CN115875201A - Buffer operation duration optimization method and system for wind turbine generator - Google Patents

Buffer operation duration optimization method and system for wind turbine generator Download PDF

Info

Publication number
CN115875201A
CN115875201A CN202211482661.3A CN202211482661A CN115875201A CN 115875201 A CN115875201 A CN 115875201A CN 202211482661 A CN202211482661 A CN 202211482661A CN 115875201 A CN115875201 A CN 115875201A
Authority
CN
China
Prior art keywords
delay
transmission delay
transmission
control signal
wind turbine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211482661.3A
Other languages
Chinese (zh)
Inventor
齐革军
李铮
郭小江
姚中原
张钧阳
陈怡静
申旭辉
孙栩
罗海光
周国栋
陶伟
孙捷
阮克俭
杨瑾
胡皓
陈宁路
葛恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Clean Energy Research Institute
Huaneng Group Technology Innovation Center Co Ltd
Clean Energy Branch of Huaneng International Power Jiangsu Energy Development Co Ltd Clean Energy Branch
Shengdong Rudong Offshore Wind Power Co Ltd
Original Assignee
Huaneng Clean Energy Research Institute
Huaneng Group Technology Innovation Center Co Ltd
Clean Energy Branch of Huaneng International Power Jiangsu Energy Development Co Ltd Clean Energy Branch
Shengdong Rudong Offshore Wind Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Clean Energy Research Institute, Huaneng Group Technology Innovation Center Co Ltd, Clean Energy Branch of Huaneng International Power Jiangsu Energy Development Co Ltd Clean Energy Branch, Shengdong Rudong Offshore Wind Power Co Ltd filed Critical Huaneng Clean Energy Research Institute
Priority to CN202211482661.3A priority Critical patent/CN115875201A/en
Publication of CN115875201A publication Critical patent/CN115875201A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Control Of Eletrric Generators (AREA)
  • Wind Motors (AREA)

Abstract

The application provides a buffer operation duration optimization method and system for a wind turbine generator, wherein the method comprises the following steps: when the working condition of the wind turbine needs to be changed, acquiring a corresponding control signal when the working condition of the wind turbine needs to be changed; determining a transmission sequence of the control signal in the wind turbine generator and a transmission delay grade corresponding to each transmission process according to the control signal; determining the delay time of each transmission delay grade according to the per-unit value of the main output physical quantity of the starting point component and the per-unit value of the main output physical quantity of the end point component corresponding to each transmission delay grade; and sequencing the delay time of each transmission delay grade from small to large according to the transmission delay grades to form a delay sequence, and optimizing the buffer operation time of the wind turbine generator based on the delay sequence. According to the technical scheme, the risk of unit integrity oscillation and damage caused by working condition change is avoided to the greatest extent, and the reliability of unit operation is improved.

Description

Buffer operation duration optimization method and system for wind turbine generator
Technical Field
The application relates to the field of wind turbine generator control, in particular to a method and a system for optimizing buffer operation duration of a wind turbine generator.
Background
A complete wind turbine generator system from the energy transfer perspective has included a plurality of parts, including fan wheel, fan driving chain, generator, converter, grid-connected system, master control system etc.. The change of the working condition of the wind turbine generator is executed from the main control system, then the main execution component executes the change (the main execution component is a fan impeller under the condition of different kinds of working condition changes, for example, the working condition of the pitch angle changes, the change of the working condition of grid-connected power or rotating speed and torque, the main execution component is a converter and a generator), and then the working condition change occurs naturally in turn according to the connection relation with the main execution component.
The prior technical scheme is carried out according to the naturally occurring sequence of the working condition change, and does not carry out human intervention on the process of the working condition change. However, the prior art cannot interfere with the fluctuation or oscillation influence of the change of the working condition on the wind turbine generator, so that the wind turbine generator is unstable in operation and has instability or even serious faults when the working condition is changed greatly.
Disclosure of Invention
The application provides a buffer operation time length optimization method and system for a wind turbine generator, and the technical problems that the wind turbine generator cannot be operated unstably and even fails seriously when the working condition is changed to a large extent due to the fact that intervention cannot be caused on fluctuation or oscillation type influence of the working condition change on the wind turbine generator are solved.
An embodiment of a first aspect of the present application provides a buffer operation duration optimization method for a wind turbine generator, where the method includes:
when the working condition of the wind turbine needs to be changed, acquiring a corresponding control signal when the working condition of the wind turbine needs to be changed;
determining a transmission sequence of the control signal in the wind turbine generator and a transmission delay grade corresponding to each transmission process according to the control signal;
determining the delay time of each transmission delay grade according to the per-unit value of the main output physical quantity of the starting point component and the per-unit value of the main output physical quantity of the end point component corresponding to each transmission delay grade;
and sequencing the delay time of each transmission delay grade from small to large according to the transmission delay grades to form a delay sequence, and optimizing the buffer operation time of the wind turbine generator based on the delay sequence.
Preferably, the determining, according to the control signal, a transmission sequence of the control signal in the wind turbine generator and a transmission delay level corresponding to each transmission process includes:
when the control signal is used for controlling the rotating speed of the wind turbine generator, the control signal is sequentially input into a master control system, a generator, a converter, a fan transmission chain, a fan impeller and a grid-connected system of the wind turbine generator, the transmission delay from the master control system to the generator is set as first-stage delay, the transmission delay from the generator to the converter and the fan transmission chain is set as second-stage delay, and the transmission delay from the converter and the fan transmission chain to the fan impeller and the grid-connected system is set as third-stage delay;
when the control signal is used for controlling the torque or the power of the wind turbine generator, the control signal is sequentially input into a main control system, a converter, a generator, a grid-connected system, a fan transmission chain and a fan impeller of the wind turbine generator, the transmission delay from the main control system to the converter is set as first-stage delay, the transmission delay from the converter to the generator and the grid-connected system is set as second-stage delay, the transmission delay from the generator and the grid-connected system to the fan transmission chain is set as third-stage delay, and the transmission delay from the fan transmission chain to the fan impeller is set as fourth-stage delay;
when the control signal is used for controlling the pitch angle of the wind turbine generator, the control signal is sequentially input into a master control system, a fan impeller, a fan transmission chain, a generator, a converter and a grid-connected system of the wind turbine generator, the transmission delay from the master control system to the fan impeller is set as first-stage delay, the transmission delay from the fan impeller to the fan transmission chain is set as second-stage delay, the transmission delay from the fan transmission chain to the generator is set as third-stage delay, the transmission delay from the generator to the converter is set as fourth-stage delay, and the transmission delay from the converter to the grid-connected system is set as fifth-stage delay.
Further, the determining the delay time length of each transmission delay level according to the per unit value of the starting-point component main output physical quantity and the per unit value of the ending-point component main output physical quantity corresponding to each transmission delay level includes:
acquiring the average transmission delay of the control signal from the starting point component to the end point component corresponding to each transmission delay grade under the control signal;
and determining the delay time length of each transmission delay grade under the control signal according to the average transmission delay from the starting point component to the end point component, the per unit value of the main output physical quantity of the starting point component and the per unit value of the main output physical quantity of the end point component, which correspond to each transmission delay grade under the control signal.
Further, the following formula for calculating the delay time of each transmission delay class according to the control signal is as follows:
Figure BDA0003962362140000021
in the formula, T i Delay duration for the i-th transmission delay class, A i (t) i-th transmission delay at current time t, etcPer unit value of the principal output physical quantity of the stage starting point unit, B i (t) is a per unit value of the main output physical quantity of the ith-stage transmission delay level end point component at the current time t,
Figure BDA0003962362140000022
the average transmission delay from the starting point component to the end point component of the control signal corresponding to the ith transmission delay level is i ∈ [ 1-N [ ]]And N is the total number of transmission delay grades under the control signal.
An embodiment of a second aspect of the present application provides a buffer operation duration optimization system for a wind turbine generator, where the system includes:
the acquisition module is used for acquiring a corresponding control signal when the working condition of the wind turbine generator needs to be changed;
the first determining module is used for determining the transmission sequence of the control signals in the wind turbine generator and the transmission delay grades corresponding to the transmission processes according to the control signals;
a second determining module, configured to determine a delay time length of each transmission delay class according to the per unit value of the starting-point component main output physical quantity and the per unit value of the ending-point component main output physical quantity corresponding to each transmission delay class;
and the optimization module is used for sequencing the delay time of each transmission delay grade from small to large according to the transmission delay grades to form a delay sequence, and optimizing the buffer operation time of the wind turbine generator based on the delay sequence.
Preferably, the first determining module is specifically configured to:
when the control signal is used for controlling the rotating speed of the wind turbine generator, the control signal is sequentially input into a master control system, a generator, a converter, a fan transmission chain, a fan impeller and a grid-connected system of the wind turbine generator, the transmission delay from the master control system to the generator is set as first-stage delay, the transmission delay from the generator to the converter and the fan transmission chain is set as second-stage delay, and the transmission delay from the converter and the fan transmission chain to the fan impeller and the grid-connected system is set as third-stage delay;
when the control signal is used for controlling the torque or the power of the wind turbine generator, the control signal is sequentially input into a master control system, a converter, a generator, a grid-connected system, a fan transmission chain and a fan impeller of the wind turbine generator, the transmission delay from the master control system to the converter is set as first-stage delay, the transmission delay from the converter to the generator and the grid-connected system is set as second-stage delay, the transmission delay from the generator and the grid-connected system to the fan transmission chain is set as third-stage delay, and the transmission delay from the fan transmission chain to the fan impeller is set as fourth-stage delay;
when the control signal is used for controlling the pitch angle of the wind turbine generator, the control signal is sequentially input into a master control system, a fan impeller, a fan transmission chain, a generator, a converter and a grid-connected system of the wind turbine generator, the transmission delay from the master control system to the fan impeller is set as first-stage delay, the transmission delay from the fan impeller to the fan transmission chain is set as second-stage delay, the transmission delay from the fan transmission chain to the generator is set as third-stage delay, the transmission delay from the generator to the converter is set as fourth-stage delay, and the transmission delay from the converter to the grid-connected system is set as fifth-stage delay.
Preferably, the second determining module includes:
the acquisition unit is used for acquiring the average transmission delay of the control signal corresponding to each transmission delay grade under the control signal from the starting point component to the end point component;
and the determining unit is used for determining the delay time of each transmission delay level under the control signal according to the average transmission delay from the starting point component to the end point component of the control signal corresponding to each transmission delay level under the control signal, the per-unit value of the main output physical quantity of the starting point component and the per-unit value of the main output physical quantity of the end point component.
Further, the calculation formula of the delay time of each transmission delay level under the control signal is as follows:
Figure BDA0003962362140000041
in the formula, T i Delay time length of ith transmission delay class, A i (t) is the unit value of the main output physical quantity of the ith-stage transmission delay level starting point component at the current time t, B i (t) is a per unit value of the main output physical quantity of the ith-stage transmission delay level end point component at the current time t,
Figure BDA0003962362140000042
the average transmission delay from the starting point component to the end point component of the control signal corresponding to the ith transmission delay level is represented by i E [ 1-N [ ]]And N is the total number of transmission delay grades under the control signal. . . . .
An embodiment of a third aspect of the present application provides an electronic device, including: memory, a processor and a computer program stored on the memory and executable on the processor, the processor implementing the method as described in the embodiments of the first aspect when executing the program.
An embodiment of a fourth aspect of the present application provides a computer-readable storage medium, on which a computer program is stored, where the computer program, when executed by a processor, implements the method as described in the embodiment of the first aspect.
The technical scheme provided by the embodiment of the application at least has the following beneficial effects:
the application provides a buffer operation duration optimization method and system for a wind turbine generator, wherein the method comprises the following steps: when the working condition of the wind turbine generator needs to be changed, acquiring a corresponding control signal when the working condition of the wind turbine generator needs to be changed; determining a transmission sequence of the control signal in the wind turbine generator and a transmission delay grade corresponding to each transmission process according to the control signal; determining the delay time of each transmission delay grade according to the per unit value of the main output physical quantity of the starting point component and the per unit value of the main output physical quantity of the end point component corresponding to each transmission delay grade; and sequencing the delay time of each transmission delay grade from small to large according to the transmission delay grades to form a delay sequence, and optimizing the buffer operation time of the wind turbine generator based on the delay sequence. According to the technical scheme, the risk of unit integrity oscillation and damage caused by working condition change is avoided to the greatest extent, and the reliability of unit operation is improved.
Additional aspects and advantages of the present application will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the present application.
Drawings
The foregoing and/or additional aspects and advantages of the present application will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
fig. 1 is a flowchart of a buffer operation duration optimization method for a wind turbine generator according to an embodiment of the present application;
fig. 2 is a structural diagram of a buffer operation duration optimization system for a wind turbine generator according to an embodiment of the present application;
FIG. 3 is a diagram of a second determination module configured according to one embodiment of the present application.
Detailed Description
Reference will now be made in detail to embodiments of the present application, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present application and should not be construed as limiting the present application.
The application provides a buffer operation time length optimization method and system for a wind turbine generator, and the method comprises the following steps: when the working condition of the wind turbine needs to be changed, acquiring a corresponding control signal when the working condition of the wind turbine needs to be changed; determining a transmission sequence of the control signal in the wind turbine generator and a transmission delay grade corresponding to each transmission process according to the control signal; determining the delay time of each transmission delay grade according to the per unit value of the main output physical quantity of the starting point component and the per unit value of the main output physical quantity of the end point component corresponding to each transmission delay grade; and sequencing the delay time of each transmission delay grade from small to large according to the transmission delay grades to form a delay sequence, and optimizing the buffer operation time of the wind turbine generator based on the delay sequence. According to the technical scheme, the risk of unit integrity oscillation and damage caused by working condition change is avoided to the greatest extent, and the reliability of unit operation is improved.
The following describes a method and a system for optimizing buffer operation duration of a wind turbine generator according to an embodiment of the present application with reference to the accompanying drawings.
Example one
Fig. 1 is a flowchart of a buffer operation duration optimization method for a wind turbine generator according to an embodiment of the present application, and as shown in fig. 1, the method includes:
step 1: when the working condition of the wind turbine needs to be changed, acquiring a corresponding control signal when the working condition of the wind turbine needs to be changed;
and 2, step: determining a transmission sequence of the control signal in the wind turbine generator and a transmission delay grade corresponding to each transmission process according to the control signal;
in an embodiment of the present disclosure, the step 2 specifically includes:
when the control signal is used for controlling the rotating speed of the wind turbine generator, the control signal is sequentially input into a main control system, a generator, a converter, a fan transmission chain, a fan impeller and a grid-connected system of the wind turbine generator, the transmission delay from the main control system to the generator is set as first-stage delay, the transmission delay from the generator to the converter and the fan transmission chain is set as second-stage delay, and the transmission delay from the converter and the fan transmission chain to the fan impeller and the grid-connected system is set as third-stage delay;
when the control signal is used for controlling the torque or the power of the wind turbine generator, the control signal is sequentially input into a master control system, a converter, a generator, a grid-connected system, a fan transmission chain and a fan impeller of the wind turbine generator, the transmission delay from the master control system to the converter is set as first-stage delay, the transmission delay from the converter to the generator and the grid-connected system is set as second-stage delay, the transmission delay from the generator and the grid-connected system to the fan transmission chain is set as third-stage delay, and the transmission delay from the fan transmission chain to the fan impeller is set as fourth-stage delay;
when the control signal is used for controlling the pitch angle of the wind turbine generator, the control signal is sequentially input into a main control system, a fan impeller, a fan transmission chain, a generator, a converter and a grid-connected system of the wind turbine generator, the transmission delay from the main control system to the fan impeller is set as first-stage delay, the transmission delay from the fan impeller to the fan transmission chain is set as second-stage delay, the transmission delay from the fan transmission chain to the generator is set as third-stage delay, the transmission delay from the generator to the converter is set as fourth-stage delay, and the transmission delay from the converter to the grid-connected system is set as fifth-stage delay.
And step 3: determining the delay time of each transmission delay grade according to the per unit value of the main output physical quantity of the starting point component and the per unit value of the main output physical quantity of the end point component corresponding to each transmission delay grade;
in an embodiment of the present disclosure, the step 3 specifically includes:
step 3-1: acquiring the average transmission delay of the control signal from the starting point component to the end point component corresponding to each transmission delay level under the control signal;
step 3-2: and determining the delay time length of each transmission delay grade under the control signal according to the average transmission delay from the starting point component to the end point component, the per unit value of the main output physical quantity of the starting point component and the per unit value of the main output physical quantity of the end point component, which correspond to each transmission delay grade under the control signal.
Wherein, the calculation formula of the delay time of each transmission delay grade under the control signal is as follows:
Figure BDA0003962362140000061
in the formula, T i Delay time length of ith transmission delay class, A i (t) is the unit value of the main output physical quantity of the ith-stage transmission delay level starting point component at the current time t, B i (t) is the main output physical quantity of the ith transmission delay level end part at the current time tThe per-unit value is set to be,
Figure BDA0003962362140000062
the average transmission delay from the starting point component to the end point component of the control signal corresponding to the ith transmission delay level is represented by i E [ 1-N [ ]]And N is the total number of transmission delay grades under the control signal.
And 4, step 4: and sequencing the delay time of each transmission delay grade from small to large according to the transmission delay grades to form a delay sequence, and optimizing the buffer operation time of the wind turbine generator based on the delay sequence.
In order to more clearly describe the implementation process of the buffer operation duration optimization method for the wind turbine generator according to the embodiment of the present application, a specific method embodiment is described in detail below:
step 1) inputting a requirement for changing the working condition of the wind turbine generator, and if the main physical quantity of the working condition is the rotating speed, turning to step 2); if the main physical quantity of the working condition is torque or power, turning to step 3); if the main physical quantity of the working condition is the pitch angle, turning to the step 4);
step 2) setting a working condition change sequence table as (main control system → generator → converter, fan transmission chain → fan impeller and grid-connected system), and defining the first-stage time delay T1 as the working condition transmission time delay of the main control system → generator; the second-stage delay T2 is defined as the working condition transmission delay of the generator → a converter and a fan transmission chain; the third-stage delay T3 is defined as the working condition transmission delay of a converter, a fan transmission chain → a fan impeller and a grid-connected system, the serial stage number N =3 of the system is switched to the step 5);
step 3) setting a working condition change sequence table as (main control system → converter → generator, grid-connected system → fan transmission chain → fan impeller), and defining the first-stage time delay T1 as the working condition transmission time delay of the main control system → converter; the second-stage delay T2 is defined as the working condition transmission delay of a converter → a generator and a grid-connected system; the third stage delay T3 is defined as the working condition transmission delay of the generator → the fan transmission chain; defining the fourth-stage delay T4 as the transmission delay of the working condition of the fan transmission chain → the fan impeller, and switching to the step 5 if the serial stage number of the system is N = 4);
step 4), setting a working condition change sequence table as (main control system → fan impeller → fan transmission chain → generator → converter → grid-connected system), and defining the first-stage time delay T1 as the working condition transmission time delay of the main control system → fan impeller; the second-stage delay T2 is defined as the working condition transmission delay of the fan impeller → the fan transmission chain; the third-stage delay T3 is defined as the working condition transmission delay of the fan transmission chain → the generator; the fourth-stage delay T4 is defined as the working condition transmission delay of the fan generator → the converter; defining the fifth-stage delay T5 as the working condition transmission delay of the converter → the grid-connected system, and turning to the step 5, wherein the serial stage number of the system is N = 5);
step 5) i =1;
step 6) using the formula
Figure BDA0003962362140000071
Calculating the value (in s) of the ith stage delay Ti, wherein T is i Delay duration for the i-th transmission delay class, A i (t) is the unit value of the main output physical quantity of the ith-stage transmission delay level starting point component at the current time t, B i (t) is the unit value of the master output physical quantity of the ith transmission delay level end point component at the current time t, and the unit value is greater than or equal to the unit value of the master output physical quantity of the ith transmission delay level end point component at the current time t>
Figure BDA0003962362140000072
The average transmission delay from a starting point component to an end point component of a control signal corresponding to the ith transmission delay level is directly input in the unit of s, the average transmission delay is an external system parameter of the wind turbine generator, and i belongs to [ 1-N ]]N is the total number of transmission delay levels under the control signal;
step 7) judging whether i is smaller than N, if so, making i = i +1, and returning to the step 6); if not, go to step 8)
And 8) finishing calculation, and outputting the working condition change sequence table and the values of T1-TN at the moment as final output.
It should be noted that the wind turbine generator is particularly referred to as a direct-drive wind turbine generator in this embodiment;
when the buffer operation is performed on the system, when the working condition changes, the operation working conditions of all the sub-components of the system do not change along with the response immediately, but change one by one according to the time sequence, so as to improve the operation mode of the system operation stability.
In summary, according to the method for optimizing the buffer operation duration of the wind turbine generator set provided by this embodiment, after the master control system changes the operating conditions, the sequence and time of the changes of the operating conditions of the other components are manually controlled, and the operating condition change time sequence table under manual intervention is generated, so that the risks of integral oscillation and damage of the wind turbine generator set caused by the changes of the operating conditions are avoided to the greatest extent, and the reliability of the operation of the wind turbine generator set is improved.
Example two
Fig. 2 is a structural diagram of a buffer operation duration optimization system of a wind turbine generator according to an embodiment of the present application, and as shown in fig. 2, the system includes:
the acquiring module 100 is configured to acquire a corresponding control signal when a working condition of the wind turbine needs to be changed when the working condition of the wind turbine needs to be changed;
the first determining module 200 is configured to determine, according to the control signal, a transmission sequence of the control signal in the wind turbine generator and a transmission delay level corresponding to each transmission process;
a second determining module 300, configured to determine a delay time duration of each transmission delay class according to the per unit value of the starting-point component main output physical quantity and the per unit value of the ending-point component main output physical quantity corresponding to each transmission delay class;
and the optimizing module 400 is configured to sort the delay durations of the transmission delay levels from small to large according to the transmission delay levels to form a delay sequence, and optimize the buffer operation duration of the wind turbine generator based on the delay sequence.
In an embodiment of the present disclosure, the first determining module 200 is specifically configured to:
when the control signal is used for controlling the rotating speed of the wind turbine generator, the control signal is sequentially input into a main control system, a generator, a converter, a fan transmission chain, a fan impeller and a grid-connected system of the wind turbine generator, the transmission delay from the main control system to the generator is set as first-stage delay, the transmission delay from the generator to the converter and the fan transmission chain is set as second-stage delay, and the transmission delay from the converter and the fan transmission chain to the fan impeller and the grid-connected system is set as third-stage delay;
when the control signal is used for controlling the torque or the power of the wind turbine generator, the control signal is sequentially input into a master control system, a converter, a generator, a grid-connected system, a fan transmission chain and a fan impeller of the wind turbine generator, the transmission delay from the master control system to the converter is set as first-stage delay, the transmission delay from the converter to the generator and the grid-connected system is set as second-stage delay, the transmission delay from the generator and the grid-connected system to the fan transmission chain is set as third-stage delay, and the transmission delay from the fan transmission chain to the fan impeller is set as fourth-stage delay;
when the control signal is used for controlling the pitch angle of the wind turbine generator, the control signal is sequentially input into a master control system, a fan impeller, a fan transmission chain, a generator, a converter and a grid-connected system of the wind turbine generator, the transmission delay from the master control system to the fan impeller is set as first-stage delay, the transmission delay from the fan impeller to the fan transmission chain is set as second-stage delay, the transmission delay from the fan transmission chain to the generator is set as third-stage delay, the transmission delay from the generator to the converter is set as fourth-stage delay, and the transmission delay from the converter to the grid-connected system is set as fifth-stage delay.
In an embodiment of the disclosure, as shown in fig. 3, the second determining module 300 includes:
an obtaining unit 301, configured to obtain an average transmission delay from a starting point component to an end point component of a control signal corresponding to each transmission delay level under the control signal;
a determining unit 302, configured to determine a delay time duration of each transmission delay level under the control signal according to an average transmission delay from the starting point component to the ending point component of the control signal corresponding to each transmission delay level under the control signal, a per-unit value of the main output physical quantity of the starting point component, and a per-unit value of the main output physical quantity of the ending point component.
Wherein, the calculation formula of the delay time of each transmission delay grade under the control signal is as follows:
Figure BDA0003962362140000091
in the formula, T i Delay duration for the i-th transmission delay class, A i (t) is the per unit value of the main output physical quantity of the ith transmission delay level starting component at the current time t, B i (t) is a per unit value of the main output physical quantity of the ith-stage transmission delay level end point component at the current time t,
Figure BDA0003962362140000092
the average transmission delay from the starting point component to the end point component of the control signal corresponding to the ith transmission delay level is i ∈ [ 1-N [ ]]And N is the total number of transmission delay grades under the control signal.
In summary, according to the buffer operation duration optimization system for the wind turbine generator, after the master control system changes the operating conditions, the sequence and time of changing the operating conditions of the other components are manually controlled, and the operating condition change time sequence table under manual intervention is generated, so that risks of integral oscillation and damage of the wind turbine generator caused by the change of the operating conditions are avoided to the greatest extent, and the reliability of the operation of the wind turbine generator is improved.
EXAMPLE III
In order to implement the above embodiments, the present disclosure also provides an electronic device, including: the system comprises a memory, a processor and a computer program stored on the memory and capable of running on the processor, wherein the processor executes the program to realize the method according to the first embodiment.
Example four
In order to implement the above-mentioned embodiments, the present disclosure also proposes a computer-readable storage medium on which a computer program is stored, which when executed by a processor implements the method according to the first embodiment.
In the description herein, reference to the description of the term "one embodiment," "some embodiments," "an example," "a specific example," or "some examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the application. In this specification, the schematic representations of the terms used above are not necessarily intended to refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Moreover, various embodiments or examples and features of various embodiments or examples described in this specification can be combined and combined by one skilled in the art without being mutually inconsistent.
Any process or method descriptions in flow charts or otherwise described herein may be understood as representing modules, segments, or portions of code which include one or more executable instructions for implementing steps of a custom logic function or process, and alternate implementations are included within the scope of the preferred embodiment of the present application in which functions may be executed out of order from that shown or discussed, including substantially concurrently or in reverse order, depending on the functionality involved, as would be understood by those reasonably skilled in the art of the present application.
Although embodiments of the present application have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present application, and that variations, modifications, substitutions and alterations may be made to the above embodiments by those of ordinary skill in the art within the scope of the present application.

Claims (10)

1. A buffer operation duration optimization method for a wind turbine generator is characterized by comprising the following steps:
when the working condition of the wind turbine needs to be changed, acquiring a corresponding control signal when the working condition of the wind turbine needs to be changed;
determining a transmission sequence of the control signal in the wind turbine generator and a transmission delay grade corresponding to each transmission process according to the control signal;
determining the delay time of each transmission delay grade according to the per-unit value of the main output physical quantity of the starting point component and the per-unit value of the main output physical quantity of the end point component corresponding to each transmission delay grade;
and sequencing the delay time of each transmission delay grade from small to large according to the transmission delay grades to form a delay sequence, and optimizing the buffer operation time of the wind turbine generator based on the delay sequence.
2. The method of claim 1, wherein the determining, according to the control signal, a transmission sequence of the control signal in the wind turbine generator and a transmission delay level corresponding to each transmission process comprises:
when the control signal is used for controlling the rotating speed of the wind turbine generator, the control signal is sequentially input into a main control system, a generator, a converter, a fan transmission chain, a fan impeller and a grid-connected system of the wind turbine generator, the transmission delay from the main control system to the generator is set as first-stage delay, the transmission delay from the generator to the converter and the fan transmission chain is set as second-stage delay, and the transmission delay from the converter and the fan transmission chain to the fan impeller and the grid-connected system is set as third-stage delay;
when the control signal is used for controlling the torque or the power of the wind turbine generator, the control signal is sequentially input into a main control system, a converter, a generator, a grid-connected system, a fan transmission chain and a fan impeller of the wind turbine generator, the transmission delay from the main control system to the converter is set as first-stage delay, the transmission delay from the converter to the generator and the grid-connected system is set as second-stage delay, the transmission delay from the generator and the grid-connected system to the fan transmission chain is set as third-stage delay, and the transmission delay from the fan transmission chain to the fan impeller is set as fourth-stage delay;
when the control signal is used for controlling the pitch angle of the wind turbine generator, the control signal is sequentially input into a main control system, a fan impeller, a fan transmission chain, a generator, a converter and a grid-connected system of the wind turbine generator, the transmission delay from the main control system to the fan impeller is set as first-stage delay, the transmission delay from the fan impeller to the fan transmission chain is set as second-stage delay, the transmission delay from the fan transmission chain to the generator is set as third-stage delay, the transmission delay from the generator to the converter is set as fourth-stage delay, and the transmission delay from the converter to the grid-connected system is set as fifth-stage delay.
3. The method according to claim 2, wherein determining the delay time duration for each of the transmission delay time levels from the per unit value of the starting-point unit main output physical quantity and the per unit value of the ending-point unit main output physical quantity for each transmission delay time level comprises:
acquiring the average transmission delay of the control signal from the starting point component to the end point component corresponding to each transmission delay grade under the control signal;
and determining the delay time length of each transmission delay grade under the control signal according to the average transmission delay from the starting point component to the end point component, the per unit value of the main output physical quantity of the starting point component and the per unit value of the main output physical quantity of the end point component, which correspond to each transmission delay grade under the control signal.
4. The method of claim 3, wherein said control signal calculates a delay duration for each of said transmission delay levels as follows:
Figure FDA0003962362130000021
in the formula, T i Delay time length of ith transmission delay class, A i (t) is the per unit value of the main output physical quantity of the ith transmission delay level starting component at the current time t, B i (t) is a per unit value of the main output physical quantity of the i-th stage transmission delay level end point component at the current time t,
Figure FDA0003962362130000022
the average transmission delay from the starting point component to the end point component of the control signal corresponding to the ith transmission delay level is i ∈ [ 1-N [ ]]N is under the control signalTotal number of transmission delay levels.
5. The utility model provides a long optimizing system of buffering operation of wind turbine generator system which characterized in that, the system includes:
the acquisition module is used for acquiring a corresponding control signal when the working condition of the wind turbine generator needs to be changed;
the first determining module is used for determining the transmission sequence of the control signals in the wind turbine generator and the transmission delay grades corresponding to the transmission processes according to the control signals;
a second determining module, configured to determine the delay time of each transmission delay class according to the per-unit value of the starting-point component main output physical quantity and the per-unit value of the ending-point component main output physical quantity corresponding to each transmission delay class;
and the optimizing module is used for sequencing the delay time of each transmission delay grade from small to large according to the transmission delay grades to form a delay sequence, and optimizing the buffer operation time of the wind turbine generator based on the delay sequence.
6. The system of claim 5, wherein the first determination module is specifically configured to:
when the control signal is used for controlling the rotating speed of the wind turbine generator, the control signal is sequentially input into a master control system, a generator, a converter, a fan transmission chain, a fan impeller and a grid-connected system of the wind turbine generator, the transmission delay from the master control system to the generator is set as first-stage delay, the transmission delay from the generator to the converter and the fan transmission chain is set as second-stage delay, and the transmission delay from the converter and the fan transmission chain to the fan impeller and the grid-connected system is set as third-stage delay;
when the control signal is used for controlling the torque or the power of the wind turbine generator, the control signal is sequentially input into a main control system, a converter, a generator, a grid-connected system, a fan transmission chain and a fan impeller of the wind turbine generator, the transmission delay from the main control system to the converter is set as first-stage delay, the transmission delay from the converter to the generator and the grid-connected system is set as second-stage delay, the transmission delay from the generator and the grid-connected system to the fan transmission chain is set as third-stage delay, and the transmission delay from the fan transmission chain to the fan impeller is set as fourth-stage delay;
when the control signal is used for controlling the pitch angle of the wind turbine generator, the control signal is sequentially input into a master control system, a fan impeller, a fan transmission chain, a generator, a converter and a grid-connected system of the wind turbine generator, the transmission delay from the master control system to the fan impeller is set as first-stage delay, the transmission delay from the fan impeller to the fan transmission chain is set as second-stage delay, the transmission delay from the fan transmission chain to the generator is set as third-stage delay, the transmission delay from the generator to the converter is set as fourth-stage delay, and the transmission delay from the converter to the grid-connected system is set as fifth-stage delay.
7. The system of claim 6, wherein the second determination module comprises:
the acquisition unit is used for acquiring the average transmission delay of the control signal corresponding to each transmission delay grade under the control signal from the starting point component to the end point component;
and the determining unit is used for determining the delay time of each transmission delay grade under the control signal according to the average transmission delay from the starting point component to the end point component of the control signal corresponding to each transmission delay grade under the control signal, the per unit value of the main output physical quantity of the starting point component and the per unit value of the main output physical quantity of the end point component.
8. The system of claim 7, wherein said control signal calculates a delay duration for each of said transmission delay levels as follows:
Figure FDA0003962362130000031
in the formula, T i Delay duration for the i-th transmission delay class, A i (t) is the unit value of the main output physical quantity of the ith-stage transmission delay level starting point component at the current time t, B i (t) is a per unit value of the main output physical quantity of the i-th stage transmission delay level end point component at the current time t,
Figure FDA0003962362130000032
the average transmission delay from the starting point component to the end point component of the control signal corresponding to the ith transmission delay level is represented by i E [ 1-N [ ]]And N is the total number of transmission delay grades under the control signal.
9. An electronic device, comprising: memory, processor and computer program stored on the memory and executable on the processor, which when executed by the processor implements the method of any of claims 1 to 4.
10. A computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the method according to any one of claims 1 to 4.
CN202211482661.3A 2022-11-24 2022-11-24 Buffer operation duration optimization method and system for wind turbine generator Pending CN115875201A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211482661.3A CN115875201A (en) 2022-11-24 2022-11-24 Buffer operation duration optimization method and system for wind turbine generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211482661.3A CN115875201A (en) 2022-11-24 2022-11-24 Buffer operation duration optimization method and system for wind turbine generator

Publications (1)

Publication Number Publication Date
CN115875201A true CN115875201A (en) 2023-03-31

Family

ID=85763800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211482661.3A Pending CN115875201A (en) 2022-11-24 2022-11-24 Buffer operation duration optimization method and system for wind turbine generator

Country Status (1)

Country Link
CN (1) CN115875201A (en)

Similar Documents

Publication Publication Date Title
CN108708822B (en) Variable-pitch self-adaptive control method and system for wind generating set
CN106444956A (en) Particle swarm optimization based control method and device of photovoltaic maximum power point tracking
CN112031996B (en) Method and system for optimizing over-limit of cabin vibration during yaw motion of wind turbine generator
AU2017332959B2 (en) Method and device for distributing active power for wind farm
CN103986193B (en) A kind of method that maximum wind grid connection capacity obtains
CN115875201A (en) Buffer operation duration optimization method and system for wind turbine generator
CN110048410A (en) Realize the frequency conversion load control method of network of ship stable operation
CN113315385A (en) Dynamic cascade prediction control method for ocean direct-drive permanent magnet synchronous wind power converter
CN108599240A (en) The Wind turbines converter controller parameter tuning method of meter and small signal stability
CN112290888A (en) IV scanning method and photovoltaic power station
CN114285088B (en) Energy system optimal configuration method and system considering thermal power unit constraint
CN113872230B (en) New energy fault ride-through control parameter optimization method and device
CN115241922A (en) Method and system for determining unit combination of wind power plant participating in power grid frequency support
WO2022016733A1 (en) Method for controlling voltage source-type wind turbine unit, main control system, electronic device, and storage medium
CN114285089B (en) Method and system for optimizing start-stop of thermal power generating unit in wind, light and fire storage system
CN108879767B (en) High voltage ride through control method, device and system for wind generating set
CN109667713B (en) Power increasing control method and device for wind generating set
CN116341736A (en) Fan rotating speed optimization method and system for wind farm
CN114336776B (en) Thermal power generating unit startup sequence determining method and system based on optimized binary tree
CN112477623B (en) Motor rotating speed optimization method and system
CN112968480B (en) Wind-thermal power combined optimization scheduling method and system based on unit load response capability
JP7481130B2 (en) Power generation equipment control device
CN117518806A (en) Wind turbine generator pitch control parameter design method based on adaptive genetic algorithm
CN116205080A (en) Method and system for determining efficiency curve of each part of wind turbine generator
CN115800398A (en) Power optimization method and system for upstream wind turbine generator in longitudinally adjacent wind turbine generators

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination