CN115875802A - Air conditioner refrigerating capacity evaluation method, device and equipment and readable storage medium - Google Patents

Air conditioner refrigerating capacity evaluation method, device and equipment and readable storage medium Download PDF

Info

Publication number
CN115875802A
CN115875802A CN202111133729.2A CN202111133729A CN115875802A CN 115875802 A CN115875802 A CN 115875802A CN 202111133729 A CN202111133729 A CN 202111133729A CN 115875802 A CN115875802 A CN 115875802A
Authority
CN
China
Prior art keywords
air conditioner
machine room
heat load
power consumption
preset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111133729.2A
Other languages
Chinese (zh)
Inventor
魏强
黄建丰
何照东
金美华
张妙富
徐江炳
胡泷
郑煦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Yiyou Information Technology Co ltd
China Mobile Communications Group Co Ltd
China Mobile Group Zhejiang Co Ltd
Original Assignee
Hangzhou Yiyou Information Technology Co ltd
China Mobile Communications Group Co Ltd
China Mobile Group Zhejiang Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Yiyou Information Technology Co ltd, China Mobile Communications Group Co Ltd, China Mobile Group Zhejiang Co Ltd filed Critical Hangzhou Yiyou Information Technology Co ltd
Priority to CN202111133729.2A priority Critical patent/CN115875802A/en
Publication of CN115875802A publication Critical patent/CN115875802A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses an air conditioner refrigerating capacity evaluation method, device, equipment and a readable storage medium, wherein the method comprises the following steps: determining the actual energy efficiency ratio of the air conditioner based on the power consumption of the first main device, the power consumption of the first switching power supply and the power consumption of the first air conditioner; determining an air conditioner energy efficiency ratio corresponding to each second preset date based on the power consumption of the second main device, the power consumption of the second switching power supply, the power consumption of the second air conditioner and the building temperature difference heat load, and determining an energy efficiency ratio temperature coefficient corresponding to the air conditioner based on the air conditioner energy efficiency ratio and the daily average outdoor temperature corresponding to each second preset date; and determining a first refrigerating capacity based on the actual energy efficiency ratio of the air conditioner and the temperature coefficient of the energy efficiency ratio, and determining a second refrigerating capacity based on the actual energy efficiency ratio of the air conditioner and the input power. According to the invention, the actual energy efficiency ratio and the temperature coefficient of the energy efficiency ratio of the air conditioner can be obtained according to the state of each device in the machine room, and the accuracy of the evaluation of the refrigeration capacity of the air conditioner is improved.

Description

Air conditioner refrigerating capacity evaluation method, device and equipment and readable storage medium
Technical Field
The invention relates to the technical field of data processing, in particular to an air conditioner refrigerating capacity evaluation method, device and equipment and a readable storage medium.
Background
The main function of a communication base station is to provide wireless coverage, i.e. to enable wireless signal transmission between a wired communication network and a wireless terminal. Generally, an air conditioner or a ventilation and heat exchange facility is basically installed in a machine room of an existing base station, except for communication equipment. Because the indoor temperature of the machine room has a great influence on the service life of communication equipment components (such as a main board and a storage battery pack), the temperature of the machine room should be kept between 20 ℃ and 25 ℃, and the operation state of an air conditioner in the machine room is related to the cooling capacity of the air conditioner, so that the cooling capacity of the air conditioner needs to be evaluated.
At present, the refrigerating capacity of an air conditioner in a machine room is mainly evaluated through a dynamic heat load of the machine room, the dynamic heat load of the machine room is obtained by analyzing and calculating historical data of indoor temperature, outdoor temperature, machine room area, IT equipment heat load and refrigerating capacity of refrigerating equipment according to human experience, and the difference of different equipment is not considered, so that the evaluation of the refrigerating capacity of the air conditioner is inaccurate.
The above is only for the purpose of assisting understanding of the technical aspects of the present invention, and does not represent an admission that the above is prior art.
Disclosure of Invention
The invention mainly aims to provide a method, a device and equipment for evaluating the refrigerating capacity of an air conditioner and a readable storage medium, and aims to solve the technical problem that the refrigerating capacity of the air conditioner in the existing communication base station is not accurately evaluated.
In order to achieve the above object, the present invention provides an air conditioner refrigeration capacity evaluation method, including the steps of:
determining an actual energy efficiency ratio of an air conditioner based on the power consumption of first main equipment of the main equipment in the machine room, the power consumption of first switching power supply of the switching power supply and the power consumption of first air conditioner of the air conditioner in the machine room within a first preset date corresponding to first preset meteorological information, wherein the temperature difference between the average outdoor temperature and the average indoor temperature in the machine room within the preset date is smaller than a preset temperature difference;
acquiring the power consumption of second main equipment of the main equipment in the machine room, the power consumption of a second switching power supply of the switching power supply, the power consumption of a second air conditioner in the machine room and the building temperature difference heat load amount corresponding to the machine room in a plurality of second preset dates corresponding to second preset meteorological information, wherein the daily average outdoor temperature corresponding to each second preset date is different;
determining an air conditioner energy efficiency ratio corresponding to each second preset date based on the power consumption of the second main device, the power consumption of a second switching power supply, the power consumption of a second air conditioner and the building temperature difference heat load, and determining an energy efficiency ratio temperature coefficient corresponding to the air conditioner based on the air conditioner energy efficiency ratio and the daily average outdoor temperature corresponding to each second preset date;
and determining a first refrigerating capacity of the air conditioner based on the input power of the air conditioner, the actual energy efficiency ratio of the air conditioner and the energy efficiency ratio temperature coefficient, and determining a second refrigerating capacity of the air conditioner based on the actual energy efficiency ratio of the air conditioner and the input power.
Further, in a plurality of second preset dates corresponding to the second preset meteorological information, the steps of obtaining the power consumption of the second main device of the main device in the machine room, the power consumption of the second switching power supply of the switching power supply, the power consumption of the second air conditioner in the machine room and the building temperature difference heat load amount corresponding to the machine room include:
determining the power consumption of second main equipment corresponding to each second preset date based on the heat load of wireless indoor equipment of the machine room, the heat load of transmission equipment of the machine room and the heat load of an optical line terminal of the base station in each second preset date;
acquiring the power consumption of a second switching power supply corresponding to each second preset date;
determining the power consumption of a second air conditioner corresponding to each second preset date based on the electric quantity of the intelligent electric meter in each second preset date and the electric quantity of the virtual electric meter input by the switching power supply;
and acquiring the building temperature difference heat load corresponding to the machine room in each second preset date.
Further, the step of obtaining the building temperature difference heat load amount corresponding to the machine room within each second preset date includes:
acquiring average meteorological temperatures corresponding to the second preset dates and average indoor temperatures in the machine room, and acquiring a building temperature difference heat load coefficient;
and respectively determining the building temperature difference heat load amount corresponding to each date based on the area of the machine room, the building temperature difference heat load coefficient, the average meteorological temperature and the average indoor temperature.
Further, the step of obtaining the building temperature difference heat load coefficient comprises:
acquiring the meteorological temperature under the preset condition corresponding to the third preset meteorological information and the indoor temperature in the machine room;
acquiring the average power corresponding to the intelligent electric meter of the machine room;
determining the building temperature difference thermal load coefficient based on the average power, the meteorological temperature, the indoor temperature and the area of the machine room.
Further, the air conditioner refrigerating capacity evaluation method further comprises the following steps:
when the current weather information is in a fourth preset weather information, the indoor temperature of the machine room is in a preset temperature range and the air conditioner operates according to the preset temperature, acquiring the power consumption of a third main device of the main device in the machine room, the power consumption of a third switch power supply of the switch power supply and the power consumption of a third air conditioner of the air conditioner on the same day;
determining an actual rated energy efficiency ratio of the air conditioner based on the power consumption of the third main device, the power consumption of the third switch power supply and the power consumption of the third air conditioner;
and if the actual rated energy efficiency ratio is smaller than the preset energy efficiency ratio, outputting alarm information of poor air conditioner performance.
Further, the air conditioner refrigerating capacity evaluation method further comprises the following steps:
acquiring the heat load of current machine room wireless indoor equipment, the heat load of machine room transmission equipment, the heat load of an optical line terminal of a base station, the heat load of a battery and the heat load of shared electric equipment;
acquiring a solar radiation heat coefficient, and acquiring an outdoor average temperature within a preset time before the current moment and an indoor average temperature in a machine room;
determining the building thermal load corresponding to the machine room based on the building temperature difference thermal load coefficient, the temperature difference heat conduction coefficient, the solar radiation thermal coefficient, the outdoor average temperature and the indoor average temperature corresponding to the machine room;
and determining the indoor total heat load corresponding to the machine room based on the building heat load, the machine room wireless indoor equipment heat load, the machine room transmission equipment heat load, the optical line terminal heat load of the base station, the battery heat load and the shared electric equipment heat load.
Further, after the step of determining the total indoor heat load corresponding to the machine room based on the building heat load, the machine room wireless indoor device heat load, the machine room transmission device heat load, the optical line terminal heat load of the base station, the battery heat load, and the shared electric device heat load, the method further includes:
acquiring a heat load of the wireless outdoor equipment of the machine room corresponding to the machine room;
and determining the total heat load corresponding to the machine room based on the wireless outdoor equipment heat load of the machine room and the indoor total heat load.
In addition, to achieve the above object, the present invention also provides an air conditioning cooling capacity evaluation device, including:
the first determining module is used for determining the actual energy efficiency ratio of the air conditioner based on the power consumption of first main equipment of the main equipment in the machine room, the power consumption of first switch power supply of the switch power supply and the power consumption of first air conditioner of the air conditioner in the machine room within a first preset date corresponding to first preset meteorological information, wherein the temperature difference between the average outdoor temperature and the average indoor temperature in the machine room within the preset date is smaller than a preset temperature difference;
the acquisition module is used for acquiring the power consumption of second main equipment of the main equipment in the machine room, the power consumption of a second switching power supply of the switching power supply, the power consumption of a second air conditioner in the machine room and the building temperature difference heat load amount corresponding to the machine room in a plurality of second preset dates corresponding to second preset meteorological information, wherein the daily average outdoor temperature corresponding to each second preset date is different;
the second determining module is used for determining the air conditioner energy efficiency ratio corresponding to each second preset date based on the second main equipment power consumption, the second switching power supply power loss quantity, the second air conditioner power consumption and the building temperature difference heat load quantity, and determining the energy efficiency ratio temperature coefficient corresponding to the air conditioner based on the air conditioner energy efficiency ratio and the daily average outdoor temperature corresponding to each second preset date;
the evaluation module is used for determining a first refrigerating capacity of the air conditioner based on the input power of the air conditioner, the actual energy efficiency ratio of the air conditioner and the energy efficiency ratio temperature coefficient, and determining a second refrigerating capacity of the air conditioner based on the actual energy efficiency ratio of the air conditioner and the input power.
In addition, to achieve the above object, the present invention also provides an air conditioning cooling capability evaluation apparatus, including: the air conditioner refrigerating capacity evaluation method comprises a memory, a processor and an air conditioner refrigerating capacity evaluation program which is stored on the memory and can run on the processor, wherein the air conditioner refrigerating capacity evaluation program realizes the steps of the air conditioner refrigerating capacity evaluation method when being executed by the processor.
In addition, to achieve the above object, the present invention further provides a readable storage medium, on which an air-conditioning cooling capacity evaluation program is stored, and the air-conditioning cooling capacity evaluation program, when executed by a processor, implements the steps of the air-conditioning cooling capacity evaluation method described above.
The method comprises the steps of determining the actual energy efficiency ratio of the air conditioner based on the power consumption of first main equipment of the main equipment in the machine room, the power consumption of first switch power supply of the switch power supply and the power consumption of first air conditioner of the air conditioner in the machine room in a first preset date corresponding to first preset weather information, then obtaining the power consumption of second main equipment of the main equipment in the machine room, the power consumption of second switch power supply of the switch power supply, the power consumption of second air conditioner in the machine room and the building temperature difference heat load quantity corresponding to the machine room in a plurality of second preset dates corresponding to second preset weather information, then determining the energy efficiency ratio of the air conditioner corresponding to each second preset date based on the power consumption of the second main equipment, the power consumption of the second switch power supply, the power consumption of the second air conditioner and the building temperature difference heat load quantity, and determining the specific temperature coefficient corresponding to the air conditioner based on the energy efficiency ratio of the air conditioner and the daily average outdoor temperature corresponding to each second preset date; and finally, determining the first refrigerating capacity of the air conditioner based on the input power of the air conditioner, the actual energy efficiency ratio of the air conditioner and the energy efficiency ratio temperature coefficient, determining the second refrigerating capacity of the air conditioner based on the actual energy efficiency ratio of the air conditioner and the input power, obtaining the actual energy efficiency ratio of the air conditioner and the energy efficiency ratio temperature coefficient according to the states of all devices in the machine room, evaluating the refrigerating capacity of the air conditioner according to the actual energy efficiency ratio of the air conditioner and the energy efficiency ratio temperature coefficient, avoiding the influence of human experience on the evaluation of the refrigerating capacity of the air conditioner, and improving the accuracy of the evaluation of the refrigerating capacity of the air conditioner.
Drawings
Fig. 1 is a schematic structural diagram of an air conditioning refrigeration capacity evaluation device in a hardware operating environment according to an embodiment of the present invention;
FIG. 2 is a schematic flow chart illustrating a first embodiment of the method for evaluating the refrigerating capacity of an air conditioner according to the present invention;
fig. 3 is a schematic functional block diagram of an embodiment of an air conditioner refrigeration capacity evaluation device according to the present invention.
The implementation, functional features and advantages of the objects of the present invention will be further explained with reference to the accompanying drawings.
Detailed Description
It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1, fig. 1 is a schematic structural diagram of an air conditioner cooling capacity evaluation device in a hardware operating environment according to an embodiment of the present invention.
The air conditioner refrigerating capacity evaluation device provided by the embodiment of the invention can be a PC. As shown in fig. 1, the air conditioning refrigerating capacity evaluating apparatus may include: a processor 1001, such as a CPU, a network interface 1004, a user interface 1003, a memory 1005, a communication bus 1002. Wherein a communication bus 1002 is used to enable connective communication between these components. The user interface 1003 may include a Display screen (Display), an input unit such as a Keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface, a wireless interface. The network interface 1004 may optionally include a standard wired interface, a wireless interface (e.g., WI-FI interface). The memory 1005 may be a high-speed RAM memory or a non-volatile memory such as a disk memory. The memory 1005 may alternatively be a storage device separate from the processor 1001 described previously.
Optionally, the air conditioner cooling capability evaluation device may further include a camera, a Radio Frequency (RF) circuit, a sensor, an audio circuit, a WiFi module, and the like. Of course, the air conditioning refrigeration capacity evaluation device may also be configured with other sensors such as a barometer, a hygrometer, a thermometer, an infrared sensor, and the like, which are not described herein again.
It will be appreciated by those skilled in the art that the terminal structure shown in fig. 1 does not constitute a limitation of the air cooling capability assessment apparatus and may include more or fewer components than those shown, or some components in combination, or a different arrangement of components.
As shown in fig. 1, a memory 1005, which is a kind of computer storage medium, may include therein an operating system, a network communication module, a user interface module, and an air conditioning and cooling capability evaluation program.
In the terminal shown in fig. 1, the network interface 1004 is mainly used for connecting to a backend server and performing data communication with the backend server; the user interface 1003 is mainly used for connecting a client (user side) and performing data communication with the client; and the processor 1001 may be configured to call an air conditioning cooling capacity evaluation program stored in the memory 1005.
In the present embodiment, the air conditioning cooling capability evaluation apparatus includes: the system comprises a memory 1005, a processor 1001 and an air-conditioning cooling capacity evaluation program which is stored in the memory 1005 and can run on the processor 1001, wherein when the processor 1001 calls the air-conditioning cooling capacity evaluation program stored in the memory 1005, the steps of the air-conditioning cooling capacity evaluation method in each of the following embodiments are executed.
The invention also provides an air conditioner refrigerating capacity evaluation method, and referring to fig. 2, fig. 2 is a schematic flow chart of a first embodiment of the air conditioner refrigerating capacity evaluation method of the invention.
In this embodiment, the method for evaluating the cooling capacity of the air conditioner includes the following steps:
step S101, determining an actual energy efficiency ratio of an air conditioner based on the power consumption of first main equipment of the main equipment in the machine room, the power consumption of the first switching power supply of the switching power supply and the power consumption of the first air conditioner of the air conditioner in the machine room within a first preset date corresponding to first preset meteorological information, wherein the temperature difference between the average outdoor temperature and the average indoor temperature in the machine room within the preset date is smaller than a preset temperature difference;
in this embodiment, the first preset weather information is a cloudy day in summer and autumn, the first preset date is a day when the weather in the day is the first preset weather information, the difference between the outdoor average temperature and the indoor average temperature in the machine room is smaller than the preset temperature difference, the preset temperature difference may be 1 ℃, and the refrigeration equipment except the air conditioner in the machine room is controlled to stop operating. And after the first preset date is finished, acquiring the power consumption of the first main equipment of the main equipment in the machine room, the power consumption of the first switch power supply of the switch power supply and the power consumption of the first air conditioner of the air conditioner in the machine room.
The first main device power consumption is determined through the machine room wireless indoor device heat load, the machine room transmission device heat load and the optical line terminal heat load of the base station, and specifically, the first main device power consumption = (the machine room wireless indoor device heat load, the machine room transmission device heat load and the optical line terminal heat load of the base station) is the time length of the same day (for example, 24 hours or 1 day). Wherein, acquire computer lab wireless indoor equipment heat load through "energy-conserving effect evaluation technology research and development requirement book" or "virtual ammeter technique", indoor wireless equipment heat load includes: power of 2GRRU (or RRU for 2G, 4G), power of 4GBBU, power of 5 GBBU. The heat load of the machine room transmission equipment and the heat load of the optical line terminal are obtained by a virtual electric meter technology.
Specifically, for each switch in the machine room, the switching power supply loss power is obtained through the power supply input power and the power supply output power of the switch, and the first switching power supply loss electric quantity = the switching power supply loss power about the time of the day.
The power consumption of the first air conditioner is obtained through the intelligent electric meter and the switch corresponding to the air conditioner, specifically, the power of the intelligent electric meter and the input power of the switch power supply are obtained, the electric quantity of the intelligent electric meter on the same day and the electric quantity of the switch power supply input virtual electric meter are calculated, the electric quantity of the intelligent electric meter is the power of the intelligent electric meter and the time of the same day, the electric quantity of the switch power supply input virtual electric meter is the input power of the switch power supply and the time of the same day, and the power consumption of the first air conditioner = the electric quantity of the intelligent electric meter-the electric quantity of the switch power supply input virtual electric meter.
Next, an air conditioner actual energy efficiency ratio is determined based on the first master power consumption amount, the first switching power supply power loss amount, and the first air conditioner power consumption amount, specifically, the air conditioner actual energy efficiency ratio = (first master power consumption amount + first switching power supply power loss amount)/the first air conditioner power consumption amount.
Step S102, acquiring second main equipment power consumption of main equipment in a machine room, second switch power consumption of a switch power supply, second air conditioner power consumption in the machine room and building temperature difference heat load quantity corresponding to the machine room in a plurality of second preset dates corresponding to second preset meteorological information, wherein the daily average outdoor temperature corresponding to each second preset date is different;
in this embodiment, the second preset weather information is a cloudy day, the weather on the same day is the second preset weather information, the daily average outdoor temperatures corresponding to the second preset dates are different, the operating temperature of the air conditioner is 28 ℃, the remote on-off temperature of the air conditioner is set to 30 ℃ and 26 ℃, that is, the air conditioner is remotely turned off when the indoor temperature of the machine room reaches 26 ℃, and the air conditioner is remotely turned off when the indoor temperature of the machine room reaches 30 ℃. And after the second preset date is finished, acquiring the power consumption of the second main equipment of the main equipment in the machine room, the power consumption of the second switching power supply of the switching power supply, the power consumption of the second air conditioner of the air conditioner in the machine room and the building temperature difference heat load corresponding to the machine room.
The power consumption of the second main device is the same as the power consumption of the first main device, the power consumption of the second switching power supply is the same as the power consumption of the first switching power supply, and the power consumption of the first air conditioner is the same as the power consumption of the second air conditioner, which is not described herein again. And obtaining the building temperature difference heat load corresponding to the machine room according to the area of the machine room, the building temperature difference heat load coefficient of the machine room, the average meteorological temperature of each second preset date and the average indoor temperature.
Step S103, determining an air conditioner energy efficiency ratio corresponding to each second preset date based on the power consumption of the second main device, the power consumption of a second switching power supply, the power consumption of a second air conditioner and the building temperature difference heat load, and determining an energy efficiency ratio temperature coefficient corresponding to the air conditioner based on the air conditioner energy efficiency ratio and the daily average outdoor temperature corresponding to each second preset date;
in this embodiment, when the second main device power consumption amount, the second switching power supply loss electric quantity, the second air conditioner power consumption amount, and the building temperature difference heat load amount are obtained, the air conditioner energy efficiency ratio corresponding to each second preset date is determined based on the second main device power consumption amount, the second switching power supply loss electric quantity, the second air conditioner power consumption amount, and the building temperature difference heat load amount, and specifically, for each second preset date, the current air conditioner energy efficiency ratio = (the second main device power consumption amount + the second switching power supply loss electric quantity + the building temperature difference heat load amount)/the second air conditioner power consumption amount is corresponding to each second preset date.
Then, based on the air conditioner energy efficiency ratio and the daily average outdoor temperature corresponding to each second preset date, determining an energy efficiency ratio temperature coefficient corresponding to the air conditioner, specifically, the formula of the energy efficiency ratio temperature coefficient is as follows: m = (P1-P2)/(T2-T1).
Wherein M is an energy efficiency ratio temperature coefficient, P1 and T1 are respectively the air-conditioning energy efficiency ratio and the daily average outdoor temperature of a certain day in the second preset date, and P2 and T2 are respectively the air-conditioning energy efficiency ratio and the daily average outdoor temperature of the other day in the second preset date.
It should be noted that the number of days of the second preset date is greater than 2, that is, two or more second preset dates are included, then the two-day energy efficiency ratio temperature coefficients between any two days can be respectively calculated, and the average value of the two-day energy efficiency ratio temperature coefficients is taken as the final energy efficiency ratio temperature coefficient.
And step S104, determining a first refrigerating capacity of the air conditioner based on the input power of the air conditioner, the actual energy efficiency ratio of the air conditioner and the energy efficiency ratio temperature coefficient, and determining a second refrigerating capacity of the air conditioner based on the actual energy efficiency ratio of the air conditioner and the input power.
In this embodiment, when the energy efficiency ratio temperature coefficient is obtained, the input power of the air conditioner is obtained, and the input power of the air conditioner is the input power of the switching power supply of the smart meter power-switch of the smart meter (at the same time).
And then, determining a first refrigerating capacity of the air conditioner according to the input power of the air conditioner, the actual energy efficiency ratio of the air conditioner and the energy efficiency ratio temperature coefficient, and determining a second refrigerating capacity of the air conditioner based on the actual energy efficiency ratio of the air conditioner and the input power. Specifically, the first refrigeration capacity = air conditioner actual energy efficiency ratio (1 + energy efficiency ratio temperature coefficient) input power; second cooling capacity = air conditioner actual energy efficiency ratio input power.
It should be noted that, in other embodiments, when the first refrigeration capacity and the second refrigeration capacity are obtained, if the first refrigeration capacity is smaller than the corresponding first capacity threshold or the second refrigeration capacity is smaller than the corresponding second capacity threshold, an alarm prompt message for replacing the air conditioner is output, so that the air conditioner is replaced in time when the refrigeration capacity of the air conditioner is poor.
In the method for evaluating the refrigeration capacity of the air conditioner, an actual energy efficiency ratio of the air conditioner is determined based on power consumption of first main equipment of the main equipment in the machine room, power consumption of first switching power supply of the switching power supply and power consumption of the first air conditioner of the air conditioner in the machine room in a first preset date corresponding to first preset weather information, then, power consumption of second main equipment of the main equipment in the machine room, power consumption of second switching power supply of the switching power supply, power consumption of second air conditioner in the machine room and heat load capacity of building temperature difference corresponding to the machine room in a plurality of second preset dates corresponding to second preset weather information are obtained, then, an energy efficiency ratio of the air conditioner corresponding to each second preset date is determined based on the power consumption of the second main equipment, the power consumption of the second switching power supply, the power consumption of the second air conditioner and the heat load capacity of building temperature difference, and an energy efficiency ratio temperature coefficient corresponding to the air conditioner is determined based on the energy efficiency ratio and the average outdoor temperature of the air conditioner corresponding to each second preset date; and finally, determining the first refrigerating capacity of the air conditioner based on the input power of the air conditioner, the actual energy efficiency ratio of the air conditioner and the energy efficiency ratio temperature coefficient, determining the second refrigerating capacity of the air conditioner based on the actual energy efficiency ratio of the air conditioner and the input power, obtaining the actual energy efficiency ratio of the air conditioner and the energy efficiency ratio temperature coefficient according to the states of all devices in a machine room, and evaluating the refrigerating capacity of the air conditioner according to the actual energy efficiency ratio of the air conditioner and the energy efficiency ratio temperature coefficient, so that the influence of human experience on the evaluation of the refrigerating capacity of the air conditioner is avoided, and the accuracy of the evaluation of the refrigerating capacity of the air conditioner is improved.
A second embodiment of the air conditioning cooling capacity evaluation method according to the present invention is provided based on the first embodiment, and in this embodiment, step S102 includes
Step S201, determining the power consumption of second main equipment corresponding to each second preset date based on the heat load of the wireless indoor equipment of the machine room, the heat load of the transmission equipment of the machine room and the heat load of the optical line terminal of the base station in each second preset date;
step S202, acquiring the power consumption of a second switching power supply corresponding to each second preset date;
step S203, determining the power consumption of a second air conditioner corresponding to each second preset date based on the electric quantity of the intelligent electric meter in each second preset date and the electric quantity of the virtual electric meter input by the switching power supply;
and step S204, acquiring the building temperature difference heat load corresponding to the machine room in each second preset date.
In this embodiment, based on the heat load of the wireless indoor devices of the machine rooms, the heat load of the transmission devices of the machine rooms, and the heat load of the optical line terminal of the base station in each second preset date, the power consumption of the second main device corresponding to each second preset date is determined, specifically, for each second preset date, the heat load of the wireless indoor devices of the machine rooms + the heat load of the transmission devices of the machine rooms + the heat load of the optical line terminal of the base station on the current day is obtained first, and the power consumption of the second main device = (the heat load of the wireless indoor devices of the machine rooms + the heat load of the transmission devices of the machine rooms + the heat load of the optical line terminal of the base station) is obtained for the current day (for example, 24 hours or 1 day), where the heat load of the wireless indoor devices of the machine rooms is obtained through "energy saving effect evaluation technology research and development requirement book" or "virtual electric meter technology", where the heat load of the indoor wireless devices includes: power of 2GRRU (or RRU for 2G, 4G), power of 4GBBU, power of 5 GBBU. The heat load of the machine room transmission equipment and the heat load of the optical line terminal are obtained by a virtual electric meter technology.
Then, acquiring second switching power supply power consumption corresponding to each second preset date; for each second preset date, the second switching power supply loss electric quantity of the switching power supply is obtained through the switching power supply loss power, specifically, for each switch in the machine room, the switching power supply loss power is obtained through the power supply input power and the power supply output power of the switch, and the second switching power supply loss electric quantity = the switching power supply loss power x the time of the day.
Meanwhile, based on the electric quantity of the smart electric meter in each second preset date and the electric quantity of the switch power supply input virtual electric meter, determining the electric quantity of a second air conditioner corresponding to each second preset date, specifically, for each second preset date, obtaining the power of the smart electric meter and the input power of the switch power supply of the smart electric meter in the current day, calculating the electric quantity of the smart electric meter and the electric quantity of the switch power supply input virtual electric meter in the current day, wherein the electric quantity of the smart electric meter in the current day is the time length of the smart electric meter and the time length of the switch power supply in the current day, the electric quantity of the switch power supply input virtual electric meter in the current day is the time length of the switch power supply input power and the time length of the switch power supply in the current day, and the electric quantity of the second air conditioner = the electric quantity of the smart electric meter in the current day-the electric quantity of the switch power supply input virtual electric meter in the current day.
And finally, acquiring the building temperature difference heat load quantity corresponding to the machine room in each second preset date, wherein the building temperature difference heat load quantity corresponding to the machine room is obtained according to the area of the machine room, the building temperature difference heat load coefficient of the machine room, the average meteorological temperature and the average indoor temperature of each second preset date.
According to the air conditioner refrigeration capacity evaluation method provided by the embodiment, the power consumption of the second main device corresponding to each second preset date is determined based on the heat load of the wireless indoor equipment of the machine room, the heat load of the transmission equipment of the machine room and the heat load of the optical line terminal of the base station in each second preset date; then acquiring the power consumption of a second switching power supply corresponding to each second preset date; then, determining the power consumption of a second air conditioner corresponding to each second preset date based on the electric quantity of the intelligent electric meter in each second preset date and the electric quantity of the virtual electric meter input by the switching power supply; and then, the building temperature difference heat load amount corresponding to the machine room in each second preset date is obtained, the power consumption of the second main device, the power consumption of the second switching power supply, the power consumption of the second air conditioner and the building temperature difference heat load amount can be accurately obtained, the energy efficiency ratio temperature coefficient is accurately obtained, and the accuracy of the evaluation of the air conditioner refrigerating capacity is further improved.
Based on the second embodiment, a third embodiment of the air conditioner refrigeration capacity evaluation method of the present invention is provided, in this embodiment, step S204 includes:
step S301, acquiring average meteorological temperatures corresponding to second preset dates and average indoor temperatures in the machine room, and acquiring a building temperature difference thermal load coefficient;
step S302, based on the area of the machine room, the building temperature difference heat load coefficient, the average meteorological temperature and the average indoor temperature, building temperature difference heat load quantities corresponding to all dates are respectively determined.
In this embodiment, the average weather temperature corresponding to each second preset date and the average indoor temperature in the machine room are obtained first, where for each second preset date, the average weather temperature is an average value of the weather temperatures at each time in the day, and the average indoor temperature is an average value of the indoor temperatures at each time in the day. Wherein the average meteorological temperature is greater than the average indoor temperature. And then acquiring a building temperature difference heat load coefficient, and specifically determining the building temperature difference heat load coefficient through the average power, the meteorological temperature and the indoor temperature corresponding to the intelligent electric meter of the machine room and the area of the machine room.
Then, based on the area of the machine room, the building temperature difference thermal load coefficient, the average meteorological temperature and the average indoor temperature, building temperature difference thermal load quantities corresponding to the respective dates are respectively determined, specifically, for each second preset date, the building temperature difference thermal load quantity of the day = building temperature difference thermal load coefficient (average meteorological temperature-average indoor temperature) × the area of the machine room (average meteorological temperature-average indoor temperature) × the time of the day (for example, 24 hours or 1 day).
According to the air conditioner refrigerating capacity evaluation method provided by the embodiment, the average meteorological temperature corresponding to each second preset date and the average indoor temperature in the machine room are obtained, and the building temperature difference heat load coefficient is obtained; and then respectively determining the building temperature difference heat load amount corresponding to each date based on the area of the machine room, the building temperature difference heat load coefficient, the average meteorological temperature and the average indoor temperature, accurately obtaining the building temperature difference heat load amount according to the building temperature difference heat load coefficient, the average meteorological temperature and the average indoor temperature, further accurately obtaining an energy efficiency ratio temperature coefficient according to the building temperature difference heat load amount, and further improving the accuracy of air-conditioning refrigeration capacity evaluation.
Based on the third embodiment, a fourth embodiment of the air conditioner refrigeration capacity evaluation method of the present invention is proposed, in this embodiment, step S301 includes:
step S401, acquiring a weather temperature under a preset condition corresponding to third preset weather information and an indoor temperature in a machine room;
step S402, obtaining average power corresponding to the intelligent electric meter of the machine room;
step S403, determining the building temperature difference thermal load coefficient based on the average power, the meteorological temperature, the indoor temperature, and the area of the machine room.
In this embodiment, the third preset meteorological information is that the daily average temperature is less than a preset temperature value, the preset temperature value is less than 15 ℃, the preset condition is that the indoor temperature difference of the machine room in the preset time period in the current preset time period is less than a preset temperature difference, the preset time period may be from 1 point to 5 points in the morning, the preset time period may be 1 hour, the preset temperature difference may be 1 ℃, the meteorological temperature is the local temperature when the preset time period is reached, the indoor temperature is the ambient temperature in the machine room when the preset time period is reached, and the indoor temperature is greater than the meteorological temperature.
And then, acquiring the average power corresponding to the intelligent electric meters in the machine room, wherein the average power is the average value of the power of the intelligent electric meters in the preset time length.
Then, based on the average power, the meteorological temperature, the indoor temperature and the area of the machine room, the building temperature difference thermal load coefficient is determined, specifically, the building temperature difference thermal load coefficient = average power/((indoor temperature-meteorological temperature) × area).
However, the design is not limited to this, and in other embodiments, the average power of the switching power supply input virtual electric meter may be obtained, and the building temperature difference thermal load coefficient = the average power of the switching power supply input virtual electric meter ((indoor temperature-meteorological temperature) × area).
According to the air conditioner refrigerating capacity evaluation method provided by the embodiment, the meteorological temperature under the preset condition corresponding to the third preset meteorological information and the indoor temperature in the machine room are obtained; then, acquiring the average power corresponding to the intelligent electric meter of the machine room; and then determining the building temperature difference heat load coefficient based on the average power, the meteorological temperature, the indoor temperature and the area of the machine room, accurately obtaining the building temperature difference heat load coefficient according to the average power, the meteorological temperature and the indoor temperature, further accurately obtaining an energy efficiency ratio temperature coefficient according to the building temperature difference heat load, and further improving the accuracy of the evaluation of the air-conditioning refrigeration capacity.
Based on the first embodiment, a fifth embodiment of the air conditioning cooling capacity evaluation method of the present invention is provided, and in this embodiment, the air conditioning cooling capacity evaluation method further includes:
step S501, when the current situation is in fourth preset meteorological information, the indoor temperature of the machine room is in a preset temperature range and the air conditioner runs according to the preset temperature, acquiring the power consumption of third main equipment of the main equipment in the machine room, the power consumption of third switch power supply of the switch power supply and the power consumption of the third air conditioner of the air conditioner on the same day;
step S502, determining the actual rated energy efficiency ratio of the air conditioner based on the power consumption of the third main device, the power consumption of a third switch power supply and the power consumption of a third air conditioner;
and step S503, if the actual rated energy efficiency ratio is smaller than the preset energy efficiency ratio, outputting alarm information of poor air conditioner performance.
In this embodiment, the fourth preset weather information is cloudy day, and the temperature difference between the average weather temperature and the preset weather temperature is less than the preset weather temperature difference, wherein the preset weather temperature may be 25 ℃ and the preset weather temperature difference may be 1 or 2 ℃. Currently, the indoor temperature of the machine room is in a preset temperature range, the preset temperature range can be 25-27 ℃, the air conditioner operates according to the preset temperature, specifically, the working temperature of the air conditioner is 25 ℃, and the remote on-off temperature of the air conditioner is set to be 37 ℃ and 23 ℃. At this time, the power consumption of the third main device of the main device in the machine room, the power consumption of the third switch power supply of the switch power supply and the power consumption of the third air conditioner of the air conditioner are obtained on the same day, wherein the power consumption of the third main device is the same as the power consumption obtaining mode of the first main device, the power consumption of the third switch power supply is the same as the power consumption obtaining mode of the first switch power supply, and the power consumption of the third air conditioner is the same as the power consumption obtaining mode of the second air conditioner, which is not repeated herein.
Then, determining an actual rated energy efficiency ratio of the air conditioner based on the power consumption of the third main device, the power consumption of a third switch power supply and the power consumption of a third air conditioner; specifically, the actual rated energy efficiency ratio of the air conditioner = (third main device power consumption amount + third switch power loss electric amount)/third air conditioner power consumption amount.
When the actual rated energy efficiency ratio is obtained, judging whether the actual rated energy efficiency ratio is smaller than a preset energy efficiency ratio, if so, judging that the current air conditioner is poor in energy efficiency, and outputting alarm information of poor air conditioner performance.
However, the present design is not limited to this, and in other embodiments, the energy efficiency change ratio corresponding to the set temperature of the air conditioner may be calculated, specifically, when the air conditioner operates at different operating temperatures on each third preset date corresponding to the fifth preset weather information, the fourth main device power consumption of the main device in the indoor unit, the fourth switch power consumption of the switch power supply, the fourth air conditioner power consumption of the air conditioner, and the building temperature difference heat load amount are obtained on each day, for example, 3 cloudy days with the same average temperature are selected, that is, the fifth preset weather information is a cloudy day, the air conditioner temperature operating temperature is also set at 25, 28, and 30 ℃, that is, the operating temperature is 25, 28, and 30 ℃, and the remote on-off temperature is set as the plus 2 degrees and the minus 1.8 degrees of the operating temperature.
Then, based on the fourth main device power consumption amount, the fourth switch power loss power consumption amount of the switch power supply, the fourth air conditioner power consumption amount of the air conditioner and the building temperature difference heat load amount, the actual energy efficiency ratio of the air conditioner on each day in the third preset date is determined, and for each third preset date, namely each day in the third preset date, the actual energy efficiency ratio of the air conditioner is = (the fourth main device power consumption amount + the fourth switch power loss power consumption amount + the building temperature difference heat load amount)/the fourth air conditioner power consumption amount.
Then, based on the actual energy efficiency ratio of the air conditioner and the working temperature of the air conditioner corresponding to each third preset date, determining an energy efficiency change ratio corresponding to the set temperature quantity of the air conditioner, specifically, the formula of the energy efficiency change ratio is as follows: x = (P3-P4)/(T4-T3).
Wherein, X is an energy efficiency change ratio, P3 and T3 are an actual energy efficiency ratio and an operating temperature of the air conditioner on a certain day in a third preset date respectively, and P4 and T4 are an actual energy efficiency ratio and an operating temperature of the air conditioner on another day in the third preset date respectively. It should be noted that if the number of days of the third preset date is greater than 2, the two-day energy efficiency change ratios between any two days can be respectively calculated, and the average value of the two-day energy efficiency change ratios is taken as the final energy efficiency change ratio.
According to the air conditioner refrigerating capacity evaluation method provided by the embodiment, when the current situation is in fourth preset meteorological information, the indoor temperature of the machine room is in a preset temperature range, and the air conditioner operates according to the preset temperature, the third main equipment power consumption of the main equipment in the machine room, the third switching power consumption electric quantity of the switching power supply and the third air conditioner power consumption of the air conditioner are obtained on the same day; then determining the actual rated energy efficiency ratio of the air conditioner based on the power consumption of the third main device, the power consumption of a third switch power supply and the power consumption of a third air conditioner; and then if the actual rated energy efficiency ratio is smaller than the preset energy efficiency ratio, outputting alarm information of poor performance of the air conditioner, accurately obtaining the actual rated energy efficiency ratio of the air conditioner according to the power consumption of the third main device, the power consumption of the third switch power supply and the power consumption of the third air conditioner, and giving an alarm according to the actual rated energy efficiency ratio, so that the accuracy of the alarm is improved.
Based on the foregoing embodiments, a sixth embodiment of the air conditioning cooling capacity evaluation method according to the present invention is provided, and in this embodiment, the air conditioning cooling capacity evaluation method further includes:
step S601, acquiring the heat load of the current wireless indoor equipment of the machine room, the heat load of the transmission equipment of the machine room, the heat load of an optical line terminal of a base station, the heat load of a battery and the heat load of shared electric equipment;
step S602, acquiring a solar radiation heat coefficient, and acquiring an outdoor average temperature within a preset time before the current moment and an indoor average temperature in a machine room;
step S603, determining the building thermal load corresponding to the machine room based on the building temperature difference thermal load coefficient, the temperature difference thermal conductivity, the solar radiation thermal coefficient, the outdoor average temperature and the indoor average temperature corresponding to the machine room;
step S604, determining the total indoor heat load corresponding to the machine room based on the building heat load, the machine room wireless indoor equipment heat load, the machine room transmission equipment heat load, the optical line terminal heat load of the base station, the battery heat load, and the shared electric equipment heat load.
Obtaining the current heat load of the wireless indoor equipment in the machine room, the heat load of the transmission equipment in the machine room, the heat load of the optical line terminal, the heat load of the battery and the heat load of the shared electric equipment in the base station
In this embodiment, the current heat load of the wireless indoor device in the machine room is obtained through the "energy saving effect evaluation technology research and development requirement book" or the "virtual electric meter technology", where the current heat load of the wireless indoor device includes: power of 2GRRU (or RRU for 2G, 4G), power of 4GBBU, power of 5 GBBU. The heat load of the current machine room transmission equipment and the heat load of the optical line terminal are obtained by a virtual electric meter technology.
The driven loop monitoring system obtains charging current and direct current voltage of each switching power supply in the machine room, and obtains battery loss rate corresponding to battery type, where battery thermal load = battery charging current × voltage battery loss rate of each battery, for example, the charging loss of a lead-acid battery is S =12%, the charging loss of a lithium battery is S =7%, and when the charging current is a negative value, that is, when the battery is discharged, the battery charging loss power is not counted. The battery thermal load in the present embodiment is the sum of the battery thermal loads of the respective batteries.
The method comprises the steps of firstly obtaining sharing electric heating load, wherein the sharing electric heating load = switching power supply input virtual electric meter power data is based on virtual electric meter power data of mobile equipment power, and the sharing electric equipment heat load = sharing electric heating load/the number of operators to which equipment in a machine room belongs.
Meanwhile, the solar radiation heat coefficient is obtained, specifically, under the condition of sixth preset meteorological information, the sixth preset meteorological information is a sunny day in summer and autumn (for example, the first sunny day after a cloudy day, namely the day with the highest solar radiation coefficient), the electric quantity of the smart electric meter and the electric quantity of the virtual electric meter input by the switching power supply in the same day are obtained, the electric quantity for air conditioning = the electric quantity of the smart electric meter-the electric quantity of the virtual electric meter input by the switching power supply are obtained, the current air conditioning energy efficiency ratio is obtained, the air conditioning refrigeration quantity = the air conditioning energy efficiency ratio and the air conditioning power consumption in the same day are obtained, and further the building heat load quantity = the air conditioning refrigeration quantity-the virtual electric meter input by the switching power supply are obtained. Then, the current building temperature difference heat load is obtained, and the building solar radiation heat = building heat load-building temperature difference heat load is calculated. And calculating the average sunlight radiation thermal power W0 of a unit area according to the building sunlight radiation heat, wherein W0= the building sunlight radiation heat/(24 × area S), and the sunlight radiation thermal coefficient = W0 × sunlight coefficient/average sunlight coefficient of a preset time interval before the current moment.
Meanwhile, the outdoor average temperature (average weather temperature on the same day) and the indoor average temperature in the machine room within a preset time period before the current time are obtained.
Then, determining the building thermal load corresponding to the machine room based on the building temperature difference thermal load coefficient, the temperature difference heat conduction, the solar radiation thermal coefficient, the outdoor average temperature and the indoor average temperature corresponding to the machine room; specifically, building thermal load = building temperature differential thermal load coefficient area (outdoor average temperature-indoor average temperature) + solar radiant heat coefficient area + temperature differential thermal conductivity.
Wherein the thermosiphon Φ = λ a Δ t δ; lambda is the heat conductivity coefficient W/(m × k), the heat conductivity coefficient of the brick-concrete structure is 0.39-0.42W/mK, and the default is 0.41W/mK; the default of the color steel plate house is 100 polystyrene foam color steel plates, the heat conductivity coefficient is 0.33W/mK, if the materials are different, phi 1 and phi 2 of the material 1 and the material 2 are respectively calculated and then added; a-a machine room area is square meter; Δ t is the outdoor average temperature-indoor average temperature; delta-the wall thickness m of the machine room.
And finally, determining the indoor total heat load corresponding to the machine room based on the building heat load, the machine room wireless indoor equipment heat load, the machine room transmission equipment heat load, the optical line terminal heat load of the base station, the battery heat load and the shared electric equipment heat load. Specifically, the indoor total heat load = building heat load + heat load of wireless indoor equipment in the machine room + heat load of transmission equipment in the machine room + heat load of an optical line terminal of the base station + heat load of a battery + heat load of shared electric equipment.
It should be noted that, if the total heat in the machine room within the preset time period needs to be calculated, the total heat = the indoor total heat load — the preset time period.
Further, in an embodiment, after step S604, the method for evaluating cooling capacity of an air conditioner further includes:
step a, acquiring a heat load of a machine room wireless outdoor device corresponding to the machine room;
and b, determining the total heat load corresponding to the machine room based on the heat load of the wireless outdoor equipment of the machine room and the indoor total heat load.
In this embodiment, the obtaining manner of the heat load of the wireless outdoor device of the computer room is similar to that of the wireless indoor device of the computer room, and the total heat load corresponding to the computer room is calculated according to the heat load of the wireless outdoor device of the computer room and the total heat load corresponding to the total heat load of the indoor total heat load, where the total heat load corresponding to the computer room = the heat load of the wireless outdoor device of the computer room + the total heat load of the indoor total heat load, so that the total heat load corresponding to the computer room can be accurately obtained.
According to the air conditioner refrigeration capacity evaluation method provided by the embodiment, the current heat load of the wireless indoor equipment of the machine room, the heat load of the transmission equipment of the machine room, the heat load of the optical line terminal of the base station, the heat load of the battery and the heat load of the shared electric equipment are obtained; then acquiring a solar radiation heat coefficient, and acquiring an outdoor average temperature within a preset time before the current moment and an indoor average temperature in the machine room; then determining the building thermal load corresponding to the machine room based on the building temperature difference thermal load coefficient, the temperature difference heat conduction, the solar radiation thermal coefficient, the outdoor average temperature and the indoor average temperature corresponding to the machine room; and then determining the indoor total heat load corresponding to the machine room based on the building heat load, the wireless indoor equipment heat load of the machine room, the machine room transmission equipment heat load, the optical line terminal heat load of the base station, the battery heat load and the shared electric equipment heat load, so that the indoor total heat load of the machine room can be comprehensively and accurately obtained, the accuracy of the indoor total heat load is improved, and an air conditioning system in the machine room can be conveniently and reasonably set.
The present invention also provides an air conditioning cooling capacity evaluation apparatus, referring to fig. 3, the air conditioning cooling capacity evaluation apparatus including:
the first determining module 10 is configured to determine an actual energy efficiency ratio of the air conditioner based on power consumption of first main equipment of the main equipment in the machine room, power consumption of a first switching power supply of the switching power supply, and power consumption of a first air conditioner of the air conditioner in the machine room on a first preset date corresponding to first preset weather information, where a temperature difference between an outdoor average temperature in the preset date and an indoor average temperature in the machine room is smaller than a preset temperature difference;
the acquiring module 20 is configured to acquire, within a plurality of second preset dates corresponding to second preset weather information, power consumption of a second main device of the main device in the machine room, power consumption of a second switching power supply of the switching power supply, power consumption of a second air conditioner in the machine room, and a building temperature difference heat load amount corresponding to the machine room, where daily average outdoor temperatures corresponding to the second preset dates are different;
the second determining module 30 is configured to determine an air conditioner energy efficiency ratio corresponding to each second preset date based on the second main device power consumption, the second switching power supply power loss amount, the second air conditioner power consumption and the building temperature difference heat load amount, and determine an energy efficiency ratio temperature coefficient corresponding to the air conditioner based on the air conditioner energy efficiency ratio and the daily average outdoor temperature corresponding to each second preset date;
and the evaluation module 40 is configured to determine a first refrigeration capacity of the air conditioner based on the input power of the air conditioner, the actual energy efficiency ratio of the air conditioner, and the energy efficiency ratio temperature coefficient, and determine a second refrigeration capacity of the air conditioner based on the actual energy efficiency ratio of the air conditioner and the input power.
The methods executed by the program units may refer to various embodiments of the method for evaluating the cooling capacity of the air conditioner of the present invention, and are not described herein again.
The invention also provides a readable storage medium.
The readable storage medium of the present invention stores thereon an air-conditioning cooling capacity evaluation program which, when executed by a processor, implements the steps of the air-conditioning cooling capacity evaluation method as described above.
The method implemented when the air-conditioning refrigeration capacity evaluation program running on the processor is executed may refer to each embodiment of the air-conditioning refrigeration capacity evaluation method of the present invention, and is not described herein again.
In addition, an embodiment of the present invention further provides a computer program product, where the computer program product includes an air conditioning refrigeration capacity evaluation program, and when the air conditioning refrigeration capacity evaluation program is executed by a processor, the steps of the air conditioning refrigeration capacity evaluation method described above are implemented.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or system that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or system. Without further limitation, an element defined by the phrases "comprising a," "8230," "8230," or "comprising" does not exclude the presence of other like elements in a process, method, article, or system comprising the element.
The above-mentioned serial numbers of the embodiments of the present invention are only for description, and do not represent the advantages and disadvantages of the embodiments.
Through the above description of the embodiments, those skilled in the art will clearly understand that the method of the above embodiments can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware, but in many cases, the former is a better implementation manner. Based on such understanding, the technical solution of the present invention may be embodied in the form of a software product, which is stored in a storage medium (e.g., ROM/RAM, magnetic disk, optical disk) as described above and includes instructions for enabling a terminal device (e.g., a mobile phone, a computer, a server, an air conditioner, or a network device) to execute the method according to the embodiments of the present invention.
The above description is only a preferred embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (10)

1. An air conditioner refrigerating capacity evaluation method is characterized by comprising the following steps:
determining an actual energy efficiency ratio of an air conditioner based on the power consumption of first main equipment of the main equipment in the machine room, the power consumption of first switching power supply of the switching power supply and the power consumption of first air conditioner of the air conditioner in the machine room within a first preset date corresponding to first preset meteorological information, wherein the temperature difference between the average outdoor temperature and the average indoor temperature in the machine room within the preset date is smaller than a preset temperature difference;
acquiring the power consumption of second main equipment of main equipment in the machine room, the power consumption of a second switching power supply of the switching power supply, the power consumption of a second air conditioner in the machine room and the building temperature difference heat load amount corresponding to the machine room in a plurality of second preset dates corresponding to second preset meteorological information, wherein the daily average outdoor temperature corresponding to each second preset date is different;
determining an air conditioner energy efficiency ratio corresponding to each second preset date based on the power consumption of the second main device, the power consumption of a second switching power supply, the power consumption of a second air conditioner and the building temperature difference heat load, and determining an energy efficiency ratio temperature coefficient corresponding to the air conditioner based on the air conditioner energy efficiency ratio and the daily average outdoor temperature corresponding to each second preset date;
and determining a first refrigerating capacity of the air conditioner based on the input power of the air conditioner, the actual energy efficiency ratio of the air conditioner and the energy efficiency ratio temperature coefficient, and determining a second refrigerating capacity of the air conditioner based on the actual energy efficiency ratio of the air conditioner and the input power.
2. The method for evaluating a cooling capability of an air conditioner according to claim 1, wherein the step of obtaining power consumption of a second main device of a main device in a machine room, power consumption of a second switching power supply of the switching power supply, power consumption of a second air conditioner in the machine room, and heat load of a building temperature difference corresponding to the machine room on a plurality of second preset dates corresponding to the second preset weather information comprises:
determining the power consumption of second main equipment corresponding to each second preset date based on the heat load of the wireless indoor equipment of the machine room, the heat load of the transmission equipment of the machine room and the heat load of the optical line terminal of the base station in each second preset date;
acquiring the power consumption of a second switching power supply corresponding to each second preset date;
determining the power consumption of a second air conditioner corresponding to each second preset date based on the electric quantity of the intelligent electric meter in each second preset date and the electric quantity of the virtual electric meter input by the switching power supply;
and acquiring the building temperature difference heat load corresponding to the machine room in each second preset date.
3. The method for evaluating the refrigerating capacity of an air conditioner according to claim 2, wherein the step of obtaining the building temperature difference heat load amount corresponding to the machine room in each second preset date comprises:
acquiring average meteorological temperatures corresponding to the second preset dates and average indoor temperatures in the machine room, and acquiring a building temperature difference heat load coefficient;
and respectively determining the building temperature difference heat load amount corresponding to each date based on the area of the machine room, the building temperature difference heat load coefficient, the average meteorological temperature and the average indoor temperature.
4. The air conditioning refrigerating capacity evaluation method according to claim 3, wherein the step of obtaining the building temperature difference heat load coefficient comprises:
acquiring the meteorological temperature under the preset condition corresponding to the third preset meteorological information and the indoor temperature in the machine room;
acquiring the average power corresponding to the intelligent electric meter of the machine room;
determining the building temperature difference thermal load coefficient based on the average power, the meteorological temperature, the indoor temperature and the area of the machine room.
5. The air conditioning refrigerating capacity evaluation method according to claim 1, further comprising:
when the current situation is in fourth preset meteorological information, the indoor temperature of the machine room is in a preset temperature range and the air conditioner operates according to the preset temperature, acquiring the power consumption of third main equipment of the main equipment in the machine room, the power consumption of third switch power supply of the switch power supply and the power consumption of a third air conditioner of the air conditioner in the same day;
determining an actual rated energy efficiency ratio of the air conditioner based on the power consumption of the third main device, the power consumption of the third switch power supply and the power consumption of the third air conditioner;
and if the actual rated energy efficiency ratio is smaller than the preset energy efficiency ratio, outputting alarm information of poor air conditioner performance.
6. The air conditioner refrigerating capacity evaluation method according to any one of claims 1 to 5, further comprising:
acquiring the heat load of current machine room wireless indoor equipment, the heat load of machine room transmission equipment, the heat load of an optical line terminal of a base station, the heat load of a battery and the heat load of shared electric equipment;
acquiring a solar radiation heat coefficient, and acquiring an outdoor average temperature within a preset time before the current moment and an indoor average temperature in a machine room;
determining a building thermal load corresponding to the machine room based on a building temperature difference thermal load coefficient, a temperature difference heat conduction coefficient, the solar radiation thermal coefficient, the outdoor average temperature and the indoor average temperature corresponding to the machine room;
and determining the indoor total heat load corresponding to the machine room based on the building heat load, the machine room wireless indoor equipment heat load, the machine room transmission equipment heat load, the optical line terminal heat load of the base station, the battery heat load and the shared electric equipment heat load.
7. The method for evaluating the cooling capacity of an air conditioner according to claim 6, wherein after the step of determining the total indoor heat load corresponding to the room based on the building heat load, the wireless indoor equipment heat load of the room, the transmission equipment heat load of the room, and the optical line terminal heat load, the battery heat load and the shared electric equipment heat load of the base station, the method further comprises:
acquiring a heat load of the wireless outdoor equipment of the machine room corresponding to the machine room;
and determining the total heat load corresponding to the machine room based on the heat load of the wireless outdoor equipment of the machine room and the indoor total heat load.
8. An air conditioning cooling capacity evaluation device, characterized by comprising:
the first determining module is used for determining the actual energy efficiency ratio of the air conditioner based on the power consumption of first main equipment of the main equipment in the machine room, the power consumption of first switch power supply of the switch power supply and the power consumption of first air conditioner of the air conditioner in the machine room within a first preset date corresponding to first preset meteorological information, wherein the temperature difference between the average outdoor temperature and the average indoor temperature in the machine room within the preset date is smaller than a preset temperature difference;
the acquisition module is used for acquiring the power consumption of second main equipment of the main equipment in the machine room, the power consumption of a second switching power supply of the switching power supply, the power consumption of a second air conditioner in the machine room and the building temperature difference heat load amount corresponding to the machine room in a plurality of second preset dates corresponding to second preset meteorological information, wherein the daily average outdoor temperature corresponding to each second preset date is different;
the second determining module is used for determining the air conditioner energy efficiency ratio corresponding to each second preset date based on the second main equipment power consumption, the second switching power supply power loss quantity, the second air conditioner power consumption and the building temperature difference heat load quantity, and determining the energy efficiency ratio temperature coefficient corresponding to the air conditioner based on the air conditioner energy efficiency ratio and the daily average outdoor temperature corresponding to each second preset date;
the evaluation module is used for determining a first refrigerating capacity of the air conditioner based on the input power of the air conditioner, the actual energy efficiency ratio of the air conditioner and the energy efficiency ratio temperature coefficient, and determining a second refrigerating capacity of the air conditioner based on the actual energy efficiency ratio of the air conditioner and the input power.
9. An air conditioning cooling capability evaluation apparatus, characterized by comprising: a memory, a processor and an air conditioning cooling capacity evaluation program stored on the memory and executable on the processor, the air conditioning cooling capacity evaluation program when executed by the processor implementing the steps of the air conditioning cooling capacity evaluation method of any one of claims 1 to 7.
10. A readable storage medium, wherein the readable storage medium has stored thereon an air conditioning cooling capacity evaluation program, which when executed by a processor, implements the steps of the air conditioning cooling capacity evaluation method according to any one of claims 1 to 7.
CN202111133729.2A 2021-09-26 2021-09-26 Air conditioner refrigerating capacity evaluation method, device and equipment and readable storage medium Pending CN115875802A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111133729.2A CN115875802A (en) 2021-09-26 2021-09-26 Air conditioner refrigerating capacity evaluation method, device and equipment and readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111133729.2A CN115875802A (en) 2021-09-26 2021-09-26 Air conditioner refrigerating capacity evaluation method, device and equipment and readable storage medium

Publications (1)

Publication Number Publication Date
CN115875802A true CN115875802A (en) 2023-03-31

Family

ID=85762831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111133729.2A Pending CN115875802A (en) 2021-09-26 2021-09-26 Air conditioner refrigerating capacity evaluation method, device and equipment and readable storage medium

Country Status (1)

Country Link
CN (1) CN115875802A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101931979A (en) * 2010-08-27 2010-12-29 无锡博欧电子科技有限公司 Mobile communication base station energy efficiency evaluation method and system
CN101975673A (en) * 2010-09-07 2011-02-16 区峰 Central air-conditioning system energy efficiency real-time monitoring system and method
CN102749534A (en) * 2012-05-28 2012-10-24 中国南方电网有限责任公司 Energy efficiency management method and device for computer room
CN102799201A (en) * 2012-08-08 2012-11-28 深圳市中兴新地通信器材有限公司 Communication machine room temperature energy-saving control method and system based on equipment life factors
CN104748327A (en) * 2015-03-23 2015-07-01 同济大学 Public building air conditioner energy efficiency diagnosis system based on power consumption data
CN107091753A (en) * 2017-04-13 2017-08-25 青岛海尔空调器有限总公司 Air conditioner refrigerating efficiency when refrigerating capacity online test method
CN107144438A (en) * 2017-04-13 2017-09-08 青岛海尔空调器有限总公司 The method of on-line checking air conditioner refrigerating Energy Efficiency Ratio and refrigerating capacity
US20170277816A1 (en) * 2016-03-22 2017-09-28 Chu-Fu Chen Method of verifying and analyzing energy efficiency ratio EER of a heating ventilation and air conditioning HVAC chiller unit
CN208419115U (en) * 2018-05-31 2019-01-22 广州罗杰韦尔电气有限公司 A kind of air-conditioner controller
CN109595763A (en) * 2018-12-21 2019-04-09 珠海格力电器股份有限公司 The control strategy optimization method, apparatus and computer equipment of air-conditioning system
CN110567089A (en) * 2019-09-16 2019-12-13 珠海格力电器股份有限公司 Equipment management method and device for air conditioner energy efficiency ratio management and air conditioner system
CN112082784A (en) * 2019-06-13 2020-12-15 中国信息通信研究院 Method for testing energy utilization efficiency energy efficiency factor of air conditioner product in data center

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101931979A (en) * 2010-08-27 2010-12-29 无锡博欧电子科技有限公司 Mobile communication base station energy efficiency evaluation method and system
CN101975673A (en) * 2010-09-07 2011-02-16 区峰 Central air-conditioning system energy efficiency real-time monitoring system and method
CN102749534A (en) * 2012-05-28 2012-10-24 中国南方电网有限责任公司 Energy efficiency management method and device for computer room
CN102799201A (en) * 2012-08-08 2012-11-28 深圳市中兴新地通信器材有限公司 Communication machine room temperature energy-saving control method and system based on equipment life factors
CN104748327A (en) * 2015-03-23 2015-07-01 同济大学 Public building air conditioner energy efficiency diagnosis system based on power consumption data
US20170277816A1 (en) * 2016-03-22 2017-09-28 Chu-Fu Chen Method of verifying and analyzing energy efficiency ratio EER of a heating ventilation and air conditioning HVAC chiller unit
CN107091753A (en) * 2017-04-13 2017-08-25 青岛海尔空调器有限总公司 Air conditioner refrigerating efficiency when refrigerating capacity online test method
CN107144438A (en) * 2017-04-13 2017-09-08 青岛海尔空调器有限总公司 The method of on-line checking air conditioner refrigerating Energy Efficiency Ratio and refrigerating capacity
CN208419115U (en) * 2018-05-31 2019-01-22 广州罗杰韦尔电气有限公司 A kind of air-conditioner controller
CN109595763A (en) * 2018-12-21 2019-04-09 珠海格力电器股份有限公司 The control strategy optimization method, apparatus and computer equipment of air-conditioning system
CN112082784A (en) * 2019-06-13 2020-12-15 中国信息通信研究院 Method for testing energy utilization efficiency energy efficiency factor of air conditioner product in data center
CN110567089A (en) * 2019-09-16 2019-12-13 珠海格力电器股份有限公司 Equipment management method and device for air conditioner energy efficiency ratio management and air conditioner system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
牛琳: "既有空调系统使用评估及优化方案的应用研究", 信息科技, 30 November 2020 (2020-11-30), pages 226 - 230 *

Similar Documents

Publication Publication Date Title
US11385664B2 (en) Methods and apparatus for achieving energy consumption goals through model-based simulations
Newsham et al. Building-level occupancy data to improve ARIMA-based electricity use forecasts
Spagnuolo et al. Monitoring and optimization of energy consumption of base transceiver stations
CN102609015A (en) Apparatus and method for determining load of energy consuming appliances within a premise
CA2790756A1 (en) Method and system to monitor and control energy
CN104279715A (en) Load predication method of building air-conditioning equipment
Gong et al. Virtual power plant control for large residential communities using hvac systems for energy storage
JP6676477B2 (en) Building power consumption prediction system, power storage device control system, and power storage device control method
Farbod et al. Resource allocation and outage control for solar-powered WLAN mesh networks
CN106249681B (en) Building energy consumption abnormality monitoring method and device
CN103644628A (en) Energy-saving method and device of air conditioner
US8610590B2 (en) System and method for monitoring electrical demand performance, particularly using historical data and an outside temperature
CN105324902A (en) Techniques for adaptive demand/response energy management of electronic systems
Akmal et al. Modelling and simulation of underfloor heating system supplied from heat pump
Broka et al. Modelling residential heat demand supplied by a local smart electric thermal storage system
CN115875802A (en) Air conditioner refrigerating capacity evaluation method, device and equipment and readable storage medium
WO2013172430A1 (en) Alert presentation device and alert presentation method
CN110895018A (en) Power supply diagnosis and alarm method and device based on air conditioning energy control of communication machine room
CN114450531B (en) Information processing method, information processing device, and program
WO2013002871A1 (en) Techniques for providing holistic views of personal energy consumption
Sanchez et al. Modelling and mitigating lifetime impact of building demand responsive control of heating, ventilation and air-conditioning systems
Yu et al. Power consumption modeling of base stations based on dynamic factors
Liu et al. Intelligent battery management for cellular networks with hybrid energy supplies
EP4312333A1 (en) System and method for managing energy at premises
US20200200400A1 (en) Method for determining a preferential minimum power set point, method for controlling a plurality of water heaters and associated device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination