CN115879867A - Terminal system applied to power plant power utilization application - Google Patents

Terminal system applied to power plant power utilization application Download PDF

Info

Publication number
CN115879867A
CN115879867A CN202211002753.7A CN202211002753A CN115879867A CN 115879867 A CN115879867 A CN 115879867A CN 202211002753 A CN202211002753 A CN 202211002753A CN 115879867 A CN115879867 A CN 115879867A
Authority
CN
China
Prior art keywords
information
power
module
utilization application
power utilization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211002753.7A
Other languages
Chinese (zh)
Inventor
武立国
杨宝清
马向阳
李鲲鹏
徐宝德
黄令帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Linyi Power Generation Co Ltd
Original Assignee
Huaneng Linyi Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Linyi Power Generation Co Ltd filed Critical Huaneng Linyi Power Generation Co Ltd
Priority to CN202211002753.7A priority Critical patent/CN115879867A/en
Publication of CN115879867A publication Critical patent/CN115879867A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a terminal system applied to power plant power utilization application, which comprises: the APP unit is used for registering an overhaul power supply box, submitting power utilization application, reporting faults, recording responsibility and inquiring historical information; the first terminal unit is used for auditing, classifying, storing and statistically analyzing the power utilization application information, the power supply box registration information and the fault information, and sending the data to the APP unit and the second terminal unit; the second terminal unit is used for generating the two-dimensional code and printing the operation ticket, the work ticket and the two-dimensional code; and the terminal system is used for auditing, counting and analyzing the power utilization application information of the power plant and generating corresponding operation tickets, work tickets and two-dimensional codes. Therefore, this application maintenance power supply box can be applied to audit and statistical analysis power plant's power consumption application information, generates corresponding operation ticket, work ticket and two-dimensional code, reduces the operation administrative cost of power plant, strengthens the safety guarantee of power plant's interim power consumption.

Description

Terminal system applied to power plant power utilization application
Technical Field
The invention relates to the technical field of computers, in particular to a terminal system applied to power plant power utilization application.
Background
The overhaul power box is a combined three-phase socket and a direct current socket, is provided with a 63A380V five-wire industrial plug connector, a 16A220V three-jack socket and a 10A220V five-jack socket, and is also provided with a corresponding protection device, so that the overhaul power box allows larger current. The maintenance power box is arranged around a power plant factory building, and various electric tools, electrical equipment, illuminating lamps and other temporary electric devices are plugged in the maintenance power box when maintenance is convenient.
In a power plant, the number of the maintenance power boxes is large and can reach one or two hundred sometimes, the requirements are large, the operation is frequent, and the use frequency in the work of the power plant is large.
Therefore, risks and accidents due to irregular operation of plant personnel are inevitable.
Therefore, the power plant needs to record the service condition, the device capacity, the main wiring, the operation mode, the relay protection mode, the scheduling communication, the security measure, the electric energy metering mode, the wiring mode, the installation position, the property right, the maintenance responsibility division point, the technical parameters of main electrical equipment and the like of each maintenance power box, and the data are numerous in the power plant and have large updating requirements.
Moreover, when the temporary electricity demand is submitted, it is only possible to manually confirm and routinely check compliance of the operation ticket and the work ticket for repairing the power supply box by a human. At this moment, if the staff carries out the maloperation to the maintenance power supply box, takes place the incident even to operation ticket and work ticket damage have then increased the degree of difficulty of following up the liability to action subject and process, can't ensure electric power system's safe operation, very big hindrance electric power system's development.
Therefore, how to design a digital system to manage and verify the process of power plant electricity application, including the process of issuing operation tickets and work tickets, is easy to submit the application, and the communication mode of the terminal system and the maintenance power supply box is designed to meet the requirements of the electric power safety work rules-electric part (GB 26860-2011), which is a technical problem to be solved at present.
Disclosure of Invention
The invention provides a terminal system applied to power plant power utilization application, which comprises:
an APP (Application) unit for registering an overhaul power supply box, submitting a power utilization Application, reporting a fault, recording responsibility and inquiring historical information, and sending information of the result to a first terminal unit through WIFI or an optical fiber;
the first terminal unit is used for auditing, classifying, storing and statistically analyzing the power utilization application information, the power box registration information and the fault information, and sending the data to the APP unit and the second terminal unit through WIFI or optical fibers;
and the second terminal unit is used for generating the two-dimensional code and printing the operation ticket, the work ticket and the two-dimensional code.
Preferably, the APP unit comprises a login request module, a power utilization application submission module, a fault reporting and responsibility recording module, a history information query module and an overhaul power supply box registration module;
preferably, the first terminal unit comprises an electricity application auditing module, another information auditing module, a notification module, a classification storage module and a statistical analysis module;
preferably, the second terminal unit comprises a two-dimensional code generating module and a printing module;
preferably, the statistical analysis module is used for counting the statistics of power frequency and time length of an applicant and an application unit, and the statistics of the power frequency and time length of an overhaul power box, and generating an ASP (Active Server Pages, dynamic Server Pages), a work ticket and an operation ticket;
preferably, the electricity application auditing module and other information auditing modules enable power plant managers to audit electricity information and other information on line through mobile phone APP through a cloud platform.
Therefore, the power supply box for overhauling can be applied to auditing and counting and analyzing power utilization application information of the power plant, corresponding operation tickets, work tickets and two-dimensional codes are generated, the operation management cost of the power plant is reduced, and the safety guarantee of temporary power utilization of the power plant is enhanced.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings needed to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 shows an effect diagram of a terminal system and a maintenance power box framework according to an embodiment of the invention;
FIG. 2 shows a block diagram of a terminal system of the present invention;
FIG. 3 shows an APP interface effect diagram of an embodiment of the present invention;
FIG. 4 shows an APP effect diagram of a power application submission of an embodiment of the invention;
fig. 5 is a diagram illustrating a partial effect of a two-dimensional code tag according to an embodiment of the present invention.
The terminal comprises an APP unit, a 2-first terminal unit and a 3-second terminal unit.
Detailed Description
The technical solutions in the embodiments of the present application will be described clearly and completely with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only some embodiments of the present application, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The embodiment of the application provides a terminal system for power plant's power consumption application, as shown in FIG. 1, the system includes:
an APP (Application) unit for registering an overhaul power supply box, submitting a power utilization Application, reporting a fault, recording responsibility and inquiring historical information, and sending information of the result to a first terminal unit through WIFI or an optical fiber;
the first terminal unit is used for auditing, classifying, storing and statistically analyzing the power utilization application information, the power box registration information and the fault information, and sending the data to the APP unit and the second terminal unit through WIFI or optical fibers;
and the second terminal unit is used for generating the two-dimensional code and printing the operation ticket, the work ticket and the two-dimensional code.
The two-dimensional code enables the maintenance power box to open the door lock through scanning.
Therefore, the communication between the terminal and the maintenance power box is free of a network, and the requirement of electric power safety work rules-electric parts (GB 26860-2011) is met.
The printing operation ticket and the working ticket are attached to the maintenance power supply box, so that an operator can conveniently find the interval of the operation to be executed and the maintenance power supply box according to the working ticket, and execute the required operation according to the operation ticket.
The APP unit is used for registering the maintenance power supply box, submitting power utilization application, reporting faults, recording responsibility and inquiring historical information, and comprises a login request module, a power utilization application submitting module, a fault reporting and responsibility recording module, a historical information inquiring module and a maintenance power supply box registering module.
The login request module is used for checking whether the login account is a compliance identity, if so, judging that the login account is an operator account or a manager account, and if not, refusing to login.
The login request module comprises a receiving transmitter and an account information base.
And the step of checking the login account is to judge whether the input account ID can be matched with the same account ID in the account information base.
And judging the ID identification digit number of the account number as an operator account number or a manager account number.
And the administrator account number enables the login request module to refuse to login by using the account number of the operator who overhauls the power box in a violation manner through the APP unit.
And the login rejection is to pop up an illegal identity interface for login rejection or an illegal operation login prohibition interface.
The power utilization application submitting module is used for selecting the maintenance power box needing to be operated, filling in the operation ticket template, constructing the operation ticket template into power utilization application information, sending the power utilization application information to the first terminal unit, and receiving the power utilization application auditing result of the first terminal unit.
The power utilization application information includes a maintenance power cabinet number, a use start time, a use end time, a use unit, a use person in charge, and the like, as shown in fig. 4.
And the fault reporting and responsibility recording module is used for filling fault information by a manager.
The fault information comprises a failed overhauling power box, a failed fault type and a fault-causing responsibility main body.
And the historical information query module is used for power utilization application information, power supply box registration information and fault information.
The statistics of the power utilization application comprises statistics of power utilization frequency and time of an applicant and an application unit, and usage frequency and time of the maintenance power box.
The maintenance power box registration module is used for submitting and modifying power box registration information recorded into the terminal system of the application to the first terminal unit after the administrator logs in through the account, and is shown in fig. 3.
The power box registration information comprises device capacity, main wiring, operation modes, relay protection modes, security measures, electric energy metering modes, socket specifications, installation positions, property rights, maintenance responsibility demarcation points, main electrical equipment technical parameters and the like.
The first terminal unit is used for auditing, classifying, storing and statistically analyzing the power utilization application information, the power supply box registration information and the fault information, and sending the data to the APP unit and the second terminal unit, and the first terminal unit comprises a power utilization application auditing module, other information auditing modules, a notification module, a classified storage module and a statistical analysis module.
The power utilization application auditing module and other information auditing modules enable power plant managers to audit power utilization information and other information on line through mobile phone APP through the cloud platform.
The cloud platform is a computing type cloud platform constructed by OpenStack software and used for storing auditing information and simultaneously auditing power utilization information and other information on line by a plurality of power plant managers.
The OpenStack is an open-source cloud computing management platform project.
The other information includes fault information and service power box registration information.
And the classified storage module is used for storing the information which is audited by the power utilization application auditing module and other information auditing modules in a classified manner as power utilization application data.
The classified storage module is used for storing the power frequency and the time length of the power consumption of the applicant and the application unit, the use frequency and the time length of the maintenance power box in a classified mode, the power consumption application data, the power box registration data and the fault data according to the power consumption application information, the power box registration information and the fault information.
The power utilization application data comprise power utilization application data, power supply box registration data and fault data.
And the statistical analysis module comprises power utilization application data, a power utilization application database and a service JavaBean set.
The JavaBean set can be programmed by a programming compiler Javac using the Java language.
The javaBean set encapsulates the connection, query and update functions of the power utilization database and is used for updating the power utilization application database according to the power utilization application data.
The electricity application database executes the structured SQL sentences to complete the creation and the updating of the electricity application data table and sends the electricity application data table to the notification module.
The power utilization application data table comprises power utilization application data, power supply box registration data and fault data.
The electricity utilization application data sheet is applied to ASP (Active Server Pages, dynamic Server Pages) of the APP, so that data in the electricity utilization application data sheet updated in real time can be checked on line through the account number of the identity authentication.
Therefore, the classified storage module and the statistical analysis module can enable managers and operators to check the electricity utilization application information, the power box registration information and the fault information which are updated in real time on line.
And the notification module is used for sending the information whether the power utilization application passes the audit or not, the audit information whether other information passes the audit or not and the result generated by the statistical analysis module to the APP unit and the second terminal unit through WIFI or optical fiber.
And the result generated by the statistical analysis module comprises the power utilization application data table, the work ticket and the operation ticket.
The statistics of power consumption application includes the statistics of the frequency and duration of power consumption of the applicant and the application unit, and the frequency and duration of use of the maintenance power box.
The second terminal unit is used for generating the two-dimension code and printing the operation ticket, the work ticket and the two-dimension code and comprises a two-dimension code generating module and a printing module.
The two-dimension code generating module comprises a two-dimension code generator and is used for generating a two-dimension code containing the number of the maintenance power cabinet, the using start time, the using end time, the using unit and the information of the using responsible person;
the two-dimension code generating module is further configured to combine the two-dimension code, the work ticket and the operation ticket information into a two-dimension code label, as shown in fig. 4, and send the two-dimension code label to the printing module;
the printing module is used for printing the two-dimensional code label;
the two-dimensional code label needs to be provided with a back adhesive and a pasting capability.
Sending the result generated by the statistical analysis module into a two-dimensional code generator to generate a two-dimensional code;
the two-dimensional code generation module is used for unlocking a cabinet door of the maintenance power box consistent with the work ticket, so that the power supply time of the maintenance power box is consistent with the requirement on the operation ticket.
Therefore, the power supply box for overhauling can be applied to auditing and counting and analyzing power utilization application information of the power plant, corresponding operation tickets, work tickets and two-dimensional codes are generated, the operation management cost of the power plant is reduced, and the safety guarantee of temporary power utilization of the power plant is enhanced.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present application, and not to limit the same; although the present application has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art will understand that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not necessarily depart from the spirit and scope of the corresponding technical solutions in the embodiments of the present application.

Claims (9)

1.A terminal system applied to power plant power utilization application comprises:
the system comprises an APP (Application) unit, a first terminal unit and a second terminal unit, wherein the APP unit is used for registering an overhaul power box, submitting a power utilization Application, reporting a fault, recording responsibility and inquiring historical information, and sending information of the result to the first terminal unit through WIFI or optical fibers;
the first terminal unit is used for auditing, classifying, storing and statistically analyzing the power utilization application information, the power box registration information and the fault information, and sending the data to the APP unit and the second terminal unit through WIFI or optical fibers;
and the second terminal unit is used for generating the two-dimensional code and printing the operation ticket, the work ticket and the two-dimensional code.
2. The system of claim 1, wherein the APP unit comprises:
the power supply management system comprises a login request module, a power utilization application submission module, a fault reporting and responsibility recording module, a historical information inquiry module and a maintenance power supply box registration module;
the login request module is used for checking whether the login account is a compliance identity, if so, judging that the login account is an operator or a manager, and if not, refusing to login;
the power utilization application submitting module is used for selecting an overhaul power box needing to be operated, filling an operation ticket template, constructing the operation ticket template into power utilization application information, sending the power utilization application information to the first terminal unit, and receiving a power utilization application auditing result of the first terminal unit;
the power utilization application information comprises a maintenance power cabinet number, use start time, use end time, a use unit and a use responsible person;
the fault reporting and responsibility recording module is used for filling fault information by a manager;
the fault information comprises a fault overhauling power box, a fault type and a fault initiating responsibility main body;
the historical information query module is used for classifying and querying the past power utilization application information, the power box registration information and the fault information;
the maintenance power box registration module is used for a manager to submit and modify the power box registration information recorded into the terminal system of the application to the first terminal unit;
the power box registration information comprises device capacity, main wiring, an operation mode, a relay protection mode, security measures, an electric energy metering mode, socket specifications, installation positions, property rights, maintenance responsibility demarcation points and main electrical equipment technical parameters.
3. The system of claim 2, wherein the login request module comprises:
the login request module comprises a receiving transmitter and an account information base;
the checking of the login account is to determine whether the input account ID (Identity document) can be matched with the same account ID in the account information base;
and judging the ID identification digit number of the account number as an operator account number or a manager account number.
4. The system of claim 1, wherein the first terminal unit comprises:
the system comprises an electricity utilization application auditing module, other information auditing modules, a notification module, a classification storage module and a statistical analysis module;
the power utilization application auditing module and the other information auditing module enable power plant managers to audit power utilization information and other information on line through mobile phone APPs through the cloud platform;
the other information comprises fault information and overhaul power supply box registration information;
the classified storage module is used for storing the power utilization frequency and time length classified as the power utilization frequency and time length of an applicant and an application unit, the service frequency and time length classified storage of an overhaul power box, the power utilization application data, the power box registration data and the fault data according to the power utilization application information, the power box registration information and the fault information;
the statistical analysis module is used for counting the electricity frequency and time length of an applicant and an application unit, and the electricity frequency and time length of the maintenance power box to generate ASP (Active Server Pages), work tickets and operation tickets;
the notification module is used for sending information whether the power utilization application passes the audit or not, audit information whether other information passes the audit or not and results generated by the statistical analysis module to the APP unit and the second terminal unit through WIFI or optical fibers;
the first terminal units are a plurality of computers provided with power utilization application auditing modules, other information auditing modules, notification modules, classification storage modules and statistical analysis modules.
5. The system of claim 4, wherein the cloud platform comprises:
the cloud platform is a computing type cloud platform constructed by OpenStack software;
the cloud platform is used for storing audit information;
the cloud platform is used for simultaneously auditing the electricity utilization information and other information on line by 1 or more power plant managers.
6. The system of claim 4, wherein the statistical analysis module comprises:
the system comprises electricity utilization application data, an electricity utilization application database and a service JavaBean set;
the JavaBean set can be programmed by a programming compiler java language;
the javaBean set encapsulates the connection, query and update functions of the power utilization database, and is used for updating the power utilization application database according to the power utilization application data;
the electricity utilization application database executes the structured SQL sentences to complete the creation and the updating of the electricity utilization application data table and sends the electricity utilization application data table to the notification module;
the power utilization application data table comprises power utilization application data, power supply box registration data and fault data;
the electricity utilization application data table is applied to the ASP of the APP, so that the data in the electricity utilization application data table updated in real time can be checked on line through the account passing the identity authentication;
and generating a work ticket and an operation ticket according to the power utilization application data table.
7. The system of claim 4, wherein notifying the results generated by the statistical analysis module in the module comprises:
the electricity utilization application data table, the work ticket and the operation ticket.
8. The system of claim 1, wherein the second terminal unit comprises:
the device comprises a two-dimensional code generation module and a printing module;
the two-dimensional code generation module comprises a two-dimensional code generator and is used for generating a two-dimensional code containing the number of the maintenance power supply cabinet, the use start time, the use end time, the use unit and the use responsible person information;
the two-dimension code generating module is also used for combining the two-dimension code, the work ticket and the operation ticket information into a two-dimension code label and sending the two-dimension code label to the printing module;
the printing module is used for printing the two-dimensional code label;
the two-dimensional code label needs to be provided with a back glue and a pasting capacity;
the second terminal unit is a server and a printer.
9. The system of claim 8, wherein the two-dimensional code generation module comprises:
sending the result generated by the statistical analysis module into a two-dimensional code generator to generate a two-dimensional code;
and unlocking a cabinet door of the maintenance power box consistent with the work ticket, so that the power supply time of the maintenance power box is consistent with the requirement on the operation ticket.
CN202211002753.7A 2022-08-19 2022-08-19 Terminal system applied to power plant power utilization application Pending CN115879867A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211002753.7A CN115879867A (en) 2022-08-19 2022-08-19 Terminal system applied to power plant power utilization application

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211002753.7A CN115879867A (en) 2022-08-19 2022-08-19 Terminal system applied to power plant power utilization application

Publications (1)

Publication Number Publication Date
CN115879867A true CN115879867A (en) 2023-03-31

Family

ID=85769658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211002753.7A Pending CN115879867A (en) 2022-08-19 2022-08-19 Terminal system applied to power plant power utilization application

Country Status (1)

Country Link
CN (1) CN115879867A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104731528A (en) * 2015-03-17 2015-06-24 清华大学 Construction method and system for storage service of cloud computing block
CN106096870A (en) * 2016-07-21 2016-11-09 杭州迪脉信息科技有限公司 A kind of performance data treating method and apparatus
CN110046720A (en) * 2019-04-17 2019-07-23 济南纵向软件有限公司 Work ticket management method based on the control of electric field maintenance safety
CN112114274A (en) * 2020-09-14 2020-12-22 安徽中科超屹科技有限公司 Intelligent power utilization management system
CN113888347A (en) * 2021-09-13 2022-01-04 安徽国祯生态科技有限公司 Production management system of biomass power plant

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104731528A (en) * 2015-03-17 2015-06-24 清华大学 Construction method and system for storage service of cloud computing block
CN106096870A (en) * 2016-07-21 2016-11-09 杭州迪脉信息科技有限公司 A kind of performance data treating method and apparatus
CN110046720A (en) * 2019-04-17 2019-07-23 济南纵向软件有限公司 Work ticket management method based on the control of electric field maintenance safety
CN112114274A (en) * 2020-09-14 2020-12-22 安徽中科超屹科技有限公司 Intelligent power utilization management system
CN113888347A (en) * 2021-09-13 2022-01-04 安徽国祯生态科技有限公司 Production management system of biomass power plant

Similar Documents

Publication Publication Date Title
CN101247532B (en) Electrical wiring schedule information management system
CN104952117B (en) A kind of attendance management method
CN101482987A (en) Central control and management method for outdoor communication machine room door based on communication network
CN106845647A (en) The tour repair method of charging station, apparatus and system
CN104156824A (en) Mobile HSE inspection method based on explosion-proof hand-held terminal
CN109782724B (en) Control method for preventing misoperation-locking and terminal equipment
CN105225071A (en) Based on the power communication identity management method of Quick Response Code
CN102043986A (en) Online processing system for abnormal electricity information transferring and application method of system
CN105447539A (en) RFID-based MODF construction method and network management system thereof
CN105956774A (en) Asset (equipment) maintenance management and traceability realization method
CN106502219A (en) A kind of bearing Internet of Things intelligence fabrication line process control system
CN107977718A (en) Substation equipment maintaining method and system based on BIM models
CN207799760U (en) Intelligent building management system
CN106920023B (en) Chip production, distribution and management method and system
CN113435694A (en) Enterprise talent information management system based on big data
CN212627319U (en) System for wind-powered electricity generation field safety control
CN103065104A (en) Mobile storage equipment and monitoring system formed by same
CN115879867A (en) Terminal system applied to power plant power utilization application
CN105117822A (en) Electric power system basic data lean processing method
CN109829088A (en) A kind of Expressway Mechanical & Electrical Project detection system
CN105718602A (en) Cloud system for work safety standardization of rural hydropower station
CN106033509A (en) A machine room tour inspection method and system
CN111461926A (en) Charging station electric power demand side management system
CN107168238A (en) Substation equipment is overhauled and information management integrated system
CN104183046A (en) RFID based universal unlocking system and method applied to transformer substation five-prevention lockout

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20230331