CN115856515A - 一种考虑故障发展过程的配电网弧光接地故障建模方法 - Google Patents
一种考虑故障发展过程的配电网弧光接地故障建模方法 Download PDFInfo
- Publication number
- CN115856515A CN115856515A CN202310190919.0A CN202310190919A CN115856515A CN 115856515 A CN115856515 A CN 115856515A CN 202310190919 A CN202310190919 A CN 202310190919A CN 115856515 A CN115856515 A CN 115856515A
- Authority
- CN
- China
- Prior art keywords
- fault
- arc
- contact resistance
- development process
- resistance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 82
- 230000008569 process Effects 0.000 title claims abstract description 54
- 230000008859 change Effects 0.000 claims abstract description 13
- 238000004458 analytical method Methods 0.000 claims abstract description 4
- 238000003763 carbonization Methods 0.000 claims description 7
- 238000010891 electric arc Methods 0.000 claims description 4
- 230000005855 radiation Effects 0.000 claims description 3
- 230000009467 reduction Effects 0.000 claims description 2
- 230000007704 transition Effects 0.000 abstract description 6
- 238000002485 combustion reaction Methods 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 238000001514 detection method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 241000218378 Magnolia Species 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008033 biological extinction Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000017525 heat dissipation Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 229910052755 nonmetal Inorganic materials 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S10/52—Outage or fault management, e.g. fault detection or location
Landscapes
- Locating Faults (AREA)
Abstract
本申请涉及考虑故障发展过程的配电网弧光接地故障建模方法,包括以下步骤:采集线路故障相电压与接地故障电流,并进行离散傅里叶变换提取故障相电压与故障电流的工频分量,计算得到接触电阻的变化曲线;利用最小二乘法对接触电阻进行指数函数拟合,得到接触电阻值随时间变化的函数关系式,建立考虑故障发展过程的接触电阻模型;建立考虑故障发展过程的动态电弧模型,推导弧隙电阻表达式;基于接触电阻与弧隙电阻串联的配电网弧光接地故障解析方法,解得线路出口处的零模电压、零模电流的电气量的解析表达。本申请通过将故障点的过渡电阻等效为弧隙电阻与接触电阻的串联组合,建立弧光故障时的解析方程组,实现对故障过程中故障电气量的计算。
Description
技术领域
本申请涉及电力系统保护与故障检测技术领域,特别涉及到考虑故障发展过程的弧光接地故障建模方法。
背景技术
配电网线路分支较多,接线复杂多变,线路所处的自然地理环境往往较为恶劣,经常会发生经树枝、草地、灌木等非金属导电介质接地的高阻(过渡电阻在几百甚至上千欧姆)接地故障。交流线路在发生接地故障时,存在能量的积累与释放过程,因此电弧将不断熄灭与重燃。因弧光高阻接地故障电气量微弱,此类弧光高阻接地故障的检测难度较大,若故障不能被及时地发现、清除,易引发森林火灾等电气事故。在电弧故障发展过程中,会引起接地介质的碳化与燃烧过程,此过程受热效应、磁场等多因素影响难以对故障过程进行刻画。因此有必要展开考虑故障发展过程的配电网弧光接地故障建模方法的研究,进一步掌握弧光接地发展下的故障特征,有利于配电网线路的选线、消弧,减少人身触电、森林火灾等事故发生概率,增强配电网供电可靠性。
现对于弧光高阻接地故障的研究往往将故障支路视为电弧模型与塔基固定电阻的串联,建立高阻接地故障模型,并给出相关故障电气量的解析表达。此类方法忽略了在故障发展过程中接地介质的变化过程,由于故障电弧温度高达上千度,极易引发接地介质的碳化燃烧,形成碳化通道使得接触电阻值降低,无法对发展过程中的故障电气量进行准确表达。同时对于弧隙通道的电阻未准确刻画,未考虑在故障发展过程中各因素对电弧燃烧与熄灭的影响,因此传统的弧光高阻接地故障模型无法全面刻画考虑发展过程中的弧光接地故障特征。
弧光高阻接地故障由于过渡电阻值较大,故障电气量信息微弱,导致传统的继电保护方法难以准确识别故障线路与故障相,保护装置不能及时跳开,可能导致孤光接地故障不断发展引发电气火灾,极大的危害了电力系统的供电安全性与可靠性。若不能对弧光高阻接地故障的发展过程进行精确建模,则无法分析故障电气量的变化过程,对故障选线与选相造成较大干扰。
发明内容
本申请实施例的目的在于提供一种考虑故障发展过程的配电网弧光接地故障建模方法,通过将故障点的过渡电阻等效为弧隙电阻与接触电阻的串联组合,建立弧光故障时的解析方程组,实现对故障过程中故障电气量的计算。
为实现上述目的,本申请提供如下技术方案:
本申请实施例提供一种考虑故障发展过程的配电网弧光接地故障建模方法,包括以下具体步骤:
步骤一:采集线路故障相电压与接地故障电流,并进行离散傅里叶变换提取故障相电压与故障电流的工频分量,计算得到接触电阻的变化曲线;
步骤二:利用最小二乘法对接触电阻进行指数函数拟合,得到接触电阻值随时间变化的函数关系式,建立考虑故障发展过程的接触电阻模型;
步骤三:建立考虑故障发展过程的动态电弧模型,推导弧隙电阻表达式;
步骤四:基于接触电阻与弧隙电阻串联的配电网弧光接地故障解析方法,解得线路出口处的零模电压、零模电流的电气量的解析表达。
所述步骤二中,得到接触电阻值随时间t变化的函数关系式如下:
所述步骤三中,弧隙电阻表达式具体为:
考虑在接触物燃烧过程中,由于火焰温度远高于环境温度,故电弧的耗散功率下降,根据基尔霍夫热辐射定律,得到接触物燃烧时耗散功率表示为:
所述步骤四中,考虑故障发展过程得电弧模型的表达式为:
求解得:
与现有技术相比,本发明的有益效果是:通过将故障点的过渡电阻等效为弧隙电阻与接触电阻的串联组合,建立弧光故障时的解析方程组,实现对故障过程中故障电气量的计算。建立的弧光高阻接地故障模型能够有效反应接触物燃烧碳化的影响,建立考虑故障发展过程的弧光高阻接地故障模型,为后续研究配电网弧光接地故障发展机理提供理论支撑。
附图说明
为了更清楚地说明本申请实施例的技术方案,下面将对本申请实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本申请的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。
图1是本发明实施的考虑故障发展过程的配电网弧光接地故障建模方法的流程图。
图2是在故障线路发生电弧接地故障的电弧接地故障等效模型。
图3是考虑接地故障发展过程的接触电阻模型。
图4是考虑故障发展过程动态电弧模型的电弧电压。
图5是考虑故障发展过程动态电弧模型的弧隙电阻。
具体实施方式
下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行描述。应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。
术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。
术语“第一”、“第二”等仅用于将一个实体或者操作与另一个实体或操作区分开来,而不能理解为指示或暗示相对重要性,也不能理解为要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。
参照图1,本申请实施例提供包括以下具体步骤:
步骤一:采集线路故障相电压与接地故障电流,并进行离散傅里叶变换提取故障相电压与故障电流的工频分量,计算得到接触电阻的变化曲线;
步骤二:利用最小二乘法对接触电阻进行指数函数拟合,得到接触电阻值随时间变化的函数关系式,建立考虑故障发展过程的接触电阻模型;
步骤三:建立考虑故障发展过程的动态电弧模型,推导弧隙电阻表达式;
步骤四:基于接触电阻与弧隙电阻串联的配电网弧光接地故障解析方法,解得线路出口处的零模电压、零模电流的电气量的解析表达。
如图2所示,通过将故障点的过渡电阻等效为弧隙电阻与接触电阻的串联组合,在具体的实例中包括以下步骤:
图3为经过玉兰树接地故障的接触电阻波形与模型拟合曲线,电阻值呈现指数衰减,可见此接触电阻模型能够精确表征故障时的接触电阻变化情况。
建立考虑故障发展过程的动态电弧模型,推导弧隙电阻表达式,该模型充分考虑电弧故障引发接触物燃烧过程中,各影响因素对于燃弧、熄弧过程的影响。
建立考虑电弧模型给出的解析表达式具体为:
电弧的非线性本质上由弧隙电阻的非线性引起,而弧隙电阻的非线性又受到弧隙热交换过程的影响。由于电压、电流为注入量,因此在接地点的弧隙空间中,热交换过程对外部场景的反映主要表现在参数的变化上。反映的是弧隙的散热能力,这主要由空气隙及其周边介质的可动性和导热能力决定。
其特征在于,可得到电弧模型的表达式为:
求解可得:
图4与图5分别为考虑故障发展过程动态电弧模型的电压波形图与弧隙电阻波形图,可以发现,燃弧电压峰值与弧隙电阻峰值在故障发展过程中不断降低,充分反应了在故障发展过程中的电弧变化情况,相较于传统电弧模型能够更精确表征实际工况下的电弧状态。
以上所述仅为本申请的实施例而已,并不用于限制本申请的保护范围,对于本领域的技术人员来说,本申请可以有各种更改和变化。凡在本申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。
Claims (5)
1.一种考虑故障发展过程的配电网弧光接地故障建模方法,其特征在于,包括以下具体步骤:
步骤一:采集线路故障相电压与接地故障电流,并进行离散傅里叶变换提取故障相电压与故障电流的工频分量,计算得到接触电阻的变化曲线;
步骤二:利用最小二乘法对接触电阻进行指数函数拟合,得到接触电阻值随时间变化的函数关系式,建立考虑故障发展过程的接触电阻模型;
步骤三:建立考虑故障发展过程的动态电弧模型,推导弧隙电阻表达式;
步骤四:基于接触电阻与弧隙电阻串联的配电网弧光接地故障解析方法,解得线路出口处的零模电压、零模电流的电气量的解析表达。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310190919.0A CN115856515B (zh) | 2023-03-02 | 2023-03-02 | 一种考虑故障发展过程的配电网弧光接地故障建模方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310190919.0A CN115856515B (zh) | 2023-03-02 | 2023-03-02 | 一种考虑故障发展过程的配电网弧光接地故障建模方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115856515A true CN115856515A (zh) | 2023-03-28 |
CN115856515B CN115856515B (zh) | 2023-05-02 |
Family
ID=85659722
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310190919.0A Active CN115856515B (zh) | 2023-03-02 | 2023-03-02 | 一种考虑故障发展过程的配电网弧光接地故障建模方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115856515B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117233471A (zh) * | 2023-11-09 | 2023-12-15 | 四川大学 | 基于接触阻抗渐变特性的中压配网树枝碰线故障检测方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102028716B1 (ko) * | 2019-04-08 | 2019-11-08 | 주식회사 데카엔지니어링 | 전기 배선 접촉부 불꽃 발생 검출 장치 및 방법 |
WO2019216626A1 (ko) * | 2018-05-09 | 2019-11-14 | (주)아이티이 | 전기고장 만능탐지 및 복구 배전시스템 및 그 공사방법 |
CN111985176A (zh) * | 2020-07-06 | 2020-11-24 | 清华大学 | 一种基于分段线性等效的弧光接地故障建模及解析方法 |
CN113792442A (zh) * | 2021-09-28 | 2021-12-14 | 国网四川省电力公司电力科学研究院 | 一种配电网弧光接地故障建模分析方法 |
WO2022121138A1 (zh) * | 2020-12-09 | 2022-06-16 | 山东大学 | 一种谐振接地系统高阻故障选线和区段定位方法及系统 |
CN115017444A (zh) * | 2022-04-18 | 2022-09-06 | 上海交通大学 | 一种树线早期故障定位识别方法 |
-
2023
- 2023-03-02 CN CN202310190919.0A patent/CN115856515B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019216626A1 (ko) * | 2018-05-09 | 2019-11-14 | (주)아이티이 | 전기고장 만능탐지 및 복구 배전시스템 및 그 공사방법 |
KR102028716B1 (ko) * | 2019-04-08 | 2019-11-08 | 주식회사 데카엔지니어링 | 전기 배선 접촉부 불꽃 발생 검출 장치 및 방법 |
CN111985176A (zh) * | 2020-07-06 | 2020-11-24 | 清华大学 | 一种基于分段线性等效的弧光接地故障建模及解析方法 |
WO2022121138A1 (zh) * | 2020-12-09 | 2022-06-16 | 山东大学 | 一种谐振接地系统高阻故障选线和区段定位方法及系统 |
CN113792442A (zh) * | 2021-09-28 | 2021-12-14 | 国网四川省电力公司电力科学研究院 | 一种配电网弧光接地故障建模分析方法 |
CN115017444A (zh) * | 2022-04-18 | 2022-09-06 | 上海交通大学 | 一种树线早期故障定位识别方法 |
Non-Patent Citations (4)
Title |
---|
李天友;徐丙垠;薛永端;: "配电网高阻接地故障保护技术及其发展" * |
杨明波;龙毅;樊三军;马格土;: "基于组合Mayr和Cassie电弧模型的弧光接地故障仿真及分析" * |
秦雪;刘亚东;孙鹏;王鹏;江秀臣;: "基于故障波形时频特征配网故障识别方法研究" * |
胡文广;王师奇;: "基于Mayr-Cassie的配电网络单相接地电弧建模及仿真研究" * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117233471A (zh) * | 2023-11-09 | 2023-12-15 | 四川大学 | 基于接触阻抗渐变特性的中压配网树枝碰线故障检测方法 |
CN117233471B (zh) * | 2023-11-09 | 2024-01-23 | 四川大学 | 基于接触阻抗渐变特性的中压配网树枝碰线故障检测方法 |
Also Published As
Publication number | Publication date |
---|---|
CN115856515B (zh) | 2023-05-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Jazebi et al. | Review of wildfire management techniques—Part I: Causes, prevention, detection, suppression, and data analytics | |
CN113792442B (zh) | 一种配电网弧光接地故障建模分析方法 | |
CN115856515B (zh) | 一种考虑故障发展过程的配电网弧光接地故障建模方法 | |
Lima et al. | High impedance fault detection method for distribution networks under non-linear conditions | |
Lee et al. | Modeling of a 22.9 kV 50 MVA superconducting power cable based on PSCAD/EMTDC for application to the Icheon substation in Korea | |
Ge et al. | Experimental research on the thermal characteristic of low-voltage alternating current (AC) arc faults | |
Hu et al. | Power cable fired by transient arcing below the action value of relay protection: an analysis of a medium-voltage cable joint breakdown fault | |
Sutlovic et al. | Analysis of conductor clashing experiments | |
Oliveira et al. | Harmonic propagation analysis in electric energy distribution systems | |
Hu et al. | Current tolerance capability calculation model of transmission lines and its application in overload protection | |
Teng | Enhancing power distribution grid resilience against massive wildfires | |
CN116167205A (zh) | 一种高压输电线路隐性缺陷检测方法及预警系统 | |
Panossian et al. | Power System Wildfire Risks and Potential Solutions: A Literature Review & Proposed Metric | |
England | An investigation into arc detection and fire safety aspects of photovoltaic installations | |
Zhao et al. | Evolution of grounding failure‐insulation failure of 10 kV cable joints: Prerequisites of an explosion in enclosed cable trench | |
Yin et al. | Research on the Influence Mechanism of Vegetation Length on Tree-Contact Single-Phase-to-Ground Faults | |
Huang et al. | Information model of low-voltage distribution IoT monitoring terminal based on IEC 61850 | |
Zhang et al. | Experimental Research on Heat Transfer and Ignition Characteristics of Series Fault Arc Combustion in 220VAC Power System | |
Liu et al. | Modeling of Tree Contact Faults in Distribution Networks | |
Chen et al. | A method to assess the wildfire induced breakdown of high-voltage transmission lines | |
Liang et al. | Comprehensive study on tree‐contact single‐phase‐to‐ground faults: Modelling, risk analysis, and detection recommendations | |
Zeng et al. | Modeling and Identification Method of Contact Tree Grounding Fault in 10kV Overhead Line | |
CN117390863B (zh) | 多场景下三要素配电网单相接地电弧建模分析方法及系统 | |
Mineev et al. | Model of calculating the response of a superconducting fault current limiter in the electrical grid | |
Thompson et al. | Use of Advanced Monitoring Technology to Detect Incipient Failure of Line Equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |