CN115853189B - Gypsum board furred ceiling mounting structure - Google Patents
Gypsum board furred ceiling mounting structure Download PDFInfo
- Publication number
- CN115853189B CN115853189B CN202310181354.XA CN202310181354A CN115853189B CN 115853189 B CN115853189 B CN 115853189B CN 202310181354 A CN202310181354 A CN 202310181354A CN 115853189 B CN115853189 B CN 115853189B
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- sleeve
- gypsum board
- push rod
- mounting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Finishing Walls (AREA)
- Dowels (AREA)
Abstract
The invention discloses a gypsum board ceiling mounting structure, which belongs to the field of ceiling mounting and comprises a plurality of expansion screws, wherein the lower ends of the expansion screws are fixedly connected with steel wires, the lower ends of the steel wires are fixedly connected with a bracket, the lower ends of the bracket are fixedly connected with a plurality of keel frames, the middle part of the bracket is fixedly connected with a plurality of limiting devices, each limiting device comprises a base, a cylindrical hole is formed in the middle part of the base, the upper end of the base is fixedly connected with a supporting rod, the upper end of the supporting rod is fixedly connected with two sleeves, the upper ends of the middle parts of the sleeves are provided with annular protrusions, the middle parts of the sleeves are slidably connected with baffle plates, the lower ends of the middle parts of the sleeves are provided with liquid outlets, the liquid glue flows out through hollow thorn cones, and pressing blocks are bonded with plastic plates, so that the middle parts of gypsum boards are reinforced by solidification of the liquid glue after the gypsum boards are mounted, and the situation that cracking or breakage of the gypsum boards in the later stages is reduced.
Description
Technical Field
The invention relates to the field of suspended ceiling installation, in particular to a gypsum board suspended ceiling installation structure.
Background
Suspended ceiling refers to a decoration of the top of the living environment of a house. Simply, it is the decoration of the ceiling, which is one of the important parts of the interior decoration.
The gypsum board furred ceiling is a comparatively common furred ceiling installation kind, and the gypsum board furred ceiling is fixed in the ceiling position by fossil fragments frame, because the gypsum board is bulky, and the gypsum board middle part position is difficult to be fixed by fossil fragments frame, generally adopts the nail to consolidate the gypsum board middle part on the market, and the tiny altitude mixture change can appear in the furred ceiling installation in-process for the gypsum board, this just leads to ordinary nail to fix the gypsum board after can be because the nimble regulation of the fixed middle part of the altitude mixture change of gypsum board is difficult for, leads to causing the gypsum board to appear fracture or cracked condition easily after the installation is accomplished.
Disclosure of Invention
1. Technical problem to be solved
Aiming at the problems existing in the prior art, the invention aims to provide a gypsum board suspended ceiling mounting structure, which can realize that liquid glue flows out through a hollow thorn cone and a pressing block is bonded with a plastic plate, so that the middle part of a gypsum board is reinforced by solidification of the liquid glue after the gypsum board is mounted, and the situation that cracking or breaking occurs in the later stage of the gypsum board is reduced.
2. Technical proposal
In order to solve the problems, the invention adopts the following technical scheme.
The utility model provides a gypsum board furred ceiling mounting structure, includes a plurality of expansion screw, expansion screw lower extreme fixedly connected with wire rope, a plurality of wire rope lower extreme fixedly connected with support, a plurality of fossil fragments frame of support lower extreme fixedly connected with, a plurality of stop device of support middle part fixedly connected with, stop device includes the base, the cylindricality hole has been seted up at the base middle part, base upper end fixedly connected with bracing piece, two sleeves of bracing piece upper end fixedly connected with, annular arch has been seted up to sleeve middle part upper end, sleeve middle part sliding connection has the fender dish, the liquid outlet has been seted up to sleeve middle part lower extreme, two sleeve upper end fixedly connected with transfer groove, transfer groove middle part lower extreme fixedly connected with stop collar, cylindricality hole middle part sliding connection has the aggregate unit, fossil fragments frame lower extreme middle part fixedly connected with gypsum board, gypsum board middle part fixedly connected with plastics dish. The liquid glue flows out through the hollow thorn cone, and the pressing block is bonded with the plastic plate, so that the middle part of the gypsum board is reinforced by solidification of the liquid glue after the gypsum board is installed, and the later cracking or breaking condition of the gypsum board is reduced.
Further, the aggregate unit includes the push rod, push rod outer end joint has spacing packing ring, the push rod outer end is located spacing packing ring upside equiangular fixedly connected with riding block, riding block upper end middle part fixedly connected with pin, the push rod outside is located riding block upside position sliding connection has the ring, both ends all fixedly connected with horizontal pole about the ring, the one end fixedly connected with hollow thorn awl that the ring was kept away from to the horizontal pole, two liquid holes have been seted up to hollow thorn awl upper end, push rod lower extreme fixedly connected with briquetting for aggregate unit can extrude liquid glue in the sleeve, can fix the aggregate unit after making liquid glue solidify.
Further, liquid glue is stored in the middle of the sleeve, and a plastic film is covered in the middle of the liquid outlet, so that the liquid glue in the sleeve can fix the linkage device, and the liquid glue can be sealed in the sleeve.
Further, the protruding internal diameter of annular is less than the diameter of fender dish, and the inside material of fender dish is corrosion-resistant rubber for the fender dish is difficult for deviate from the sleeve middle part, and keeps off the dish and not fragile.
Further, the transfer groove is respectively communicated with the sleeve and the limiting sleeve, and liquid water is stored in the transfer groove, so that the liquid water can move between the sleeve, the limiting sleeve and the transfer groove, and the liquid water can push the baffle plate to move.
Further, the upper end of the push rod is inserted into the limit sleeve, and the diameter of the push rod is the same as the inner diameter of the limit sleeve, so that the push rod can plug the middle of the limit sleeve, and liquid water is prevented from flowing out.
Further, the inside material of spacing packing ring is elastic rubber, and the inside material of riding block is brittle plastic for spacing packing ring can carry out spacingly to the push rod, and the riding block can be destroyed by external force.
Furthermore, the circular ring is limited by the pin, and the hollow thorn cone is positioned right below the liquid outlet, so that the circular ring is not easy to deviate, and the hollow thorn cone can puncture the plastic film.
Further, the upper surface of the plastic disc is a smooth plane, and the plastic disc is positioned right below the pressing block, so that the plastic disc can be adhered with the pressing block through quick-drying glue.
3. Advantageous effects
Compared with the prior art, the invention has the advantages that:
(1) According to the scheme, the liquid glue flows out through the hollow thorn cone, and the pressing block is bonded with the plastic plate, so that the middle of the gypsum board is reinforced by solidification of the liquid glue after the gypsum board is installed, and the later cracking or breaking of the gypsum board is reduced.
(2) The linkage comprises a push rod, the outer end of the push rod is clamped with a limit gasket, the outer end of the push rod is positioned at the upper side of the limit gasket and is fixedly connected with a supporting block, the middle part of the upper end of the supporting block is fixedly connected with a pin, the outer side of the push rod is positioned at the upper side of the supporting block and is slidably connected with a circular ring, the left end and the right end of the circular ring are fixedly connected with a cross rod, one end of the cross rod, which is far away from the circular ring, is fixedly connected with a hollow thorn cone, the upper end of the hollow thorn cone is provided with two liquid passing holes, and the lower end of the push rod is fixedly connected with a pressing block, so that the linkage can extrude liquid glue in a sleeve, and the linkage can be fixed after the liquid glue is solidified.
(3) The liquid glue is deposited at the sleeve middle part, and the liquid outlet middle part covers there is plastic film for the inside liquid glue of sleeve can fix the aggregate unit, and liquid glue can be sealed inside the sleeve.
(4) The inner diameter of the annular bulge is smaller than the diameter of the baffle disc, and the inner material of the baffle disc is made of corrosion-resistant rubber, so that the baffle disc is not easy to deviate from the middle part of the sleeve, and the baffle disc is not easy to damage.
(5) The transfer groove is respectively communicated with the sleeve and the limiting sleeve, and liquid water is stored in the transfer groove, so that the liquid water can move between the sleeve, the limiting sleeve and the transfer groove, and the liquid water can push the baffle plate to move.
(6) The push rod upper end inserts the stop collar inside, and the push rod diameter is the same with the stop collar internal diameter for the push rod can block up the stop collar middle part, avoids liquid water to flow out.
(7) The inside material of spacing packing ring is elastic rubber, and the inside material of riding block is brittle plastic for spacing packing ring can carry out spacingly to the push rod, and the riding block can be destroyed by external force.
(8) The circular ring is limited by the pin, and the hollow thorn cone is positioned under the liquid outlet, so that the circular ring is not easy to deviate, and the hollow thorn cone can puncture the plastic film.
(9) The upper surface of the plastic disc is a smooth plane, and the plastic disc is positioned under the pressing block, so that the plastic disc can be adhered with the pressing block through quick-drying glue.
Drawings
FIG. 1 is an overall perspective view of the present invention;
FIG. 2 is an installation-completed perspective view of the present invention;
FIG. 3 is a perspective view of a body portion of the present invention;
FIG. 4 is a perspective view of a stop and linkage combination of the present invention;
FIG. 5 is a split perspective view of the spacing device and linkage of the present invention;
FIG. 6 is an enlarged view of a portion of the linkage of the present invention;
FIG. 7 is a partial cutaway perspective view of a spacing device of the present invention;
FIG. 8 is a partially cut-away perspective view of the linkage of the present invention;
FIG. 9 is a front view, partially in cross-section, of a combined stop and linkage assembly of the present invention;
FIG. 10 is a front view of the combined part of the spacing device and linkage of the present invention in an operational state;
fig. 11 is a schematic diagram of the operation of the present invention.
The reference numerals in the figures illustrate:
1. an expansion screw; 2. a wire rope; 3. a bracket; 4. a keel frame; 5. a base; 6. a cylindrical hole; 7. a support rod; 8. a sleeve; 9. an annular protrusion; 10. a baffle disc; 11. a liquid outlet; 12. a transfer tank; 13. a limit sleeve; 14. a push rod; 15. a limit gasket; 16. a support block; 17. a pin; 18. a circular ring; 19. a cross bar; 20. a hollow thorn cone; 21. a liquid passing hole; 22. briquetting; 23. a gypsum board; 24. a plastic tray.
Description of the embodiments
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention; it is apparent that the described embodiments are only some embodiments of the present invention, not all embodiments, and that all other embodiments obtained by persons of ordinary skill in the art without making creative efforts based on the embodiments in the present invention are within the protection scope of the present invention.
In the description of the present invention, it should be noted that the positional or positional relationship indicated by the terms such as "upper", "lower", "inner", "outer", "top/bottom", etc. are based on the positional or positional relationship shown in the drawings, are merely for convenience of describing the present invention and simplifying the description, and do not indicate or imply that the apparatus or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "configured to," "engaged with," "connected to," and the like are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communicated with the inside of the element of the adapting model. The specific meaning of the above terms in the present invention will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1-11, a gypsum board ceiling mounting structure comprises a plurality of expansion screws 1, the lower ends of the expansion screws 1 are fixedly connected with steel wire ropes 2, the lower ends of the plurality of steel wire ropes 2 are fixedly connected with a support 3, the lower ends of the support 3 are fixedly connected with a plurality of keel frames 4, the middle part of the support 3 is fixedly connected with a plurality of limiting devices, each limiting device comprises a base 5, a cylindrical hole 6 is formed in the middle of each base 5, a supporting rod 7 is fixedly connected with the upper end of each supporting rod 7, two sleeves 8 are fixedly connected with the upper ends of the corresponding sleeves 8, annular protrusions 9 are formed in the middle of the corresponding sleeves 8, a baffle disc 10 is slidably connected with the middle of each sleeve 8, a liquid outlet 11 is formed in the lower end of each middle of each sleeve 8, a transfer groove 12 is fixedly connected with a limiting sleeve 13, a linkage device is slidably connected in the middle of each cylindrical hole 6, a gypsum board 23 is fixedly connected with the middle of each keel frame 4, and a plastic disc 24 is fixedly connected with the middle of each gypsum board 23.
Referring to fig. 3-7, the linkage device comprises a push rod 14, a limit washer 15 is clamped at the outer end of the push rod 14, a supporting block 16 is fixedly connected at equal angles, the outer end of the push rod 14 is located at the upper side of the limit washer 15, a pin 17 is fixedly connected at the middle part of the upper end of the supporting block 16, a circular ring 18 is slidably connected at the outer side of the push rod 14, transverse rods 19 are fixedly connected at the left end and the right end of the circular ring 18, one end of each transverse rod 19, far away from the circular ring 18, is fixedly connected with a hollow thorn cone 20, two liquid through holes 21 are formed at the upper end of the hollow thorn cone 20, and a pressing block 22 is fixedly connected at the lower end of the push rod 14, so that the linkage device can extrude liquid glue in a sleeve 8, and the linkage device can be fixed after the liquid glue is solidified.
Referring to fig. 2-9, the middle part of the sleeve 8 is stored with liquid glue, and the middle part of the liquid outlet 11 is covered with a plastic film, so that the liquid glue in the sleeve 8 can fix the linkage device, and the liquid glue can be sealed in the sleeve 8. The internal diameter of annular protruding 9 is less than the diameter of fender dish 10, and the inside material of fender dish 10 is corrosion-resistant rubber for fender dish 10 is difficult for deviate from sleeve 8 middle part, and fender dish 10 is not fragile.
Referring to fig. 4-8, the transfer groove 12 is respectively connected with the sleeve 8 and the stop collar 13, and the transfer groove 12 stores liquid water, so that the liquid water can move between the sleeve 8 and the stop collar 13 and the transfer groove 12, and the liquid water can push the baffle disc 10 to move. The upper end of the push rod 14 is inserted into the limit sleeve 13, and the diameter of the push rod 14 is the same as the inner diameter of the limit sleeve 13, so that the push rod 14 can plug the middle part of the limit sleeve 13, and liquid water is prevented from flowing out.
Referring to fig. 5-9, the inner material of the limit washer 15 is elastic rubber, and the inner material of the supporting block 16 is brittle plastic, so that the limit washer 15 can limit the push rod 14, and the supporting block 16 can be damaged by external force. The circular ring 18 is limited by the pin 17, and the hollow thorn cone 20 is positioned right below the liquid outlet 11, so that the circular ring 18 is not easy to deviate, and the hollow thorn cone 20 can puncture the plastic film. The upper surface of the plastic tray 24 is a smooth plane, and the plastic tray 24 is located right below the pressing block 22, so that the plastic tray 24 can be adhered to the pressing block 22 through quick-drying glue.
During installation, firstly, the expansion screw 1 is driven into a ceiling, the steel wire rope 2, the bracket 3 and the keel frame 4 are installed together, quick-drying glue is coated on the upper end of the plastic disc 24 in the middle of the gypsum board 23, the gypsum board 23 is lifted to a designated position, the plastic disc 24 and the pressing block 22 are in contact and bonded together, meanwhile, the push rod 14 is lifted, the push rod 14 drives the supporting block 16 to lift, the supporting block 16 lifts to drive the circular ring 18 to lift, the circular ring 18 drives the cross rod 19 to lift so that the hollow thorn cone 20 moves upwards, the hollow thorn cone 20 breaks through the plastic film, meanwhile, the push rod 14 pushes liquid water in the transfer groove 12 and the limiting sleeve 13 into the sleeve 8, the liquid water pushes the baffle disc 10 downwards so that the liquid glue is discharged from the liquid outlet 11 through the hollow thorn cone 20, the push rod 14 continues to lift, the cross rod 19 is limited by the sleeve 8, and the circular ring 18 is crushed and broken by the cross rod 19. The gypsum board 23 is fixed at the lower end of the keel frame 4 by nails, and then subsequent joint filling or plastering operation is carried out, at the moment, the push rod 14 can move up and down slightly along with the gypsum board 23 before the liquid glue is solidified, and after the gypsum board 23 is installed, the push rod 14 and the base 5 are fixedly connected together by the solidification of the liquid glue, so that the middle part of the gypsum board 23 can be flexibly fixed through a linkage device. The liquid glue flows out through the hollow thorn cone 20 and the pressing block 22 is adhered to the plastic disc 24, so that the middle of the gypsum board 23 is reinforced by solidification of the liquid glue after the gypsum board 23 is installed, and the situation that cracking or breaking occurs in the later stage of the gypsum board 23 is reduced.
The above description is only of the preferred embodiments of the present invention; the scope of the invention is not limited in this respect. Any person skilled in the art, within the technical scope of the present disclosure, may apply to the present invention, and the technical solution and the improvement thereof are all covered by the protection scope of the present invention.
Claims (5)
1. The utility model provides a gypsum board furred ceiling mounting structure, includes a plurality of expansion screw (1), expansion screw (1) lower extreme fixedly connected with wire rope (2), a plurality of wire rope (2) lower extreme fixedly connected with support (3), a plurality of fossil fragments frame (4) of support (3) lower extreme fixedly connected with, its characterized in that: the utility model provides a plurality of stop device of support (3) middle part fixedly connected with, stop device includes base (5), cylindricality hole (6) have been seted up at base (5) middle part, base (5) upper end fixedly connected with bracing piece (7), two sleeve (8) of bracing piece (7) upper end fixedly connected with, annular arch (9) have been seted up to sleeve (8) middle part upper end, sleeve (8) middle part sliding connection has baffle (10), liquid outlet (11) have been seted up to sleeve (8) middle part lower extreme, two sleeve (8) upper end fixedly connected with transfer groove (12), transfer groove (12) middle part lower extreme fixedly connected with stop sleeve (13), cylindricality hole (6) middle part sliding connection has aggregate unit, fossil fragments frame (4) lower extreme middle part fixedly connected with gypsum board (23), gypsum board (23) middle part fixedly connected with plastic tray (24), aggregate unit includes push rod (14), push rod (14) outer end joint has spacing washer (15), push rod (14) outer end joint, push rod (14) are located equiangular block (16) upper end fixedly connected with pin (16), the outer side of the push rod (14) is positioned at the upper side of the supporting block (16) and is slidably connected with a circular ring (18), the left end and the right end of the circular ring (18) are fixedly connected with cross rods (19), one end of each cross rod (19) far away from the circular ring (18) is fixedly connected with a hollow thorn cone (20), the upper end of each hollow thorn cone (20) is provided with two liquid passing holes (21), the lower end of the push rod (14) is fixedly connected with a pressing block (22), the liquid glue is stored in the middle of the sleeve (8), a plastic film is covered in the middle of the liquid outlet (11), the transfer groove (12) is respectively communicated with the sleeve (8) and the limiting sleeve (13), liquid water is stored in the transfer groove (12), the circular ring (18) is limited by the pin (17), and the hollow thorn cone (20) is located under the liquid outlet (11).
2. The gypsum board ceiling mounting structure of claim 1, wherein: the inner diameter of the annular bulge (9) is smaller than the diameter of the baffle disc (10), and the inside material of the baffle disc (10) is corrosion-resistant rubber.
3. The gypsum board ceiling mounting structure of claim 1, wherein: the upper end of the push rod (14) is inserted into the limit sleeve (13), and the diameter of the push rod (14) is the same as the inner diameter of the limit sleeve (13).
4. The gypsum board ceiling mounting structure of claim 1, wherein: the inner material of the limit gasket (15) is elastic rubber, and the inner material of the supporting block (16) is brittle plastic.
5. The gypsum board ceiling mounting structure of claim 1, wherein: the upper surface of the plastic disc (24) is a smooth plane, and the plastic disc (24) is positioned right below the pressing block (22).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310181354.XA CN115853189B (en) | 2023-03-01 | 2023-03-01 | Gypsum board furred ceiling mounting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310181354.XA CN115853189B (en) | 2023-03-01 | 2023-03-01 | Gypsum board furred ceiling mounting structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN115853189A CN115853189A (en) | 2023-03-28 |
CN115853189B true CN115853189B (en) | 2023-08-29 |
Family
ID=85659438
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310181354.XA Active CN115853189B (en) | 2023-03-01 | 2023-03-01 | Gypsum board furred ceiling mounting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115853189B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117457564B (en) * | 2023-09-19 | 2024-05-31 | 弘润半导体(苏州)有限公司 | Chip installation auxiliary fixtures |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201849815U (en) * | 2010-10-28 | 2011-06-01 | 王芮 | Dual-purpose glue |
CN110103564A (en) * | 2019-05-27 | 2019-08-09 | 业成科技(成都)有限公司 | Joint tool and the applying method for applying it |
CN213038662U (en) * | 2020-08-04 | 2021-04-23 | 长安大学 | Building ceiling material with auxiliary fixing function |
CN214531451U (en) * | 2021-03-17 | 2021-10-29 | 重庆钜泰建筑装饰工程有限公司 | Gypsum board suspended ceiling with anti-cracking structure |
CN115354790A (en) * | 2022-10-19 | 2022-11-18 | 南京轩美装饰品有限公司 | Suspended ceiling structure of architectural decoration gypsum board and construction method |
CN218508684U (en) * | 2022-09-30 | 2023-02-21 | 浙江梵石装修工程有限公司 | Indoor gypsum ceiling structure |
-
2023
- 2023-03-01 CN CN202310181354.XA patent/CN115853189B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201849815U (en) * | 2010-10-28 | 2011-06-01 | 王芮 | Dual-purpose glue |
CN110103564A (en) * | 2019-05-27 | 2019-08-09 | 业成科技(成都)有限公司 | Joint tool and the applying method for applying it |
CN213038662U (en) * | 2020-08-04 | 2021-04-23 | 长安大学 | Building ceiling material with auxiliary fixing function |
CN214531451U (en) * | 2021-03-17 | 2021-10-29 | 重庆钜泰建筑装饰工程有限公司 | Gypsum board suspended ceiling with anti-cracking structure |
CN218508684U (en) * | 2022-09-30 | 2023-02-21 | 浙江梵石装修工程有限公司 | Indoor gypsum ceiling structure |
CN115354790A (en) * | 2022-10-19 | 2022-11-18 | 南京轩美装饰品有限公司 | Suspended ceiling structure of architectural decoration gypsum board and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN115853189A (en) | 2023-03-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN115853189B (en) | Gypsum board furred ceiling mounting structure | |
CN107227829B (en) | A kind of quick levelling hanging structure of metope | |
CN215410535U (en) | Fire fighting pipeline fixing frame for fire fighting engineering | |
CN216473199U (en) | A bioreactor for exosome separation and collection | |
CN216521020U (en) | Lighting equipment for hydraulic engineering construction convenient to installation | |
CN113578185A (en) | Discharging device for manufacturing LNG cargo tank insulation box | |
CN219671590U (en) | Anti-fouling water overflow type intercepting well | |
CN218004329U (en) | Dismounting device for mounting LED display screen | |
CN211733823U (en) | Mineral water is liquid filling machine for production | |
CN111042343B (en) | A pre-buried device for creeping formwork hangs | |
CN213967442U (en) | Gluing device for packaging communication system subelements | |
CN217205379U (en) | Concrete host computer discharge hopper | |
CN217268806U (en) | Climbing frame structure with cantilever plate | |
CN221373665U (en) | But quick installation's concatenation wallboard for tunnel | |
CN220727838U (en) | Monitoring installation assembly suitable for passenger elevator | |
CN219119983U (en) | Construction support is built in room | |
CN216743740U (en) | High-definition electronic police monitoring rod | |
CN115162736A (en) | Leveling system for coating of external wall heat insulation construction | |
CN213330011U (en) | Aluminum alloy template bottom reinforced structure | |
CN221492919U (en) | Glue spraying device for rain shoes production | |
CN212949272U (en) | Assembly fixture for connecting vacuum tube and metal joint | |
CN214915548U (en) | Device for manufacturing vacuum environment of emulsifying pot | |
CN221252295U (en) | Storage device for calcium chloride dihydrate | |
CN218643548U (en) | Assembly type structure component connection structure | |
CN219281130U (en) | Energy-saving environment-friendly sound-insulation light wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20230807 Address after: Machangping Office, Fuquan City, Qiannan Buyi and Miao Autonomous Prefecture, Guizhou Province, 550100 Applicant after: Guizhou Taifu gypsum Co.,Ltd. Address before: Room 1101, No. 18, Zhongshan East Road, Qinhuai District, Nanjing, Jiangsu 210000 Applicant before: Nanjing Xuanmei Decoration Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |