CN116052084A - Potential safety hazard management and control and investigation method, device, equipment and medium - Google Patents

Potential safety hazard management and control and investigation method, device, equipment and medium Download PDF

Info

Publication number
CN116052084A
CN116052084A CN202310095576.XA CN202310095576A CN116052084A CN 116052084 A CN116052084 A CN 116052084A CN 202310095576 A CN202310095576 A CN 202310095576A CN 116052084 A CN116052084 A CN 116052084A
Authority
CN
China
Prior art keywords
hidden danger
potential safety
construction
construction site
report
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310095576.XA
Other languages
Chinese (zh)
Inventor
王安生
任帅杰
侯文强
何荔菁
原晨华
孙正国
李沛
问海红
杨颖�
张旭辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Zhongwei Information Engineering Co ltd
Original Assignee
Shanxi Zhongwei Information Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Zhongwei Information Engineering Co ltd filed Critical Shanxi Zhongwei Information Engineering Co ltd
Priority to CN202310095576.XA priority Critical patent/CN116052084A/en
Publication of CN116052084A publication Critical patent/CN116052084A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06VIMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
    • G06V20/00Scenes; Scene-specific elements
    • G06V20/50Context or environment of the image
    • G06V20/52Surveillance or monitoring of activities, e.g. for recognising suspicious objects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06VIMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
    • G06V10/00Arrangements for image or video recognition or understanding
    • G06V10/70Arrangements for image or video recognition or understanding using pattern recognition or machine learning
    • G06V10/764Arrangements for image or video recognition or understanding using pattern recognition or machine learning using classification, e.g. of video objects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06VIMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
    • G06V20/00Scenes; Scene-specific elements
    • G06V20/40Scenes; Scene-specific elements in video content
    • G06V20/41Higher-level, semantic clustering, classification or understanding of video scenes, e.g. detection, labelling or Markovian modelling of sport events or news items
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • G08B21/182Level alarms, e.g. alarms responsive to variables exceeding a threshold
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Multimedia (AREA)
  • Software Systems (AREA)
  • Artificial Intelligence (AREA)
  • Health & Medical Sciences (AREA)
  • Computational Linguistics (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Computing Systems (AREA)
  • Databases & Information Systems (AREA)
  • Evolutionary Computation (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Alarm Systems (AREA)

Abstract

The application relates to a potential safety hazard management and control and investigation method, device, equipment and medium, which are applied to the technical field of construction safety, and the method comprises the following steps: acquiring monitoring information of a construction site; judging whether potential safety hazards exist on the construction site or not based on the monitoring information; if the potential safety hazard exists, analyzing the potential safety hazard based on the monitoring information to obtain an analysis result; generating a rectification report based on the analysis result; and reminding based on the correction report. The method has the effects of realizing real-time monitoring of the construction site and checking hidden danger.

Description

Potential safety hazard management and control and investigation method, device, equipment and medium
Technical Field
The application relates to the technical field of construction safety, in particular to a potential safety hazard management, control and investigation method, device, equipment and medium.
Background
With the continuous development of society, risks in all kinds are continuously appeared, especially in construction sites, in order to complete construction progress, hidden dangers with certain sizes are continuously appeared, and the hidden dangers can not only affect construction quality, but also seriously endanger life safety of people.
In a construction site, hidden danger investigation is usually carried out on the construction site every day by personnel of a safety department, but in the investigation process, because personnel investigation is not in time or the personnel investigation is not in place, a plurality of hidden dangers remain, and the construction safety is affected, so that a method for managing, controlling and investigating the hidden dangers is needed.
Disclosure of Invention
In order to realize real-time monitoring of a construction site and investigation of hidden dangers, the application provides a method, a device, equipment and a medium for controlling and investigation of potential safety hazards.
In a first aspect, the present application provides a method for controlling and checking potential safety hazards, which adopts the following technical scheme:
a potential safety hazard management and control and investigation method comprises the following steps:
acquiring monitoring information of a construction site;
judging whether potential safety hazards exist on the construction site or not based on the monitoring information;
if the potential safety hazard exists, analyzing the potential safety hazard based on the monitoring information to obtain an analysis result;
generating a rectification report based on the analysis result;
and reminding based on the correction report.
Through adopting above-mentioned technical scheme, when constructing at the job site, the hidden danger of job site is managed and controlled and investigation through the monitoring information of job site, can be through monitoring information to being the job site and carry out full coverage simultaneously, reduce the hidden danger position in the job site and do not carry out the possibility of investigation, obtain the correction report through analysis result simultaneously, can be after the hidden danger is found, formulate corresponding correction measure to corresponding hidden danger, solve the hidden danger fast, guarantee job site steady operation, on the other hand, tender consolidate reduces staff's work load, save human resources.
Optionally, the analyzing the potential safety hazard based on the monitoring information includes:
acquiring first hidden danger information based on the monitoring information;
determining a hidden danger category based on the first hidden danger information;
determining a hidden danger level based on the hidden danger category;
and taking the hidden danger grade as an analysis result.
Optionally, the determining the hidden danger level based on the hidden danger category includes:
acquiring a construction specification of the construction site;
establishing a hidden danger database based on the construction specification;
acquiring all second hidden danger information sets in the hidden danger category based on the hidden danger database;
determining hidden danger results generated by the first hidden danger information based on the second hidden danger information set;
and determining the hidden danger grade based on the hidden danger result.
Optionally, after the determining the hidden danger level based on the hidden danger category, the method further includes:
and determining the hidden danger area based on the first hidden danger information, wherein the hidden danger area comprises an area where the first hidden danger information exists in the construction site.
Judging whether the hidden danger area belongs to a preset key hidden danger area or not;
if the hidden danger area belongs to a preset key hidden danger area, adjusting the hidden danger grade based on the hidden danger category to obtain an adjustment result;
and taking the adjustment result as a new analysis result.
Optionally, the generating the rectification report based on the analysis result includes:
acquiring operation parameters of the construction site;
establishing a digital twin model based on the operating parameters;
acquiring the operation condition of the construction site based on the analysis result;
inputting the running condition into the digital twin model, and performing simulation operation to obtain an operation result;
setting a modification scheme based on the operation result;
determining a modification period based on the modification scheme;
and generating a modification report based on the modification scheme and the modification period.
Optionally, after the generating of the rectification report based on the analysis result, the method includes:
determining a corresponding reforming department based on the reforming report;
obtaining an organization framework of the construction unit;
determining related responsible persons based on the rectification department and the organization architecture, wherein the related responsible persons comprise department managers, department books and department authorities;
and sending the correction report to the mobile terminal of the relevant responsible person so as to remind the relevant responsible person.
Optionally, the reminding based on the rectification report includes:
a plurality of correction nodes are formulated based on the correction period;
corresponding reminding strategies are formulated based on the plurality of correction nodes;
and reminding based on the reminding strategy.
In a second aspect, the present application provides a potential safety hazard management and control and investigation device, which adopts the following technical scheme:
the potential safety hazard management, control and investigation device comprises an acquisition module, a control module and a control module, wherein the acquisition module is used for acquiring monitoring information of a construction site;
the judging module is used for judging whether potential safety hazards exist in the construction site or not based on the monitoring information; if the potential safety hazard exists, analyzing the potential safety hazard based on the monitoring information to obtain an analysis result;
the generation module is used for generating a rectification report based on the analysis result;
and the reminding module is used for reminding based on the correction report.
Through adopting above-mentioned technical scheme, when constructing at the job site, the hidden danger of job site is managed and controlled and investigation through the monitoring information of job site, can be through monitoring information to being the job site and carry out full coverage simultaneously, reduce the hidden danger position in the job site and do not carry out the possibility of investigation, obtain the correction report through analysis result simultaneously, can be after the hidden danger is found, formulate corresponding correction measure to corresponding hidden danger, solve the hidden danger fast, guarantee job site steady operation, on the other hand, tender consolidate reduces staff's work load, save human resources.
In a third aspect, the present application provides an intelligent terminal or an electronic device, which adopts the following technical scheme:
an electronic device comprising a processor coupled with a memory;
the memory stores a computer program that can be loaded by a processor and execute the method for controlling and checking potential safety hazards according to any one of the first aspects.
In a fourth aspect, the present application provides a computer readable storage medium, which adopts the following technical scheme:
a computer readable storage medium storing a computer program loadable by a processor and performing the method of controlling and troubleshooting the potential safety hazard of any of the first aspects.
Drawings
Fig. 1 is a schematic flow chart of a method for controlling and checking potential safety hazards according to an embodiment of the present application.
Fig. 2 is a structural block diagram of a device for controlling and checking potential safety hazards provided in an embodiment of the present application.
Fig. 3 is a block diagram of an electronic device according to an embodiment of the present application.
Description of the embodiments
The present application is described in further detail below with reference to the accompanying drawings.
The embodiment of the application provides a potential safety hazard management and investigation method, which can be executed by electronic equipment, wherein the electronic equipment can be a server or terminal equipment, and the server can be an independent physical server, a server cluster or a distributed system formed by a plurality of physical weapons or a cloud server for providing cloud computing service. The terminal device may be, but is not limited to, a smart phone, a tablet computer, a desktop computer, etc.
As shown in fig. 1, a method for controlling and checking potential safety hazards is described as follows (steps S101 to S105):
step S101, monitoring information of a construction site is obtained.
In this embodiment, at every job site, can all set up the camera, monitor the job site through the camera, especially can prevent through video monitoring that construction material is stolen in the work progress, can also inquire the construction progress through monitoring information simultaneously.
The monitoring information comprises a monitoring video, and in the process of checking hidden danger of the construction site, the camera can be used for monitoring and fully covering the construction site, so that each area of the construction site can be inquired through the monitoring video.
Step S102, judging whether the potential safety hazard exists in the construction site based on the monitoring information, and admitting the step S103 if the potential safety hazard exists.
In this embodiment, when it is required to determine whether a safety hazard exists in a construction site based on monitoring information, firstly, the monitoring video is divided into a plurality of monitoring segments based on the monitoring video, for example, the video time of the monitoring video is one minute, the capturing can be performed at ten seconds, twenty seconds, thirty seconds, forty seconds, fifty seconds and one minute, the monitoring video is divided into six monitoring segments, one or more feature images are captured on each monitoring segment, and the determination of whether the safety hazard exists in the construction site is performed through one or more feature images.
As an optional implementation manner of this embodiment, feature extraction is performed on one or more feature images through an image recognition model, so that whether potential safety hazards exist or not is determined by using feature information, for example, wire private pull disorder, fire protection articles are not prepared when personnel enter a construction site without safety protection articles or fire operation, and the like, where the image recognition model is a deep neural network for image recognition, and the neural network may be, but is not limited to, a convolutional neural network.
When the related characteristic information exists, the potential safety hazard of the construction site can be judged, and step S103 is needed to be carried out at the moment;
when the related characteristic information does not exist, the fact that the potential safety hazard does not exist in the construction site can be judged, and real-time monitoring is needed to be conducted on the construction site so that the potential safety hazard can be timely processed.
And step S103, analyzing the potential safety hazard based on the monitoring information to obtain an analysis result.
Specifically, based on monitoring information, analyzing the potential safety hazard, and obtaining an analysis result includes: acquiring first hidden danger information based on the monitoring information; determining a hidden danger category based on the first hidden danger information; determining hidden danger levels based on hidden danger categories; and taking the hidden danger grade as an analysis result.
In this embodiment, since the construction tasks on the construction site are relatively complicated, there may be potential safety hazards in each construction task, by using the image recognition model, first potential hazard information on the construction site may be further obtained, and the type of potential hazard may be determined by using the first potential hazard information, for example, the wire is drawn out in disorder, the electric energy is overloaded, no grounding measure is set, no fire-fighting facility is set for personnel fire operation, construction waste is thrown anywhere, construction is not performed according to the construction specification, and the construction equipment is operated correctly. In this embodiment, the hidden trouble categories include electricity, water, fire, personnel safety, construction building and construction equipment, and the like. Each hidden danger category comprises a plurality of small categories, for example, in the hidden danger category of electricity consumption, electric wire private drawing disorder connection, high-power supply with small-power equipment operation, abnormal operation of a transformer, random access of a distribution room, overload operation of a power supply and the like belong to potential safety hazards of electricity consumption; in the hidden danger category of fire, welding is not correctly operated, fire is started as a fire-fighting article, fire starting operation is carried out near flammable and explosive construction materials, and the like are all hidden dangers of fire; in the hidden danger category of personnel safety, construction does not accord with the standard, one person performs high-altitude operation, or enters a construction site without wearing safety measures, and the like, belong to the hidden safety hazards of personnel safety.
Further, determining the hidden danger level based on the hidden danger category includes: acquiring a construction specification of a construction site; establishing a hidden danger database based on construction specifications; acquiring all second hidden danger information sets in hidden danger categories based on a hidden danger database; determining hidden danger results generated by the first hidden danger information based on the second hidden danger information set; the hidden danger rating is determined based on the hidden danger consequences.
In this embodiment, because the construction scope of each construction site is different, the construction team is different, the construction task is different, so the construction specification of each construction site is different, if the construction specification is different, because the potential safety hazard is formulated according to the construction specification, the potential hazards specified by each construction site are inconsistent, so the potential hazard database needs to be built according to the construction specification of the construction site, the potential hazards of each construction specification are collected, and the potential hazard database is continuously perfected.
Because importance is attached to life safety in the construction process, the hidden danger class which has serious consequences for constructors is determined as a first hidden danger class; the hidden danger class affecting the construction progress is a second hidden danger class; the third hidden trouble level is met, wherein the third hidden trouble level can be used for a short time, but serious accidents can be caused for a long time.
In order to further accurately which hidden danger class the small class in each hidden danger class belongs to respectively, the hidden danger results caused by hidden danger can be divided according to the sequence of personnel-construction progress-construction equipment, namely, the hidden danger class which hurts people is a first hidden danger class, the hidden danger class which affects the construction progress is a second hidden danger class, and the hidden danger class which affects the construction equipment is a third hidden danger class.
For example, the first hidden danger level comprises hidden dangers that a person performs aloft work, or enters a construction site without wearing safety measures, welding is not operated correctly, and the like; the second hidden danger level comprises hidden troubles such as construction is not in accordance with the specification, the transformer works abnormally, the power supply is in overload operation, fire is used as a non-set fire-fighting article, and fire operation is carried out nearby flammable and explosive construction materials; the third hidden danger level comprises hidden troubles such as wire private drawing disorder connection, operation of high-power supply with low-power equipment, incorrect welding operation and the like.
Further, after determining the hidden danger level based on the hidden danger category, the method further includes: and determining a hidden danger area based on the first hidden danger information, wherein the hidden danger area comprises an area where the first hidden danger information exists on the construction site. Judging whether the hidden danger area belongs to a preset key hidden danger area or not; if the hidden danger area belongs to a preset key hidden danger area, adjusting hidden danger class based on hidden danger class to obtain an adjustment result; and taking the adjustment result as a new analysis result.
In this embodiment, in a construction site, a plurality of construction tasks are performed simultaneously, and may cause injury to people for some high-risk tasks, for example, when people perform high-altitude operations, some construction tools of the people are all carried with the people, but in the personnel construction process, the hidden danger area division may be performed according to the height of the high-altitude operations, and in this embodiment, when the height of the high-altitude operations is greater than five meters, the high-altitude operation area is taken as a key hidden danger area.
For example, in modern construction, a power supply is required to perform work, so that a distribution room can be used as a key hidden trouble area.
When the first hidden danger information is hidden danger in the power distribution room, the current hidden danger level is judged to be the second hidden danger level according to the first hidden danger information, and the current hidden danger level can be adjusted to be the first hidden danger level because the first hidden danger information is hidden danger in the power distribution room.
For example, the power carried by one power distribution cabinet is five hundred watts, but at this time, because the power carried by the power distribution cabinet is six hundred watts, the power carried by the power distribution cabinet is exceeded, the hidden danger level at this time is judged to be the second hidden danger level according to the monitoring information, but the power distribution cabinet at this time is the power distribution cabinet in the power distribution room, if the hidden danger is generated by the power distribution cabinet in the power distribution room, the construction progress can be influenced, and if the power carried by the power distribution cabinet exceeds the load by a lot, the power carried by the power distribution cabinet at this time is seven hundred watts, the power distribution cabinet at this time probably causes fire in the power distribution room, so that the personnel safety is damaged, and the current hidden danger level is adjusted to be the first hidden danger level.
And step S104, generating a rectification report based on the analysis result.
Specifically, generating the rectification report based on the analysis results includes: acquiring operation parameters of a construction site; establishing a digital twin model based on the operation parameters; acquiring the operation condition of the construction site based on the analysis result; inputting the running condition into a digital twin model, and performing simulation operation to obtain an operation result; setting a modification scheme based on the operation result; determining a modification period based on the modification scheme; a reform report is generated based on the reform scheme and the reform period.
In this embodiment, each hidden danger information needs to be modified after being found, but in the construction site, some hidden dangers can not generate results in a short period of time, and the hidden dangers can be released after a period of time of operation in the construction site, so that the generation time of the hidden danger results can be deduced by adopting a digital twin model for the hidden dangers, and corresponding modification schemes can be formulated.
For example, a construction device is running in a phase-failure mode, parameters of the device are input into a digital twin model, and then simulation running is performed in the digital twin model to obtain running results, wherein the running results comprise how long the device can still work, the damage degree to the device and the like.
In this embodiment, the electric device may be monitored by monitoring the output power and the three-phase voltage of the electric device.
After the operation result is obtained, a corresponding rectification scheme needs to be formulated, for example, when the equipment is in open-phase operation, the construction equipment needs to be checked at the moment to check whether the construction equipment is in one-phase connection, each item of the construction equipment is grounded one by one in a digital twin model, whether the operation state of the construction equipment is consistent with the operation state of the construction equipment in reality is judged, when the operation state is consistent with the operation state of the construction equipment, the phase is judged to be grounded, at the moment, each parameter of the construction equipment is observed to be modified one by one, the part with the problem is found one by one, the part with the problem is replaced, and the corresponding rectification period is determined according to the replacement difficulty.
When the construction equipment is in open-phase operation, the open-phase operation can be continued for a period of time, which can be ten minutes, thirty minutes or sixty minutes, but the maximum time can not exceed sixty minutes, namely the rectifying period is sixty minutes, and the rectifying must be carried out within sixty minutes.
The modification report generated at this time includes a modification scheme and a modification period, wherein the modification scheme includes a period that needs to be replaced, and the modification period is the longest modification time.
Further, after generating the rectification report based on the analysis result, the method includes: determining a corresponding rectification department based on the rectification report; obtaining an organization framework of a construction unit; determining related responsible persons based on the rectifying departments and the organization architecture, wherein the related responsible persons comprise department managers, department books and department authorities; and sending the correction report to the mobile terminal of the relevant responsible person so as to remind the relevant responsible person.
In this embodiment, the corresponding hidden danger is already known, and the corresponding rectifying department needs to be notified to continue rectifying according to the hidden danger, for example, when the hidden danger type is electricity, the corresponding electric power construction department needs to be notified to rectify the hidden danger, and the relevant responsible person of the corresponding electric power construction department is notified through the organization architecture of the construction unit, and then the formulated rectifying report is sent to the mobile terminal of the relevant responsible person, so that the relevant responsible person can conveniently push the rectifying report, and the hidden danger information can be rectified more quickly.
Step S105, reminding is performed based on the rectification report.
Specifically, alerting based on the rectification report includes: a plurality of correction nodes are formulated based on the correction period; corresponding reminding strategies are formulated based on the plurality of correction nodes; and reminding based on the reminding strategy.
In this embodiment, taking the modification period determined in the modification report as an example, the modification period is eight hours, the modification node is the modification node in the 5 th hour, the 7 th hour and the 7.5 th hour, and when the modification time reaches the fifth hour, the related responsible person is reminded by means of software application and the like when the modification is not completed; after seven hours pass, the correction is not finished, the relevant responsible person is required to be reminded through a short message and/or a telephone, the correction is not finished when only half an hour of correction time is left, the position of the relevant responsible person and the position of hidden danger occurrence are required to be acquired, and the correction scheme is propelled on site by the relevant responsible person so as to achieve the optimal correction effect, ensure hidden danger elimination and further ensure construction safety.
Fig. 2 is a block diagram of a safety hazard management and inspection device 200 according to an embodiment of the present application.
As shown in fig. 2, the safety hazard management and inspection device 200 mainly includes:
an acquisition module 201, configured to acquire monitoring information of a construction site;
the judging module 202 is configured to judge whether a potential safety hazard exists in the construction site based on the monitoring information; if the potential safety hazard exists, analyzing the potential safety hazard based on the monitoring information to obtain an analysis result;
a generation module 203 for generating a rectification report based on the analysis result;
and the reminding module 204 is used for reminding based on the correction report.
As an optional implementation manner of this embodiment, the judging module 202 is further specifically configured to analyze the potential safety hazard based on the monitoring information, and the obtaining an analysis result includes: acquiring first hidden danger information based on the monitoring information; determining a hidden danger category based on the first hidden danger information; determining hidden danger levels based on hidden danger categories; and taking the hidden danger grade as an analysis result.
As an optional implementation manner of this embodiment, the determining module 202 is further specifically configured to determine the hidden danger level based on the hidden danger category includes: acquiring a construction specification of a construction site; establishing a hidden danger database based on construction specifications; acquiring all second hidden danger information sets in hidden danger categories based on a hidden danger database; determining hidden danger results generated by the first hidden danger information based on the second hidden danger information set; the hidden danger rating is determined based on the hidden danger consequences.
As an optional implementation manner of this embodiment, the determining module 202 is further specifically configured to, after determining the hidden danger level based on the hidden danger category, further include: and determining a hidden danger area based on the first hidden danger information, wherein the hidden danger area comprises an area where the first hidden danger information exists on the construction site. Judging whether the hidden danger area belongs to a preset key hidden danger area or not; if the hidden danger area belongs to a preset key hidden danger area, adjusting hidden danger class based on hidden danger class to obtain an adjustment result; and taking the adjustment result as a new analysis result.
As an optional implementation manner of this embodiment, the generating module 203 is further specifically configured to generate the rectification report based on the analysis result, where the generating includes: acquiring operation parameters of a construction site; establishing a digital twin model based on the operation parameters; acquiring the operation condition of the construction site based on the analysis result; inputting the running condition into a digital twin model, and performing simulation operation to obtain an operation result; setting a modification scheme based on the operation result; determining a modification period based on the modification scheme; a reform report is generated based on the reform scheme and the reform period.
As an optional implementation manner of this embodiment, the generating module 203 is further specifically configured to, after generating the modification report based on the analysis result, the method includes: determining a corresponding rectification department based on the rectification report; obtaining an organization framework of a construction unit; determining related responsible persons based on the rectifying departments and the organization architecture, wherein the related responsible persons comprise department managers, department books and department authorities; and sending the correction report to the mobile terminal of the relevant responsible person so as to remind the relevant responsible person.
As an optional implementation manner of this embodiment, the reminding module 204 is further specifically configured to perform reminding based on the rectification report, including: a plurality of correction nodes are formulated based on the correction period; corresponding reminding strategies are formulated based on the plurality of correction nodes; and reminding based on the reminding strategy.
In one example, a module in any of the above apparatuses may be one or more integrated circuits configured to implement the above methods, for example: one or more application specific integrated circuits (application specific integratedcircuit, ASIC), or one or more digital signal processors (digital signal processor, DSP), or one or more field programmable gate arrays (field programmable gate array, FPGA), or a combination of at least two of these integrated circuit forms.
For another example, when a module in an apparatus may be implemented in the form of a scheduler of processing elements, the processing elements may be general-purpose processors, such as a central processing unit (central processing unit, CPU) or other processor that may invoke a program. For another example, the modules may be integrated together and implemented in the form of a system-on-a-chip (SOC).
It will be clearly understood by those skilled in the art that, for convenience and brevity of description, the specific working process of the apparatus and modules described above may refer to the corresponding process in the foregoing method embodiment, which is not repeated herein.
Fig. 3 is a block diagram of an electronic device 300 according to an embodiment of the present application.
As shown in FIG. 3, electronic device 300 includes a processor 301 and memory 302, and may further include an information input/information output (I/O) interface 303, one or more of a communication component 304, and a communication bus 305.
The processor 301 is configured to control the overall operation of the electronic device 300, so as to complete all or part of the steps of the above-mentioned potential safety hazard management and investigation method; the memory 302 is used to store various types of data to support operation at the electronic device 300, which may include, for example, instructions for any application or method operating on the electronic device 300, as well as application-related data. The Memory 302 may be implemented by any type or combination of volatile or non-volatile Memory devices, such as one or more of static random access Memory (Static Random Access Memory, SRAM), electrically erasable programmable Read-Only Memory (Electrically Erasable Programmable Read-Only Memory, EEPROM), erasable programmable Read-Only Memory (Erasable Programmable Read-Only Memory, EPROM), programmable Read-Only Memory (Programmable Read-Only Memory, PROM), read-Only Memory (ROM), magnetic Memory, flash Memory, magnetic disk, or optical disk.
The I/O interface 303 provides an interface between the processor 301 and other interface modules, which may be a keyboard, mouse, buttons, etc. These buttons may be virtual buttons or physical buttons. The communication component 304 is used for wired or wireless communication between the electronic device 300 and other devices. Wireless communication, such as Wi-Fi, bluetooth, near field communication (Near Field Communication, NFC for short), 2G, 3G, or 4G, or a combination of one or more thereof, and accordingly the communication component 304 can include: wi-Fi part, bluetooth part, NFC part.
The electronic device 300 may be implemented by one or more application specific integrated circuits (Application Specific Integrated Circuit, abbreviated as ASIC), digital signal processors (Digital Signal Processor, abbreviated as DSP), digital signal processing devices (Digital Signal Processing Device, abbreviated as DSPD), programmable logic devices (Programmable Logic Device, abbreviated as PLD), field programmable gate arrays (Field Programmable Gate Array, abbreviated as FPGA), controllers, microcontrollers, microprocessors, or other electronic components for performing the method of controlling and checking security risks as described in the above embodiments.
Communication bus 305 may include a pathway to transfer information between the aforementioned components. The communication bus 305 may be a PCI (Peripheral Component Interconnect, peripheral component interconnect standard) bus or an EISA (Extended Industry Standard Architecture ) bus, or the like. The communication bus 305 may be divided into an address bus, a data bus, a control bus, and the like.
The electronic device 300 may include, but is not limited to, mobile terminals such as mobile phones, notebook computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), car terminals (e.g., car navigation terminals), and the like, and fixed terminals such as digital TVs, desktop computers, and the like, and may also be a server, and the like.
The application also provides a computer readable storage medium, wherein the computer readable storage medium stores a computer program, and the computer program realizes the steps of the potential safety hazard management and control and investigation method when being executed by a processor.
The computer readable storage medium may include: a U-disk, a removable hard disk, a read-Only Memory (ROM), a random access Memory (Random Access Memory, RAM), a magnetic disk, or an optical disk, or other various media capable of storing program codes.
The terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The foregoing description is only of the preferred embodiments of the present application and is presented as a description of the principles of the technology being utilized. It will be appreciated by persons skilled in the art that the scope of the application referred to in this application is not limited to the specific combinations of features described above, but it is intended to cover other embodiments in which any combination of features described above or their equivalents is possible without departing from the spirit of the application. Such as the above-mentioned features and the technical features having similar functions (but not limited to) applied for in this application are replaced with each other.

Claims (10)

1. The potential safety hazard management and control and investigation method is characterized by comprising the following steps:
acquiring monitoring information of a construction site;
judging whether potential safety hazards exist on the construction site or not based on the monitoring information;
if the potential safety hazard exists, analyzing the potential safety hazard based on the monitoring information to obtain an analysis result;
generating a rectification report based on the analysis result;
and reminding based on the correction report.
2. The method of claim 1, wherein analyzing the potential safety hazard based on the monitoring information to obtain an analysis result comprises:
acquiring first hidden danger information based on the monitoring information;
determining a hidden danger category based on the first hidden danger information;
determining a hidden danger level based on the hidden danger category;
and taking the hidden danger grade as an analysis result.
3. The method of claim 2, wherein the determining a risk rating based on the risk category comprises:
acquiring a construction specification of the construction site;
establishing a hidden danger database based on the construction specification;
acquiring all second hidden danger information sets in the hidden danger category based on the hidden danger database;
determining hidden danger results generated by the first hidden danger information based on the second hidden danger information set;
and determining the hidden danger grade based on the hidden danger result.
4. The method of claim 2, wherein after the determining a risk level based on the risk category, the method further comprises:
determining the hidden danger area based on the first hidden danger information, wherein the hidden danger area comprises an area where the first hidden danger information exists in the construction site;
judging whether the hidden danger area belongs to a preset key hidden danger area or not;
if the hidden danger area belongs to a preset key hidden danger area, adjusting the hidden danger grade based on the hidden danger category to obtain an adjustment result;
and taking the adjustment result as a new analysis result.
5. The method of claim 1, wherein the generating a rectification report based on the analysis results comprises:
acquiring operation parameters of the construction site;
establishing a digital twin model based on the operating parameters;
acquiring the operation condition of the construction site based on the analysis result;
inputting the running condition into the digital twin model, and performing simulation operation to obtain an operation result;
setting a modification scheme based on the operation result;
determining a modification period based on the modification scheme;
and generating a modification report based on the modification scheme and the modification period.
6. The method of claim 5, wherein after the generating a rectification report based on the analysis results, the method comprises:
determining a corresponding reforming department based on the reforming report;
obtaining an organization framework of the construction unit;
determining related responsible persons based on the rectification department and the organization architecture, wherein the related responsible persons comprise department managers, department books and department authorities;
and sending the correction report to the mobile terminal of the relevant responsible person so as to remind the relevant responsible person.
7. The method of claim 5, wherein the alerting based on the modification report comprises:
a plurality of correction nodes are formulated based on the correction period;
corresponding reminding strategies are formulated based on the plurality of correction nodes;
and reminding based on the reminding strategy.
8. Potential safety hazard management and control and investigation device, its characterized in that includes:
the acquisition module is used for acquiring monitoring information of the construction site;
the judging module is used for judging whether potential safety hazards exist in the construction site or not based on the monitoring information; if the potential safety hazard exists, analyzing the potential safety hazard based on the monitoring information to obtain an analysis result;
the generation module is used for generating a rectification report based on the analysis result;
and the reminding module is used for reminding based on the correction report.
9. An electronic device comprising a processor coupled to a memory;
the processor is configured to execute a computer program stored in the memory to cause the electronic device to perform the method of any one of claims 1 to 7.
10. A computer readable storage medium comprising a computer program or instructions which, when run on a computer, cause the computer to perform the method of any of claims 1 to 7.
CN202310095576.XA 2023-02-03 2023-02-03 Potential safety hazard management and control and investigation method, device, equipment and medium Pending CN116052084A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310095576.XA CN116052084A (en) 2023-02-03 2023-02-03 Potential safety hazard management and control and investigation method, device, equipment and medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310095576.XA CN116052084A (en) 2023-02-03 2023-02-03 Potential safety hazard management and control and investigation method, device, equipment and medium

Publications (1)

Publication Number Publication Date
CN116052084A true CN116052084A (en) 2023-05-02

Family

ID=86124217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310095576.XA Pending CN116052084A (en) 2023-02-03 2023-02-03 Potential safety hazard management and control and investigation method, device, equipment and medium

Country Status (1)

Country Link
CN (1) CN116052084A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117671396A (en) * 2024-02-02 2024-03-08 新疆盛诚工程建设有限责任公司 Intelligent monitoring and early warning system and method for construction progress

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117671396A (en) * 2024-02-02 2024-03-08 新疆盛诚工程建设有限责任公司 Intelligent monitoring and early warning system and method for construction progress
CN117671396B (en) * 2024-02-02 2024-04-26 新疆盛诚工程建设有限责任公司 Intelligent monitoring and early warning system and method for construction progress

Similar Documents

Publication Publication Date Title
WO2023040575A1 (en) Internet-of-things-based abnormality early warning analysis system and method for special operation site
CN107451732A (en) A kind of enterprise safety operation total management system and method
CN116052084A (en) Potential safety hazard management and control and investigation method, device, equipment and medium
CN107092222A (en) Power grid regulation operational administrative system based on the integration of anti-error check analysis
CN108206586A (en) A kind of power circuit intelligence O&M examination and repair system
CN211509189U (en) Electric power operation field supervision equipment and system
CN104835376B (en) There is the dispatcher training system system of prepared auto restart automatic safety device action simulation
CN111463902A (en) Overhead line monitoring method, system, device and server
CN112637345A (en) Intelligent electricity safety supervision system and method
CN113568328A (en) Safety monitoring method and device for personnel entering transformer substation to work
CN114778936A (en) Monitoring method, monitor, system and electronic equipment for electric energy metering abnormity
CN113807751B (en) Safety risk grade assessment method and system based on knowledge graph
CN115291109A (en) Monitoring method and system of battery energy storage system, electronic equipment and storage medium
CN104836329B (en) Local-level dispatch supporting system capable of improving analyzing and processing capability of dispatcher during accident generation
CN112508384B (en) Visual automatic monitoring equipment and method for power dispatching operation ticket
JP2006014533A (en) Power usage monitoring system and load factor calculating/displaying method
CN115503535B (en) Secure charging method, apparatus, device and computer readable storage medium
CN115313555A (en) Power supply intelligent operation and maintenance management and control platform
CN108122036B (en) Substation live operation and inspection auxiliary analysis method
CN115795359A (en) Signal type distinguishing method and device and computer equipment
CN115879763A (en) Risk prompting method, device, equipment and storage medium for intelligent park operation
CN104914813B (en) The multi-platform synchronous method of prepared auto restart model in static security analysis system
CN113850463A (en) Processing method and device for misoperation prevention of transformer substation
CN114069843A (en) Alarm method for misoperation of transformer substation
CN111092491A (en) Transformer substation supervision method and device and computer readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination