CN115884342A - Power control method, device, terminal and network node - Google Patents

Power control method, device, terminal and network node Download PDF

Info

Publication number
CN115884342A
CN115884342A CN202111152657.6A CN202111152657A CN115884342A CN 115884342 A CN115884342 A CN 115884342A CN 202111152657 A CN202111152657 A CN 202111152657A CN 115884342 A CN115884342 A CN 115884342A
Authority
CN
China
Prior art keywords
power control
terminal
scg
mode
uplink power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111152657.6A
Other languages
Chinese (zh)
Inventor
蒲文娟
杨晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vivo Mobile Communication Co Ltd
Original Assignee
Vivo Mobile Communication Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vivo Mobile Communication Co Ltd filed Critical Vivo Mobile Communication Co Ltd
Priority to CN202111152657.6A priority Critical patent/CN115884342A/en
Priority to PCT/CN2022/121266 priority patent/WO2023051448A1/en
Publication of CN115884342A publication Critical patent/CN115884342A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/14Two-way operation using the same type of signal, i.e. duplex
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. Transmission Power Control [TPC] or power classes
    • H04W52/04Transmission power control [TPC]
    • H04W52/06TPC algorithms
    • H04W52/14Separate analysis of uplink or downlink
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The application discloses a power control method, a device, a terminal and a network node, belonging to the technical field of communication, wherein the power control method of the embodiment of the application comprises the following steps: the terminal adjusts the uplink power control parameter according to the state of the service cell group; wherein the serving cell group comprises: a master cell group MCG and/or at least one secondary cell group SCG of the terminal; the uplink power control parameter is used for controlling the uplink transmission power of the terminal in a dual-connection DC mode and/or a multi-connection MC mode.

Description

功率控制方法、装置、终端及网络节点Power control method, device, terminal and network node

技术领域Technical Field

本申请属于通信领域,特别涉及一种功率控制方法、装置、终端及网络节点。The present application relates to the field of communications, and in particular to a power control method, device, terminal and network node.

背景技术Background Art

3GPP Rel-18中终端可能被预配置多个辅小区组(Secondary Cell Group,SCG),并控制用户设备(User Equipment,UE,也称终端)在多个SCG之间进行转换(Switching),多个SCG的Switching可能对主节点(MN)透明:一方面不会因为频繁的SCG Switching而产生过多的网元间接口信令交互,另一方面MN和辅节点(SN)为独立的网元,可能进行独立地升级,从而可能SN支持多个SCG的特性,而MN为未升级的既有(legacy)MN,不支持多个SCG的特性或机制。In 3GPP Rel-18, a terminal may be pre-configured with multiple secondary cell groups (SCGs) and control the user equipment (UE, also known as the terminal) to switch between multiple SCGs. The switching of multiple SCGs may be transparent to the master node (MN): on the one hand, there will not be too much interface signaling interaction between network elements due to frequent SCG switching; on the other hand, the MN and the secondary node (SN) are independent network elements and may be upgraded independently, so that the SN may support the features of multiple SCGs, while the MN is a legacy MN that has not been upgraded and does not support the features or mechanisms of multiple SCGs.

当UE从第一SCG转换到第二SCG时,由于MN不知情,终端在某些上行功控模式下的上行功率控制会出现问题。例如,在动态(dynamic)模式下,由于转换前后SCG配置的不同,UE在上行功率控制机制所使用的时间偏移量(即T-offset)的值可能会发生变化,从而对UE的通信性能产生不好的影响。若该值变小,UE会在MN不尝试调度自己的时间段内监听MN的调度,导致功耗方面的损失。若值变大,则UE会在MN尝试调度自己的时间段内不监听MN的调度,从而丢失MN的调度。再如,半静态模式二也会受到影响,因为转换前后SCG的时分双工图样(TDD pattern)会发生变化。When the UE switches from the first SCG to the second SCG, since the MN is unaware, problems may occur in the uplink power control of the terminal in certain uplink power control modes. For example, in dynamic mode, due to the different SCG configurations before and after the switch, the value of the time offset (i.e., T-offset) used by the UE in the uplink power control mechanism may change, thereby adversely affecting the communication performance of the UE. If the value becomes smaller, the UE will monitor the scheduling of the MN during the time period when the MN does not try to schedule itself, resulting in power consumption losses. If the value becomes larger, the UE will not monitor the scheduling of the MN during the time period when the MN tries to schedule itself, thereby losing the scheduling of the MN. For another example, semi-static mode 2 will also be affected because the time division duplex pattern (TDD pattern) of the SCG will change before and after the switch.

发明内容Summary of the invention

本申请实施例提供一种功率控制方法、装置、终端及网络节点,能够解决在终端进行接入小区组变化的情况下,现有的实现方式会影响UE上行功率性能,影响通信可靠性的问题。The embodiments of the present application provide a power control method, device, terminal and network node, which can solve the problem that when the terminal changes the access cell group, the existing implementation method will affect the UE uplink power performance and communication reliability.

第一方面,提供了一种功率控制方法,包括:In a first aspect, a power control method is provided, comprising:

终端根据服务小区组的状态,进行上行功控参数的调整;The terminal adjusts the uplink power control parameters according to the status of the serving cell group;

其中,所述服务小区组包括:所述终端的主小区组MCG和/或至少一个辅小区组SCG;所述上行功控参数用于控制所述终端在双连接DC模式和/或多连接MC模式下的上行传输功率。Among them, the service cell group includes: the main cell group MCG and/or at least one secondary cell group SCG of the terminal; the uplink power control parameter is used to control the uplink transmission power of the terminal in dual connection DC mode and/or multi-connection MC mode.

第二方面,提供了一种功率控制装置,包括:In a second aspect, a power control device is provided, comprising:

调整模块,用于根据服务小区组的状态,进行上行功控参数的调整;An adjustment module, used to adjust uplink power control parameters according to the status of the serving cell group;

其中,所述服务小区组包括:所述终端的主小区组MCG和/或至少一个辅小区组SCG;所述上行功控参数用于控制所述终端在双连接DC模式和/或多连接MC模式下的上行传输功率。Among them, the service cell group includes: the main cell group MCG and/or at least one secondary cell group SCG of the terminal; the uplink power control parameter is used to control the uplink transmission power of the terminal in the dual connection DC mode and/or multi-connection MC mode.

第三方面,提供了一种功率控制方法,包括:In a third aspect, a power control method is provided, including:

主节点MN向辅节点SN发送第一信息;The master node MN sends first information to the slave node SN;

其中,所述第一信息包括以下至少一项:The first information includes at least one of the following:

在终端被配置为多连接模式且上行功控模式被配置为动态模式的情况下,SN配置或调度SCG传输时需要满足的最大时域偏移量;When the terminal is configured in multi-connection mode and the uplink power control mode is configured in dynamic mode, the maximum time domain offset that needs to be met when the SN configures or schedules SCG transmission;

第一请求,所述第一请求用于指示以下至少一项:SN为多个SCG配置相同的时分双工TDD图案公共配置、SN为多个SCG配置的TDD图案配置具有关联的图案。The first request is used to indicate at least one of the following: the SN configures the same time division duplex TDD pattern common configuration for multiple SCGs, and the TDD pattern configurations configured by the SN for multiple SCGs have associated patterns.

第四方面,提供了一种功率控制装置,包括:In a fourth aspect, a power control device is provided, comprising:

第一发送模块,用于向辅节点SN发送第一信息;A first sending module, configured to send first information to the secondary node SN;

其中,所述第一信息包括以下至少一项:The first information includes at least one of the following:

在终端被配置为多连接模式且上行功控模式被配置为动态模式的情况下,SN配置或调度SCG传输时需要满足的最大时域偏移量;When the terminal is configured in multi-connection mode and the uplink power control mode is configured in dynamic mode, the maximum time domain offset that needs to be met when the SN configures or schedules SCG transmission;

第一请求,所述第一请求用于指示以下至少一项:SN为多个SCG配置相同的时分双工TDD图案公共配置、SN为多个SCG配置的TDD图案配置具有关联的图案。The first request is used to indicate at least one of the following: the SN configures the same time division duplex TDD pattern common configuration for multiple SCGs, and the TDD pattern configurations configured by the SN for multiple SCGs have associated patterns.

第五方面,提供了一种功率控制方法,包括:In a fifth aspect, a power control method is provided, including:

在终端执行辅小区组SCG转换且所述终端的上行功控模式为动态模式的情况下,辅节点SN向主节点MN发送当前SCG上终端所使用的时间偏移量。When the terminal performs a secondary cell group SCG conversion and the uplink power control mode of the terminal is a dynamic mode, the secondary node SN sends the time offset used by the terminal on the current SCG to the primary node MN.

第六方面,提供了一种功率控制装置,包括:In a sixth aspect, a power control device is provided, comprising:

第二发送模块,用于在终端执行辅小区组SCG转换且所述终端的上行功控模式为动态模式的情况下,向主节点MN发送当前SCG上终端所使用的时间偏移量。The second sending module is used to send the time offset used by the terminal on the current SCG to the master node MN when the terminal performs the secondary cell group SCG conversion and the uplink power control mode of the terminal is the dynamic mode.

第七方面,提供了一种终端,该终端包括处理器、存储器及存储在所述存储器上并可在所述处理器上运行的程序或指令,所述程序或指令被所述处理器执行时实现如第一方面所述的方法的步骤。In a seventh aspect, a terminal is provided, comprising a processor, a memory, and a program or instruction stored in the memory and executable on the processor, wherein the program or instruction, when executed by the processor, implements the steps of the method described in the first aspect.

第八方面,提供了一种终端,包括处理器及通信接口,其中,所述处理器用于根据服务小区组的状态,进行上行功控参数的调整;In an eighth aspect, a terminal is provided, comprising a processor and a communication interface, wherein the processor is configured to adjust an uplink power control parameter according to a state of a serving cell group;

其中,所述服务小区组包括:所述终端的主小区组MCG和/或至少一个辅小区组SCG;所述上行功控参数用于控制所述终端在双连接DC模式和/或多连接MC模式下的上行传输功率。Among them, the service cell group includes: the main cell group MCG and/or at least one secondary cell group SCG of the terminal; the uplink power control parameter is used to control the uplink transmission power of the terminal in dual connection DC mode and/or multi-connection MC mode.

第九方面,提供了一种网络节点,所述网络节点为主节点MN,包括处理器、存储器及存储在所述存储器上并可在所述处理器上运行的程序或指令,所述程序或指令被所述处理器执行时实现如第三方面所述的方法的步骤。In the ninth aspect, a network node is provided, which is a main node MN, including a processor, a memory, and a program or instruction stored in the memory and executable on the processor, and the program or instruction, when executed by the processor, implements the steps of the method described in the third aspect.

第十方面,提供了一种网络节点,所述网络节点为主节点MN,包括处理器及通信接口,其中,所述通信接口用于向辅节点SN发送第一信息;In a tenth aspect, a network node is provided, the network node being a primary node MN, comprising a processor and a communication interface, wherein the communication interface is used to send first information to a secondary node SN;

其中,所述第一信息包括以下至少一项:The first information includes at least one of the following:

在终端被配置为多连接模式且上行功控模式被配置为动态模式的情况下,SN配置或调度SCG传输时需要满足的最大时域偏移量;When the terminal is configured in multi-connection mode and the uplink power control mode is configured in dynamic mode, the maximum time domain offset that needs to be met when the SN configures or schedules SCG transmission;

第一请求,所述第一请求用于指示以下至少一项:SN为多个SCG配置相同的时分双工TDD图案公共配置、SN为多个SCG配置的TDD图案配置具有关联的图案。The first request is used to indicate at least one of the following: the SN configures the same time division duplex TDD pattern common configuration for multiple SCGs, and the TDD pattern configurations configured by the SN for multiple SCGs have associated patterns.

第十一方面,提供了一种网络节点,所述网络节点为辅节点SN,包括处理器、存储器及存储在所述存储器上并可在所述处理器上运行的程序或指令,所述程序或指令被所述处理器执行时实现如第五方面所述的方法的步骤。In the eleventh aspect, a network node is provided, which is a secondary node SN, including a processor, a memory, and a program or instruction stored in the memory and executable on the processor, and when the program or instruction is executed by the processor, the steps of the method described in the fifth aspect are implemented.

第十二方面,提供了一种网络节点,所述网络节点为辅节点SN,包括处理器及通信接口,其中,所述通信接口用于在终端执行辅小区组SCG转换且所述终端的上行功控模式为动态模式的情况下,向主节点MN发送当前SCG上终端所使用的时间偏移量。In the twelfth aspect, a network node is provided, which is a secondary node SN, including a processor and a communication interface, wherein the communication interface is used to send the time offset used by the terminal on the current SCG to the main node MN when the terminal performs a secondary cell group SCG conversion and the uplink power control mode of the terminal is a dynamic mode.

第十三方面,提供了一种可读存储介质,所述可读存储介质上存储程序或指令,所述程序或指令被处理器执行时实现如第一方面、第三方面或第五方面所述的方法的步骤。In the thirteenth aspect, a readable storage medium is provided, on which a program or instruction is stored. When the program or instruction is executed by a processor, the steps of the method described in the first aspect, the third aspect or the fifth aspect are implemented.

第十四方面,提供了一种芯片,所述芯片包括处理器和通信接口,所述通信接口和所述处理器耦合,所述处理器用于运行程序或指令,实现如第一方面、第三方面或第五方面所述的方法的步骤。In a fourteenth aspect, a chip is provided, comprising a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run programs or instructions to implement the steps of the method described in the first aspect, the third aspect, or the fifth aspect.

第十五方面,提供了一种计算机程序/程序产品,所述计算机程序/程序产品被存储在非瞬态的存储介质中,所述程序/程序产品被至少一个处理器执行以实现如第一方面、第三方面或第五方面所述的方法的步骤。In the fifteenth aspect, a computer program/program product is provided, wherein the computer program/program product is stored in a non-volatile storage medium, and the program/program product is executed by at least one processor to implement the steps of the method described in the first aspect, the third aspect or the fifth aspect.

在本申请实施例中,通过根据服务小区组的状态,进行上行功控参数的调整,以此保证UE上行功率性能,保证通信可靠性。In an embodiment of the present application, uplink power control parameters are adjusted according to the status of the service cell group, thereby ensuring the uplink power performance of the UE and ensuring communication reliability.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1是本申请实施例可应用的一种无线通信系统的框图;FIG1 is a block diagram of a wireless communication system to which an embodiment of the present application can be applied;

图2是本申请实施例的功率控制方法的流程示意图之一;FIG2 is a schematic diagram of a power control method according to an embodiment of the present application;

图3是本申请实施例的功率控制装置的模块示意图之一;FIG3 is a schematic diagram of a module of a power control device according to an embodiment of the present application;

图4是本申请实施例的终端的结构框图;FIG4 is a block diagram of a terminal according to an embodiment of the present application;

图5是本申请实施例的功率控制方法的流程示意图之二;FIG5 is a second flow chart of the power control method according to an embodiment of the present application;

图6是本申请实施例的功率控制装置的模块示意图之二;FIG6 is a second schematic diagram of a module of a power control device according to an embodiment of the present application;

图7是本申请实施例的网络节点的结构框图;FIG7 is a structural block diagram of a network node according to an embodiment of the present application;

图8是本申请实施例的功率控制方法的流程示意图之三;FIG8 is a third flow chart of the power control method according to an embodiment of the present application;

图9是本申请实施例的功率控制装置的模块示意图之三;FIG9 is a third schematic diagram of a module of a power control device according to an embodiment of the present application;

图10是本申请实施例的通信设备的结构框图。FIG. 10 is a structural block diagram of a communication device according to an embodiment of the present application.

具体实施方式DETAILED DESCRIPTION

下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚描述,显然,所描述的实施例是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本申请保护的范围。The following will be combined with the drawings in the embodiments of the present application to clearly describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of this application.

本申请的说明书和权利要求书中的术语“第一”、“第二”等是用于区别类似的对象,而不用于描述特定的顺序或先后次序。应该理解这样使用的术语在适当情况下可以互换,以便本申请的实施例能够以除了在这里图示或描述的那些以外的顺序实施,且“第一”、“第二”所区别的对象通常为一类,并不限定对象的个数,例如第一对象可以是一个,也可以是多个。此外,说明书以及权利要求中“和/或”表示所连接对象的至少其中之一,字符“/”一般表示前后关联对象是一种“或”的关系。The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the terms used in this way are interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first" and "second" are generally of the same type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and/or" in the specification and claims represents at least one of the connected objects, and the character "/" generally represents that the objects associated with each other are in an "or" relationship.

值得指出的是,本申请实施例所描述的技术不限于长期演进型(Long TermEvolution,LTE)/LTE的演进(LTE-Advanced,LTE-A)系统,还可用于其他无线通信系统,诸如码分多址(Code Division Multiple Access,CDMA)、时分多址(Time DivisionMultiple Access,TDMA)、频分多址(Frequency Division Multiple Access,FDMA)、正交频分多址(Orthogonal Frequency Division Multiple Access,OFDMA)、单载波频分多址(Single-carrier Frequency-Division Multiple Access,SC-FDMA)和其他系统。本申请实施例中的术语“系统”和“网络”常被可互换地使用,所描述的技术既可用于以上提及的系统和无线电技术,也可用于其他系统和无线电技术。以下描述出于示例目的描述了新空口(New Radio,NR)系统,并且在以下大部分描述中使用NR术语,但是这些技术也可应用于NR系统应用以外的应用,如第6代(6th Generation,6G)通信系统。It is worth noting that the technology described in the embodiments of the present application is not limited to the Long Term Evolution (LTE)/LTE-Advanced (LTE-A) system, but can also be used in other wireless communication systems, such as Code Division Multiple Access (CDMA), Time Division Multiple Access (TDMA), Frequency Division Multiple Access (FDMA), Orthogonal Frequency Division Multiple Access (OFDMA), Single-carrier Frequency Division Multiple Access (SC-FDMA) and other systems. The terms "system" and "network" in the embodiments of the present application are often used interchangeably, and the described technology can be used for the above-mentioned systems and radio technologies as well as for other systems and radio technologies. The following description describes a New Radio (NR) system for example purposes, and NR terms are used in most of the following descriptions, but these technologies can also be applied to applications other than NR system applications, such as the 6th Generation (6G) communication system.

图1示出本申请实施例可应用的一种无线通信系统的框图。无线通信系统包括终端11和网络侧设备12。其中,终端11可以是手机、平板电脑(Tablet Personal Computer)、膝上型电脑(Laptop Computer)或称为笔记本电脑、个人数字助理(Personal DigitalAssistant,PDA)、掌上电脑、上网本、超级移动个人计算机(ultra-mobile personalcomputer,UMPC)、移动上网装置(Mobile Internet Device,MID)、增强现实(augmentedreality,AR)/虚拟现实(virtual reality,VR)设备、机器人、可穿戴式设备(WearableDevice)、车载设备(VUE)、行人终端(PUE)、智能家居(具有无线通信功能的家居设备,如冰箱、电视、洗衣机或者家具等)等终端侧设备,可穿戴式设备包括:智能手表、智能手环、智能耳机、智能眼镜、智能首饰(智能手镯、智能手链、智能戒指、智能项链、智能脚镯、智能脚链等)、智能腕带、智能服装、游戏机等。需要说明的是,在本申请实施例并不限定终端11的具体类型。网络侧设备12可以是基站或核心网,其中,基站可被称为节点B、演进节点B、接入点、基收发机站(Base Transceiver Station,BTS)、无线电基站、无线电收发机、基本服务集(Basic Service Set,BSS)、扩展服务集(Extended Service Set,ESS)、B节点、演进型B节点(eNB)、家用B节点、家用演进型B节点、WLAN接入点、WiFi节点、发送接收点(Transmitting Receiving Point,TRP)或所述领域中其他某个合适的术语,只要达到相同的技术效果,所述基站不限于特定技术词汇,需要说明的是,在本申请实施例中仅以NR系统中的基站为例,但是并不限定基站的具体类型。FIG1 shows a block diagram of a wireless communication system applicable to an embodiment of the present application. The wireless communication system includes a terminal 11 and a network side device 12. The terminal 11 may be a mobile phone, a tablet computer (Tablet Personal Computer), a laptop computer (Laptop Computer) or a notebook computer, a personal digital assistant (Personal Digital Assistant, PDA), a handheld computer, a netbook, an ultra-mobile personal computer (ultra-mobile personal computer, UMPC), a mobile Internet device (Mobile Internet Device, MID), an augmented reality (augmented reality, AR)/virtual reality (virtual reality, VR) device, a robot, a wearable device (WearableDevice), a vehicle-mounted device (VUE), a pedestrian terminal (PUE), a smart home (a home appliance with a wireless communication function, such as a refrigerator, a television, a washing machine or furniture, etc.) and other terminal side devices, and the wearable device includes: a smart watch, a smart bracelet, a smart headset, a smart glasses, a smart jewelry (smart bracelet, a smart bracelet, a smart ring, a smart necklace, a smart anklet, a smart anklet, etc.), a smart wristband, a smart clothing, a game console, etc. It should be noted that the specific type of the terminal 11 is not limited in the embodiment of the present application. The network side device 12 may be a base station or a core network, wherein the base station may be referred to as a node B, an evolved node B, an access point, a base transceiver station (Base Transceiver Station, BTS), a radio base station, a radio transceiver, a basic service set (Basic Service Set, BSS), an extended service set (Extended Service Set, ESS), a B node, an evolved B node (eNB), a home B node, a home evolved B node, a WLAN access point, a WiFi node, a transmitting and receiving point (Transmitting Receiving Point, TRP) or some other appropriate term in the field, as long as the same technical effect is achieved, the base station is not limited to a specific technical vocabulary, it should be noted that in the embodiment of the present application, only the base station in the NR system is taken as an example, but the specific type of the base station is not limited.

下面先对与本申请相关的现有技术说明如下。The prior art related to the present application is described below.

1、DC/CA基本概念1. Basic Concepts of DC/CA

双连接(Dual Connectivity,DC),即为UE提供两个网络节点的资源,其中一个网络节点称为主节点(Master node,MN),另一个称为辅节点(Secondary node,SN)。在每个网络节点,还可以使用载波聚合技术(CA),即为UE配置由该节点控制的一系列服务小区,这些服务小区组成小区组(cell group)。MN控制的小区组为主小区组(Master Cell Group,MCG),SN控制的为辅小区组(Secondary Cell Group,SCG)。每个小区组都包含一个特殊小区(Special Cell,SpCell)和一系列辅小区(Secondary Cell,SCell)。在MCG中特殊小区称为主小区(Primary Cell,PCell),在SCG中特殊小区称为主辅小区(Primary SecondaryCell,PSCell)。Dual Connectivity (DC) means providing the UE with the resources of two network nodes, one of which is called the master node (MN) and the other is called the secondary node (SN). At each network node, carrier aggregation technology (CA) can also be used, that is, configuring a series of service cells controlled by the node for the UE, and these service cells form a cell group (cell group). The cell group controlled by MN is the master cell group (MCG), and the cell group controlled by SN is the secondary cell group (SCG). Each cell group contains a special cell (SpCell) and a series of secondary cells (SCell). In MCG, the special cell is called the primary cell (PCell), and in SCG, the special cell is called the primary secondary cell (PSCell).

2、Rel-16 NR-DC上行动态功率共享机制2. Rel-16 NR-DC uplink dynamic power sharing mechanism

NR-DC的上行功率共享,也可以称为上行功率控制,即MCG和SCG内工作于同一个频率范围(frequency range,FR)的服务小区可以共享UE的总最大发射功率,进行联合的功率分配,其中FR包括FR1、FR2。假设UE最大总传输功率(Ptotal)一定,当MCG上行传输和SCG上行传输同时发生时(具体地,MCG中任意一个服务小区的上行传输与SCG中任意一个服务小区的上行传输同时发生),UE需要调整MCG或SCG的上行传输功率,以保证二者之和不超过UE最大上行总传输功率。The uplink power sharing of NR-DC can also be called uplink power control, that is, the service cells operating in the same frequency range (frequency range, FR) in MCG and SCG can share the total maximum transmit power of the UE and perform joint power allocation, where FR includes FR1 and FR2. Assuming that the maximum total transmission power (Ptotal) of the UE is constant, when the uplink transmission of MCG and the uplink transmission of SCG occur at the same time (specifically, the uplink transmission of any service cell in MCG and the uplink transmission of any service cell in SCG occur simultaneously), the UE needs to adjust the uplink transmission power of MCG or SCG to ensure that the sum of the two does not exceed the maximum total uplink transmission power of the UE.

NR-DC上行功率控制/上行功率共享包括三种模式:NR-DC uplink power control/uplink power sharing includes three modes:

半静态功率控制模式1(也称半静态模式1):MCG和SCG分别依据各自小区组的最大发射功率进行功率控制;Semi-static power control mode 1 (also called semi-static mode 1): MCG and SCG perform power control based on the maximum transmit power of their respective cell groups;

半静态功率控制模式2(也称半静态模式2):MCG确定上行功率时,考虑SCG的上下行帧结构时分双工图案(TDD pattern)配置信息;SCG同理。Semi-static power control mode 2 (also called semi-static mode 2): When the MCG determines the uplink power, the uplink and downlink frame structure time division duplex pattern (TDD pattern) configuration information of the SCG is considered; the same applies to the SCG.

动态功率控制模式:SCG确定T0时刻的上行功率时,若在T0-T_offset时刻之前接收了到MCG的调度则UE根据MCG的实际发送功率、UE的最大上行总传输功率、SCG的最大发射功率来限制SCG的发送功率,而在[T0-Toffset~T0]期间UE不希望接收MCG的调度。具体方案为:假设UE在时刻T0时将开始进行SCG上行传输,其SCG上行传输功率用pwr_SCG表示。UE根据以下方式来计算时刻T0时的SCG上行传输功率pwr_SCG:Dynamic power control mode: When the SCG determines the uplink power at time T0, if the UE receives the scheduling to the MCG before time T0-T_offset, the UE limits the SCG's transmission power according to the actual transmission power of the MCG, the UE's maximum total uplink transmission power, and the SCG's maximum transmission power. During [T0-Toffset~T0], the UE does not want to receive the MCG's scheduling. The specific solution is: Assume that the UE will start SCG uplink transmission at time T0, and its SCG uplink transmission power is represented by pwr_SCG. The UE calculates the SCG uplink transmission power pwr_SCG at time T0 according to the following method:

在时刻T0-T_offset以前,UE监听MCG的物理下行控制信道(PDCCH):Before time T0-T_offset, the UE monitors the physical downlink control channel (PDCCH) of the MCG:

如果该PDCCH触发/指示了该UE的一个与T0时刻的SCG上行传输存在overlap的MCG上行传输,则UE的SCG上行传输功率应该满足pwr_SCG<=min{PSCG,Ptotal–MCG tx power},其中Ptotal为UE的最大上行总传输功率,PSCG为SCG的最大上行传输功率,MCG tx power是MCG的上行传输功率;If the PDCCH triggers/indicates an MCG uplink transmission of the UE that overlaps with the SCG uplink transmission at time T0, the SCG uplink transmission power of the UE should satisfy pwr_SCG<=min{ PSCG , Ptotal -MCG tx power}, where Ptotal is the maximum total uplink transmission power of the UE, PSCG is the maximum uplink transmission power of the SCG, and MCG tx power is the uplink transmission power of the MCG;

否则,pwr_SCG<=PtotalOtherwise, pwr_SCG<=P total .

在T0-T_offset之后,UE不希望MCG的PDCCH调度UE去执行与T0时刻的SCG上行传输存在overlap的MCG上行传输。After T0-T_offset, the UE does not want the PDCCH of the MCG to schedule the UE to perform MCG uplink transmission that overlaps with the SCG uplink transmission at time T0.

其中,T_offset为UE在上行功控模式为动态模式时所使用的时间偏移量,下面介绍关于T_offset取值:Among them, T_offset is the time offset used by the UE when the uplink power control mode is the dynamic mode. The following describes the value of T_offset:

T_offset的取值为

Figure BDA0003287669670000071
其中
Figure BDA0003287669670000072
为UE在MCG中的最大准备时间,
Figure BDA0003287669670000073
为UE在SCG中的最大准备时间。在“向前看(Look-ahead)”时,
Figure BDA0003287669670000074
的取值为Tproc,2,Tproc,CSI,
Figure BDA0003287669670000075
和/或
Figure BDA0003287669670000076
中的最大值;在“不使用向前看(Without look-ahead)”时,
Figure BDA0003287669670000077
的取值为Tproc,2,Tproc,CSI,
Figure BDA0003287669670000078
和/或
Figure BDA0003287669670000079
中的最大值。The value of T_offset is
Figure BDA0003287669670000071
in
Figure BDA0003287669670000072
is the maximum preparation time of UE in MCG,
Figure BDA0003287669670000073
The maximum preparation time of the UE in the SCG.
Figure BDA0003287669670000074
The value of is T proc,2 ,T proc,CSI ,
Figure BDA0003287669670000075
and/or
Figure BDA0003287669670000076
The maximum value in; When "Without look-ahead",
Figure BDA0003287669670000077
The value of is T proc,2 ,T proc,CSI ,
Figure BDA0003287669670000078
and/or
Figure BDA0003287669670000079
The maximum value in .

以上参数的解释:Explanation of the above parameters:

Tproc,2为终端在MCG或SCG的物理上行共享信道(Physical Uplink SharedChannel,PUSCH)processing time;T proc,2 is the physical uplink shared channel (PUSCH) processing time of the terminal in MCG or SCG;

需要说明的是,processing time可以理解为准备时间、处理时间、准备时延或处理时延等。It should be noted that processing time can be understood as preparation time, processing time, preparation delay or processing delay, etc.

Tproc,CSI为终端在MCG或SCG的信道状态信息(Channel State Information,CSI)准备时间;T proc,CSI is the channel state information (CSI) preparation time of the terminal in MCG or SCG;

Figure BDA0003287669670000081
为终端在MCG或SCG上发送SPS PDSCH release的PUSCH或PUCCH与其他PUCCH和/或PUSCH复用时的SPS PDSCH release准备时间;
Figure BDA0003287669670000081
The SPS PDSCH release preparation time when the PUSCH or PUCCH of the SPS PDSCH release sent by the terminal on the MCG or SCG is multiplexed with other PUCCH and/or PUSCH;

Figure BDA0003287669670000082
为终端在MCG或SCG的PUSCH与PUCCH和/或其他PUSCH复用时的PUSCH准备时间;
Figure BDA0003287669670000082
It is the PUSCH preparation time of the terminal when the PUSCH of MCG or SCG is multiplexed with PUCCH and/or other PUSCH;

Figure BDA0003287669670000083
为终端在MCG或SCG上发送CSI的PUSCH或PUCCH与其他PUCCH或PUSCH复用时的CSI准备时间。
Figure BDA0003287669670000083
It is the CSI preparation time when the PUSCH or PUCCH for sending CSI by the terminal on the MCG or SCG is multiplexed with other PUCCH or PUSCH.

3、Rel-17 SCG激活/去激活机制3. Rel-17 SCG activation/deactivation mechanism

Rel-17引入了SCG激活/去激活机制。当SCG上没有需要传输的数据或者UE当前过热或者出于省电的目的,网络侧和UE侧可以发起SCG去激活流程。当这些条件有所改变时,网络侧和UE侧可以再发起SCG激活流程。由于SCG去激活期间,UE不监听SCG上的PDCCH,也没有物理上行共享信道(PUSCH)、SRS传输等行为,终端在这期间可以较为省电的方式工作。此外,在此期间UE还可能进行SCG的无线资源管理(RRM)测量、无线链路管理(RLM)测量,从而尽量保证在激活SCG时SCG是质量良好的。Rel-17 introduced the SCG activation/deactivation mechanism. When there is no data to be transmitted on the SCG or the UE is currently overheated or for the purpose of power saving, the network side and the UE side can initiate the SCG deactivation process. When these conditions change, the network side and the UE side can initiate the SCG activation process again. Since the UE does not monitor the PDCCH on the SCG during SCG deactivation, and there is no physical uplink shared channel (PUSCH), SRS transmission and other behaviors, the terminal can operate in a more power-saving manner during this period. In addition, during this period, the UE may also perform radio resource management (RRM) measurements and radio link management (RLM) measurements of the SCG, so as to try to ensure that the SCG is of good quality when the SCG is activated.

4、多连接MC4. Multi-connection MC

3GPP的后续版本中可能会引入多个SCG,即网络侧给终端配置MCG及多于一个SCG,利用聚合技术或者SCG转换技术,来提高UE的吞吐量、移动性、链路稳定性等方面的性能。Multiple SCGs may be introduced in subsequent versions of 3GPP, that is, the network side configures MCG and more than one SCG for the terminal, and uses aggregation technology or SCG conversion technology to improve the UE's performance in terms of throughput, mobility, link stability, etc.

下面结合附图,通过一些实施例及其应用场景对本申请实施例提供的功率控制方法、装置、终端及网络节点进行详细地说明。The power control method, device, terminal and network node provided in the embodiments of the present application are described in detail below with reference to the accompanying drawings through some embodiments and their application scenarios.

如图2所示,本申请实施例提供一种功率控制方法,包括:As shown in FIG2 , an embodiment of the present application provides a power control method, including:

步骤201,终端根据服务小区组的状态,进行上行功控参数的调整;Step 201, the terminal adjusts the uplink power control parameters according to the status of the serving cell group;

其中,所述服务小区组包括:所述终端的主小区组MCG和/或至少一个辅小区组SCG;所述上行功控参数用于控制所述终端在双连接DC模式和/或多连接MC模式下的上行传输功率。Among them, the service cell group includes: the main cell group MCG and/or at least one secondary cell group SCG of the terminal; the uplink power control parameter is used to control the uplink transmission power of the terminal in dual connection DC mode and/or multi-connection MC mode.

需要说明的是,本申请实施例中的上行功控参数(即上行功率控制参数)主要包括以下至少一项:上行功控模式(即上行功率控制模式)、UE的最大上行发射功率配置、UE在对应小区组的最大上行发射功率配置、上行功控相关的终端能力、UE在动态模式下所使用的时间偏移量(T_offset)。It should be noted that the uplink power control parameters (i.e., uplink power control parameters) in the embodiments of the present application mainly include at least one of the following: uplink power control mode (i.e., uplink power control mode), the maximum uplink transmit power configuration of the UE, the maximum uplink transmit power configuration of the UE in the corresponding cell group, the terminal capabilities related to uplink power control, and the time offset (T_offset) used by the UE in the dynamic mode.

上行功控参数用于控制所述终端在双连接DC模式下的上行传输功率,所述DC模式可以是NR-DC、EN-DC、NGEN-DC,NE-DC等。The uplink power control parameter is used to control the uplink transmission power of the terminal in the dual connection DC mode, and the DC mode can be NR-DC, EN-DC, NGEN-DC, NE-DC, etc.

所述上行功控参数可能是所述终端在双连接模式下由网络侧配置的,那么当所述终端进入多连接模式的情况下,所述上行功控参数也可以基于协议约定或者网络侧的指示应用到多连接模式下。The uplink power control parameter may be configured by the network side when the terminal is in the dual connection mode. Then, when the terminal enters the multi-connection mode, the uplink power control parameter may also be applied to the multi-connection mode based on the protocol agreement or the instruction of the network side.

另一种实施例为,在所述终端工作于多连接模式下,网络侧可以给终端配置专用于多连接模式下的上行功率控制参数。例如,网络侧可以将多连接模式下的上行功率控制模式配置为每个小区组独立地执行功率控制。再如,当终端的MCG和2个SCG都处于激活状态时,终端基于网络侧配置的UE的最大上行传输功率,MCG的最大上行传输功率,两个SCG上分别的最大上行传输功率来执行每个小区组独立地上行功率控制。Another embodiment is that when the terminal operates in the multi-connection mode, the network side can configure the terminal with uplink power control parameters dedicated to the multi-connection mode. For example, the network side can configure the uplink power control mode in the multi-connection mode to independently perform power control for each cell group. For another example, when the MCG and two SCGs of the terminal are both activated, the terminal performs independent uplink power control for each cell group based on the maximum uplink transmission power of the UE configured by the network side, the maximum uplink transmission power of the MCG, and the maximum uplink transmission power of the two SCGs.

这里需要说明的是,本申请实施例中所说的上行功控模式包括上行功率共享中的三个模式和每个小区组的独立功控(也可以称为独立功控模式)。It should be noted here that the uplink power control mode mentioned in the embodiment of the present application includes three modes in uplink power sharing and independent power control of each cell group (also referred to as independent power control mode).

下面对本申请的具体实现方式说明如下。The specific implementation method of this application is described below.

情况一、终端基于第一配置向主节点(MN)发送指示。Case 1: The terminal sends an indication to the master node (MN) based on the first configuration.

可选地,此种情况下,步骤201的实现方式为:Optionally, in this case, step 201 is implemented as follows:

在所述终端向网络侧请求第一配置,或接收到所述第一配置的情况下,向主节点MN发送第一指示信息;When the terminal requests the first configuration from the network side or receives the first configuration, sending first indication information to the master node MN;

需要说明的是,此处所提到的网络侧可以指MN,也可以指辅节点(SN),即终端可以向MN请求第一配置,也可以向SN请求第一配置;可选地,终端可以从MN接收到第一配置,也可以从SN接收到第一配置。It should be noted that the network side mentioned here can refer to MN or secondary node (SN), that is, the terminal can request the first configuration from MN or SN; optionally, the terminal can receive the first configuration from MN or SN.

可选地,该第一配置用于指示以下一项:Optionally, the first configuration is used to indicate one of the following:

A11、将所述终端配置为多连接模式;A11, configuring the terminal to a multi-connection mode;

此种情况是,为终端配置至少一个SCG,使终端处于多连接模式。In this case, at least one SCG is configured for the terminal so that the terminal is in multi-connection mode.

A12、为所述终端配置多个SCG;A12. Configure multiple SCGs for the terminal;

需要说明的是,此种情况下的第一配置可以用于一次为终端配置多个SCG;或者,第一配置用于在终端已经被配置一个SCG的情况下,为终端额外配置其他SCG。It should be noted that the first configuration in this case can be used to configure multiple SCGs for the terminal at one time; or, the first configuration is used to configure other SCGs for the terminal when the terminal has been configured with one SCG.

在本申请中,所述终端被配置为多连接模式和被配置多个SCG的说法,在描述具体方法时可以互换。In the present application, the statements that the terminal is configured in multi-connection mode and is configured with multiple SCGs can be interchangeable when describing specific methods.

可选地,所述第一指示信息用于指示以下一项:Optionally, the first indication information is used to indicate one of the following:

A21、所述终端支持的上行功控模式为半静态模式一(即半静态模式1);A21, the uplink power control mode supported by the terminal is semi-static mode 1 (i.e., semi-static mode 1);

A22、所述终端仅支持每个服务小区组的独立功率控制;A22, the terminal only supports independent power control of each serving cell group;

需要说明的是,本申请实施例中所说的半静态模式一也可以理解为在每个小区组上执行独立地功率控制。It should be noted that the semi-static mode 1 mentioned in the embodiment of the present application can also be understood as performing independent power control on each cell group.

一种实施方式为,在上报第一指示信息之前,所述终端上报过支持的上行功控模式,再上报第一指示信息意味着,所述终端重新上报自己的上行功控模式(替换之前上报的),或者所述终端去使能(disable)一部分上行功控模式,仅使能终端当前在第一指示信息中指示的上行功控模式。One implementation method is that before reporting the first indication information, the terminal has reported the supported uplink power control mode, and reporting the first indication information again means that the terminal re-reports its own uplink power control mode (replacing the previously reported one), or the terminal disables part of the uplink power control mode and only enables the uplink power control mode currently indicated by the terminal in the first indication information.

A23、请求将上行功控模式配置为半静态模式一;A23, request to configure the uplink power control mode to semi-static mode 1;

A24、请求配置每个服务小区组的独立功率控制。A24. Request to configure independent power control for each service cell group.

需要说明的是,上述的A21和A22可以看作是终端能力的上报,即终端可以直接在向网络侧请求第一配置,或接收到第一配置的情况下就向MN发送终端关于上行功控的能力,MN基于终端的能力进行上行功控模式的配置;而上述的A23和A24可以看作是终端主动请求配何种上行功控模式,即终端可以直接在向网络侧请求第一配置,或接收到第一配置的情况下就向MN请求更新上行功控模式,MN基于终端的请求判断是否为终端进行上行功控模式的重新配置。It should be noted that the above-mentioned A21 and A22 can be regarded as reporting of terminal capabilities, that is, the terminal can directly request the first configuration from the network side, or send the terminal's uplink power control capabilities to the MN after receiving the first configuration, and the MN configures the uplink power control mode based on the terminal's capabilities; and the above-mentioned A23 and A24 can be regarded as the terminal actively requesting which uplink power control mode to configure, that is, the terminal can directly request the first configuration from the network side, or request the MN to update the uplink power control mode after receiving the first configuration, and the MN determines whether to reconfigure the uplink power control mode for the terminal based on the terminal's request.

需要说明的是,终端可以直接在向网络侧请求第一配置,或接收到第一配置的情况下就向MN发送第一指示信息,可选地,为了进一步降低第一指示信息的发送频率,本申请实施例中还可以在终端向网络侧请求第一配置,或接收到第一配置的情况下,同时再判断是否满足第一条件,只有在满足第一条件的情况下,终端才向MN发送第一指示信息。It should be noted that the terminal can directly send the first indication information to the MN when requesting the first configuration from the network side or receiving the first configuration. Optionally, in order to further reduce the sending frequency of the first indication information, in an embodiment of the present application, when the terminal requests the first configuration from the network side or receives the first configuration, it can also determine whether the first condition is met at the same time. Only when the first condition is met, the terminal sends the first indication information to the MN.

可选地,该第一条件包括以下至少一项:Optionally, the first condition includes at least one of the following:

A31、所述第一配置为SN生成;A31, the first configuration is SN generation;

A32、所述第一配置为SN发送给所述终端;A32. The first configuration is sent as SN to the terminal;

A33、所述第一配置对所述MN不可见;A33: The first configuration is invisible to the MN;

需要说明的是,在A31至A33这三种情况下,因第一配置是由SN决定的,MN不知道SN进行了何种配置,需要将第一指示信息发送给MN,以保证MN与终端的理解一致。It should be noted that, in the three cases A31 to A33, since the first configuration is determined by the SN, the MN does not know what configuration the SN has performed, and the first indication information needs to be sent to the MN to ensure that the MN and the terminal have consistent understanding.

A34、终端当前的上行功控模式为半静态模式二;A34, the current uplink power control mode of the terminal is semi-static mode 2;

具体地,半静态模式二(即半静态模式2)是UE确定MCG上的上行功率时,需要考虑SCG的上下行帧结构(例如,时分双工图案(TDD pattern)的配置。Specifically, semi-static mode 2 (ie, semi-static mode 2) is that when the UE determines the uplink power on the MCG, it needs to consider the uplink and downlink frame structure of the SCG (eg, the configuration of the time division duplex pattern (TDD pattern)).

可选地,在此种情况下,所述第一条件还包括以下至少一项:Optionally, in this case, the first condition also includes at least one of the following:

A341、多个SCG的TDD pattern满足第二条件,所述第二条件包括:多个SCG的TDDpattern不同,或多个SCG的TDD pattern的差别大于或等于第一阈值;A341. The TDD patterns of the multiple SCGs satisfy a second condition, where the second condition includes: the TDD patterns of the multiple SCGs are different, or the difference between the TDD patterns of the multiple SCGs is greater than or equal to a first threshold;

例如,多个SCG的TDD pattern不同可以是TDD pattern common configuration和dedicated configuration中至少一个不同;For example, the different TDD patterns of the multiple SCGs may be different in at least one of the TDD pattern common configuration and the dedicated configuration;

多个SCG的TDD pattern的差别可以是TDD pattern common configuration和dedicated configuration中至少一个的差别大于或等于第一阈值。The difference in TDD patterns of the plurality of SCGs may be that a difference in at least one of a common configuration and a dedicated configuration of the TDD pattern is greater than or equal to a first threshold.

第一阈值可以是多个SCG的TDD pattern中在对应子帧或时隙或正交频分复用(Orthogonal Frequency Division Multiplexing,OFDM)符号上的不同上下行传输方向的个数或比例。The first threshold may be the number or ratio of different uplink and downlink transmission directions in the TDD patterns of the multiple SCGs in the corresponding subframes or time slots or orthogonal frequency division multiplexing (OFDM) symbols.

A342、多个SCG所对应的SCG最大发射功率满足第三条件,所述第三条件包括:多个SCG所对应的SCG最大发射功率不同,或多个SCG所对应的SCG最大发射功率的差别大于或等于第二阈值。A342. The SCG maximum transmission power corresponding to multiple SCGs satisfies the third condition, and the third condition includes: the SCG maximum transmission power corresponding to multiple SCGs is different, or the difference in the SCG maximum transmission power corresponding to multiple SCGs is greater than or equal to the second threshold.

需要说明的是,A342中的方式也可以适用于MCG最大发射功率和/或UE最大发射功率。It should be noted that the method in A342 can also be applied to the MCG maximum transmit power and/or the UE maximum transmit power.

A35、终端当前的上行功控模式为动态模式;A35, the current uplink power control mode of the terminal is dynamic mode;

可选地,在此种情况下,所述第一条件还包括以下至少一项:Optionally, in this case, the first condition also includes at least one of the following:

A351、多个SCG对应的时域偏移量满足第四条件,所述第四条件包括:多个SCG对应的时域偏移量不同,或多个SCG对应的时域偏移量的差值大于或等于第三阈值;A351. The time domain offsets corresponding to the multiple SCGs meet the fourth condition, wherein the fourth condition includes: the time domain offsets corresponding to the multiple SCGs are different, or the difference between the time domain offsets corresponding to the multiple SCGs is greater than or equal to the third threshold;

需要说明的是,此处所说的时域偏移量指的是UE在上行功控模式为动态模式时所使用的时间偏移量(T_offset)。由于可以认为MCG配置是不随SCG转换而变化的,即仅SCG配置会因为SCG转换发生变化,那么SCG对应的时域偏移量可以理解为,在某个SCG配置下,终端基于该SCG配置、MCG配置和公式

Figure BDA0003287669670000121
计算出的时域偏移量T-offset值。It should be noted that the time domain offset mentioned here refers to the time offset (T_offset) used by the UE when the uplink power control mode is dynamic mode. Since it can be considered that the MCG configuration does not change with the SCG conversion, that is, only the SCG configuration will change due to the SCG conversion, then the time domain offset corresponding to the SCG can be understood as, under a certain SCG configuration, the terminal based on the SCG configuration, MCG configuration and formula
Figure BDA0003287669670000121
The calculated time domain offset T-offset value.

A352、多个SCG对应的SCG最大发射功率满足第五条件,所述第五条件包括:多个SCG对应的SCG最大发射功率不同,或多个SCG对应的SCG最大发射功率的差值大于或等于第四阈值。A352. The SCG maximum transmission power corresponding to multiple SCGs satisfies the fifth condition, and the fifth condition includes: the SCG maximum transmission powers corresponding to multiple SCGs are different, or the difference in the SCG maximum transmission powers corresponding to multiple SCGs is greater than or equal to the fourth threshold.

需要说明的是,A352中的方式也可以适用于MCG最大发射功率和/或UE最大发射功率。It should be noted that the method in A352 can also be applied to MCG maximum transmit power and/or UE maximum transmit power.

需要说明的是,上述的第一阈值、第二阈值、第三阈值和第四阈值可以是协议约定,也可以是网络侧配置或预配置的。It should be noted that the first threshold, the second threshold, the third threshold and the fourth threshold mentioned above may be a protocol agreement, or may be a network-side configuration or pre-configuration.

可选地,本申请实施例中还提供了一种根据终端服务小区组状态更新上行功控模式的方式,具体地,在所述终端接收到第一释放指示的情况下,向所述MN发送第二指示信息。Optionally, an embodiment of the present application further provides a method for updating an uplink power control mode according to a terminal service cell group status. Specifically, when the terminal receives a first release indication, a second indication information is sent to the MN.

需要说明的是,所述第二指示信息满足以下一项:It should be noted that the second indication information satisfies one of the following:

A41、用于更新所述终端支持的上行功控模式;A41, used to update the uplink power control mode supported by the terminal;

需要说明的是,此种情况是终端自动触发更新,只要收到第一释放指示,则终端自动更新支持的上行功控模式,并将自身的此种能力(指的是支持何种上行功控模式的能力)告知MN。It should be noted that in this case, the terminal automatically triggers the update. As long as the first release indication is received, the terminal automatically updates the supported uplink power control mode and informs the MN of its own capability (referring to the capability of supporting which uplink power control mode).

A42、用于请求MN重配置所述上行功控模式;A42, used to request the MN to reconfigure the uplink power control mode;

需要说明的是,此种情况是终端向MN请求重配置上行功控模式,即只要收到第一释放指示,终端便向MN发送第二指示信息,请求MN为其重新配置上行功控模式。It should be noted that in this case, the terminal requests the MN to reconfigure the uplink power control mode, that is, as long as the first release indication is received, the terminal sends the second indication information to the MN, requesting the MN to reconfigure the uplink power control mode for it.

其中,所述第一释放指示用于指示以下至少之一:The first release indication is used to indicate at least one of the following:

A51、释放多连接模式配置;A51, release multi-connection mode configuration;

A52、释放至少一个所述SCG的配置。A52. Release the configuration of at least one of the SCGs.

下面对此种情况在实际应用中的使用举例说明如下。The following is an example of how this situation can be used in practical applications.

举例一、一旦UE被SN配置了第二SCG或多连接模式,UE向MN上报自己的上行功率控制能力为半静态模式1Example 1: Once the UE is configured with the second SCG or multi-connection mode by the SN, the UE reports its uplink power control capability to the MN as semi-static mode 1

此使用情况下的具体过程包括:The specific process for this use case includes:

步骤S101、UE被配置MCG和第一SCG,工作于双连接模式。双连接上行功控模式被配置为动态模式或半静态模式2;Step S101: The UE is configured with an MCG and a first SCG and operates in a dual connection mode. The dual connection uplink power control mode is configured as a dynamic mode or a semi-static mode 2;

步骤S102、UE接收第二SCG的配置或UE被配置为多连接模式。Step S102: The UE receives the configuration of the second SCG or the UE is configured for multi-connection mode.

步骤S103、在条件A满足时,UE向网络侧指示自己仅支持半静态模式1:Step S103: When condition A is met, the UE indicates to the network that it only supports semi-static mode 1:

条件A包括以下一项:Condition A includes one of the following:

A1、第二SCG的配置或多连接配置为SN配置的,对MN不可见;A1. The configuration of the second SCG or the multi-connection configuration is configured by the SN and is not visible to the MN;

A2、UE当前功控模式为半静态模式2,而第一SCG和第二SCG的TDD pattern(commonconfiguration)不同或者差别超过某个预设值;A2. The current power control mode of the UE is semi-static mode 2, and the TDD patterns (common configuration) of the first SCG and the second SCG are different or the difference exceeds a preset value;

A3、UE当前功控模式为动态模式,而第一SCG和第二SCG的T_Offset不同,或者差别超过某个预设范围;A3. The current power control mode of the UE is dynamic mode, and the T_Offset of the first SCG and the second SCG is different, or the difference exceeds a certain preset range;

步骤S104、UE收到重配消息,其双连接上行功控模式被配置为半静态模式1。Step S104: The UE receives a reconfiguration message, and its dual connection uplink power control mode is configured as semi-static mode 1.

可选地,在步骤S104之后,UE在第一SCG和第二SCG之间切换时,上行功控模式一直为半静态模式1。若UE接收到网络侧的第二SCG释放指示或者多连接释放指示,UE可以向网络侧更新上行功控模式的相关能力。Optionally, after step S104, when the UE switches between the first SCG and the second SCG, the uplink power control mode is always semi-static mode 1. If the UE receives a second SCG release indication or a multi-connection release indication from the network side, the UE may update the relevant capabilities of the uplink power control mode to the network side.

情况二、终端在SCG发生转换(Switch)的情况下执行的相关操作Case 2: Related operations performed by the terminal when the SCG switches

可选地,此种情况下,步骤201的实现方式为:Optionally, in this case, step 201 is implemented as follows:

在所述终端执行SCG转换的情况下,终端执行第一操作;In the case where the terminal performs SCG conversion, the terminal performs a first operation;

其中,所述第一操作包括以下至少一项:The first operation includes at least one of the following:

B11、若转换前所述上行功控模式为动态模式,且转换后所述终端保持所述上行功控模式不变,则所述终端通过第一方式确定转换后所使用的时间偏移量;B11. If the uplink power control mode before the conversion is a dynamic mode, and the terminal maintains the uplink power control mode unchanged after the conversion, the terminal determines the time offset used after the conversion by a first method;

可选地,所述第一方式包括以下至少一项:Optionally, the first method includes at least one of the following:

B111、将第一时间偏移量确定为转换后所使用的时间偏移量,所述第一时间偏移量为转换前的时间偏移量和根据转换后的SCG所计算出的时间偏移量中取值最小或者取值最大的一个;B111, determining a first time offset as the time offset used after conversion, wherein the first time offset is the smallest or largest one of the time offset before conversion and the time offset calculated according to the SCG after conversion;

B112、若转换前的时间偏移量与根据转换后的SCG所计算出的时间偏移量的差值大于或等于第五阈值,确定转换后所使用的时间偏移量为默认值;B112, if the difference between the time offset before conversion and the time offset calculated according to the SCG after conversion is greater than or equal to a fifth threshold, determining the time offset used after conversion to be a default value;

例如,时间偏移量较大的一者减去时间偏移量较小的一者后,若差值(差值为正值)大于或等于第五阈值,则表明转换前与转换后的时间偏移量差别较大,此时不能再利用转换前的时间偏移量或转换后的时间偏移量,而是所使用一个预先设置的默认值。再如,转换前的时间偏移量减去根据转换后的SCG所计算出的时间偏移量后,若差值(正值或负值)大于或等于第五阈值,则表明转换前与转换后的时间偏移量差别较大,此时不能再利用转换前的时间偏移量或转换后的时间偏移量,而是所使用一个预先设置的默认值。For example, after subtracting the time offset with the larger time offset from the time offset with the smaller time offset, if the difference (the difference is a positive value) is greater than or equal to the fifth threshold, it indicates that the time offset before and after the conversion is significantly different, and the time offset before or after the conversion cannot be used at this time, but a preset default value is used. For another example, after subtracting the time offset calculated according to the converted SCG from the time offset before the conversion, if the difference (positive or negative value) is greater than or equal to the fifth threshold, it indicates that the time offset before and after the conversion is significantly different, and the time offset before or after the conversion cannot be used at this time, but a preset default value is used.

B113、若转换前的时间偏移量与根据转换后的SCG所计算出的时间偏移量的差值小于或等于第六阈值,确定转换后所使用的时间偏移量为默认值。B113. If the difference between the time offset before conversion and the time offset calculated according to the SCG after conversion is less than or equal to a sixth threshold, determine that the time offset used after conversion is a default value.

例如,时间偏移量较小的一者减去时间偏移量较大的一者后,若差值(差值为负值)小于或等于第六阈值,则表明转换前与转换后的时间偏移量差别较大,此时不能再利用转换前的时间偏移量或转换后的时间偏移量,而是所使用一个预先设置的默认值。再如,转换前的时间偏移量减去根据转换后的SCG所计算出的时间偏移量后,若差值(负值或正值)小于或等于第六阈值,则表明转换前与转换后的时间偏移量差别较大,此时不能再利用转换前的时间偏移量或转换后的时间偏移量,而是使用一个预先设置的默认值。For example, after subtracting the time offset with the smaller time offset from the time offset with the larger time offset, if the difference (the difference is a negative value) is less than or equal to the sixth threshold, it indicates that the time offsets before and after the conversion are greatly different, and the time offset before or after the conversion cannot be used at this time, but a preset default value is used. For another example, after subtracting the time offset calculated according to the converted SCG from the time offset before the conversion, if the difference (negative or positive value) is less than or equal to the sixth threshold, it indicates that the time offsets before and after the conversion are greatly different, and the time offset before or after the conversion cannot be used at this time, but a preset default value is used.

这里需要说明的是,B112和B113可以理解为若转换前的时间偏移量与根据转换后的SCG所计算出的时间偏移量的差值的绝对值大于或等于预设值,则确定转换后所使用的时间偏移量为默认值。It should be noted here that B112 and B113 can be understood as if the absolute value of the difference between the time offset before conversion and the time offset calculated according to the converted SCG is greater than or equal to the preset value, then the time offset used after conversion is determined to be the default value.

下面对此种情况在实际应用中的使用举例说明如下。The following is an example of how this situation can be used in practical applications.

举例二、动态功控模式下,在SCG Switch过程中UE总是使用Switch前后的T_Offset最小值或者默认值Example 2: In dynamic power control mode, during SCG Switch, UE always uses the minimum or default value of T_Offset before and after Switch.

此使用情况下的具体过程包括:The specific process for this use case includes:

步骤S201、UE被配置MCG、第一SCG,第二SCG;Step S201: UE is configured with MCG, first SCG, and second SCG;

其中,双连接上行功控模式被配置为动态模式,根据第一SCG、第二SCG计算出的时间偏移量为T_offset1、T_offset2;Among them, the dual connection uplink power control mode is configured as a dynamic mode, and the time offsets calculated according to the first SCG and the second SCG are T_offset1 and T_offset2;

步骤S202、若终端执行了SCG Switching,例如,从第一SCG Switch到第二SCG,终端通过方式B确定Switch后所采用的T_offset;Step S202: If the terminal performs SCG Switching, for example, from the first SCG Switch to the second SCG, the terminal determines the T_offset used after Switching through method B;

方式B包括以下一项:Method B includes one of the following:

B1、选择Switch前后T_offset的最小值作为当前选择的T_offset值;B1. Select the minimum value of T_offset before and after Switch as the currently selected T_offset value;

例如,T_offset1最小,则确定转换后使用的时间偏移量为T_offset1。For example, if T_offset1 is the smallest, the time offset used after conversion is determined to be T_offset1.

B2、若Switch前后T_offset值变化超过某一预设阈值,UE将当前的时间偏移量配置为一个默认值。B2. If the T_offset value change before and after the Switch exceeds a preset threshold, the UE configures the current time offset as a default value.

B12、根据转换后的激活的SCG的频率范围与MCG的频率范围的关系,确定上行功控模式;B12, determining the uplink power control mode according to the relationship between the frequency range of the activated SCG and the frequency range of the MCG after conversion;

需要说明的是,此种情况的进一步实现方式为:It should be noted that the further implementation of this situation is as follows:

B121、若转换后的激活的SCG的频率范围与MCG的频率范围不同,则终端确定转换后所使用的上行功控模式为独立功控模式或半静态模式一;B121. If the frequency range of the activated SCG after conversion is different from the frequency range of the MCG, the terminal determines that the uplink power control mode used after conversion is the independent power control mode or the semi-static mode 1;

下面对此种情况在实际应用中的使用举例说明如下。The following is an example of how this situation can be used in practical applications.

举例三、SCG Switch触发的上行功控模式改变,从相同FR切到不同FRExample 3: Uplink power control mode change triggered by SCG Switch, from the same FR to a different FR

步骤S301、UE被配置MCG(FR1)、第一SCG(FR1),第二SCG(FR2)。双连接上行功控模式被配置为动态模式;Step S301: The UE is configured with MCG (FR1), the first SCG (FR1), and the second SCG (FR2). The dual connection uplink power control mode is configured as dynamic mode;

步骤S302、终端工作于MCG和第一SCG,使用动态模式进行上行功率控制;Step S302: The terminal works in the MCG and the first SCG and uses a dynamic mode to perform uplink power control;

步骤S303、若UE执行了SCG Switching,从第一SCG Switch到第二SCG,由于MCG和第二SCG是不同的FR,则UE执行每个小区组的独立功控或者使用半静态模式1进行上行功率控制。Step S303: If the UE performs SCG Switching, from the first SCG Switch to the second SCG, since the MCG and the second SCG are different FRs, the UE performs independent power control for each cell group or uses semi-static mode 1 for uplink power control.

B122、若转换后的激活的SCG的频率范围与MCG的频率范围相同,则终端执行第二操作;B122. If the frequency range of the activated SCG after conversion is the same as the frequency range of the MCG, the terminal performs a second operation;

具体地,所述第二操作包括以下一项:Specifically, the second operation includes one of the following:

B1221、确定转换后所使用的上行功控模式为预配置的上行功控模式;B1221, determining that the uplink power control mode used after the conversion is the pre-configured uplink power control mode;

需要说明的是,终端在进行双连接配置时,可以被配置在双连接下的预配置的上行功控模式,在转换前使用的上行功控模式与预配置的上行功控模式不一致,此种情况下因转换后的激活的SCG的频率范围与MCG的频率范围相同,则终端可以使用之前配置的上行功控模式。It should be noted that when the terminal is performing dual connection configuration, it can be configured in the pre-configured uplink power control mode under the dual connection. The uplink power control mode used before the conversion is inconsistent with the pre-configured uplink power control mode. In this case, since the frequency range of the activated SCG after the conversion is the same as the frequency range of the MCG, the terminal can use the previously configured uplink power control mode.

B1222、终端忽略预配置的上行功控模式,确定转换后所使用的上行功控模式为独立功控模式或半静态模式一;B1222, the terminal ignores the pre-configured uplink power control mode and determines that the uplink power control mode used after the conversion is the independent power control mode or the semi-static mode 1;

需要说明的是,此种情况是终端不考虑与配置的上行功控模式,直接在转换后进行独立的功率控制。It should be noted that in this case, the terminal does not consider the configured uplink power control mode and directly performs independent power control after the conversion.

下面对此种情况在实际应用中的使用举例说明如下。The following is an example of how this situation can be used in practical applications.

举例四、SCG Switch触发的上行功控模式改变,从不同FR切到相同FRExample 4: Uplink power control mode change triggered by SCG Switch, switching from different FR to the same FR

步骤S401、UE被配置MCG(FR2)、第一SCG(FR1),第二SCG(FR2)。双连接上行功控模式被预配置为动态模式;Step S401: The UE is configured with MCG (FR2), the first SCG (FR1), and the second SCG (FR2). The dual connection uplink power control mode is preconfigured as a dynamic mode;

步骤S402、终端工作于MCG和第一SCG,UE执行独立功控;Step S402: The terminal works in the MCG and the first SCG, and the UE performs independent power control;

步骤S403、若UE执行了SCG Switching,从第一SCG Switch到第二SCG,由于MCG和第二SCG是相同的FR,则UE按照预配置的上行功控模式执行动态模式,或者UE忽略预配置的上行功控模式,继续执行独立的功控。Step S403: If the UE performs SCG Switching from the first SCG Switch to the second SCG, since the MCG and the second SCG are the same FR, the UE performs the dynamic mode according to the pre-configured uplink power control mode, or the UE ignores the pre-configured uplink power control mode and continues to perform independent power control.

B13、向MN发送时间偏移量变化信息;B13. Sending time offset change information to MN;

可选地,所述时间偏移量变化信息包括以下至少一项:Optionally, the time offset change information includes at least one of the following:

SCG转换指示、变化后的时间偏移量、或时间偏移量的变化量、转换前的SCG标识和转换后的SCG标识。SCG conversion indication, the time offset after the change, or the change in the time offset, the SCG identifier before the conversion and the SCG identifier after the conversion.

下面对此种情况在实际应用中的使用举例说明如下。The following is an example of how this situation can be used in practical applications.

举例五、SCG Switch后,UE发起T_offset的更新协商过程Example 5: After SCG Switch, UE initiates T_offset update negotiation process

步骤S501、UE被配置MCG、第一SCG,第二SCG。双连接上行功控模式被配置为动态模式。Step S501: The UE is configured with an MCG, a first SCG, and a second SCG. The dual connection uplink power control mode is configured as a dynamic mode.

步骤S502、一旦UE执行了SCG Switching,从第一SCG Switch到第二SCG,UE向MN上报携带SCG转换指示的时间偏移量变化信息,以向MN通知UE自己执行了SCG Switching。Step S502: Once the UE executes SCG Switching, from the first SCG Switch to the second SCG, the UE reports the time offset change information carrying the SCG switching indication to the MN to notify the MN that the UE has executed SCG Switching.

情况三、终端基于传输状态进行上行功控模式的确定Case 3: The terminal determines the uplink power control mode based on the transmission status

可选地,此种情况下,步骤201的实现方式为:Optionally, in this case, step 201 is implemented as follows:

在终端的第一传输处于第一状态的情况下,确定上行功控模式为动态模式;When the first transmission of the terminal is in the first state, determining that the uplink power control mode is a dynamic mode;

其中,所述第一传输为MCG传输或SCG传输;The first transmission is MCG transmission or SCG transmission;

所述第一状态包括以下至少一项:The first state includes at least one of the following:

被挂起、发生异常、失败、被去激活。Suspended, exception occurred, failed, deactivated.

可选地,在终端的第一传输恢复的情况下,确定上行功控模式为第一传输处于第一状态之前所使用的上行功控模式或者为配置的上行功率控制模式。Optionally, when the first transmission of the terminal is resumed, the uplink power control mode is determined to be the uplink power control mode used before the first transmission was in the first state or the configured uplink power control mode.

下面对此种情况在实际应用中的使用举例说明如下。The following is an example of how this situation can be used in practical applications.

举例六、fast MCG recovery过程中的上行功率控制Example 6: Uplink power control during fast MCG recovery

步骤S601、UE被配置MCG和SCG,上行功控模式被配置为半静态模式1;Step S601: The UE is configured with MCG and SCG, and the uplink power control mode is configured as semi-static mode 1;

步骤S602、MCG发生了无线链路失败;Step S602: A radio link failure occurs in the MCG;

步骤S603、UE发起MCG failure information流程(即通过SCG上报MCG失败)。一旦发起该流程,UE挂起MCG的传输,并通过SCG发送MCG failure information消息;Step S603: The UE initiates the MCG failure information process (i.e., reports the MCG failure through the SCG). Once the process is initiated, the UE suspends the transmission of the MCG and sends the MCG failure information message through the SCG;

步骤S604、一旦UE挂起了MCG传输,UE认为自己的上行功控模式为动态模式。Step S604: Once the UE suspends the MCG transmission, the UE considers that its uplink power control mode is the dynamic mode.

步骤S605、一旦UE收到了MCG同步重配消息或一旦MCG传输被恢复,UE认为自己的上行功控模式被恢复为半静态模式1。Step S605: Once the UE receives the MCG synchronization reconfiguration message or once the MCG transmission is restored, the UE considers that its uplink power control mode is restored to semi-static mode 1.

举例七、SCG去激活后的UE上行功控Example 7: UE uplink power control after SCG deactivation

步骤S701、UE被配置MCG和SCG,上行功控模式被配置为半静态模式1(即功率硬分割);Step S701: The UE is configured with MCG and SCG, and the uplink power control mode is configured as semi-static mode 1 (i.e., hard power splitting);

步骤S702、一旦SCG被去激活,UE认为自己的上行功控模式为动态模式。Step S702: Once the SCG is deactivated, the UE considers that its uplink power control mode is a dynamic mode.

步骤S703、一旦SCG被激活或者UE发起了SCG激活流程,UE认为自己的上行功控模式被恢复为半静态模式1。Step S703: Once the SCG is activated or the UE initiates the SCG activation process, the UE considers that its uplink power control mode is restored to semi-static mode 1.

情况四、终端重新请求配置至少一个SCGCase 4: The terminal re-requests to configure at least one SCG

可选地,此种情况下,步骤201的实现方式包括以下至少一项:Optionally, in this case, the implementation of step 201 includes at least one of the following:

C11、向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的最大准备时间不超过所述MCG的最大准备时间;C11. Request the network side to configure or reconfigure at least one SCG so that the maximum preparation time of multiple SCGs of the terminal does not exceed the maximum preparation time of the MCG;

需要说明的是,SCG的最大准备时间指的是UE在SCG中的最大准备时间

Figure BDA0003287669670000181
MCG的最大准备时间指的是UE在MCG中的最大准备时间
Figure BDA0003287669670000182
若终端的多个SCG的最大准备时间都小于等于MCG的最大准备时间,那么时间偏移量由MCG的最大准备时间决定,进而SCG转换操作不会改变时间偏移量。It should be noted that the maximum preparation time of SCG refers to the maximum preparation time of UE in SCG.
Figure BDA0003287669670000181
The maximum preparation time of MCG refers to the maximum preparation time of UE in MCG.
Figure BDA0003287669670000182
If the maximum preparation times of multiple SCGs of the terminal are less than or equal to the maximum preparation time of the MCG, then the time offset is determined by the maximum preparation time of the MCG, and the SCG conversion operation will not change the time offset.

C12、向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的最大准备时间不超过第七阈值;C12. Requesting the network side to configure or reconfigure at least one SCG so that the maximum preparation time of multiple SCGs of the terminal does not exceed the seventh threshold;

需要说明的是,该第七阈值可以是协议约定,也可以是网络侧配置或预配置的。It should be noted that the seventh threshold may be a protocol agreement, or may be a network-side configuration or pre-configuration.

C13、向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的时分双工图案通用配置相同或具有关联的图案。C13. Request the network side to configure or reconfigure at least one SCG so that the time division duplex patterns of multiple SCGs of the terminal are generally configured the same or have associated patterns.

需要说明的是,此种情况下所提到的网络侧可以指MN,也可以指SN,即终端可以向MN请求配置或重配置至少一个SCG,也可以向SN请求配置或重配置至少一个SCG。It should be noted that the network side mentioned in this case may refer to MN or SN, that is, the terminal may request the MN to configure or reconfigure at least one SCG, or may request the SN to configure or reconfigure at least one SCG.

需要说明的是,终端通过向网络侧请求配置或重配置至少一个SCG,以使得终端与MN根据网络侧配置的至少一个SCG确定的T_Offset具有相同的理解。It should be noted that the terminal requests the network side to configure or reconfigure at least one SCG so that the terminal and the MN have the same understanding of T_Offset determined according to at least one SCG configured by the network side.

需要说明的是,本申请实施例在双连接或多连接模式下,终端可以根据实际情况(例如发生SCG Switch,或MCG无线链路失败,或SCG被去激活)更加灵活地应用合理的上行功控模式,从而提升UE的上行发送性能。It should be noted that in the dual connection or multi-connection mode of the embodiment of the present application, the terminal can more flexibly apply a reasonable uplink power control mode according to the actual situation (for example, an SCG Switch occurs, or the MCG wireless link fails, or the SCG is deactivated), thereby improving the uplink transmission performance of the UE.

需要说明的是,本申请实施例提供的功率控制方法,执行主体可以为功率控制装置,或者,该功率控制装置中的用于执行功率控制方法的控制模块。本申请实施例中以功率控制装置执行功率控制方法为例,说明本申请实施例提供的功率控制装置。It should be noted that the power control method provided in the embodiment of the present application can be executed by a power control device, or a control module in the power control device for executing the power control method. In the embodiment of the present application, the power control device provided in the embodiment of the present application is described by taking the power control device executing the power control method as an example.

如图3所示,本申请实施例提供一种功率控制装置300,包括:As shown in FIG3 , an embodiment of the present application provides a power control device 300, including:

调整模块301,用于根据服务小区组的状态,进行上行功控参数的调整;An adjustment module 301, configured to adjust uplink power control parameters according to the status of the serving cell group;

其中,所述服务小区组包括:所述终端的主小区组MCG和/或至少一个辅小区组SCG;所述上行功控参数用于控制所述终端在双连接DC模式和/或多连接MC模式下的上行传输功率。Among them, the service cell group includes: the main cell group MCG and/or at least one secondary cell group SCG of the terminal; the uplink power control parameter is used to control the uplink transmission power of the terminal in dual connection DC mode and/or multi-connection MC mode.

可选地,所述调整模块301,包括:Optionally, the adjustment module 301 includes:

第一发送单元,用于在向网络侧请求第一配置,或接收到所述第一配置的情况下,向主节点MN发送第一指示信息;A first sending unit, configured to send first indication information to the master node MN when requesting a first configuration from the network side or receiving the first configuration;

其中,所述第一指示信息用于指示以下一项:The first indication information is used to indicate one of the following:

所述终端支持的上行功控模式为半静态模式一;The uplink power control mode supported by the terminal is semi-static mode 1;

所述终端仅支持每个服务小区组的独立功率控制;The terminal only supports independent power control for each serving cell group;

请求将上行功控模式配置为半静态模式一;Request to configure the uplink power control mode to semi-static mode 1;

请求配置每个服务小区组的独立功率控制;Request to configure independent power control for each serving cell group;

所述第一配置用于:将所述终端配置为多连接模式,或为所述终端配置多个SCG。The first configuration is used to: configure the terminal to a multi-connection mode, or configure multiple SCGs for the terminal.

可选地,所述第一发送单元,用于:Optionally, the first sending unit is used to:

在满足第一条件的情况下,向MN发送第一指示信息;When the first condition is met, sending first indication information to the MN;

其中,所述第一条件包括以下至少一项:The first condition includes at least one of the following:

所述第一配置为辅节点SN生成;The first configuration is generated by the secondary node SN;

所述第一配置为SN发送给所述终端;The first configuration is a SN sent to the terminal;

所述第一配置对所述MN不可见;The first configuration is invisible to the MN;

终端当前的上行功控模式为半静态模式二;The current uplink power control mode of the terminal is semi-static mode 2;

终端当前的上行功控模式为动态模式。The current uplink power control mode of the terminal is dynamic mode.

可选地,在所述第一条件包括终端当前的上行功控模式为半静态模式二的情况下,所述第一条件还包括以下至少一项:Optionally, when the first condition includes that the current uplink power control mode of the terminal is semi-static mode 2, the first condition also includes at least one of the following:

多个SCG的时分双工TDD图案满足第二条件,所述第二条件包括:多个SCG的TDD图案不同,或多个SCG的TDD图案的差别大于或等于第一阈值;The time division duplex TDD patterns of the multiple SCGs satisfy a second condition, wherein the second condition includes: the TDD patterns of the multiple SCGs are different, or the difference between the TDD patterns of the multiple SCGs is greater than or equal to a first threshold;

多个SCG所对应的SCG最大发射功率满足第三条件,所述第三条件包括:多个SCG所对应的SCG最大发射功率不同,或多个SCG所对应的SCG最大发射功率的差别大于或等于第二阈值。The SCG maximum transmission power corresponding to multiple SCGs satisfies a third condition, and the third condition includes: the SCG maximum transmission power corresponding to multiple SCGs is different, or the difference in the SCG maximum transmission power corresponding to multiple SCGs is greater than or equal to a second threshold.

可选地,在所述第一条件包括终端当前的上行功控模式为动态模式的情况下,所述第一条件还包括以下至少一项:Optionally, when the first condition includes that the current uplink power control mode of the terminal is a dynamic mode, the first condition also includes at least one of the following:

多个SCG对应的时域偏移量满足第四条件,所述第四条件包括:多个SCG对应的时域偏移量不同,或多个SCG对应的时域偏移量的差值大于或等于第三阈值;The time domain offsets corresponding to the multiple SCGs satisfy a fourth condition, wherein the fourth condition includes: the time domain offsets corresponding to the multiple SCGs are different, or the difference between the time domain offsets corresponding to the multiple SCGs is greater than or equal to a third threshold;

多个SCG对应的SCG最大发射功率满足第五条件,所述第五条件包括:多个SCG对应的SCG最大发射功率不同,或多个SCG对应的SCG最大发射功率的差值大于或等于第四阈值。The SCG maximum transmission power corresponding to multiple SCGs satisfies the fifth condition, and the fifth condition includes: the SCG maximum transmission power corresponding to multiple SCGs is different, or the difference between the SCG maximum transmission power corresponding to multiple SCGs is greater than or equal to the fourth threshold.

可选地,所述装置,还包括:Optionally, the device further includes:

第三发送模块,用于在接收到第一释放指示的情况下,向所述MN发送第二指示信息,所述第二指示信息用于更新所述终端支持的上行功控模式,或者用于请求MN重配置所述上行功控模式;a third sending module, configured to send second indication information to the MN when receiving the first release indication, wherein the second indication information is used to update the uplink power control mode supported by the terminal or to request the MN to reconfigure the uplink power control mode;

其中,所述第一释放指示用于指示以下至少之一:The first release indication is used to indicate at least one of the following:

释放多连接模式配置;Release multi-connection mode configuration;

释放至少一个所述SCG的配置。Release the configuration of at least one of the SCGs.

可选地,所述调整模块301,包括:Optionally, the adjustment module 301 includes:

执行单元,用于在执行SCG转换的情况下,执行第一操作;An execution unit, configured to execute a first operation when performing an SCG conversion;

其中,所述第一操作包括以下至少一项:The first operation includes at least one of the following:

若转换前所述上行功控模式为动态模式,且转换后所述终端保持所述上行功控模式不变,则所述终端通过第一方式确定转换后所使用的时间偏移量;If the uplink power control mode before the conversion is a dynamic mode, and the terminal maintains the uplink power control mode unchanged after the conversion, the terminal determines the time offset used after the conversion by a first method;

根据转换后的激活的SCG的频率范围与MCG的频率范围的关系,确定上行功控模式;Determine the uplink power control mode according to the relationship between the frequency range of the activated SCG and the frequency range of the MCG after conversion;

向MN发送时间偏移量变化信息;Sending time offset change information to MN;

所述第一方式包括以下至少一项:The first method includes at least one of the following:

将第一时间偏移量确定为转换后所使用的时间偏移量,所述第一时间偏移量为转换前的时间偏移量和根据转换后的SCG所计算出的时间偏移量中取值最小或者取值最大的一个;Determine a first time offset as the time offset used after the conversion, wherein the first time offset is the smallest or largest of the time offset before the conversion and the time offset calculated according to the SCG after the conversion;

若转换前的时间偏移量与根据转换后的SCG所计算出的时间偏移量的差值大于或等于第五阈值,确定转换后所使用的时间偏移量为默认值;If the difference between the time offset before conversion and the time offset calculated according to the SCG after conversion is greater than or equal to a fifth threshold, determining that the time offset used after conversion is a default value;

若转换前的时间偏移量与根据转换后的SCG所计算出的时间偏移量的差值小于或等于第六阈值,确定转换后所使用的时间偏移量为默认值。If the difference between the time offset before conversion and the time offset calculated according to the SCG after conversion is less than or equal to the sixth threshold, the time offset used after conversion is determined to be a default value.

可选地,所述根据转换后的激活的SCG的频率范围与MCG的频率范围的关系,确定上行功控模式的实现方式,包括以下一项:Optionally, the determining of an implementation method of the uplink power control mode according to a relationship between the converted activated SCG frequency range and the MCG frequency range comprises one of the following:

若转换后的激活的SCG的频率范围与MCG的频率范围不同,则终端确定转换后所使用的上行功控模式为独立功控模式或半静态模式一;If the frequency range of the activated SCG after conversion is different from the frequency range of the MCG, the terminal determines that the uplink power control mode used after conversion is the independent power control mode or the semi-static mode 1;

若转换后的激活的SCG的频率范围与MCG的频率范围相同,则终端执行第二操作;If the frequency range of the activated SCG after conversion is the same as the frequency range of the MCG, the terminal performs a second operation;

其中,所述第二操作包括以下一项:The second operation includes one of the following:

确定转换后所使用的上行功控模式为预配置的上行功控模式;Determining that the uplink power control mode used after the conversion is the pre-configured uplink power control mode;

终端忽略预配置的上行功控模式,确定转换后所使用的上行功控模式为独立功控模式或半静态模式一。The terminal ignores the pre-configured uplink power control mode and determines that the uplink power control mode used after the conversion is the independent power control mode or the semi-static mode one.

可选地,所述时间偏移量变化信息包括以下至少一项:Optionally, the time offset change information includes at least one of the following:

SCG转换指示、变化后的时间偏移量、时间偏移量的变化量、转换前的SCG标识和转换后的SCG标识。SCG conversion indication, time offset after change, change in time offset, SCG identifier before conversion and SCG identifier after conversion.

可选地,所述调整模块301,包括:Optionally, the adjustment module 301 includes:

确定单元,用于在终端的第一传输处于第一状态的情况下,确定上行功控模式为动态模式;A determining unit, configured to determine that the uplink power control mode is a dynamic mode when the first transmission of the terminal is in a first state;

其中,所述第一传输为MCG传输或SCG传输;The first transmission is MCG transmission or SCG transmission;

所述第一状态包括以下至少一项:The first state includes at least one of the following:

被挂起、发生异常、失败、被去激活。Suspended, exception occurred, failed, deactivated.

可选地,所述装置,还包括:Optionally, the device further includes:

确定模块,用于在第一传输恢复的情况下,确定上行功控模式为第一传输处于第一状态之前所使用的上行功控模式或者为配置的上行功率控制模式。The determination module is used to determine, when the first transmission is resumed, that the uplink power control mode is the uplink power control mode used before the first transmission is in the first state or the configured uplink power control mode.

可选地,所述调整模块301,包括以下至少一项:Optionally, the adjustment module 301 includes at least one of the following:

第一请求单元,用于向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的最大准备时间不超过所述MCG的最大准备时间;A first requesting unit, configured to request the network side to configure or reconfigure at least one SCG so that the maximum preparation time of multiple SCGs of the terminal does not exceed the maximum preparation time of the MCG;

第二请求单元,用于向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的最大准备时间不超过第七阈值;A second requesting unit, configured to request the network side to configure or reconfigure at least one SCG so that the maximum preparation time of multiple SCGs of the terminal does not exceed a seventh threshold;

第三请求单元,用于向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的时分双工图案通用配置相同或具有关联的图案。The third request unit is used to request the network side to configure or reconfigure at least one SCG so that the time division duplex patterns of multiple SCGs of the terminal are generally configured the same or have associated patterns.

需要说明的是,该装置实施例是与上述方法对应的装置,上述方法实施例中的所有实现方式均适用于该装置实施例中,也能达到相同的技术效果,在此不再赘述。It should be noted that the device embodiment is a device corresponding to the above-mentioned method. All implementation methods in the above-mentioned method embodiment are applicable to the device embodiment and can achieve the same technical effect, which will not be repeated here.

本申请实施例中的功率控制装置可以是装置,具有操作系统的装置或电子设备,也可以是终端中的部件、集成电路、或芯片。该装置或电子设备可以是移动终端,也可以为非移动终端。示例性的,移动终端可以包括但不限于上述所列举的终端11的类型,非移动终端可以为服务器、网络附属存储器(Network Attached Storage,NAS)、个人计算机(personal computer,PC)、电视机(television,TV)、柜员机或者自助机等,本申请实施例不作具体限定。The power control device in the embodiment of the present application can be a device, a device or electronic device with an operating system, or a component, an integrated circuit, or a chip in a terminal. The device or electronic device can be a mobile terminal or a non-mobile terminal. Exemplarily, the mobile terminal can include but is not limited to the types of terminals 11 listed above, and the non-mobile terminal can be a server, a network attached storage (Network Attached Storage, NAS), a personal computer (personal computer, PC), a television (television, TV), a teller machine or a self-service machine, etc., which is not specifically limited in the embodiment of the present application.

本申请实施例提供的功率控制装置能够实现图2的方法实施例实现的各个过程,并达到相同的技术效果,为避免重复,这里不再赘述。The power control device provided in the embodiment of the present application can implement each process implemented in the method embodiment of Figure 2 and achieve the same technical effect. To avoid repetition, it will not be described here.

本申请实施例还提供一种终端,包括处理器和通信接口,处理器用于根据服务小区组的状态,进行上行功控参数的调整;The embodiment of the present application also provides a terminal, including a processor and a communication interface, the processor being used to adjust uplink power control parameters according to the state of a serving cell group;

其中,所述服务小区组包括:所述终端的主小区组MCG和/或至少一个辅小区组SCG;所述上行功控参数用于控制所述终端在双连接DC模式和/或多连接MC模式下的上行传输功率。Among them, the service cell group includes: the main cell group MCG and/or at least one secondary cell group SCG of the terminal; the uplink power control parameter is used to control the uplink transmission power of the terminal in dual connection DC mode and/or multi-connection MC mode.

该终端实施例是与上述终端侧方法实施例对应的,上述方法实施例的各个实施过程和实现方式均可适用于该终端实施例中,且能达到相同的技术效果。具体地,图4为实现本申请实施例的一种终端的硬件结构示意图。The terminal embodiment corresponds to the above-mentioned terminal side method embodiment, and each implementation process and implementation mode of the above-mentioned method embodiment can be applied to the terminal embodiment and can achieve the same technical effect. Specifically, Figure 4 is a schematic diagram of the hardware structure of a terminal implementing the embodiment of the present application.

该终端400包括但不限于:射频单元401、网络模块402、音频输出单元403、输入单元404、传感器405、显示单元406、用户输入单元407、接口单元408、存储器409、以及处理器410等中的至少部分部件。The terminal 400 includes but is not limited to: a radio frequency unit 401, a network module 402, an audio output unit 403, an input unit 404, a sensor 405, a display unit 406, a user input unit 407, an interface unit 408, a memory 409, and at least some of the components of a processor 410.

本领域技术人员可以理解,终端400还可以包括给各个部件供电的电源(比如电池),电源可以通过电源管理系统与处理器410逻辑相连,从而通过电源管理系统实现管理充电、放电、以及功耗管理等功能。图4中示出的终端结构并不构成对终端的限定,终端可以包括比图示更多或更少的部件,或者组合某些部件,或者不同的部件布置,在此不再赘述。Those skilled in the art will appreciate that the terminal 400 may also include a power source (such as a battery) for supplying power to each component, and the power source may be logically connected to the processor 410 through a power management system, so as to implement functions such as managing charging, discharging, and power consumption management through the power management system. The terminal structure shown in FIG4 does not constitute a limitation on the terminal, and the terminal may include more or fewer components than shown in the figure, or combine certain components, or arrange components differently, which will not be described in detail here.

应理解的是,本申请实施例中,输入单元404可以包括图形处理器(GraphicsProcessing Unit,GPU)4041和麦克风4042,图形处理器4041对在视频捕获模式或图像捕获模式中由图像捕获装置(如摄像头)获得的静态图片或视频的图像数据进行处理。显示单元406可包括显示面板4061,可以采用液晶显示器、有机发光二极管等形式来配置显示面板4061。用户输入单元407包括触控面板4071以及其他输入设备4072。触控面板4071,也称为触摸屏。触控面板4071可包括触摸检测装置和触摸控制器两个部分。其他输入设备4072可以包括但不限于物理键盘、功能键(比如音量控制按键、开关按键等)、轨迹球、鼠标、操作杆,在此不再赘述。It should be understood that in the embodiment of the present application, the input unit 404 may include a graphics processor (Graphics Processing Unit, GPU) 4041 and a microphone 4042, and the graphics processor 4041 processes the image data of the static picture or video obtained by the image capture device (such as a camera) in the video capture mode or the image capture mode. The display unit 406 may include a display panel 4061, and the display panel 4061 may be configured in the form of a liquid crystal display, an organic light emitting diode, etc. The user input unit 407 includes a touch panel 4071 and other input devices 4072. The touch panel 4071 is also called a touch screen. The touch panel 4071 may include two parts: a touch detection device and a touch controller. Other input devices 4072 may include, but are not limited to, a physical keyboard, function keys (such as volume control keys, switch keys, etc.), a trackball, a mouse, and a joystick, which will not be repeated here.

本申请实施例中,射频单元401将来自网络侧设备的下行数据接收后,给处理器410处理;另外,将上行的数据发送给网络侧设备。通常,射频单元401包括但不限于天线、至少一个放大器、收发信机、耦合器、低噪声放大器、双工器等。In the embodiment of the present application, the radio frequency unit 401 receives downlink data from the network side device and sends it to the processor 410 for processing; in addition, the uplink data is sent to the network side device. Generally, the radio frequency unit 401 includes but is not limited to an antenna, at least one amplifier, a transceiver, a coupler, a low noise amplifier, a duplexer, etc.

存储器409可用于存储软件程序或指令以及各种数据。存储器409可主要包括存储程序或指令区和存储数据区,其中,存储程序或指令区可存储操作系统、至少一个功能所需的应用程序或指令(比如声音播放功能、图像播放功能等)等。此外,存储器409可以包括高速随机存取存储器,还可以包括非易失性存储器,其中,非易失性存储器可以是只读存储器(Read-Only Memory,ROM)、可编程只读存储器(Programmable ROM,PROM)、可擦除可编程只读存储器(Erasable PROM,EPROM)、电可擦除可编程只读存储器(Electrically EPROM,EEPROM)或闪存。例如至少一个磁盘存储器件、闪存器件、或其他非易失性固态存储器件。The memory 409 can be used to store software programs or instructions and various data. The memory 409 can mainly include a program or instruction storage area and a data storage area, wherein the program or instruction storage area can store an operating system, an application program or instruction required for at least one function (such as a sound playback function, an image playback function, etc.), etc. In addition, the memory 409 can include a high-speed random access memory, and can also include a non-volatile memory, wherein the non-volatile memory can be a read-only memory (Read-Only Memory, ROM), a programmable read-only memory (Programmable ROM, PROM), an erasable programmable read-only memory (Erasable PROM, EPROM), an electrically erasable programmable read-only memory (Electrically EPROM, EEPROM) or a flash memory. For example, at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device.

处理器410可包括一个或多个处理单元;可选的,处理器410可集成应用处理器和调制解调处理器,其中,应用处理器主要处理操作系统、用户界面和应用程序或指令等,调制解调处理器主要处理无线通信,如基带处理器。可以理解的是,上述调制解调处理器也可以不集成到处理器410中。The processor 410 may include one or more processing units; optionally, the processor 410 may integrate an application processor and a modem processor, wherein the application processor mainly processes an operating system, a user interface, and application programs or instructions, etc., and the modem processor mainly processes wireless communications, such as a baseband processor. It is understandable that the modem processor may not be integrated into the processor 410.

其中,处理器410用于实现:The processor 410 is used to implement:

根据服务小区组的状态,进行上行功控参数的调整;Adjust uplink power control parameters according to the status of the serving cell group;

其中,所述服务小区组包括:所述终端的主小区组MCG和/或至少一个辅小区组SCG;所述上行功控参数用于控制所述终端在双连接DC模式和/或多连接MC模式下的上行传输功率。Among them, the service cell group includes: the main cell group MCG and/or at least one secondary cell group SCG of the terminal; the uplink power control parameter is used to control the uplink transmission power of the terminal in dual connection DC mode and/or multi-connection MC mode.

本申请实施例的终端通过根据服务小区组的状态,进行上行功控参数的调整,以此保证UE上行功率性能,保证通信可靠性。The terminal of the embodiment of the present application adjusts the uplink power control parameters according to the status of the service cell group, thereby ensuring the uplink power performance of the UE and ensuring communication reliability.

可选地,所述射频单元401用于实现:Optionally, the radio frequency unit 401 is used to implement:

在向网络侧请求第一配置,或接收到所述第一配置的情况下,向主节点MN发送第一指示信息;When requesting a first configuration from the network side or receiving the first configuration, sending first indication information to the master node MN;

其中,所述第一指示信息用于指示以下一项:The first indication information is used to indicate one of the following:

所述终端支持的上行功控模式为半静态模式一;The uplink power control mode supported by the terminal is semi-static mode 1;

所述终端仅支持每个服务小区组的独立功率控制;The terminal only supports independent power control for each serving cell group;

请求将上行功控模式配置为半静态模式一;Request to configure the uplink power control mode to semi-static mode 1;

请求配置每个服务小区组的独立功率控制;Request to configure independent power control for each serving cell group;

所述第一配置用于:将所述终端配置为多连接模式,或为所述终端配置多个SCG。The first configuration is used to: configure the terminal to a multi-connection mode, or configure multiple SCGs for the terminal.

可选地,所述射频单元401还用于实现:Optionally, the radio frequency unit 401 is further configured to implement:

在满足第一条件的情况下,向MN发送第一指示信息;When the first condition is met, sending first indication information to the MN;

其中,所述第一条件包括以下至少一项:The first condition includes at least one of the following:

所述第一配置为辅节点SN生成;The first configuration is generated by the secondary node SN;

所述第一配置为SN发送给所述终端;The first configuration is a SN sent to the terminal;

所述第一配置对所述MN不可见;The first configuration is invisible to the MN;

终端当前的上行功控模式为半静态模式二;The current uplink power control mode of the terminal is semi-static mode 2;

终端当前的上行功控模式为动态模式。The current uplink power control mode of the terminal is dynamic mode.

可选地,在所述第一条件包括终端当前的上行功控模式为半静态模式二的情况下,所述第一条件还包括以下至少一项:Optionally, when the first condition includes that the current uplink power control mode of the terminal is semi-static mode 2, the first condition also includes at least one of the following:

多个SCG的时分双工TDD图案满足第二条件,所述第二条件包括:多个SCG的TDD图案不同,或多个SCG的TDD图案的差别大于或等于第一阈值;The time division duplex TDD patterns of the multiple SCGs satisfy a second condition, wherein the second condition includes: the TDD patterns of the multiple SCGs are different, or the difference between the TDD patterns of the multiple SCGs is greater than or equal to a first threshold;

多个SCG所对应的SCG最大发射功率满足第三条件,所述第三条件包括:多个SCG所对应的SCG最大发射功率不同,或多个SCG所对应的SCG最大发射功率的差别大于或等于第二阈值。The SCG maximum transmission power corresponding to multiple SCGs satisfies a third condition, and the third condition includes: the SCG maximum transmission power corresponding to multiple SCGs is different, or the difference in the SCG maximum transmission power corresponding to multiple SCGs is greater than or equal to a second threshold.

可选地,在所述第一条件包括终端当前的上行功控模式为动态模式的情况下,所述第一条件还包括以下至少一项:Optionally, when the first condition includes that the current uplink power control mode of the terminal is a dynamic mode, the first condition also includes at least one of the following:

多个SCG对应的时域偏移量满足第四条件,所述第四条件包括:多个SCG对应的时域偏移量不同,或多个SCG对应的时域偏移量的差值大于或等于第三阈值;The time domain offsets corresponding to the multiple SCGs satisfy a fourth condition, wherein the fourth condition includes: the time domain offsets corresponding to the multiple SCGs are different, or the difference between the time domain offsets corresponding to the multiple SCGs is greater than or equal to a third threshold;

多个SCG对应的SCG最大发射功率满足第五条件,所述第五条件包括:多个SCG对应的SCG最大发射功率不同,或多个SCG对应的SCG最大发射功率的差值大于或等于第四阈值。The SCG maximum transmission power corresponding to multiple SCGs satisfies the fifth condition, and the fifth condition includes: the SCG maximum transmission power corresponding to multiple SCGs is different, or the difference between the SCG maximum transmission power corresponding to multiple SCGs is greater than or equal to the fourth threshold.

可选地,所述射频单元401还用于实现:Optionally, the radio frequency unit 401 is further configured to implement:

在接收到第一释放指示的情况下,向所述MN发送第二指示信息,所述第二指示信息用于更新所述终端支持的上行功控模式,或者用于请求MN重配置所述上行功控模式;In case of receiving the first release indication, sending second indication information to the MN, where the second indication information is used to update the uplink power control mode supported by the terminal, or to request the MN to reconfigure the uplink power control mode;

其中,所述第一释放指示用于指示以下至少之一:The first release indication is used to indicate at least one of the following:

释放多连接模式配置;Release multi-connection mode configuration;

释放至少一个所述SCG的配置。Release the configuration of at least one of the SCGs.

可选地,处理器410用于实现:Optionally, the processor 410 is configured to implement:

在所述终端执行SCG转换的情况下,执行第一操作;In the case where the terminal performs SCG conversion, performing a first operation;

其中,所述第一操作包括以下至少一项:The first operation includes at least one of the following:

若转换前所述上行功控模式为动态模式,且转换后所述终端保持所述上行功控模式不变,则所述终端通过第一方式确定转换后所使用的时间偏移量;If the uplink power control mode before the conversion is a dynamic mode, and the terminal maintains the uplink power control mode unchanged after the conversion, the terminal determines the time offset used after the conversion by a first method;

根据转换后的激活的SCG的频率范围与MCG的频率范围的关系,确定上行功控模式;Determine the uplink power control mode according to the relationship between the frequency range of the activated SCG and the frequency range of the MCG after conversion;

向MN发送时间偏移量变化信息;Sending time offset change information to MN;

所述第一方式包括以下至少一项:The first method includes at least one of the following:

将第一时间偏移量确定为转换后所使用的时间偏移量,所述第一时间偏移量为转换前的时间偏移量和根据转换后的SCG所计算出的时间偏移量中取值最小或者取值最大的一个;Determine a first time offset as the time offset used after the conversion, wherein the first time offset is the smallest or largest of the time offset before the conversion and the time offset calculated according to the SCG after the conversion;

若转换前的时间偏移量与根据转换后的SCG所计算出的时间偏移量的差值大于或等于第五阈值,确定转换后所使用的时间偏移量为默认值;If the difference between the time offset before conversion and the time offset calculated according to the SCG after conversion is greater than or equal to a fifth threshold, determining that the time offset used after conversion is a default value;

若转换前的时间偏移量与根据转换后的SCG所计算出的时间偏移量的差值小于或等于第六阈值,确定转换后所使用的时间偏移量为默认值。If the difference between the time offset before conversion and the time offset calculated according to the SCG after conversion is less than or equal to the sixth threshold, the time offset used after conversion is determined to be a default value.

可选地,所述处理器410用于实现以下一项:Optionally, the processor 410 is configured to implement one of the following:

若转换后的激活的SCG的频率范围与MCG的频率范围不同,则终端确定转换后所使用的上行功控模式为独立功控模式或半静态模式一;If the frequency range of the activated SCG after conversion is different from the frequency range of the MCG, the terminal determines that the uplink power control mode used after conversion is the independent power control mode or the semi-static mode 1;

若转换后的激活的SCG的频率范围与MCG的频率范围相同,则终端执行第二操作;If the frequency range of the activated SCG after conversion is the same as the frequency range of the MCG, the terminal performs a second operation;

其中,所述第二操作包括以下一项:The second operation includes one of the following:

确定转换后所使用的上行功控模式为预配置的上行功控模式;Determining that the uplink power control mode used after the conversion is the pre-configured uplink power control mode;

终端忽略预配置的上行功控模式,确定转换后所使用的上行功控模式为独立功控模式或半静态模式一。The terminal ignores the pre-configured uplink power control mode and determines that the uplink power control mode used after the conversion is the independent power control mode or the semi-static mode one.

可选地,所述时间偏移量变化信息包括以下至少一项:Optionally, the time offset change information includes at least one of the following:

SCG转换指示、变化后的时间偏移量、时间偏移量的变化量、转换前的SCG标识和转换后的SCG标识。SCG conversion indication, time offset after change, change in time offset, SCG identifier before conversion and SCG identifier after conversion.

可选地,所述处理器410用于实现:Optionally, the processor 410 is configured to implement:

在终端的第一传输处于第一状态的情况下,确定上行功控模式为动态模式;When the first transmission of the terminal is in the first state, determining that the uplink power control mode is a dynamic mode;

其中,所述第一传输为MCG传输或SCG传输;The first transmission is MCG transmission or SCG transmission;

所述第一状态包括以下至少一项:The first state includes at least one of the following:

被挂起、发生异常、失败、被去激活。Suspended, exception occurred, failed, deactivated.

可选地,处理器410还用于实现:Optionally, the processor 410 is further configured to implement:

在终端的第一传输恢复的情况下,确定上行功控模式为第一传输处于第一状态之前所使用的上行功控模式或者为配置的上行功率控制模式。When the first transmission of the terminal is resumed, the uplink power control mode is determined to be the uplink power control mode used before the first transmission was in the first state or the configured uplink power control mode.

可选地,所述射频单元401还用于实现以下至少一项:Optionally, the radio frequency unit 401 is further configured to implement at least one of the following:

向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的最大准备时间不超过所述MCG的最大准备时间;Requesting the network side to configure or reconfigure at least one SCG so that the maximum preparation time of multiple SCGs of the terminal does not exceed the maximum preparation time of the MCG;

向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的最大准备时间不超过第七阈值;Requesting the network side to configure or reconfigure at least one SCG so that the maximum preparation time of multiple SCGs of the terminal does not exceed a seventh threshold;

向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的时分双工图案通用配置相同或具有关联的图案。Request the network side to configure or reconfigure at least one SCG so that the time division duplex patterns of multiple SCGs of the terminal are generally configured the same or have associated patterns.

优选的,本申请实施例还提供一种终端,包括处理器,存储器,存储在存储器上并可在所述处理器上运行的程序或指令,该程序或指令被处理器执行时实现功率控制方法实施例的各个过程,且能达到相同的技术效果,为避免重复,这里不再赘述。Preferably, an embodiment of the present application also provides a terminal, including a processor, a memory, and a program or instruction stored in the memory and executable on the processor. When the program or instruction is executed by the processor, each process of the power control method embodiment is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be described here.

本申请实施例还提供一种可读存储介质,可读存储介质上存储有程序或指令,该程序或指令被处理器执行时实现功率控制方法实施例的各个过程,且能达到相同的技术效果,为避免重复,这里不再赘述。其中,所述的计算机可读存储介质,如只读存储器(Read-Only Memory,简称ROM)、随机存取存储器(Random Access Memory,简称RAM)、磁碟或者光盘等。The embodiment of the present application also provides a computer-readable storage medium, on which a program or instruction is stored, which, when executed by a processor, implements each process of the power control method embodiment and can achieve the same technical effect. To avoid repetition, it is not repeated here. The computer-readable storage medium is, for example, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

如图5所示,本申请实施例还提供一种功率控制方法,包括:As shown in FIG5 , the embodiment of the present application further provides a power control method, including:

步骤501,主节点MN向辅节点SN发送第一信息;Step 501, the master node MN sends first information to the slave node SN;

其中,所述第一信息包括以下至少一项:The first information includes at least one of the following:

D11、在终端被配置为多连接模式且上行功控模式被配置为动态模式的情况下,SN配置或调度SCG传输时需要满足的最大时域偏移量;D11, when the terminal is configured in multi-connection mode and the uplink power control mode is configured in dynamic mode, the maximum time domain offset that needs to be met when the SN configures or schedules SCG transmission;

需要说明的是,该最大时域偏移量指的是UE在SCG中的最大准备时间

Figure BDA0003287669670000281
通过MN控制
Figure BDA0003287669670000282
使得终端与MN计算得到的T_Offset一致,以此能够保证MN对终端的调度准确性。It should be noted that the maximum time domain offset refers to the maximum preparation time of the UE in the SCG.
Figure BDA0003287669670000281
Control via MN
Figure BDA0003287669670000282
The T_Offset calculated by the terminal and the MN is made consistent, thereby ensuring the scheduling accuracy of the MN for the terminal.

D12、第一请求,所述第一请求用于指示以下至少一项:SN为多个SCG配置相同的时分双工TDD图案公共配置、SN为多个SCG配置的TDD图案配置具有关联的图案;D12, a first request, the first request is used to indicate at least one of the following: the SN configures the same time division duplex TDD pattern common configuration for multiple SCGs, and the TDD pattern configurations configured by the SN for multiple SCGs have associated patterns;

需要说明的是,通过由MN控制SN的SCG配置,以使得MN清楚知道SN是如何配置SCG的,避免SCG配置对MN不可见的情况出现,进而能够保证MN对终端的调度准确性。It should be noted that by controlling the SCG configuration of the SN through the MN, the MN can clearly know how the SN configures the SCG, thereby avoiding the situation where the SCG configuration is invisible to the MN, thereby ensuring the scheduling accuracy of the MN for the terminal.

下面对此种情况在实际应用中的使用举例说明如下。The following is an example of how this situation can be used in practical applications.

举例八、网络侧发送配置保证配置参数符合要求Example 8: The network side sends configuration to ensure that the configuration parameters meet the requirements

在动态功控模式中,参数T_offset值为

Figure BDA0003287669670000283
这两项分别由MCG配置和SCG配置决定。MN可以向SN指示
Figure BDA0003287669670000284
的最大取值,用于SN来确定合适的SCG配置,即SCG配置所得出的
Figure BDA0003287669670000285
不应超过MN给出的限制。SN在配置SCG后,会将实际的
Figure BDA0003287669670000286
发送给MN,而MN知道
Figure BDA0003287669670000287
从而MN可以计算出T_offset。基于此,网络侧可以采用下述方法来解决:In dynamic power control mode, the parameter T_offset value is
Figure BDA0003287669670000283
These two items are determined by the MCG configuration and SCG configuration respectively. The MN can indicate to the SN
Figure BDA0003287669670000284
The maximum value of is used by SN to determine the appropriate SCG configuration, that is, the value obtained by SCG configuration
Figure BDA0003287669670000285
The limit given by MN should not be exceeded. After configuring SCG, SN will
Figure BDA0003287669670000286
Sent to MN, and MN knows
Figure BDA0003287669670000287
Therefore, the MN can calculate T_offset. Based on this, the network side can adopt the following method to solve it:

若MN配置UE的上行功控模式为动态模式,且UE通过MN被配置了多个SCG,则MN可以在上述的Xn接口交互信令过程来控制T_offset值不变,例如MN向SN指示

Figure BDA0003287669670000291
的最大取值为小于等于
Figure BDA0003287669670000292
的某个数值,即控制T_offset值始终为
Figure BDA0003287669670000293
If the MN configures the UE's uplink power control mode to be dynamic, and the UE is configured with multiple SCGs through the MN, the MN can control the T_offset value to remain unchanged during the above-mentioned Xn interface interactive signaling process, for example, the MN indicates to the SN
Figure BDA0003287669670000291
The maximum value is less than or equal to
Figure BDA0003287669670000292
A certain value, that is, to control the T_offset value to always be
Figure BDA0003287669670000293

同理,若MN配置UE的上行功控模式为半静态模式2,且UE通过MN被配置了多个SCG,则MN请求SN将多个SCG TDD pattern common configuration配置成相同或者具有关联的pattern。Similarly, if the MN configures the UE's uplink power control mode to semi-static mode 2, and the UE is configured with multiple SCGs through the MN, the MN requests the SN to configure multiple SCG TDD pattern common configurations to the same or related patterns.

需要说明的是,第二SCG也可以是SN配置的,有可能对MN不可见,那么SN应保证配置符合上述要求。It should be noted that the second SCG may also be configured by the SN and may not be visible to the MN. In this case, the SN should ensure that the configuration meets the above requirements.

需要说明的是,本申请实施例通过MN控制SN的SCG配置,避免因SCG配置对MN不可见造成影响MN对终端的调度的情况出现,本申请实施例能够保证MN对终端的调度准确性。It should be noted that the embodiment of the present application controls the SCG configuration of the SN through the MN to avoid the situation where the SCG configuration is invisible to the MN and affects the scheduling of the terminal by the MN. The embodiment of the present application can ensure the scheduling accuracy of the terminal by the MN.

如图6所示,本申请实施例还提供一种功率控制装置600,包括:As shown in FIG6 , the embodiment of the present application further provides a power control device 600, including:

第一发送模块,用于向辅节点SN发送第一信息;A first sending module, configured to send first information to the secondary node SN;

其中,所述第一信息包括以下至少一项:The first information includes at least one of the following:

在终端被配置为多连接模式且上行功控模式被配置为动态模式的情况下,SN配置或调度SCG传输时需要满足的最大时域偏移量;When the terminal is configured in multi-connection mode and the uplink power control mode is configured in dynamic mode, the maximum time domain offset that needs to be met when the SN configures or schedules SCG transmission;

第一请求,所述第一请求用于指示以下至少一项:SN为多个SCG配置相同的时分双工TDD图案公共配置、SN为多个SCG配置的TDD图案配置具有关联的图案。The first request is used to indicate at least one of the following: the SN configures the same time division duplex TDD pattern common configuration for multiple SCGs, and the TDD pattern configurations configured by the SN for multiple SCGs have associated patterns.

该装置实施例是与上述方法对应的装置,上述方法实施例中的所有实现方式均适用于该装置实施例中,也能达到相同的技术效果,在此不再赘述。The device embodiment is a device corresponding to the above method. All implementation methods in the above method embodiment are applicable to the device embodiment and can achieve the same technical effect, which will not be repeated here.

优选的,本申请实施例还提供一种网络节点,所述网络节点为主节点MN,包括处理器,存储器,存储在存储器上并可在所述处理器上运行的程序或指令,该程序或指令被处理器执行时实现应用于MN侧的功率控制方法实施例的各个过程,且能达到相同的技术效果,为避免重复,这里不再赘述。Preferably, an embodiment of the present application also provides a network node, which is a main node MN, including a processor, a memory, and a program or instruction stored in the memory and executable on the processor. When the program or instruction is executed by the processor, each process of the power control method embodiment applied to the MN side is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be described here.

本申请实施例还提供一种可读存储介质,计算机可读存储介质上存储有程序或指令,该程序或指令被处理器执行时实现应用于MN侧的功率控制方法实施例的各个过程,且能达到相同的技术效果,为避免重复,这里不再赘述。An embodiment of the present application also provides a computer-readable storage medium, on which a program or instruction is stored. When the program or instruction is executed by a processor, the various processes of the power control method embodiment applied to the MN side are implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.

其中,所述的计算机可读存储介质,如只读存储器(Read-Only Memory,简称ROM)、随机存取存储器(Random Access Memory,简称RAM)、磁碟或者光盘等。The computer-readable storage medium may be a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

本申请实施例还提供一种网络节点,所述网络节点为主节点MN,包括处理器和通信接口,通信接口用于向辅节点SN发送第一信息;The embodiment of the present application further provides a network node, the network node being a primary node MN, including a processor and a communication interface, the communication interface being used to send first information to a secondary node SN;

其中,所述第一信息包括以下至少一项:The first information includes at least one of the following:

在终端被配置为多连接模式且上行功控模式被配置为动态模式的情况下,SN配置或调度SCG传输时需要满足的最大时域偏移量;When the terminal is configured in multi-connection mode and the uplink power control mode is configured in dynamic mode, the maximum time domain offset that needs to be met when the SN configures or schedules SCG transmission;

第一请求,所述第一请求用于指示以下至少一项:SN为多个SCG配置相同的时分双工TDD图案公共配置、SN为多个SCG配置的TDD图案配置具有关联的图案。The first request is used to indicate at least one of the following: the SN configures the same time division duplex TDD pattern common configuration for multiple SCGs, and the TDD pattern configurations configured by the SN for multiple SCGs have associated patterns.

该网络节点实施例是与上述MN侧方法实施例对应的,上述方法实施例的各个实施过程和实现方式均可适用于该网络节点实施例中,且能达到相同的技术效果。This network node embodiment corresponds to the above-mentioned MN side method embodiment. Each implementation process and implementation method of the above-mentioned method embodiment can be applied to this network node embodiment and can achieve the same technical effect.

具体地,本申请实施例还提供了一种网络节点,所述网络节点为主节点MN。如图7所示,该网络节点700包括:天线701、射频装置702、基带装置703。天线701与射频装置702连接。在上行方向上,射频装置702通过天线701接收信息,将接收的信息发送给基带装置703进行处理。在下行方向上,基带装置703对要发送的信息进行处理,并发送给射频装置702,射频装置702对收到的信息进行处理后经过天线701发送出去。Specifically, the embodiment of the present application further provides a network node, which is a master node MN. As shown in FIG7 , the network node 700 includes: an antenna 701, a radio frequency device 702, and a baseband device 703. The antenna 701 is connected to the radio frequency device 702. In the uplink direction, the radio frequency device 702 receives information through the antenna 701 and sends the received information to the baseband device 703 for processing. In the downlink direction, the baseband device 703 processes the information to be sent and sends it to the radio frequency device 702. The radio frequency device 702 processes the received information and sends it out through the antenna 701.

上述频带处理装置可以位于基带装置703中,以上实施例中网络设备执行的方法可以在基带装置703中实现,该基带装置703包括处理器704和存储器705。The frequency band processing device may be located in the baseband device 703 . The method performed by the network device in the above embodiment may be implemented in the baseband device 703 . The baseband device 703 includes a processor 704 and a memory 705 .

基带装置703例如可以包括至少一个基带板,该基带板上设置有多个芯片,如图7所示,其中一个芯片例如为处理器704,与存储器705连接,以调用存储器705中的程序,执行以上方法实施例中所示的网络设备操作。The baseband device 703 may include, for example, at least one baseband board, on which multiple chips are arranged, as shown in Figure 7, one of which is, for example, a processor 704, which is connected to the memory 705 to call the program in the memory 705 and execute the network device operations shown in the above method embodiment.

该基带装置703还可以包括网络接口706,用于与射频装置702交互信息,该接口例如为通用公共无线接口(common public radio interface,简称CPRI)。The baseband device 703 may further include a network interface 706 for exchanging information with the radio frequency device 702 . The interface may be, for example, a common public radio interface (CPRI).

具体地,本发明实施例的网络设备还包括:存储在存储器705上并可在处理器704上运行的指令或程序,处理器704调用存储器705中的指令或程序执行图6所示各模块执行的方法,并达到相同的技术效果,为避免重复,故不在此赘述。Specifically, the network device of the embodiment of the present invention also includes: instructions or programs stored in the memory 705 and executable on the processor 704. The processor 704 calls the instructions or programs in the memory 705 to execute the method executed by each module shown in Figure 6 and achieve the same technical effect. To avoid repetition, it will not be repeated here.

如图8所示,本申请实施例还提供一种功率控制方法,包括:As shown in FIG8 , the embodiment of the present application further provides a power control method, including:

步骤801,在终端执行辅小区组SCG转换且所述终端的上行功控模式为动态模式的情况下,辅节点SN向主节点MN发送当前SCG上终端所使用的时间偏移量。Step 801: When a terminal performs a secondary cell group SCG conversion and the uplink power control mode of the terminal is a dynamic mode, the secondary node SN sends a time offset used by the terminal on the current SCG to the primary node MN.

下面对此种情况在实际应用中的使用举例说明如下。The following is an example of how this situation can be used in practical applications.

举例九、SCG Switch后,SN发起T_offset的更新协商过程Example 9: After SCG Switch, SN initiates T_offset update negotiation process

步骤1:UE被配置MCG、第一SCG,第二SCG。双连接上行功控模式被配置为动态模式。Step 1: The UE is configured with MCG, the first SCG, and the second SCG. The dual connection uplink power control mode is configured as dynamic mode.

步骤2:一旦UE执行了SCG Switching,从第一SCG Switch到第二SCG,SN将其当前的T-offset值通知给MN。Step 2: Once the UE performs SCG Switching, from the first SCG Switch to the second SCG, the SN notifies the MN of its current T-offset value.

需要说明的是,本申请实施例,通过在终端转换SCG的情况下,将终端在转换后的SCG上所使用的时间偏移量告知MN,避免因SCG配置对MN不可见造成影响MN对终端的调度的情况出现,本申请实施例能够保证MN对终端的调度准确性。It should be noted that the embodiment of the present application, by informing the MN of the time offset used by the terminal on the SCG after the terminal switches SCG, avoids the situation where the SCG configuration is invisible to the MN and affects the scheduling of the terminal by the MN. The embodiment of the present application can ensure the scheduling accuracy of the terminal by the MN.

如图9所示,本申请实施例还提供一种功率控制装置900,应用于辅节点SN,包括:As shown in FIG. 9 , the embodiment of the present application further provides a power control device 900, which is applied to a secondary node SN, including:

第二发送模块,用于在终端执行辅小区组SCG转换且所述终端的上行功控模式为动态模式的情况下,向主节点MN发送当前SCG上终端所使用的时间偏移量。The second sending module is used to send the time offset used by the terminal on the current SCG to the master node MN when the terminal performs the secondary cell group SCG conversion and the uplink power control mode of the terminal is the dynamic mode.

需要说明的是,该装置实施例是与上述方法对应的装置,上述方法实施例中的所有实现方式均适用于该装置实施例中,也能达到相同的技术效果,在此不再赘述。It should be noted that the device embodiment is a device corresponding to the above-mentioned method. All implementation methods in the above-mentioned method embodiment are applicable to the device embodiment and can achieve the same technical effect, which will not be repeated here.

优选的,本申请实施例还提供一种网络节点,所述网络节点为辅节点SN,包括处理器,存储器,存储在存储器上并可在所述处理器上运行的程序或指令,该程序或指令被处理器执行时实现应用于SN侧的功率控制方法实施例的各个过程,且能达到相同的技术效果,为避免重复,这里不再赘述。Preferably, an embodiment of the present application also provides a network node, which is a secondary node SN, including a processor, a memory, and a program or instruction stored in the memory and executable on the processor. When the program or instruction is executed by the processor, each process of the power control method embodiment applied to the SN side is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.

本申请实施例还提供一种可读存储介质,计算机可读存储介质上存储有程序或指令,该程序或指令被处理器执行时实现应用于SN侧的功率控制方法实施例的各个过程,且能达到相同的技术效果,为避免重复,这里不再赘述。An embodiment of the present application also provides a computer-readable storage medium, on which a program or instruction is stored. When the program or instruction is executed by a processor, each process of the power control method embodiment applied to the SN side is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.

其中,所述的计算机可读存储介质,如只读存储器(Read-Only Memory,简称ROM)、随机存取存储器(Random Access Memory,简称RAM)、磁碟或者光盘等。The computer-readable storage medium may be a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

本申请实施例还提供一种网络节点,所述网络节点为辅节点SN,包括处理器和通信接口,通信接口用于在终端执行辅小区组SCG转换且所述终端的上行功控模式为动态模式的情况下,向主节点MN发送当前SCG上终端所使用的时间偏移量。An embodiment of the present application also provides a network node, which is a secondary node SN, including a processor and a communication interface. The communication interface is used to send the time offset used by the terminal on the current SCG to the main node MN when the terminal performs a secondary cell group SCG conversion and the uplink power control mode of the terminal is a dynamic mode.

该网络节点实施例是与上述SN侧方法实施例对应的,上述方法实施例的各个实施过程和实现方式均可适用于该网络节点实施例中,且能达到相同的技术效果。This network node embodiment corresponds to the above-mentioned SN side method embodiment. Each implementation process and implementation method of the above-mentioned method embodiment can be applied to this network node embodiment and can achieve the same technical effect.

具体地,本申请实施例还提供了一种网络节点,该网络节点为辅节点SN,具体地,SN的结构可参见图7的网络节点的结构,在此不再赘述。Specifically, an embodiment of the present application further provides a network node, which is a secondary node SN. Specifically, the structure of the SN can refer to the structure of the network node in Figure 7, which will not be repeated here.

可选的,如图10所示,本申请实施例还提供一种通信设备1000,包括处理器1001,存储器1002,存储在存储器1002上并可在所述处理器1001上运行的程序或指令,例如,该通信设备1000为终端时,该程序或指令被处理器1001执行时实现上述功率控制方法实施例的各个过程,且能达到相同的技术效果。该通信设备1000为网络节点时,该程序或指令被处理器1001执行时实现上述功率控制方法实施例的各个过程,且能达到相同的技术效果,为避免重复,这里不再赘述。Optionally, as shown in FIG10, an embodiment of the present application further provides a communication device 1000, including a processor 1001, a memory 1002, and a program or instruction stored in the memory 1002 and executable on the processor 1001. For example, when the communication device 1000 is a terminal, the program or instruction is executed by the processor 1001 to implement the various processes of the above-mentioned power control method embodiment, and can achieve the same technical effect. When the communication device 1000 is a network node, the program or instruction is executed by the processor 1001 to implement the various processes of the above-mentioned power control method embodiment, and can achieve the same technical effect. To avoid repetition, it will not be repeated here.

本申请实施例涉及的终端,可以是指向用户提供语音和/或数据连通性的设备,具有无线连接功能的手持式设备、或连接到无线调制解调器的其他处理设备等。在不同的系统中,终端设备的名称可能也不相同,例如在5G系统中,终端设备可以称为用户设备(UserEquipment,UE)。无线终端设备可以经无线接入网(Radio Access Network,RAN)与一个或多个核心网(Core Network,CN)进行通信,无线终端设备可以是移动终端设备,如移动电话(或称为“蜂窝”电话)和具有移动终端设备的计算机,例如,可以是便携式、袖珍式、手持式、计算机内置的或者车载的移动装置,它们与无线接入网交换语言和/或数据。例如,个人通信业务(Personal Communication Service,PCS)电话、无绳电话、会话发起协议(SessionInitiated Protocol,SIP)话机、无线本地环路(Wireless Local Loop,WLL)站、个人数字助理(Personal Digital Assistant,PDA)等设备。无线终端设备也可以称为系统、订户单元(subscriber unit)、订户站(subscriber station),移动站(mobile station)、移动台(mobile)、远程站(remote station)、接入点(access point)、远程终端设备(remoteterminal)、接入终端设备(access terminal)、用户终端设备(user terminal)、用户代理(user agent)、用户装置(user device),本申请实施例中并不限定。The terminal involved in the embodiment of the present application may be a device that provides voice and/or data connectivity to a user, a handheld device with a wireless connection function, or other processing devices connected to a wireless modem. In different systems, the name of the terminal device may also be different. For example, in a 5G system, the terminal device may be called a user equipment (UE). A wireless terminal device can communicate with one or more core networks (CN) via a radio access network (RAN). The wireless terminal device may be a mobile terminal device, such as a mobile phone (or a "cellular" phone) and a computer with a mobile terminal device. For example, it may be a portable, pocket-sized, handheld, computer-built-in or vehicle-mounted mobile device that exchanges language and/or data with a wireless access network. For example, personal communication service (PCS) phones, cordless phones, session initiation protocol (SIP) phones, wireless local loop (WLL) stations, personal digital assistants (PDAs) and other devices. The wireless terminal device may also be referred to as a system, a subscriber unit, a subscriber station, a mobile station, a mobile station, a remote station, an access point, a remote terminal device, an access terminal device, a user terminal device, a user agent, and a user device, but is not limited to these terms in the embodiments of the present application.

本申请实施例涉及的网络节点可以是全球移动通讯(Global System of Mobilecommunication,简称GSM)或码分多址(Code Division Multiple Access,简称CDMA)中的基站(Base Transceiver Station,简称BTS),也可以是宽带码分多址(Wideband CodeDivision Multiple Access,简称WCDMA)中的基站(NodeB,简称NB),还可以是LTE中的演进型基站(Evolutional Node B,简称eNB或eNodeB),或者中继站或接入点,或者未来5G网络中的基站等,在此并不限定。The network node involved in the embodiments of the present application can be a base station (Base Transceiver Station, BTS) in Global System of Mobilecommunication (GSM) or Code Division Multiple Access (CDMA), or a base station (NodeB, NB) in Wideband Code Division Multiple Access (WCDMA), or an evolved base station (Evolutional Node B, eNB or eNodeB) in LTE, or a relay station or access point, or a base station in a future 5G network, etc., which is not limited here.

网络节点与终端之间可以各自使用一或多根天线进行多输入多输出(MultiInput Multi Output,MIMO)传输,MIMO传输可以是单用户MIMO(Single User MIMO,SU-MIMO)或多用户MIMO(Multiple User MIMO,MU-MIMO)。根据根天线组合的形态和数量,MIMO传输可以是2D-MIMO、3D-MIMO、FD-MIMO或massive-MIMO,也可以是分集传输或预编码传输或波束赋形传输等。Network nodes and terminals can each use one or more antennas for multiple-input multiple-output (MIMO) transmission. MIMO transmission can be single-user MIMO (SU-MIMO) or multi-user MIMO (MU-MIMO). Depending on the form and number of antenna combinations, MIMO transmission can be 2D-MIMO, 3D-MIMO, FD-MIMO or massive-MIMO, or it can be diversity transmission, precoded transmission or beamforming transmission, etc.

本申请实施例另提供了一种芯片,所述芯片包括处理器和通信接口,所述通信接口和所述处理器耦合,所述处理器用于运行程序或指令,实现上述功率控制方法实施例的各个过程,且能达到相同的技术效果,为避免重复,这里不再赘述。An embodiment of the present application further provides a chip, which includes a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run programs or instructions to implement the various processes of the above-mentioned power control method embodiment, and can achieve the same technical effect. To avoid repetition, it will not be repeated here.

应理解,本申请实施例提到的芯片还可以称为系统级芯片、系统芯片、芯片系统或片上系统芯片等。It should be understood that the chip mentioned in the embodiments of the present application can also be called a system-level chip, a system chip, a chip system or a system-on-chip chip, etc.

需要说明的是,在本文中,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者装置不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者装置所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括该要素的过程、方法、物品或者装置中还存在另外的相同要素。此外,需要指出的是,本申请实施方式中的方法和装置的范围不限按示出或讨论的顺序来执行功能,还可包括根据所涉及的功能按基本同时的方式或按相反的顺序来执行功能,例如,可以按不同于所描述的次序来执行所描述的方法,并且还可以添加、省去、或组合各种步骤。另外,参照某些示例所描述的特征可在其他示例中被组合。It should be noted that, in this article, the terms "comprise", "include" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "including one..." do not exclude the presence of other identical elements in the process, method, article or device including the element. In addition, it should be pointed out that the scope of the methods and devices in the embodiments of the present application is not limited to performing functions in the order shown or discussed, and may also include performing functions in a substantially simultaneous manner or in reverse order according to the functions involved, for example, the described method may be performed in an order different from that described, and various steps may also be added, omitted, or combined. In addition, the features described with reference to certain examples may be combined in other examples.

通过以上的实施方式的描述,本领域的技术人员可以清楚地了解到上述实施例方法可借助软件加必需的通用硬件平台的方式来实现,当然也可以通过硬件,但很多情况下前者是更佳的实施方式。基于这样的理解,本申请的技术方案本质上或者说对现有技术做出贡献的部分可以以软件产品的形式体现出来,该计算机软件产品存储在一个存储介质(如ROM/RAM、磁碟、光盘)中,包括若干指令用以使得一台终端(可以是手机,计算机,服务器,空调器,或者网络设备等)执行本申请各个实施例所述的方法。Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM/RAM, a disk, or an optical disk), and includes a number of instructions for a terminal (which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to execute the methods described in each embodiment of the present application.

上面结合附图对本申请的实施例进行了描述,但是本申请并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,而不是限制性的,本领域的普通技术人员在本申请的启示下,在不脱离本申请宗旨和权利要求所保护的范围情况下,还可做出很多形式,均属于本申请的保护之内。The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.

Claims (26)

1.一种功率控制方法,其特征在于,包括:1. A power control method, comprising: 终端根据服务小区组的状态,进行上行功控参数的调整;The terminal adjusts the uplink power control parameters according to the status of the serving cell group; 其中,所述服务小区组包括:所述终端的主小区组MCG和/或至少一个辅小区组SCG;所述上行功控参数用于控制所述终端在双连接DC模式和/或多连接MC模式下的上行传输功率。Among them, the service cell group includes: the main cell group MCG and/or at least one secondary cell group SCG of the terminal; the uplink power control parameter is used to control the uplink transmission power of the terminal in dual connection DC mode and/or multi-connection MC mode. 2.根据权利要求1所述的方法,其特征在于,所述终端根据服务小区组的状态,进行上行功控参数的调整,包括:2. The method according to claim 1, wherein the terminal adjusts the uplink power control parameters according to the state of the serving cell group, comprising: 在所述终端向网络侧请求第一配置,或接收到所述第一配置的情况下,向主节点MN发送第一指示信息;When the terminal requests the first configuration from the network side or receives the first configuration, sending first indication information to the master node MN; 其中,所述第一指示信息用于指示以下一项:The first indication information is used to indicate one of the following: 所述终端支持的上行功控模式为半静态模式一;The uplink power control mode supported by the terminal is semi-static mode 1; 所述终端仅支持每个服务小区组的独立功率控制;The terminal only supports independent power control for each serving cell group; 请求将上行功控模式配置为半静态模式一;Request to configure the uplink power control mode to semi-static mode 1; 请求配置每个服务小区组的独立功率控制;Request to configure independent power control for each serving cell group; 所述第一配置用于:将所述终端配置为多连接模式,或为所述终端配置多个SCG。The first configuration is used to: configure the terminal to a multi-connection mode, or configure multiple SCGs for the terminal. 3.根据权利要求2所述的方法,其特征在于,所述向主节点MN发送第一指示信息,包括:3. The method according to claim 2, wherein the sending of the first indication information to the master node MN comprises: 在满足第一条件的情况下,向MN发送第一指示信息;When the first condition is met, sending first indication information to the MN; 其中,所述第一条件包括以下至少一项:The first condition includes at least one of the following: 所述第一配置为辅节点SN生成;The first configuration is generated by the secondary node SN; 所述第一配置为SN发送给所述终端;The first configuration is a SN sent to the terminal; 所述第一配置对所述MN不可见;The first configuration is invisible to the MN; 终端当前的上行功控模式为半静态模式二;The current uplink power control mode of the terminal is semi-static mode 2; 终端当前的上行功控模式为动态模式。The current uplink power control mode of the terminal is dynamic mode. 4.根据权利要求3所述的方法,其特征在于,在所述第一条件包括终端当前的上行功控模式为半静态模式二的情况下,所述第一条件还包括以下至少一项:4. The method according to claim 3, wherein, when the first condition includes that the current uplink power control mode of the terminal is semi-static mode 2, the first condition further includes at least one of the following: 多个SCG的时分双工TDD图案满足第二条件,所述第二条件包括:多个SCG的TDD图案不同,或多个SCG的TDD图案的差别大于或等于第一阈值;The time division duplex TDD patterns of the multiple SCGs satisfy a second condition, wherein the second condition includes: the TDD patterns of the multiple SCGs are different, or the difference between the TDD patterns of the multiple SCGs is greater than or equal to a first threshold; 多个SCG所对应的SCG最大发射功率满足第三条件,所述第三条件包括:多个SCG所对应的SCG最大发射功率不同,或多个SCG所对应的SCG最大发射功率的差别大于或等于第二阈值。The SCG maximum transmission power corresponding to multiple SCGs satisfies a third condition, and the third condition includes: the SCG maximum transmission power corresponding to multiple SCGs is different, or the difference in the SCG maximum transmission power corresponding to multiple SCGs is greater than or equal to a second threshold. 5.根据权利要求3所述的方法,其特征在于,在所述第一条件包括终端当前的上行功控模式为动态模式的情况下,所述第一条件还包括以下至少一项:5. The method according to claim 3, wherein, when the first condition includes that the current uplink power control mode of the terminal is a dynamic mode, the first condition further includes at least one of the following: 多个SCG对应的时域偏移量满足第四条件,所述第四条件包括:多个SCG对应的时域偏移量不同,或多个SCG对应的时域偏移量的差值大于或等于第三阈值;The time domain offsets corresponding to the multiple SCGs satisfy a fourth condition, wherein the fourth condition includes: the time domain offsets corresponding to the multiple SCGs are different, or the difference between the time domain offsets corresponding to the multiple SCGs is greater than or equal to a third threshold; 多个SCG对应的SCG最大发射功率满足第五条件,所述第五条件包括:多个SCG对应的SCG最大发射功率不同,或多个SCG对应的SCG最大发射功率的差值大于或等于第四阈值。The SCG maximum transmission power corresponding to multiple SCGs satisfies the fifth condition, and the fifth condition includes: the SCG maximum transmission power corresponding to multiple SCGs is different, or the difference between the SCG maximum transmission power corresponding to multiple SCGs is greater than or equal to the fourth threshold. 6.根据权利要求2或3所述的方法,其特征在于,还包括:6. The method according to claim 2 or 3, further comprising: 在所述终端接收到第一释放指示的情况下,向所述MN发送第二指示信息,所述第二指示信息用于更新所述终端支持的上行功控模式,或者用于请求MN重配置所述上行功控模式;When the terminal receives the first release indication, sending second indication information to the MN, where the second indication information is used to update the uplink power control mode supported by the terminal or to request the MN to reconfigure the uplink power control mode; 其中,所述第一释放指示用于指示以下至少之一:The first release indication is used to indicate at least one of the following: 释放多连接模式配置;Release multi-connection mode configuration; 释放至少一个所述SCG的配置。Release the configuration of at least one of the SCGs. 7.根据权利要求1至6中任一项所述的方法,其特征在于,所述终端根据服务小区组的状态,进行上行功控参数的调整,包括:7. The method according to any one of claims 1 to 6, characterized in that the terminal adjusts the uplink power control parameters according to the state of the serving cell group, comprising: 在所述终端执行SCG转换的情况下,终端执行第一操作;In the case where the terminal performs SCG conversion, the terminal performs a first operation; 其中,所述第一操作包括以下至少一项:The first operation includes at least one of the following: 若转换前所述上行功控模式为动态模式,且转换后所述终端保持所述上行功控模式不变,则所述终端通过第一方式确定转换后所使用的时间偏移量;If the uplink power control mode before the conversion is a dynamic mode, and the terminal maintains the uplink power control mode unchanged after the conversion, the terminal determines the time offset used after the conversion by a first method; 根据转换后的激活的SCG的频率范围与MCG的频率范围的关系,确定上行功控模式;Determine the uplink power control mode according to the relationship between the frequency range of the activated SCG and the frequency range of the MCG after conversion; 向MN发送时间偏移量变化信息;Sending time offset change information to MN; 所述第一方式包括以下至少一项:The first method includes at least one of the following: 将第一时间偏移量确定为转换后所使用的时间偏移量,所述第一时间偏移量为转换前的时间偏移量和根据转换后的SCG所计算出的时间偏移量中取值最小或者取值最大的一个;Determine a first time offset as the time offset used after the conversion, wherein the first time offset is the smallest or largest of the time offset before the conversion and the time offset calculated according to the SCG after the conversion; 若转换前的时间偏移量与根据转换后的SCG所计算出的时间偏移量的差值大于或等于第五阈值,确定转换后所使用的时间偏移量为默认值;If the difference between the time offset before conversion and the time offset calculated according to the SCG after conversion is greater than or equal to a fifth threshold, determining that the time offset used after conversion is a default value; 若转换前的时间偏移量与根据转换后的SCG所计算出的时间偏移量的差值小于或等于第六阈值,确定转换后所使用的时间偏移量为默认值。If the difference between the time offset before conversion and the time offset calculated according to the SCG after conversion is less than or equal to the sixth threshold, the time offset used after conversion is determined to be a default value. 8.根据权利要求7所述的方法,其特征在于,所述根据转换后的激活的SCG的频率范围与MCG的频率范围的关系,确定上行功控模式,包括以下一项:8. The method according to claim 7, characterized in that the determining of the uplink power control mode according to the relationship between the converted activated SCG frequency range and the MCG frequency range comprises one of the following: 若转换后的激活的SCG的频率范围与MCG的频率范围不同,则终端确定转换后所使用的上行功控模式为独立功控模式或半静态模式一;If the frequency range of the activated SCG after conversion is different from the frequency range of the MCG, the terminal determines that the uplink power control mode used after conversion is the independent power control mode or the semi-static mode 1; 若转换后的激活的SCG的频率范围与MCG的频率范围相同,则终端执行第二操作;If the frequency range of the activated SCG after conversion is the same as the frequency range of the MCG, the terminal performs a second operation; 其中,所述第二操作包括以下一项:The second operation includes one of the following: 确定转换后所使用的上行功控模式为预配置的上行功控模式;Determining that the uplink power control mode used after the conversion is the pre-configured uplink power control mode; 终端忽略预配置的上行功控模式,确定转换后所使用的上行功控模式为独立功控模式或半静态模式一。The terminal ignores the pre-configured uplink power control mode and determines that the uplink power control mode used after the conversion is the independent power control mode or the semi-static mode one. 9.根据权利要求7所述的方法,其特征在于,所述时间偏移量变化信息包括以下至少一项:9. The method according to claim 7, wherein the time offset change information includes at least one of the following: SCG转换指示、变化后的时间偏移量、时间偏移量的变化量、转换前的SCG标识和转换后的SCG标识。SCG conversion indication, time offset after change, change in time offset, SCG identifier before conversion and SCG identifier after conversion. 10.根据权利要求1至6中任一项所述的方法,其特征在于,所述终端根据服务小区组的状态,进行上行功控参数的调整,包括:10. The method according to any one of claims 1 to 6, characterized in that the terminal adjusts the uplink power control parameters according to the state of the serving cell group, comprising: 在终端的第一传输处于第一状态的情况下,确定上行功控模式为动态模式;When the first transmission of the terminal is in the first state, determining that the uplink power control mode is a dynamic mode; 其中,所述第一传输为MCG传输或SCG传输;The first transmission is MCG transmission or SCG transmission; 所述第一状态包括以下至少一项:The first state includes at least one of the following: 被挂起、发生异常、失败、被去激活。Suspended, exception occurred, failed, deactivated. 11.根据权利要求10所述的方法,其特征在于,还包括:11. The method according to claim 10, further comprising: 在终端的第一传输恢复的情况下,确定上行功控模式为第一传输处于第一状态之前所使用的上行功控模式或者为配置的上行功率控制模式。When the first transmission of the terminal is resumed, the uplink power control mode is determined to be the uplink power control mode used before the first transmission was in the first state or the configured uplink power control mode. 12.根据权利要求1至6中任一项所述的方法,其特征在于,所述终端根据服务小区组的状态,进行上行功控参数的调整,包括以下至少一项:12. The method according to any one of claims 1 to 6, wherein the terminal adjusts the uplink power control parameters according to the state of the serving cell group, including at least one of the following: 向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的最大准备时间不超过所述MCG的最大准备时间;Requesting the network side to configure or reconfigure at least one SCG so that the maximum preparation time of multiple SCGs of the terminal does not exceed the maximum preparation time of the MCG; 向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的最大准备时间不超过第七阈值;Requesting the network side to configure or reconfigure at least one SCG so that the maximum preparation time of multiple SCGs of the terminal does not exceed a seventh threshold; 向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的时分双工图案通用配置相同或具有关联的图案。Request the network side to configure or reconfigure at least one SCG so that the time division duplex patterns of multiple SCGs of the terminal are generally configured the same or have associated patterns. 13.一种功率控制方法,其特征在于,包括:13. A power control method, comprising: 主节点MN向辅节点SN发送第一信息;The master node MN sends first information to the slave node SN; 其中,所述第一信息包括以下至少一项:The first information includes at least one of the following: 在终端被配置为多连接模式且上行功控模式被配置为动态模式的情况下,SN配置或调度SCG传输时需要满足的最大时域偏移量;When the terminal is configured in multi-connection mode and the uplink power control mode is configured in dynamic mode, the maximum time domain offset that needs to be met when the SN configures or schedules SCG transmission; 第一请求,所述第一请求用于指示以下至少一项:SN为多个SCG配置相同的时分双工TDD图案公共配置、SN为多个SCG配置的TDD图案配置具有关联的图案。The first request is used to indicate at least one of the following: the SN configures the same time division duplex TDD pattern common configuration for multiple SCGs, and the TDD pattern configurations configured by the SN for multiple SCGs have associated patterns. 14.一种功率控制方法,其特征在于,包括:14. A power control method, comprising: 在终端执行辅小区组SCG转换且所述终端的上行功控模式为动态模式的情况下,辅节点SN向主节点MN发送当前SCG上终端所使用的时间偏移量。When the terminal performs a secondary cell group SCG conversion and the uplink power control mode of the terminal is a dynamic mode, the secondary node SN sends the time offset used by the terminal on the current SCG to the primary node MN. 15.一种功率控制装置,其特征在于,包括:15. A power control device, comprising: 调整模块,用于根据服务小区组的状态,进行上行功控参数的调整;An adjustment module, used to adjust uplink power control parameters according to the status of the serving cell group; 其中,所述服务小区组包括:所述终端的主小区组MCG和/或至少一个辅小区组SCG;所述上行功控参数用于控制所述终端在双连接DC模式和/或多连接MC模式下的上行传输功率。Among them, the service cell group includes: the main cell group MCG and/or at least one secondary cell group SCG of the terminal; the uplink power control parameter is used to control the uplink transmission power of the terminal in dual connection DC mode and/or multi-connection MC mode. 16.根据权利要求15所述的装置,其特征在于,所述调整模块,包括:16. The device according to claim 15, characterized in that the adjustment module comprises: 第一发送单元,用于在向网络侧请求第一配置,或接收到所述第一配置的情况下,向主节点MN发送第一指示信息;A first sending unit, configured to send first indication information to the master node MN when requesting a first configuration from the network side or receiving the first configuration; 其中,所述第一指示信息用于指示以下一项:The first indication information is used to indicate one of the following: 所述终端支持的上行功控模式为半静态模式一;The uplink power control mode supported by the terminal is semi-static mode 1; 所述终端仅支持每个服务小区组的独立功率控制;The terminal only supports independent power control for each serving cell group; 请求将上行功控模式配置为半静态模式一;Request to configure the uplink power control mode to semi-static mode 1; 请求配置每个服务小区组的独立功率控制;Request to configure independent power control for each serving cell group; 所述第一配置用于:将所述终端配置为多连接模式,或为所述终端配置多个SCG。The first configuration is used to: configure the terminal to a multi-connection mode, or configure multiple SCGs for the terminal. 17.根据权利要求16所述的装置,其特征在于,所述第一发送单元,用于:17. The device according to claim 16, wherein the first sending unit is used to: 在满足第一条件的情况下,向MN发送第一指示信息;When the first condition is met, sending first indication information to the MN; 其中,所述第一条件包括以下至少一项:The first condition includes at least one of the following: 所述第一配置为辅节点SN生成;The first configuration is generated by the secondary node SN; 所述第一配置为SN发送给所述终端;The first configuration is a SN sent to the terminal; 所述第一配置对所述MN不可见;The first configuration is invisible to the MN; 终端当前的上行功控模式为半静态模式二;The current uplink power control mode of the terminal is semi-static mode 2; 终端当前的上行功控模式为动态模式。The current uplink power control mode of the terminal is dynamic mode. 18.根据权利要求16或17所述的装置,其特征在于,还包括:18. The device according to claim 16 or 17, further comprising: 第三发送模块,用于在接收到第一释放指示的情况下,向所述MN发送第二指示信息,所述第二指示信息用于更新所述终端支持的上行功控模式,或者用于请求MN重配置所述上行功控模式;a third sending module, configured to send second indication information to the MN when receiving the first release indication, wherein the second indication information is used to update the uplink power control mode supported by the terminal or to request the MN to reconfigure the uplink power control mode; 其中,所述第一释放指示用于指示以下至少之一:The first release indication is used to indicate at least one of the following: 释放多连接模式配置;Release multi-connection mode configuration; 释放至少一个所述SCG的配置。Release the configuration of at least one of the SCGs. 19.根据权利要求15至18中任一项所述的装置,其特征在于,所述调整模块,包括:19. The device according to any one of claims 15 to 18, characterized in that the adjustment module comprises: 执行单元,用于在执行SCG转换的情况下,执行第一操作;An execution unit, configured to execute a first operation when performing an SCG conversion; 其中,所述第一操作包括以下至少一项:The first operation includes at least one of the following: 若转换前所述上行功控模式为动态模式,且转换后所述终端保持所述上行功控模式不变,则所述终端通过第一方式确定转换后所使用的时间偏移量;If the uplink power control mode before the conversion is a dynamic mode, and the terminal maintains the uplink power control mode unchanged after the conversion, the terminal determines the time offset used after the conversion by a first method; 根据转换后的激活的SCG的频率范围与MCG的频率范围的关系,确定上行功控模式;Determine the uplink power control mode according to the relationship between the frequency range of the activated SCG and the frequency range of the MCG after conversion; 向MN发送时间偏移量变化信息;Sending time offset change information to MN; 所述第一方式包括以下至少一项:The first method includes at least one of the following: 将第一时间偏移量确定为转换后所使用的时间偏移量,所述第一时间偏移量为转换前的时间偏移量和根据转换后的SCG所计算出的时间偏移量中取值最小或者取值最大的一个;Determine a first time offset as the time offset used after the conversion, wherein the first time offset is the smallest or largest of the time offset before the conversion and the time offset calculated according to the SCG after the conversion; 若转换前的时间偏移量与根据转换后的SCG所计算出的时间偏移量的差值大于或等于第五阈值,确定转换后所使用的时间偏移量为默认值;If the difference between the time offset before conversion and the time offset calculated according to the SCG after conversion is greater than or equal to a fifth threshold, determining that the time offset used after conversion is a default value; 若转换前的时间偏移量与根据转换后的SCG所计算出的时间偏移量的差值小于或等于第六阈值,确定转换后所使用的时间偏移量为默认值。If the difference between the time offset before conversion and the time offset calculated according to the SCG after conversion is less than or equal to the sixth threshold, the time offset used after conversion is determined to be a default value. 20.根据权利要求15至18中任一项所述的装置,其特征在于,所述调整模块,包括:20. The device according to any one of claims 15 to 18, characterized in that the adjustment module comprises: 确定单元,用于在终端的第一传输处于第一状态的情况下,确定上行功控模式为动态模式;A determining unit, configured to determine that the uplink power control mode is a dynamic mode when the first transmission of the terminal is in a first state; 其中,所述第一传输为MCG传输或SCG传输;The first transmission is MCG transmission or SCG transmission; 所述第一状态包括以下至少一项:The first state includes at least one of the following: 被挂起、发生异常、失败、被去激活。Suspended, exception occurred, failed, deactivated. 21.根据权利要求15至18中任一项所述的装置,其特征在于,所述调整模块,包括以下至少一项:21. The device according to any one of claims 15 to 18, characterized in that the adjustment module comprises at least one of the following: 第一请求单元,用于向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的最大准备时间不超过所述MCG的最大准备时间;A first requesting unit, configured to request the network side to configure or reconfigure at least one SCG so that the maximum preparation time of multiple SCGs of the terminal does not exceed the maximum preparation time of the MCG; 第二请求单元,用于向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的最大准备时间不超过第七阈值;A second requesting unit, configured to request the network side to configure or reconfigure at least one SCG so that the maximum preparation time of multiple SCGs of the terminal does not exceed a seventh threshold; 第三请求单元,用于向网络侧请求配置或重配置至少一个SCG,以使得所述终端的多个SCG的时分双工图案通用配置相同或具有关联的图案。The third request unit is used to request the network side to configure or reconfigure at least one SCG so that the time division duplex patterns of multiple SCGs of the terminal are generally configured the same or have associated patterns. 22.一种终端,其特征在于,包括处理器,存储器及存储在所述存储器上并可在所述处理器上运行的程序或指令,所述程序或指令被所述处理器执行时实现如权利要求1至12任一项所述的功率控制方法的步骤。22. A terminal, characterized in that it comprises a processor, a memory, and a program or instruction stored in the memory and executable on the processor, wherein when the program or instruction is executed by the processor, the steps of the power control method according to any one of claims 1 to 12 are implemented. 23.一种功率控制装置,其特征在于,包括:23. A power control device, comprising: 第一发送模块,用于向辅节点SN发送第一信息;A first sending module, configured to send first information to the secondary node SN; 其中,所述第一信息包括以下至少一项:The first information includes at least one of the following: 在终端被配置为多连接模式且上行功控模式被配置为动态模式的情况下,SN配置或调度SCG传输时需要满足的最大时域偏移量;When the terminal is configured in multi-connection mode and the uplink power control mode is configured in dynamic mode, the maximum time domain offset that needs to be met when the SN configures or schedules SCG transmission; 第一请求,所述第一请求用于指示以下至少一项:SN为多个SCG配置相同的时分双工TDD图案公共配置、SN为多个SCG配置的TDD图案配置具有关联的图案。The first request is used to indicate at least one of the following: the SN configures the same time division duplex TDD pattern common configuration for multiple SCGs, and the TDD pattern configurations configured by the SN for multiple SCGs have associated patterns. 24.一种功率控制装置,其特征在于,包括:24. A power control device, comprising: 第二发送模块,用于在终端执行辅小区组SCG转换且所述终端的上行功控模式为动态模式的情况下,向主节点MN发送当前SCG上终端所使用的时间偏移量。The second sending module is used to send the time offset used by the terminal on the current SCG to the master node MN when the terminal performs the secondary cell group SCG conversion and the uplink power control mode of the terminal is the dynamic mode. 25.一种网络节点,其特征在于,包括处理器,存储器及存储在所述存储器上并可在所述处理器上运行的程序或指令,所述程序或指令被所述处理器执行时实现如权利要求13或14所述的功率控制方法的步骤。25. A network node, characterized in that it comprises a processor, a memory, and a program or instruction stored in the memory and executable on the processor, wherein the program or instruction, when executed by the processor, implements the steps of the power control method according to claim 13 or 14. 26.一种可读存储介质,其特征在于,所述可读存储介质上存储程序或指令,所述程序或指令被处理器执行时实现如权利要求1至14任一项所述的功率控制方法的步骤。26. A readable storage medium, characterized in that the readable storage medium stores a program or instruction, and when the program or instruction is executed by a processor, the steps of the power control method according to any one of claims 1 to 14 are implemented.
CN202111152657.6A 2021-09-29 2021-09-29 Power control method, device, terminal and network node Pending CN115884342A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202111152657.6A CN115884342A (en) 2021-09-29 2021-09-29 Power control method, device, terminal and network node
PCT/CN2022/121266 WO2023051448A1 (en) 2021-09-29 2022-09-26 Power control method and apparatus, terminal, and network node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111152657.6A CN115884342A (en) 2021-09-29 2021-09-29 Power control method, device, terminal and network node

Publications (1)

Publication Number Publication Date
CN115884342A true CN115884342A (en) 2023-03-31

Family

ID=85756201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111152657.6A Pending CN115884342A (en) 2021-09-29 2021-09-29 Power control method, device, terminal and network node

Country Status (2)

Country Link
CN (1) CN115884342A (en)
WO (1) WO2023051448A1 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102257707B1 (en) * 2014-01-22 2021-05-28 엘지전자 주식회사 Method for performing power control, and user equipment
US11419169B2 (en) * 2019-03-21 2022-08-16 Qualcomm Incorporated Uplink power control for dual connectivity
US11546864B2 (en) * 2020-02-14 2023-01-03 Samsung Electronics Co., Ltd. Uplink power control in dual connectivity

Also Published As

Publication number Publication date
WO2023051448A1 (en) 2023-04-06

Similar Documents

Publication Publication Date Title
EP4398663A1 (en) Monitoring method and apparatus, wake-up signal transmission method and apparatus, terminal, and network-side device
EP3031287B1 (en) Techniques for device-to-device communications
US20240235761A1 (en) Transmission processing method and apparatus, terminal, network-side device, and storage medium
WO2022228526A1 (en) Mobility management configuration method and apparatus, and terminal, network side device, and medium
US20230284141A1 (en) Energy saving indication method and apparatus, device, and readable storage medium
WO2023011286A1 (en) Feedback method, related device and readable storage medium
US20240267837A1 (en) Uai transmission method and device and reception method and device, and readable storage medium
US20240163730A1 (en) Initial bandwidth part determining method and apparatus, and related device
CN115915296A (en) Cell handover method, device, user equipment and storage medium
JP2024516908A (en) Method for transmitting request information, UE and network side device
US20230199907A1 (en) Discontinuous Reception Configuration Method and Device
EP4358615A1 (en) Method for configuring gap, and terminal and network device
WO2022184107A1 (en) Gap configuration method and apparatus, and device and storage medium
CN115884342A (en) Power control method, device, terminal and network node
WO2022214017A1 (en) Transmission method and apparatus, terminal, and network side device
CN115314175B (en) Bandwidth part processing method, device and terminal
JP7678898B2 (en) Method, apparatus and device for configuring the operating mode of a smart signal amplifier
US20240244423A1 (en) Ue capability change method, terminal, and network-side device
WO2024001952A1 (en) Parameter determination method, terminal, and network side device
CN117279051A (en) Methods for determining the impact of interruptions, network side equipment and terminals
WO2023088318A1 (en) Gap window configuration method and apparatus, device, and medium
WO2024067357A1 (en) Data transmission method and apparatus, and user equipment and network-side device
CN116847445A (en) Uplink power control method, device, terminal and network side equipment
WO2023241453A1 (en) Antenna capability change method and apparatus, and terminal and network-side device
EP4413784A1 (en) Drx with carrier aggregation for telecommunication systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination