to the maintenance constraint conditions, the maintenance flow and equipment to be maintained in each maintenance link in the maintenance flow, the maintenance planning is carried out for the first time on the basis of the maintenance scheduling regulation and the power grid safe operation requirement, the maintenance planning is carried out for the first time on the basis of the maintenance constraint conditions, and the maintenance constraint conditions which are carried out for the second time are obtained according to the specific operation condition of the power grid, such as equipment constraint, construction period constraint and the like, so that the planning efficiency of the maintenance planning is further optimized.
After the basic data corresponding to the distribution network area for maintenance is obtained, the basic data are classified according to the external interface types, the corresponding basic data are respectively subjected to data verification according to the classification result, the basic data passing the data verification are subjected to format conversion, and various basic data are integrated into a unified data format.
The external interface comprises a power generation plan supporting system, a dispatching automation system, an overhaul ticket management system, a dispatching information management system and the like.
In the process of converting the format of the basic data passing through the data verification, various basic data of the same equipment are subjected to matching mapping based on the equipment name, and various basic data belonging to the same equipment are integrated according to the matching mapping result.
Because the data of different types generated by the same equipment can be acquired through different information acquisition systems, the data types acquired by the different information acquisition systems are inconsistent, and the efficiency of subsequent overhauling analysis on the equipment can be improved after the different data of the same equipment are integrated.
The basic data comprise equipment account data, power grid equipment fixed inspection information, an annual calendar history inspection plan, a monthly calendar history inspection plan, equipment information to be eliminated and familial defect equipment information.
Specifically, the equipment account data, the power grid equipment fixed inspection information, the calendar history inspection plan and the calendar history inspection plan data can be obtained from a dispatching information management system (OMS), and the equipment information to be eliminated and the familial defect equipment information can be obtained from a dispatching automation system.
And after the overhaul plan is arranged according to the overhaul constraint conditions, the overhaul flow and the overhaul equipment to be overhauled of each overhaul link in the overhaul flow, the arranged overhaul plan is adjusted according to the implementation result of the overhaul plan.
The maintenance plan can be divided in time, specific equipment to be maintained and corresponding maintenance contents to be completed are arranged every day, after the maintenance plan of the current day is completed, the operation data of the equipment to be maintained are called, whether the corresponding equipment operation requirement is met or not is judged based on the operation data of the equipment to be maintained, if the equipment operation requirement still cannot be met after the maintenance is completed, the equipment to be maintained which does not meet the equipment operation requirement is used as the equipment to be maintained which is not maintained, the position information and the maintenance contents of the equipment to be maintained are matched with other maintenance links which are not carried out in the maintenance plan, and the equipment to be maintained which does not meet the equipment operation requirement is added into the maintenance links which are obtained by matching and are closest to the position information and the maintenance contents according to the matching result.
And after the overhaul plan is arranged according to the overhaul constraint conditions, the overhaul flow and the overhaul equipment to be overhauled of each overhaul link in the overhaul flow, annual overhaul plan, monthly overhaul plan and weekly overhaul plan are also arranged based on the arranged overhaul plan.
When annual maintenance planning is carried out, firstly, screening out temporary equipment to be inspected based on the historical maintenance time in the equipment ledger, adding the temporary equipment to be inspected into an equipment pool to be inspected, and automatically arranging the temporary equipment to be inspected in combination with constraint conditions such as electricity conservation, holidays, personnel bearing capacity and the like to generate maintenance month time of each piece of equipment to be inspected in the equipment pool to be inspected, thereby forming an annual plan initial draft, and recording planning contents in the planned maintenance plan, thereby acquiring a specific annual maintenance plan.
And after constraint conditions such as electricity protection, personnel bearing capacity and the like are considered, the annual maintenance plan can be decomposed into a monthly maintenance plan, and the content of the monthly maintenance plan can be adjusted according to specific equipment maintenance conditions.
Similarly, the monthly maintenance schedule can be decomposed into a Zhou Jianxiu schedule, and the specific risk level and the grading cause thereof in the weekly maintenance schedule, management and control measures corresponding to the risks and the like can be adjusted and set based on specific requirements.
After all the maintenance plans are compiled, the visual display is also carried out on the compiled maintenance plans, annual maintenance plans, monthly maintenance plans and weekly maintenance plans.
When the personnel bearing capacity constraint condition is considered, the personnel bearing capacity can be judged according to factors such as task work order workload, work simple substance quantity evaluation, personal labels and the like, wherein the personal labels comprise personnel age, health level, professional rating and equipment health degree. And the personnel bearing capacity is also used as a constraint condition, so that the rationality of the overhaul plan is optimized, and the optimal personnel configuration arrangement of overhaul work is ensured.
After the maintenance flow and the equipment to be overhauled of each maintenance link in the maintenance flow are determined based on the work order data and the basic data and the topology data of the distribution network area for maintenance, the maintenance ticket binding is further carried out based on the work order data and the topology data, and the specific process of the maintenance ticket binding based on the work order data and the topology data is as follows: the method comprises the steps of obtaining position information of each equipment to be overhauled based on topology data of a distribution network area for maintenance, extracting an overhauling list corresponding to each equipment to be overhauled, determining the maintenance type of each equipment to be overhauled according to the overhauling list, screening the equipment to be overhauled according to the position information and the maintenance type, and binding overhauling tickets of the screened equipment to be overhauled which is located in the same line and has the same maintenance type.
For the equipment to be overhauled which is in a unified line and has the same maintenance type, the overhauling work can be arranged on the same day, after the overhauling ticket is bound, when the overhauling plan is arranged, the equipment to be overhauled which is bound by the overhauling ticket can be used as equipment, so that the workload of the overhauling plan arrangement is effectively reduced.
The overhaul constraint conditions comprise simultaneous overhaul constraint, mutually exclusive overhaul constraint and construction period constraint.
The simultaneous overhaul constraint is specifically as follows: equipment in the same substation which causes power failure in the same area should be arranged to be overhauled in the same period.
The mutually exclusive overhaul constraint comprises the following rules:
rule 1: the tie lines between substations cannot be serviced at the same time, i.e. in case of multiple tie lines, the two tie lines cannot be serviced at the same time.
Rule 2: two or more connecting lines which are mutually standby power supplies of a certain transformer substation cannot be simultaneously arranged for maintenance, namely, in the case of a plurality of connecting lines, the two connecting lines cannot be simultaneously arranged for maintenance.
Rule 3: the buses and the main transformer which are mutually standby in the transformer substation cannot be simultaneously arranged for maintenance.
Rule 4: two or more tie lines cannot be arranged for maintenance at the same time across the regional tie lines, i.e. in the case of multiple tie lines, the two tie lines cannot be arranged for maintenance at the same time.
Rule 5: and the season constraint, namely, when the hydropower is greatly started, related equipment maintenance is not arranged, so that the influence on the hydropower output is avoided. During irrigation in spring or winter, related power transmission, transformation and distribution facilities are not arranged for maintenance, so that spring and winter irrigation are prevented from being influenced.
Rule 6: and safety constraint, namely performing system evaluation after power failure is simulated on equipment to be overhauled, and providing modification comments on an overhauling scheme which causes bus voltage out-of-limit, line overload and transformer overload, and staggering overhauling time or overhauling interval.
Rule 7: section constraint, namely based on accurate description of a network topological structure, is combined with power transmission section safety check, and an overhaul scheme containing conditions such as section out-of-limit, load overload and the like is accurately identified, and is modified and adjusted.
The construction period constraint comprises the following rules:
rule 1: and (3) the important electricity-keeping event needs to be repaired in advance, and the repair operation is stopped during electricity keeping.
Rule 2: considering bad weather effects, the service operation is stopped during bad weather.
Rule 3: and analyzing the historical power generation curve, and avoiding maintenance operation in the power utilization peak period.
Rule 4: and the bearing capacity of the overhaul teams is considered, so that overhaul work is reasonably arranged.
The above-described embodiment is only a preferred embodiment of the present invention, and is not limited in any way, and other variations and modifications may be made without departing from the technical aspects set forth in the claims.

Claims (8)

1. A method for finely managing and controlling a distribution network maintenance plan based on work order data is characterized by comprising the following steps:
receiving an overhaul application form, extracting the content of the overhaul application form, acquiring corresponding work order data, demarcating a network distribution area for maintenance based on the work order data, and calling topology data of the network distribution area for maintenance;
based on the external interface, acquiring basic data corresponding to the distribution network area for maintenance, and determining an overhaul flow and equipment to be overhauled of each overhaul link in the overhaul flow based on the work order data, the basic data of the distribution network area for maintenance and the topology data;
and obtaining maintenance constraint conditions, and carrying out maintenance planning according to the maintenance constraint conditions, the maintenance flow and equipment to be maintained in each maintenance link in the maintenance flow.
2. The method for finely managing and controlling the distribution network maintenance plan based on the work order data according to claim 1 is characterized in that after the basic data corresponding to the distribution network area for maintenance is obtained, the basic data are classified according to the types of external interfaces, the corresponding basic data are respectively subjected to data verification according to classification results, the basic data passing the data verification are subjected to format conversion, and various basic data are integrated into a unified data format.
3. The method for finely managing and controlling the distribution network maintenance plan based on the work order data according to claim 2, wherein in the process of converting the format of the basic data passing the data verification, various basic data of the same equipment are subjected to matching mapping based on the equipment name, and various basic data belonging to the same equipment are integrated according to the matching mapping result.
4. The method for finely controlling the maintenance schedule of the distribution network based on the work order data according to claim 2, wherein the basic data comprises equipment account data, power grid equipment fixed inspection information, an annual calendar history maintenance schedule, a monthly calendar history maintenance schedule, equipment information to be eliminated and familial defect equipment information.
5. The method for finely managing and controlling the maintenance schedule of the distribution network based on the work order data according to claim 4, wherein after the maintenance schedule is arranged according to maintenance constraint conditions, maintenance procedures and equipment to be maintained in each maintenance link in the maintenance procedures, the arranged maintenance schedule is adjusted according to implementation results of the maintenance schedule.
6. The method for finely managing and controlling the maintenance schedule of the distribution network based on the work order data according to claim 1, wherein after the maintenance schedule is organized according to maintenance constraint conditions, maintenance procedures and equipment to be maintained in each maintenance link in the maintenance procedures, annual maintenance schedule, monthly maintenance schedule and weekly maintenance schedule are also organized based on the organized maintenance schedule.
7. The method for finely managing and controlling the maintenance plan of the distribution network based on the work order data according to claim 1, wherein after the maintenance flow and the equipment to be overhauled of each maintenance link in the maintenance flow are determined based on the work order data and the basic data and the topology data of the distribution network area for maintenance, the maintenance ticket binding is further performed based on the work order data and the topology data, and the specific process of the maintenance ticket binding based on the work order data and the topology data is as follows: the method comprises the steps of obtaining position information of each equipment to be overhauled based on topology data of a distribution network area for maintenance, extracting an overhauling list corresponding to each equipment to be overhauled, determining the maintenance type of each equipment to be overhauled according to the overhauling list, screening the equipment to be overhauled according to the position information and the maintenance type, and binding overhauling tickets of the screened equipment to be overhauled which is located in the same line and has the same maintenance type.
8. The method for finely controlling the maintenance plan of the distribution network based on the work order data according to claim 1, wherein the maintenance constraint conditions comprise simultaneous maintenance constraint, mutually exclusive maintenance constraint and construction period constraint.
CN202211711808.1A 2022-12-29 2022-12-29 Fine management and control method for distribution network maintenance plan based on work order data Pending CN116071043A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211711808.1A CN116071043A (en) 2022-12-29 2022-12-29 Fine management and control method for distribution network maintenance plan based on work order data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211711808.1A CN116071043A (en) 2022-12-29 2022-12-29 Fine management and control method for distribution network maintenance plan based on work order data

Publications (1)

Publication Number Publication Date
CN116071043A true CN116071043A (en) 2023-05-05

Family

ID=86181467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211711808.1A Pending CN116071043A (en) 2022-12-29 2022-12-29 Fine management and control method for distribution network maintenance plan based on work order data

Country Status (1)

Country Link
CN (1) CN116071043A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117094539A (en) * 2023-10-20 2023-11-21 国网浙江省电力有限公司杭州供电公司 Power-preserving intelligent industrial personal management control method, system, equipment and storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117094539A (en) * 2023-10-20 2023-11-21 国网浙江省电力有限公司杭州供电公司 Power-preserving intelligent industrial personal management control method, system, equipment and storage medium
CN117094539B (en) * 2023-10-20 2024-01-16 国网浙江省电力有限公司杭州供电公司 Power-preserving intelligent industrial personal management control method, system, equipment and storage medium

Similar Documents

Publication Publication Date Title
Varela et al. The IGREENGrid project: increasing hosting capacity in distribution grids
CN111682534B (en) Method for analyzing batch transfer scheme of feeder lines of power distribution network
CN103578039B (en) A kind of power networks risk prewarning analysis system
CN112104083B (en) Power grid production command system based on situation awareness
CN112132443B (en) Reliability distribution network power supply management and control system
CN107767067A (en) Power distribution network management and running evaluation index system construction method based on big data
CN110298056A (en) A kind of power distribution network contact efficiency assessment method
CN109472459B (en) Power grid operation task optimization method considering change overhaul risk and waiting time
CN113469486A (en) Line negative loss and high loss analysis method
CN116071043A (en) Fine management and control method for distribution network maintenance plan based on work order data
CN111667143A (en) Method for realizing fusion of real-time monitoring data and service management data in power grid dispatching
CN112465167A (en) Intelligent decision management system and method for regional power grid equipment maintenance
CN110826916A (en) Incremental power distribution network regulation and control and display system
CN116070867A (en) Intelligent auxiliary decision algorithm for maintenance plan
CN111105218A (en) Power distribution network operation monitoring method based on holographic image technology
CN114529166A (en) Power distribution network operation safety risk early warning method and system
CN116703081A (en) Comprehensive energy operation management cloud platform
CN111062191A (en) Operation ticket generation method and device for power grid
CN115829404A (en) Distribution network project optimal selection ordering system based on full life cycle cost benefit model
CN110796567B (en) Production early report application framework based on regulation and control cloud
CN113962516A (en) Digital application system based on power supply service command system and result evaluation method
CN111915048A (en) Novel power failure management method based on intelligent analysis decision theory technology
CN110942161B (en) Method for improving power supply reliability based on business middle station
CN113902317A (en) Power distribution network line operation risk analysis system and method
CN116503043A (en) Intelligent arrangement system for distribution network maintenance plan

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination